ROUGH INSPECTION C + CKr.reT
1- Ryser Construction and Location A pprovai YES
a Dram valve -
b. Bactdibw devica (single check)
a Bee activation device
d. Inspectoes test valve
e. Riser s¢ed per approved plans
2. Pressure Test
bSysferrr tested at operating pressure for 2 hoar;
Pressure gauge nstalled
3. Soy nkfer Heads shall not be r StaAa i m frttinas Door to a, sr„
f7e7Fla OLM_enfad in Dia (lemondyy
oil
test Dlucsra. Installation and spacing of tmporary test plugs4_
Pivinq
El
a_ Material installed per plan
b. Hangers percodas(preventupwardrnovernenrc.All
JEI
CPVC �Ing SW be installed by persons who have been
certified by the mar ufacbAer far installationof. o
pip¢rg d-Pipingpmle�dfromdamagel'
wkV msfa9ed per code
b. Boxes installed at proper lo. cations
NOTE .PVC plastic pipe in fhe garage shalt not he expo-e ,i. Sp hkler; that, are listed as `C
Response' or'ResidertfiaP
most be used.
CORRECTIONS AND NOTES;
Z'SZPPJ'qRNF:PA1311 SYSTEM ROUGH INSPECTINAPPROAE
PERMrr
DATE2
,1
NO
IIAP
Famvs�Fire Sprinkler NF: A L�(] System _ gnugh Irtspecpan Cneddut a5/12/2pS
�ti8wP0.Ql,� Clji 1- OF 1�,.�1�E rr 1 lJR BEACH
COMMUNM BU•• DPiGDIYISION
Civic Center Drive j P:O. Box 1768 1 Newport Beach, CA 92658 8915
wwwr.newportheachcargov, j (949) 644-3200
EI4I
NEE SP FINAL CHECKLIST
(RESIDENTIAL)
YES
No
1,
Water meter proper sin
❑
9
Fie sprinkler system jnstIled per the approved plans
3.
All ccnshu5on covers removed from sprinkler heads
El
NOT to be installed, but shall be available on the jobsite
are tall
El
4.
Cover plates
Ej
5.
All type and palm removed from sprinker heads
6.
Finish trim ustaIted around sprinkler heads
❑
7.
Proper si9nage posted at all r=quirzd locations
0
S.
El
Row test conducted and befl basted
9.
Location of inspedors tab i valve in approved location
❑
SYSTEMS:
10. Clearances around sprig ider heads and riser - no obstructions ❑
a r stalled at ser showing proper water pressure ❑
1 I. operating pressure 9 ❑
12. Back flow preventerinstaAed
13. System instaDed per manufacturers specifications ❑ ❑