Loading...
HomeMy WebLinkAboutSS3 - Central Library Lecture Hall - PowerPoint (Staff)November 14, 2023 Item No. SS3 CENTRAL LIBRARY LECTURE HALL PROJECT FUNDING DISCUSSION CITY OF NEWPORT BEACH ProjJect Location next t AL 1 4V o Central Library A vu 11 61&'? m .,i** ,. 11INIF - '417wW Approved Library Lecture Hall Concept EXISTING LIBRARY Floor Plan 9j814 SF Seating for up to 299 - ENTRY DRIVE I, CITY OF NEWPORT BEACH Approved Library Lecture Hall Concept I, CITY OF NEWPORT BEACH Approved Library Lecture Hall Concept I, CITY OF NEWPORT BEACH Approved Library Lecture Hall Concept " - 4d, i CITY OF NEWPORT BEACH LQ Project Background $70,000 included in 2018-19 CIP to initiate exploratory effort 3/19/2019 - City Council CIP Study Session - Central Library Lecture Hall discussion leads to $500K added to 2019-20 CIP for Concept Plan Development and Cost Estimate 7/9/2019 - City Council forms 5 member "Library Lecture Hall Design Committee" (LLHDC) including former Councilmember Dixon as Council Representative 11/19/2019 - LLHDC recommends, and Council approves project Design Architect Consultant team. Total Overall Project Cost identified as $8,000,000 with proposed 50-50 split for 7,000 sf building w/275 seats. Projected completion was Fall 2022 4d, �11 CITY OF NEWPORT BEACH Project Background February 2020 — Covid 19 Pandemic Begins 9/28/2021- City Council Study Session - Council Reviews/Tentatively Approves LLHDC recommended Concept Design with a Total Projected Project Cost of $12,777,670, and 50-50 Split of cost up to $13 million 11/30/2021- Council Approves 9,500 sf Concept Plan, with a Total Projected Project Cost of $12,812,000. CIP budget set at $13 million w/ $6.5 M in Contributions from Library Foundation 2/28/2023 - City receives five bids for project. Low bid was $17,135,000 by AMG & Associates, 22% higher than Estimate of $14,000,000 3/28/2023 - Council Rejects Bids and directs staff to rebid around September 2023 CITY OF NEWPORT BEACH Current Project Status L Funding MOU in place with Library Foundation - 50/50 Split up to $13 Million ($6.5 M each) Final Plans Completed & Building Permits Secured (9,814 SF 299 seats) (Engineers Estimate of $18,500,000) City Cost to Date $758,700 + staff time Three bids received on October 12t", with Lowest Qualified Bid from AMG & Associates for a base bid of $19,068,000. Deductive Bid item for Pollution Liability Insurance of $9,000 Additive Bid item for enhanced Digital Acoustics System of $409,000 4J, j Total all -in Project Cost projected at $23,438,935 Million CITY OF (Cost per SF `v $Z 388) NEWPORT BEACH Total Project Cost Summery TASK DESCRIPTION ESTIMATE & BUDGET TOTAL(11121) PROJECTED TOTAL COST (as of 101231 COMMENTS CONCEPTUAL DESIGNIPERMITTING RCA $ 215,635 $ 215,635 Design, Inspection, Utility SOFT COSTS $ 1,302,035 $ 2,173,500 Connections, Construction Management, MateriallSoil Testing, Permits HARD COSTS $ 11,239,800 $ 20,974,800 Building Construction & 10% Contingency FIXTURES, FURNISHINGS, & EQUIPMENT (FF&E) $ 55,000 $ 75,000 PROJECT TOTAL $ 12,812,470 $ 23,438,935 AMOUNT OVER MOU & PROJECT BUDGET > $ (10,438,935) FY23-24 Approved Budget Foundation Contributions $ 6,500,000 City FFP $ 6,500,000 Total $ 13,000,000 Projected Annual Operational Cost Annual Janitorial starting at N $30,000 Annual Repair & Maintenance $315,000/yr (+CPI) over life of building (-1.5% of Construction Cost) Annual Utilities (usage dependent) — $76,500 (N$.651sf/month for low use) Additional Staffing Needs to be determined I, CITY OF NEWPORT BEACH a NB Library Foundation — Funding Contributions ➢ Current MOU requires $6.5 million deposited into escrow prior to Award of Construction Contract for Facility ➢ As of October 25t", the Library Foundation advised staff they have $8,200,000 in hard commitments available now $7,000,000 to be placed in escrow account prior to contract award $1,200,000 to be collected over next three years i Foundation identified they have another N$1,000,000 in soft pledges that should be available after contract award bringing total to N$9,200,000 Foundation also may have an interest in further fundraising beyond the $9.2 million identified to date but that would need to be discussed and approved by the entire board first. CITY OF NEWPORT BEACH Shortfall Funding If City commits to funding 50% of total project costs, additional $5.2 million is required, for a total contribution of $11.7 million The City has $29 million in capital reserves, for projects outlined in City's long-term capital planning documents (FFP, HEMP, CIP) Over next several years, $20 million from the reserves are for projects such as Balboa Island Drainage System and Balboa Library & Fire Station Significant projects are in the long-term horizon (ten plus years) including the Newport Pier, Balboa Pier & Balboa Island Seawall projects General Fund operating surpluses, pay off of long-term liabilities will be some of the strategies to provide funding to support the City's long-term capital needs in the future Ji J.11 CITY OF NEWPORT BEACH Temporary Gap Funding The Library Foundation proposed contribution would be structured with $7 million placed in escrow prior to contract award and $4.7 million funded from donations over next three years ➢ Depending on the timing of the donations and construction, the City would need to temporarily allocate up to $4.7 million for the portion of the project to be repaid by the Foundation over the next three years, in addition to the City's contribution I, CITY OF NEWPORT BEACH Next Steps Decide whether to Accept Bid and Award Construction Contract If proceeding - Determine how to fund gap over current $13 million Agreement with the Library Foundation ❑ If funding share/amounts modifications acceptable, amend current MOU with Library Foundation prior to contract award Award Construction Contract and start project Estimated 21 month Construction Timeframe I, CITY OF NEWPORT BEACH Questions Comments Discussion Need direction whether Council would like to proceed with this bid and award a construction contract for the Project? And if so, how should we plan to fund it?