Loading...
HomeMy WebLinkAboutF2022-0532 - MiscFzoZz- vS3z lS21 —rah�� crfy OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT oQ Civ c Center Dr ve Un DING DIVLgGN 1P.0, BOX f7681 Newport Beach, CA 92658-3915 wwwAewportbeachca.gov 1 (949) 644-3200 Fes' S'F'RDffaR N"A 13D SYSTEM ROUGH INSPECTION C + CKr.reT 1- Ryser Construction and Location A pprovai YES a Dram valve - b. Bactdibw devica (single check) a Bee activation device d. Inspectoes test valve e. Riser s¢ed per approved plans 2. Pressure Test bSysferrr tested at operating pressure for 2 hoar; Pressure gauge nstalled 3. Soy nkfer Heads shall not be r StaAa i m frttinas Door to a, sr„ f7e7Fla OLM_enfad in Dia (lemondyy oil test Dlucsra. Installation and spacing of tmporary test plugs4_ Pivinq El a_ Material installed per plan b. Hangers percodas(preventupwardrnovernenrc.All JEI CPVC �Ing SW be installed by persons who have been certified by the mar ufacbAer far installationof. o pip¢rg d-Pipingpmle�dfromdamagel' wkV msfa9ed per code b. Boxes installed at proper lo. cations NOTE .PVC plastic pipe in fhe garage shalt not he expo-e ,i. Sp hkler; that, are listed as `C Response' or'ResidertfiaP most be used. CORRECTIONS AND NOTES; Z'SZPPJ'qRNF:PA1311 SYSTEM ROUGH INSPECTINAPPROAE PERMrr DATE2 ,1 NO IIAP Famvs�Fire Sprinkler NF: A L�(] System _ gnugh Irtspecpan Cneddut a5/12/2pS �ti8wP0.Ql,� Clji 1- OF 1�,.�1�E rr 1 lJR BEACH COMMUNM BU•• DPiGDIYISION Civic Center Drive j P:O. Box 1768 1 Newport Beach, CA 92658 8915 wwwr.newportheachcargov, j (949) 644-3200 EI4I NEE SP FINAL CHECKLIST (RESIDENTIAL) YES No 1, Water meter proper sin ❑ 9 Fie sprinkler system jnstIled per the approved plans 3. All ccnshu5on covers removed from sprinkler heads El NOT to be installed, but shall be available on the jobsite are tall El 4. Cover plates Ej 5. All type and palm removed from sprinker heads 6. Finish trim ustaIted around sprinkler heads ❑ 7. Proper si9nage posted at all r=quirzd locations 0 S. El Row test conducted and befl basted 9. Location of inspedors tab i valve in approved location ❑ SYSTEMS: 10. Clearances around sprig ider heads and riser - no obstructions ❑ a r stalled at ser showing proper water pressure ❑ 1 I. operating pressure 9 ❑ 12. Back flow preventerinstaAed 13. System instaDed per manufacturers specifications ❑ ❑ NOTES: 7flp,EN RNEPA 13D SYSTEM FINAL APPROVED:PERMITDATE Forms\Fire SPd m- INAL let NFPA 13�Sys<Edi¢krts[9E51DEN11AL 0S/LRQu