HomeMy WebLinkAbout14 - Award of On-Call Harbor M/RSA'sQ �EwPpRT
CITY OF
s NEWPORT BEACH
`q44:09 City Council Staff Report
August 22, 2023
Agenda Item No. 14
TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
FROM: Paul Blank, City Harbormaster - 949-270-8159,
pblank@newportbeachca.gov
PREPARED BY: Melanie Franceschini, Management Analyst
mfranceschini@newportbeachca.gov
PHONE: 949-644-3028
TITLE: Award of On -Call Harbor Maintenance/Repair Service Agreements
with South Waterfront Construction Corporation and Tidal Marine
Construction, Inc.
In order to maintain the safety and integrity of Newport Harbor and various public harbor
facilities, the Harbor Department seeks approval to enter into on -call maintenance and
repair services agreements for biennial inspection and testing, annual
repositioning/realigning, occasional installation and removal, and as -needed painting of
City of Newport Beach (City) moorings, buoys, markers, lines and floats. Staff recently
issued a Request for Proposals (RFP) for the maintenance/repair service of harbor
moorings and buoys, and is requesting the City Council's approval to enter into on -call
Maintenance/Repair Services Agreements with South Waterfront Construction
Corporation and Tidal Marine Construction, Inc.
RECOMMENDATIONS:
a) Determine this action is exempt from the California Environmental Quality Act (CEQA)
pursuant to Sections 15060(c)(2) and 15060(c)(3) of the CEQA Guidelines because
this action will not result in a physical change to the environment, directly or indirectly;
and
b) Approve two separate On -Call Maintenance/Repair Services Agreements: one with
South Waterfront Construction Corporation at a not -to -exceed amount of $400,000
and one with Tidal Marine Construction, Inc. at a not -to -exceed amount of $300,000,
both over the span of five years, and authorize the Mayor and City Clerk to execute
the agreements.
DISCUSSION:
The Harbor Department is responsible for the maintenance and repair of various floating
elements within the harbor, including moorings, buoys, markers, lines and floats. The City
does not have the capability to perform the maintenance and repair of these various
floating elements and has therefore contracted out the service to various private -sector
companies.
14-1
Award of On -Call Harbor Maintenance/Repair Service Agreements with South
Waterfront Construction Corporation and Tidal Marine Construction, Inc.
August 22, 2023
Page 2
These services are best provided to the City through on -call agreements with firms that
specialize in and are equipped to perform this type of maintenance and repair work.
RFP No. 23-61 was published on April 4, 2023, and closed on April 25, 2023. Given the
limited response to the RFP and the desire of the Harbor Department to have multiple
firms under contract for this type of work, RFP No. 23-61 REBID was published on
May 22, 2023 and closed on June 5, 2023. Three proposals were received and evaluated
by a panel of three City staff members using a qualifications -based selection process.
Each proposal was scored based on the following criteria:
• The contractor's qualifications, experience, subject matter expertise and ability to
provide the requested maintenance and repair services, particularly for
government agencies and/or maritime clients; and
• Proposed project costs.
Evaluation Scores:
Global Diving &
South Waterfront
Tidal Marine
Salvage, Inc.
Construction
Construction, Inc.
Corporation
Technical Score
48.00
49.00
50.00
(Out of 60)
Cost Ratio Score
14.17
40.00
26.15
(Out of 40)
Aggregate Score
62.17
89.00
76.15
(Out of 100)
Overall Rank
3
1
2
South Waterfront Construction Corporation, a division of Newport Dredging Co. Inc.,
submitted a proposal that met all of the City's desired qualifications, while demonstrating
the understanding and ability to provide all maintenance and repair services as requested
by the Harbor Department, without subcontracting. The experienced, local firm has the
ability to provide services quickly at a cost-effective rate. Therefore, the Harbor
Department requests the City Council's approval to enter into an On -Call
Maintenance/Repair Services Agreement with South Waterfront Construction
Corporation for Harbor Maintenance and Repair at a not -to -exceed amount of $400,000,
inclusive of an initial three-year term, with the option of two optional one-year terms.
Tidal Marine Construction, Inc. also met the City's desired qualifications and can provide
all the services requested by the Harbor Department, without subcontracting. Although
the firm in located in Northern California, Tidal Marine Construction, Inc. has over a
decade of experience providing similar services to various cities and states.
14-2
Award of On -Call Harbor Maintenance/Repair Service Agreements with South
Waterfront Construction Corporation and Tidal Marine Construction, Inc.
August 22, 2023
Page 3
Therefore, the Harbor Department also requests the City Council's approval to enter into
an On -Call Maintenance/Repair Services Agreement with Tidal Marine Construction, Inc.
for Harbor Maintenance and Repair at a not -to -exceed amount of $300,000, inclusive of
an initial three-year term, with the option of two optional one-year terms.
Both of the recommended firms have worked with the Harbor Department previously and
are experienced in providing maintenance/repair service of moorings, buoys, markers,
lines and floats in Newport Harbor.
FISCAL IMPACT:
The adopted budget includes sufficient funding for this purchase. It will be expensed to
the Maintenance and Repair account in the Harbor Department, 10045451-851037.
ENVIRONMENTAL REVIEW:
Staff recommends the City Council find this action is not subject to the California
Environmental Quality Act (CEQA) pursuant to Sections 15060(c)(2) (the activity will not
result in a direct or reasonably foreseeable indirect physical change in the environment)
and 15060(c)(3) (the activity is not a project as defined in Section 15378) of the CEQA
Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no
potential for resulting in physical change to the environment, directly or indirectly.
NOTICING:
The agenda item has been noticed according to the Brown Act (72 hours in advance of
the meeting at which the City Council considers the item).
ATTACHMENTS:
Attachment A — Maintenance/Repair Services Agreement with South Waterfront
Construction Corporation
Attachment B — Maintenance/Repair Services Agreement with Tidal Marine
Construction, Inc.
14-3
ATTACHMENT A
ON -CALL MAINTENANCE/REPAIR SERVICES AGREEMENT
WITH SOUTH WATERFRONT CONSTRUCTION CORPORATION FOR
HARBOR MOORING AND BUOY MAINTENANCE & REPAIR SERVICES
THIS ON -CALL MAINTENANCE/REPAIR SERVICES AGREEMENT
("Agreement") is made and entered into as of this 22nd day of August, 2023 ("Effective
Date"), by and between the CITY OF NEWPORT BEACH, a California municipal
corporation and charter city ("City"), and SOUTH WATERFRONT CONSTRUCTION
CORPORATION, a California corporation ("Contractor'), whose address is 1730 Pomona
Ave, Suite 11, Costa Mesa, CA 92627, and is made with reference to the following:
RECITALS
A. City is a municipal corporation duly organized and validly existing under the laws
of the State of California with the power to cant' on its business as it is now being
conducted under the statutes of the State of California and the Charter of City.
B. City desires to engage Contractor to perform on -call maintenance and/or repair
services for City related to moorings and buoys located throughout Newport Harbor
to support the City's Harbor Department in the upkeep and repair of moorings and
buoys ("Project").
C. Contractor possesses the skill, experience, ability, background, certification and
knowledge to provide the maintenance and/or repair services described in this
Agreement.
D. Contractor has examined the location of all proposed work, carefully reviewed and
evaluated the specifications set forth by City for the Project, is familiar with all
conditions relevant to the performance of services, and has committed to perform
all work required for the compensation specified in this Agreement.
NOW, THEREFORE, it is mutually agreed by and between the undersigned parties
as follows:
1.1 Initial Term. The initial term of this Agreement shall commence on the
Effective Date, and shall terminate on August 21, 2026, unless terminated earlier as set
forth herein ("Initial Term").
1.2 Option Term. Provided Contractor is not in default of its obligations under
this Agreement, upon Contractor's written request and with written approval by the City,
prior to the expiration of the term of this Agreement, the term of this Agreement may be
extended for an additional one (1) year term, not to exceed a maximum of two (2)
additional one (1) year terms (each an "Option Term," or collectively, "Option Terms"), on
the same terms and conditions contained in this Agreement. Contractor shall give the
City written notice of its request to exercise an Option Term at least ninety (90) days prior
to the expiration of the existing Initial Term or Option Term.
14-4
2. SERVICES TO BE PERFORMED
2.1 Contractor shall perform the on -call services described in the Scope of
Services attached hereto as Exhibit A and incorporated herein by reference ("Services"
or "Work"). Upon written request from the Project Administrator as defined herein,
Contractor shall provide a letter proposal for Services requested by the City (hereinafter
referred to as the "Letter Proposal"). The Letter Proposal shall include the following:
2.1.1 A detailed description of the Services to be provided;
2.1.2 The position of each person to be assigned to perform the Services,
and the name of the individuals to be assigned, if available;
and
2.1.3 The estimated number of hours and cost to complete the Services;
2.1.4 The time needed to finish the specific project.
2.2 No Services shall be provided until the Project Administrator has provided
written acceptance of the Letter Proposal. Once authorized to proceed, Contractor shall
diligently perform the duties in the approved Letter Proposal.
3. TIME OF PERFORMANCE
3.1 Time is of the essence in the performance of Services under this Agreement
and Contractor shall perform the Services in accordance with the schedule included in
Exhibit A and the Letter Proposal. In the absence of a specific schedule, the Services
shall be performed to completion in a diligent and timely manner. The failure by
Contractor to strictly adhere to the schedule set forth in Exhibit A and the Letter Proposal,
if any, or perform the Services in a diligent and timely manner may result in termination
of this Agreement by City.
3.2 Notwithstanding the foregoing, Contractor shall not be responsible for
delays due to causes beyond Contractor's reasonable control. However, in the case of
any such delay in the Services to be provided for the Project, each party hereby agrees
to provide notice within two (2) calendar days of the occurrence causing the delay to the
other party so that all delays can be addressed.
3.3 Contractor shall submit all requests for extensions of time for performance
in writing to the Project Administrator as defined herein, not later than two (2) calendar
days after the start of the condition that purportedly causes a delay. The Project
Administrator shall review all such requests and may grant reasonable time extensions
for unforeseeable delays that are beyond Contractor's control.
3.4 For all time periods not specifically set forth herein, Contractor shall respond
in the most expedient and appropriate manner under the circumstances, by fax, hand -
delivery or mail.
South Waterfront Construction Corporation Page 2 14-5
4. COMPENSATION TO CONTRACTOR
4.1 City shall pay Contractor for the Services on a time and expense not -to -
exceed basis in accordance with the provisions of this Section and the Letter Proposal
and the Schedule of Billing Rates attached hereto as Exhibit B and incorporated herein
by reference. Except as otherwise provided herein, no rate changes shall be made during
the term of this Agreement without the prior written approval of City. Contractor's
compensation for all Services performed in accordance with this Agreement, including all
reimbursable items, shall not exceed Two Hundred and Forty Thousand Dollars and
00/100 ($240,000.00) for the Initial Term, and Eighty Thousand Dollars ($80,000.00)
for each Option Term, for a grand total not to exceed Four Hundred Thousand
Dollars and 00/100 ($400,000.00), without prior written amendment to the Agreement.
4.2 Contractor shall submit monthly invoices to City describing the Work
performed the preceding month. Contractor's bills shall include the name and/or
classification of employee who performed the Work, a brief description of the Services
performed and/or the specific task in the Scope of Services to which it relates, the date
the Services were performed, the number of hours spent on all Work billed on an hourly
basis, and a description of any reimbursable expenditures. City shall pay Contractor no
later than thirty (30) calendar days after approval of the monthly invoice by City staff.
4.3 City shall reimburse Contractor only for those costs or expenses specifically
identified in Exhibit B to this Agreement and the Letter Proposal, or specifically approved
in writing in advance by City.
4.4 Contractor shall not receive any compensation for Extra Work performed
without the prior written authorization of City. As used herein, "Extra Work" means any
Work that is determined by City to be necessary for the proper completion of the Project,
but which is not included within the Scope of Services and which the parties did not
reasonably anticipate would be necessary at the execution of this Agreement.
Compensation for any authorized Extra Work shall be paid in accordance with Exhibit B
and the Letter Proposal.
5. PROJECT MANAGER
5.1 Contractor shall designate a Project Manager, who shall coordinate all
phases of the Project. This Project Manager shall be available to City at all reasonable
times during the Agreement term. Contractor has designated Charles South to be its
Project Manager. Contractor shall not remove or reassign the Project Manager or any
personnel listed in Exhibit A or assign any new or replacement personnel to the Project
without the prior written consent of City. City's approval shall not be unreasonably
withheld with respect to the removal or assignment of non -key personnel.
5.2 Contractor, at the sole discretion of City, shall remove from the Project any
of its personnel assigned to the performance of Services upon written request of City.
Contractor warrants that it will continuously furnish the necessary personnel to complete
the Project on a timely basis as contemplated by this Agreement.
South Waterfront Construction Corporation Page 3 14-6
6. ADMINISTRATION
This Agreement will be administered by the Harbor Department. City's
Harbormaster or designee shall be the Project Administrator and shall have the authority
to act for City under this Agreement. The Project Administrator shall represent City in all
matters pertaining to the Services to be rendered pursuant to this Agreement.
7. CITY'S RESPONSIBILITIES
To assist Contractor in the execution of its responsibilities under this Agreement,
City agrees to provide access to and upon request of Contractor, one copy of all existing
relevant information on file at City. City will provide all such materials in a timely manner
so as not to cause delays in Contractor's Work schedule.
8. TYPE AND INSTALLATION OF MATERIALS/STANDARD OF CARE
8.1 Contractor shall use only the standard materials described in Exhibit A in
performing Services under this Agreement. Any deviation from the materials described
in Exhibit A shall not be installed or utilized unless approved in advance and in writing by
the Project Administrator.
8.2 All of the Services shall be performed by Contractor or under Contractor's
supervision. Contractor represents that it possesses the personnel required to perform
the Services required by this Agreement, and that it will perform all Services in a manner
commensurate with community professional standards and with the ordinary degree of
skill and care that would be used by other reasonably competent practitioners of the same
discipline under similar circumstances. All Services shall be performed by qualified and
experienced personnel who are not employed by City. By delivery of completed Work,
Contractor certifies that the Work conforms to the requirements of this Agreement, all
applicable federal, state and local laws and legally recognized professional standards.
8.3 Contractor represents and warrants to City that it has, shall obtain and shall
keep in full force and effect during the term hereof, at its sole cost and expense, all
licenses, permits, qualifications, insurance and approvals of whatsoever nature that is
legally required of Contractor to practice its profession. Contractor shall maintain a City
of Newport Beach business license during the term of this Agreement.
8.4 Contractor shall not be responsible for delay, nor shall Contractor be
responsible for damages or be in default or deemed to be in default by reason of strikes,
lockouts, accidents, acts of God, or the failure of City to furnish timely information or to
approve or disapprove Contractor's Work promptly, or delay orfaulty performance by City,
contractors, or governmental agencies.
9. RESPONSIBILITY FOR DAMAGES OR INJURY
9.1 City and all officers, employees and representatives thereof and all persons
and entities owning or otherwise in legal control of the property upon which Contractor
performs the Project and/or Services shall not be responsible in any manner for any loss
South Waterfront Construction Corporation Page 4 14-7
or damage to any of the materials or other things used or employed in performing the
Project or for injury to or death of any person as a result of Contractor's performance of
the Services required hereunder; or for damage to property from any cause arising from
the performance of the Project and/or Services by Contractor, or its subcontractors, or its
workers, or anyone employed by either of them.
9.2 Contractor shall be responsible for any liability imposed by law and for
injuries to or death of any person or damage to property resulting from defects,
obstructions or from any cause arising from Contractor's Work on the Project and/or
Services, or the Work of any subcontractor or supplier selected by Contractor.
9.3 To the fullest extent permitted by law, Contractor shall indemnify, defend
and hold harmless City, its City Council, boards and commissions, officers, agents,
volunteers, employees, and any person or entity owning or otherwise in legal control of
the property upon which Contractor performs the Project and/or Services contemplated
by this Agreement (collectively, the "indemnified Parties") from and against any and all
claims (including, without limitation, claims for bodily injury, death or damage to property),
demands, obligations, damages, actions, causes of action, suits, losses, judgments,
fines, penalties, liabilities, costs and expenses (including, without limitation, attorneys'
fees, disbursements and court costs) of every kind and nature whatsoever (individually,
a Claim; collectively, "Claims"), which may arise from or in any manner relate (directly or
indirectly) to any breach of the terms and conditions of this Agreement, any Work
performed or Services provided under this Agreement including, without limitation,
defects in workmanship or materials or Contractor's presence or activities conducted on
the Project (including the negligent and/or willful acts, errors and/or omissions of
Contractor, its principals, officers, agents, employees, vendors, suppliers, consultants,
subcontractors, anyone employed directly or indirectly by any of them or for whose acts
they may be liable or any or all of them).
9.4 Notwithstanding the foregoing, nothing herein shall be construed to require
Contractor to indemnify the Indemnified Parties from any Claim arising from the sole
negligence or willful misconduct of the Indemnified Parties. Nothing in this indemnity shall
be construed as authorizing any award of attorneys' fees in any action on or to enforce
the terms of this Agreement. This indemnity shall apply to all claims and liability
regardless of whether any insurance policies are applicable. The policy limits do not act
as a limitation upon the amount of indemnification to be provided by Contractor.
9.5 Contractor shall perform all Work in a manner to minimize public
inconvenience and possible hazard, to restore other work areas to their original condition
and former usefulness as soon as possible, and to protect public and private property.
Contractor shall be liable for any private or public property damaged during the
performance of the Work by Contractor or its agents.
9.6 To the extent authorized by law, as much of the money due Contractor
under and by virtue of the Agreement as shall be considered necessary by City may be
retained by it until disposition has been made of such suits or claims for damages as
aforesaid.
South Waterfront Construction Corporation Page 5 14-8
9.7 The rights and obligations set forth in this Section shall survive the
termination of this Agreement.
10. INDEPENDENT CONTRACTOR
It is understood that City retains Contractor on an independent contractor basis
and Contractor is not an agent or employee of City. The manner and means of conducting
the Work are under the control of Contractor, except to the extent they are limited by
statute, rule or regulation and the expressed terms of this Agreement. No civil service
status or other right of employment shall accrue to Contractor or its employees. Nothing
in this Agreement shall be deemed to constitute approval for Contractor or any of
Contractor's employees or agents, to be the agents or employees of City. Contractor
shall have the responsibility for and control over the means of performing the Work,
provided that Contractor is in compliance with the terms of this Agreement. Anything in
this Agreement that may appear to give City the right to direct Contractor as to the details
of the performance of the Work or to exercise a measure of control over Contractor shall
mean only that Contractor shall follow the desires of City with respect to the results of the
Services.
11. COOPERATION
Contractor agrees to work closely and cooperate fully with City's designated
Project Administrator and any other agencies that may have jurisdiction or interest in the
Work to be performed. City agrees to cooperate with Contractor on the Project.
12. CITY POLICY
Contractor shall discuss and review all matters relating to policy and Project
direction with City's Project Administrator in advance of all critical decision points in order
to ensure the Project proceeds in a manner consistent with City goals and policies.
13. PROGRESS
Contractor is responsible for keeping the Project Administrator informed on a
regular basis regarding the status and progress of the Project, activities performed and
planned, and any meetings that have been scheduled or are desired.
14. INSURANCE
Without limiting Contractor's indemnification of City, and prior to commencement
of Work, Contractor shall obtain, provide and maintain at its own expense during the term
of this Agreement or for other periods as specified in this Agreement, policies of insurance
of the type, amounts, terms and conditions described in the Insurance Requirements
attached hereto as Exhibit C, and incorporated herein by reference.
South Waterfront Construction Corporation Page 6 14-9
15. BONDING
15.1 For any Letter Proposal accepted by City of over Twenty Five Thousand
Dollars and 00/100 ($25,000.00), Contractor shall obtain, provide and maintain at its own
expense during the term of this Agreement: (1) a Labor and Materials Payment Bond in
the amount of one hundred percent (100%) of the total amount to be paid Contractor as
set forth in any Letter Proposal accepted by City of over Twenty Five Thousand Dollars
and 00/100 ($25,000.00), and in the form attached hereto as Exhibit D which is
incorporated herein by this reference; and (2) a Faithful Performance Bond in the amount
of one hundred percent (100%) of the total amount to be paid Contractor as set forth in
any Letter Proposal accepted by City of over Twenty Five Thousand Dollars and 00/100
($25,000.00), and in the form attached hereto as Exhibit E which is incorporated herein
by this reference.
15.2 The Labor and Materials Payment Bond and Faithful Performance Bond
shall be issued by an insurance organization or surety (1) currently authorized by the
Insurance Commissioner to transact business of insurance in the State of California, (2)
listed as an acceptable surety in the latest revision of the Federal Register Circular 570,
and (3) assigned a Policyholders' Rating A (or higher) and Financial Size Category Class
VII (or larger) in accordance with the latest edition of Best's Key Rating Guide: Property -
Casualty.
15.3 Contractor shall deliver, concurrently with City's approval of any Letter
Proposal over Twenty Five Thousand Dollars and 00/100 ($25,000.00), the Labor and
Materials Payment Bond and Faithful Performance Bond, a certified copy of the
"Certificate of Authority" of the Insurer or Surety issued by the Insurance Commissioner,
which authorizes the Insurer or Surety to transact surety insurance in the State of
California.
16. PREVAILING WAGES
16.1 Pursuant to the applicable provisions of the Labor Code of the State of
California, not less than the general prevailing rate of per diem wages including legal
holidays and overtime Work for each craft or type of workman needed to execute the
Work contemplated under the Agreement shall be paid to all workmen employed on the
Work to be done according to the Agreement by the Contractor and any subcontractor. In
accordance with the California Labor Code (Sections 1770 et seq.), the Director of
Industrial Relations has ascertained the general prevailing rate of per diem wages in the
locality in which the Work is to be performed for each craft, classification, or type of
workman or mechanic needed to execute the Agreement. A copy of said determination
is available by calling the prevailing wage hotline number (415) 703-4774, and requesting
one from the Department of Industrial Relations. The Contractor is required to obtain the
wage determinations from the Department of Industrial Relations and post at the job site
the prevailing rate or per diem wages. It shall be the obligation of the Contractor or any
subcontractor under him/her to comply with all State of California labor laws, rules and
regulations and the parties agree that the City shall not be liable for any violation thereof.
South Waterfront Construction Corporation Page 7 14-10
16.2 Unless otherwise exempt by law, Contractor warrants that no contractor or
subcontractor was listed on the bid proposal for the Services that it is not currently
registered and qualified to perform public work. Contractor further warrants that it is
currently registered and qualified to perform "public work" pursuant to California Labor
Code section 1725.5 or any successor statute thereto and that no contractor or
subcontractor will engage in the performance of the Services unless currently registered
and qualified to perform public work.
17. PROHIBITION AGAINST ASSIGNMENTS AND TRANSFERS
Except as specifically authorized under this Agreement, the Services to be
provided under this Agreement shall not be assigned, transferred contracted or
subcontracted out without the prior written approval of City. Any of the following shall be
construed as an assignment: The sale, assignment, transfer or other disposition of any
of the issued and outstanding capital stock of Contractor, or of the interest of any general
partner or joint venturer or syndicate member or cotenant if Contractor is a partnership or
joint -venture or syndicate or cotenancy, which shall result in changing the control of
Contractor. Control means fifty percent (50%) or more of the voting power or twenty-five
percent (25%) or more of the assets of the corporation, partnership or joint -venture.
18. SUBCONTRACTING
The subcontractors authorized by City, if any, to perform Work on this Project are
identified in Exhibit A and the Letter Proposal. Contractor shall be fully responsible to
City for all acts and omissions of any subcontractor. Nothing in this Agreement shall
create any contractual relationship between City and any subcontractor nor shall it create
any obligation on the part of City to pay or to see to the payment of any monies due to
any such subcontractor other than as otherwise required by law. City is an intended
beneficiary of any Work performed by the subcontractor for purposes of establishing a
duty of care between the subcontractor and City. Except as specifically authorized herein,
the Services to be provided under this Agreement shall not be otherwise assigned,
transferred, contracted or subcontracted out without the prior written approval of City.
19. OWNERSHIP OF DOCUMENTS
Each and every report, draft, map, record, plan, document and other writing
produced (hereinafter "Documents"), prepared or caused to be prepared by Contractor,
its officers, employees, agents and subcontractors, in the course of implementing this
Agreement, shall become the exclusive property of City, and City shall have the sole right
to use such materials in its discretion without further compensation to Contractor or any
other party. Contractor shall, at Contractor's expense, provide such Documents to City
upon prior written request.
20. CONFIDENTIALITY
All Documents, including drafts, preliminary drawings or plans, notes and
communications that result from the Services in this Agreement, shall be kept confidential
unless City expressly authorizes in writing the release of information.
South Waterfront Construction Corporation Page 8 14-11
21. RECORDS
Contractor shall keep records and invoices in connection with the Services to be
performed under this Agreement. Contractor shall maintain complete and accurate
records with respect to the costs incurred under this Agreement and any Services,
expenditures and disbursements charged to City, for a minimum period of three (3) years,
or for any longer period required by law, from the date of final payment to Contractor
under this Agreement. All such records and invoices shall be clearly identifiable.
Contractor shall allow a representative of City to examine, audit and make transcripts or
copies of such records and invoices during regular business hours. Contractor shall allow
inspection of all Work, data, Documents, proceedings and activities related to the
Agreement for a period of three (3) years from the date of final payment to Contractor
under this Agreement.
22. WITHHOLDINGS
City may withhold payment to Contractor of any disputed sums until satisfaction of
the dispute with respect to such payment. Such withholding shall not be deemed to
constitute a failure to pay according to the terms of this Agreement. Contractor shall not
discontinue Work as a result of such withholding. Contractor shall have an immediate
right to appeal to the City Manager or his/her designee with respect to such disputed
sums. Contractor shall be entitled to receive interest on any withheld sums at the rate of
return that City earned on its investments during the time period, from the date of
withholding of any amounts found to have been improperly withheld.
23. CITY'S RIGHT TO EMPLOY OTHER CONTRACTORS
City reserves the right to employ other contractors in connection with the Project.
24. CONFLICTS OF INTEREST
24.1 Contractor or its employees may be subject to the provisions of the
California Political Reform Act of 1974 (the "Act") and/or Government Code §§ 1090 et
seq., which (1) require such persons to disclose any financial interest that may
foreseeably be materially affected by the Work performed under this Agreement, and (2)
prohibit such persons from making, or participating in making, decisions that will
foreseeably financially affect such interest.
24.2 If subject to the Act and/or Government Code §§ 1090 et seg., Contractor
shall conform to all requirements therein. Failure to do so constitutes a material breach
and is grounds for immediate termination of this Agreement by City. Contractor shall
indemnify and hold harmless City for any and all claims for damages resulting from
Contractor's violation of this Section.
25. NOTICES
25.1 All notices, demands, requests or approvals, including any change in
mailing address, to be given under the terms of this Agreement shall be given in writing,
South Waterfront Construction Corporation Page 9 14-12
and conclusively shall be deemed served when delivered personally, or on the third
business day after the deposit thereof in the United States mail, postage prepaid, first-
class mail, addressed as hereinafter provided.
25.2 All notices, demands, requests or approvals from Contractor to City shall be
addressed to City at:
Attn: Harbormaster
Harbor Department
City of Newport Beach
100 Civic Center Drive
PO Box 1768
Newport Beach, CA 92658
25.3 All notices, demands, requests or approvals from City to Contractor shall be
addressed to Contractor at:
Attn: Charles South
South Waterfront Construction Corporation
P.O. Box 528
Newport Beach, CA 92661
26. CLAIMS
Unless a shorter time is specified elsewhere in this Agreement, before making its
final request for payment under this Agreement, Contractor shall submit to City, in writing,
all claims for compensation under or arising out of this Agreement. Contractor's
acceptance of the final payment shall constitute a waiver of all claims for compensation
under or arising out of this Agreement except those previously made in writing and
identified by Contractor in writing as unsettled at the time of its final request for payment.
Contractor and City expressly agree that in addition to any claims filing requirements set
forth in the Agreement, Contractor shall be required to file any claim Contractor may have
against City in strict conformance with the Government Claims Act (Government Code
sections 900 et seq.).
27. TERMINATION
27.1 In the event that either party fails or refuses to perform any of the provisions
of this Agreement at the time and in the manner required, that party shall be deemed in
default in the performance of this Agreement. If such default is not cured within a period
of two (2) calendar days, or if more than two (2) calendar days are reasonably required
to cure the default and the defaulting party fails to give adequate assurance of due
performance within two (2) calendar days after receipt of written notice of default,
specifying the nature of such default and the steps necessary to cure such default, and
thereafter diligently take steps to cure the default, the non -defaulting party may terminate
the Agreement forthwith by giving to the defaulting party written notice thereof.
South Waterfront Construction Corporation Page 10 14-13
27.2 Notwithstanding the above provisions, City shall have the right, at its sole
and absolute discretion and without cause, of terminating this Agreement at any time by
giving no less than seven (7) calendar days' prior written notice to Contractor. In the
event of termination under this Section, City shall pay Contractor for Services
satisfactorily performed and costs incurred up to the effective date of termination for which
Contractor has not been previously paid. On the effective date of termination, Contractor
shall deliver to City all reports, Documents and other information developed or
accumulated in the performance of this Agreement, whether in draft or final form.
28. LABOR
28.1 Contractor shall conform with all applicable provisions of state and federal
law including, but not limited to, applicable provisions of the federal Fair Labor Standards
Act ("FLSA") (29 USCA § 201, et seq.).
28.2 Whenever Contractor has knowledge that any actual or potential labor
dispute is delaying or threatens to delay the timely performance of this Agreement,
Contractor shall immediately give written notice to City, and provide all relevant
information.
28.3 Contractor represents that all persons working under this Agreement are
verified to be U.S. citizens or persons legally authorized to work in the United States.
28.4 To the fullest extent permitted by law, Contractor shall indemnify, defend,
and hold harmless City, its City Council, boards and commissions, officers, agents,
volunteers, and employees from loss or damage, including but not limited to attorneys'
fees, and other costs of defense by reason of actual or alleged violations of any applicable
federal, state and local labor laws or law, rules, and/or regulations. This obligation shall
survive the expiration and/or termination of the Agreement.
29. STANDARD PROVISIONS
29.1 Recitals. City and Contractor acknowledge that the above Recitals are true
and correct and are hereby incorporated by reference.
29.2 Compliance with all Laws. Contractor shall, at its own cost and expense,
comply with all statutes, ordinances, regulations and requirements of all governmental
entities, including federal, state, county or municipal, whether now in force or hereinafter
enacted. In addition, all Work prepared by Contractor shall conform to applicable City,
county, state and federal laws, rules, regulations and permit requirements and be subject
to approval of the Project Administrator and City.
29.3 Waiver. A waiver by either party of any breach, of any term, covenant or
condition contained herein shall not be deemed to be a waiver of any subsequent breach
of the same or any other term, covenant or condition contained herein, whether of the
same or a different character.
South Waterfront Construction Corporation Page 11 14-14
29.4 Integrated Contract. This Agreement represents the full and complete
understanding of every kind or nature whatsoever between the parties hereto, and all
preliminary negotiations and agreements of whatsoever kind or nature are merged herein.
No verbal agreement or implied covenant shall be held to vary the provisions herein.
29.5 Conflicts or Inconsistencies. In the event there are any conflicts or
inconsistencies between this Agreement and the Scope of Services or any other
attachments attached hereto, the terms of this Agreement shall govern.
29.6 Interpretation. The terms of this Agreement shall be construed in
accordance with the meaning of the language used and shall not be construed for or
against either party by reason of the authorship of the Agreement or any other rule of
construction which might otherwise apply.
29.7 Amendments. This Agreement may be modified or amended only by a
written document executed by both Contractor and City and approved as to form by the
City Attorney.
29.8 Severability. If any term or portion of this Agreement is held to be invalid,
illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining
provisions of this Agreement shall continue in full force and effect.
29.9 Controlling Law and Venue. The laws of the State of California shall govern
this Agreement and all matters relating to it and any action brought relating to this
Agreement shall be adjudicated in a court of competent jurisdiction in the County of
Orange, State of California.
29.10 Equal Opportunity Employment. Contractor represents that it is an equal
opportunity employer and it shall not discriminate against any subcontractor, employee
or applicant for employment because of race, religious creed, color, national origin,
ancestry, physical handicap, medical condition, marital status, sex, sexual orientation,
age or any other impermissible basis under law.
29.11 No Attorneys' Fees. In the event of any dispute or legal action arising under
this Agreement, the prevailing party shall not be entitled to attorneys' fees.
29.12 Counterparts. This Agreement may be executed in two (2) or more
counterparts, each of which shall be deemed an original and all of which together shall
constitute one (1) and the same instrument.
[SIGNATURES ON NEXT PAGE]
South Waterfront Construction Corporation Page 12 14-15
IN WITNESS WHEREOF, the parties have caused this Agreement to be executed
on the dates written below.
APPROVED AS TO FORM:
CITY ATTORNEY'S OFFICE
Date: /Z'�;
By: L0ilk)
a on C. Harp 1'7-y
City Attorney 3/�23
ATTEST:
Date:
Leilani I. Brown
City Clerk
CITY OF NEWPORT BEACH,
a California municipal corporation
Date:
Bv:
Noah Blom
Mayor
CONTRACTOR: SOUTH
WATERFRONT CONSTRUCTION
CORPORATION, a California
corporation
Date:
By:
Charles South
Chief Executive Officer, Chief Financial
Officer, Secretary
[END OF SIGNATURES]
Attachments: Exhibit A
— Scope of Services
Exhibit B
— Schedule of Billing Rates
Exhibit C
— Insurance Requirements
Exhibit D — Labor and Materials Payment Bond
Exhibit E —
Faithful Performance Bond
South Waterfront Construction Corporation Page 13 14-16
EXHIBIT
SCOPE OF SERVICES
South Waterfront Construction Corporation Page A-1 14-17
1. Mooring Maintenance & Repair Services
1.1 Perform inspections, testing, painting, and numbering of the City's moorings located
throughout various designated mooring fields. Frequency: Semi -Annually
1.2 Perform inspections of mooring weight and condition of chain and all other mooring
components, repairing, replacing and/or augmenting these elements as needed to
ensure the overall mooring systems are compliment with established City requirements,
and are capable and safe to store vessels of designated sizes from specified mooring
locations. Frequency: Semi -Annually
1.3 Perform repositioning/realignment of moorings (where placements may have shifted due
to dragging or other conditions resulting in movement), at the direction of the City, to
maintain: properly spacing between moorings and moored vessels within a given
mooring field, safe and unobstructed fairways for vessel navigation within mooring fields,
and assurance that moorings remain within designated field boundaries. Frequency:
As -Needed
1.4 Perform signing of buoys and shore moorings, so they are identifiable to permitted users
and others. Such signing includes the painting of stenciled numbers and letters atop
buoys, seawalls, and posts — depending on the location and type of buoy or shore
shoring being serviced. Frequency: As -Needed
1.5 Perform other mooring related services as applicable. Frequency: As -Needed
2. Buoy Maintenance & Repair Services
2.1 Perform inspections, painting, application of replacement decals, and removal of marine
growth from City owned informational buoys and markers, which serve as navigational
aids located throughout the harbor (examples include: buoys designating swim areas;
known shoals; locations where vessel entry is prohibited; known safety conditions (such
as alerting boaters of areas where bridge jumping occurs, etc.). Frequency: Annually
2.2 Perform repositioning/realignment of City owned buoys (where placements may have
shifted due to dragging or other conditions resulting in movement), at the direction of the
City, to maintain the equipment's properly positioning throughout the harbor.
Frequency: As -Needed
2.3 Perform installation and removal of attached lines and floats, as needed to designate
swim areas, areas temporarily closed to vessel traffic due to marine related construction,
etc. Frequency: Semi -Annually
2.4 Maintain City lighting equipment affixed to City owned moorings, ensuring they operate
in compliance with City expectations and USCG requirements for such illuminated aids
to navigation. Frequency: As -Needed
2.5 Perform other buoy maintenance related services as applicable. Frequency: As -Needed
14-18
EXHIBIT B
SCHEDULE OF BILLING RATES
South Waterfront Construction Corporation Page B-1 14-19
COST FILE
TABLE 1: MAINTENANCE & REPAIR SERVICES PRICING
SECTION A
Services
Section
Description
Frequency
Price
Mooring
1.1
Mooring inspection,
Semi -Annually
$ 900.00
Maintenance &
testing, painting and
Repair Services
numbering
Per 6 months
1.2
Inspection of
Semi -Annually
$
mooring weight and
4,200.00
condition of chain
Per 6 months
1.3
Reposition/realigning
As -Needed
$ 385.00
of moorings
Hourly rate
1.4
Signing of buoys and
As -Needed
$
385.00
moorings
Hourly rate
I
1.5
Other mooring-
As -Needed $ 385.00
related services
Hourly rate
SECTION B
Services
Section
Description
Frequency
Price
Buoy
1.1
Inspections,
Annually
$ 5,250.00
Maintenance &
painting, decals and
Repair Services
removal of buoys
Per year
1.2
Reposition/realigning
As -Needed
$ 385.00
of buoys
Hourly rate
1.3
Installation and
Semi -Annually
$ 840.00
removal of attached
lines and floats
Per 6 months
South Waterfront Construction
14-20
COST FILE
1.4
Maintain lighting
As -Needed
385.00
attached to moorings
Hourly rate
1.5
Other buoy -related
As -Needed
5 385.00
services
Hourly rate
TABLE 2: BOND PRICING
Bond Premium
Total Annual Price
Bond Premium
For all services with a
$
$
frequency of QUARTERLY,
32,580.00
350.00
SEMI-ANNUALLY or
Annually (cost of all recurring
Annually (cost of securing
ANNUALLY, tally the TOTAL
maintenance services)
bond)
ANNUAL price for all services.
This is the amount that will
need to be bonded by a
labor/materials bond and
performance bond.
Services with a frequency of
AS -NEEDED will only need to
be bonded if any individual as -
needed project exceeds
$25,000.
South Waterfront Construction
14-21
EXHIBIT C
INSURANCE REQUIREMENTS — MAINTENANCE/REPAIR/JANITORIAL SERVICES
1. Provision of Insurance. Without limiting Contractor's indemnification of City, and
prior to commencement of Work, Contractor shall obtain, provide and maintain at
its own expense during the term of this Agreement, policies of insurance of the
type and amounts described below and in a form satisfactory to City. Contractor
agrees to provide insurance in accordance with requirements set forth here. If
Contractor uses existing coverage to comply and that coverage does not meet
these requirements, Contractor agrees to amend, supplement or endorse the
existing coverage.
2. Acceptable Insurers. All insurance policies shall be issued by an insurance
company currently authorized by the Insurance Commissioner to transact
business of insurance in the State of California, with an assigned policyholders'
Rating of A- (or higher) and Financial Size Category Class VII (or larger) in
accordance with the latest edition of Best's Key Rating Guide, unless otherwise
approved by the City's Risk Manager.
3. Coverage Requirements.
A. Workers' Compensation Insurance. Contractor shall maintain Workers'
Compensation Insurance, statutory limits, and Employer's Liability
Insurance with limits of at least one million dollars ($1,000,000) each
accident for bodily injury by accident and each employee for bodily injury by
disease in accordance with the laws of the State of California, Section 3700
of the Labor Code.
Contractor shall submit to City, along with the certificate of insurance, a
Waiver of Subrogation endorsement in favor of City, its City Council,
boards and commissions, officers, agents, volunteers, employees, and
any person or entity owning or otherwise in legal control of the property
upon which Contractor performs the Project and/or Services
contemplated by this Agreement.
B. General Liability Insurance. Contractor shall maintain commercial general
liability insurance and, if necessary, umbrella liability insurance, with
coverage at least as broad as provided by Insurance Services Office form
CG 00 01, in an amount not less than one million dollars ($1,000,000) per
occurrence, two million dollars ($2,000,000) general aggregate. The policy
shall cover liability arising from premises, operations, products -completed
operations, personal and advertising injury, and liability assumed under an
insured contract (including the tort liability of another assumed in a business
contract).
South Waterfront Construction Corporation Page C-1 14-22
C. Automobile Liability Insurance. Contractor shall maintain automobile
insurance at least as broad as Insurance Services Office form CA 00 01
covering bodily injury and property damage for all activities of Contractor
arising out of or in connection with Work to be performed under this
Agreement, including coverage for any owned, hired, non -owned or rented
vehicles, in an amount not less than one million dollars ($1,000,000)
combined single limit each accident.
D. Pollution Liability Insurance. If required, Contractor shall maintain a policy
providing contractor's pollution liability ("CPL") coverage with a total limit of
liability of no less than one million dollars ($1,000,000) per loss and two
million dollars ($2,000,000) in the aggregate per policy period. Claims -
made policies require a 5-year extended reporting period. The CPL policy
shall include coverage for cleanup costs, third -party bodily injury and
property damage, including loss of use of damaged property or of property
that has not been physically injured or destroyed, resulting from pollution
conditions caused by contracting operations. Coverage as required in this
paragraph shall apply to sudden and non -sudden pollution conditions
resulting from the escape or release of smoke, vapors, fumes, acids, alkalis,
toxic chemicals, liquids, or gases, waste materials, or other irritants,
contaminants, or pollutants. The CPL shall also provide coverage for
transportation and off -Site disposal of materials. The policy shall not
contain any provision or exclusion (including any so-called "insured versus
insured" exclusion or "cross -liability" exclusion) the effect of which would be
to prevent, bar, or otherwise preclude any insured or additional insured
under the policy from making a claim which would otherwise be covered by
such policy on the grounds that the claim is brought by an insured or
additional insured against an insured or additional insured under the policy.
4. Other Insurance Requirements. The policies are to contain, or be endorsed to
contain, the following provisions:
A. Waiver of Subrogation. All insurance coverage maintained or procured
pursuant to this Agreement shall be endorsed to waive subrogation against
City, its City Council, boards and commissions, officers, agents, volunteers,
employees, and any person or entity owning or otherwise in legal control of
the property upon which Contractor performs the Project and/or Services
contemplated by this Agreement or shall specifically allow Contractor or
others providing insurance evidence in compliance with these requirements
to waive their right of recovery prior to a loss. Contractor hereby waives its
own right of recovery against City, and shall require similar written express
waivers from each of its subcontractors.
B. Additional Insured Status. All liability policies including general liability,
products and completed operations, excess liability, pollution liability, and
automobile liability, if required, shall provide or be endorsed to provide that
City, its City Council, boards and commissions, officers, agents, volunteers,
South Waterfront Construction Corporation Page C-2 14-23
employees, and any person or entity owning or otherwise in legal control of
the property upon which Contractor performs the Project and/or Services
contemplated by this Agreement shall be included as insureds under such
policies.
C. Primary and Non Contributory. All liability coverage shall apply on a primary
basis and shall not require contribution from any insurance or self-insurance
maintained by City.
D. Notice of Cancellation. All policies shall provide City with thirty (30)
calendar days notice of cancellation (except for nonpayment for which ten
(10) calendar days notice is required) or nonrenewal of coverage for each
required coverage.
5. Additional Agreements Between the Parties. The parties hereby agree to the
following:
A. Evidence of Insurance. Contractor shall provide certificates of insurance to
City as evidence of the insurance coverage required herein, along with a
waiver of subrogation endorsement for workers' compensation and other
endorsements as specified herein for each coverage. Insurance certificates
and endorsement must be approved by City's Risk Manager prior to
commencement of performance. Current certification of insurance shall be
kept on file with City at all times during the term of this Agreement. The
certificates and endorsements for each insurance policy shall be signed by
a person authorized by that insurer to bind coverage on its behalf. At least
fifteen (15) days prior to the expiration of any such policy, evidence of
insurance showing that such insurance coverage has been renewed or
extended shall be filed with the City. If such coverage is cancelled or
reduced, Contractor shall, within ten (10) days after receipt of written notice
of such cancellation or reduction of coverage, file with the City evidence of
insurance showing that the required insurance has been reinstated or has
been provided through another insurance company or companies. City
reserves the right to require complete, certified copies of all required
insurance policies, at any time.
B. City's Right to Revise Requirements. City reserves the right at any time
during the term of the Agreement to change the amounts and types of
insurance required by giving Contractor sixty (60) calendar days advance
written notice of such change. If such change results in substantial
additional cost to Contractor, City and Contractor may renegotiate
Contractor's compensation.
C. Right to Review Subcontracts. Contractor agrees that upon request, all
agreements with subcontractors or others with whom Contractor enters into
contracts with on behalf of City will be submitted to City for review. Failure
of City to request copies of such agreements will not impose any liability on
South Waterfront Construction Corporation Page C-3 14-24
City, or its employees. Contractor shall require and verify that all
subcontractors maintain insurance meeting all the requirements stated
herein, and Contractor shall ensure that City is an additional insured on
insurance required from subcontractors. For CGL coverage,
subcontractors shall provide coverage with a format at least as broad as CG
20 38 04 13.
D. Enforcement of Agreement Provisions. Contractor acknowledges and
agrees that any actual or alleged failure on the part of City to inform
Contractor of non-compliance with any requirement imposes no additional
obligations on City nor does it waive any rights hereunder.
E. Requirements not Limiting. Requirements of specific coverage features or
limits contained in this Section are not intended as a limitation on coverage,
limits or other requirements, or a waiver of any coverage normally provided
by any insurance. Specific reference to a given coverage feature is for
purposes of clarification only as it pertains to a given issue and is not
intended by any party or insured to be all inclusive, or to the exclusion of
other coverage, or a waiver of any type. If the Contractor maintains higher
limits than the minimums shown above, the City requires and shall be
entitled to coverage for higher limits maintained by the Contractor. Any
available insurance proceeds in excess of the specified minimum limits of
insurance and coverage shall be available to the City.
F. Self -insured Retentions. Any self -insured retentions must be declared to
and approved by City. City reserves the right to require that self -insured
retentions be eliminated, lowered, or replaced by a deductible. Self-
insurance will not be considered to comply with these requirements unless
approved by City.
G. City Remedies for Non -Compliance. If Contractor or any subcontractor fails
to provide and maintain insurance as required herein, then City shall have
the right but not the obligation, to purchase such insurance, to terminate this
Agreement, or to suspend Contractor's right to proceed until proper
evidence of insurance is provided. Any amounts paid by City shall, at City's
sole option, be deducted from amounts payable to Contractor or reimbursed
by Contractor upon demand.
H. Timely Notice of Claims. Contractor shall give City prompt and timely notice
of claims made or suits instituted that arise out of or result from Contractor's
performance under this Agreement, and that involve or may involve
coverage under any of the required liability policies. City assumes no
obligation or liability by such notice, but has the right (but not the duty) to
monitor the handling of any such claim or claims if they are likely to involve
City.
South Waterfront Construction Corporation Page C-4 14-25
Contractor's Insurance. Contractor shall also procure and maintain, at its
own cost and expense, any additional kinds of insurance, which in its own
judgment may be necessary for its proper protection and prosecution of the
Work.
South Waterfront Construction Corporation Page C-5 14-26
EXHIBIT D
CITY OF NEWPORT BEACH
BOND NO.
LABOR AND MATERIALS PAYMENT BOND
WHEREAS, the City of Newport Beach, State of California, has awarded to
hereinafter designated as the "Principal," an agreement for
maintenance and/or repair services, in the City of Newport Beach, in strict conformity with
the Agreement on file with the office of the City Clerk of the City of Newport Beach, which
is incorporated herein by this reference.
WHEREAS, Principal has executed or is about to execute the Agreement and the
terms thereof require the furnishing of a bond, providing that if Principal or any of
Principal's subcontractors, shall fail to pay for any materials, provisions, or other supplies
used in, upon, for, or about the performance of the Work agreed to be done, or for any
work or labor done thereon of any kind, the Surety on this bond will pay the same to the
extent hereinafter set forth.
NOW, THEREFORE, We the undersigned Principal, and,
duly authorized to transact business under the laws of the State of California, as Surety,
(referred to herein as "Surety") are held and firmly bound unto the City of Newport Beach,
in the sum of Dollars ( ),
lawful money of the United States of America, said sum being equal to 100% of the
amount of any Letter Proposal accepted by City of over Twenty Five Thousand Dollars
and 00/100 ($25,000.00), payable by the City of Newport Beach under the terms of the
Agreement; for which payment well and truly to be made, we bind ourselves, our heirs,
executors and administrators, successors, or assigns, jointly and severally, firmly by
these present.
THE CONDITION OF THIS OBLIGATION IS SUCH, that if the Principal or the
Principal's subcontractors, fail to pay for any materials, provisions, or other supplies,
implements or machinery used in, upon, for, or about the performance of the Work
contracted to be done, or for any other work or labor thereon of any kind, or for amounts
due under the Unemployment Insurance Code with respect to such work or labor, or for
any amounts required to be deducted, withheld and paid over to the Employment
Development Department from the wages of employees of the Principal and
subcontractors pursuant to Section 13020 of the Unemployment Insurance Code with
respect to such work and labor, then the Surety will pay for the same, in an amount not
exceeding the sum specified in this Bond, and also, in case suit is brought to enforce the
obligations of this Bond, a reasonable attorneys' fee, to be fixed by the Court as required
by the provisions of Section 9554 of the Civil Code of the State of California.
The Bond shall inure to the benefit of any and all persons, companies, and
corporations entitled to file claims under Section 9100 of the California Civil Code so as
to give a right of action to them or their assigns in any suit brought upon this Bond, as
South Waterfront Construction Corporation Page D-1 14-27
required by and in accordance with the provisions of Sections 9500 et seq. of the Civil
Code of the State of California.
And Surety, for value received, hereby stipulates and agrees that no change,
extension of time, alterations or additions to the terms of the Agreement or to the Work to
be performed thereunder shall in any wise affect its obligations on this Bond, and it does
hereby waive notice of any such change, extension of time, alterations or additions to the
terms of the Agreement or to the Work or to the specifications.
In the event that any principal above named executed this Bond as an individual,
it is agreed that the death of any such principal shall not exonerate the Surety from its
obligations under this Bond.
IN WITNESS WHEREOF, this instrument has been duly executed by the above
named Principal and Surety, on the day of , 20
Name of Contractor (Principal)
Name of Surety
Address of Surety
Telephone
APPROVED AS TO FORM:
CITY ATTORNEY'S OFFICE
Date:
Aaron C. Harp
City Attorney
Authorized Signature/Title
Authorized Agent Signature
Print Name and Title
NOTARY ACKNOWLEDGMENTS OF CONTRACTOR AND SURETY MUST BE
ATTACHED
South Waterfront Construction Corporation Page D-2 14-28
ACKNOWLEDGMENT
A notary public or other officer completing this
certificate verifies only the identity of the individual who
signed the document to which this certificate is
attached, and not the truthfulness, accuracy, or validity
of that document.
State of California
County of } ss.
On 20 before me,
Notary Public, personally appeared
who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are
subscribed to the within instrument and acknowledged to me that he/she/they executed the same
in his/her/their authorized capacity(ies), and that by his/her/their signatures(s) on the instrument
the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing
paragraph is true and correct.
WITNESS my hand and official seal.
Signature
ACKNOWLEDGMENT
A notary public or other officer completing this
certificate verifies only the identity of the individual who
signed the document to which this certificate is
attached, and not the truthfulness, accuracy, or validity
of that document.
(seal)
State of California
County of } ss.
On 20 before me, ,
Notary Public, personally appeared
proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are
subscribed to the within instrument and acknowledged to me that he/she/they executed the same
in his/her/their authorized capacity(ies), and that by his/her/their signatures(s) on the instrument
the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing
paragraph is true and correct.
WITNESS my hand and official seal.
Signature (seal)
South Waterfront Construction Corporation Page D-3 14-29
EXHIBIT E
CITY OF NEWPORT BEACH
BOND NO.
FAITHFUL PERFORMANCE BOND
The premium charges on this Bond is $ , being at the
rate of $ thousand of the Agreement price.
WHEREAS, the City of Newport Beach, State of California, has awarded to
hereinafter designated as the "Principal," an agreement for
maintenance and/or repair services in the City of Newport Beach, in strict conformity with
the Agreement on file with the office of the City Clerk of the City of Newport Beach, which
is incorporated herein by this reference.
WHEREAS, Principal has executed or is about to execute the Agreement and the
terms thereof require the furnishing of a Bond for the faithful performance of the
Agreement.
NOW, THEREFORE, we, the Principal, and
, duly authorized to
transact business under the laws of the State of California as Surety (hereinafter
"Surety"), are held and firmly bound unto the City of Newport Beach, in the sum of
( ) lawful
money of the United States of America, said sum being equal to 100% of the amount of
any Letter Proposal accepted by City of over Twenty Five Thousand Dollars and 00/100
($25,000.00), to be paid to the City of Newport Beach, its successors, and assigns; for
which payment well and truly to be made, we bind ourselves, our heirs, executors and
administrators, successors, or assigns, jointly and severally, firmly by these present.
THE CONDITION OF THIS OBLIGATION IS SUCH, that if the Principal, or the
Principal's heirs, executors, administrators, successors, or assigns, fail to abide by, and
well and truly keep and perform any or all the Work, covenants, conditions, and
agreements in the Agreement and any alteration thereof made as therein provided on its
part, to be kept and performed at the time and in the manner therein specified, and in all
respects according to its true intent and meaning, or fails to indemnify, defend, and save
harmless the City of Newport Beach, its officers, employees and agents, as therein
stipulated, then, Surety will faithfully perform the same, in an amount not exceeding the
sum specified in this Bond; otherwise this obligation shall become null and void.
As a part of the obligation secured hereby, and in addition to the face amount
specified in this Performance Bond, there shall be included costs and reasonable
expenses and fees, including reasonable attorneys fees, incurred by City, only in the
event City is required to bring an action in law or equity against Surety to enforce the
obligations of this Bond.
Surety, for value received, stipulates and agrees that no change, extension of time,
alterations or additions to the terms of the Agreement or to the Work to be performed
South Waterfront Construction Corporation
Page E-1
14-30
thereunder shall in any way affect its obligations on this Bond, and it does hereby waive
notice of any such change, extension of time, alterations or additions of the Agreement
or to the Work or to the specifications.
This Faithful Performance Bond shall be extended and maintained by the Principal
in full force and effect for one (1) year following the date of formal acceptance of the
Project by City.
In the event that the Principal executed this bond as an individual, it is agreed that
the death of any such Principal shall not exonerate the Surety from its obligations under
this Bond.
IN WITNESS WHEREOF, this instrument has been duly executed by the Principal
and Surety above named, on the day of , 20
Name of Contractor (Principal)
Name of Surety
Address of Surety
Telephone
APPROVED AS TO FORM:
CITY ATTORNEY'S OFFICE
Date:
0
Aaron C. Harp
City Attorney
Authorized Signature/Title
Authorized Agent Signature
Print Name and Title
NOTARY ACKNOWLEDGMENTS OF
CONTRACTOR AND SURETY MUST BE ATTACHED
South Waterfront Construction Corporation
Page E-2
14-31
ACKNOWLEDGMENT
A notary public or other officer completing this
certificate verifies only the identity of the individual who
signed the document to which this certificate is
attached, and not the truthfulness, accuracy, or validity
of that document.
State of California
County of } ss.
On , 20 before me,
Notary Public, personally appeared
who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are
subscribed to the within instrument and acknowledged to me that he/she/they executed the same
in his/her/their authorized capacity(ies), and that by his/her/their signatures(s) on the instrument
the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing
paragraph is true and correct.
WITNESS my hand and official seal.
Signature (seal)
ACKNOWLEDGMENT
A notary public or other officer completing this
certificate verifies only the identity of the individual who
signed the document to which this certificate is
attached, and not the truthfulness, accuracy, or validity
of that document.
State of California
County of } ss.
On 20 before me, ,
Notary Public, personally appeared
proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are
subscribed to the within instrument and acknowledged to me that he/she/they executed the same
in his/her/their authorized capacity(ies), and that by his/her/their signatures(s) on the instrument
the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing
paragraph is true and correct.
WITNESS my hand and official seal.
Signature (seal)
South Waterfront Construction Corporation
Page E-3 14-32
ATTACHMENT B
ON -CALL MAINTENANCE/REPAIR SERVICES AGREEMENT
WITH TIDAL MARINE CONSTRUCTION, INC. FOR
HARBOR MOORING AND BUOY MAINTENANCE & REPAIR SERVICES
THIS ON -CALL MAINTENANCE/REPAIR SERVICES AGREEMENT
("Agreement") is made and entered into as of this 22nd day of August, 2023 ("Effective
Date"), by and between the CITY OF NEWPORT BEACH, a California municipal
corporation and charter city ("City"), and TIDAL MARINE CONSTRUCTION, INC., a
California corporation ("Contractor'), whose address is 2540 Wilbur Ave, Antioch, CA
94509, and is made with reference to the following:
RECITALS
A. City is a municipal corporation duly organized and validly existing under the laws
of the State of California with the power to carry on its business as it is now being
conducted under the statutes of the State of California and the Charter of City.
B. City desires to engage Contractor to perform on -call maintenance and/or repair
services for City related to moorings and buoys located throughout Newport Harbor
to support the City's Harbor Department in the upkeep and repair of moorings and
buoys ("Project").
C. Contractor possesses the skill, experience, ability, background, certification and
knowledge to provide the maintenance and/or repair services described in this
Agreement.
D. Contractor has examined the location of all proposed work, carefully reviewed and
evaluated the specifications set forth by City for the Project, is familiar with all
conditions relevant to the performance of services, and has committed to perform
all work required for the compensation specified in this Agreement.
NOW, THEREFORE, it is mutually agreed by and between the undersigned parties
as follows:
1. TERM
1.1 Initial Term. The initial term of this Agreement shall commence on the
Effective Date, and shall terminate on August 21, 2026, unless terminated earlier as set
forth herein ("Initial Term").
1.2 Option Term. Provided Contractor is not in default of its obligations under
this Agreement, upon Contractor's written request and with written approval by the City,
prior to the expiration of the term of this Agreement, the term of this Agreement may be
extended for an additional one (1) year term, not to exceed a maximum of two (2)
additional one (1) year terms (each an "Option Term," or collectively, "Option Terms"), on
the same terms and conditions contained in this Agreement. Contractor shall give the City
14-33
written notice of its request to exercise an Option Term at least ninety (90) calendar days
prior to the expiration of the existing Initial Term or Option Term.
2. SERVICES TO BE PERFORMED
2.1 Contractor shall perform the on -call services described in the Scope of
Services attached hereto as Exhibit A and incorporated herein by reference ("Services"
or "Work"). Upon written request from the Project Administrator as defined herein,
Contractor shall provide a letter proposal for Services requested by the City (hereinafter
referred to as the "Letter Proposal"). The Letter Proposal shall include the following:
2.1.1 A detailed description of the Services to be provided;
2.1.2 The position of each person to be assigned to perform the Services,
and the name of the individuals to be assigned, if available;
and
2.1.3 The estimated number of hours and cost to complete the Services;
2.1.4 The time needed to finish the specific project.
2.2 No Services shall be provided until the Project Administrator has provided
written acceptance of the Letter Proposal. Once authorized to proceed, Contractor shall
diligently perform the duties in the approved Letter Proposal.
3. TIME OF PERFORMANCE
3.1 Time is of the essence in the performance of Services under this Agreement
and Contractor shall perform the Services in accordance with the schedule included in
Exhibit A and the Letter Proposal. In the absence of a specific schedule, the Services
shall be performed to completion in a diligent and timely manner. The failure by
Contractor to strictly adhere to the schedule set forth in Exhibit A and the Letter Proposal,
if any, or perform the Services in a diligent and timely manner may result in termination
of this Agreement by City.
3.2 Notwithstanding the foregoing, Contractor shall not be responsible for
delays due to causes beyond Contractor's reasonable control. However, in the case of
any such delay in the Services to be provided for the Project, each party hereby agrees
to provide notice within two (2) calendar days of the occurrence causing the delay to the
other party so that all delays can be addressed.
3.3 Contractor shall submit all requests for extensions of time for performance
in writing to the Project Administrator as defined herein, not later than two (2) calendar
days after the start of the condition that purportedly causes a delay. The Project
Administrator shall review all such requests and may grant reasonable time extensions
for unforeseeable delays that are beyond Contractor's control.
Tidal Marine Construction, Inc. Page 2 14-34
3.4 For all time periods not specifically set forth herein, Contractor shall respond
in the most expedient and appropriate manner under the circumstances, by fax, hand -
delivery or mail.
4. COMPENSATION TO CONTRACTOR
4.1 City shall pay Contractor for the Services on a time and expense not -to -
exceed basis in accordance with the provisions of this Section and the Letter Proposal
and the Schedule of Billing Rates attached hereto as Exhibit B and incorporated herein
by reference. Except as otherwise provided herein, no rate changes shall be made during
the term of this Agreement without the prior written approval of City. Contractor's
compensation for all Services performed in accordance with this Agreement, including all
reimbursable items, shall not exceed One Hundred Eighty Thousand Dollars
($180,000.00) for the Initial Term, and Sixty Thousand Dollars ($60,000.00) for each
Option Term, for a grand total not to exceed of Three Hundred Thousand Dollars
and 00/100 ($300,000.00), without prior written amendment to the Agreement.
4.2 Contractor shall submit monthly invoices to City describing the Work
performed the preceding month. Contractor's bills shall include the name and/or
classification of employee who performed the Work, a brief description of the Services
performed and/or the specific task in the Scope of Services to which it relates, the date
the Services were performed, the number of hours spent on all Work billed on an hourly
basis, and a description of any reimbursable expenditures. City shall pay Contractor no
later than thirty (30) calendar days after approval of the monthly invoice by City staff.
4.3 City shall reimburse Contractor only for those costs or expenses specifically
identified in Exhibit B to this Agreement and the Letter Proposal, or specifically approved
in writing in advance by City.
4.4 Contractor shall not receive any compensation for Extra Work performed
without the prior written authorization of City. As used herein, "Extra Work" means any
Work that is determined by City to be necessary for the proper completion of the Project,
but which is not included within the Scope of Services and which the parties did not
reasonably anticipate would be necessary at the execution of this Agreement.
Compensation for any authorized Extra Work shall be paid in accordance with Exhibit B
and the Letter Proposal.
5. PROJECT MANAGER
5.1 Contractor shall designate a Project Manager, who shall coordinate all
phases of the Project. This Project Manager shall be available to City at all reasonable
times during the Agreement term. Contractor has designated Steven Ackart to be its
Project Manager. Contractor shall not remove or reassign the Project Manager or any
personnel listed in Exhibit A or assign any new or replacement personnel to the Project
without the prior written consent of City. City's approval shall not be unreasonably
withheld with respect to the removal or assignment of non -key personnel.
Tidal Marine Construction, Inc. Page 3 14-35
5.2 Contractor, at the sole discretion of City, shall remove from the Project any
of its personnel assigned to the performance of Services upon written request of City.
Contractor warrants that it will continuously furnish the necessary personnel to complete
the Project on a timely basis as contemplated by this Agreement.
6. ADMINISTRATION
This Agreement will be administered by the Harbor Department. City's
Harbormaster or designee shall be the Project Administrator and shall have the authority
to act for City under this Agreement. The Project Administrator shall represent City in all
matters pertaining to the Services to be rendered pursuant to this Agreement.
7. CITY'S RESPONSIBILITIES
To assist Contractor in the execution of its responsibilities under this Agreement,
City agrees to provide access to and upon request of Contractor, one copy of all existing
relevant information on file at City. City will provide all such materials in a timely manner
so as not to cause delays in Contractor's Work schedule.
8. TYPE AND INSTALLATION OF MATE RIALSISTANDARD OF CARE
8.1 Contractor shall use only the standard materials described in Exhibit A in
performing Services under this Agreement. Any deviation from the materials described
in Exhibit A shall not be installed or utilized unless approved in advance and in writing by
the Project Administrator.
8.2 All of the Services shall be performed by Contractor or under Contractor's
supervision. Contractor represents that it possesses the personnel required to perform
the Services required by this Agreement, and that it will perform all Services in a manner
commensurate with community professional standards and with the ordinary degree of
skill and care that would be used by other reasonably competent practitioners of the same
discipline under similar circumstances. All Services shall be performed by qualified and
experienced personnel who are not employed by City. By delivery of completed Work,
Contractor certifies that the Work conforms to the requirements of this Agreement, all
applicable federal, state and local laws and legally recognized professional standards.
8.3 Contractor represents and warrants to City that it has, shall obtain and shall
keep in full force and effect during the term hereof, at its sole cost and expense, all
licenses, permits, qualifications, insurance and approvals of whatsoever nature that is
legally required of Contractor to practice its profession. Contractor shall maintain a City
of Newport Beach business license during the term of this Agreement.
8.4 Contractor shall not be responsible for delay, nor shall Contractor be
responsible for damages or be in default or deemed to be in default by reason of strikes,
lockouts, accidents, acts of God, or the failure of City to furnish timely information or to
approve or disapprove Contractor's Work promptly, or delay or faulty performance by City,
contractors, or governmental agencies.
Tidal Marine Construction, Inc. Page 4 14-36
9. RESPONSIBILITY FOR DAMAGES OR INJURY
9.1 City and all officers, employees and representatives thereof and all persons
and entities owning or otherwise in legal control of the property upon which Contractor
performs the Project and/or Services shall not be responsible in any manner for any loss
or damage to any of the materials or other things used or employed in performing the
Project or for injury to or death of any person as a result of Contractor's performance of
the Services required hereunder; or for damage to property from any cause arising from
the performance of the Project and/or Services by Contractor, or its subcontractors, or its
workers, or anyone employed by either of them.
9.2 Contractor shall be responsible for any liability imposed by law and for
injuries to or death of any person or damage to property resulting from defects,
obstructions or from any cause arising from Contractor's Work on the Project and/or
Services, or the Work of any subcontractor or supplier selected by Contractor.
9.3 To the fullest extent permitted by law, Contractor shall indemnify, defend
and hold harmless City, its City Council, boards and commissions, officers, agents,
volunteers, employees, and any person or entity owning or otherwise in legal control of
the property upon which Contractor performs the Project and/or Services contemplated
by this Agreement (collectively, the "Indemnified Parties") from and against any and all
claims (including, without limitation, claims for bodily injury, death or damage to property),
demands, obligations, damages, actions, causes of action, suits, losses, judgments,
fines, penalties, liabilities, costs and expenses (including, without limitation, attorneys'
fees, disbursements and court costs) of every kind and nature whatsoever (individually,
a Claim; collectively, "Claims"), which may arise from or in any manner relate (directly or
indirectly) to any breach of the terms and conditions of this Agreement, any Work
performed or Services provided under this Agreement including, without limitation,
defects in workmanship or materials or Contractor's presence or activities conducted on
the Project (including the negligent and/or willful acts, errors and/or omissions of
Contractor, its principals, officers, agents, employees, vendors, suppliers, consultants,
subcontractors, anyone employed directly or indirectly by any of them or for whose acts
they may be liable or any or all of them).
9.4 Notwithstanding the foregoing, nothing herein shall be construed to require
Contractor to indemnify the Indemnified Parties from any Claim arising from the sole
negligence orwillful misconduct of the Indemnified Parties. Nothing in this indemnity shall
be construed as authorizing any award of attorneys' fees in any action on or to enforce
the terms of this Agreement. This indemnity shall apply to all claims and liability
regardless of whether any insurance policies are applicable. The policy limits do not act
as a limitation upon the amount of indemnification to be provided by Contractor.
9.5 Contractor shall perform all Work in a manner to minimize public
inconvenience and possible hazard, to restore other work areas to their original condition
and former usefulness as soon as possible, and to protect public and private property.
Contractor shall be liable for any private or public property damaged during the
performance of the Work by Contractor or its agents.
Tidal Marine Construction, Inc. Page 5 14-37
9.6 To the extent authorized by law, as much of the money due Contractor
under and by virtue of the Agreement as shall be considered necessary by City may be
retained by it until disposition has been made of such suits or claims for damages as
aforesaid.
9.7 The rights and obligations set forth in this Section shall survive the
termination of this Agreement.
10. INDEPENDENT CONTRACTOR
It is understood that City retains Contractor on an independent contractor basis
and Contractor is not an agent or employee of City. The manner and means of conducting
the Work are under the control of Contractor, except to the extent they are limited by
statute, rule or regulation and the expressed terms of this Agreement. No civil service
status or other right of employment shall accrue to Contractor or its employees. Nothing
in this Agreement shall be deemed to constitute approval for Contractor or any of
Contractor's employees or agents, to be the agents or employees of City. Contractor
shall have the responsibility for and control over the means of performing the Work,
provided that Contractor is in compliance with the terms of this Agreement. Anything in
this Agreement that may appear to give City the right to direct Contractor as to the details
of the performance of the Work or to exercise a measure of control over Contractor shall
mean only that Contractor shall follow the desires of City with respect to the results of the
Services.
11. COOPERATION
Contractor agrees to work closely and cooperate fully with City's designated
Project Administrator and any other agencies that may have jurisdiction or interest in the
Work to be performed. City agrees to cooperate with Contractor on the Project.
12. CITY POLICY
Contractor shall discuss and review all matters relating to policy and Project
direction with City's Project Administrator in advance of all critical decision points in order
to ensure the Project proceeds in a manner consistent with City goals and policies.
13. PROGRESS
Contractor is responsible for keeping the Project Administrator informed on a
regular basis regarding the status and progress of the Project, activities performed and
planned, and any meetings that have been scheduled or are desired.
14. INSURANCE
Without limiting Contractor's indemnification of City, and prior to commencement
of Work, Contractor shall obtain, provide and maintain at its own expense during the term
of this Agreement or for other periods as specified in this Agreement, policies of insurance
Tidal Marine Construction, Inc. Page 6 14-38
of the type, amounts, terms and conditions described in the Insurance Requirements
attached hereto as Exhibit C, and incorporated herein by reference.
15. BONDING
15.1 For any Letter Proposal accepted by City of over Twenty Five Thousand
Dollars and 00/100 ($25,000.00), Contractor shall obtain, provide and maintain at its own
expense during the term of this Agreement: (1) a Labor and Materials Payment Bond in
the amount of one hundred percent (100%) of the total amount to be paid Contractor as
set forth in any Letter Proposal accepted by City of over Twenty Five Thousand Dollars
and 00/100 ($25,000.00), and in the form attached hereto as Exhibit D which is
incorporated herein by this reference; and (2) a Faithful Performance Bond in the amount
of one hundred percent (100%) of the total amount to be paid Contractor as set forth in
any Letter Proposal accepted by City of over Twenty Five Thousand Dollars and 00/100
($25,000.00), and in the form attached hereto as Exhibit E which is incorporated herein
by this reference.
15.2 The Labor and Materials Payment Bond and Faithful Performance Bond
shall be issued by an insurance organization or surety (1) currently authorized by the
Insurance Commissioner to transact business of insurance in the State of California, (2)
listed as an acceptable surety in the latest revision of the Federal Register Circular 570,
and (3) assigned a Policyholders' Rating A (or higher) and Financial Size Category Class
VII (or larger) in accordance with the latest edition of Best's Key Rating Guide: Property -
Casualty.
15.3 Contractor shall deliver, concurrently with City's approval of any Letter
Proposal over Twenty Five Thousand Dollars and 00/100 ($25,000.00), the Labor and
Materials Payment Bond and Faithful Performance Bond, a certified copy of the
"Certificate of Authority" of the Insurer or Surety issued by the Insurance Commissioner,
which authorizes the Insurer or Surety to transact surety insurance in the State of
California.
16. PREVAILING WAGES
16.1 Pursuant to the applicable provisions of the Labor Code of the State of
California, not less than the general prevailing rate of per diem wages including legal
holidays and overtime Work for each craft or type of workman needed to execute the
Work contemplated under the Agreement shall be paid to all workmen employed on the
Work to be done according to the Agreement by the Contractor and any subcontractor. In
accordance with the California Labor Code (Sections 1770 et seq.), the Director of
Industrial Relations has ascertained the general prevailing rate of per diem wages in the
locality in which the Work is to be performed for each craft, classification, or type of
workman or mechanic needed to execute the Agreement. A copy of said determination
is available by calling the prevailing wage hotline number (415) 703-4774, and requesting
one from the Department of Industrial Relations. The Contractor is required to obtain the
wage determinations from the Department of Industrial Relations and post at the job site
the prevailing rate or per diem wages. It shall be the obligation of the Contractor or any
Tidal Marine Construction, Inc. Page 7 14-39
subcontractor under him/her to comply with all State of California labor laws, rules and
regulations and the parties agree that the City shall not be liable for any violation thereof.
16.2 Unless otherwise exempt by law, Contractor warrants that no contractor or
subcontractor was listed on the bid proposal for the Services that it is not currently
registered and qualified to perform public work. Contractor further warrants that it is
currently registered and qualified to perform "public work" pursuant to California Labor
Code section 1725.5 or any successor statute thereto and that no contractor or
subcontractor will engage in the performance of the Services unless currently registered
and qualified to perform public work.
17. PROHIBITION AGAINST ASSIGNMENTS AND TRANSFERS
Except as specifically authorized under this Agreement, the Services to be
provided under this Agreement shall not be assigned, transferred contracted or
subcontracted out without the prior written approval of City. Any of the following shall be
construed as an assignment: The sale, assignment, transfer or other disposition of any
of the issued and outstanding capital stock of Contractor, or of the interest of any general
partner or joint venturer or syndicate member or cotenant if Contractor is a partnership or
joint -venture or syndicate or cotenancy, which shall result in changing the control of
Contractor. Control means fifty percent (50%) or more of the voting power or twenty-five
percent (25%) or more of the assets of the corporation, partnership or joint -venture.
18. SUBCONTRACTING
The subcontractors authorized by City, if any, to perform Work on this Project are
identified in Exhibit A and the Letter Proposal. Contractor shall be fully responsible to
City for all acts and omissions of any subcontractor. Nothing in this Agreement shall
create any contractual relationship between City and any subcontractor nor shall it create
any obligation on the part of City to pay or to see to the payment of any monies due to
any such subcontractor other than as otherwise required by law. City is an intended
beneficiary of any Work performed by the subcontractor for purposes of establishing a
duty of care between the subcontractor and City. Except as specifically authorized herein,
the Services to be provided under this Agreement shall not be otherwise assigned,
transferred, contracted or subcontracted out without the prior written approval of City.
19. OWNERSHIP OF DOCUMENTS
Each and every report, draft, map, record, plan, document and other writing
produced (hereinafter "Documents"), prepared or caused to be prepared by Contractor,
its officers, employees, agents and subcontractors, in the course of implementing this
Agreement, shall become the exclusive property of City, and City shall have the sole right
to use such materials in its discretion without further compensation to Contractor or any
other party. Contractor shall, at Contractor's expense, provide such Documents to City
upon prior written request.
Tidal Marine Construction, Inc. Page 8 14-40
20. CONFIDENTIALITY
All Documents, including drafts, preliminary drawings or plans, notes and
communications that result from the Services in this Agreement, shall be kept confidential
unless City expressly authorizes in writing the release of information.
21. RECORDS
Contractor shall keep records and invoices in connection with the Services to be
performed under this Agreement. Contractor shall maintain complete and accurate
records with respect to the costs incurred under this Agreement and any Services,
expenditures and disbursements charged to City, for a minimum period of three (3) years,
or for any longer period required by law, from the date of final payment to Contractor -
under this Agreement. All such records and invoices shall be clearly identifiable.
Contractor shall allow a representative of City to examine, audit and make transcripts or
copies of such records and invoices during regular business hours. Contractor shall allow
inspection of all Work, data, Documents, proceedings and activities related to the
Agreement for a period of three (3) years from the date of final payment to Contractor
under this Agreement.
22. WITHHOLDINGS
City may withhold payment to Contractor of any disputed sums until satisfaction of
the dispute with respect to such payment. Such withholding shall not be deemed to
constitute a failure to pay according to the terms of this Agreement. Contractor shall not
discontinue Work as a result of such withholding. Contractor shall have an immediate
right to appeal to the City Manager or his/her designee with respect to such disputed
sums. Contractor shall be entitled to receive interest on any withheld sums at the rate of
return that City earned on its investments during the time period, from the date of
withholding of any amounts found to have been improperly withheld.
23. CITY'S RIGHT TO EMPLOY OTHER CONTRACTORS
City reserves the right to employ other contractors in connection with the Project.
24. CONFLICTS OF INTEREST
24.1 Contractor or its employees may be subject to the provisions of the
California Political Reform Act of 1974 (the "Act") and/or Government Code §§ 1090 et
seq., which (1) require such persons to disclose any financial interest that may
foreseeably be materially affected by the Work performed under this Agreement, and (2)
prohibit such persons from making, or participating in making, decisions that will
foreseeably financially affect such interest.
24.2 If subject to the Act and/or Government Code §§ 1090 et seq., Contractor
shall conform to all requirements therein. Failure to do so constitutes a material breach
and is grounds for immediate termination of this Agreement by City. Contractor shall
Tidal Marine Construction, Inc. Page 9 14-41
indemnify and hold harmless City for any and all claims for damages resulting from
Contractor's violation of this Section.
25. NOTICES
25.1 All notices, demands, requests or approvals, including any change in
mailing address, to be given under the terms of this Agreement shall be given in writing,
and conclusively shall be deemed served when delivered personally, or on the third
business day after the deposit thereof in the United States mail, postage prepaid, first-
class mail, addressed as hereinafter provided.
25.2 All notices, demands, requests or approvals from Contractor to City shall be
addressed to City at:
Attn: Harbormaster
Harbor Department
City of Newport Beach
100 Civic Center Drive
PO Box 1768
Newport Beach, CA 92658
25.3 All notices, demands, requests or approvals from City to Contractor shall be
addressed to Contractor at:
Attn: Steven Ackart
Tidal Marine Construction, Inc.
2540 Wilbur Ave
Antioch, CA 94509
26. CLAIMS
Unless a shorter time is specified elsewhere in this Agreement, before making its
final request for payment under this Agreement, Contractor shall submit to City, in writing,
all claims for compensation under or arising out of this Agreement. Contractor's
acceptance of the final payment shall constitute a waiver of all claims for compensation
under or arising out of this Agreement except those previously made in writing and
identified by Contractor in writing as unsettled at the time of its final request for payment.
Contractor and City expressly agree that in addition to any claims filing requirements set
forth in the Agreement, Contractor shall be required to file any claim Contractor may have
against City in strict conformance with the Government Claims Act (Government Code
sections 900 et seq.).
27. TERMINATION
27.1 1 n the event that either party fails or refuses to perform any of the provisions
of this Agreement at the time and in the manner required, that party shall be deemed in
default in the performance of this Agreement. If such default is not cured within a period
of two (2) calendar days, or if more than two (2) calendar days are reasonably required
Tidal Marine Construction, Inc. Page 10 14-42
to cure the default and the defaulting party fails to give adequate assurance of due
performance within two (2) calendar days after receipt of written notice of default,
specifying the nature of such default and the steps necessary to cure such default, and
thereafter diligently take steps to cure the default, the non -defaulting party may terminate
the Agreement forthwith by giving to the defaulting party written notice thereof.
27.2 Notwithstanding the above provisions, City shall have the right, at its sole
and absolute discretion and without cause, of terminating this Agreement at any time by
giving no less than seven (7) calendar days' prior written notice to Contractor. In the
event of termination under this Section, City shall pay Contractor for Services
satisfactorily performed and costs incurred up to the effective date of termination for which
Contractor has not been previously paid. On the effective date of termination, Contractor
shall deliver to City all reports, Documents and other information developed or
accumulated in the performance of this Agreement, whether in draft or final form.
28. LABOR
28.1 Contractor shall conform with all applicable provisions of state and federal
law including, but not limited to, applicable provisions of the federal Fair Labor Standards
Act ("FLSA") (29 USCA § 201, et seq.).
28.2 Whenever Contractor has knowledge that any actual or potential labor
dispute is delaying or threatens to delay the timely performance of this Agreement,
Contractor shall immediately give written notice to City, and provide all relevant
information.
28.3 Contractor represents that all persons working under this Agreement are
verified to be U.S. citizens or persons legally authorized to work in the United States.
28.4 To the fullest extent permitted by law, Contractor shall indemnify, defend,
and hold harmless City, its City Council, boards and commissions, officers, agents,
volunteers, and employees from loss or damage, including but not limited to attorneys'
fees, and other costs of defense by reason of actual or alleged violations of any applicable
federal, state and local labor laws or law, rules, and/or regulations. This obligation shall
survive the expiration and/or termination of the Agreement.
29. STANDARD PROVISIONS
29.1 Recitals. City and Contractor acknowledge that the above Recitals are true
and correct and are hereby incorporated by reference.
29.2 Compliance with all Laws. Contractor shall, at its own cost and expense,
comply with all statutes, ordinances, regulations and requirements of all governmental
entities, including federal, state, county or municipal, whether now in force or hereinafter
enacted. In addition, all Work prepared by Contractor shall conform to applicable City,
county, state and federal laws, rules, regulations and permit requirements and be subject
to approval of the Project Administrator and City.
Tidal Marine Construction, Inc. Page 11 14-43
29.3 Waiver. A waiver by either party of any breach, of any term, covenant or
condition contained herein shall not be deemed to be a waiver of any subsequent breach
of the same or any other term, covenant or condition contained herein, whether of the
same or a different character.
29.4 Integrated Contract. This Agreement represents the full and complete
understanding of every kind or nature whatsoever between the parties hereto, and all
preliminary negotiations and agreements of whatsoever kind or nature are merged herein.
No verbal agreement or implied covenant shall be held to vary the provisions herein.
29.5 Conflicts or Inconsistencies. In the event there are any conflicts or
inconsistencies between this Agreement and the Scope of Services or any other
attachments attached hereto, the terms of this Agreement shall govern.
29.6 Interpretation. The terms of this Agreement shall be construed in
accordance with the meaning of the language used and shall not be construed for or
against either party by reason of the authorship of the Agreement or any other rule of
construction which might otherwise apply.
29.7 Amendments. This Agreement may be modified or amended only by a
written document executed by both Contractor and City and approved as to form by the
City Attorney.
29.8 Severability. If any term or portion of this Agreement is held to be invalid,
illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining
provisions of this Agreement shall continue in full force and effect.
29.9 Controlling Law and Venue. The laws of the State of California shall govern
this Agreement and all matters relating to it and any action brought relating to this
Agreement shall be adjudicated in a court of competent jurisdiction in the County of
Orange, State of California.
29.10 Equal Opportunity Employment. Contractor represents that it is an equal
opportunity employer and it shall not discriminate against any subcontractor, employee
or applicant for employment because of race, religious creed, color, national origin,
ancestry, physical handicap, medical condition, marital status, sex, sexual orientation,
age or any other impermissible basis under law.
29.11 No Attorneys' Fees. In the event of any dispute or legal action arising under
this Agreement, the prevailing party shall not be entitled to attorneys' fees.
29.12 Counterparts. This Agreement may be executed in two (2) or more
counterparts, each of which shall be deemed an original and all of which together shall
constitute one (1) and the same instrument.
[SIGNATURES ON NEXT PAGE]
Tidal Marine Construction, Inc. Page 12 14-44
IN WITNESS WHEREOF, the parties have caused this Agreement to be executed
on the dates written below.
APPROVED AS TO FORM:
CITY ATTORNEY'S OFFICE
Date:/ 1 (Z'
By:;2t4o r)
AdVon C. Harp
City Attorney
ATTEST:
Date:
go
Leilani I. Brown
City Clerk
CITY OF NEWPORT BEACH,
a California municipal corporation
Date:
Bv:
Noah Blom
Mayor
CONTRACTOR: TIDAL MARINE
CONSTRUCTION, INC., a California
corporation
Date:
Bv:
Steven Ackart
Chief Executive Officer
Date:
By:
Shawn Stambaugh
Secretary
[END OF SIGNATURES]
Attachments: Exhibit A
— Scope of Services
Exhibit B
— Schedule of Billing Rates
Exhibit C
— Insurance Requirements
Exhibit D — Labor and Materials Payment Bond
Exhibit E —
Faithful Performance Bond
Tidal Marine Construction, Inc. Page 13 14-45
EXHIBIT
SCOPE OF SERVICES
Tidal Marine Construction, Inc. Page A-1 14-46
1. Mooring Maintenance & Repair Services
1.1 Perform inspections, testing, painting, and numbering of the City's moorings located
throughout various designated mooring fields. Frequency: Semi -Annually
1.2 Perform inspections of mooring weight and condition of chain and all other mooring
components, repairing, replacing and/or augmenting these elements as needed to
ensure the overall mooring systems are compliment with established City requirements,
and are capable and safe to store vessels of designated sizes from specified mooring
locations. Frequency: Semi -Annually
1.3 Perform repositioning/realignment of moorings (where placements may have shifted due
to dragging or other conditions resulting in movement), at the direction of the City, to
maintain: properly spacing between moorings and moored vessels within a given
mooring field, safe and unobstructed fairways for vessel navigation within mooring fields,
and assurance that moorings remain within designated field boundaries. Frequency:
As -Needed
1.4 Perform signing of buoys and shore moorings, so they are identifiable to permitted users
and others. Such signing includes the painting of stenciled numbers and letters atop
buoys, seawalls, and posts — depending on the location and type of buoy or shore
shoring being serviced. Frequency: As -Needed
1.5 Perform other mooring related services as applicable. Frequency: As -Needed
2. Buoy Maintenance & Repair Services
2.1 Perform inspections, painting, application of replacement decals, and removal of marine
growth from City owned informational buoys and markers, which serve as navigational
aids located throughout the harbor (examples include: buoys designating swim areas;
known shoals; locations where vessel entry is prohibited; known safety conditions (such
as alerting boaters of areas where bridge jumping occurs, etc.). Frequency: Annually
2.2 Perform repositioning/realignment of City owned buoys (where placements may have
shifted due to dragging or other conditions resulting in movement), at the direction of the
City, to maintain the equipment's properly positioning throughout the harbor.
Frequency: As -Needed
2.3 Perform installation and removal of attached lines and floats, as needed to designate
swim areas, areas temporarily closed to vessel traffic due to marine related construction,
etc. Frequency: Semi -Annually
2.4 Maintain City lighting equipment affixed to City owned moorings, ensuring they operate
in compliance with City expectations and USCG requirements for such illuminated aids
to navigation. Frequency: As -Needed
2.5 Perform other buoy maintenance related services as applicable. Frequency: As -Needed
14-4 7
EXHIBIT B
SCHEDULE OF BILLING RATES
Tidal Marine Construction, Inc. Page B-1 14-48
COST FILE
TABLE 1: MAINTENANCE & REPAIR SERVICES PRICING
SECTION A
Services
Section
Description
Frequency
Price
Mooring
1.1
Mooring inspection,
Semi -Annually
$ 8,450.00
Maintenance &
testing, painting and
Repair Services
numbering
Per 6 months
1.2
Inspection of
Semi -Annually
$
mooring weight and
8,450.00
condition of chain
Per 6 months
1.3
Reposition/realigning
As -Needed
$ 548.00
of moorings
Hourly rate
1.4
Signing of buoys and
As -Needed
$ 548.00
moorings
Hourly rate
1.5
Other mooring-
As -Needed
$ 548.00
related services
Hourly rate
SECTION B
Services
Section
Description
Frequency
Price
Buoy
1.1
Inspections,
Annually
$
Maintenance &
painting, decals and
8,450.00
Repair Services
removal of buoys
Per year
1.2
Reposition/realigning
As -Needed
$
of buoys
548.00
Hourly rate
1.3
Installation and
Semi -Annually
$ 548.00
removal of attached
lines and floats
Per 6 months
Tidal Marine Construction, Inc.
w t
COST FILE
1.4
Maintain lighting
As -Needed
$ 548.00
attached to moorings
Hourly rate
1.5
Other buoy -related
As -Needed
$ 548.00
services
Hourly rate
TABLE 2: BOND PRICING
Bond Premium
Total Annual Price Bond Premium
For all services with a
$
$
frequency of QUARTERLY,
29,186.00
583.72
SEMI-ANNUALLY or
Annually (cost of all recurring
Annually (cost of securing
ANNUALLY, tally the TOTAL
maintenance services)
bond)
ANNUAL price for all services.
This is the amount that will
need to be bonded by a
laborlmaterials bond and
performance bond.
Services with a frequency of
AS -NEEDED will only need to
be bonded if any individual as -
needed project exceeds
$25,000.
l [dal Marine Construction, inc.
14-50
EXHIBIT C
INSURANCE REQUIREMENTS — MAINTENANCE/REPAIR/JANITORIAL SERVICES
1. Provision of Insurance. Without limiting Contractor's indemnification of City, and
prior to commencement of Work, Contractor shall obtain, provide and maintain at
its own expense during the term of this Agreement, policies of insurance of the
type and amounts described below and in a form satisfactory to City. Contractor
agrees to provide insurance in accordance with requirements set forth here. If
Contractor uses existing coverage to comply and that coverage does not meet
these requirements, Contractor agrees to amend, supplement or endorse the
existing coverage.
2. Acceptable Insurers. All insurance policies shall be issued by an insurance
company currently authorized by the Insurance Commissioner to transact
business of insurance in the State of California, with an assigned policyholders'
Rating of A- (or higher) and Financial Size Category Class VII (or larger) in
accordance with the latest edition of Best's Key Rating Guide, unless otherwise
approved by the City's Risk Manager.
3. Coverage Requirements.
A. Workers' Compensation Insurance. Contractor shall maintain Workers'
Compensation Insurance, statutory limits, and Employer's Liability
Insurance with limits of at least one million dollars ($1,000,000) each
accident for bodily injury by accident and each employee for bodily injury by
disease in accordance with the laws of the State of California, Section 3700
of the Labor Code.
Contractor shall submit to City, along with the certificate of insurance, a
Waiver of Subrogation endorsement in favor of City, its City Council,
boards and commissions, officers, agents, volunteers, employees, and
any person or entity owning or otherwise in legal control of the property
upon which Contractor performs the Project and/or Services
contemplated by this Agreement.
B. General Liability Insurance. Contractor shall maintain commercial general
liability insurance and, if necessary, umbrella liability insurance, with
coverage at least as broad as provided by Insurance Services Office form
CG 00 01, in an amount not less than one million dollars ($1,000,000) per
occurrence, two million dollars ($2,000,000) general aggregate. The policy
shall cover liability arising from premises, operations, products -completed
operations, personal and advertising injury, and liability assumed under an
insured contract (including the tort liability of another assumed in a business
contract).
Tidal Marine Construction, Inc. Page C-1 14-51
C. Automobile Liability Insurance. Contractor shall maintain automobile
insurance at least as broad as Insurance Services Office form CA 00 01
covering bodily injury and property damage for all activities of Contractor
arising out of or in connection with Work to be performed under this
Agreement, including coverage for any owned, hired, non -owned or rented
vehicles, in an amount not less than one million dollars ($1,000,000)
combined single limit each accident.
D. Pollution Liability Insurance. If required, Contractor shall maintain a policy
providing contractor's pollution liability ("CPL") coverage with a total limit of
liability of no less than one million dollars ($1,000,000) per loss and two
million dollars ($2,000,000) in the aggregate per policy period. Claims -
made policies require a 5-year extended reporting period. The CPL policy
shall include coverage for cleanup costs, third -party bodily injury and
property damage, including loss of use of damaged property or of property
that has not been physically injured or destroyed, resulting from pollution
conditions caused by contracting operations. Coverage as required in this
paragraph shall apply to sudden and non -sudden pollution conditions
resulting from the escape or release of smoke, vapors, fumes, acids, alkalis,
toxic chemicals, liquids, or gases, waste materials, or other irritants,
contaminants, or pollutants. The CPL shall also provide coverage for
transportation and off -Site disposal of materials. The policy shall not
contain any provision or exclusion (including any so-called "insured versus
insured" exclusion or "cross -liability" exclusion) the effect of which would be
to prevent, bar, or otherwise preclude any insured or additional insured
under the policy from making a claim which would otherwise be covered by
such policy on the grounds that the claim is brought by an insured or
additional insured against an insured or additional insured under the policy.
4. Other Insurance Requirements. The policies are to contain, or be endorsed to
contain, the following provisions:
A. Waiver of Subrogation. All insurance coverage maintained or procured
pursuant to this Agreement shall be endorsed to waive subrogation against
City, its City Council, boards and commissions, officers, agents, volunteers,
employees, and any person or entity owning or otherwise in legal control of
the property upon which Contractor performs the Project and/or Services
contemplated by this Agreement or shall specifically allow Contractor or
others providing insurance evidence in compliance with these requirements
to waive their right of recovery prior to a loss. Contractor hereby waives its
own right of recovery against City, and shall require similar written express
waivers from each of its subcontractors.
B. Additional Insured Status. All liability policies including general liability,
products and completed operations, excess liability, pollution liability, and
automobile liability, if required, shall provide or be endorsed to provide that
City, its City Council, boards and commissions, officers, agents, volunteers,
Tidal Marine Construction, Inc. Page C-2 14-52
employees, and any person or entity owning or otherwise in legal control of
the property upon which Contractor performs the Project and/or Services
contemplated by this Agreement shall be included as insureds under such
policies.
C. Primary and Non Contributory. All liability coverage shall apply on a primary
basis and shall not require contribution from any insurance or self-insurance
maintained by City.
D. Notice of Cancellation. All policies shall provide City with thirty (30)
calendar days notice of cancellation (except for nonpayment for which ten
(10) calendar days notice is required) or nonrenewal of coverage for each
required coverage.
5. Additional Agreements Between the Parties. The parties hereby agree to the
following:
A. Evidence of Insurance. Contractor shall provide certificates of insurance to
City as evidence of the insurance coverage required herein, along with a
waiver of subrogation endorsement for workers' compensation and other
endorsements as specified herein for each coverage. Insurance certificates
and endorsement must be approved by City's Risk Manager prior to
commencement of performance. Current certification of insurance shall be
kept on file with City at all times during the term of this Agreement. The
certificates and endorsements for each insurance policy shall be signed by
a person authorized by that insurer to bind coverage on its behalf. At least
fifteen (15) days prior to the expiration of any such policy, evidence of
insurance showing that such insurance coverage has been renewed or
extended shall be filed with the City. If such coverage is cancelled or
reduced, Contractor shall, within ten (10) days after receipt of written notice
of such cancellation or reduction of coverage, file with the City evidence of
insurance showing that the required insurance has been reinstated or has
been provided through another insurance company or companies. City
reserves the right to require complete, certified copies of all required
insurance policies, at any time.
B. City's Right to Revise Requirements. City reserves the right at any time
during the term of the Agreement to change the amounts and types of
insurance required by giving Contractor sixty (60) calendar days advance
written notice of such change. If such change results in substantial
additional cost to Contractor, City and Contractor may renegotiate
Contractor's compensation.
C. Right to Review Subcontracts. Contractor agrees that upon request, all
agreements with subcontractors or others with whom Contractor enters into
contracts with on behalf of City will be submitted to City for review. Failure
of City to request copies of such agreements will not impose any liability on
Tidal Marine Construction, Inc. Page C-3 14-53
City, or its employees. Contractor shall require and verify that all
subcontractors maintain insurance meeting all the requirements stated
herein, and Contractor shall ensure that City is an additional insured on
insurance required from subcontractors. For CGL coverage,
subcontractors shall provide coverage with a format at least as broad as CG
20380413,
D. Enforcement of Agreement Provisions. Contractor acknowledges and
agrees that any actual or alleged failure on the part of City to inform
Contractor of non-compliance with any requirement imposes no additional
obligations on City nor does it waive any rights hereunder.
E. Requirements not Limiting. Requirements of specific coverage features or
limits contained in this Section are not intended as a limitation on coverage,
limits or other requirements, or a waiver of any coverage normally provided
by any insurance. Specific reference to a given coverage feature is for
purposes of clarification only as it pertains to a given issue and is not
intended by any party or insured to be all inclusive, or to the exclusion of
other coverage, or a waiver of any type. If the Contractor maintains higher
limits than the minimums shown above, the City requires and shall be
entitled to coverage for higher limits maintained by the Contractor. Any
available insurance proceeds in excess of the specified minimum limits of
insurance and coverage shall be available to the City.
F. Self -insured Retentions. Any self -insured retentions must be declared to
and approved by City. City reserves the right to require that self -insured
retentions be eliminated, lowered, or replaced by a deductible. Self-
insurance will not be considered to comply with these requirements unless
approved by City.
G. City Remedies for Non -Compliance. If Contractor or any subcontractor fails
to provide and maintain insurance as required herein, then City shall have
the right but not the obligation, to purchase such insurance, to terminate this
Agreement, or to suspend Contractor's right to proceed until proper
evidence of insurance is provided. Any amounts paid by City shall, at City's
sole option, be deducted from amounts payable to Contractor or reimbursed
by Contractor upon demand.
H. Timely Notice of Claims. Contractor shall give City prompt and timely notice
of claims made or suits instituted that arise out of or result from Contractor's
performance under this Agreement, and that involve or may involve
coverage under any of the required liability policies. City assumes no
obligation or liability by such notice, but has the right (but not the duty) to
monitor the handling of any such claim or claims if they are likely to involve
City.
Tidal Marine Construction, Inc. Page C-4 14-54
Contractor's Insurance. Contractor shall also procure and maintain, at its
own cost and expense, any additional kinds of insurance, which in its own
judgment may be necessary for its proper protection and prosecution of the
Work.
Tidal Marine Construction, Inc. Page C-5 14-55
EXHIBIT D
CITY OF NEWPORT BEACH
BOND NO.
LABOR AND MATERIALS PAYMENT BOND
WHEREAS, the City of Newport Beach, State of California, has awarded to
hereinafter designated as the "Principal," an agreement for
maintenance and/or repair services, in the City of Newport Beach, in strict conformity with
the Agreement on file with the office of the City Clerk of the City of Newport Beach, which
is incorporated herein by this reference.
WHEREAS, Principal has executed or is about to execute the Agreement and the
terms thereof require the furnishing of a bond, providing that if Principal or any of
Principal's subcontractors, shall fail to pay for any materials, provisions, or other supplies
used in, upon, for, or about the performance of the Work agreed to be done, or for any
work or labor done thereon of any kind, the Surety on this bond will pay the same to the
extent hereinafter set forth.
NOW, THEREFORE, We the undersigned Principal, and,
duly authorized to transact business under the laws of the State of California, as Surety,
(referred to herein as "Surety") are held and firmly bound unto the City of Newport Beach,
in the sum of Dollars ( ),
lawful money of the United States of America, said sum being equal to 100% of the
amount of any Letter Proposal accepted by City of over Twenty Five Thousand Dollars
and 00/100 ($25,000.00), payable by the City of Newport Beach under the terms of the
Agreement; for which payment well and truly to be made, we bind ourselves, our heirs,
executors and administrators, successors, or assigns, jointly and severally, firmly by
these present.
THE CONDITION OF THIS OBLIGATION IS SUCH, that if the Principal or the
Principal's subcontractors, fail to pay for any materials, provisions, or other supplies,
implements or machinery used in, upon, for, or about the performance of the Work
contracted to be done, or for any other work or labor thereon of any kind, or for amounts
due under the Unemployment Insurance Code with respect to such work or labor, or for
any amounts required to be deducted, withheld and paid over to the Employment
Development Department from the wages of employees of the Principal and
subcontractors pursuant to Section 13020 of the Unemployment Insurance Code with
respect to such work and labor, then the Surety will pay for the same, in an amount not
exceeding the sum specified in this Bond, and also, in case suit is brought to enforce the
obligations of this Bond, a reasonable attorneys' fee, to be fixed by the Court as required
by the provisions of Section 9554 of the Civil Code of the State of California.
The Bond shall inure to the benefit of any and all persons, companies, and
corporations entitled to file claims under Section 9100 of the California Civil Code so as
to give a right of action to them or their assigns in any suit brought upon this Bond, as
Tidal Marine Construction, Inc. Page D-1 14-56
required by and in accordance with the provisions of Sections 9500 et seq. of the Civil
Code of the State of California.
And Surety, for value received, hereby stipulates and agrees that no change,
extension of time, alterations or additions to the terms of the Agreement or to the Work to
be performed thereunder shall in any wise affect its obligations on this Bond, and it does
hereby waive notice of any such change, extension of time, alterations or additions to the
terms of the Agreement or to the Work or to the specifications.
In the event that any principal above named executed this Bond as an individual,
it is agreed that the death of any such principal shall not exonerate the Surety from its
obligations under this Bond.
IN WITNESS WHEREOF, this instrument has been duly executed by the above
named Principal and Surety, on the day of , 20
Name of Contractor (Principal)
Name of Surety
Address of Surety
Telephone
APPROVED AS TO FORM:
CITY ATTORNEY'S OFFICE
Date:
Aaron C. Harp
City Attorney
Authorized Signature/Title
Authorized Agent Signature
Print Name and Title
NOTARY ACKNOWLEDGMENTS OF CONTRACTOR AND SURETY MUST BE
ATTACHED
Tidal Marine Construction, Inc. Page D-2 14-57
ACKNOWLEDGMENT
A notary public or other officer completing this
certificate verifies only the identity of the individual who
signed the document to which this certificate is
attached, and not the truthfulness, accuracy, or validity
of that document.
State of California
County of } SS.
On 20 before me,
Notary Public, personally appeared
who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are
subscribed to the within instrument and acknowledged to me that he/she/they executed the same
in his/her/their authorized capacity(ies), and that by his/her/their signatures(s) on the instrument
the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing
paragraph is true and correct.
WITNESS my hand and official seal.
Signature (seal)
ACKNOWLEDGMENT
A notary public or other officer completing this
certificate verifies only the identity of the individual who
signed the document to which this certificate is
attached, and not the truthfulness, accuracy, or validity
of that document.
State of California
County of } ss.
On , 20 before me,
Notary Public, personally appeared
proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are
subscribed to the within instrument and acknowledged to me that he/she/they executed the same
in his/her/their authorized capacity(ies), and that by his/her/their signatures(s) on the instrument
the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing
paragraph is true and correct.
WITNESS my hand and official seal.
Signature
(seal)
Tidal Marine Construction, Inc. Page D-3 14-58
EXHIBIT E
CITY OF NEWPORT BEACH
BOND NO.
FAITHFUL PERFORMANCE BOND
The premium charges on this Bond is $ , being at the
rate of $ thousand of the Agreement price.
WHEREAS, the City of Newport Beach, State of California, has awarded to
hereinafter designated as the "Principal," an agreement for
maintenance and/or repair services in the City of Newport Beach, in strict conformity with
the Agreement on file with the office of the City Clerk of the City of Newport Beach, which
is incorporated herein by this reference.
WHEREAS, Principal has executed or is about to execute the Agreement and the
terms thereof require the furnishing of a Bond for the faithful performance of the
Agreement.
NOW, THEREFORE, we, the Principal, and
duly authorized to
transact business under the laws of the State of California as Surety (hereinafter
"Surety"), are held and firmly bound unto the City of Newport Beach, in the sum of
( ) lawful
money of the United States of America, said sum being equal to 100% of the amount of
any Letter Proposal accepted by City of over Twenty Five Thousand Dollars and 00/100
($25,000.00), to be paid to the City of Newport Beach, its successors, and assigns; for
which payment well and truly to be made, we bind ourselves, our heirs, executors and
administrators, successors, or assigns, jointly and severally, firmly by these present.
THE CONDITION OF THIS OBLIGATION IS SUCH, that if the Principal, or the
Principal's heirs, executors, administrators, successors, or assigns, fail to abide by, and
well and truly keep and perform any or all the Work, covenants, conditions, and
agreements in the Agreement and any alteration thereof made as therein provided on its
part, to be kept and performed at the time and in the manner therein specified, and in all
respects according to its true intent and meaning, or fails to indemnify, defend, and save
harmless the City of Newport Beach, its officers, employees and agents, as therein
stipulated, then, Surety will faithfully perform the same, in an amount not exceeding the
sum specified in this Bond; otherwise this obligation shall become null and void.
As a part of the obligation secured hereby, and in addition to the face amount
specified in this Performance Bond, there shall be included costs and reasonable
expenses and fees, including reasonable attorneys fees, incurred by City, only in the
event City is required to bring an action in law or equity against Surety to enforce the
obligations of this Bond.
Surety, for value received, stipulates and agrees that no change, extension of time,
alterations or additions to the terms of the Agreement or to the Work to be performed
thereunder shall in any way affect its obligations on this Bond, and it does hereby waive
Tidal Marine Construction, Inc. Page E-1
14-59
notice of any such change, extension of time, alterations or additions of the Agreement
or to the Work or to the specifications.
This Faithful Performance Bond shall be extended and maintained by the Principal
in full force and effect for one (1) year following the date of formal acceptance of the
Project by City.
In the event that the Principal executed this bond as an individual, it is agreed that
the death of any such Principal shall not exonerate the Surety from its obligations under
this Bond.
IN WITNESS WHEREOF, this instrument has been duly executed by the Principal
and Surety above named, on the day of , 20
Name of Contractor (Principal)
Name of Surety
Address of Surety
Telephone
APPROVED AS TO FORM:
CITY ATTORNEY'S OFFICE
Date:
Aaron C. Harp
City Attorney
Authorized Signature/Title
Authorized Agent Signature
Print Name and Title
NOTARY ACKNOWLEDGMENTS OF
CONTRACTOR AND SURETY MUST BE ATTACHED
Tidal Marine Construction, Inc. Page E-2
14-60
ACKNOWLEDGMENT
A notary public or other officer completing this
certificate verifies only the identity of the individual who
signed the document to which this certificate is
attached, and not the truthfulness, accuracy, or validity
of that document.
State of California
County of } ss.
On 20 before me,
Notary Public, personally appeared
who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are
subscribed to the within instrument and acknowledged to me that he/she/they executed the same
in his/her/their authorized capacity(ies), and that by his/her/their signatures(s) on the instrument
the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing
paragraph is true and correct.
WITNESS my hand and official seal.
Signature (seal)
ACKNOWLEDGMENT
A notary public or other officer completing this
certificate verifies only the identity of the individual who
signed the document to which this certificate is
attached, and not the truthfulness, accuracy, or validity
of that document.
State of California
County of } ss.
On 20 before me, ,
Notary Public, personally appeared
proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are
subscribed to the within instrument and acknowledged to me that he/she/they executed the same
in his/her/their authorized capacity(ies), and that by his/her/their signatures(s) on the instrument
the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing
paragraph is true and correct.
WITNESS my hand and official seal.
Signature
(seal)
Tidal Marine Construction, Inc. Page E-3 14-61