Loading...
HomeMy WebLinkAboutF2022-0194 - MiscFZ01z-v1 CITY OF NEWPORT BEACH CONV*'UNMYDEVELOPMENT DEPARTMENT tu0CvcCenter arvDy OINGMr IO P NewportBeach, CA 9265a-8915 www newpor€beachm.gov 1(949) 644-3200 I ntlII SPRffff't{u NFPA 13D SYSTEVI ROUGHINSPECTIONCHECKI, T t- Riser Consirucrion and Location ornval a- Chain valve b- Baafdtow device (single check) c- Bell activation device d- InsRedgls test valve e- Rser sized per approved plans 2. Pressure Test a- System tested at aperat rg prsss, ure for 2 hours b` Pressure gauge irrsfailed 5- r Heads shall not be rtsiafted n ffne fitb gs to the frthnes i-ng certerrted m otacee (temor test olugsl a. Instatlatpn and spacung of temporary test plugs 4. Piping a- Material installed per plan °- Bangers per codes pr vent upward movement c. All CPVC piping shag be hstalled by persons who have been cexfified by the manufacturer for irrstattatton of CPVC PPn9 d- Piping Rretected from damage 5. Ben a 1Al0g rtsta[led per code b. Boxes friStalled at properlgcat[ons YE I NO El Q Q f El Q tY! El ❑ NOTE CFVC plastic pipe h the garage shalt not he P. r Gam. Sp, a; at c Gs ed as Response" or °ResidentaC must be used. FIRE SPRINKLER NFPA 13D SYSTE.m ROUGH iNSPECTMN APPROVED. l A DATE -IT � 1 BY: ATE Por*vU:r_ sFri Ml w1A 305y - �y-ry L�sps:Gon Chzcd t 25/*1J20*S F-W t! ESwpaVol CITY OF NEWPORT BEACH CONV4UPTd'Ti' DEVELOPWNl' DEPARTMENT o BUILDING DIVISION 1Do Civic Center Chive ( P:O_ Box 1768 j Newport Beach, CA 92658-8915 wywy.newportbeachca_gov j (949) 644-3200 FIRE SPRIlVKf ER NFPA 13D SYSTEM FINAL CHECKLIST (RESIDENTIAL) YES No ❑ 1. Water meter proper size 2. Fire sprinkler system cistaW per the approved puns ❑ 3. AD construction covers removed from sPm ler heads ❑ 4. Cover plates are NOT to be installed, but shall be available on the jobsite / ❑ s. Ail tape and pant removed from sprinkler head [�f ❑ 6. Finish trim installed around sprinkler heads 7��✓// ❑ 7. Proper signage pasted at all required locations ury/ ❑ a_ Plow test conducted and bell tasted Y' j ❑ 9. Location of anspedoes tasting valve to approved location L—�/ ❑ SYSTEMS: 10. Clearances around spr h*er heads and riser - no obstructions ❑ 11. Operating pressure gauge installed at riser showing proper water pressure ❑ 12. Back flow preventer installed ❑ 13. System installed per manufacturers specifications ❑ NOTES: FIRE SPRINKLER NFPA 13D SYSTEM FINAL APPROVE®: PERM FT 1F ZOZ2- � DATE: It7 - 13 - 2 3 Fort \ FRe 5pmkle NRA L50 System - RNAL nh Wi R010EM L 05/12/M0