Loading...
HomeMy WebLinkAboutF2016-0275 - Misc\5-7 Shored �( CITY OF NEWPORT BEACH COWNAUNrrY DEVELOPMENT DEPART.NIENT 1E;UMDING DIVMGN M CMC Ce<=r D v-.1 P.O. Box 1 T68 1 NewFat Beams CA g2658-&Qt 5 wwwmewpot a.govI(949j644-3200 FIRE SPRIN�RR NFPA 13D SYSTEM ROUGH INSPEMON CHECKLIST YES NO i- Riser Construction and Location Approval a- gait valve a- ❑ b. Bacldiow device (single check) L7 G Bell activation device ❑ d. InspecWs testvatve ❑ e- Riser sad per approved plans 2- Pressure Test a. System tested at operating pressure for 2 hours ❑ b. Pressure gauge installed ❑ 3. Sprinkler Heads shag not be installed n the fiftings orfor to the fittings being cemerrfed in dace (temporary test Plugs) a fristaffation and spacing of temporary test plugs 4- Piping a Material mstaled per plan ❑ b- Hangers per codesiprevent upward movement ❑ c. All CPVC piping stW be mstaged by persons who have been ❑ cerfiied by the manufacturer for instadation of CPVC Piping d. Piping protected from damage ❑ 5. Bell a_ W-I ng instaled per code b- Boxes installed at proper to a+'cns NOTE CPVC plastic pipe u; the garage shag net be exposed- Sprinklers that are fisted as 'Quick Response' or'Residerr iaF must be used. CORRECTIONS AND NOTES: FIRE M ROUGH INSPECTION APPROVED: DATE: �-5prn -pT:AJ Sy�n-ieu -fin CneCN"e: Uf/-7� ;,S"pd CITY OF NEWPORT BEACH CONLU N= DEVELOPMENT DEPARTMENT BUn DLNG DIVMON e'caocPT too Civic Center Drive I P.©_ Box 1768 E Newport Reach, CA 92858 8915 w&w-rmwpprtbeachca gov, t (949) 644-3200 FIRE SPRLNXLER N +�A I3D MTEINI FOAL CHECKLIST IS'T gtESID£NTLAL) 1dd - L 1. Water meter proper sip 2 Re sprinkler system installed per the approved plans ❑ 3_ AH construction covers removed from sprmkter heads ❑ 4. Cover *tes are NOT to be irstaded, but shall be avaliabie an the jot site 5. All tape and pa&. removed from sprinkler heads ❑ 6. F'rn&h fain installed around sprinkier heads ❑ 7. Proper signage Mss ed at all reqmad kxadicns 3. Flaw best oosducizd and bed tested 2. Loren of inspec[w's testing vaaive in approved location SYSfcdkS` 10. Clearances around sprinler heads and riser - no obsfiuctie(ts ❑ 11. Operating pressu a gauge in. --Wed at riser showing proper .eater pressure ❑ 12- Back flow preventer insta➢ed 13. System r--Wed per manufacurers spec0cations NOTES: 9 ❑ ❑ By: 13D VRA M SIsl