HomeMy WebLinkAboutPA2023-0076_20230726_PRR_WQMPTmplt: 06/07/19
P ROJECT R EVIEW R EQUEST C OMMUNITY D EVELOPMENT D EPARTMENT Planning Division Please Distribute to: Geotechnical – Gutierrez
Date: April 17, 2023
Please return PRR and Plans to Staff Planner
David Lee, Senior Planner 949-644-3225, dlee@newportbeachca.gov Applicant: Orange County Sanitation District Contact: Harmik Aghanian harmik.aghanian@arcadis.com 818-653-9028
Project Name OC Sanitation District Pump Station Replacement
Address: 250 East Coast Highway
(PA2023-0076) Site Development Review, Coastal Development Permit, Limited Term Permit (TBD)
A request for the reconstruction of an existing OC Sanitation pump station located near the bay bridge
(Bay Bridge Pump Station), which includes the construction of a new pump station and force mains. The new pump station includes structures below grade, above grade electrical building, generator room, and a structure for odor control. Please see detailed plans and project description (included in the “Files”
section in Energov).
REPORT REQUESTED BY: April 28, 2023
PLANNING COMMISSION HEARING DATE: TBD Check all that apply:
No comments on the project as presented.
Notes:
Please provide Preliminary Conceptual WQMP Report. Stormwater
is to be treated prior to entering City’s Stormdrain System.
Sergio Gutierrez 1332 7/26/2023
Signature Ext. Date
Application of Standard Code
requirements are not expected to alter the project design. X Recommended conditions of
approval are attached.
Application of Standard Code requirements or the attached conditions of approval will substantially impact or alter
the design of the project.
I contacted the applicant on
To schedule an appt. for Code review
To discuss the following (see notes)