12. The pennittee or his agent shall notify the Building Division when the grading operation is ready for each of the
following inspections:
a. PRE -GRADE MEETING When the permittee is ready to begin work, but not less than two days before any
grading or brushing is started.
b. DRAINAGE DEVICE INSPECTION After forming of terrace drains, down drains or after placement of pipe in
subdrains, but before any concrete or filter material is placed.
c. SPECIAL
d. ROUGH GRADING When all rough grading has been completed, the rough grade report shall be provided to
the Building Inspector at foundation inspection or sooner based on the Building Inspector's discretion.
e. FINAL When all work, including installation of all drainage structures and other protective devices, has beer.
completed and the as -graded plan, professional approvals and the required reports have been submitted.
13. All footing excavations, slab on grade areas and subdrains shall be inspected and approved by the Geotechnical
Engineer or Engineering Geologist Written approval shall be submitted to the Building Inspector.
14. Prior to the start of grading, all permanent property comer monuments shall be in place. Prior to any foundation
inspections, proof of recordation of the "comer record" or "record of survey" with the County of Orange shall be
provided.
15. The undersigned acknowledge a copy of the above and agree to comply with the Grading Code of the City of
Newport Beach, the recommendations of the project soils report and any special requirements of the permit
16. Prior to foundation inspection a Line and Grade Certificate Form must signed and stamped by the surveyor of
record and submitted to the building inspector. A Structural Observation Report may be required.
17. All parties listed below must be present for the pregrade meeting unless approved by the building inspector.
18. All duplex construction requires separate utilities (sewer, water, gas, electrical, fire sprinkler risers).
OWNER/CONTRACTOR: W'C J�,>J QAW i DESIGN CIVIL ENGR.: CA t%hl.rn`M,-�
By: ��) %. Jtl'04e,� " By: Al"
Address: 2-Tq Qras Address: /„ct""8i
Telephone: 4221 901, V Telephone: It A -H �22�%Z�►y+ r
GEOTECHNICAL ENGINEER: i��� �Alfzl(nK¢trEOLOGIST.:
By: �'�,M� C��. �S�fii fr-Ly �' C3'� t BY:
Address: 1 i�Ay &)e, w�v G 4i ,)O Address:
Telephone: On— ,S� ' -7`CI ° Telephone:
GRADING CONTR.: .J-" t ,,r�Z COORDINATOR:
. G2 ��CA4
By0 fBy:
Address: 7361 Address:
Telephone: 77/ rT— ^/I �D Telephone:
NEWPORT BEACH REPRESENTATIVE: 12,61rb PHONE#: S1!?
INSPECTION REQUESTS: (949) 644-3255
Newport Beach Construction Hours:
Monday through Friday: 7:00 a.m. to 6:30 p.m.
Saturdays: 8:00 a.m. to 6:00 p.m.
No work on Sundays and Holidays
Fart s'yregmde me bng agreement 6-18
�uStOM Cfl$S INC.
American Lift Technology
5/24/23
Re: Zurich Residence Elevator Self Certification
929 Zurich Circle
Newport Beach, CA 92663
To Whom It May Concern:
The round glass elevator & platform lifts at the project mentioned above, are designed, manufactured
and installed based on architectural drawings, job & customer specifications and manufacturing
specifications. These units were submitted and approved by the city of Newport Beach and meets code
requirements.
Regards,
F w
Fa rid Waleh
Eng. Director
Custom Cabs Inc.
1516 Santiago Ridge Way San Diego, CA 92154 Ph. 619-205-1000