Loading...
HomeMy WebLinkAboutSS3 - Central Library Lecture HallCENTRAL LIBRARY LECTURE H PROJECT FUNDING DISCUSSION CITY OF NEWPORT BEACH SS3-1 Project Location next to Central Library Approved Library Lecture Hall Concept Floor Plan 91514 SF Seating for up to 299 I, CITY OF NEWPORT BEACH COURTYAP PLAZA EXISTING LIBRARY LOBBY`' LIBRARY ENTRANCE SS3-3 Approved Library Lecture Hall Concept ~- in !-& 7 �r I, CITY OF NEWPORT BEACH 4 SS3-4 Approved Library Lecture Hall Concept I, CITY OF NEWPORT BEACH 5 SS3-5 Approved Library Lecture Hall Concept Ir I I, CITY OF NEWPORT BEACH SS3-6 Project Background $70,000 included in 2018-19 CIP to initiate exploratory effort 3/19/2019 - City Council CIP Study Session - Central Library Lecture Hall discussion leads to $500K added to 2019-20 CIP for Concept Plan Development and Cost Estimate 7/9/2019 - City Council forms 5 member "Library Lecture Hall Design Committee" (LLHDC) including former Councilmember Dixon as Council Representative 11/19/2019 - LLHDC recommends, and Council approves project Design Architect Consultant team. Total Overall Project Cost identified as $8,000,000 with proposed 50-50 split for 7,000 sf building w/275 seats. Projected completion was Fall 2022 CITY OF NEWPORT BEACH SS3-7 Project Background February 2020 — Covid 19 Pandemic Begins 9/28/2021 - City Council Study Session - Council Reviews/Tentatively Approves LLHDC recommended Concept Design with a Total Projected Project Cost of $12,777,670, and 50-50 Split of cost up to $13 million 11/30/2021- Council Approves 9,500 sf Concept Plan, with a Total Projected Project Cost of $12,812,000. CIP budget set at $13 million w/ $6.5 M in Contributions from Library Foundation 2/28/2023 - City receives five bids for project. Low bid was $17,135,000 by AMG & Associates, 22% higher than Estimate of $14,000,000 3/28/2023 - Council Rejects Bids and directs staff to rebid around September 2023 CITY OF NEWPORT BEACH SS3-8 Current Project Status Funding MOU in place with Library Foundation - 50/50 Split up to $13 Million ($6.5 M each) Final Plans Completed & Building Permits Secured (9,814 SF 299 seats) (Engineers Estimate of $18,500,000) City Cost to Date $758,700 + staff time Three bids received on October 12t", with Lowest Qualified Bid from AMG & Associates for a base bid of $19,068,000. Deductive Bid item for Pollution Liability Insurance of $9,000 • Additive Bid item for enhanced Digital Acoustics System of $409,000 ➢ Total all -in Project Cost projected at $23,438,935 Million Ali CITY OF (Cost per SF N $Z_ 01 NEWPORT BEACH SS3-9 Total Project Cost Summery TASK DESCRIPTION ESTIMATE & BUDGET TOTAL(11121) PROJECTED TOTAL COST (as of 101231 COMMENTS CONCEPTUAL DESIGNIPERMITTING RCA $ 215,635 $ 215,635 Design, Inspection, Utility SOFT COSTS $ 1,302,035 $ 2,173,500 Connections, Construction Management, MateriallSoil Testing, Permits HARD CASTS $ 11,239,800 $ 20,974,800 Building Construction & 10% Contingency FIXTURES, FURNISHINGS, & EQUIPMENT (FF&E) $ 55,000 $ 75,000 PROJECT TOTAL $ 12,812,470 $ 23,438,935 AMOUNT OVER MOU & PROJECT BUDGET > $ (10,438,935) FY23-24 Approved Budget Foundation Contributions $ 6,500,000 City FFP $ 6,500,000 Total $ 13,000,000 SS3-10 Projected Annual Operational Cost Annual Janitorial starting at N $30,000 Annual Repair& Maintenance — $315,000/yr (+CPI) over life of building (-1.5% of Construction Cost) Annual Utilities (usage dependent) — $76,500 (-$.651sf/month for low use) Additional Staffing Needs to be determined I, CITY OF NEWPORT BEACH SS3-11 &NB Library Foundation — Funding Contributions ➢ Current MOU requires $6.5 million deposited into escrow prior to Award of Construction Contract for Facility ➢ As of October 25t", the Library Foundation advised staff they have $8,200,000 in hard commitments available now $7,000,000 to be placed in escrow account prior to contract award $1,200,000 to be collected over next three years. ➢ Foundation identified they have another N$1,000,000 in soft pledges that should be available after contract award bringing total to N$9,200,000 ➢ Foundation also committed to taking on further fundraising campaign to raise remaining contributions up to 50% of total project cost, 4d, � CITY OF NEWPORT BEACH or ^'$11,719,500 SS3-12 Shortfall Funding If City commits to funding 50% of total project costs, additional $5.2 million is required, for a total contribution of $11.7 million ➢ The City has $29 million in capital reserves, for projects outlined in City's long-term capital planning documents (FFP, HBMP, CIP) Over next several years, $20 million from the reserves are for projects such as Balboa Island Drainage System and Balboa Library & Fire Station ➢ Significant projects are in the long-term horizon (ten plus years) including the Newport Pier, Balboa Pier & Balboa Island Seawall projects General Fund operating surpluses, pay off of long-term liabilities will be some of the strategies to provide funding to support the City's long-term capital needs in the future J, i CITY OF NEWPORT BEACH SS3-13 Temporary Gap Funding The Library Foundation proposed contribution would be structured with $7 million placed in escrow prior to contract award and $4.7 million funded from donations over next three years ➢ Depending on the timing of the donations and construction, the City would need to temporarily allocate up to $4.7 million for the portion of the project to be repaid by the Foundation over the next three years, in addition to the City's contribution I, CITY OF NEWPORT BEACH SS3-14 Next Steps ❑ Decide whether to Accept Bid and Award Construction Contract If proceeding - Determine how to fund gap over current $13 million Agreement with the Library Foundation ❑ If funding share/amounts modifications acceptable, amend current MOU with Library Foundation prior to contract award Award Construction Contract and start project Estimated 21 month Construction Timeframe I, CITY OF NEWPORT BEACH SS3-15 Questions Comments Discussion Need direction whether Council would like to proceed with this bid and award a construction contract for the Project? And if so, how should we plan to fund it? SS3-16