CITY OF NEWPORT BEACH
CONV*'UNMYDEVELOPMENT DEPARTMENT
tu0CvcCenter arvDy OINGMr IO
P
NewportBeach, CA 9265a-8915
www newpor€beachm.gov 1(949) 644-3200
I ntlII SPRffff't{u NFPA 13D SYSTEVI
ROUGHINSPECTIONCHECKI, T
t- Riser Consirucrion and Location ornval
a- Chain valve
b- Baafdtow device (single check)
c- Bell activation device
d- InsRedgls test valve
e- Rser sized per approved plans
2. Pressure Test
a- System tested at aperat rg prsss, ure for 2 hours
b` Pressure gauge irrsfailed
5- r Heads shall not be rtsiafted n ffne fitb gs to the frthnes
i-ng certerrted m otacee (temor test olugsl
a. Instatlatpn and spacung of temporary test plugs
4. Piping
a- Material installed per plan
°- Bangers per codes pr vent upward movement
c. All CPVC piping shag be hstalled by persons who have been
cexfified by the manufacturer for irrstattatton of CPVC PPn9
d- Piping Rretected from damage
5. Ben
a 1Al0g rtsta[led per code
b. Boxes friStalled at properlgcat[ons
YE I NO
El
Q
Q
f
El
Q
tY! El
❑
NOTE CFVC plastic pipe h the garage shalt not he P. r Gam. Sp, a; at c Gs ed as
Response" or °ResidentaC must be used.
FIRE SPRINKLER NFPA 13D SYSTE.m ROUGH iNSPECTMN APPROVED.
l A DATE -IT � 1
BY: ATE
Por*vU:r_ sFri Ml w1A 305y - �y-ry L�sps:Gon Chzcd t 25/*1J20*S
F-W
t! ESwpaVol CITY OF NEWPORT BEACH
CONV4UPTd'Ti' DEVELOPWNl' DEPARTMENT
o BUILDING DIVISION
1Do Civic Center Chive ( P:O_ Box 1768 j Newport Beach, CA 92658-8915
wywy.newportbeachca_gov j (949) 644-3200
FIRE SPRIlVKf ER NFPA 13D SYSTEM
FINAL CHECKLIST
(RESIDENTIAL)
YES
No
❑
1. Water meter proper size
2. Fire sprinkler system cistaW per the approved puns
❑
3. AD construction covers removed from sPm ler heads
❑
4. Cover plates are NOT to be installed, but shall be available on the jobsite
/
❑
s. Ail tape and pant removed from sprinkler head
[�f
❑
6. Finish trim installed around sprinkler heads
7��✓//
❑
7. Proper signage pasted at all required locations
ury/
❑
a_ Plow test conducted and bell tasted
Y' j
❑
9. Location of anspedoes tasting valve to approved location
L—�/
❑
SYSTEMS:
10. Clearances around spr h*er heads and riser - no obstructions ❑
11. Operating pressure gauge installed at riser showing proper water pressure ❑
12. Back flow preventer installed ❑
13. System installed per manufacturers specifications ❑
NOTES:
FIRE SPRINKLER NFPA 13D SYSTEM FINAL APPROVE®:
PERM FT 1F ZOZ2- �
DATE: It7 - 13 - 2 3
Fort \ FRe 5pmkle NRA L50 System - RNAL nh Wi R010EM L 05/12/M0