Loading...
HomeMy WebLinkAboutPA2023-0079_20230517_PRR_BldgTmplt: 06/07/19 P ROJECT R EVIEW R EQUES T C O M M U N I T Y D E V E L O P M E N T D E P AR T M E N T Planning Division Please Distribute to: Building – Aquino Public Works – Keely Fire – Gillespie Date: May 4, 2023 Please return PRR and Plans to Staff Planner Oscar Orozco, Assistant Planner (x3219) Applicant: Ali Samsami Contact: 949-851-8345 ali@cjlight.net Project Name Griley Residence Address: 2596 Crestview Drive & 2592 Arbor Drive (PA2023-0079) Coastal Development Permit and Lot Line Adjustment A coastal development permit and lot line adjustment request to demolish two existing single unit dwelling located at the above referenced addresses. A 4,865 square foot single unit dwelling is proposed at 2596 Crestview Drive and a 1,002 square foot single unit residence is proposed at 2592 Arbor Drive. The lot line adjustment request is a proposal to shift the property line over a few feet (refer to lot ling adjustment exhibit for further details) to increase the total lot size of lot 58 and accommodate the proposed single unit dwelling. REPORT REQUESTED BY: May 23, 2022 ZONING ADMINISTRATOR HEARING DATE: TBD Check all that apply: ❑ No comments on the project as presented. Notes: 1. Provide fire sprinkler to maintain non-rated exterior wall and exterior wall openings. Table R302.1 CRC 2022. 2. WQMP is required when impervious area is more than 5000 sq. ft. 3. Design foundation for liquefaction mitigation. 4. Cross lot drainage is not allowed. Provide drainage easement. Show adjacent units on the plans. 5. Provide ingress and egress easement 6. All construction shall be inside property line, construction including utilities cannot cross property line. Provide site improvement at the property line easement. Signature Ext. Date ❑ Application of Standard Code requirements are not expected to alter the project design. ❑ Recommended conditions of approval are attached. ❑ Application of Standard Code requirements or the attached conditions of approval will substantially impact or alter the design of the project. ❑ I contacted the applicant on ❑ To schedule an appt. for Code review ❑ To discuss the following (see notes) 05/17/23