Loading...
HomeMy WebLinkAboutPA2023-0027_20230609_2nd Submittal Response Letter eric austeric austeric austeric aust architect 62 balboa coves newport beach, california 92663 tel 949.637.5220 email aust.architect@gmail.com date 05 June 2023 attention Joselyn Perez (Planning); David Keely (PW); Sergio company City of Newport Beach;100 Civic Center Drive; Newport Beach, CA 92663 tel number 949.644.3312 pages 2 ccccityityityity plan review/correctionsplan review/correctionsplan review/correctionsplan review/corrections regarding PA2023-0027– Pine Knot Motel – 6302 West Coast Highway notes City of Newport Beach, the following is a response to the corrections noted in the revised set of plans, dated 22 May 2023 PLANNINGPLANNINGPLANNINGPLANNING DEPARTMENTDEPARTMENTDEPARTMENTDEPARTMENT PLAN PLAN PLAN PLAN CHECK CORRECTIONSCHECK CORRECTIONSCHECK CORRECTIONSCHECK CORRECTIONS Correction # Correction description 1 Plan check corrections picked up to comply with Property Development Standards 2 Revised Visitor Accommodations Study to be submitted by the owner representative, Kevin Giz 3 “Notice of Application Filing” posted on site on 17 March 2023 4 Comments from other departments picked up on latest plans 5 Certificate of Compliance will be obtained. Working on obtaining the documents required and will submit to the City of NB a0.0 Parking has been revised on Site/Roof Plan a0.6 Elevator has been removed from plan. Floor area has been revised to include the area where the elevator has now been converted to a storage room. d1.0 Existing caretakers unit noted on the demolition plan Misc. Sign program submittal as well as tsunami signage noted on a0.0 PUBLIC WORKSPUBLIC WORKSPUBLIC WORKSPUBLIC WORKS PLAN PLAN PLAN PLAN CHECK CORRECTIONSCHECK CORRECTIONSCHECK CORRECTIONSCHECK CORRECTIONS Correction # Correction description 1 Exterior walls between buildings indicated as 1-hour on sheet a1.0 2 Occupant load at 2nd floor deck limited to 49 occupants, noted on 2nd Floor Plan, sheet a1.1 3 Building construction type revised on sheet a0.0 4 Elevator removed from project (sheets a1.0 + a1.1) 5 Accessible parking and access revised on sheet a1.0 6 Detectable warning revised to be outside of door landing 7 Van accessible parking revised on sheet a1.0 8 Newly constructed building will comply with liquefaction mitigation; Existing building remodel valuation to be limited to 50% GRADINGGRADINGGRADINGGRADING & & & & DRAINAGDRAINAGDRAINAGDRAINAGEEEE + + + + GEOTECHNICAL CORRECTIONSGEOTECHNICAL CORRECTIONSGEOTECHNICAL CORRECTIONSGEOTECHNICAL CORRECTIONS Correction # Correction description 1 Finish floor elevations for the existing building are to remain the same (+9.67’). FF for new structure to align with existing sidewalks (+9.75’) and be provided with a concrete curb at the perimeter walls (+10.33’) to provide required clearance. Additional waterproofing around the perimeter walls can be provided. FIRE DEPT.FIRE DEPT.FIRE DEPT.FIRE DEPT. CORRECTIONSCORRECTIONSCORRECTIONSCORRECTIONS Correction # Correction description NFPA 13 sprinklers noted on sheet a0.0 Fire Alarm noted on sheet a0.0 Thanks. eric d. aust