Loading...
HomeMy WebLinkAbout4.0_Residences at 1400 Bristol Street_PA2022-0296 CITY OF NEWPORT BEACH PLANNING COMMISSION STAFF REPORT December 7, 2023 Agenda Item No. 4 SUBJECT: Residences at 1400 Bristol Street (PA2022-0296) ▪ General Plan Amendment ▪ Planned Community Development Plan Amendment ▪ Major Site Development Review ▪ Affordable Housing Implementation Plan ▪ Traffic Study ▪ Development Agreement ▪ Environmental Impact Report Addendum SITE LOCATION: 1400 and 1420 North Bristol Street APPLICANT: The Picerne Group OWNER: BCD Newport Beach II, LLC. PLANNER: Liz Westmoreland, Senior Planner 949-644-3234, lwestmoreland@newportbeachca.gov PROJECT SUMMARY The Residences at 1400 Bristol Street project includes the demolition of two existing two- story office buildings and surface parking and the construction of 229 apartment units atop of 422-space parking structure. The project is located in the Newport Place Planned Community, at the northwest corner of Bristol Street North (“Bristol Street”) and Spruce Street in the Airport Area. The project includes the construction of a pedestrian bridge that would connect to the approved residential apartment project at 1300 Bristol Street, across the Spruce Street right-of-way. RECOMMENDATION 1) Conduct a public hearing; 2) Find that potential environmental impacts have been previously mitigated through the implementation of the policies of the General Plan as evaluated in Program Environmental Impact Report for the 2006 General Plan Update (SCH No. 2006011119), and the City of Newport Beach Housing Element Initial Study/Negative Declaration (collectively, the PEIR); therefore, in accordance with Section 15164 of the California Environmental Quality Act (CEQA) Guidelines, an addendum to the previously adopted PEIR is the appropriate environmental documentation for the project; and 1 INTENTIONALLY BLANK PAGE2 Residences at 1400 Bristol Street (PA2022-0296) Planning Commission, December 7, 2023 Page 2 3) Adopt Resolution No. PC2023-043 (Attachment No. PC 1) recommending the City Council adoption of Environmental Impact Report Addendum, and approval of General Plan Amendment, Planned Community Development Plan Amendment, Major Site Development Review, Affordable Housing Implementation Plan, Traffic Study, and Development Agreement, for the Residences at 1400 Bristol Street Project located at 1400 and 1420 North Bristol Street (PA2022-0296). VICINITY MAP GENERAL PLAN ZONING LOCATION GENERAL PLAN ZONING CURRENT USE ON-SITE General Commercial Office (CO-G) PC-11 Office buildings NORTH CO-G PC-11 Office building SOUTH N/A N/A California State Route 73 EAST Mixed-Use Horizontal (MU-H2) PC-11 Office building (future Residences at 1300 Bristol) WEST CO-G PC-11 Office buildings 3 INTENTIONALLY BLANK PAGE4 Residences at 1400 Bristol Street (PA2022-0296) Planning Commission, December 7, 2023 Page 3 INTRODUCTION Project Setting The subject property is located in the Newport Place Planned Community (PC-11) and approximately 2.38 acres in size. The site is currently designated for office uses by the General Plan and PC-11. The property is rectangular in shape, located at the northwest corner of Bristol Street and Spruce Street, and adjacent to existing office buildings and surface parking. The north office property located at 1401 Quail Street is currently being considered for residential development (Residences at 1401 Quail Street Project (PA2023-0040). The subject property is currently improved with two two-story, office buildings consisting of 38,764-square-foot and a surface parking lot. Project Description The Applicant, the Picerne Group, is proposing to demolish the two existing office buildings and construct a 229-unit for-rent project atop a 422-space parking structure (“Project”). The parking structure includes one level on-grade (podium level) and two levels below grade with five levels of residential above the podium. Given that the site is designated for office use by the General Plan, the applicant requests a General Plan Amendment from General Commercial Office (CO-G) to Mixed-Use Horizontal (MU-H2) to allow residential use. The base density allotted to the property if designated MU-H2 is 89 dwelling units. This density is based on the conversion of the existing 38,764 square foot office buildings, consistent with the City’s adopted land use conversion factors. The General Plan Amendment includes a request to increase the project’s base density by 64 dwelling units for a total base of 153 dwelling units. The applicant also proposes a 50% density bonus to increase the total unit count to 229 pursuant to Government Code Section 65915 (Density Bonus Law) and Newport Beach Municipal Code (NBMC) Section 20. 32 (Density Bonus). The dwelling unit calculations are summarized below in Table 1. Table 1: Dwelling Unit Summary The project includes a proposed pedestrian bridge that would extend from the project over the Spruce Street right-of-way to the approved residential apartment project at 1300 Bristol Street (Figure 1). Units Based on Existing Nonresidential Uses 89 Additional Units Per Proposed General Plan Amendment1 64 Total Base Units 153 Density Bonus (50%)77 Total Units Permitted 230 Total Units Provided 229 5 Residences at 1400 Bristol Street (PA2022-0296) Planning Commission, December 7, 2023 Page 4 Figure 1: Pedestrian Bridge The Applicant’s full project description is provided as Attachment No. PC 2. The following approvals are requested to implement the Project as proposed: • General Plan Amendment (GPA)- A request to change the existing General Plan land use designation from General Commercial Office (CO-G) to Mixed Use Horizontal 2 (MU-H2) and add 64 dwelling units above the General Plan allowance to Anomaly 16 of the General Plan Table LU2 (Anomaly Locations); • Planned Community Development Plan Amendment- An amendment to the Newport Place Planned Community (PC-11) to include the project site within the Residential Overlay; • Major Site Development Review - A site development review in accordance with the Newport Place Planned Community and Section 20.52.80 (Site Development Reviews) of the Newport Beach Municipal Code (“NBMC”), for the construction of the Project; • Affordable Housing Implementation Plan (“AHIP”) - A plan specifying how the Project would meet the City’s affordable housing requirements, in exchange for a request of 50 percent increase in density. The Applicant seeks six (6) development standard waivers related to park land dedication, building setbacks, 6 Residences at 1400 Bristol Street (PA2022-0296) Planning Commission, December 7, 2023 Page 5 building height, private open space for each residential unit, common open space for the entire Project, and overall residential project density pursuant to Chapter 20.32 (Density Bonus) of the NBMC and Government Code Section 65915 (Density Bonus Law). The Applicant also seeks one development concession related to the mix of affordable units, pursuant to Chapter 20.32 (Density Bonus) of the NBMC and Government Code Section 65915; • Traffic Study - A traffic study pursuant to Chapter 15.40 (Traffic Phasing Ordinance) of the NBMC; • Development Agreement – A Development Agreement between the Applicant and the City, pursuant to Section 15.45.020(A)(2)(a) (Development Agreement Required) of the NBMC, which would provide the Applicant with the vested right to develop the Project for a term of 10 years and to provide negotiated public benefits to the City; and • Addendum to the 2006 General Plan Update Program Environmental Impact Report (“Addendum”) - Pursuant to the California Environmental Quality Act (“CEQA”), the Addendum addresses reasonably foreseeable environmental impacts resulting from the Project. Project Components: Residential Development The proposed multi-unit residential building is designed as a “podium style” structure that consists of five stories over one level of on-grade parking and two levels of subterranean parking. The building height would be approximately 85 feet, including architectural elements, parapet, rooftop mechanical equipment, and roof access. The 229 apartment units include 40 studio units,126 one-bedroom units, and 63 two- bedroom units. The studio units would be 515 square feet, the one-bedroom units would range from 613 to 896 square feet, and the two-bedroom units are proposed to range from 1,049 to 1,469 square feet. Of the 229 units, 23 units would be affordable and restricted to very-low-income households. The remaining 203 units would be market-rate, for-rent apartment units. While there is an overall unit mix of studio (17.5%), one-bedroom (55%), and two- bedroom (27.5%) units, almost all of the affordable units are one-bedroom or studio units (refer to Table 2 below). This does not meet the standards of Section 20.32.110 (Design and Distribution of Affordable Units) of the NBMC, which requires affordable units in a density bonus project to reflect the same range of unit types in the development as a 7 Residences at 1400 Bristol Street (PA2022-0296) Planning Commission, December 7, 2023 Page 6 whole. However, the applicant is requesting relief through an incentive/concession1 from State Density Bonus Law, further discussed below. Table 2: Unit Mix The Project would include a modern contemporary architectural style with articulated facades composed of a mix of stucco, fiber cement board siding, and tile veneer façade accents. The color scheme would be white, dark grey, and beige. Metal awnings and metal railings on the private decks would further provide façade articulation. The architectural design of the Project reflects the surrounding office context. Its contemporary forms complement the existing office buildings to create a building that respects the current condition while creating a distinctly unique identity. The Project corners are enhanced with rich materials to bring attention to and articulate the prominent areas of the Project. The applicant’s approach to the building site orientation was to create a sheltered refuge in the center of the project by enclosing the courtyards shielding them from the busy roadways of Bristol Street and Spruce Street. Figure 2: Rendering from Bristol Street 1 The terms incentive and concession are used interchangeably. 8 Residences at 1400 Bristol Street (PA2022-0296) Planning Commission, December 7, 2023 Page 7 Vehicular Access, Parking, and Pedestrian Bridge Vehicular access to the project site is currently and would continue to be provided from one driveway on Bristol Street and one driveway on Spruce Street. Vehicular access and circulation are shown below on Figure 3. Because Bristol Street is a one-way roadway, the driveway will only allow right turns in and out. The driveway at Spruce Street will provide full access (i.e., right and left turns in and out). The driveway entrance on Bristol Street North would be relocated approximately 65 feet to the northwest (further away from the intersection at Spruce) and it will provide controlled access to the resident garage entry. The driveway entrance on Spruce Street would lead to another gated entry for residents and guests. The gated entry on Spruce Street would remain open during business hours for guests. After business hours, guests would use a free-standing call box for entry. A designated turn out area is proposed within the Bristol Street North entry for loading, deliveries, and trash pick-up. Separately, a turnout area on Spruce Street will be provided for ride share pick up and drop offs. Figure 3 Vehicular Circulation Guest parking would be provided on the ground level from the Spruce Street entrance. All guest parking would be separated from resident parking by roll up gates. The Bristol Street entrance leads to a resident only access with assigned parking. Subterranean parking would be restricted to residents with key-card access. Spruce Street 9 Residences at 1400 Bristol Street (PA2022-0296) Planning Commission, December 7, 2023 Page 8 As a Density Bonus project, the Project is required to provide 261 parking spaces. The Project proposes to provide 422 parking spaces. The parking ratio would be 1.84 parking spaces per dwelling unit inclusive of guest parking, which would exceed Government Code Section 65915(p) and NBMC Section 20.32.060 (Parking Requirements in Density Bonus Projects) requirements as summarized in Table 3. Table 3: Parking Summary Level Resident Guest Total Resident Accessible EV Guest Accessible EV Ground Level 57 3 3 42 3 1 109 Subterranean Level 1 131 5 17 0 0 0 153 Subterranean Level 2 160 0 0 0 0 0 160 Total 348 8 20 42 3 1 Total Resident: 376 Total Guest: 46 422 EV=Electric Vehicle Source: TCA Architects, 2023. The project includes a steel truss pedestrian bridge that extends from the proposed project over the Spruce Street right-of-way to the approved residential apartment project at 1300 Bristol Street. The pedestrian bridge would be located on the second story, at the southern corner of the building. The bridge would include a 9-foot-wide pathway and span approximately 108 feet and provide a minimum 17-foot clearance for emergency vehicles. The pedestrian bridge is intended to provide connectivity between the two residential projects and allow sharing of amenities between the sites. The properties are owned and will be operated by the same entity. The applicant will be required to enter into a lease agreement with the City of Newport Beach subject to the payment of fees for the use of air- space over the City’s right-of-way. The pedestrian bridge has been conditioned to comply with Caltrans standards for bridge construction. Project Amenities The proposed project includes a variety of private on-site recreation and amenities for residents and guests including a clubroom, pool deck, roof deck, and other uses summarized below: 10 Residences at 1400 Bristol Street (PA2022-0296) Planning Commission, December 7, 2023 Page 9 Table 4: Project Amenities Construction Phasing Implementation of the proposed Project occur over an approximately 24-month period. Demolition and construction activities are assumed to commence in Summer 2024 and conclude in Spring 2026. The applicant has submitted a draft construction management plan, subject to staff approval that will be finalized prior to the issuance of a building permit and is included as Attachment No. PC 3. Off-Site Improvements The Sewer Capacity Study prepared by Tait & Associates, Inc. dated August 11, 2023, concludes that there is insufficient capacity in a downstream segment of pipe to support the project along with other approved and planned residential development in the area. Figure 4 below shows the location of a 435-foot long segment of pipe near the intersection of Newport Place and Dove Street where an existing 10-inch vitrified clay pipe (VCP) pipe will need to be replaced by a 12-inch main. As conditioned, the applicant will either replace the existing segment of pipe (and be potentially reimbursed by future applicants and the City), or the City will replace the line and all applicants will pay their fair share of the costs. Alternatively, the City may choose a different method to finance the cost of the improvement. No other off-site improvements other than typical utility connections are proposed or required as part of the project (other than the pedestrian bridge that would cross the public right-of-way). 11 Residences at 1400 Bristol Street (PA2022-0296) Planning Commission, December 7, 2023 Page 10 Figure 4: Off-Site Sewer Improvements DISCUSSION General Plan Amendment The subject property is located in the Airport Area and is currently designated as General Commercial Office (CO-G) by the General Plan Land Use Element. The applicant is requesting to change the land use designation of the subject property from the CO-G designation to Mixed-Use Horizontal 2 (MU-H2), which provides for a horizontal intermixing of uses that may include regional commercial office, multifamily residential, vertical mixed-use buildings, industrial, hotel rooms, and ancillary neighborhood commercial uses. The MU-H2 designation applies to a majority of properties in the Airport Area and allows a maximum of 2,200 residential units as replacement of existing office, retail, and/or industrial uses at a maximum density of 50 units per net acre. Any eligible density bonus allowed by Government Code Section 65915 (State density bonus law) and NBMC Chapter 20.32 (Density Bonus) and the requested 64 GPA units are not included in the 2,200-unit policy allowance. Presently, there are a total of 353 units remaining and available to be entitled. With the approval of this project, there would be 264 (353-89=264) dwelling units remaining (exclusive of density bonus units and units authorized through General Plan Amendments). Residential units approved, proposed and remaining within the MU-H2 designation of the Airport Area are listed in the table below. Subject Property Off-site Sewer Line Segment 12 Residences at 1400 Bristol Street (PA2022-0296) Planning Commission, December 7, 2023 Page 11 Airport Area Residential Units Residential Development Allocation Base Units Density Bonus Units Project Totals with Density Bonus Replacement Units Additive Units Transferred Units Total Units General Plan Unit Limit (MU-H2) 1,650 550 0 2,200 Approved Projects Uptown Newport 632 290 -77 845 322 1,167 Newport Crossings 259 0 0 259 91 350 Newport Airport Village 329 0 0 329 115 444 Residences at 4400 Von Karman 260 0 260 52 312 Residences at 1300 Bristol 77 0 +77 154 39 193 Projects Under Review Residences at 1400 Bristol 89 0 0 89 77 229* Remaining Development Allocation 264 0 264 *Project total reflects actual proposed project inclusive of density bonus units and GPA units. However, the density bonus units and GPA units are not restricted by the 2,200 residential unit limit identified in the 2006 General Plan. The GPA also includes a revision to Anomaly 16 of the General Plan Table LU2 (Anomaly Locations) to allow 64 additional residential dwelling units at the Property. Conversions of existing commercial space to dwelling units and density bonus units are not tracked within Table LU2. The GPA and the resulting land use change are compatible with the existing surrounding uses and planned land uses identified by the General Plan, because the project would introduce additional residential land uses in the Airport Area which includes a diverse mix of land uses including the gradual development of residential multiunit dwellings. Additionally, even with the conversion from CO-G to MU-H2, the building will be compatible with adjacent commercial properties architectural style and pedestrian connectivity. Additional residential development would support commercial properties within the Airport Area. Furthermore, the GPA does not eliminate existing or future land uses to the overall detriment of the community given the subject property’s size, location, and surrounding uses. The existing office buildings on-site were built in the 1970’s and there are sufficient office facilities in the Airport Area to support the business needs of the community. The proposed change to allow residential uses would increase the City’s housing stock including the provision of 23 units that will be affordable to lower incomes. 13 Residences at 1400 Bristol Street (PA2022-0296) Planning Commission, December 7, 2023 Page 12 The General Plan contains a number of policies that provide for the orderly evolution of the Airport Area, from a business park, to a mixed-use district with cohesive residential villages integrated within the existing fabric of office, industrial, retail, and airport-related businesses. Residential opportunities are to be developed as clusters of residential villages centering on neighborhood parks and interconnected by pedestrian walkways. These would contain a mix of housing types and buildings that integrate housing with ground level convenience retail uses and would be developed at a sufficient scale to achieve a complete neighborhood. While this specific site was not identified as a site for mixed-use development due to noise from the airport, actual noise from the airport is less than predicted due to changes in flying patterns and improved technology. As a result, it is appropriate to consider housing at the project site. Housing Element The Housing Element identifies adequate sites to accommodate its fair share allocation for the Sixth Cycle Housing Element to accommodate housing growth needs by income categories. The project site is identified as a housing inventory site. Figure B-3 of the Housing Element (below) displays the capacity and opportunity within the Airport Area which can help accommodate a portion of the City’s RHNA. Ultimately, the project implements the certified Housing Element and aids the City in its goal to provide new housing opportunities. 14 Residences at 1400 Bristol Street (PA2022-0296) Planning Commission, December 7, 2023 Page 13 Noise Element and Airport Environs Land Use Plan The Project is within the boundaries of the Airport Environs Land Use Plan (“AELUP”), therefore, the overseeing agency, Airport Land Use Commission (ALUC), must review the proposed GPA and PCDP Amendment pursuant to Government Code Section 65302.3 and Public Utilities Code Section 21676. The purpose of ALUC’s review is to determine whether the Project is consistent with the AELUP prior to the City Council acting on the Project. Staff anticipates review of the project by the ALUC on December 21, 2023. The Project is consistent with the policies of the Noise Element and the safety standards of the AELUP. With respect to noise, the City adopted noise-related amendments to the General Plan Noise and Land Use Elements, the Newport Place Planned Community (PC-11) and Title 20 (Planning and Zoning) contours to implement the 6th Cycle Housing Element. The Project is located within the updated 60 decibel ("dBA”) community noise equivalent level (“CNEL”) contour as shown in Figure N5 of the Noise Element of the General Plan, where residential development is allowed. As a result, the Project will be required to comply with the development standards set forth in Section 20.30.080(F) of the NBMC. The Project site is outside of any safety zones set forth in the AELUP. The AELUP includes noise contours from the 1985 Master Plan and the site is bisected by the 65 dBA CNEL noise contour. The AELUP indicates that housing within this noise contour would not be compatible, but it does not prohibit residential use. These outdated AELUP noise contour maps do not reflect changes in aviation technology and current air traffic patterns. In other words, the noise contours do not reflect current and future noise contours and the site will not be subject to aircraft noise that exceeds 65 dBA CNEL under current approved conditions. The draft Planning Commission resolution (Attachment No. PC 1) includes facts in support of a finding of consistency of relevant Airport Area policies. Furthermore, the EIR Addendum includes a comprehensive analysis of all relevant General Plan policies. The project, as proposed, is consistent with all relevant General Plan policies. Charter Section 423 Analysis Charter Section 423 requires voter approval of any major General Plan amendment to the General Plan. A major General Plan amendment is one that significantly increases allowed density or intensity by 40,000 square feet of non-residential floor area, increases traffic by more than 100 peak hour vehicle trips (AM/PM), or increases residential dwelling units by 100 units. These thresholds apply to the total of increases resulting from the amendment itself, plus 80% of the increases resulting from other amendments affecting the same neighborhood (defined as a Statistical Area as shown in the General Plan Land Use Element) and adopted within the preceding ten years. Council Policy A-18 (Guidelines for Implementing Charter Section 423) requires that proposed amendments to the General Plan be reviewed to determine if a vote of the 15 Residences at 1400 Bristol Street (PA2022-0296) Planning Commission, December 7, 2023 Page 14 Newport Beach electorate would be required. This policy includes a provision that all General Plan amendments be tracked as “Prior Amendments” for ten (10) years to determine if minor amendments in a single Statistical Area cumulatively exceed the thresholds indicated above. The Project is the first General Plan Amendment in Statistical Area L1 within the last 10 years that includes additional dwelling units or non-residential floor area. The proposed amendment results in 64 additional dwelling units and no change in the square footage of non-residential floor area. Conversions of existing commercial development is allowed by the current General Plan, as discussed previously. Reductions in commercial floor area are not tracked as part of the Charter Section 423 analysis. Density bonus units are not included in Charter Section 423 analysis because it is mandated by State law and allowed at any site designated for housing. The 64 additional dwelling units allocated by the requested general plan amendment result in a net increase of 24 a.m. peak hour trips and 25 p.m. peak hour trips based on the “Multifamily Housing (Mid Rise) Not Close to Rail” ITE 11th Edition trip rate for the proposed use, as provided in Council Policy A-18. No credit is given to the existing non- residential uses on-site because the existing office floor area was converted to residential dwelling units so that the proposed project (less the density bonus and GPA units) is traffic neutral. Therefore, the Project individually does not exceed the Charter Section 423 thresholds to require a vote of the electorate should the City Council approve the requested GPA. Furthermore, since there have been no other applicable projects in the last 10-years, there is no need to analyze the cumulative development of 80% of prior General Plan amendments from the last 10 years with the proposed project (i.e., cumulative analysis). As none of the thresholds specified by Charter Section 423 are exceeded, no vote of the electorate is required if the City Council chooses to approve the requested GPA. 80% of the increases in units and peak hour trips related to this project will be tracked as a prior amendment for 10 years from the date of approval of the proposed GPA. Tribal Consultation (SB-18) Pursuant to California Government Code Section 65352.3 (SB18), a local government is required to contact the appropriate tribes identified by the Native American Heritage Commission (“NAHC”) each time it considers a proposal to adopt or amend the General Plan. If requested by any tribe, the City must consult for the purpose of preserving or mitigating impacts to cultural resources. The City received a response from the NAHC indicating that 12 tribal contacts should be provided notice regarding the proposed amendment. The tribal contacts were provided notice on January 26, 2023. California Government Code Section 65352.3 requires notification 90 days prior to Council action to allow tribal contacts to respond to the request to consult. Three tribal contacts requested consultation within the 90-day period: the Gabrieleno Band of Mission Indians – Kizh Nation, the Juaneno Band of Mission Indians, Acjachemen Nation-Belardes, and the Gabrielino Tongva Indians of California. Although consultation with the participating 16 Residences at 1400 Bristol Street (PA2022-0296) Planning Commission, December 7, 2023 Page 15 Native American Tribes is ongoing, draft conditions of approval have been included to address potential concerns regarding the protection of Tribal Cultural Resources. The conditions of approval require on-site monitoring during ground disturbing activities by tribal representatives as well as appropriate conditions should tribal cultural resources be discovered. Newport Place Planned Community (Zoning Code) Amendment The property is currently located within Industrial Site 3A of PC11 and not within the Residential Overlay of PC11. The industrial zoning designation was established in 1972 with the adoption of the planned community text. Office development is and remains allowed. A request to allow the subject property to be added to the Residential Overlay of PC11 is necessary to accommodate the proposed residential development. Further change to PC11 is not necessary as the intent of the residential overlay is to allow housing regardless of the underlying zoning category. The property is located within 85 feet of properties subject to the Residential Overlay. The Overlay allows for multiple residential development as a stand-alone use provided that it includes a minimum of 15% of the base density for lower income households. The project provides this minimum number of affordable units by provide 23 dwelling units as affordable for very-low income households (153 base units x 15% = 22.95 = 23 units). The Overlay also contains development standards for multi-residential development, including density, height, setbacks, parking, signage, airport noise compatibility, amenities, and landscaping. The Overlay limits the density for a residential development to be between 30 and 50 dwelling units per acre. The Project includes 89 base units or 37.4 dwelling units per acre, not including density bonus units or the requested units through the requested GPA. The base density with the requested GPA results in a density of 64.3 dwelling units per acre. The overall density of the project including the density bonus units is 96.2 units per acre. Both the base density and density bonus units are not consistent with the PC Text density requirement; however, the Applicant is requesting a development standard waiver pursuant to the NBMC and State Density Bonus Law. Additionally, the Overlay requires that residential dwellings are to be permitted as replacement of existing nonresidential uses consistent with General Plan policy, and the number of peak hour trips generated by the Project is not to exceed the number of trips of the underlying permitted nonresidential use. A detailed discussion of the proposed project and conversion of existing office space is provided in the prior sections. Although the Project includes waivers or reductions of the development standards specified in the Overlay pertaining building height and setbacks, the overall intent of providing residential opportunities in the proposed Residential Overlay are being met. 17 Residences at 1400 Bristol Street (PA2022-0296) Planning Commission, December 7, 2023 Page 16 Site Development Review Residential development pursuant to the Residential Overlay of PC11 requires a site development review, consistent with NBMC Section 20.52.080 (Site Development Review). In accordance with Section 20.52.080(F), the Planning Commission may approve or conditionally approve a site development review application, only after first finding that the proposed development is: 1. Allowed within the subject zoning district; 2. In compliance with all of the applicable criteria identified in 20.52.080(C)(2)(c) below: i. Compliance with this section, the General Plan, this Zoning Code, any applicable specific plan, and other applicable criteria and policies related to the use or structure; ii. The efficient arrangement of structures on the site and the harmonious relationship of the structures to one another and to other adjacent developments; and whether the relationship is based on standards of good design; iii. The compatibility in terms of bulk, scale, and aesthetic treatment of structures on the site and adjacent developments and public areas; iv. The adequacy, efficiency, and safety of pedestrian and vehicular access, including drive aisles, driveways, and parking and loading spaces; v. The adequacy and efficiency of landscaping and open space areas and the use of water efficient plant and irrigation materials; and vi. The protection of significant views from public right(s)-of-way and compliance with Section 20.30.100 (Public View Protection). 3. Not detrimental to the harmonious and orderly growth of the City, nor endangers, jeopardizes, or otherwise constitutes a hazard to the public convenience, health, interest, safety, or general welfare of persons residing or working in the neighborhood of the proposed development. The project seeks to implement the proposed MU-H2 General Plan designation and Residential Overlay of PC-11 by providing 229 new residential units to an existing major employment center (the Airport Area and Irvine Business Complex), including setting aside 23 residential units for very-low income households. The proposed project plans (Attachment No. PC 7) show the configuration of the proposed residential building, including driveways, location of open spaces, landscaping, and private amenities. The building is proposed to be six stories tall and approximately 85 feet in height including all architectural elements and rooftop mechanical equipment. The architecture would be high-quality and incorporate neutral colors with stone/tile, metal, and glass features. The proposed pedestrian bridge is designed to match the 18 Residences at 1400 Bristol Street (PA2022-0296) Planning Commission, December 7, 2023 Page 17 architectural style of the proposed building and the approved, but not yet constructed apartment building at 1300 Bristol Street. The parking is largely screened from public view, with two of the three levels located entirely below grade and landscaping buffers around the first-floor parking structure. The project includes enhanced landscaping along Bristol Street North in compliance with PC-11 and the project is conditioned to widen sidewalks, which will improve the pedestrian experience in the area. The pedestrian bridge includes “see-through” elements that reduce its mass and scale. The Project’s building mass including the pedestrian bridge are compatible with the surrounding office developments and anticipated future development. The project’s building mass and scale are similar to the nearby existing office developments in the Airport Area and includes pedestrian connectivity to public sidewalks along Bristol Street and Spruce Street and pedestrian-scale landscaped areas around the apartment building. The property at 1451 Quail Street is developed with an approximately 37-foot tall office building. The 1400 Quail Street property, located across Quail Street, is developed with an approximately 30-foot tall office building. Furthermore, a 78-foot tall residential apartment building has been approved to be constructed at 1300 Bristol Street, which is located across Spruce Street. Finally, 1401 Quail Street which is the adjacent property, is proposing a 67-unit condominium project that is approximately 86 feet in height. The height and scale of pending and approved development in the immediate vicinity, the proposed project at 85 feet high will be compatible with the planned urban village planned for the Airport Area. The project includes 422 onsite parking spaces located on a podium level parking structure which includes a two subterranean parking levels below. The project includes adequate onsite parking exceeding the minimum required residential standard pursuant to Density Bonus Law. NBMC Section 20.40.040, Off-Street Parking Requirements, identifies that multi-family developments with more than four dwelling units are required to provide two covered parking spaces per unit and 0.5 space per unit for guest parking. Based on these criteria, the proposed Project, if it were not a project requesting consideration pursuant to Density Bonus Laws, would be required to provide 458 resident parking spaces and 115 guest parking spaces for a total of 573 parking spaces. As provided for in Government Code Section 65915 Density Bonus Law and NBMC Section 20.32.060 (Parking Requirements in Density Bonus Projects), the applicant is requesting a reduction in the number of required parking spaces for the project. NBMC Section 20.32.060, reflects the language of Government Code Section 65915 provision of 1.0 parking spaces for studio and one- bedroom units and 1.5 parking spaces for units with two bedrooms. Parking for the project is based on application of regulatory standards for density bonus projects and under these regulatory standards, the proposed Project is required to provide a minimum of 261 parking spaces. The project as presently designed includes 422 parking spaces, with 376 for resident spaces and 76 for guest. The parking ratio of the proposed project would be 1.84 parking spaces per dwelling unit inclusive of guest parking, which exceeds the 19 Residences at 1400 Bristol Street (PA2022-0296) Planning Commission, December 7, 2023 Page 18 minimum parking requirement specified by the Density Bonus parking requirements. This excess parking is necessary in recognition that mass transit in the area is not as robust, and residents will rely on the automobile. As the area transitions, transit and walkability will improve as new uses are developed to provide services and goods for future residents. The City’s General Plan does not identify any scenic vistas or viewpoints on or proximate to the Project site. The nearest public viewpoint to the Project site identified in the City’s General Plan is approximately 0.5 mile south at Bayview Park. The nearest coastal view designated portion of Jamboree Road is approximately 2,000 feet south of the site. Due to the distance and highly urbanized nature of the Project area, public coastal views along this view corridor would not be impacted by the Project. As discussed above, the project has been designed to ensure that potential conflicts with surrounding land uses are minimized to the extent possible to maintain a healthy environment for both businesses and residents by providing an architecturally pleasing project with articulation and building modulations to enhance the urban environment. The proposed project is consistent with the General Plan as it would integrate residential uses into the existing surroundings, which are primarily nonresidential, as anticipated by the General Plan. Staff believes facts to support the required findings exist to approve the Site Development Review, and they are included in the attached draft resolution for approval (Attachment No. PC 1). Affordable Housing Implementation Plan The applicant has prepared a draft Affordable Housing Implementation Plan (AHIP), dated August 11, 2023 (Exhibit C of Attachment No. PC 1) to illustrate compliance with the affordable housing requirements of the Residential Overlay of Newport Place Planned Community and density bonus allowances pursuant Government Code Section 65915- 65918 (Density Bonus Law) and NBMC Chapter 20.32 (Density Bonus Code). Consistent with the affordable housing requirements of the Residential Overlay, 15% or 23 units of the project’s 153 base units would be set aside as affordable units to very-low income households for 55 years. Incentive/Concession Request: The 15% allocation of very-low-income households makes the project entitled to a density bonus of 50% (77 units) above the maximum number of units allowed by the General Plan. In addition to the 77 density bonus units requested, the project is entitled to receive three incentives or concessions that would result in identifiable, financially sufficient, and actual cost reductions. The applicant requests the following incentive: 20 Residences at 1400 Bristol Street (PA2022-0296) Planning Commission, December 7, 2023 Page 19 a. Affordable unit mix that does not meet NBMC Section 20.32.110 (Design and Distribution of Affordable Units). This section requires affordable units in a density bonus project reflect the same range of unit types in the residential development as a whole. See previous discussion regarding unit mix. Granting this incentive will result in identifiable, financially sufficient, and actual project cost reductions by reducing the long-term rental subsidy costs associated with the two-bedroom units and affording additional rental income for the project to ensure financial feasibility. Development Standard Waivers In addition to the density bonus units, parking reductions, and financial concessions, the Project is entitled to receive unlimited waivers or reductions of development standards if the development standard would physically prevent the project from being built at the permitted density. In this case, the Applicant requests waivers of the following development standards: a. Park dedication requirement. General Plan Land Use Policy LU 6.15.13 requires a public park equal to eight percent of the gross land area of the development, or a minimum one-half acre, whichever is greater, be provided. In this case, the 2.28- acre project site is too small to feasibly accommodate a half-acre park. The City has granted this dedication waiver twice previously with the Newport Airport Village planned community and the Residences at 1300 Bristol Street project. b. Residential density. General Plan Land Use Policy LU 6.15.7 limits residential density between 30-50 units per acre. Inclusive of only the conversion units, the density would comply at 37.4 dwelling units per acre. Including the proposed GPA units, the resulting base density would be 64.3 units per acre exceeding the limit and a waiver is necessary to implement the project. Again, the City has previously granted this policy waiver allowing excess density twice with the Newport Airport Village planned community and the 1300 Bristol Street projects. c. Street setbacks. The Newport Place Planned Community (PC-11) requires street setbacks of 30 feet from property lines. In this case, 30-foot setbacks along Bristol Street and Spruce Street would substantially decrease the development of the footprint of the Project. The Project is designed with 8-foot setbacks to Spruce Street and 18-foot setbacks to Bristol Street similar to the setback reduction with the Residences at 1300 Bristol project. d. Building height. The Newport Place Planned Community (PC-11) limits building height to 55 feet from established grade. In this case, a higher building height is necessary to accommodate 229 residential units. The Project is designed with a height of approximately 85 feet from established grade. The City granted a similar waiver with the Residences at 1300 Bristol Street project. e. Private open space. NBMC Section 20.18.030 (Residential Zoning Districts General Development Standards) requires a minimum of 5% of the gross floor area of each unit to be provided as open space. The Project’s studio dwelling units and 21 Residences at 1400 Bristol Street (PA2022-0296) Planning Commission, December 7, 2023 Page 20 nine of the two-bedroom units (including four units which provide only 2 square feet less than the private open space requirement) are unable to achieve these minimum private open space standards given their size and location. f. Common open space. NBMC Section 20.18.030 (Residential Zoning Districts General Developments Standards) requires a minimum of 75 square feet per unit be provided as common open space area. In this case, the requirement is 17,175 square feet (75 square feet per unit x 229 units). The Project as designed provides approximately 13,800 square feet of common open space due to space limitations on the 2.38-acre lot. Fiscal Impact Analysis and Development Agreement Pursuant to General Plan Implementation Program 12.1, a fiscal impact analysis was prepared for the project by Applied Development Economics dated August 14, 2023 (Attachment PC 5). The fiscal impact model used in the report calculates public service impacts for specific land uses that support the residential population, the employment base and the visitor population in Newport Beach. It also calculates the public revenues that each type of land use typically generates for the City, including property taxes, sales taxes and other taxes as well as a variety of user charges and fees. The report concludes that the proposed residential rental project would generate a negative fiscal impact for the City, substantially higher than the negative fiscal impact of the existing office use of the site. Annually, the existing office use generates a negative fiscal impact of about $56,000 per year and the project would generate a negative fiscal impact of approximately $173,824. This is consistent with the original fiscal analysis of residential uses in the 2006 General Plan, although in recent years some very high value luxury residential projects have shown a positive fiscal benefit. The net impact of the growth in land uses at buildout of the General Plan compared to existing land uses in 2006 when the plan was adopted, would result in a positive fiscal impact for the General Fund of $21.7 million per year. Additionally, the project will be required to pay public benefit fees as part of the Development Agreement, which would offset some of the impacts. The project would also provide much needed housing opportunities in the City in furtherance of the certified Housing Element including 23 rental units affordable to very- low income households. In accordance with Section 15.45.020.A.2.a (Development Agreement Required) of the NBMC, a development agreement is required as the proposed project includes an amendment to PC11 and a General Plan Amendment to change the land use designation which include the development of 50 or more residential units. The applicant requests a 10-year term of agreement. The agreement provides assurance that the applicant may proceed with the proposed project in accordance with existing policies, rules and regulations, and conditions of approval. Additionally, the agreement helps the applicant avoid a waste of resources and escalated costs of the proposed 22 Residences at 1400 Bristol Street (PA2022-0296) Planning Commission, December 7, 2023 Page 21 project while encouraging a commitment to private participation in comprehensive planning. Staff supports the requested 10-year term. The DA provides vested rights to develop the project and the City is currently negotiating public benefit fees per each residential dwelling unit. The final negotiated fees will be presented to the City Council and are based on prior development agreements including the Newport Airport Village project. These fees are subject to annual adjustments, based on the CPI Index and would be payable at building permit issuance or prior to occupancy. Finally, the agreement includes all mandatory elements, including public benefits that are appropriate to support conveying the vested development rights consistent with the City’s General Plan, NBMC, and Government Code Sections 65864 et seq. Traffic Phasing Ordinance (TPO) NBMC Chapter 15.40 (Traffic Phasing Ordinance) requires a traffic study to be prepared prior to issuance of building permits if a proposed project generates in excess of 300 new average daily trips (ADT). Ganddini Group Inc. has prepared a traffic study dated June 28, 2023 (Exhibit D of Attachment No. PC 1), under the supervision of the City Traffic Engineer, pursuant to the Traffic Phasing Ordinance (TPO) and its implementing guidelines. The focus of a TPO traffic study is the conditions one year after project occupancy, or five years after project approval for larger projects not expected to be complete within five years. Baseline traffic conditions for a TPO traffic study include previously approved projects in the City. The entire project is anticipated to be complete by the end of 2026, well within the five year criteria. The Traffic Study provides an evaluation of morning and evening peak hours at 13 existing intersections that are located in the City and the adjoining City of Irvine. The Project is projected to generate an additional (i.e. net increase of) 624 daily trips, including 26 peak AM trips and 34 peak PM trips. When these trips are distributed to these studied intersections, the analysis concludes that there is no significant impact as the project will neither cause nor make worse an unsatisfactory level of service at any impacted primary intersection, and all intersections are forecasted to continue to operate at acceptable Levels of Service (LOS). Additionally, the Traffic Study includes vehicle miles traveled (VMT) analysis for informational purposes only. An analysis of VMT was not required as a part of the CEQA Addendum because the adopted Program Environmental Impact Report (PEIR), adopted in 2006, did not utilize VMT analysis. Nonetheless, the informational analysis concludes that the project is in an area mapped with low residential VMT per capita. Therefore, the project is presumed to have a less than significant impact on VMT since it satisfies the City established screening criteria. Furthermore, the TPO requires findings that, based on the weight of the evidence in the administrative record, including the traffic study, the proposed project complies with the 23 Residences at 1400 Bristol Street (PA2022-0296) Planning Commission, December 7, 2023 Page 22 TPO. Findings related to the preparation of the traffic study are provided in the draft resolution for project approval (Attachment No. PC 1). Environmental Review On July 25, 2006, the City Council adopted Resolution No. 2006-75, thereby certifying the adequacy and completeness of the Environmental Impact Report (“EIR”) for the General Plan 2006 Update (SCH No. 2006011119). The EIR was prepared in compliance with the CEQA set forth in the California Public Resources Code Section 21000 et seq. and its implementing State regulations set forth in the California Code of Regulations Title 14, Division 6, Chapter 3 (“CEQA Guidelines”) and City Council Policy K-3. Additionally, in accordance with Section 15168(a) of the CEQA Guidelines, the City prepared the EIR as a Program Environmental Impact Report (“PEIR”). This PEIR analyzed the potential impacts of a citywide land use plan, and the goals and policies of 10 general plan elements. Additionally, on November 22, 2011, the City Council adopted General Plan Amendment No. GP2008-003, thereby approving the City of Newport Beach Housing Element Update (2008-2014) and its associated Housing Element Initial Study/Negative Declaration. Pursuant to Section 21166 of the California Public Resources Code and Section 15162 of the CEQA Guidelines, when an EIR or prior Negative Declaration has been certified for a project, no subsequent EIR or other analysis is required unless the lead agency determines, on the basis of substantial evidence in the light of the whole record, one or more of the following: 1. Substantial changes are proposed in the project which will require major revisions of the previous EIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects; 2. Substantial changes occur with respect to the circumstances under which the project is undertaken which will require major revisions of the previous EIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects; or 3. New information of substantial importance, which was not known and could not have been known with the exercise of reasonable diligence at the time the previous EIR was certified as complete, shows any of the following: a. The project will have one or more significant effects not discussed in the previous EIR; b. Significant effects previously examined will be substantially more severe than shown in the previous EIR; 24 Residences at 1400 Bristol Street (PA2022-0296) Planning Commission, December 7, 2023 Page 23 c. Mitigation measures or alternatives previously found not to be feasible would in fact be feasible and would substantially reduce one or more significant effects of the project, but the project proponents decline to adopt the mitigation measure or alternative; or d. Mitigation measures or alternatives which are considerably different from those analyzed in the previous EIR would substantially reduce one or more significant effects on the environment, but the project proponents decline to adopt the mitigation measure or alternative. The City contracted with an environmental consultant (Kimley Horn and Associates) to prepare an Addendum to the PEIR. The entire Addendum and its technical appendixes are available online at the City’s website at: www.newportbeachca.gov/ceqa. The conclusion of the Addendum analysis supports the finding that no additional environmental documentation is required by CEQA. On the basis of the entire environmental review record, the project will not result in any new significant impacts that were not previously analyzed in the PEIR for the General Plan 2006 Update (SCH No. 2006011119) or the Housing Element Initial Study/Negative Declaration. All potential impacts associated with this Project would either be the same or less than those described in either the PEIR or Negative Declaration that have been appropriately mitigated. In addition, there are no substantial changes to the circumstances under which the project would be undertaken that would result in new or more severe environmental impacts than previously addressed in either the PEIR, nor has any new information regarding the potential for new or more severe significant environmental impacts been identified. Therefore, in accordance with Section 15164 of the CEQA Guidelines, an addendum to the previously adopted PEIR is the appropriate environmental document for the project. Summary Staff believes the findings for project approval can be made, with specific conditions of approval. The proposed project is consistent with the proposed MU-H2 General Plan Land Use designation and its land use policies related residential developments in the Airport Area. The proposed project is also consistent with the recently updated Noise Element. The proposed application of the Newport Place Residential Overlay will provide for the project as it allows multi-family uses subject to approval of a site development review and facts support approval of the application request. The site development review will ensure the project will be implemented consistent with the approved development standards. The applicant proposes to redevelop the underperforming office development with a for rent multi-unit development with affordable units consistent with the Overlay and in furtherance of the Certified Housing Element. The proposed development with on-site 25 Residences at 1400 Bristol Street (PA2022-0296) Planning Commission, December 7, 2023 Page 24 recreation amenities and adequate provisions of parking, allowed by the density bonus provisions, will create a suitable urban living environment integrated into the existing nonresidential area. The proposed pedestrian bridge will create connectivity between the approved project at 1300 Bristol and the subject project. Conditions of approval are included in the draft resolution that will require the applicant to enter a lease agreement with the City of Newport Beach and pay the fair market value for rent of the City’s airspace over the Spruce Street right-of-way. The construction drawings will be reviewed by all City departments including the City Traffic Engineer, Building Division, and Life Safety Services Divisions (Fire Department) to ensure the design meets height, accessibility, and other applicable standards. Alternatives The Planning Commission has the following alternatives: 1. The Planning Commission may require or suggest specific design changes that are necessary to alleviate any areas of concern. If the requested changes are substantial, staff will return with a revised resolution incorporating new findings and/or conditions; or 2. If the Planning Commission chooses to deny the project, findings must be made consistent with the Housing Accountability Act (Government Code Section 65589.5) and Density Bonus Law (Government Code Section 65915). Therefore, if after consideration of all written and oral evidence presented, the Planning Commission desires to either disapprove or impose a condition that the project be developed at a lower density or with any other conditions that would adversely impact feasibility of the proposed project, the Planning Commission must articulate the factual basis for making the following findings and direct staff to return with a revised resolution incorporating the articulated findings and factual basis for the decision: a. The housing development project would have a specific, adverse impact upon the public health or safety. As used in this paragraph, a “specific, adverse impact” means a significant, quantifiable, direct, and unavoidable impact, based on objective, identified written public health or safety standards, policies, or conditions as they existed on the date the application was deemed complete. b. There is no feasible method to satisfactorily mitigate or avoid the adverse impact without rendering the development unaffordable to affordable households financially infeasible. Public Notice 26 Residences at 1400 Bristol Street (PA2022-0296) Planning Commission, December 7, 2023 Page 25 Notice of this hearing was published in the Daily Pilot, mailed to all owners of property within 300 feet of the boundaries of the site (excluding intervening rights-of-way and waterways) including the applicant, and posted on the subject property at least 10 days before the scheduled meeting, consistent with the provisions of the Municipal Code. Additionally, the item appeared on the agenda for this meeting, which was posted at City Hall and on the city website. Prepared by: Submitted by: ATTACHMENTS PC 1 Draft Resolution with Findings and Conditions PC 2 Applicant’s Project Description PC 3 Construction Management Plan PC 4 Addendum to the 2006 General Plan EIR PC 5 Fiscal Impact Analysis PC 6 Public Comments PC 7 Project plans 27 INTENTIONALLY BLANK PAGE28 Attachment No. PC 1 Draft Resolution with Findings and Conditions 29 INTENTIONALLY BLANK PAGE30 RESOLUTION NO. PC2023-043 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF NEWPORT BEACH RECOMMENDING CITY COUNCIL ADOPTION OF A GENERAL PLAN AMENDMENT, PLANNED COMMUNITY DEVELOPMENT PLAN AMENDMENT, SITE DEVELOPMENT REVIEW, AFFORDABLE HOUSING IMPLEMENTATION PLAN, DEVELOPMENT AGREEMENT, ENVIRONMENTAL IMPACT REPORT ADDENDUM, AND TRAFFIC STUDY FOR THE 1400 BRISTOL STREET RESIDENTIAL PROJECT LOCATED AT 1400 BRISTOL STREET (PA2022-0296) THE PLANNING COMMISSION OF THE CITY OF NEWPORT BEACH HEREBY FINDS AS FOLLOWS: SECTION 1. STATEMENT OF FACTS. 1. An application was filed by The Picerne Group (Applicant), concerning property located at 1400 Bristol Street and legally described in Exhibit “A,” which is attached hereto and incorporated by reference (Property). 2. The Applicant is requesting approval for the demolition of two existing office buildings and the development of 229 apartment units, including a 422-space parking structure (Project). The following approvals are requested to implement the Project as proposed: • General Plan Amendment (GPA)- A request to amend the existing General Plan land use designation from General Commercial Office (CO-G) to Mixed Use Horizontal 2 (MU-H2), and an additional 64 dwelling units above the General Plan allowance. The GPA includes a revision to Anomaly 16 of the General Plan Table LU2 (Anomaly Locations) to allow 64 residential dwelling units at the Property; • Planned Community Development Plan Amendment (PCDP Amendment)- An amendment to the Newport Place Planned Community (PC-11) Development Plan to include the project site within the Residential Overlay; • Major Site Development Review (SDR) - A site development review in accordance with the Newport Place Planned Community and Section 20.52.80 (Site Development Reviews) of the Newport Beach Municipal Code (NBMC), for the construction of the Project; • Affordable Housing Implementation Plan (AHIP) - A plan specifying how the Project would meet the City’s affordable housing requirements, in exchange for a request of 50% increase in density. The Applicant seeks six development standard waivers related to park land dedication, building setbacks, building height, private open space for each residential unit, common open space for the entire Project, and overall residential project density pursuant to Chapter 20.32 (Density Bonus) of the NBMC and 31 Planning Commission Resolution No. PC2023-043 Page 2 of 43 Government Code Section 65915 (Density Bonus Law). The Applicant also seeks a development concession related to the mix of affordable units pursuant to Chapter 20.32 (Density Bonus) of the NBMC and Government Code Section 65915; • Development Agreement (DA)– A Development Agreement between the Applicant and the City, pursuant to Section 15.45.020 (Development Agreement Required) of the NBMC, which would provide the Applicant with the vested right to develop the Project for a term of 10 years and to provide negotiated public benefits to the City; • Addendum to the 2006 General Plan Update Program Environmental Impact Report (Addendum) - Pursuant to the California Environmental Quality Act (CEQA), the Addendum addresses reasonably foreseeable environmental impacts resulting from the Project; and • Traffic Study - A traffic study pursuant to Chapter 15.40 (Traffic Phasing Ordinance) of the NBMC. 3. The Property is designated General Commercial Office (CO-G) by the General Plan Land Use Element and is located within the Newport Place Planned Community (PC-11 Newport Place) Zoning District in the Industrial Site 3A sub-area. 4. The Property is not located within the coastal zone. 5. A public hearing was held on December 7, 2023, in the Council Chambers at 100 Civic Center Drive, Newport Beach. A notice of the time, place, and purpose of the hearing was given in accordance with Government Code Section 54950 et seq. (Ralph M. Brown Act), and Chapter 15.45 (Development Agreements), Chapter 20.56 (Planned Community District Procedures), and Chapter 20.62 (Public Hearings) of the NBMC. Evidence, both written and oral, was presented to and considered by, the Planning Commission at this hearing. SECTION 2. CALIFORNIA ENVIRONMENTAL QUALITY ACT DETERMINATION. 1. On July 25, 2006, the City Council adopted Resolution No. 2006-75, thereby certifying the adequacy and completeness of the Environmental Impact Report (EIR) for the General Plan Update (SCH No. 2006011119). The EIR was prepared in compliance with CEQA Guidelines set forth in the California Public Resources Code Section 21000 et seq. and its implementing State regulations set forth in the California Code of Regulations Title 14, Division 6, Chapter 3 (CEQA Guidelines) and City Council Policy K-3. Additionally, in accordance with Section 15168(a) of the CEQA Guidelines, the City prepared the EIR as a Program Environmental Impact Report (PEIR). This PEIR analyzed the potential impacts of a citywide land use plan, and the goals and policies of 10 general plan elements. 2. Additionally, on November 22, 2011, the City Council adopted General Plan Amendment No. GP2008-003, thereby approving the City of Newport Beach Housing Element Update (2008-2014) and its associated Housing Element and Initial Study/Negative Declaration 32 Planning Commission Resolution No. PC2023-043 Page 3 of 43 under CEQA. The PEIR and Initial Study/Negative Declaration are collectively referred to herein as the “PEIR”. 3. Pursuant to Section 21166 of the California Public Resources Code and Section 15162 of the CEQA Guidelines, when an EIR has been certified for a project, no subsequent EIR is required unless the lead agency determines, on the basis of substantial evidence in the light of the whole record, one or more of the following: a. Substantial changes are proposed in the Project which will require major revisions of the previous EIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects; b. Substantial changes occur with respect to the circumstances under which the Project is undertaken which will require major revisions of the previous EIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects; or c. New information of substantial importance, which was not known and could not have been known with the exercise of reasonable diligence at the time the previous EIR was certified as complete, shows any of the following: i. The project will have one or more significant effects not discussed in the previous EIR; ii. Significant effects previously examined will be substantially more severe than shown in the previous EIR; iii. Mitigation measures or alternatives previously found not to be feasible would in fact be feasible and would substantially reduce one or more significant effects of the Project, but the Project proponents decline to adopt the mitigation measure or alternative; or iv. Mitigation measures or alternatives which are considerably different from those analyzed in the previous EIR would substantially reduce one or more significant effects on the environment, but the Project proponents decline to adopt the mitigation measure or alternative. 4. An Addendum to PEIR was prepared pursuant to Section 15162 (Subsequent EIRs and Negative Declarations) and 15164 (Addendum to an EIR or Negative Declaration) of the CEQA Guidelines. 5. The following environmental topics were analyzed for the Project: Aesthetics, Air Quality, Biological Resources, Cultural Resources, Energy, Geology and Soils, Greenhouse Gas Emissions, Hazards and Hazardous Materials, Hydrology and Water Quality, Land Use and Planning, Mineral Resources, Noise, Population and Housing, Public Services, Recreation, Transportation, Tribal Cultural Resources, Utilities and Service Systems, and Wildfire. The Addendum includes analysis of new topics that were 33 Planning Commission Resolution No. PC2023-043 Page 4 of 43 not included in the previous EIRs; specifically, it includes a new Energy, Wildfire, and Tribal Cultural Resources section. These additional analyses are appropriate for inclusion in the Addendum, but none result in new or increased significant impacts that would require preparation of a subsequent EIR pursuant to Section 15162 of the CEQA Guidelines. 6. On the basis of the PEIR and entire environmental review record, the Project will not result in any new significant impacts that were not previously analyzed in the PEIR. The Addendum confirms and provides substantial evidence that the potential impacts associated with this Project would either be the same or less than those described in the PEIR, as reduced by applicable General Plan Policies in the PEIR. In addition, there are no substantial changes to the circumstances under which the Project would be undertaken that would result in new or more severe environmental impacts than previously addressed in the PEIR, nor has any new information regarding the potential for new or more severe significant environmental impacts been identified. Therefore, in accordance with Section 15164 of the CEQA Guidelines, an addendum to the previously adopted PEIR is the appropriate environmental document for the Project. In taking action to approve any of the requested applications for the Project, the data presented in the PEIR, as augmented by the Addendum for this Project, are considered as part of the record. 7. The Addendum to the PEIR, is hereby recommended for adoption by the City Council given its analysis and conclusions. The Addendum to the PEIR and related and referenced documentation, constitute the administrative record upon which this decision was based, are on file with the Planning Division, City Hall, 100 Civic Center Drive, Newport Beach, California. 8. The Planning Commission finds that judicial challenges to the City's CEQA determinations and approvals of land use projects are costly and time-consuming. In addition, project opponents often seek an award of attorneys' fees in such challenges. As project applicants are the primary beneficiaries of such approvals, it is appropriate that such applicants should bear the expense of defending against any such judicial challenge, and bear the responsibility for any costs, attorneys' fees, and damages that may be awarded to a successful challenger. SECTION 3. REQUIRED FINDINGS. General Plan Amendment An amendment to the 2006 Newport Beach General Plan Land Use Element is a legislative act. Neither Title 20 (Planning and Zoning) nor California Government Code Section 65000 et seq., set forth any required findings for either approval or denial of such amendments. Finding and Facts in Support of Findings: 1. The request is to amend the General Plan Land Use designation from General Commercial Office (CO-G) to Mixed-Use Horizontal 2 (MU-H2). The MU-H2 designation applies to properties located in the Airport Area. It provides for a horizontal intermixing 34 Planning Commission Resolution No. PC2023-043 Page 5 of 43 of uses that may include regional commercial office, multifamily residential, vertical mixed-use buildings, industrial, hotel rooms, and ancillary neighborhood commercial uses. 2. The GPA and the resulting land use change are compatible with the existing surrounding uses and planned land uses identified by the General Plan, because the Project would introduce additional residential land uses in the Airport Area which includes a diverse mix of land uses including the gradual development of residential multifamily dwellings. Additionally, even with the conversion from CO-G to MU-H2, the building will be compatible with adjacent commercial properties architectural style and pedestrian connectivity. Additional residential development would support commercial properties within the Airport Area. 3. The requested GPA from CO-G to MU-H2 does not eliminate existing or future land uses to the overall detriment of the community given the site’s size, location, and surrounding uses. The existing office buildings on-site were built in the 1970’s and there are sufficient office facilities in the Airport Area to support the business needs of the community. The proposed change to allow residential uses would increase the City’s housing stock including the provision of 23 units that will be affordable to lower incomes. 4. The Property is located in an area of the City that has sufficient utility systems to serve the Project once the Applicant completes a necessary upgrade to an off-site sewer line. As conditioned, applicant will replace the existing 10-inch vitrified clay pipe (VCP) pipe with a 12-inch sewer main, which is located near the intersection of Newport Place and Dove Street. This off-site improvement would result in approximately 435 linear feet of sewer line replacement. No off-site improvements other than typical utility connections are proposed or required as part of the Project (other than the pedestrian bridge that would cross the public right-of-way). 5. The Project is consistent with the following City of Newport Beach General Plan policies that establish fundamental criteria for the formation and implementation of new residential villages in the Airport Business Area (additional policy analysis is included in the EIR Addendum attached hereto as Exhibit “B”): a. Land Use Element Policy LU 1.1 (Unique Environment): Maintain and enhance the beneficial and unique character of the different neighborhoods, business districts, and harbor that together identify Newport Beach. Locate and design development to reflect Newport Beach’s topography, architectural diversity, and view sheds. The Project enhances the distinct, urban character of the Airport Area by providing a means for replacing parking lots and 1970’s era office buildings with attractive and functional residential development, in line with the General Plan goal of transitioning the Airport Area to a mixed-use community. The Property is not in or near any of the City’s areas that feature the harbor, unique topography, or view sheds. The proposed project would introduce residential units to the Property consistent with the uses and urbanized character of the Airport Area and the proposed MU-H2 designation. 35 Planning Commission Resolution No. PC2023-043 Page 6 of 43 b. Land Use Element Policy LU 2.3 (Range of Residential Choices). Provide opportunities for the development of residential units that respond to community and regional needs in terms of density, size, location, and cost. Implement goals, policies, programs, and objectives identified within the City’s Housing Element. The Project establishes 229 multi-family residential units, including 23 affordable units for very low-income households. The Project responds to market needs and diversifies the City’s housing stock by adding additional dwelling units to the Airport Area. c. Land Use Element Policy LU 3.8 (Project Entitlement Review with Airport Land Use Commission) - Refer the adoption or amendment of the General Plan, Zoning Code, specific plans, and Planned Community development plans for land within the John Wayne Airport planning area, as established in the JWA Airport Environs Land Use Plan (AELUP), to the Airport Land Use Commission (ALUC) for Orange County for review, as required by Section 21676 of the California Public Utilities Code. In addition, refer all development projects that include buildings with a height greater than 200 feet above ground level to the ALUC for review. The Project is within the boundaries of the Airport Environs Land Use Plan (AELUP), therefore, the overseeing agency, ALUC, must review the proposed GPA and PCDP Amendment pursuant to Government Code Section 65302.3 and Public Utilities Code Section 21676. The purpose of ALUC’s review is to determine whether the Project is consistent with the AELUP prior to the City Council taking action on the Project. The Project is consistent with the noise and safety standards of the AELUP. With respect to noise, the City adopted noise-related amendments to the General Plan Noise and Land Use Elements, the Newport Place Planned Community (PC- 11) and Title 20 (Planning and Zoning) contours to implement the 6th Cycle Housing Element. The Project is located within the updated 60 decibel (dBA) community noise equivalent level (CNEL) contour as shown in Figure N5 of the Noise Element of the General Plan, where residential development is allowed. As a result, the Project will be required to comply with the development standards set forth in Section 20.30.080(F) (Noise-Airport Environs Land Use Plan) of the NBMC. The Project sites is outside of any safety zones set forth in the AELUP, therefore, is consistent with the noise standards of the AELUP. d. Land Use Element Policy 6.15.3 (Airport Compatibility). Require that all development be constructed in conformance with the height restrictions set forth by the Federal Aviation Administration (FAA), Federal Aviation Regulations (FAR) Part 77, and Caltrans Division of Aeronautics, and that residential development shall be allowed only on parcels with noise levels of less than John Wayne Airport 65 dBA CNEL noise contour area as shown in Figure N5 of the Noise Element of the General Plan, unless and until the City determines, based on substantial evidence, that the sites wholly within the 65 dBA CNEL noise contour shown in Figure N5 are needed for the City to satisfy its Sixth Cycle RHNA mandate. Nonresidential uses are, however, encouraged on parcels located wholly within the 65 dBA CNEL contour area. 36 Planning Commission Resolution No. PC2023-043 Page 7 of 43 The Project is located at 1400 Bristol Street and approximately 85 feet in height. The Federal Aviation Administration (FAA) conducted an aeronautical study of the Project pursuant to applicable Federal regulations and has determined no hazard to air navigation for the Project. The Project is located within the updated 60 dBA CNEL contour as shown in Figure N5 of the Noise Element of the General Plan, where residential development is allowed, subject to the development standards set forth in Section 20.30.080(F) (Noise-Airport Environs Land Use Plan). e. Land Use Element Policy LU 6.15.5 (Residential and Supporting Uses). Accommodate the development of a maximum of 2,200 multi-family residential units, including work force housing, and mixed-use buildings that integrate residential with ground level office or retail uses, along with supporting retail, grocery stores, and parklands. Residential units may be developed only as the replacement of underlying permitted nonresidential uses. When a development phase includes a mix of residential and nonresidential uses or replaces existing industrial uses, the number of peak hour trips generated by cumulative development of the site shall not exceed the number of trips that would result from development of the underlying permitted nonresidential uses. However, a maximum of 550 units may be developed as infill on surface parking lots or areas not used as occupiable buildings on properties within the Conceptual Development Plan Area depicted on Figure LU22 provided that the parking is replaced on site. General Plan Land Use Policy 6.15.5 established a development limit of 2,200 maximum dwelling units for the Airport Area. Of the 2,200 residential units allowed, 1,650 units may be developed as replacement of existing office, retail, and/or industrial uses. The remaining 550 units are classified as additive units meaning they are not required to replace other units and they may be constructed as “in-fill” units to existing commercial or office development within the Conceptual Development Plan Area (CDPA) of the Airport Area. Any eligible density bonus allowed by Government Code Sections 65915 (Density Bonus Law) and Chapter 20.32 (Density Bonus) of the NBMC are not included in the 2,200-unit allowance. The 550 additive units have been previously allocated to the Uptown Newport and Residences at 4400 Von Karman projects. Considering the dwelling unit sum of the previously approved projects, the remaining and available development allocation within the Airport Area would be 353 dwelling units. With the development of this Project, there would be 264 dwelling units (353-89=264) exclusive of density bonus units and units authorized through a GPA. The Property is developed with existing two-story commercial office buildings totaling 38,764 square feet. Since the Project can be developed only as the replacement of the underlying nonresidential use (office)1, and the number of peak hour trips 1 Without a GPA. 37 Planning Commission Resolution No. PC2023-043 Page 8 of 43 generated by cumulative development of the Property shall not exceed the number of trips that would result from development of the underlying permitted nonresidential uses, a conversion rate of 2.29 dwelling units per 1,000 square feet of commercial floor area is required. This results in a total of 89 dwelling units. The Project includes a request for a GPA to increase the base units by 64 dwelling units, which results in a total base unit count of 153 dwelling units. With a 50% density bonus, a maximum of 230 units could be constructed and a total of 229 dwelling units are proposed. Presently, there are a total of 353 remaining and available dwelling units in the Airport Area. Considering the dwelling unit sum of the previously approved projects and the proposed Project, the remaining development allocation within the Airport Area would be 264 (353-89) dwelling units excluding any density bonus units. f. Land Use Element Policy LU 6.15.6 (Size of Residential Villages). Allow development of mixed-use residential villages, each containing a minimum of 10 acres and centered on a neighborhood park and other amenities (as conceptually illustrated in Figure LU23). The first phase of residential development in each village shall encompass at least 5 gross acres of land, exclusive of existing rights-of-way. This acreage may include multiple parcels provided that they are contiguous or face one another across an existing street. At the discretion of the City, this acreage may also include part of a contiguous property in a different land use category, if the City finds that a sufficient portion of the contiguous property is used to provide functionally proximate parking, open space, or other amenity. The “Conceptual Development Plan” area shown on Figure LU22 shall be exempt from the 5-acre minimum, but a conceptual development plan described in Policy LU 6.15.11 shall be required. The Property is 2.38 acres in size. The Residential Overlay of PC-11 allows residential development on sites containing less than 10 acres, if housing units affordable to lower income households are provided. The Project includes 23 dwelling units that will be affordable for very-low-income households. If the Planned Community Development Plan is amended to include the Project within the Residential Overlay, as requested by the Applicant, the Project will be exempt from General Plan Policy 6.15.6 (Size of Residential Villages). g. Land Use Policy LU 6.15.7 (Overall Density and Housing Types). Require that residential units be developed at a minimum density of 30 units and maximum of 50 units per net acre averaged over the total area of each residential village. Net acreage shall be exclusive of existing and new rights-of-way, public pedestrian ways, and neighborhood parks. Within these densities, provide for the development of a mix of building types ranging from townhomes to high-rises to accommodate a variety of household types and incomes and to promote a diversity of building masses and scales. The Project proposes 153 base units at a density of 64 dwelling units per acre on the 2.38-net-acre site. A waiver from Policy 6.15.7 regarding maximum density has been requested by the Applicant as a part of the Project. The base density does not include the 50% density bonus of 77 units that is allowed by the State Bonus Density law 38 Planning Commission Resolution No. PC2023-043 Page 9 of 43 which includes 23 units set aside for affordable housing. Altogether, the Project has an overall density of 96 dwelling units per acre, which is exclusive of rights-of-ways, public pedestrian ways, and neighborhood parks. The Project is a for rent apartment building with 229 units. There is a mixture of unit types, ranging from studios to two-bedroom units, accommodating a variety of household types and incomes. Of the 229 units, 23 units will be affordable to very low-income households and 206 units will be market-rate housing, which will increase the City’s overall housing stock for various household income levels. h. Land Use Policy LU 6.15.8 (First Phase Development Density). Require a residential density of 45 to 50 units per net acre, averaged over the first phase for each residential village. This shall be applied to 100 percent of properties in the first phase development area whether developed exclusively for residential or integrating service commercial horizontally on the site or vertically within a mixed-use building. On individual sites, housing development may exceed or be below this density to encourage a mix of housing types, provided that the average density for the area encompassed by the first phase is achieved. The Project would be developed in one phase on an individual site with a density of 96 units per acre. The Project provides a mixture of residential unit types that include 23 units of affordable housing to very-low-income households. The proposed density is above the required minimum of 45 units per acre and the Applicant is requesting a development standard waiver allowed by State Density Bonus Law to exceed the maximum density of 50 units per acre. i. Land Use Policy LU 6.15.9 (Subsequent Phase Development Location and Density). Subsequent phases of residential development shall abut the first phase or shall face the first phase across a street. The minimum density of residential development (including residential mixed-use development) shall be 30 units per net acre and shall not exceed the maximum of 50 units per net acre averaged over the development phase. See finding LU 6.15.9 First Phase Development Density above. j. Land Use Policy LU 6.15.13 (Neighborhood Parks Standards). To provide a focus and identity for the entire neighborhood and to serve the daily recreational and commercial needs of the community within easy walking distance of homes, require dedication and improvement of at least 8 percent of the gross land area (exclusive of existing rights-of-way) of the first phase development in each neighborhood, or ½ acre, whichever is greater, as a neighborhood park. This requirement may be waived by the City where it can be demonstrated that the development parcels are too small to feasibly accommodate the park or inappropriately located to serve the needs of local residents, and when an in-lieu fee is paid to the City for the acquisition and improvement of other properties as parklands to serve the Airport Area. 39 Planning Commission Resolution No. PC2023-043 Page 10 of 43 In every case, the neighborhood park shall be at least 8 percent of the total Residential Village Area or one acre in area, whichever is greater, and shall have a minimum dimension of 150 feet. Park acreage shall be exclusive of existing or new rights-of-way, development sites, or setback areas. A neighborhood park shall satisfy some or all of the requirements of the Park Dedication Ordinance, as prescribed by the Recreation Element of the General Plan. The Project includes a waiver from Land Use Policy LU 6.15.13, as allowed by the policy, due to a 2.38-acre parcel size that is too small to feasibly accommodate a park. k. Land Use Policy LU 6.15.14 (Location). Require that each neighborhood park is clearly public in character and is accessible to all residents of the neighborhood. Each park shall be surrounded by public streets on at least two sides (preferably with on-street parking to serve the park),and shall be linked to residential uses in its respective neighborhood by streets or pedestrian ways. See finding LU 6.15.13 above. l. Land Use Policy LU 6.15.16 (On-Site Recreation and Open Space Standards). Require developers of multi-family residential developments on parcels 8 acres or larger to provide on-site recreational amenities. For these developments, 44 square feet of on-site recreational amenities shall be provided for each dwelling unit in addition to the requirements under the City’s Park Dedication Ordinance and in accordance with the Parks and Recreation Element of the General Plan. On-site recreational amenities can consist of public urban plazas or squares where there is the capability for recreation and outdoor activity. These recreational amenities may also include swimming pools, exercise facilities, tennis courts, and basketball courts. Where there is insufficient land to provide on-site recreational amenities, the developer shall be required to pay cash in-lieu that would be used to develop or upgrade nearby recreation facilities to offset user demand as defined in the City’s Park Dedication Fee Ordinance. The acreage of on-site open space developed with residential projects may be credited against the parkland dedication requirements where it is accessible to the public during daylight hours, visible from public rights-of-way, and is of sufficient size to accommodate recreational use by the public. However, the credit for the provision of on-site open space shall not exceed 30 percent of the parkland dedication requirements. The Project is located on a 2.38-acre site and is not subject to Policy LU 6.15.16, as the policy only applies to properties consisting of eight acres or larger. However, the Project exceeds the 44 square feet per unit minimum by providing approximately 60 square feet per unit (approximately 13,800 square feet) of on-site recreational amenities including a large central courtyard, clubroom, media center, a roof deck, and a lounge area. 40 Planning Commission Resolution No. PC2023-043 Page 11 of 43 m. Land Use Policy LU 6.15.17 (Street and Pedestrian Grid). Create a pattern of streets and pedestrian ways that breaks up large blocks, improves connections between neighborhoods and community amenities, and is scaled to the predominantly residential character of the neighborhoods. The Project is a podium style development with two driveways for vehicular circulation to the garage entries, accessed from Spruce Street and Bristol Street. Pedestrian connections are provided to public sidewalks along Spruce Street and Bristol Street. The Project retains the curb-to-curb dimension of both Bristol Street and Spruce Street and will include sidewalk easements to provide 10-foot-wide sidewalks. n. Land Use Policy 6.15.18 (Walkable Streets). Retain the curb-to-curb dimension of existing streets, but widen sidewalks to provide park strips and generous sidewalks by means of dedications or easements. Except where traffic loads preclude fewer lanes, add parallel parking to calm traffic, buffer pedestrians, and provide short term parking for visitors and shop customers. See finding Land Use Policy 6.15.17 above. o. Land Use Policy 6.15.19 (Connected Streets). Require dedication and improvement of new streets as shown on Figure LU23. The illustrated alignments are tentative and may change as long as the routes provide the intended connectivity. If traffic conditions allow, connect new and existing streets across Macarthur Boulevard with signalized intersections, crosswalks, and pedestrian refuges in the median. See finding Land Use Policy 6.15.17 above. p. Land Use Policy 6.15.20 (Pedestrian Improvements). Require the dedication and improvement of new pedestrian ways as conceptually shown on Figure LU23. The alignment is tentative and may change as long as the path provides the intended connectivity. For safety, the full length of pedestrian ways shall be visible from intersecting streets. To maintain an intimate scale and to shade the path with trees, pedestrian ways should not be sized as fire lanes. Pedestrian ways shall be open to the public at all times. The Project includes conditions of approval requiring the reconstruction of all broken and/or damaged curb, gutter, and sidewalk along Spruce and Bristol Street frontages to preserve and improve all existing sidewalks for pedestrian access. q. Land Use Policy LU 6.15.22 (Building Massing). Require that high-rise structures be surrounded with low- and mid-rise structures fronting public streets and pedestrian ways or other means to promote a more pedestrian scale. The Project is approximately 85 feet in height and is compatible with nearby properties as well as the larger pattern of development in the Airport Area, with building mass and scale similar to the nearby existing office developments and the 41 Planning Commission Resolution No. PC2023-043 Page 12 of 43 approved, but not yet construction 78-foot-tall residential apartment building at 1300 Bristol Street. The nearby property at 1451 Quail Street is developed with an approximately 37-foot tall office building. The property located across the street at 1400 Quail Street, is developed with an approximately 30-foot-tall office building. A project is currently being reviewed for an approximately 86-foot-high condominium project at 1401 Quail Street, which is adjacent to the site. The Project includes pedestrian connectivity to public sidewalks along Bristol Street and Spruce Street and pedestrian-scale landscaped areas around the apartment building. Lastly, the Project includes a pedestrian bridge across the Spruce Street right-of-way that would connect to the approved project at 1300 Bristol. The bridge would be connected to and accessible from the second level of both buildings, which would reduce the appearance of bulk and scale from the street level. r. Land Use Policy LU 6.15.23 Sustainability Development Practices. Require that development achieves a high level of environmental sustainability that reduces pollution and consumption of energy, water, and natural resources. This may be accomplished through the mix and density of uses, building location and design, transportation modes, and other techniques. Among the strategies that should be considered are the integration of residential with jobs-generating uses, use of alternative transportation modes, maximized walkability, use of recycled materials, capture and re-use of storm water on-site, water conserving fixtures and landscapes, and architectural elements that reduce heat gain and loss. The Project is required to comply with the provisions of the Building and Energy Efficiency Standards (CCR, Title 24, Parts 6 and 11) and the Green Building Standards Code (CCR, Title 24, Part 11 - CALGreen). Additionally, the Project would implement water-efficient landscaping, water quality best management practices to treat surface runoff from the project site, and low impact development practices. The Project is also adjacent to office developments in the Airport Area and would provide housing near employment opportunities. The Project includes pedestrian linkage to public sidewalks that would provide connections throughout the site and to adjacent and surrounding uses, thereby providing an alternative mode of public transportation for the residents and their visitors. The Project would also provide alternative forms of transportation to residents by locating close to the existing Orange County Transportation Authority (OCTA) bus routes provided along Bristol Street and Birch Street. Tribal Consultation (SB18) 6. Pursuant to California Government Code Section 65352.3 (SB18), a local government is required to contact the appropriate tribes identified by the Native American Heritage Commission (NAHC) each time it considers a proposal to adopt or amend the General Plan. If requested by any tribe, the local government must consult for the purpose of preserving or mitigating impacts to cultural resources. The City received comments from the NAHC indicating that 12 tribal contacts should be provided notice regarding the proposed amendment. The tribal contacts were provided notice on January 26, 2023. 42 Planning Commission Resolution No. PC2023-043 Page 13 of 43 California Government Code Section 65352.3 requires notification 90 days prior to Council action to allow tribal contacts to respond to the request to consult. The Project will not be heard by the City Council until after the 90-day period, which expired on April 26, 2023. The City participated in consultations with three tribes: the Gabrieleno Band of Mission Indians – Kizh Nation, the Juaneno Band of Mission Indians, Acjachemen Nation-Belardes, and the Gabrielino Tongva Indians of California. Based on consultation with the participating Native American Tribes, conditions of approval have been included to address potential concerns regarding the protection of Tribal Cultural Resources. Charter Section 423 Analysis Finding: Charter Section 423 requires voter approval of any major General Plan amendment to the General Plan. A major General Plan amendment is one that significantly increases allowed density or intensity by 40,000 square feet of non-residential floor area, increases traffic by more than 100 peak hour vehicle trips (AM/PM), or increases residential dwelling units by 100 units. These thresholds apply to the total of increases resulting from the amendment itself, plus 80% of the increases resulting from other amendments affecting the same neighborhood (defined as a Statistical Area as shown in the General Plan Land Use Element) and adopted within the preceding 10 years. Council Policy A-18 (Guidelines for Implementing Charter Section 423) requires that proposed amendments to the General Plan be reviewed to determine if a vote of the Newport Beach electorate would be required. This policy includes a provision that all General Plan amendments be tracked as “Prior Amendments” for 10 years to determine if minor amendments in a single Statistical Area cumulatively exceed the thresholds indicated above. Facts in Support of Findings: 1. The Project is the first General Plan Amendment in Statistical Area L1 within the last 10 years that included additional dwelling units or non-residential floor area. The proposed amendment results in 64 additional dwelling units and no change in the square footage of non-residential floor area. Conversions of existing commercial development is allowed by the current General Plan (2,200 in-fill units maximum in the Airport Area based on conversion of existing commercial floor area). Reductions in commercial floor area are not tracked as part of the Charter Section 423 analysis. Density bonus units are not included in Charter Section 423 analysis nor the General Plan Anomaly calculations. 2. The 64 additional dwelling units result in a net increase of 24 a.m. peak hour trips and 25 p.m. peak hour trips based on the “Multifamily Housing (Mid Rise) Not Close to Rail” ITE 11th Edition trip rate for the proposed use, as provided in Council Policy A-18. No credit is given to the existing non-residential uses on-site because the existing office floor area was converted to residential dwelling units so that the proposed Project (less the density bonus and GPA units) is traffic neutral. Therefore, the Project individually does not exceed the Greenlight thresholds. Furthermore, since there have been no other applicable projects in the last 10 years, there is no need to analyze the cumulative development of 80% of prior 43 Planning Commission Resolution No. PC2023-043 Page 14 of 43 General Plan amendments from the last 10 years with the proposed project (i.e., cumulative analysis). As none of the thresholds specified by Charter Section 423 are exceeded, no vote of the electorate is required if the City Council chooses to approve the requested GPA. Planned Community Development Plan Amendment An amendment to the Newport Place Planned Community Development Plan (PC-11), which is the zoning document for the Property, is a legislative act. Neither PC-11, Chapters 20.66 (Amendments), nor 20.56 (Planned Community Development District Procedures) of Title 20 (Planning and Zoning) of the NBMC, or Article 2 (Adoption of Regulations) of Chapter 4 (Zoning Regulations) of Division 1 (Planning and Zoning) of Title 7 (Planning and Land Use) of the California Government Code set forth any required findings for either approval or denial of such amendments to the NBMC. However, the proposed amendment complies with the intent of Part III Residential Overlay of PC-11 as follows: 1. The proposed Project allocates 15% of the base units (23 dwelling units) as affordable for very-low-income households. 2. Given the location of subject property in the Airport Area which includes a mixture of service uses, hotels, Airport and commercial support services, professional offices, and new residential developments that cumulatively contain the ingredients of a planned community, the proposed PC Amendment would not disrupt the existing uses within the Planned Community and would add to this diversity of uses, assisting the City in larger scale community planning and the provision of additional housing opportunities. 3. The Property is located within 85 feet of the Residential Overlay. The property nearest to the site within the Residential Overlay is 1300 Bristol Street, across Spruce Street. The property at 1300 Bristol has been approved but not yet constructed as a residential apartment project. The proposed project at 1400 Bristol Street includes a pedestrian bridge that would extend from the subject site to the approved residential project at 1300 Bristol Street. The Project would be consistent with the anticipated future development of 1300 Bristol Street as well other adjacent properties within the Residential Overlay of PC-11. The proposed pedestrian bridge would support pedestrian connectivity that integrates the Project into the existing community and larger residential development that may occur in the future pursuant to Section F (Amenities and Neighborhood Integration) of the PCDP Amendment. 4. The Project would be subject to the appropriate site and project specific setbacks, density, and height limits for this urban location. All required parking is provided on-site. The Project compiles with the development standards identified for the Residential Overlay, except as modified by the allowed development standard waivers identified in the Affordable Housing Implementation Plan. The Residential Overlay provides a density range for proposed projects and references the Section 20.32 (Density Bonus) of the NBMC that prescribes the 44 Planning Commission Resolution No. PC2023-043 Page 15 of 43 maximum density bonus and incentives allowed. Although the PCDP Amendment references a maximum density bonus of 35%, the project requests a 50% density bonus, which is consistent with Section 20.32 (Density Bonus) of the NBMC that allows up to 80% density bonus depending on the percentage of affordable units being provided. Therefore, the proposed project is consistent with the intent of the density bonus assumptions in the Residential Overlay and within the maximum allowed by the density bonus provisions. 5. The PCDP Amendment requires a site development review in accordance with Section 20.52.080 of the NBMC. The Project includes a site development review, and all required findings are addressed below (Findings A through C below). 6. The PCDP Amendment requires the density for a residential development to be between 30 and 50 dwelling units per acre. The Project includes 153 base units, not including density bonus units. Since the Property is 2.28 acres in size, there is a base density of 67 dwelling units per acre. With the density bonus, there is a total of 229 dwelling units, which results in 96 units per acre. Both the base density and density bonus units are not consistent with the PCDP Amendment density requirement; however, the Applicant is requesting a development standard waiver which is required under California Government Code Section 65915(e) and Section 20.32.080 where application of the development standard would physically preclude construction of a density bonus project. 7. The Property is located near existing office buildings within the Airport Area and is not negatively impacted by noise, dust, smoke, vibration, odor, toxic or noxious matter that may be generated by existing commercial or industrial uses nearby. 8. Residential dwellings are to be permitted as replacement of existing nonresidential uses, and the number of peak hour trips generated by the Project is not to exceed the number of trips of the underlying permitted nonresidential use. The Property is developed with existing two-story commercial office buildings totaling 38,764 square feet. A standardized conversion rate of 2.29 dwelling units per 1,000 square feet of commercial floor area, as provided by the City Traffic Engineer, is required. This results in a total of 89 dwelling units, which is the proposed based density of the Project less the GPA units requested. The Applicant is requesting a GPA to increase the base units for the Project by 64 dwelling units. With a 50% density bonus or 77 dwelling units requested, a total of 229 dwelling units are proposed for the Project. 9. The Property is fully developed and does not support any natural resources and all potential environmental impacts associated with the Project are appropriately addressed through standard building permit procedures, conditions of approval, and the General Plan Policies identified in the 2006 General Plan EIR and summarized in Attachment B (EIR Addendum). Major Site Development Review In accordance with Section 20.52.080(F) (Site Development Reviews – Findings and Decisions) of the NBMC, the following findings and facts in support of such findings are set forth as follows: 45 Planning Commission Resolution No. PC2023-043 Page 16 of 43 Finding: A. The proposed development is allowed within the subject zoning district. Fact in Support of Finding: 1. The Property is located within Industrial Site 3 of PC-11. The Project includes a request to amend Property’s land use designation to be included as a part of the Residential Overlay of PC-11. The residential overlay allows for residential development consistent with the requested MU-H2 land use designation and subject to site development review. Finding: B. The proposed development is in compliance with all of the following applicable criteria: i. Compliance with this section, the General Plan, this Zoning Code, any applicable specific plan, and other applicable criteria and policies related to the use or structure; ii. The efficient arrangement of structures on the site and the harmonious relationship of the structures to one another and to other adjacent developments; and whether the relationship is based on standards of good design; iii. The compatibility in terms of bulk, scale, and aesthetic treatment of structures on the site and adjacent developments and public areas; iv. The adequacy, efficiency, and safety of pedestrian and vehicular access, including drive aisles, driveways, and parking and loading spaces; v. The adequacy and efficiency of landscaping and open space areas and the use of water efficient plant and irrigation materials; and vi. The protection of significant views from public right(s)-of-way and compliance with NBMC Section 20.30.100 (Public View Protection). Facts in Support of Finding: 1. Refer to Facts under General Plan Amendment and Planned Community Development Plan Amendment, above that discuss the Project’s consistency with the proposed Mixed Use Horizontal 2 (MU-H2) General Plan land use designation and the PC-11 (Newport Place Planned Community Development Plan) Zoning District including the Residential Overlay. 2. The proposed six-story residential building would be approximately 85 feet in height inclusive of architectural elements and rooftop mechanical equipment. The architecture would be high-quality and incorporate neutral colors with stone/tile, metal, and glass features. The proposed pedestrian bridge is designed to match the architectural style of the proposed building and the approved, but not yet constructed apartment building at 1300 46 Planning Commission Resolution No. PC2023-043 Page 17 of 43 Bristol Street. The pedestrian bridge includes “see-through” elements that reduce its mass and scale. The Project’s building mass including the pedestrian bridge are compatible with the surrounding office developments and anticipated future development. 3. The Project includes a variety of enhanced amenities such as private balconies for most of the units, an outdoor courtyard with pool and spa, a clubroom, a fitness center, roof deck, lounge area, and media room. 4. The Project includes 422 onsite parking spaces located in a gated parking structure. Therefore, upon completion of the Project, there would be adequate onsite parking exceeding the minimum required residential standard pursuant to State Density Bonus Law. The parking is largely screened from public view, with two of the three levels located entirely below grade and landscaping buffers around the first floor parking structure. 5. The Project site is generally flat and bordered by existing office buildings and developed roadways. The City’s General Plan does not identify any scenic vistas or view points on or proximate to the Project site. The nearest public view point to the Project site identified in the City’s General Plan is approximately 0.5 mile south at Bayview Park. The nearest coastal view designated portion of Jamboree Road is approximately 2,000 feet south of the site. Due to the distance and highly urbanized nature of the Project area, public coastal views along this view corridor would not be impacted by the Project. Finding: C. The proposed development is not detrimental to the harmonious and orderly growth of the City, nor will it endanger, jeopardize, or otherwise constitute a hazard to the public convenience, health, interest, safety, or general welfare of person residing or working in the neighborhood of the proposed development. Facts in Support of Finding: 1. The Project has been designed to ensure that potential conflicts with surrounding uses are minimized to the extent possible to maintain a healthy environment for both surrounding businesses and residents by providing an architecturally pleasing project with articulation and building modulations to enhance the urban environment. 2. The proposed residential building has been designed to accommodate and provide safe access for emergency vehicles, delivery trucks, and refuse collections vehicles, as determined by the City Traffic Engineer. A Fire Department turnaround area is provided on- site at the rear of the property. Refuse collection is accommodated via an on-site staging area along the private driveway (accessed from Bristol Street) to ensure safe maneuvering by refuse vehicles. As conditioned, the project will also be required to accommodate sufficient queuing for vehicles onsite, so that vehicles waiting to enter the garage will not cause impacts to the Spruce Street right-of-way. 3. The Project site is located approximately 0.45-mile of the southernmost John Wayne Airport runway and is within the notification area of the AELUP for John Wayne Airport. However, the Project is below the maximum transitional imagery surface heights, and thus the Project 47 Planning Commission Resolution No. PC2023-043 Page 18 of 43 is within the building height limits of the AELUP. The property is located partially within the updated 65dBA CNEL noise contours for John Wayne Airport and Safety Zone 6 (Traffic Pattern Zone), where the likelihood of an accident is low. Consistent with the residential overlay, the Project shall be required to comply with conditions specified in Section 20.30.080(F) (Noise-Airport Environs Land Use Plan), including provisions of noise study, sound attenuation design features, and notice to all future residents of potential annoyances or inconveniences associated with residing in proximity to airport operations. 4. The Project will comply with all Building, Public Works, Fire Codes, City ordinances, and all conditions of approval. 5. As conditioned, the proposed pedestrian bridge shall be required to comply with standards of the Caltrans Highway Design Manual, which includes a minimum vertical clearance above the Spruce Street right-of-way. The final design of the bridge will be subject to City review, which will ensure that the bridge is constructed in a manner that will not obstruct views for motorists, cyclists, or pedestrians in the vicinity. Affordable Housing Implementation Plan The AHIP is consistent with the intent to implement affordable housing goals within the City pursuant to Government Code Sections 65915-65918 (State Density Bonus Law), and Title 20, Chapter 20.32 (Density Bonus) of the NBMC for the following reasons: 1. Consistent with the requested 50% density bonus, 23 units (15% of the base units) would be set aside as affordable units to lower income households. Lower income households are defined as households with 80% or less of the area median income, adjusted for family size for minimum term of 55 years for very low-income households. The Project is consistent the provisions of the Residential Overlay of Newport Place Planned Community, which requires a minimum of 15% of base units to be set aside for lower income households. 2. The State Density Bonus Law and the City’s Density Bonus Code (NBCM Section 20.32 Density Bonus) provide for an increase in the number of units above General Plan and zoning limits for projects that include a minimum of 15% of the base units affordable to very- low-income households earning 50% or less of area median income. The Project’s inclusion of 23 very-low-income units, which is 15% of the base unit count of 153 units makes the Project eligible for 77 additional units. Inclusive of all base units, density bonus units, and affordable units the total project includes 229 units. 3. In addition to the 77 density bonus units and parking reductions, the Project is entitled under California Government Code Section 65915(d), Section 20.32.070, to receive up to three incentives or concessions that would result in identifiable, financially sufficient, and actual cost reductions. The Project includes a development concession for the proposed affordable unit mix that does not meet Section 20.32.070 (Design and Distribution of Affordable Units) of the NBMC. Section 20.32.070 (Design and Distribution of Affordable Units) of the NBMC requires affordable units in a density bonus project reflect the same range of unit types in the 48 Planning Commission Resolution No. PC2023-043 Page 19 of 43 residential development as a whole. In this case, the Project provides a higher percentage of affordable studio units and fewer affordable two-bedroom units compared to market rate units. Granting this incentive will result in identifiable, financially sufficient, and actual project cost reductions by reducing the long-term rental subsidy costs associated with the two- bedroom units and affording additional rental income for the project to ensure financial feasibility. The reduction in park in-lieu fees would allow the applicant to contribute to the overall fund for parks in the Airport Area, while providing identifiable cost reduction that make the provision of affordable units feasible. 4. In addition to the density bonus units, parking reductions, and concessions, the Project is entitled under California Government Code Section 65915(e), Section 20.32.080, and recent caselaw to receive waivers or reductions of development standards where application of the development standard would physically preclude construction of a density bonus project. In this case, the following development standards are entitled to waiver: a. Park dedication requirement. General Plan Land Use Policy LU 6.15.13 requires a public park equal to 8% of the gross land area of the development, or a minimum one-half acre, whichever is greater, be provided. In this case, the 1.97-acre Project site is too small to feasibly accommodate a half-acre park. b. Residential density. General Plan Land Use Policy LU 6.15.7 requires residential density between 30-50 units per acre. Inclusive of only the conversion units, the density would comply at 37 dwelling units per acre. Including the proposed GPA units, conversion units, and density bonus units, the Project would not comply at a density of 96 dwelling units per acre and a waiver is necessary to implement the project. c. Street setbacks. The Newport Place Planned Community (PC-11) requires street setbacks of 30 feet from property lines. In this case, 30-foot setbacks along Bristol Street and Spruce Street would substantially decrease the development of the footprint of the Project. The Project is designed with 8-foot setbacks to Spruce Street and 18-foot setbacks to Bristol Street. d. Building height. The Newport Place Planned Community (PC-11) limits building height to 55 feet from established grade. In this case, a higher building height is necessary to accommodate 229 residential units. The Project is designed with a height of approximately 85 feet from established grade. e. Private open space. NBMC Section 20.18.030 (Residential Zoning Districts General Development Standards) requires a minimum of 5 percent of the gross floor area of each unit to be provided as open space. The Project’s studio dwelling units and nine of the two-bedroom units (including 4 units which provide only 2 square feet less than the private open space requirement) are unable to achieve these minimum private open space standards given their size and location. f. Common open space. NBMC Section 20.18.030 (Residential Zoning Districts General Developments Standards) requires a minimum of 75 square feet per unit be provided as common open space area. In this case, the requirement is 17,175 square feet (75 49 Planning Commission Resolution No. PC2023-043 Page 20 of 43 square feet per unit x 229 units). The Project as designed provides approximately 13,800 square feet of common open space due to space limitations on the 2.38-acre lot. Traffic Study In accordance with Section 15.40.030 (Traffic Phasing Ordinance- Standards for Approval- Findings-Exemptions) of the NBMC, the following findings and facts in support of such findings are set forth: Finding: A. That a traffic study for the project has been prepared in compliance with this chapter and Appendix A [NBMC Chapter 15.40], Fact in Support of Finding: 1. A traffic study, entitled 1400 Bristol Street North Residences Traffic Impact Analysis, prepared by Ganddini Group, Inc., dated June 28, 2023, was prepared for the Project in compliance with Municipal Code Chapter 15.40 (Traffic Phasing Ordinance and Appendix A). Finding: D. That, based on the weight of the evidence in the administrative record, including the traffic study, one of the findings for approval in subsection 15.40.030(B) can be made: i. Construction of the project will be completed within 60 months of project approval in accordance with Section 15.40.030(B)(1) of the NBMC. ii. Additionally, the project will neither cause nor make worse an unsatisfactory level of traffic service at any impacted intersection in accordance with Section 15.40.030(B)(1)(a) of the NBMC. Facts in Support of Finding: 1. Based on the weight of the evidence in the administrative record, including the Traffic Study, and the conditions of approval, all of the findings for approval in Section 15.40.030(B)(1)(a) can be made in that: a. The Project is anticipated to be completed by the end of 2026, well within the 60-month criteria. Therefore, the Traffic Study addresses the entire project development. b. The Traffic Study provides an evaluation of morning and evening peak hours at 13 existing intersections that are located in the City and the adjoining City of Irvine. c. The Project is projected to generate an additional (i.e. net increase of) 624 daily trips, including 26 peak AM trips and 34 peak PM trips. When these trips distributed to these studied intersections, the analysis concludes that there is no significant impact as the 50 Planning Commission Resolution No. PC2023-043 Page 21 of 43 Project will neither cause nor make worse an unsatisfactory level of service at any impacted primary intersection, and all intersections are forecasted to continue to operate at acceptable Levels of Service. Finding: B. That the project proponent has agreed to make or fund the improvements, or make the contributions, that are necessary to make the findings for approval and to comply with all conditions of approval. Fact in Support of Finding: 1. No improvements or mitigation are necessary because implementation of the Project will neither cause nor make worse an unsatisfactory level of traffic service at any impacted primary intersection within the City of Newport Beach. The applicant will be required to pay any applicable Traffic Fair Share fees for the net increase in vehicles trips, which will be used to fund future planned improvements to the City’s circulation system. The Applicant will also be subject to the payment of San Joaquin Hills Transportation Corridor Fees. Development Agreement In accordance with Section 15.45.020(A)(2)(a) (Development Agreement Required) of the NBMC, a development agreement is required as the Project requires an amendment to the General Plan and PC-11 that includes the development of more than fifty residential units. In this case the Project has a total of 229 residential units. The proposed development agreement satisfies the requirements of Chapter 15.45 (Development Agreements) of the NBMC as follows: 1. A development agreement is requested by the Applicant, as the Project would include a total of 229 residential units and a General Plan amendment. The development agreement includes all the mandatory elements including a term of 10 years and public benefits that are appropriate to support conveying the vested development rights consistent with the City’s General Plan, the NBMC, and Government Code Sections 65864 et seq. 2. Public benefits include the payment of a public safety fee to satisfy any obligation the Project could have to provide new emergency response services or Fire Department equipment to serve the Airport Area whether a Community Facilities District is formed or not. The Applicant has also agreed to pay a separate public benefit fee to be used by the City Council as it deems appropriate. SECTION 4. DECISION. NOW, THEREFORE, BE IT RESOLVED: The Planning Commission of the City of Newport Beach hereby recommends the following to the City Council: 51 Planning Commission Resolution No. PC2023-043 Page 22 of 43 1. Adopt Environmental Impact Report Addendum to the 2006 General Plan Update (SCH2006011119), as depicted in Exhibit “B” which is attached hereto and incorporated by reference; 2. Approve General Plan Amendment as depicted in Exhibit “C” which is attached hereto and incorporated by reference; 3. Approve Planned Community Development Plan Amendment as depicted in Exhibit “D” which is attached hereto and incorporated by reference; 4. Approve Development Agreement, as depicted in Exhibit "E” which is attached hereto and incorporated by reference; 5. Approve Affordable Housing Implementation Plan, including requested development standard waivers related to park land dedication, building setbacks, building height, density, private open space, common open space, and development concession for the mix of affordable units as depicted in Exhibit “F” which is attached hereto and incorporated by reference; 6. Approve Traffic Study, as depicted in Exhibit “G” which is attached hereto and incorporated by reference. 7. Approve Major Site Development Review with conditions of approval, as depicted in Exhibit “H” which is attached hereto and incorporated by reference; and PASSED, APPROVED, AND ADOPTED THIS 7TH DAY OF DECEMBER, 2023. AYES: NOES: ABSTAIN: ABSENT: BY:__________________________ Curtis Ellmore, Chairman BY:__________________________ Tristan Harris, Secretary Attachment(s): Exhibit A – Legal Description Exhibit B – Addendum to the 2006 General Plan Update (SCH NO. 2006011119) Exhibit C – General Plan Amendment Exhibit D – Planned Community Development Plan Amendment Exhibit E – Development Agreement Exhibit F – Affordable Housing Implementation Plan 52 Planning Commission Resolution No. PC2023-043 Page 23 of 43 Exhibit G – Traffic Study Exhibit H – Conditions of Approval 53 Planning Commission Resolution No. PC2023-043 Page 24 of 43 EXHIBIT “A” Legal Description THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE CITY OF NEWPORT BEACH, IN THE COUNTY OF ORANGE, STATE OF CALIFORNIA, AND IS DESCRIBED AS FOLLOWS: THAT PORTION OF BLOCK 50 OF IRVINE'S SUBDIVISION, AS SHOWN ON A MAP RECORDED IN BOOK 1, PAGE 88 OF MISCELLANEOUS RECORDS MAPS, RECORDS OF ORANGE COUNTY, CALIFORNIA, TOGETHER WITH THAT PORTION OF TRACT 706, AS SHOWN ON A MAP RECORDED IN BOOK 21, PAGE 25 OF MISCELLANEOUS MAPS, RECORDS OF SAID ORANGE COUNTY, DESCRIBED AS FOLLOWS: PARCEL 2 IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS SHOWN ON A MAP FILED IN BOOK 54, PAGE 11 OF PARCEL MAPS IN THE OFFICE OF THE COUNTY RECORDER OF ORANGE COUNTY, CALIFORNIA. EXCEPT THE FULL RIGHTS TO ALL MINERALS, PETROLEUM, GAS AND OTHER HYDROCARBON SUBSTANCES EXISTING BELOW FIVE HUNDRED (500) FEET FROM THE SURFACE OF SAID REAL PROPERTY DESCRIBED ABOVE, PROVIDED, HOWEVER, THAT GRANTOR HEREBY EXPRESSLY WAIVES THE RIGHT TO ENTER UPON THE SURFACE OF SAID REAL PROPERTY FOR THE PURPOSE OF EXPLORING FOR, OR PRODUCING THE MINERALS, PETROLEUM, GAS AND OTHER HYDROCARBON SUBSTANCES SO RESERVED IN DEED RECORDED JULY 1, 1977. 54 Planning Commission Resolution No. PC2023-043 Page 25 of 43 EXHIBIT “B” ADDENDUM TO THE 2006 GENERAL PLAN UPDATE (SCH NO. 2006011119) Available separately due to bulk at: www.newportbeachca.gov/ceqa 55 Planning Commission Resolution No. PC2023-043 Page 26 of 43 EXHIBIT “C” General Plan Amendment 56 2014 2 2012 2 201 1 2 104 1061081101121141161181012010 2 2009 2 200 8 2 2007 2 2006 2 200 8 1 2009 1 201 0 1 2011 1 201 2 1 (1-25)36017 2300230223222010 2 200 8 1 2009 1 201 0 1 2011 1 233123012362234210001300 1301 (100 - 2 0 0 ) 1100 1200 1300 1000 140 0 140 1 130112019011101 145 1 140 0 150 1 1550 170 1 1420 115 1 120013006 5 42131500 10011101-1111900 10002332242 4 200 9 2 2008 2 200 5 2245224322422241223822372 366136658952350249123722382 1/23847-38573920190 03900 390140011800 39194221 3929A-39373880181 1 3990 4000 1401414141014100 4106 2372 1/223821375(A12 0 - Z 2 4 0 ) 4225 250200280290285265260220225230240803CO-G MU-H2 MU-H2 MU-H2 MU-H2 CO-G CO-G CO-G SR73 CG PIRS-D MU-H2CO-G CG DOVE S T JAMBOREERDQUA I L S T BOWSPRIT DRBIRCH STBAYVIEW PLBRI S T O L S TSPRUCE AVEBRI S T O L S T N BAYC RESTCT ZEN I T H A V E BAYVIEWAVENEWPORT PLACE DR SPRUCE STUPPER NEWPORTPLA Z ADRWESTERLY PLPA2022-0296_GP_Amendment.mxd 0 310155 FeetI City of Newport BeachGIS DivisionNovember 22, 2023 PA2022-0296 General Plan Amendment1400 Bristol St N Land Use Change: General Commercial Office (CO-G) toMixed-Use Horizontal (MU-H2) 57 Table LU2 Anomaly Locations Anomaly Number Statistical Area Land Use Designation Development Limit (sf) Development Limit (Other) Additional Information 16 L4 CO-G/MU-H2 344,231 64 Dwelling Units 89 dwelling units were converted from two existing 38,764 square foot office buildings consistent with LU 6.15.5 and 64 units were added through a GPA at 1400 Bristol Street (PA2022-0296) 58 Planning Commission Resolution No. PC2023-043 Page 27 of 43 EXHIBIT “D” Planned Community Development Plan Amendment 59 2014 2 2012 2 201 1 2 104 1061081101121141161181012010 2 2009 2 200 8 2 2007 2 2006 2 200 8 1 2009 1 201 0 1 2011 1 201 2 1 (1-25)36017 2300230223222010 2 200 8 1 2009 1 201 0 1 2011 1 233123012362234210001300 1301 (100 - 2 0 0 ) 1100 1200 1300 1000 140 0 140 1 130112019011101 145 1 140 0 150 1 1550 170 1 1420 115 1 120013006 5 42131500 10011101-1111900 10002332242 4 200 9 2 2008 2 200 5 2245224322422241223822372 366136658952350249123722382 1/23847-38573920190 03900 390140011800 39194221 3929A-39373880181 1 3990 4000 1401414141014100 4106 2372 1/223821375(A12 0 - Z 2 4 0 ) 4225 250200280290285265260220225230240803SR73 DOVE S T JAMBOREERDQUA I L S T BOWSPRIT DRBIRCH STBAYVIEW PLBRI S T O L S TSPRUCE AVEBRI S T O L S T N BAYC RESTCT ZEN I T H A V E BAYVIEWAVENEWPORT PLACE DR SPRUCE STUPPER NEWPORTPLA Z ADRWESTERLY PLPA2022-0296_PC_Amendment.mxd 0 310155 FeetI City of Newport BeachGIS DivisionNovember 22, 2023 PA2022-0296 PC-11 Newport Place Amendment1400 Bristol St N Add "Residential Overlay" to the PropertyLocated at 1400 Bristol St N inthe Newport Place Planned Community Legend Residential Overlay Newport Place Planned Community 60 Planning Commission Resolution No. PC2023-043 Page 28 of 43 EXHIBIT “E” Development Agreement 61 Exhibit “E” RECORDING REQUESTED BY AND WHEN RECORDED RETURN TO: City of Newport Beach 3300 Newport Boulevard Newport Beach, CA 92663-3884 Attn: City Clerk (Space Above This Line Is for Recorder’s Use Only) This Agreement is recorded at the request and for the benefit of the City of Newport Beach and is exempt from the payment of a recording fee pursuant to Government Code §§ 6103 and 27383. DEVELOPMENT AGREEMENT between CITY OF NEWPORT BEACH and THE PICERNE GROUP CONCERNING “THE RESDENCES AT 1400 BRISTOL STREET ” 62 -1- DEVELOPMENT AGREEMENT (Pursuant to California Government Code Sections 65864-65869.5) This DEVELOPMENT AGREEMENT (the “Agreement”) is dated for reference purposes as of the __ day of __________, 2024 (the “Agreement Date”), and is being entered into by and between the City of Newport Beach (“City”), and The Picerne Group, a California limited company “Property Owner”). City and Property Owner are sometimes collectively referred to in this Agreement as the “Parties” and individually as a “Party.” RECITALS A. Property Owner is the owner of that certain real property located in the City of Newport Beach, County of Orange, State of California commonly referred to as 1400 Bristol Street and more particularly described in the legal description attached as Exhibit “A” and depicted on the site map attached hereto as Exhibit “B” (“Property”). The Property consists of approximately 2.38 acres and is a part of the Newport Place Planned Community shown on the City’s Zoning Map. B. In order to encourage investment in, and commitment to, comprehensive planning and public facilities financing, strengthen the public planning process and encourage private implementation of the local general plan, provide certainty in the approval of projects in order to avoid waste of time and resources, and reduce the economic costs of development by providing assurance to property owners that they may proceed with projects consistent with existing land use policies, rules, and regulations, the California Legislature adopted California Government Code Sections 65864-65869.5 (the “Development Agreement Statute”) authorizing cities and counties to enter into development agreements with persons or entities having a legal or equitable interest in real property located within their jurisdiction. C. On March 13, 2007, the City Council adopted Ordinance No. 2007-6, entitled “Ordinance Amending Chapter 15.45 of City of Newport Beach Municipal Code Regarding Development Agreements” (the “Development Agreement Ordinance”). This Agreement is consistent with the Development Agreement Ordinance. D. The Parties wish to enter into Agreement for the construction of a multi-unit residential project consisting of 229 apartment units (including affordable units) atop of 422-space parking structure. E. As detailed in Section 3 of this Agreement, Property Owner has agreed to provide the following significant public benefits as consideration for this Agreement: INSERT PUBLIC BENEFITS. F. This Agreement is consistent with the City of Newport Beach General Plan (“General Plan”), including without limitation the General Plan’s designation of the Property as “MU-H2” (Mixed Use Horizontal 2) which provides for a horizontal intermixing of uses that may include regional commercial office, multifamily residential, vertical mixed-use buildings, industrial, hotel rooms, and ancillary neighborhood commercial uses and the Newport Place Planned Community that was adopted in 1970 by Ordinance No. 1369, and amended from time to 63 2 time, in order to establish appropriate zoning to regulate land use and development of property within the general boundaries of the Newport Place Planned Community. G. In recognition of the significant public benefits that this Agreement provides, the City Council finds that this Agreement: (i) is consistent with the City of Newport Beach General Plan as of the date of this Agreement; (ii) is in the best interests of the health, safety, and general welfare of City, its residents, and the public; (iii) is entered into pursuant to, and constitutes a present exercise of, City’s police power; (iv) Project’s Addendum to the Environmental Impact Report (SCH# 20060111119) (“PEIR”) that was certified by the City Council on July 25, 2006 for the 2006 General Plan Update and the Initial Study/Negative Declaration prepared in accordance with CEQA for the Newport Beach Housing Element Update (General Plan Amendment No. GP2008-003) adopted by the City Council on November 22, 2011 (the PEIR and Initial Study/Negative Declaration are collectively referred to herein as the “PEIR”), all of which analyze the environmental effects of the proposed development of the Project on the Property, and all of the findings, conditions of approval and mitigation measures related thereto; and (v) is consistent and has been approved consistent with provisions of California Government Code Section 65867 and City of Newport Beach Municipal Code chapter 15.45. H. On December 7, 2023, City’s Planning Commission held a public hearing on this Agreement, and made findings and determinations with respect to this Agreement, and recommended to the City Council that the City Council approve this Agreement. I. On[INSERT DATE], the City Council held a public hearing on this Agreement and considered the Planning Commission’s recommendations and the testimony and information submitted by City staff, Property Owner, and members of the public. On INSERT DATE, consistent with applicable provisions of the Development Agreement Statute and Development Agreement Ordinance, the City Council adopted its Ordinance No. 2024-___ (the “Adopting Ordinance”), finding this Agreement to be consistent with the City of Newport Beach General Plan and approving this Agreement. AGREEMENT NOW, THEREFORE, City and Property Owner agree as follows: 1. Definitions. In addition to any terms defined elsewhere in this Agreement, the following terms when used in this Agreement shall have the meanings set forth below: “Action” shall have the meaning ascribed in Section 8.10 of this Agreement. “Adopting Ordinance” shall mean City Council Ordinance No. 2024-___ approving and adopting this Agreement. “Agreement” shall mean this Development Agreement, as the same may be amended from time to time. “Agreement Date” shall mean INSERT DATE which date is the date the City Council adopted the Adopting Ordinance. 64 3 “CEQA” shall mean the California Environmental Quality Act (California Public Resources Code Sections 21000-21177) and the implementing regulations promulgated thereunder by the Secretary for Resources (California Code of Regulations, Title 14, Section 15000 et seq.) (“CEQA Guidelines”), as the same may be amended from time to time. “City” shall mean the City of Newport Beach, a California charter city. “City Council” shall mean the governing body of City. “City’s Affiliated Parties” shall have the meaning ascribed in Section 10.1 of this Agreement. “Claim” shall have the meaning ascribed in Section 10.1 of this Agreement. “CPI Index” shall mean the Consumer Price Index published from time to time by the United States Department of Labor, Bureau of Labor Statistics for all urban consumers (all items) for the Los Angeles-Long Beach-Anaheim, California Area, All Urban Consumers, All Items, Base Period (1982-84=100), or, if such index is discontinued, such other similar index as may be publicly available that is selected by City in its reasonable discretion. “Cure Period” shall have the meaning ascribed in Section 8.1 of this Agreement. “Default” shall have the meaning ascribed to that term in Section 8.1 of this Agreement. “Develop” or “Development” shall mean to improve or the improvement of the Property for the purpose of completing the structures, improvements, and facilities comprising the Project, including but not limited to: grading; the construction of infrastructure and public facilities related to the Project, whether located within or outside the Property; the construction of all of the private improvements and facilities comprising the Project; the preservation or restoration, as required of natural and man-made or altered open space areas; and the installation of landscaping. The terms “Develop” and “Development,” as used herein, do not include the maintenance, repair, reconstruction, replacement, or redevelopment of any structure, improvement, or facility after the initial construction and completion thereof. “Development Agreement Ordinance” shall mean Chapter 15.45 of the City of Newport Beach Municipal Code. “Development Agreement Statute” shall mean California Government Code Sections 65864-65869.5, inclusive. “Development Exactions” shall mean any requirement of City in connection with or pursuant to any ordinance, resolution, rule, or official policy for the dedication of land, the construction or installation of any public improvement or facility, or the payment of any fee or charge in order to lessen, offset, mitigate, or compensate for the impacts of Development of the Project on the environment or other public interests. “Development Plan” shall mean all of the land use entitlements, approvals and permits approved by the City for the Project on or before the Agreement Date, as the same may be amended from time to time consistent with this Agreement. Such land use entitlements, approvals and 65 4 permits include, without limitation, the following: (1) the Development rights as provided under this Agreement; (2) the amendment to the Newport Place Planned Community (PC-11) adopted pursuant to Ordinance No. 1369 and as amended by Ordinance No. 2024-__; (3) General Plan Amendment adopted pursuant to Resolution No. 2024-___; (4) Major Site Development Review adopted pursuant to Resolution No. 2024-___; (5) Affordable Housing Implementation Plan adopted pursuant to Resolution No. 2024-___; and Traffic Study adopted pursuant to Resolution No. 2024-___. “Development Regulations” shall mean the following regulations as they are in effect as of the Agreement Date and to the extent they govern or regulate the development of the Property, but excluding any amendment or modification to the Development Regulations adopted, approved, or imposed after the Agreement Date that impairs or restricts Property Owner’s rights set forth in this Agreement, unless such amendment or modification is expressly authorized by this Agreement or is agreed to by Property Owner in writing: the General Plan, the Development Plan, and, to the extent not expressly superseded by the Development Plan or this Agreement, all other land use and subdivision regulations governing the permitted uses, density and intensity of use, design, improvement, and construction standards and specifications, procedures for obtaining required City permits and approvals for development, and similar matters that may apply to development of the Project on the Property during the Term of this Agreement that are set forth in Title 15 of the Municipal Code (buildings and construction), Title 19 of the Municipal Code (subdivisions) and Title 20 of the Municipal Code (planning and zoning), but specifically excluding all other sections of the Municipal Code, including without limitation Title 5 of the Municipal Code (business licenses and regulations). Notwithstanding the foregoing, the term “Development Regulations,” as used herein, does not include any City ordinance, resolution, code, rule, regulation or official policy governing any of the following: (i) the conduct of businesses, professions, and occupations; (ii) taxes and assessments; (iii) the control and abatement of nuisances; (iv) the granting of encroachment permits and the conveyance of rights and interests which provide for the use of or entry upon public property; or (v) the exercise of the power of eminent domain. “Effective Date” shall mean the latest of the following dates, as applicable: (i) the date that is thirty (30) days after the Agreement Date; (ii) if a referendum concerning the Adopting Ordinance, the Development Plan, or any of the Development Regulations approved on or before the Agreement Date is timely qualified for the ballot and a referendum election is held concerning the Adopting Ordinance or any of such Development Regulations, the date on which the referendum is certified resulting in upholding and approving the Adopting Ordinance and the Development Regulations; or (iii) if a lawsuit is timely filed challenging the validity of the Adopting Ordinance, this Agreement, and/or any of the Development Regulations approved on or before the Agreement Date, the date on which said challenge is finally resolved in favor of the validity or legality of the Adopting Ordinance, this Agreement, the Development Plan and/or the applicable Development Regulations, which such finality is achieved by a final non-appealable judgment, voluntary or involuntary dismissal (and the passage of any time required to appeal an involuntary dismissal), or binding written settlement agreement. Promptly after the Effective Date occurs, the Parties agree to cooperate in causing an appropriate instrument to be executed and recorded against the Property memorializing the Effective Date. “Environmental Laws” means all federal, state, regional, county, municipal, and local laws, statutes, ordinances, rules, and regulations which are in effect as of the Agreement Date, and all federal, state, regional, county, municipal, and local laws, statutes, rules, ordinances, rules, and 66 5 regulations which may hereafter be enacted and which apply to the Property or any part thereof, pertaining to the use, generation, storage, disposal, release, treatment, or removal of any Hazardous Substances, including without limitation the following: the Comprehensive Environmental Response Compensation and Liability Act of 1980, 42 U.S.C. Sections 9601, et seq., as amended (“CERCLA”); the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act of 1976, 42 U.S.C. Sections 6901, et seq., as amended (“RCRA”); the Emergency Planning and Community Right to Know Act of 1986, 42 U.S.C. Sections 11001 et seq., as amended; the Hazardous Materials Transportation Act, 49 U.S.C. Section 1801, et seq., as amended; the Clean Air Act, 42 U.S.C. Sections 7401 et seq., as amended; the Clean Water Act, 33 U.S.C. Section 1251, et seq., as amended; the Toxic Substances Control Act, 15 U.S.C. Sections 2601 et seq., as amended; the Federal Insecticide, Fungicide and Rodenticide Act, 7 U.S.C. Sections 136 et seq., as amended; the Federal Safe Drinking Water Act, 42 U.S.C. Sections 300f et seq., as amended; the Federal Radon and Indoor Air Quality Research Act, 42 U.S.C. Sections 7401 et seq., as amended; the Occupational Safety and Health Act, 29 U.S.C. Sections 651 et seq., as amended; and California Health and Safety Code Section 25100, et seq. “General Plan” shall mean City’s 2006 General Plan adopted by the City Council on July 25, 2006, by Resolution No. 2006-76, as amended through the Agreement Date but excluding any amendment after the Agreement Date that impairs or restricts Property Owner’s rights set forth in this Agreement, unless such amendment is expressly authorized by this Agreement, is authorized by Sections 8 or 9, or is specifically agreed to by Property Owner. The Land Use Plan of the Land Use Element of the General Plan was approved by City voters in a general election on November 7, 2006. “Hazardous Substances” means any toxic substance or waste, pollutant, hazardous substance or waste, contaminant, special waste, industrial substance or waste, petroleum or petroleum-derived substance or waste, or any toxic or hazardous constituent or additive to or breakdown component from any such substance or waste, including without limitation any substance, waste, or material regulated under or defined as “hazardous” or “toxic” under any Environmental Law. “Mortgage” shall mean a mortgage, deed of trust, sale and leaseback arrangement, or any other form of conveyance in which the Property, or a part or interest in the Property, is pledged as security and contracted for in good faith and for fair value. “Mortgagee” shall mean the holder of a beneficial interest under a Mortgage or any successor or assignee of the Mortgagee. “Notice of Default” shall have the meaning ascribed in Section 8.1 of this Agreement. “Party” or “Parties” shall mean either City or Property Owner or both, as determined by the context. “Project” shall mean all on-site and off-site improvements that Property Owner is authorized and/or may be required to construct with respect to each parcel of the Property, as provided in this Agreement and the Development Regulations, as the same may be modified or amended from time to time consistent with this Agreement and applicable law. “Property” is described in Exhibit “A” and generally depicted on Exhibit “B”. 67 6 “Property Owner” shall mean The Picerne Group, a California limited liability company and any successor or assignee to all or any portion of the right, title, and interest in and to ownership of all or a portion of the Property. “Public Benefit Fee” shall have the meaning ascribed in Section 3.1 of this Agreement. “Subsequent Development Approvals” shall mean all discretionary development and building approvals that Property Owner is permitted to obtain to Develop the Project on and with respect to the Property after the Agreement Date consistent with the Development Regulations. “Term” shall have the meaning ascribed in Section 2.4 of this Agreement. “Termination Date” and “Lot Termination Date” shall have the meaning ascribed in Section 2.4 of this Agreement. “Transfer” shall have the meaning ascribed in Section 11 of this Agreement. 2. General Provisions. 2.1 Plan Consistency, Zoning Implementation. This Agreement and the Development Regulations applicable to the Property are consistent with the General Plan and the Newport Place Planned Community Development Plan (PC-11) as amended by the approvals in the Development Plan adopted concurrently herewith (including but not limited to the amendment to the General Plan and Newport Place Planned Community Development Plan (PC-47). 2.2 Binding Effect of Agreement. The Property is hereby made subject to this Agreement. Development of the Property is hereby authorized and shall be carried out in accordance with the terms of this Agreement. 2.3 Property Owner Representations and Warranties Regarding Ownership of the Property and Related Matters Pertaining to this Agreement. Property Owner and each person executing this Agreement on behalf of Property Owner hereby represents and warrants to City as follows: (i) Property Owner or any co-owner comprising Property Owner is a legal entity and that such entity is duly formed and existing and is authorized to do business in the State of California; (ii) if Property Owner or any co-owner comprising Property Owner is a natural person that such natural person has the legal right and capacity to execute this Agreement; (iii) that all actions required to be taken by all persons and entities comprising Property Owner to enter into this Agreement have been taken and that Property Owner has the legal authority to enter into this Agreement; (iv) Property Owner’s entering into and performing its obligations set forth in this Agreement will not result in a violation of any obligation, contractual or otherwise, that Property Owner or any person or entity comprising Property Owner has to any third party; (v) that neither Property Owner nor any co-owner comprising Property Owner is the subject of any voluntary or involuntary petition in bankruptcy; and (vi) Property Owner has the authority and ability to enter into or perform any of its obligations set forth in this Agreement. 68 7 2.4 Term. The term of this Agreement (the “Term” shall commence on the Effective Date and continue until ____________ 20__, unless otherwise terminated or modified pursuant to its terms. Notwithstanding any other provision set forth in this Agreement to the contrary, if any Party reasonably determines that the Effective Date will not occur because (i) the Adopting Ordinance or any of the Development Regulations approved on or before the Agreement Date for the Project has/have been disapproved by City’s voters at a referendum election or (ii) a final non- appealable judgment is entered in a judicial action challenging the validity or legality of the Adopting Ordinance, this Agreement, and/or any of the Development Regulations for the Project approved on or before the Agreement Date such that this Agreement and/or any of such Development Regulations is/are invalid and unenforceable in whole or in such a substantial part that the judgment substantially impairs such Party’s rights or substantially increases its obligations or risks hereunder or thereunder, then such Party, in its sole and absolute discretion, shall have the right to terminate this Agreement upon delivery of a written notice of termination to the other Party, in which event neither Party shall have any further rights or obligations hereunder except that Property Owner’s indemnity obligations set forth in Article 10 shall remain in full force and effect and shall be enforceable, and the Development Regulations applicable to the Project and the Property only (but not those general Development Regulations applicable to other properties in the City) shall be repealed by the City after delivery of said notice of termination except for the Development Regulations that have been disapproved by City’s voters at a referendum election and, therefore, never took effect. The Termination Date shall be the earliest of the following dates: (i) the tenth (10th) anniversary of the Effective Date; (ii) such earlier date that this Agreement may be terminated in accordance with Articles 5, 7, and/or Section 8.3 of this Agreement and/or Sections 65865.1 and/or 65868 of the Development Agreement Statute; or (iii) completion of the Project in accordance with the terms of this Agreement, including Property Owner’s complete satisfaction, performance, and payment, as applicable, of all Development Exactions, the issuance of all required final occupancy permits, and acceptance by City or applicable public agency(ies) or private entity(ies) of all required offers of dedication. Notwithstanding any other provision set forth in this Agreement to the contrary, the provisions set forth in Article 10 and Section 14.11 (as well as any other Property Owner obligations set forth in this Agreement that are expressly written to survive the Termination Date) shall survive the Termination Date of this Agreement. 3. Public Benefits. 3.1 Public Benefit Fee. As consideration for City’s approval and performance of its obligations set forth in this Agreement, Property Owner shall pay to City a fee that shall be in addition to any other fee or charge to which the Property and the Project would otherwise be subject to (herein, the “Public Benefit Fee”) in the total sum of INSERT DOLLAR AMOUNT ($ ) which shall be due and payable prior to the issuance of the first building permit for the Project. 69 8 The City has not designated a specific project or purpose for the Public Benefit Fee. Owner acknowledges by its approval and execution of this Agreement that it is voluntarily agreeing to pay the Public Benefit Fee and that its obligation to pay the Public Benefit Fee is an essential term of this Agreement and is not severable from City’s obligations and Owner’s vested rights to be acquired hereunder, and that Owner expressly waives any constitutional, statutory, or common law right it might have in the absence of this Agreement to protest or challenge the payment of the Public Benefits identified in this Section 3.1 on any ground whatsoever, including without limitation pursuant to the Fifth and Fourteenth Amendments to the United States Constitution, California Constitution Article I Section 19, the Mitigation Fee Act (California Government Code Section 66000 et seq.), or otherwise. In addition to any other remedy set forth in this Agreement for Owner’s default, if Owner shall fail to timely pay any portion of the Public Benefits identified in this Section 3.1 when due, City shall have the right to withhold issuance of any further building permits, occupancy permits, or other development or building permits for the Project. 3.2 Consumer Price Index (CPI) Increases. Any fee provided in this Section 3 (Public Benefit) shall be increased based upon percentage increases in the CPI Index as provided herein. The first CPI adjustment shall occur on the first anniversary of the City Council’s adoption of the Adopting Ordinance (the first “Adjustment Date”) and subsequent CPI adjustments shall occur on each anniversary of the first Adjustment Date thereafter until expiration of the Term of this Agreement (each, an “Adjustment Date”). The amount of the CPI adjustment on the applicable Adjustment Date shall in each instance be calculated based on the then most recently available CPI Index figures such that, for example, if the Effective Date of this Agreement falls on July 1 and the most recently available CPI Index figure on the first Adjustment Date (January 1 of the following year) is the CPI Index for November of the preceding year, the percentage increase in the CPI Index for that partial year (a 6-month period) shall be calculated by comparing the CPI Index for November of the preceding year with the CPI Index for May of the preceding year (a 6- month period). In no event, however, shall application of the CPI Index reduce the amount of the Public Benefit Fee (or unpaid portion thereof) below the amount in effect prior to any applicable Adjustment Date. 3.2 Other Public Benefits. INSERT OTHER PUBLIC BENEFITS. 4. Development of Project. 4.1 Applicable Regulations; Property Owner’s Vested Rights and City’s Reservation of Discretion With Respect to Subsequent Development Approvals. Other than as expressly set forth in this Agreement, during the Term of this Agreement, (i) Property Owner shall have the vested right to Develop the Project on and with respect to the Property in accordance with the terms of the Development Regulations and this Agreement and (ii) City shall not prohibit or prevent development of the Property on grounds inconsistent with the Development Regulations or this Agreement. Notwithstanding the foregoing, nothing herein is intended to limit or restrict City’s discretion with respect to (i) review and approval requirements contained in the Development Regulations, (ii) exercise of any discretionary authority City retains under the Development Regulations, (iii) the approval, conditional approval, or denial of any Subsequent Development Approvals applied for by Property Owner, or that are required, for Development of the Project as of the Agreement Date provided that all such actions are consistent with the Development Regulations, or (iv) any environmental approvals that may be required 70 9 under CEQA or any other federal or state law or regulation in conjunction with any Subsequent Development Approvals that may be required for the Project, and in this regard, as to future actions referred to in clauses (i)-(iv) of this sentence, City reserves its full discretion to the same extent City would have such discretion in the absence of this Agreement. In addition, it is understood and agreed that nothing in this Agreement is intended to vest Property Owner’s rights with respect to any laws, regulations, rules, or official policies of any other governmental agency or public utility company with jurisdiction over the Property or the Project; or any applicable federal or state laws, regulations, rules, or official policies that may be inconsistent with this Agreement and that override or supersede the provisions set forth in this Agreement, and regardless of whether such overriding or superseding laws, regulations, rules, or official policies are adopted or applied to the Property or the Project prior or subsequent to the Agreement Date. Property Owner has expended and will continue to expend substantial amounts of time and money in the planning and entitlement process to permit Development of the Project in the future. Property Owner represents and City acknowledges that Property Owner would not make these expenditures without this Agreement, and that Property Owner is and will be making these expenditures in reasonable reliance upon obtaining vested rights to Develop the Project as set forth in this Agreement. Property Owner may apply to City for permits or approvals necessary to modify or amend the Development specified in the Development Regulations, provided that unless this Agreement also is amended, the request does not propose an increase in the maximum density, intensity, height, or size of proposed structures, or a change in use that generates more peak hour traffic or more daily traffic. In addition, Property Owner may apply to City for approval of minor amendments to existing tentative tract maps, tentative parcel maps, or associated conditions of approval, consistent with City of Newport Beach Municipal Code Section 19.12.090. This Agreement does not constitute a promise or commitment by City to approve any such permit or approval, or to approve the same with or without any particular requirements or conditions, and City’s discretion with respect to such matters shall be the same as it would be in the absence of this Agreement. 4.2 No Conflicting Enactments. Except to the extent City reserves its discretion as expressly set forth in this Agreement, during the Term of this Agreement City shall not apply to the Project or the Property any ordinance, policy, rule, regulation, or other measure relating to Development of the Project that is enacted or becomes effective after the Agreement Date to the extent it conflicts with this Agreement. This Section 4.2 shall not restrict City’s ability to enact an ordinance, policy, rule, regulation, or other measure applicable to the Project pursuant to California Government Code Section 65866 consistent with the procedures specified in Section 4.3 of this Agreement. In Pardee Construction Co. v. City of Camarillo (1984) 37 Cal.3d 465, the California Supreme Court held that a construction company was not exempt from a city’s growth control ordinance even though the city and construction company had entered into a consent judgment (tantamount to a contract under California law) establishing the company’s vested rights to develop its property consistent with the zoning. The California Supreme Court reached this result because the consent judgment failed to address the timing of development. The Parties intend to avoid the result of the Pardee case by acknowledging and providing in this Agreement that Property Owner shall have the vested right to Develop the Project on and with respect to the Property at the rate, timing, and sequencing that 71 10 Property Owner deems appropriate within the exercise of Property Owner’s sole subjective business judgment, provided that such Development occurs in accordance with this Agreement and the Development Regulations, notwithstanding adoption by City’s electorate of an initiative to the contrary after the Agreement Date. No City moratorium or other similar limitation relating to the rate, timing, or sequencing of the Development of all or any part of the Project and whether enacted by initiative or another method, affecting subdivision maps, building permits, occupancy certificates, or other entitlement to use, shall apply to the Project to the extent such moratorium or other similar limitation restricts Property Owner’s vested rights in this Agreement or otherwise conflicts with the express provisions of this Agreement. 4.3 Reservations of Authority. Notwithstanding any other provision set forth in this Agreement to the contrary, the laws, rules, regulations, and official policies set forth in this Section 4.3 shall apply to and govern the Development of the Project on and with respect to the Property. 4.3.1 Procedural Regulations. Procedural regulations relating to hearing bodies, petitions, applications, notices, findings, records, hearings, reports, recommendations, appeals, and any other matter of procedure shall apply to the Property, provided that such procedural regulations are adopted and applied City-wide or to all other properties similarly situated in City. 4.3.2 Processing and Permit Fees. City shall have the right to charge and Property Owner shall be required to pay all applicable processing and permit fees to cover the reasonable cost to City of processing and reviewing applications and plans for any required Subsequent Development Approvals, building permits, excavation and grading permits, encroachment permits, and the like, for performing necessary studies and reports in connection therewith, inspecting the work constructed or installed by or on behalf of Property Owner, and monitoring compliance with any requirements applicable to Development of the Project, all at the rates in effect at the time fees are due. 4.3.3 Consistent Future City Regulations. City ordinances, resolutions, regulations, and official policies governing Development which do not conflict with the Development Regulations, or with respect to such regulations that do conflict, where Property Owner has consented in writing to the regulations, shall apply to the Property. 4.3.4 Development Exactions Applicable to Property. During the Term of this Agreement, Property Owner shall be required to satisfy and pay all Development Exactions at the time performance or payment is due to the same extent and in the same amount(s) that would apply to Property Owner and the Project in the absence of this Agreement; provided, however, that to the extent the scope and extent of a particular Development Exaction (excluding any development impact fee) for the Project has been established and fixed by City in the conditions of approval for any of the Development Regulations approved on or before the Agreement Date, City shall not alter, increase, or modify said Development Exaction in a manner that is inconsistent with such Development Regulations without Property Owner’s prior written consent or as may be otherwise required pursuant to overriding federal or state laws or regulations (Section 4.3.5 hereinbelow). In addition, nothing in this Agreement is intended or shall be deemed to vest Property Owner against the obligation to pay any of the following (which are not included within the definition of “Development Exactions”) in the full amount that would apply in the absence of this Agreement: 72 11 (i) City’s normal fees for processing, environmental assessment and review, tentative tract and parcel map review, plan checking, site review and approval, administrative review, building permit, grading permit, inspection, and similar fees imposed to recover City’s costs associated with processing, reviewing, and inspecting project applications, plans, and specifications; (ii) fees and charges levied by any other public agency, utility, district, or joint powers authority, regardless of whether City collects those fees and charges; or (iii) community facility district special taxes or special district assessments or similar assessments, business license fees, bonds or other security required for public improvements, transient occupancy taxes, sales taxes, property taxes, sewer lateral connection fees, water service connection fees, new water meter fees, and the Property Development Tax payable under Chapter 3.12 of City’s Municipal Code. 4.3.5 Overriding Federal and State Laws and Regulations. Federal and state laws and regulations that override Property Owner’s vested rights set forth in this Agreement shall apply to the Property, together with any City ordinances, resolutions, regulations, and official policies that are necessary to enable City to comply with the provisions of any such overriding federal or state laws and regulations, provided that (i) Property Owner does not waive its right to challenge or contest the validity of any such purportedly overriding federal, state, or City law or regulation; and (ii) upon the discovery of any such overriding federal, state, or City law or regulation that prevents or precludes compliance with any provision of this Agreement, City or Property Owner shall provide to the other Party a written notice identifying the federal, state, or City law or regulation, together with a copy of the law or regulation and a brief written statement of the conflict(s) between that law or regulation and the provisions of this Agreement. Promptly thereafter City and Property Owner shall meet and confer in good faith in a reasonable attempt to determine whether a modification or suspension of this Agreement, in whole or in part, is necessary to comply with such overriding federal, state, or City law or regulation. In such negotiations, City and Property Owner agree to preserve the terms of this Agreement and the rights of Property Owner as derived from this Agreement to the maximum feasible extent while resolving the conflict. City agrees to cooperate with Property Owner at no cost to City in resolving the conflict in a manner which minimizes any financial impact of the conflict upon Property Owner. City also agrees to process in a prompt manner Property Owner’s proposed changes to this Agreement, the Project and any of the Development Regulations as may be necessary to comply with such overriding federal, state, or City law or regulation; provided, however, that the approval of such changes by City shall be subject to the discretion of City, consistent with this Agreement. 4.3.6 Public Health and Safety. Any City ordinance, resolution, rule, regulation, program, or official policy that is necessary to protect persons on the Property or in the immediate vicinity from conditions dangerous to their health or safety, as reasonably determined by City, shall apply to the Property, even though the application of the ordinance, resolution, rule regulation, program, or official policy would result in the impairment of Property Owner’s vested rights under this Agreement. 4.3.7 Uniform Building Standards. Existing and future building and building- related standards set forth in the uniform codes adopted and amended by City from time to time, including building, plumbing, mechanical, electrical, housing, swimming pool, and fire codes, and any modifications and amendments thereof shall all apply to the Project and the Property to the same extent that the same would apply in the absence of this Agreement. 73 12 4.3.8 Public Works Improvements. To the extent Property Owner constructs or installs any public improvements, works, or facilities, the City standards in effect for such public improvements, works, or facilities at the time of City’s issuance of a permit, license, or other authorization for construction or installation of same shall apply. 4.3.9 No Guarantee or Reservation of Utility Capacity. Notwithstanding any other provision set forth in this Agreement to the contrary, nothing in this Agreement is intended or shall be interpreted to require City to guarantee or reserve to or for the benefit of Property Owner or the Property any utility capacity, service, or facilities that may be needed to serve the Project, whether domestic or reclaimed water service, sanitary sewer transmission or wastewater treatment capacity, downstream drainage capacity, or otherwise, and City shall have the right to limit or restrict Development of the Project if and to the extent that City reasonably determines that inadequate utility capacity exists to adequately serve the Project at the time Development is scheduled to commence. 5. Amendment or Cancellation of Agreement. This Agreement may be amended or canceled in whole or in part only by mutual written and executed consent of the Parties in compliance with California Government Code Section 65868 and Newport Beach Municipal Code Section 15.45.070 or by unilateral termination by City in the event of an uncured default of Property Owner. 6. Enforcement. Unless this Agreement is amended, canceled, modified, or suspended as authorized herein or pursuant to California Government Code Section 65869.5, this Agreement shall be enforceable by either Party despite any change in any applicable general or specific plan, zoning, subdivision, or building regulation or other applicable ordinance or regulation adopted by City (including by City’s electorate) that purports to apply to any or all of the Property. 7. Annual Review of Property Owner’s Compliance With Agreement. 7.1 General. City shall review this Agreement once during every twelve (12) month period following the Effective Date for compliance with the terms of this Agreement as provided in Government Code Section 65865.1. Property Owner (including any successor to the Property Owner executing this Agreement on or before the Agreement Date) shall pay City a reasonable fee in an amount City may reasonably establish from time to time to cover the actual and necessary costs for the annual review. City’s failure to timely provide or conduct an annual review shall not constitute a Default hereunder by City. 7.2 Property Owner Obligation to Demonstrate Good Faith Compliance. During each annual review by City, Property Owner is required to demonstrate good faith compliance with the terms of the Agreement. Property Owner agrees to furnish such evidence of good faith compliance as City, in the reasonable exercise of its discretion, may require, thirty (30) days prior to each anniversary of the Effective Date during the Term. 7.3 Procedure. The Zoning Administrator shall conduct a duly noticed hearing and shall determine, on the basis of substantial evidence, whether or not Property Owner has, for the period under review, complied with the terms of this Agreement. If the Zoning Administrator finds that 74 13 Property Owner has so complied, the annual review shall be concluded. If the Zoning Administrator finds, on the basis of substantial evidence, that Property Owner has not so complied, written notice shall be sent to Property Owner by first class mail of the Zoning Administrator’s finding of non-compliance, and Property Owner shall be given at least ten (10) calendar days to cure any noncompliance that relates to the payment of money and thirty (30) calendar days to cure any other type of noncompliance. If a cure not relating to the payment of money cannot be completed within thirty (30) calendar days for reasons which are beyond the control of Property Owner, Property Owner must commence the cure within such thirty (30) calendar days and diligently pursue such cure to completion. If Property Owner fails to cure such noncompliance within the time(s) set forth above, such failure shall be considered to be a Default and City shall be entitled to exercise the remedies set forth in Article 8 below. 7.4 Annual Review a Non-Exclusive Means for Determining and Requiring Cure of Property Owner’s Default. The annual review procedures set forth in this Article 7 shall not be the exclusive means for City to identify a Default by Property Owner or limit City’s rights or remedies for any such Default. 8. Events of Default. 8.1 General Provisions. In the event of any material default, breach, or violation of the terms of this Agreement (“Default”), the Party alleging a Default shall deliver a written notice (each, a “Notice of Default”) to the defaulting Party. The Notice of Default shall specify the nature of the alleged Default and a reasonable manner and sufficient period of time (ten (10) calendar days if the Default relates to the failure to timely make a monetary payment due hereunder and not less than thirty (30) calendar days in the event of non-monetary Defaults) in which the Default must be cured (“Cure Period”). During the Cure Period, the Party charged shall not be considered in Default for the purposes of termination of this Agreement or institution of legal proceedings. If the alleged Default is cured within the Cure Period, then the Default thereafter shall be deemed not to exist. If a non-monetary Default cannot be cured during the Cure Period with the exercise of commercially reasonable diligence, the defaulting Party must promptly commence to cure as quickly as possible, and in no event later than thirty (30) calendar days after it receives the Notice of Default, and thereafter diligently pursue said cure to completion. Notwithstanding the foregoing, the City is not required to give Property Owner notice of default and may immediately pursue remedies for a Property Owner Default that result in an immediate threat to public health, safety or welfare. 8.2 Default by Property Owner. If Property Owner is alleged to have committed a non-monetary Default and it disputes the claimed Default, it may make a written request for an appeal hearing before the City Council within ten (10) days of receiving the Notice of Default, and a public hearing shall be scheduled at the next available City Council meeting to consider Property Owner’s appeal of the Notice of Default. Failure to appeal a Notice of Default to the City Council within the ten (10) day period shall waive any right to a hearing on the claimed Default. If Property Owner’s appeal of the Notice of Default is timely and in good faith but after a public hearing of Property Owner’s appeal the City Council concludes that Property Owner is in Default as alleged in the Notice of Default, the accrual date 75 14 for commencement of the thirty (30) day Cure Period provided in Section 8.1 shall be extended until the City Council’s denial of Property Owner’s appeal is communicated to Property Owner in writing. 8.3 City’s Option to Terminate Agreement. In the event of an alleged Property Owner Default, City may not terminate this Agreement without first delivering a written Notice of Default and providing Property Owner with the opportunity to cure the Default within the Cure Period, as provided in Section 8.1, and complying with Section 8.2 if Property Owner timely appeals any Notice of Default. A termination of this Agreement by City shall be valid only if good cause exists and is supported by evidence presented to the City Council at or in connection with a duly noticed public hearing to establish the existence of a Default. The validity of any termination may be judicially challenged by Property Owner. Any such judicial challenge must be brought within thirty (30) days of service on Property Owner, by first class mail, postage prepaid, of written notice of termination by City or a written notice of City’s determination of an appeal of the Notice of Default as provided in Section 8.2. 8.4 Default by City. If Property Owner alleges a City Default and alleges that the City has not cured the Default within the Cure Period, Property Owner may pursue any equitable remedy available to it under this Agreement, including, without limitation, an action for a writ of mandamus, injunctive relief, or specific performance of City’s obligations set forth in this Agreement. Upon a City Default, any resulting delays in Property Owner’s performance hereunder shall neither be a Property Owner Default nor constitute grounds for termination or cancellation of this Agreement by City and shall, at Property Owner’s option (and provided Property Owner delivers written notice to City within thirty (30) days of the commencement of the alleged City Default), extend the Term for a period equal to the length of the delay. 8.5 Waiver. Failure or delay by either Party in delivering a Notice of Default shall not waive that Party’s right to deliver a future Notice of Default of the same or any other Default. 8.6 Specific Performance Remedy. Due to the size, nature, and scope of the Project, it will not be practical or possible to restore the Property to its pre-existing condition once implementation of this Agreement has begun. After such implementation, both Property Owner and City may be foreclosed from other choices they may have had to plan for the development of the Property, to utilize the Property or provide for other benefits and alternatives. Property Owner and City have invested significant time and resources and performed extensive planning and processing of the Project in agreeing to the terms of this Agreement and will be investing even more significant time and resources in implementing the Project in reliance upon the terms of this Agreement. It is not possible to determine the sum of money which would adequately compensate Property Owner or City for such efforts. For the above reasons, City and Property Owner agree that damages would not be an adequate remedy if either City or Property Owner fails to carry out its obligations under this Agreement. Therefore, specific performance of this Agreement is necessary to compensate Property Owner if City fails 76 15 to carry out its obligations under this Agreement or to compensate City if Property Owner falls to carry out its obligations under this Agreement. 8.7 Monetary Damages. The Parties agree that monetary damages shall not be an available remedy for either Party for a Default hereunder by the other Party; provided, however, that (i) nothing in this Section 8.7 is intended or shall be interpreted to limit or restrict City’s right to recover the Public Benefit Fees due from Property Owner as set forth herein; and (ii) nothing in this Section 8.7 is intended or shall be interpreted to limit or restrict Property Owner’s indemnity obligations set forth in Article 10 or the right of the prevailing Party in any Action to recover its litigation expenses, as set forth in Section 8.10. In no event shall damages be awarded against the City upon an event of default or upon termination of this Agreement. Owner expressly agrees that the City, any City agencies and their respective elected and appointed councils, boards, commissions, officers, agents, employees, volunteers and representatives (collectively, for purposes of this Section 8.7, “City”) shall not be liable for any monetary damage for a Default by the City or any claims against City arising out of this Agreement. Owner hereby expressly waives any such monetary damages against the City. The sole and exclusive judicial remedy for Owner in the event of a Default by the City shall be an action in mandamus, specific performance, or other injunctive or declaratory relief. 8.8 Additional City Remedy for Property Owner’s Default. In the event of any Default by Property Owner, in addition to any other remedies which may be available to City, whether legal or equitable, City shall be entitled to receive and retain any Development Exactions applicable to the Project or the Property, including any fees, grants, dedications, or improvements to public property which it may have received prior to Property Owner’s Default without recourse from Property Owner or its successors or assigns. 8.9 No Personal Liability of City Officials, Employees, or Agents. No City official, employee, or agent shall have any personal liability hereunder for a Default by City of any of its obligations set forth in this Agreement. 8.10 Recovery of Legal Expenses by Prevailing Party in Any Action. In any judicial proceeding, arbitration, or mediation (collectively, an “Action”) between the Parties that seeks to enforce the provisions of this Agreement or arises out of this Agreement, the prevailing Party shall not recover any of its costs and expenses, regardless of whether they would be recoverable under California Code of Civil Procedure Section 1033.5 or California Civil Code Section 1717 in the absence of this Agreement. These costs and expenses include, but are not limited to, court costs, expert witness fees, attorneys’ fees, City staff costs (including overhead), and costs of investigation and preparation before initiation of the Action. 9. Force Majeure. Neither Party shall be deemed to be in Default where failure or delay in performance of any of its obligations under this Agreement is caused, through no fault of the Party whose performance is prevented or delayed, by floods, earthquakes, other acts of God, fires, wars, riots or similar hostilities, strikes or other labor difficulties, state or federal regulations, or court actions. 77 16 Except as specified above, nonperformance shall not be excused because of the act or omission of a third person. In no event shall the occurrence of an event of force majeure operate to extend the Term of this Agreement. In addition, in no event shall the time for performance of a monetary obligation, including without limitation Property Owner’s obligation to pay Public Benefit Fees, be extended pursuant to this Section. 10. Indemnity Obligations of Property Owner. 10.1 Indemnity Arising From Acts or Omissions of Property Owner. Property Owner shall indemnify, defend, and hold harmless City and City’s officials, employees, agents, attorneys, and contractors (collectively, the “City’s Affiliated Parties”) from and against all suits, claims, liabilities, losses, damages, penalties, obligations, and expenses (including but not limited to attorneys’ fees and costs) (collectively, a “Claim”) that may arise, directly or indirectly, from the acts, omissions, or operations of Property Owner or Property Owner’s agents, contractors, subcontractors, agents, or employees in the course of Development of the Project or any other activities of Property Owner relating to the Property or pursuant to this Agreement. City shall have the right, in its sole discretion, to select and retain counsel to defend any Claim filed against City and/or any of City’s Affiliated Parties, and Property Owner shall pay the reasonable cost for defense of any Claim. The indemnity provisions in this Section 10.1 shall commence on the Agreement Date, regardless of whether the Effective Date occurs, and shall survive the Termination Date. 10.2 Third Party Litigation. In addition to its indemnity obligations set forth in Section 10.1, Property Owner shall indemnify, defend, and hold harmless City and City’s Affiliated Parties from and against any Claim against City or City’s Affiliated Parties seeking to attack, set aside, void, or annul the approval of this Agreement, the Adopting Ordinance, any of the Development Regulations for the Project (including without limitation any actions taken pursuant to CEQA with respect thereto), any Subsequent Development Approval, or the approval of any permit granted pursuant to this Agreement. Said indemnity obligation shall include payment of attorney’s fees, expert witness fees, City staff costs, and court costs. City shall promptly notify Property Owner of any such Claim and City shall cooperate with Property Owner in the defense of such Claim. If City fails to promptly notify Property Owner of such Claim, Property Owner shall not be responsible to indemnify, defend, and hold City harmless from such Claim until Property Owner is so notified and if City fails to cooperate in the defense of a Claim Property Owner shall not be responsible to defend, indemnify, and hold harmless City during the period that City so fails to cooperate or for any losses attributable thereto. City shall be entitled to retain separate counsel to represent City against the Claim and the City’s defense costs for its separate counsel shall be included in Property Owner’s indemnity obligation, provided that such counsel shall reasonably cooperate with Property Owner in an effort to minimize the total litigation expenses incurred by Property Owner. In the event either City or Property Owner recovers any attorney’s fees, expert witness fees, costs, interest, or other amounts from the party or parties asserting the Claim, Property Owner shall be entitled to retain the same (provided it has fully performed its indemnity obligations hereunder). The indemnity provisions in this Section 10.2 shall commence on the Agreement Date, regardless of whether the Effective Date occurs, and shall survive the Termination Date. 78 17 10.3 Environmental Indemnity. In addition to its indemnity obligations set forth in Section 10.1, from and after the Agreement Date Property Owner shall indemnify, defend, and hold harmless City and City’s Affiliated Parties from and against any and all Claims for personal injury or death, property damage, economic loss, statutory penalties or fines, and damages of any kind or nature whatsoever, including without limitation attorney’s fees, expert witness fees, and costs, based upon or arising from any of the following: (i) the actual or alleged presence of any Hazardous Substance on or under any of the Property in violation of any applicable Environmental Law; (ii) the actual or alleged migration of any Hazardous Substance from the Property through the soils or groundwater to a location or locations off of the Property; and (iii) the storage, handling, transport, or disposal of any Hazardous Substance on, to, or from the Property and any other area disturbed, graded, or developed by Property Owner in connection with Property Owner’s Development of the Project. The foregoing indemnity obligations shall not apply to any Hazardous Substance placed or stored on a separate legal lot within the Property after the Lot Termination Date for said lot, as provided in Section 2.4 of this Agreement. The indemnity provisions in this Section 10.3 shall commence on the Agreement Date, regardless of whether the Effective Date occurs, and shall survive the Termination Date. 11. Assignment. Property Owner shall have the right to sell, transfer, or assign (hereinafter, collectively, a “Transfer”) Property Owner’s interest in or fee title to the Property, in whole or in part, to any person, partnership, joint venture, firm, or corporation (which successor, as of the effective date of the Transfer, shall become the “Property Owner” under this Agreement) at any time from the Agreement Date until the Termination Date; provided, however, that no such Transfer shall violate the provisions of the Subdivision Map Act (Government Code Section 66410 et seq.) or City’s local subdivision ordinance and any such Transfer shall include the assignment and assumption of Property Owner’s rights, duties, and obligations set forth in or arising under this Agreement as to the Property or the portion thereof so Transferred and shall be made in strict compliance with the following conditions precedent: (i) no transfer or assignment of any of Property Owner’s rights or interest under this Agreement shall be made unless made together with the Transfer of all or a part of the Property; and (ii) prior to the effective date of any proposed Transfer, Property Owner (as transferor) shall notify City, in writing, of such proposed Transfer and deliver to City a written assignment and assumption, executed in recordable form by the transferring and successor Property Owner and in a form subject to the reasonable approval of the City Attorney of City (or designee), pursuant to which the transferring Property Owner assigns to the successor Property Owner and the successor Property Owner assumes from the transferring Property Owner all of the rights and obligations of the transferring Property Owner with respect to the Property or portion thereof to be so Transferred, including in the case of a partial Transfer the obligation to perform such obligations that must be performed off of the portion of the Property so Transferred that are a condition precedent to the successor Property Owner’s right to develop the portion of the Property so Transferred. Any Permitted Transferee shall have all of the same rights, benefits, duties, obligations, and liabilities of Owner under this Agreement with respect to the portion of, or interest in, the Property sold, transferred, and assigned to such Permitted Transferee; provided, however, that in the event of a Transfer of less than all of the Property, or interest in the Property, no such Permitted Transferee shall have the right to enter into an amendment of this Agreement 79 18 that jeopardizes or impairs the rights or increases the obligations of the Owner with respect to the balance of the Property, without Owner’s written consent. Notwithstanding any Transfer, the transferring Property Owner shall continue to be jointly and severally liable to City, together with the successor Property Owner, to perform all of the transferred obligations set forth in or arising under this Agreement unless the transferring Property Owner is given a release in writing by City, which release shall be only with respect to the portion of the Property so Transferred in the event of a partial Transfer. City shall provide such a release upon the transferring Property Owner’s full satisfaction of all of the following conditions: (i) the transferring Property Owner no longer has a legal or equitable interest in the portion of the Property so Transferred other than as a beneficiary under a deed of trust; (ii) the transferring Property Owner is not then in Default under this Agreement and no condition exists that with the passage of time or the giving of notice, or both, would constitute a Default hereunder; (iii) the transferring Property Owner has provided City with the notice and the fully executed written and recordable assignment and assumption agreement required as set forth in the first paragraph of this Section 11; and (iv) the successor Property Owner either (A) provides City with substitute security equivalent to any security previously provided by the transferring Property Owner to City to secure performance of the successor Property Owner’s obligations hereunder with respect to the Property or the portion of the Property so Transferred or (B) if the transferred obligation in question is not a secured obligation, the successor Property Owner either provides security reasonably satisfactory to City or otherwise demonstrates to City’s reasonable satisfaction that the successor Property Owner has the financial resources or commitments available to perform the transferred obligation at the time and in the manner required under this Agreement and the Development Regulations for the Project. Any determination by the City in regards to the second paragraph of Section 11 subpart (iv) (A) and/or (B) shall be documented in writing. 12. Mortgagee Rights. 12.1 Encumbrances on Property. The Parties agree that this Agreement shall not prevent or limit Property Owner in any manner from encumbering the Property, any part of the Property, or any improvements on the Property with any Mortgage securing financing with respect to the construction, development, use, or operation of the Project. 12.2 Mortgagee Protection. This Agreement shall be superior and senior to the lien of any Mortgage. Nevertheless, no breach of this Agreement shall defeat, render invalid, diminish, or impair the lien of any Mortgage made in good faith and for value. Any acquisition or acceptance of title or any right or interest in the Property or part of the Property by a Mortgagee (whether due to foreclosure, trustee’s sale, deed in lieu of foreclosure, lease termination, or otherwise) shall be subject to all of the terms and conditions of this Agreement. Any Mortgagee who takes title to the Property or any part of the Property shall be entitled to the benefits arising under this Agreement. 12.3 Mortgagee Not Obligated. 80 19 Notwithstanding the provisions of this Section 12.3, a Mortgagee will not have any obligation or duty under the terms of this Agreement to perform the obligations of Property Owner or other affirmative covenants of Property Owner, or to guarantee this performance except that: (i) the Mortgagee shall have no right to develop the Project under the Development Regulations without fully complying with the terms of this Agreement; and (ii) to the extent that any covenant to be performed by Property Owner is a condition to the performance of a covenant by City, that performance shall continue to be a condition precedent to City’s performance. 12.4 Notice of Default to Mortgagee; Right of Mortgagee to Cure. Each Mortgagee shall, upon written request to City, be entitled to receive written notice from City of: (i) the results of the periodic review of compliance specified in Article 7 of this Agreement, and (ii) any default by Property Owner of its obligations set forth in this Agreement. Each Mortgagee shall have a further right, but not an obligation, to cure the Default within ten (10) days after receiving a Notice of Default with respect to a monetary Default and within thirty (30) days after receiving a Notice of Default with respect to a non-monetary Default. If the Mortgagee can only remedy or cure a non-monetary Default by obtaining possession of the Property, then the Mortgagee shall have the right to seek to obtain possession with diligence and continuity through a receiver or otherwise, and to remedy or cure the non-monetary Default within thirty (30) days after obtaining possession and, except in case of emergency or to protect the public health or safety, City may not exercise any of its judicial remedies set forth in this Agreement to terminate or substantially alter the rights of the Mortgagee until expiration of the thirty (30)-day period. In the case of a non-monetary Default that cannot with diligence be remedied or cured within thirty (30) days, the Mortgagee shall have additional time as is reasonably necessary to remedy or cure the Default, provided the Mortgagee promptly commences to cure the non- monetary Default within thirty (30) days and diligently prosecutes the cure to completion. 13. Bankruptcy. The obligations of this Agreement shall not be dischargeable in bankruptcy. 14. Miscellaneous Terms. 14.1 Reserved. 14.2 Notices. Any notice or demand that shall be required or permitted by law or any provision of this Agreement shall be in writing. If the notice or demand will be served upon a Party, it either shall be personally delivered to the Party; deposited by a reliable courier service that provides a receipt showing date and time of delivery with courier charges prepaid. The notice or demand shall be addressed as follows: TO CITY: City of Newport Beach 100 Civic Center Drive Newport Beach, California 92660 Attn: City Manager 81 20 With a copy to: City of Newport Beach 100 Civic Center Drive Newport Beach, California 92660 Attn: City Attorney TO PROPERTY OWNER: Ken Picerne The Picerne Group 5000 Birch Street, Ste. 600 Newport Beach, CA 92660 Either Party may change the address stated in this Section 13.1 by delivering notice to the other Party in the manner provided in this Section 13.1, and thereafter notices to such Party shall be addressed and submitted to the new address. Notices delivered in accordance with this Agreement shall be deemed to be delivered upon the earlier of: (i) the date received or (iii) three business days after deposit in the mail as provided above. 14.3 Project as a Private Undertaking. Any future Development of the Project is a private undertaking. Neither Party will be acting as the agent of the other in any respect, and each Party will be an independent contracting entity with respect to the terms, covenants, and conditions set forth in this Agreement. This Agreement forms no partnership, joint venture, or other association of any kind. The only relationship between the Parties is that of a government entity regulating the Development of private property by the owner or user of the Property. 14.4 Cooperation. Each Party shall cooperate with and provide reasonable assistance to the other Party to the extent consistent with and necessary to implement this Agreement. Upon the request of a Party at any time, the other Party shall promptly execute, with acknowledgement or affidavit if reasonably required, and file or record the required instruments and writings and take any actions as may be reasonably necessary to implement this Agreement or to evidence or consummate the transactions contemplated by this Agreement. 14.5 Estoppel Certificates. At any time, either Party may deliver written notice to the other Party requesting that that Party certify in writing that, to the best of its knowledge: (i) this Agreement is in full force and effect and is binding on the Party; (ii) this Agreement has not been amended or modified either orally or in writing or, if this Agreement has been amended, the Party providing the certification shall identify the amendments or modifications; and (iii) the requesting Party is not in Default in the performance of its obligations under this Agreement and no event or situation has occurred that with the passage of time or the giving of Notice or both would constitute a Default or, if such is not the case, then the other Party shall describe the nature and amount of the actual or prospective Default. 82 21 The Party requested to furnish an estoppel certificate shall execute and return the certificate within thirty (30) days following receipt. Requests for the City to furnish an estoppel certificate shall include reimbursement for all administrative costs incurred by the City including reasonable attorney’s fees incurred by the City in furnishing an estoppels certificate. 14.6 Rules of Construction. The singular includes the plural; the masculine and neuter include the feminine; “shall” is mandatory; and “may” is permissive. 14.7 Time Is of the Essence. Time is of the essence regarding each provision of this Agreement as to which time is an element. 14.8 Waiver. The failure by a Party to insist upon the strict performance of any of the provisions of this Agreement by the other Party, and failure by a Party to exercise its rights upon a Default by the other Party, shall not constitute a waiver of that Party’s right to demand strict compliance by the other Party in the future. 14.9 Counterparts. This Agreement may be executed in two (2) or more counterparts, each of which shall be identical and may be introduced in evidence or used for any other purpose without any other counterpart, but all of which shall together constitute one (1) and the same agreement. 14.10 Entire Agreement. This Agreement constitutes the entire agreement between the Parties and supersedes all prior agreements and understandings, both written and oral, between the Parties with respect to the subject matter addressed in this Agreement. 14.11 Severability. The Parties intend that each and every obligation of the Parties is interdependent and interrelated with the other, and if any provision of this Agreement or the application of the provision to any Party or circumstances shall be held invalid or unenforceable to any extent, it is the intention of the Parties that the remainder of this Agreement or the application of the provision to persons or circumstances shall be rendered invalid or unenforceable. The Parties intend that neither Party shall receive any of the benefits of the Agreement without the full performance by such Party of all of its obligations provided for under this Agreement. Without limiting the generality of the foregoing, the Parties intend that Property Owner shall not receive any of the benefits of this Agreement if any of Property Owner’s obligations are rendered void or unenforceable as the result of any third party litigation, and City shall be free to exercise its legislative discretion to amend or repeal the Development Regulations applicable to the Property and Property Owner shall cooperate as required, despite this Agreement, should third party litigation result in the nonperformance of Property Owner’s obligations under this Agreement. 83 22 The provisions of this Section 14.11 shall apply regardless of whether the Effective Date occurs and after the Termination Date. 14.12 Construction. This Agreement has been drafted after negotiation and revision. Both City and Property Owner are sophisticated parties who were represented by independent counsel throughout the negotiations or City and Property Owner had the opportunity to be so represented and voluntarily chose to not be so represented. City and Property Owner each agree and acknowledge that the terms of this Agreement are fair and reasonable, taking into account their respective purposes, terms, and conditions. This Agreement shall therefore be construed as a whole consistent with its fair meaning and applicable principle or presumptions of contract construction or interpretation, if any, shall be used to construe the whole or any part of this Agreement in favor of or against either Party. 14.13 Successors and Assigns; Constructive Notice and Acceptance. The burdens of this Agreement shall be binding upon, and the benefits of this Agreement shall inure to, all successors in interest to the Parties to this Agreement. All provisions of this Agreement shall be enforceable as equitable servitudes and constitute covenants running with the land. Each covenant to do or refrain from doing some act hereunder with regard to Development of the Property: (i) is for the benefit of and is a burden upon every portion of the Property; (ii) runs with the Property and each portion thereof; and (iii) is binding upon each Party and each successor in interest during its ownership of the Property or any portion thereof. Every person or entity who now or later owns or acquires any right, title, or interest in any part of the Project or the Property is and shall be conclusively deemed to have consented and agreed to every provision of this Agreement. This Section 14.13 applies regardless of whether the instrument by which such person or entity acquires the interest refers to or acknowledges this Agreement and regardless of whether such person or entity has expressly entered into an assignment and assumption agreement as provided for in Section 11. 14.14 No Third Party Beneficiaries. The only Parties to this Agreement are City and Property Owner. This Agreement does not involve any third party beneficiaries, and it is not intended and shall not be construed to benefit or be enforceable by any other person or entity. 14.15 Applicable Law and Venue. This Agreement shall be construed and enforced consistent with the internal laws of the State of California, without regard to conflicts of law principles. Any action at law or in equity arising under this Agreement or brought by any Party for the purpose of enforcing, construing, or determining the validity of any provision of this Agreement shall be filed and tried in the Superior Court of the County of Orange, State of California, or the United States District Court for the Central District of California. The Parties waive all provisions of law providing for the removal or change of venue to any other court. 14.16 Section Headings. 84 23 All section headings and subheadings are inserted for convenience only and shall not affect construction or interpretation of this Agreement. 14.17 Incorporation of Recitals and Exhibits. All of the Recitals are incorporated into this Agreement by this reference. Exhibits A and B are attached to this Agreement and incorporated by this reference as follows: EXHIBIT DESIGNATION DESCRIPTION A Legal Description of Property B Depiction of the Property 14.18 Recordation. The City Clerk of City shall record this Agreement and any amendment, modification, or cancellation of this Agreement in the Office of the County Recorder of the County of Orange within the period required by California Government Code section 65868.5 and City of Newport Beach Municipal Code section 15.45.090. The date of recordation of this Agreement shall not modify or amend the Effective Date or the Termination Date. 85 24 SIGNATURE PAGE TO DEVELOPMENT AGREEMENT “OWNER” The Picerne Group, a California limited liability company By: ____________________________ Name: ____________________________ Title: ____________________________ By: ____________________________ Name: ____________________________ Title: ____________________________ “CITY” CITY OF NEWPORT BEACH, a municipal corporation and charter city , Mayor ATTEST: Leilani I. Brown City Clerk APPROVED AS TO FORM: Aaron C. Harp, City Attorney 86 -25- STATE OF CALIFORNIA COUNTY OF ORANGE On _____________________, before me, the undersigned, a Notary Public in and for said State, personally appeared _____________________ and _____________________, personally known to me to be the persons whose names are subscribed to the within instrument and acknowledged to me that they executed the same in their authorized capacities and that by their signature on the instrument the persons, or the entity upon behalf of which the persons acted, executed the instrument. Witness my hand and official seal. Notary Public in and for said County and State STATE OF CALIFORNIA COUNTY OF ORANGE On _____________________, before me, the undersigned, a Notary Public in and for said State, personally appeared _____________________ and _____________________, personally known to me to be the persons whose names are subscribed to the within instrument and acknowledged to me that they executed the same in their authorized capacities and that by their signature on the instrument the persons, or the entity upon behalf of which the persons acted, executed the instrument. Witness my hand and official seal. Notary Public in and for said County and State 87 1 EXHIBIT A LEGAL DESCRIPTION OF PROPERTY THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE CITY OF NEWPORT BEACH, IN THE COUNTY OF ORANGE, STATE OF CALIFORNIA, AND IS DESCRIBED AS FOLLOWS: THAT PORTION OF BLOCK 50 OF IRVINE'S SUBDIVISION, AS SHOWN ON A MAP RECORDED IN BOOK 1, PAGE 88 OF MISCELLANEOUS RECORDS MAPS, RECORDS OF ORANGE COUNTY, CALIFORNIA, TOGETHER WITH THAT PORTION OF TRACT 706, AS SHOWN ON A MAP RECORDED IN BOOK 21, PAGE 25 OF MISCELLANEOUS MAPS, RECORDS OF SAID ORANGE COUNTY, DESCRIBED AS FOLLOWS: PARCEL 2 IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS SHOWN ON A MAP FILED IN BOOK 54, PAGE 11 OF PARCEL MAPS IN THE OFFICE OF THE COUNTY RECORDER OF ORANGE COUNTY, CALIFORNIA. EXCEPT THE FULL RIGHTS TO ALL MINERALS, PETROLEUM, GAS AND OTHER HYDROCARBON SUBSTANCES EXISTING BELOW FIVE HUNDRED (500) FEET FROM THE SURFACE OF SAID REAL PROPERTY DESCRIBED ABOVE, PROVIDED, HOWEVER, THAT GRANTOR HEREBY EXPRESSLY WAIVES THE RIGHT TO ENTER UPON THE SURFACE OF SAID REAL PROPERTY FOR THE PURPOSE OF EXPLORING FOR, OR PRODUCING THE MINERALS, PETROLEUM, GAS AND OTHER HYDROCARBON SUBSTANCES SO RESERVED IN DEED RECORDED JULY 1, 1977. 88 A10-00773 v4 01.06.11 FINAL i EXHIBIT B DEPICTION OF PROPERTY 89 Planning Commission Resolution No. PC2023-043 Page 29 of 43 EXHIBIT “F” Affordable Housing Implementation Plan 90 1400 BRISTOL STREET NORTH AFFORDABLE HOUSING IMPLEMENTATION PLAN AND DENSITY BONUS APPLICATION August 11, 2023 Prepared by 91 1 1400 BRISTOL STREET NORTH AFFORDABLE HOUSING IMPLEMENTATION PLAN AND DENSITY BONUS APPLICATION August 11, 2023 Project Description & Affordability Level The Picerne Group (“Picerne”) is proposing the 1400 Bristol Street North development (“Project”) on a 2.38 acre site located in the Newport Place Planned Community (“Property”). The site is generally bounded by Bristol Street North on the South and Spruce Street on the East, with low rise office buildings and surface parking on the North and West sides. The Newport Beach General Plan designates the project site as General Commercial Office (CO-G) and the zoning is Planned Community (“PC”) 11, (“PC-11”). A General Plan Amendment to redesignate the site as Mixed Use Horizontal 2 (MU-H2) and a PC Amendment to include the property in the PC-11 Residential Overlay are being proposed as part of the overall project application. The site is currently developed as 1970’s era two story office buildings with surface parking. The Project is planned to consist of 229 units including 153 base units and 76 density bonus units. The Newport Place Development Standards, as revised by Council Resolution No. 2023-13 on July 25, 2023 (“Development Standards”), provide that 15 percent of the base units within a residential development shall be affordable to Lower Income households. Lower Income Households, as defined in California Health and Safety Code Section 50079.5, are defined as households earning 80 percent or less of area median income, adjusted for family size, including both Very Low and Low income categories. The affordable housing requirement for this project, as required by the Development Standards, is 23 units (15% of 153 Base units). Eligibility for Density Bonus Picerne will be providing 23 units (15% of base units) affordable to Very Low Income households (“Very Low Income Units”). This will comply with the provisions of Government Code Section 65915 applicable to a 50% density bonus. Rents for the Very Low Income Units will be computed in accordance with Health and Safety Code Sec. 50053, as required by Government Code Section 65915(c)(1). 92 1400 Bristol Street North Affordable Housing Plan August 11, 2023 2 Density Bonus Computation and Term of Affordability The density bonus computation for the Project per Government Code Section 65915 is shown below: Table 1 Density Bonus Computation1 Picerne intends to operate the apartment project as a rental community. The 23 Very Low Income Units will remain rent restricted for a minimum of 55 years, per Government Code Section 65915(c)(1), more than the 30-year affordability term set forth in the Development Standards. Reduction in Parking As provided for in Government Code Sec. 65915(p) and Section 20.32.030 of the City’s Zoning Code the 1400 Bristol Street North project is eligible for a reduction in parking requirements. Government Code Section 65915(p) provides the following: (1) Upon the request of the developer, no city, county, or city and county shall require a vehicular parking ratio, inclusive of handicapped and guest parking, of a development meeting the criteria of subdivision (b), that exceeds the following ratios: a. Zero to one bedroom: 1.0 onsite parking space per unit b. Two to three bedrooms: 1.5 onsite parking spaces per unit. (2) If the total number of parking spaces required for a development is other than a whole number, the number shall be rounded up to the next whole number. For purposes of this subdivision, a development may provide “onsite parking” through tandem parking or uncovered parking, but not through street parking. 1 Per Section 423 of the City Charter, with approval of the proposed General Plan Amendment, up to an additional 100 dwelling units are permitted in the Airport Area by without a vote of the electorate. Units Based on Existing Nonresidential Uses 89 Additional Units Per Proposed General Plan Amendment1 64 Total Base Units 153 Density Bonus (50%)77 Total Units Permitted 230 Total Units Provided 229 93 1400 Bristol Street North Affordable Housing Plan August 11, 2023 3 Table 2 below is a summary of Government Code Sec. 65915 parking requirements vs. spaces to be provided: Table 2 Parking Requirements Picerne requests that parking requirements be calculated in accordance with Government Code Sec. 65915(p). As shown above, the Project will provide 422 onsite parking spaces for its residential units, which is 161 spaces more than the requirements of Sec. 65915 (p). Development Incentive Request Pursuant to Government Code Section 65915(d)(1) and Section 20.32 of the City’s Zoning Code, Picerne is entitled to three concessions or incentives due to providing at least fifteen percent (15%) of the units as affordable for Very Low Income households. Picerne requests the following development incentive: Section V.F.1 of the Development Standards provides that “Affordable units shall reflect the range of numbers of bedrooms provided in the residential development project as a whole.” Picerne requests that the 23 Very Low Income units be provided utilizing the unit mixes as shown below: Table 3 Unit Mix Unit Type Studio 40 1.0 40 1 Bedroom 126 1.0 126 2 Bedroom 63 1.5 95 Total Parking Stalls Required 261 Total Parking Stalls Provided 422 Parking Provided in Excess of Minimum Requirement 161 Stalls/Unit Per Gov. Code 65915 Total Stalls Per Gov. Code 65915 Number of Units 94 1400 Bristol Street North Affordable Housing Plan August 11, 2023 4 This incentive will result in cost reductions which will provide for the affordable rents to be set in accordance with Government Code Sec. 65915(c). Pursuant to Government Code Sec. 65915(d)(1) “The city, county, or city and county shall grant the concession or incentive requested by the applicant unless the city, county, or city and county makes a written finding, based upon substantial evidence, of any of the following:” (summarized from pertinent sections) (A) the concession or incentive does not result in identifiable and actual cost reductions, (B) would have an adverse impact on public health and safety or on a site listed as a historical site, or (C) is contrary to state or federal law. Government Code Sec. 65915(a)(2) further provides that a jurisdiction “shall not condition the submission, review, or approval of an application pursuant to this chapter on the preparation of an additional report or study that is not otherwise required by state law, including this section.” Picerne reserves the right to request up to an additional two incentives or concessions in the future. Development Standards Waiver Request Government Code Sec. 65915(e)(1) provides that a city or county may not apply any development standard (including height limits) that will have the effect of physically precluding the construction of a density bonus project at the density permitted under the density bonus statute. The only exceptions to this prohibition are if the development standards waiver would have an impact on health and safety as delineated in Government Code Sec. 65589.5(d), impact on property listed in the California Register of Historical Resources, or if the development standards waiver would be contrary to state or federal law. For the proposed project, the applicant is requesting the following development standard waivers: 1. General Plan Park Dedication Requirement: Pursuant to General Plan Policy LU 16-15.13, a public park equal to 8 percent of the gross land area of the total development, or a minimum one-half-acre, whichever is greater, shall be provided. This requirement would mandate a one-half-acre park on the 2.38 acre site. The General Plan allows a waiver of its park dedication requirement where it can be demonstrated that the development parcels are too small to feasibly accommodate the park or inappropriately located to serve the needs of local residents. The applicant therefore requests waiver of the General Plan Policy LU 16-15.13 public park dedication requirement. 2. PC-11 Development Standards Deviation (30-foot Street Setback): PC-11 development standards require street setbacks of 30 feet from the property line. A 30-foot setback would substantially reduce the Project’s development footprint, making it infeasible and impossible to support the proposed 229 dwelling units. Applicant therefore requests a waiver of the PC-11 30-foot setbacks. 3. PC-11 Development Standards Deviation (Building Height): PC-11: The Development Standards limit building heights to 55 feet. Given the constraints imposed by the street setbacks, the perimeter road, and the utilities required to serve the Property, imposition of 95 1400 Bristol Street North Affordable Housing Plan August 11, 2023 5 the 55 foot height limit would physically preclude the development of the proposed 229 dwelling units. The proposed building height is 85 feet. 4. Private Open Space: Newport Beach Municipal Code Section 20.18.030 (Table 2-3) requires a minimum of 5% of the gross floor area of each unit to be set aside as private open space with a minimum dimension of 6 feet. The Project’s studio dwelling units and 9 of the two-bedroom units (including 4 units which provide 2 sf less than the private open space requirement) are unable to achieve these minimum private open space standards given their size and location. Therefore, Applicant requests a waiver from this private open space requirement since adherence to this development standard would physically preclude the Project as proposed. 5. Newport Beach Municipal Code Common Open Space: Newport Beach Municipal Code Section 20.18.030 (Table 2-3) requires a minimum of 75 square feet/unit (17,175 sf total) to be designated as common open space. The applicant requests a waiver to reduce the 75 square feet/unit (17,175 sf total) requirement to approximately 60 square feet/unit (13,800 sf total, or 3,375 sf less than the City requirement). This waiver is necessary in order to accommodate the project’s proposed density given the constraints imposed by the street setbacks, the perimeter road, and the utilities required to serve the project site. 6. General Plan Land Use Policy 6.15.7: General Plan Land Use Policy 6.15.7 (Overall Density and Housing Type) and Section IV.A.4 of the PC-11 zoning standards prescribe a density range of 30-50 dwelling units per acre ("du/ac"). The Project proposes 153 “base” units on a 2.38 acre parcel, which equates to 64 du/ac. The Project's 153 base units are comprised of 89 units from the conversion of the office building to residential and 64 additional units allocated to the Airport Area (Statistical Area L4) under the General Plan. The Project qualifies for a 50% density bonus (i.e., 77 units) in exchange for providing the necessary level of affordable housing. To the extent required, Applicant requests a waiver from the maximum base density standards under LU Policy 6.15.7 and Section IV.A.4 of the PC-11 in order to construct the Project at the density sought. Additional detail as to these waiver requests has been submitted separately as part of the development application. Waiver of these requirements is necessary to accommodate the additional units permitted by the density bonus. Government Code Section 65915(e)(1) requires that the waiver requests be approved. Income Limits and Examples of Eligible Tenants for Affordable Homes Lower Income Households are defined as households whose gross income does not exceed 80% of area median income, adjusted for household size. Lower Income Households include Very Low Income Households whose gross income does not exceed 50% of area median income, adjusted for household size. Table 4 on the following page shows the maximum income limits for Very Low Income Households as determined by the U.S. Department of Housing and Urban Development and the California Department of Housing and Community Development (“HCD”) with household sizes appropriate for the 1400 Bristol Street North project: 96 1400 Bristol Street North Affordable Housing Plan August 11, 2023 6 Table 4 Maximum Income Limits Higher income limits apply to larger families; those families however are not considered to be a target market for the Project, where the unit mix consists of studios, one-bedroom, and two- bedroom apartment homes. These income limits are updated annually. The 23 affordable homes that Picerne will provide will be rented to eligible Very Low Income Households. As shown in Table 4, Very Low Income Households includes incomes ranging from $50,250 per year for a one-person household to $77,500 per year for a five-person household. As such this could include City employees, school district employees, health care workers, restaurant and other retail workers, and other occupations which provide needed services to our community. While household size, overtime pay, summer jobs, or second jobs may affect eligibility, the income limits above are reflective of pay to many public or health care sector workers, as shown in Table 5 on the following page: Household Size Very Low Income Households Maximum Annual Income - 2023/2024 1 Person $50,250 2 Person 57,400 3 Person 64,600 4 Person 71,750 5 Person 77,500 97 1400 Bristol Street North Affordable Housing Plan August 11, 2023 7 Table 5 Examples of Qualifying Salaries The pay ranges shown above are as of 2022 and are subject to update. Retired persons or couples or young business professionals starting their careers may also qualify to rent the affordable homes at 1400 Bristol Street North. In order to provide opportunities for workers to live in one of the affordable homes, the City could provide guidelines providing for acceptance of applications on a priority basis from classes of individuals who qualify under the income limits in effect. The guidelines could provide for priority treatment for City residents, City employees, employees of the local school district, and employees of major health care institutions or other categories identified by the City for priority treatment. Rental Rate Limits for Affordable Homes The 23 Very Low Income Units shall be rented at an affordable rent calculated in accordance with the provisions of Section 50053 of the Health and Safety Code. Section 50053 of the Health and Safety Code limits affordable rent to 30% of total income for a Very Low Income household, as calculated in Table 6 on the following page. That section also requires that the rent for a studio unit assumes a one-person household for rent calculation purposes, a one-bedroom unit assumes a two-person household, and a two-bedroom unit assumes a three-person household. The rents calculated are then adjusted by a utility allowance as determined annually by the County of Orange Housing & Community Services Department. As of October 1, 2022, the reduction for the utility allowance is $149.00 per month for a studio unit, $163.00 per month for a one-bedroom unit, and $215.00 per month for a two-bedroom unit. The utility allowance utilized assumes gas cooking, gas space heating, gas water heating, as well as electricity, air conditioning, and water, sewer, and trash fees which are assumed to be paid by the tenant. The maximum rent levels for 2023/24 by income level are shown in Table 6 on the next page: Position Pay Range Information Source Comments Human Resources Specialist I $64,356-$90,444 City May qualify for Very Low units depending on household size. Park Patrol Officer $45,420-$63,924 City Will qualify for Very Low Income units depending on household size. Licensed Vocational Nurse (LVN)$60,000-$87,000 Glassdoor May qualify for Very Low units depending on household size. Newport-Mesa Unified School District ("NMUSD") Teacher $64.354-$98,740 NMUSD Website Credentialed teacher with no advanced education and up to 5 years experience may qualify for Very Low Income units depending on household size. NMUSD Library Technician.$46,020-$55,932 NMUSD Website At entry level will qualify for Very Low Income units. NMUSD MaintenanceWorker $57,468-$85,116 NMUSD Website May qualify for Very Low units depending on household size. 98 1400 Bristol Street North Affordable Housing Plan August 11, 2023 8 Table 6 2 Maximum Rents by Bedroom Count Picerne will enter into an affordable housing agreement, in recordable form, with the City prior to obtaining the first building permit for any residential unit. That agreement will ensure that the maximum rents for the affordable apartment homes will be calculated using the methodologies as utilized in Table 6. The rental rates shown will be updated prior to the commencement of rental activities and on an ongoing basis to reflect then current income limits, utility allowances, and any changes in applicable regulations and statutes. Unit Mix, Design, and Location of Affordable Homes While the exact location of each of the affordable homes within the 1400 Bristol Street North site has not yet been determined, the affordable homes will be spread throughout the development to avoid concentration of affordable homes in any area. The affordable homes shall be comparable in the quality of construction and exterior design to the market rate homes. As provided for in the Development Standards, all affordable homes will have access to the facilities and amenities offered by the development. Requested City of Newport Beach Assistance Financial Assistance Picerne is not requesting any direct financial assistance from the City of Newport Beach for this project. 2 Rents for Very Low Income units calculated in accordance with Section 50053 of the Health and Safety Code. 99 Planning Commission Resolution No. PC2023-043 Page 30 of 43 EXHIBIT “G” Traffic Study 100 101 prepared by Bryan Crawford Giancarlo Ganddini, PE, PTP GANDDINI GROUP, INC. 555 Parkcenter Drive, Suite 225 Santa Ana, California 92705 (714) 795-3100 | ganddini.com Project No. 19604 1400 BRISTOL STREET NORTH RESIDENCES TRAFFIC IMPACT ANALYSIS City of Newport Beach June 28, 2023 102 1400 Bristol Street North Residences Traffic Impact Analysis i 19604 TABLE OF CONTENTS EXECUTIVE SUMMARY ................................................................................................................................................ IV 1. INTRODUCTION .................................................................................................................................................... 1 Project Description.................................................................................................................................................. 1 Study Area ................................................................................................................................................................ 1 Analysis Scenarios ................................................................................................................................................... 1 2. METHODOLOGY ................................................................................................................................................... 5 Traffic Phasing Ordinance Analytical Methodology (Non-CEQA) .................................................................. 5 Intersection Capacity Utilization Methodology ....................................................................................... 5 Performance Standards ............................................................................................................................... 5 Substantial Operational Deficiency Criteria............................................................................................. 6 Cumulative and General Plan Analytical Methodology (CEQA) ...................................................................... 6 Thresholds of Significance for General Plan EIR Addendum ................................................................ 6 Vehicle Miles Traveled Analytical Methodology (CEQA) ................................................................................. 6 3. EXISTING CONDITIONS ...................................................................................................................................... 7 Existing Roadway System....................................................................................................................................... 7 Pedestrian Facilities ................................................................................................................................................. 7 Bicycle Routes .......................................................................................................................................................... 7 Transit Facilities ....................................................................................................................................................... 7 General Plan Context .............................................................................................................................................. 7 Existing Traffic Volumes ......................................................................................................................................... 7 Existing Intersection Level of Service .................................................................................................................. 8 4. PROJECT FORECASTS ....................................................................................................................................... 17 Project Trip Generation ........................................................................................................................................ 17 Project Trip Distribution and Assignment ......................................................................................................... 17 5. FUTURE VOLUME FORECASTS ...................................................................................................................... 25 City of Newport Beach Approved Projects ...................................................................................................... 25 Ambient Growth .................................................................................................................................................... 25 TPO Year 2027 Volume Forecasts ..................................................................................................................... 25 6. TPO ANALYSIS ..................................................................................................................................................... 30 TPO Year 2027 One-Percent Threshold Analysis ........................................................................................... 30 TPO Impact Assessment ...................................................................................................................................... 30 7. CEQA ANALYSIS .................................................................................................................................................. 33 Cumulative Projects .............................................................................................................................................. 33 CEQA Year 2027 Without Project Volume Forecasts .................................................................................... 33 CEQA Year 2027 With Project Volume Forecasts .......................................................................................... 33 CEQA Year 2027 Impact Assessment ............................................................................................................... 33 8. GENERAL PLAN COMPARISON ANALYSIS ................................................................................................. 44 General Plan Comparison Methodology ........................................................................................................... 44 General Plan Comparison Trip Generation and Trip Distribution ................................................................. 44 Post 2030 General Plan Buildout Without Project Volume Forecasts ........................................................ 44 Post 2030 General Plan Buildout With Project Volume Forecasts .............................................................. 44 General Plan Comparison Impact Assessment ................................................................................................. 44 103 1400 Bristol Street North Residences Traffic Impact Analysis ii 19604 9. CONGESTION MANAGEMENT PROGRAM ................................................................................................. 52 Background ............................................................................................................................................................. 52 CMP-Monitored Intersections ............................................................................................................................ 52 Requirements for Improvements ........................................................................................................................ 52 Criteria for Preparation of CMP Impact Analysis ............................................................................................. 52 10. SITE ACCESS AND CIRCULATION .................................................................................................................. 53 Site Access .............................................................................................................................................................. 53 On-Site Circulation ................................................................................................................................................ 53 11. VEHICLE MILES TRAVELED (VMT) ................................................................................................................. 54 Background ............................................................................................................................................................. 54 VMT Assessment and Screening ........................................................................................................................ 54 12. CONCLUSIONS .................................................................................................................................................... 55 Project Trip Generation ........................................................................................................................................ 55 TPO Impact Analysis ............................................................................................................................................. 55 CEQA Year 2027 Impact Analysis ...................................................................................................................... 55 CEQA General Plan Comparison Impact Analysis ........................................................................................... 55 VMT Screening ...................................................................................................................................................... 55 Congestion Management Program..................................................................................................................... 55 Site Access and Circulation .................................................................................................................................. 55 APPENDICES Appendix A Glossary Appendix B Volume Count Worksheets Appendix C Level of Service Worksheets Appendix D Approved Projects List and Cumulative Projects Appendix E TPO One-Percent Threshold Analysis Appendix F Existing VMT Per Population Map LIST OF TABLES Table 1. Existing (2022) Intersection Levels of Service ........................................................................................ 9 Table 2. Project Trip Generation ............................................................................................................................. 18 Table 3. TPO One-Percent Threshold Analysis Summary .................................................................................. 31 Table 4. TPO Year 2027 Intersection Levels of Service and Impact Assessment .......................................... 32 Table 5. Cumulative Projects Trip Generation ...................................................................................................... 34 Table 6. CEQA Year 2027 Intersection Levels of Service and Impact Assessment ...................................... 36 Table 7. General Plan Comparison Trip Generation ............................................................................................ 46 Table 8. General Plan Comparison: Post 2030 General Plan Buildout Intersection Levels of Service and Impact Assessment ............................................................................................................... 47 LIST OF FIGURES Figure 1. Project Location Map ................................................................................................................................... 3 Figure 2. Site Plan.......................................................................................................................................................... 4 Figure 3. Existing Lane Geometry and Intersection Traffic Controls ................................................................. 10 Figure 4. Existing Pedestrian Facilities..................................................................................................................... 11 Figure 5. Orange County Transportation Authority System Map ...................................................................... 12 Figure 6. City of Newport Beach General Plan Master Plan of Streets and Highways .................................. 13 104 1400 Bristol Street North Residences Traffic Impact Analysis iii 19604 Figure 7. City of Newport Beach General Plan Roadway Cross-Sections ........................................................ 14 Figure 8. Existing AM Peak Hour Intersection Turning Movement Volumes ................................................... 15 Figure 9. Existing PM Peak Hour Intersection Turning Movement Volumes ................................................... 16 Figure 10. Project Outbound Trip Distribution – Existing General Office Building........................................... 19 Figure 11. Project Inbound Trip Distribution – Existing General Office Building .............................................. 20 Figure 12. Project Outbound Trip Distribution – Proposed Residential .............................................................. 21 Figure 13. Project Inbound Trip Distribution – Proposed Residential ................................................................. 22 Figure 14. Project (Net) AM Peak Hour Intersection Turning Movement Volumes .......................................... 23 Figure 15. Project (Net) PM Peak Hour Intersection Turning Movement Volumes .......................................... 24 Figure 16. TPO Year 2027 Without Project AM Peak Hour Intersection Turning Movement Volumes ....................................................................................................................................................... 26 Figure 17. TPO Year 2027 Without Project PM Peak Hour Intersection Turning Movement Volumes ....................................................................................................................................................... 27 Figure 18. TPO Year 2027 With Project AM Peak Hour Intersection Turning Movement Volumes ............ 28 Figure 19. TPO Year 2027 With Project PM Peak Hour Intersection Turning Movement Volumes ............. 29 Figure 20. Cumulative Projects Location Map ......................................................................................................... 37 Figure 21. Cumulative Projects AM Peak Hour Intersection Turning Movement Volumes ............................. 38 Figure 22. Cumulative Projects PM Peak Hour Intersection Turning Movement Volumes ............................. 39 Figure 23. CEQA Year 2027 Without Project AM Peak Hour Intersection Turning Movement Volumes ....................................................................................................................................................... 40 Figure 24. CEQA Year 2027 Without Project PM Peak Hour Intersection Turning Movement Volumes ....................................................................................................................................................... 41 Figure 25. CEQA Year 2027 With Project AM Peak Hour Intersection Turning Movement Volumes ....................................................................................................................................................... 42 Figure 26. CEQA Year 2027 With Project PM Peak Hour Intersection Turning Movement Volumes .......... 43 Figure 27. Post 2030 General Plan Buildout Without Project AM Peak Hour Intersection Turning Movement Volumes ................................................................................................................................... 48 Figure 28. Post 2030 General Plan Buildout Without Project PM Peak Hour Intersection Turning Movement Volumes ................................................................................................................................... 49 Figure 29. Post 2030 General Plan Buildout With Project AM Peak Hour Intersection Turning Movement Volumes ................................................................................................................................... 50 Figure 30. Post 2030 General Plan Buildout With Project PM Peak Hour Intersection Turning Movement Volumes ................................................................................................................................... 51 105 1400 Bristol Street North Residences Traffic Impact Analysis iv 19604 EXECUTIVE SUMMARY The purpose of this study is to evaluate the potential for transportation impacts resulting from development of the proposed project both in the context of the City of Newport Beach’s discretionary authority for conformance with locally established operational standards and the California Environmental Quality Act (CEQA). Although this is a technical report, effort has been made to write the report clearly and concisely. A glossary is provided in Appendix A to assist the reader with terms related to transportation engineering. This study was prepared in consultation with City of Newport Beach staff and in accordance with the procedures and methodologies for assessing transportation impacts established by the City of Newport Beach. To assess the project’s conformance with local operational standards, this study evaluates the project’s effect on traffic operations in accordance with the City’s Traffic Phasing Ordinance (TPO) and, if necessary, identifies recommended improvements or corrective measures to alleviate operational deficiencies substantially caused or worsened by the proposed project. In addition to existing (2022) conditions, this report analyzes forecast traffic conditions for year 2027 (one year after project opening). For CEQA purposes, this study also evaluates the significance of project-related transportation impacts using cumulative methodology as well as vehicle miles traveled (VMT) analysis relative to criteria established by the City of Newport Beach as the lead agency and, if necessary, identifies any feasible mitigation measures to mitigate any significant impacts. Additionally, analysis was also prepared for Year 2027 cumulative and Post 2030 General Plan Buildout conditions in support of the project’s proposed addendum to the 2006 General Plan Environmental Impact Report (EIR). Project Description The 2.38-acre project site is addressed at 1400 and 1420 Bristol Street North, located at the northwest corner of Bristol Street North and Spruce Street, in the City of Newport Beach, California. The project site is currently developed with existing office buildings totaling 38,764 square feet. The proposed project involves demolition of the existing office buildings and construction of a new six-story podium apartment building comprised of 230 residential dwelling units (207 market rate and 23 affordable units), podium level amenity space, a business center/leasing office, and 422 parking spaces in an on-grade parking garage with two subterranean levels. Vehicular access is proposed to be maintained at Spruce Street with the existing project driveway on Bristol Street North relocated approximately 65 feet to the northwest. The proposed project is anticipated to be fully operational by year 2026. Existing Conditions The study intersections currently operate at Levels of Service D or better during the peak hours for Existing (2022) conditions. Project Trip Generation The existing project site land use is estimated to generate approximately 420 daily trips, including 59 trips during the AM peak hour and 56 trips during the PM peak hour. The proposed project site land use is forecast to generate approximately 1,044 daily trips, including 85 trips during the AM peak hour and 90 trips during the PM peak hour. Therefore, the proposed project is forecast to result in a net increase of approximately 624 net new daily trips, including 26 net new trips during the AM peak hour and 34 net new trips during the PM peak hour. 106 1400 Bristol Street North Residences Traffic Impact Analysis v 19604 TPO Impact Analysis The addition of project-generated trips is not forecast to cause any study intersection to operate deficiently (Level of Service E or F) or worsen a deficient intersection operation by more than one percent of capacity; therefore, the proposed project is forecast to result in no Level of Service impacts at the study intersections for TPO Year 2027 With Project conditions and no improvements are required. CEQA Impact Analysis The addition of project-generated trips is not forecast to cause any study intersection to operate deficiently (Level of Service E or F) or worsen a deficient intersection operation by more than one percent of capacity; therefore, the proposed project is forecast to result in no significant Level of Service impacts at the study intersections for CEQA Year 2027 With Project conditions and no new mitigation measures are required. CEQA General Plan Comparison Impact Analysis The addition of project-generated trips is not forecast to cause any study intersection to operate deficiently (Level of Service E or F) or worsen a deficient intersection operation by more than one percent of capacity; therefore, the proposed project is forecast to result in no significant Level of Service impacts at the study intersections for Post 2030 General Plan Buildout With Project conditions and no new mitigation measures are required. VMT Screening The proposed project is located in a City defined low-VMT area for residential use (lower than 85 percent of Countywide average VMT per capita). Per the City VMT guidelines and screening criteria, the project is considered to have a less than significant impact on VMT. Congestion Management Program (CMP) Since the proposed project has indirect access to a CMP facility (e.g., MacArthur Boulevard or Jamboree Road) and is forecast to generate less than 2,400 daily trips, the proposed project does not satisfy the criteria for preparation of a separate CMP impact analysis. Site Access and Circulation Vehicular access is proposed to be maintained at Spruce Street with the existing project driveway on Bristol Street North relocated approximately 65 feet to the northwest. Since Bristol Street North is a one-way street, the relocated project driveway at Bristol Street North will continue to provide right turn in/out only access. The project driveway at Spruce Street will continue to provide full access. Based on review of the adjacent development and lane configurations along Bristol Street North and Spruce Street, the existing lane configurations are anticipated to provide adequate circulation. The final parking and circulation will be reviewed and approved by the City of Newport Beach. 107 1400 Bristol Street North Residences Traffic Impact Analysis 1 19604 1. INTRODUCTION This section describes the project location, project description, study area, and analysis scenarios. PROJECT DESCRIPTION The 2.38-acre project site is addressed at 1400 and 1420 Bristol Street North, located at the northwest corner of Bristol Street North and Spruce Street, in the City of Newport Beach, California. The project site is currently developed with existing office buildings totaling 38,764 square feet. Figure 1 shows the project location map. The proposed project involves demolition of the existing office buildings and construction of a new six-story podium apartment building comprised of 230 residential dwelling units (207 market rate and 23 affordable units), podium level amenity space, a business center/leasing office, and 422 parking spaces in an on-grade parking garage with two subterranean levels. Vehicular access is proposed to be maintained at Spruce Street with the existing project driveway on Bristol Street North relocated approximately 65 feet to the northwest. The proposed project is anticipated to be fully operational by year 2026. Figure 2 illustrates the project site plan. STUDY AREA Based on scoping discussions with City of Newport Beach staff, the study area consists of the following study intersections within the City of Newport Beach, three of which share jurisdiction with the City of Irvine: Study Intersections1 Jurisdiction 1. Campus Drive (NS) at Bristol Street North (EW) Newport Beach 2. Irvine Avenue/Campus Drive (NS) at Bristol Street South (EW) Newport Beach 3. Birch Street (NS) at Bristol Street North (EW) Newport Beach 4. Birch Street (NS) at Bristol Street South (EW) Newport Beach 5. MacArthur Boulevard (NS) at Campus Drive (EW) Newport Beach/Irvine 6. MacArthur Boulevard (NS) at Birch Street (EW) Newport Beach 7. MacArthur Boulevard (NS) at Newport Place Dr/Von Karman Avenue (EW) Newport Beach 8. MacArthur Boulevard (NS) at Jamboree Road (EW) Newport Beach/Irvine 9. MacArthur Boulevard (NS) at Bison Avenue (EW) Newport Beach 10. Jamboree Road (NS) at Campus Drive (EW) Newport Beach/Irvine 11. Jamboree Road (NS) at Bristol Street North (EW) Newport Beach 12. Jamboree Road (NS) at Bristol Street South (EW) Newport Beach 13. Jamboree Road (NS) at Eastbluff Drive/University Drive (EW) Newport Beach ANALYSIS SCENARIOS In accordance with the City of Newport Beach Traffic Phasing Ordinance (TPO), this traffic report evaluates the following analysis scenarios based on one year after the anticipated project opening year: a) Existing (2022) Conditions; b) TPO Year 2027 Without Project; and c) TPO Year 2027 With Project 1 (NS) = North-South roadway; (EW) = East-West roadway 1 108 1400 Bristol Street North Residences Traffic Impact Analysis 2 19604 Additionally, this study also evaluates the following analysis scenarios in support of the project’s proposed cumulative CEQA analysis: d) CEQA Year 2027 Without Project; e) CEQA Year 2027 With Project; Lastly, this study evaluates the following analysis scenarios in support of the project’s proposed addendum to the 2006 General Plan Environmental Impact Report (EIR): f) General Plan Comparison: Post 2030 General Plan Buildout Without Project; and g) General Plan Comparison: Post 2030 General Plan Buildout With Project. 2 109 Figure 1 Project Location Map 1400 Bristol Street North ResidencesTraffic Impact Analysis 19604 N JAMBOREE RDBIRCH STCAMPUS DRMACARTHUR BLVDVON KARMAN AVEB RI ST O L ST N B RI STOL ST S AVEIRVINE BISONAVESPRUCE ST1 2 4 3 5 6 7 12 11 8 10 13 9 Study Intersection Legend # 73 73 EASTBLUFF DRMESA DR UNIVERSITY DR SA N J OA Q U I N H I L L S CORR I DORSite 3 110 Figure 2Site Plan1400 Bristol Street North ResidencesTraffic Impact Analysis19604N STREET4 111 1400 Bristol Street North Residences Traffic Impact Analysis 5 19604 2. METHODOLOGY This section discusses the analysis methodologies used to assess transportation facility performance as adopted by the respective jurisdictional agencies. TRAFFIC PHASING ORDINANCE ANALYTICAL METHODOLOGY (NON-CEQA) To establish consistency with the City of Newport Beach General Plan and other City requirements, all proposed land use projects generating 300 or more daily trips are required to prepare a Level of Service analysis for transportation impacts consistent with Chapter 15.40 (Traffic Phasing Ordinance) of the City of Newport Beach Municipal Code. The TPO requires assessment of development project impacts on the City’s arterial circulation system based on the Intersection Capacity Utilization (ICU) methodology. While operational ICU analysis is required for conformance with the City’s TPO requirements, it is noted that a project’s effect on automobile delay (as measured by Level of Service) shall not constitute a significant environmental impact in accordance with current CEQA provisions. Intersection Capacity Utilization Methodology In accordance with City of Newport Beach requirements, level of service analysis of signalized intersections is based on the ICU methodology. The ICU methodology compares the volume of traffic using the intersection to the capacity of the intersection. The resulting volume-to-capacity (V/C) ratio represents that portion of the hour required to provide sufficient capacity to accommodate all intersection traffic if all approaches operate at capacity. The volume-to-capacity ratio is then correlated to a performance measure known as level of service based on the following thresholds: Level of Service Volume/Capacity Ratio A ≤ 0.60 B > 0.60 to ≤ 0.70 C > 0.70 to ≤ 0.80 D > 0.80 to ≤ 0.90 E > 0.90 to ≤ 1.00 F > 1.00 Source: Transportation Research Board, Interim Materials on Highway Capacity, Transportation Research Circular No. 212, January 1980. Level of service is used to qualitatively describe the performance of a roadway facility, ranging from Level of service A (free-flow conditions) to Level of Service F (extreme congestion and system failure). The ICU and Level of Service calculations for this study were performed using the Traffix software. In accordance with City of Newport Beach TPO requirements, the ICU calculations assume a lane capacity of 1,600 vehicles per hour per lane and no factor for yellow time. The project-related increase in ICU is rounded to three decimal places and then rounded to two decimal places. Performance Standards The City of Newport Beach has established Level of Service D as the minimum acceptable Level of Service for its arterial roadway system, except at the following locations where Level of Service E or better is acceptable: 5 112 1400 Bristol Street North Residences Traffic Impact Analysis 6 19604 ▪ Any intersection in the Airport Area shared with City of Irvine; ▪ Dover Drive at Coast Highway; ▪ Marguerite Avenue at Coast Highway; and ▪ Goldenrod Avenue at Coast Highway. Substantial Operational Deficiency Criteria In accordance with the City’s TPO, the following criteria are used to determine if a proposed project will result in a substantial Level of Service impact and is required to provide improvements/corrective measures: ▪ A substantial project impact is defined to occur if the addition of project-generated trips is forecast to cause/worsen a deficient intersection operation (generally Level of Service E or F) and increase the intersection capacity utilization by one percent or more of capacity (i.e., V/C increases by 0.010 or more). If a project is forecast to cause or worsen a substantial Level of Service impact, the project must construct or provide funding for improvements, to the extent feasible, such that the project-related increase in capacity utilization does not exceed the City-established criteria. CUMULATIVE AND GENERAL PLAN ANALYTICAL METHODOLOGY (CEQA) Although Level of Service impacts no longer constitute a significant environmental impact based on current CEQA provisions, a Level of Service analysis and significant impact evaluation were also prepared for Year 2027 cumulative and Post 2030 General Plan Buildout conditions, which did include evaluation of Level of Service impacts based on relevant thresholds of significance at the time of preparation. The purpose of the General Plan Comparison analysis is to document whether any new traffic-related impacts would occur compared to the 2006 General Plan EIR based on the proposed project. Thresholds of Significance for General Plan EIR Addendum Year 2027 cumulative and Post 2030 General Plan Buildout conditions are analyzed based on the same ICU methodology used for the TPO analysis. Based on the 2006 General Plan EIR, the following criteria are used to determine if the proposed project would result in a significant Level of Service impact requiring new mitigation measures. ▪ A significant transportation impact is defined to occur if the addition of project-generated trips is forecast to cause/worsen a deficient intersection operation (generally Level of Service E or F) and increase the intersection capacity utilization by one percent or more of capacity (i.e., V/C increases by 0.010 or more). VEHICLE MILES TRAVELED ANALYTICAL METHODOLOGY (CEQA) The metric used to evaluate the transportation impact of land use and transportation projects under CEQA is known as vehicle miles traveled (VMT). In general terms, VMT quantifies the amount and distance of automobile travel attributable to a project or region. Additional information and a detailed project assessment is provided in the Vehicle Miles Traveled section presented later in this report. 6 113 1400 Bristol Street North Residences Traffic Impact Analysis 7 19604 3. EXISTING CONDITIONS This section describes the existing transportation setting in the project vicinity. EXISTING ROADWAY SYSTEM Figure 3 identifies the lane geometry and intersection traffic controls for existing conditions based on a field survey of the study area. Regional access to the project area is provided by the San Joaquin Hills Corridor (State Route 73) freeway south of the project site running between Bristol Street North and Bristol Street South. The key north-south roadways providing local circulation are Irvine Avenue, Campus Drive, Birch Street, MacArthur Boulevard, and Jamboree Road. The key east-west roadways providing local circulation are Bristol Street North, Bristol Street South, Newport Place Drive, Von Karman Avenue, Bison Avenue, Eastbluff Drive, and University Avenue. PEDESTRIAN FACILITIES Existing pedestrian facilities in the project vicinity are shown on Figure 4. BICYCLE ROUTES On-street bicycle facilities are provided in the project area along Bristol Street North. Bristol Street North adjacent to the project site has Class II Bike Lane (On-Road Striped) and also is classified as a Class I (Off-Road Paved) Bikeway (sidewalk riding is permitted). Roadways that provide on-street bicycle facilities near the project site include Bristol Street South, Birch Street, and intermittent areas of Jamboree Road and Campus Road. TRANSIT FACILITIES Figure 5 shows the existing transit routes available in the project vicinity. As shown on Figure 5, Orange County Transportation Authority Route 57 services Bristol Street North adjacent to the project site. A bus stop is located along Bristol Street North adjacent to the project site at the northwest corner of the Spruce Street and Bristol Street North intersection. GENERAL PLAN CONTEXT Figure 6 shows the City of Newport Beach General Plan Master Plan of Streets and Highways roadway classifications map. This figure shows the nature and extent of arterial and collector highways that are needed to adequately serve the ultimate development depicted by the Land Use Element of the General Plan. The City of Newport Beach General Plan roadway cross-sections are depicted on Figure 7. EXISTING TRAFFIC VOLUMES Existing peak hour intersection volumes were developed from intersection turning movement counts collected in March/April 2022 during typical weekday AM and PM peak periods of commuter traffic. The AM peak period was counted between 7:00 AM and 9:00 AM and the PM peak period was counted between 4:30 PM and 6:30 PM. The actual peak hour within the peak period is the four consecutive 15-minute periods with the highest total volume of all approaches. Thus, the PM peak hour at one intersection may occur at 4:45 PM to 5:45 PM if those four consecutive 15-minute periods have the highest combined volume. Count worksheets are provided in Appendix B. Based on the project’s application date, existing volume and Level of Service conditions were established for year 2022. 7 114 1400 Bristol Street North Residences Traffic Impact Analysis 8 19604 Figure 8 and Figure 9 show the Existing AM peak hour and PM peak hour intersection turning movement volumes. EXISTING INTERSECTION LEVEL OF SERVICE Existing intersection Levels of Service are summarized in Table 1. Detailed Level of Service worksheets are provided in Appendix C. As shown in Table 1, the study intersections currently operate at Levels of Service D or better during the peak hours for Existing (2022) conditions. 8 115 V/C2 LOS3 V/C2 LOS3 1. Campus Dr (NS) at Bristol St North (EW)TS 0.36 A 0.61 B 2. Irvine Ave/Campus Dr (NS) at Bristol St South (EW)TS 0.49 A 0.44 A 3. Birch St (NS) at Bristol St North (EW)TS 0.47 A 0.51 A 4. Birch St (NS) at Bristol St South (EW)TS 0.34 A 0.35 A 5.MacArthur Blvd (NS) at Campus Dr (EW)4 TS 0.33 A 0.53 A 6. MacArthur Blvd (NS) at Birch St (EW)TS 0.28 A 0.37 A 7. MacArthur Blvd (NS) at Newport Pl Dr/Von Karman Ave (EW)TS 0.31 A 0.35 A 8.MacArthur Blvd (NS) at Jamboree Rd (EW)4 TS 0.37 A 0.45 A 9. MacArthur Blvd (NS) at Bison Ave (EW)TS 0.38 A 0.41 A 10.Jamboree Rd (NS) at Campus Dr (EW)4 TS 0.48 A 0.49 A 11. Jamboree Rd (NS) at Bristol St North (EW)TS 0.34 A 0.35 A 12. Jamboree Rd (NS) at Bristol St South (EW)TS 0.58 A 0.60 A 13. Jamboree Rd (NS) at Eastbluff Dr/University Dr (EW)TS 0.54 A 0.57 A Notes: (1) TS = Traffic Signal (2) V/C = Volume/Capacity (3) LOS = Level of Service (4) Level of Service E is acceptable; shared jurisdiction with City of Irvine. Table 1 Existing (2022) Intersection Levels of Service ID Study Intersection Traffic Control1 PM Peak HourAM Peak Hour 1400 Bristol Street North Residences Traffic Impact Analysis 196049116 Figure 3 Existing Lane Geometry and Intersection Traffic Controls 1400 Bristol Street North ResidencesTraffic Impact Analysis 19604JAMBOREE RDBIRCH STCAMPUS DRMACARTHUR BLVDVON KARMAN AVEB RI ST O L ST N B RI STOL ST S AVEIRVINE BISONAVESPRUCE ST1 2 4 3 5 6 7 12 11 8 10 13 9 73 73 EASTBLUFF DRMESA DR UNIVERSITY DR SA N J OA Q U I N H I L L S CORR I DORSite Traffic Signal #-Lane Divided Roadway #-Lane Undivided Roadway Existing Lane Right Turn Overlap Free Right Turn Lane Legend #D #U RTO F 5 MacArthur Blvd (NS)/ Campus Dr (EW) 6 MacArthur Blvd (NS)/ Birch St (EW) 7 MacArthur Blvd (NS)/ Von Karman Ave (EW) 8 MacArthur Blvd (NS)/ Jamboree Rd (EW) 1 Campus Dr (NS)/ Bristol St N (EW) 2 Campus Dr (NS)/ Bristol St S (EW) 9 MacArthur Blvd (NS)/ Bison Ave (EW) 3 Birch St (NS)/ Bristol St N (EW) 10 Jamboree Rd (NS)/ Campus Dr (EW) 11 Jamboree Rd (NS)/ Bristol St N (EW) 4 Birch St (NS)/ Bristol St S (EW) 12 Jamboree Rd (NS)/ Bristol St S (EW) 13 Jamboree Rd (NS)/ University Dr (EW) N F FFRTOF RTO F #-Lanes (One-Way)# 4D 6D 4D 6D 4 4 4 4 4 3 3 4U 6D 4D 4D 4D 8D 8D 6D 4D 4D 4D 4D 4D 4D 6D 6D 7D 7D 7D 7D 8D 6D 6D 6D 6D 7D 8D 4D 4U SPLITSPLITSPLITSPLITSplit Signal PhasingSPLIT d De Facto Turn Laned F FREE RTO10 117 Figure 4 Existing Pedestrian Facilities 1400 Bristol Street North ResidencesTraffic Impact Analysis 19604 N Sidewalk Legend Cross Walk Bus StopB B Site SPRUCE STB RIS T O L S T N 11 118 Figure 5 Orange County Transportation Authority System Map 1400 Bristol Street North ResidencesTraffic Impact Analysis 19604 Source: Orange County Transportation Authority N Site 12 119 13 120 14 121 Figure 8 Existing AM Peak Hour Intersection Turning Movement Volumes 1400 Bristol Street North ResidencesTraffic Impact Analysis 19604JAMBOREE RDBIRCH STCAMPUS DRMACARTHUR BLVDVON KARMAN AVEB RI ST O L ST N B RI STOL ST S AVEIRVINE BISONAVESPRUCE ST1 2 4 3 5 6 7 12 11 8 10 13 9 Study Intersection Legend # 73 73 EASTBLUFF DRMESA DR UNIVERSITY DR SA N J OA Q U I N H I L L S CORR I DORSite N 5 MacArthur Blvd (NS)/ Campus Dr (EW)453722218786029125440637 2117060 6 MacArthur Blvd (NS)/ Birch St (EW)2136347496082455917939 1611334 7 MacArthur Blvd (NS)/ Von Karman Ave (EW)3239834548405101183820 1475930 8 MacArthur Blvd (NS)/ Jamboree Rd (EW)9454428456320197260597138 333747152 1 Campus Dr (NS)/ Bristol St N (EW)418961254226252858167 2 Campus Dr (NS)/ Bristol St S (EW)698199874576821292453 9 MacArthur Blvd (NS)/ Bison Ave (EW)105128565381721159787966 1659240 3 Birch St (NS)/ Bristol St N (EW)786241191103601161149 10 Jamboree Rd (NS)/ Campus Dr (EW)908074921015651115813331 18419487 11 Jamboree Rd (NS)/ Bristol St N (EW)65211295967223374 Birch St (NS)/ Bristol St S (EW)211240129341496905194 12 Jamboree Rd (NS)/ Bristol St S (EW)1605287298753801209 13 Jamboree Rd (NS)/ University Dr (EW)549941287714373163619032 22099142 15 122 Figure 9 Existing PM Peak Hour Intersection Turning Movement Volumes 1400 Bristol Street North ResidencesTraffic Impact Analysis 19604JAMBOREE RDBIRCH STCAMPUS DRMACARTHUR BLVDVON KARMAN AVEB RI ST O L ST N B RI STOL ST S AVEIRVINE BISONAVESPRUCE ST1 2 4 3 5 6 7 12 11 8 10 13 9 Study Intersection Legend # 73 73 EASTBLUFF DRMESA DR UNIVERSITY DR SA N J OA Q U I N H I L L S CORR I DORSite N 5 MacArthur Blvd (NS)/ Campus Dr (EW)150761196959835426222146 35625137 6 MacArthur Blvd (NS)/ Birch St (EW)69535273153910825218625 62263149 7 MacArthur Blvd (NS)/ Von Karman Ave (EW)842020131528316487127 4093681 8 MacArthur Blvd (NS)/ Jamboree Rd (EW)20736730815276233317975255 35782888 1 Campus Dr (NS)/ Bristol St N (EW)5215575758132781697107 2 Campus Dr (NS)/ Bristol St S (EW)692262123694435822485 9 MacArthur Blvd (NS)/ Bison Ave (EW)142195967561423162165102129 13510467 3 Birch St (NS)/ Bristol St N (EW)1532662595063701537110 10 Jamboree Rd (NS)/ Campus Dr (EW)54142817212081110515825582 118274251 11 Jamboree Rd (NS)/ Bristol St N (EW)57910278807225414 Birch St (NS)/ Bristol St S (EW)252264198413202903111 12 Jamboree Rd (NS)/ Bristol St S (EW)2046727435136861086 13 Jamboree Rd (NS)/ University Dr (EW)431586322155122135027110012 228106122 16 123 1400 Bristol Street North Residences Traffic Impact Analysis 17 19604 4. PROJECT FORECASTS This section describes how project trip generation, trip distribution, and trip assignment forecasts were developed. The forecast project volumes are illustrated on figures contained in this section. PROJECT TRIP GENERATION Table 2 shows the project trip generation based upon trip generation rates obtained from the Institute of Transportation Engineers (ITE) Trip Generation Manual (11th Edition, 2021). Based on review of the ITE land use description, trip generation rates for general office building (Land Use Code 710) and multifamily housing (mid-rise) not close to transit (Land Use Code 221) were determined to adequately represent the existing and proposed land uses and were selected for use in this analysis. The project trip generation forecast is determined by multiplying the trip generation rates by the land use quantities. As shown in Table 2, the existing project site land use is estimated to generate approximately 420 daily trips, including 59 trips during the AM peak hour and 56 trips during the PM peak hour. The proposed project site land use is forecast to generate approximately 1,044 daily trips, including 85 trips during the AM peak hour and 90 trips during the PM peak hour. Therefore, the proposed project is forecast to result in a net increase of approximately 624 net new daily trips, including 26 net new trips during the AM peak hour and 34 net new trips during the PM peak hour. PROJECT TRIP DISTRIBUTION AND ASSIGNMENT Figure 10 thru Figure 13 show the forecast directional distribution patterns for the project generated trips. The project trip distribution patterns were developed in consultation with City of Newport Beach staff based on review of existing volume data, surrounding land uses, and the local and regional roadway facilities in the project vicinity. The project-generated AM and PM peak hour intersection turning movement volumes are shown on Figure 14 and Figure 15. 17 124 % In % Out Rate % In % Out Rate General Office Building ITE 710 TSF 88% 12% 1.52 17% 83% 1.44 10.84 Multifamily Housing (Mid-Rise)ITE 221 DU 23% 77% 0.37 61% 39% 0.39 4.54 In Out Total In Out Total Existing General Office Building 38.764 TSF 52 7 59 9 47 56 420 Proposed Multifamily Housing (Mid-Rise)230 DU 21 64 85 55 35 90 1,044 NET PROJECT TRIPS GENERATED -31 +57 +26 +46 -12 +34 +624 Notes: (1) ITE = Institute of Transportation Engineers Trip Generation Manual (11th Edition, 2021); ### = Land Use Code (2) TSF = Thousand Square Feet (Gross Floor Area); DU = Dwelling Units Daily Trip Generation Rates Trips Generated Daily Table 2 Project Trip Generation Land Use Quantity Unit2 AM Peak Hour PM Peak Hour Land Use Source1 Unit2 AM Peak Hour PM Peak Hour 1400 Bristol Street North Residences Traffic Impact Analysis 1960418125 UNIVERSITY DR Site Figure 10 Project Outbound Trip Distribution - Existing General Office Building 1400 Bristol Street North ResidencesTraffic Impact Analysis 19604 N JAMBOREE RDBIRCH STCAMPUS DRMACARTHUR BLVDVON KARMAN AVEB RI ST O L ST N B RI STOL ST S BISONAVESPRUCE ST73 73 100% 15% 10% 5% 15% 20% 15% 50% 20% 15% AVEIRVINE EASTBLUFF DRMESA DR Percent From Project Legend 10% SA N J OA Q U I N H I L L S CORR I DOR19 126 UNIVERSITY DR SA N J OA Q U I N H I L L S CORR I DORSite Figure 11 Project Inbound Trip Distribution - Existing General Office Building 1400 Bristol Street North ResidencesTraffic Impact Analysis 19604 N JAMBOREE RDBIRCH STCAMPUS DRMACARTHUR BLVDVON KARMAN AVEB RI ST O L ST N B RI STOL ST S BISONAVESPRUCE ST73 73 100% 15% 35% 20% 15% AVEIRVINE EASTBLUFF DRMESA DR Percent To Project Legend 10% 15%5%10% 20% 15% 50% 20 127 UNIVERSITY DR Figure 12 Project Outbound Trip Distribution - Proposed Residential 1400 Bristol Street North ResidencesTraffic Impact Analysis 19604 N JAMBOREE RDBIRCH STCAMPUS DRMACARTHUR BLVDVON KARMAN AVEB RI STO L ST S BISONAVE 73 73 20% 15% 5% 25% 20% 5% 55% 10% 10% AVEIRVINE EASTBLUFF DRMESA DR Percent From Project Legend 10% SA N J OA Q U I N H I L L S CORR I DOR10% Site B RI ST O L ST NSPRUCE ST100% 21 128 UNIVERSITY DR SA N J OA Q U I N H I L L S CORR I DORFigure 13 Project Inbound Trip Distribution - Proposed Residential 1400 Bristol Street North ResidencesTraffic Impact Analysis 19604 N JAMBOREE RDBIRCH STCAMPUS DRMACARTHUR BLVDVON KARMAN AVEB RI STO L ST S BISONAVE 73 73 5% 25% 10% 10% AVEIRVINE EASTBLUFF DRMESA DR Percent To Project Legend 10% 25%5%15% 20% 20% 65% 10% 20% Site B RI ST O L ST NSPRUCE ST100% 22 129 Figure 14 Project (Net) AM Peak Hour Intersection Turning Movement Volumes 1400 Bristol Street North ResidencesTraffic Impact Analysis 19604JAMBOREE RDBIRCH STCAMPUS DRMACARTHUR BLVDVON KARMAN AVEB RI ST O L ST N B RI STOL ST S AVEIRVINE BISONAVESPRUCE ST1 2 4 3 5 6 7 12 11 8 10 13 9 Study Intersection Legend # 73 73 EASTBLUFF DRMESA DR UNIVERSITY DR SA N J OA Q U I N H I L L S CORR I DORSite N 5 MacArthur Blvd (NS)/ Campus Dr (EW)0900-20000 000 6 MacArthur Blvd (NS)/ Birch St (EW)0000-20930 000 7 MacArthur Blvd (NS)/ Von Karman Ave (EW)0000-20000 -200 8 MacArthur Blvd (NS)/ Jamboree Rd (EW)-60000-40155 0-30 1 Campus Dr (NS)/ Bristol St N (EW)00002110 2 Campus Dr (NS)/ Bristol St S (EW)0-7020-60 9 MacArthur Blvd (NS)/ Bison Ave (EW)0-80050000 000 3 Birch St (NS)/ Bristol St N (EW)0000321412 10 Jamboree Rd (NS)/ Campus Dr (EW)01500-30000 000 11 Jamboree Rd (NS)/ Bristol St N (EW)-192000-124 Birch St (NS)/ Bristol St S (EW)003200-130 12 Jamboree Rd (NS)/ Bristol St S (EW)-600765 13 Jamboree Rd (NS)/ University Dr (EW)0-60050000 000 23 130 Figure 15 Project (Net) PM Peak Hour Intersection Turning Movement Volumes 1400 Bristol Street North ResidencesTraffic Impact Analysis 19604JAMBOREE RDBIRCH STCAMPUS DRMACARTHUR BLVDVON KARMAN AVEB RI ST O L ST N B RI STOL ST S AVEIRVINE BISONAVESPRUCE ST1 2 4 3 5 6 7 12 11 8 10 13 9 Study Intersection Legend # 73 73 EASTBLUFF DRMESA DR UNIVERSITY DR SA N J OA Q U I N H I L L S CORR I DORSite N 5 MacArthur Blvd (NS)/ Campus Dr (EW)000070000 000 6 MacArthur Blvd (NS)/ Birch St (EW)0000700-10 000 7 MacArthur Blvd (NS)/ Von Karman Ave (EW)000070000 200 8 MacArthur Blvd (NS)/ Jamboree Rd (EW)900001001-6 0120 1 Campus Dr (NS)/ Bristol St N (EW)0000-5-30 2 Campus Dr (NS)/ Bristol St S (EW)010-5090 9 MacArthur Blvd (NS)/ Bison Ave (EW)0400-60000 000 3 Birch St (NS)/ Bristol St N (EW)0000-5-80 10 Jamboree Rd (NS)/ Campus Dr (EW)0100120000 000 11 Jamboree Rd (NS)/ Bristol St N (EW)15-500314 Birch St (NS)/ Bristol St S (EW)00-500110 12 Jamboree Rd (NS)/ Bristol St S (EW)40063-4 13 Jamboree Rd (NS)/ University Dr (EW)0400-40000 000 24 131 1400 Bristol Street North Residences Traffic Impact Analysis 25 19604 5. FUTURE VOLUME FORECASTS This section describes how future volume forecasts for the TPO scenarios were developed. Forecast study area volumes are illustrated on figures contained in this section. CITY OF NEWPORT BEACH APPROVED PROJECTS The City of Newport Beach staff provided a list of approved projects within the study area for use in the TPO analysis. The approved project list consists of future developments that have been approved, but have not been fully constructed and occupied. The approved project data is contained in Appendix D. Trips associated with the following 17 projects are included in the TPO analysis: ▪ Fashion Island Expansion ▪ Temple Bat Yahm Expansion ▪ Hoag Hospital Phase III ▪ St. Mark Presbyterian Church ▪ 2300 Newport Blvd (Vue) ▪ Hoag Health Center 500-540 Superior ▪ North Newport Center ▪ 328 Old Newport Medical Office GPA ▪ Mariner’s Pointe 23,105 SQ FT Commercial Center ▪ Back Bay Landing 300 ECH ▪ Balboa Marina West ▪ Newport Crossings ▪ Museum House – Vivante Senior Center ▪ Uptown Newport: Phase 1 – Trans Devel Rights (TDR) ▪ Uptown Newport: Phase 2 only ▪ Residences at 4400 VK ▪ Picerne Residential (1300 Bristol St N) AMBIENT GROWTH To account for ambient growth on roadways, existing volumes were increased by a growth rate of one percent (1.0%) per year through year 2027 along applicable arterial highways (Irvine Avenue, Jamboree Road, and MacArthur Boulevard) in accordance with the City of Newport Beach Regional Traffic Annual Growth Rate. This equates to a growth factor of 1.05 along arterials with counts conducted in 2022. TPO YEAR 2027 VOLUME FORECASTS TPO Year 2027 Without Project volume forecasts were developed by adding ambient growth and approved projects trips to existing volumes. TPO Year 2027 Without Project AM and PM peak hour intersection turning movement volumes are shown on Figure 16 and Figure 17. TPO Year 2027 With Project volume forecasts were developed by adding project-generated trips to TPO Year 2027 Without Project volumes. TPO Year 2027 With Project AM and PM peak hour intersection turning movement volumes are shown on Figure 18 and Figure 19. 25 132 Figure 16 TPO Year 2027 Without Project AM Peak Hour Intersection Turning Movement Volumes 1400 Bristol Street North ResidencesTraffic Impact Analysis 19604JAMBOREE RDBIRCH STCAMPUS DRMACARTHUR BLVDVON KARMAN AVEB RI ST O L ST N B RI STOL ST S AVEIRVINE BISONAVESPRUCE ST1 2 4 3 5 6 7 12 11 8 10 13 9 Study Intersection Legend # 73 73 EASTBLUFF DRMESA DR UNIVERSITY DR SA N J OA Q U I N H I L L S CORR I DORSite N 5 MacArthur Blvd (NS)/ Campus Dr (EW)474782319893730625440637 2117065 6 MacArthur Blvd (NS)/ Birch St (EW)2239849636662579119139 1612584 7 MacArthur Blvd (NS)/ Von Karman Ave (EW)3444036850460106183820 1625930 8 MacArthur Blvd (NS)/ Jamboree Rd (EW)9758330363366223282662149 391900171 1 Campus Dr (NS)/ Bristol St N (EW)418968261226267949167 2 Campus Dr (NS)/ Bristol St S (EW)735207874796871290453 9 MacArthur Blvd (NS)/ Bison Ave (EW)111136676401859169808467 1819340 3 Birch St (NS)/ Bristol St N (EW)786251281333811244160 10 Jamboree Rd (NS)/ Campus Dr (EW)1069475622116661186013333 18519487 11 Jamboree Rd (NS)/ Bristol St N (EW)67812256438174254 Birch St (NS)/ Bristol St S (EW)212240158342496900194 12 Jamboree Rd (NS)/ Bristol St S (EW)1712298248973921239 13 Jamboree Rd (NS)/ University Dr (EW)5710821388115993323619032 22099142 26 133 Figure 17 TPO Year 2027 Without Project PM Peak Hour Intersection Turning Movement Volumes 1400 Bristol Street North ResidencesTraffic Impact Analysis 19604JAMBOREE RDBIRCH STCAMPUS DRMACARTHUR BLVDVON KARMAN AVEB RI ST O L ST N B RI STOL ST S AVEIRVINE BISONAVESPRUCE ST1 2 4 3 5 6 7 12 11 8 10 13 9 Study Intersection Legend # 73 73 EASTBLUFF DRMESA DR UNIVERSITY DR SA N J OA Q U I N H I L L S CORR I DORSite N 5 MacArthur Blvd (NS)/ Campus Dr (EW)158852207869937226222146 35625140 6 MacArthur Blvd (NS)/ Birch St (EW)72586288560011326419525 62275176 7 MacArthur Blvd (NS)/ Von Karman Ave (EW)847122733581336487127 4213681 8 MacArthur Blvd (NS)/ Jamboree Rd (EW)22541236517281237020291856 39393199 1 Campus Dr (NS)/ Bristol St N (EW)5215715798132811734107 2 Campus Dr (NS)/ Bristol St S (EW)731291123700445830485 9 MacArthur Blvd (NS)/ Bison Ave (EW)153212488591521181170105131 14110867 3 Birch St (NS)/ Bristol St N (EW)1532672635163721570115 10 Jamboree Rd (NS)/ Campus Dr (EW)63154618412694911215925594 123274251 11 Jamboree Rd (NS)/ Bristol St N (EW)62312179547856284 Birch St (NS)/ Bristol St S (EW)253268202414202927111 12 Jamboree Rd (NS)/ Bristol St S (EW)2228768066036911112 13 Jamboree Rd (NS)/ University Dr (EW)451771345163134236827110012 235106122 27 134 Figure 18 TPO Year 2027 With Project AM Peak Hour Intersection Turning Movement Volumes 1400 Bristol Street North ResidencesTraffic Impact Analysis 19604JAMBOREE RDBIRCH STCAMPUS DRMACARTHUR BLVDVON KARMAN AVEB RI ST O L ST N B RI STOL ST S AVEIRVINE BISONAVESPRUCE ST1 2 4 3 5 6 7 12 11 8 10 13 9 Study Intersection Legend # 73 73 EASTBLUFF DRMESA DR UNIVERSITY DR SA N J OA Q U I N H I L L S CORR I DORSite N 5 MacArthur Blvd (NS)/ Campus Dr (EW)474872319893530625440637 2117065 6 MacArthur Blvd (NS)/ Birch St (EW)22398496366425710019439 1612584 7 MacArthur Blvd (NS)/ Von Karman Ave (EW)3444036850458106183820 1605930 8 MacArthur Blvd (NS)/ Jamboree Rd (EW)9158330363366219282677154 391897171 1 Campus Dr (NS)/ Bristol St N (EW)418968261226269960167 2 Campus Dr (NS)/ Bristol St S (EW)735200874816871284453 9 MacArthur Blvd (NS)/ Bison Ave (EW)111135876401864169808467 1819340 3 Birch St (NS)/ Bristol St N (EW)786251281334131258172 10 Jamboree Rd (NS)/ Campus Dr (EW)1069625622116631186013333 18519487 11 Jamboree Rd (NS)/ Bristol St N (EW)65912456438174134 Birch St (NS)/ Bristol St S (EW)212240190342496887194 12 Jamboree Rd (NS)/ Bristol St S (EW)1706298249043981244 13 Jamboree Rd (NS)/ University Dr (EW)5710761388116043323619032 22099142 28 135 Figure 19 TPO Year 2027 With Project PM Peak Hour Intersection Turning Movement Volumes 1400 Bristol Street North ResidencesTraffic Impact Analysis 19604JAMBOREE RDBIRCH STCAMPUS DRMACARTHUR BLVDVON KARMAN AVEB RI ST O L ST N B RI STOL ST S AVEIRVINE BISONAVESPRUCE ST1 2 4 3 5 6 7 12 11 8 10 13 9 Study Intersection Legend # 73 73 EASTBLUFF DRMESA DR UNIVERSITY DR SA N J OA Q U I N H I L L S CORR I DORSite N 5 MacArthur Blvd (NS)/ Campus Dr (EW)158852207870637226222146 35625140 6 MacArthur Blvd (NS)/ Birch St (EW)72586288560711326419425 62275176 7 MacArthur Blvd (NS)/ Von Karman Ave (EW)847122733588336487127 4233681 8 MacArthur Blvd (NS)/ Jamboree Rd (EW)23441236517281238020291950 39394399 1 Campus Dr (NS)/ Bristol St N (EW)5215715798132761731107 2 Campus Dr (NS)/ Bristol St S (EW)731292123695445839485 9 MacArthur Blvd (NS)/ Bison Ave (EW)153212888591515181170105131 14110867 3 Birch St (NS)/ Bristol St N (EW)1532672635163671562115 10 Jamboree Rd (NS)/ Campus Dr (EW)63154718412696111215925594 123274251 11 Jamboree Rd (NS)/ Bristol St N (EW)63812129547856594 Birch St (NS)/ Bristol St S (EW)253268197414202938111 12 Jamboree Rd (NS)/ Bristol St S (EW)2232768066096941108 13 Jamboree Rd (NS)/ University Dr (EW)451775345163133836827110012 235106122 29 136 1400 Bristol Street North Residences Traffic Impact Analysis 30 19604 6. TPO ANALYSIS Detailed intersection Level of Service calculation worksheets for each of the following analysis scenarios are provided in Appendix C. TPO YEAR 2027 ONE-PERCENT THRESHOLD ANALYSIS Table 3 summarizes the City of Newport Beach TPO one-percent threshold analysis. In accordance with the City of Newport Beach TPO requirements, if project-generated peak hour approach volumes are greater than or equal to one percent of the forecast peak hour volumes on any approach of an intersection, then a detailed ICU analysis is required to assess the project-related change in ICU. The TPO one-percent analysis calculation worksheets are contained in Appendix E. The following eight study intersections are forecast to exceed the TPO one-percent threshold and require ICU analysis: 3. Birch Street (NS) at Bristol Street North (EW) 4. Birch Street (NS) at Bristol Street South (EW) 5. MacArthur Boulevard (NS) at Campus Drive (EW) 6. MacArthur Boulevard (NS) at Birch Street (EW) 7. MacArthur Boulevard (NS) at Newport Place Drive/Von Karman Avenue (EW) 8. MacArthur Boulevard (NS) at Jamboree Road (EW) 10. Jamboree Road (NS) at Campus Drive (EW) 11. Jamboree Road (NS) at Bristol Street North (EW) TPO IMPACT ASSESSMENT ICU and Levels of Service at the applicable study intersections for TPO Year 2027 Without and With Project conditions are shown in Table 4. As shown in Table 4, the study intersections are forecast to operate at Levels of Service D or better during the peak hours for TPO Year 2027 Without and With Project conditions. Table 4 also calculates the net change in ICU at the applicable study intersections for TPO Year 2027 With Project conditions. As shown in Table 4, the addition of project-generated trips is not forecast to cause any study intersection to operate deficiently (Level of Service E or F) or worsen a deficient intersection operation by more than one percent of capacity; therefore, the proposed project is forecast to result in no Level of Service impacts at the study intersections for TPO Year 2027 With Project conditions and no improvements are required. 30 137 Northbound Southbound Eastbound Westbound AM No No No No PM No No No No AM No No No No PM No No No No AM No No No Yes PM No No No No AM No Yes No No PM No No No No AM Yes No No No PM No No No No AM No No Yes No PM No No No No AM No No No No PM No Yes No No AM No No Yes No PM No No No No AM No No No No PM No No No No AM Yes No No No PM No Yes No No AM No No No No PM No Yes No No AM No No No No PM No No No No AM No No No No PM No No No No Notes: MacArthur Blvd (NS) at Bison Ave (EW) 11. Jamboree Rd (NS) at Bristol St North (EW) 12. 13. Jamboree Rd (NS) at Eastbluff Dr/University Dr (EW) Table 3 TPO One-Percent Threshold Analysis Summary ID Study Intersection Peak Hour Project Trips Exceed One Percent?1 Birch St (NS) at Bristol St North (EW) Birch St (NS) at Bristol St South (EW) MacArthur Blvd (NS) at Campus Dr (EW) MacArthur Blvd (NS) at Birch St (EW) MacArthur Blvd (NS) at Newport Pl Dr/Von Karman Ave (EW) MacArthur Blvd (NS) at Jamboree Rd (EW) Jamboree Rd (NS) at Campus Dr (EW) Jamboree Rd (NS) at Bristol St South (EW) (1) If the project is forecast to contribute 1% or more of the projected TPO analysis year peak hour volume, then detailed Intersection Capacity Utilization analysis is required in accordance with the City of Newport Beach Traffic Phasing Ordinance. 1. 2. Campus Dr (NS) at Bristol St North (EW) Irvine Ave/Campus Dr (NS) at Bristol St South (EW) 3. 4. 5. 6. 7. 8. 9. 10. 1400 Bristol Street North Residences Traffic Impact Analysis 1960431138 V/C2 LOS3 V/C2 LOS3 V/C2 LOS3 V/C2 LOS3 AM PM 3. Birch St (NS) at Bristol St North (EW)TS 0.49 A 0.52 A 0.49 A 0.52 A 0.00 0.00 No 4. Birch St (NS) at Bristol St South (EW)TS 0.35 A 0.36 A 0.36 A 0.36 A +0.01 0.00 No 5.MacArthur Blvd (NS) at Campus Dr (EW)4 TS 0.34 A 0.54 A 0.34 A 0.54 A 0.00 0.00 No 6. MacArthur Blvd (NS) at Birch St (EW)TS 0.31 A 0.42 A 0.31 A 0.42 A 0.00 0.00 No 7. MacArthur Blvd (NS) at Newport Pl Dr/Von Karman Ave (EW) TS 0.33 A 0.37 A 0.33 A 0.37 A 0.00 0.00 No 8.MacArthur Blvd (NS) at Jamboree Rd (EW)4 TS 0.42 A 0.50 A 0.42 A 0.50 A 0.00 0.00 No 10.Jamboree Rd (NS) at Campus Dr (EW)4 TS 0.50 A 0.52 A 0.50 A 0.52 A 0.00 0.00 No 11. Jamboree Rd (NS) at Bristol St North (EW)TS 0.37 A 0.39 A 0.36 A 0.41 A -0.01 +0.02 No Notes: (1) TS = Traffic Signal (2) V/C = Volume/Capacity (3) LOS = Level of Service (4) Level of Service E is acceptable; shared jurisdiction with City of Irvine. AM Peak Hour PM Peak Hour AM Peak Hour PM Peak Hour Table 4 TPO Year 2027 Intersection Levels of Service and Impact Assessment ID Study Intersection Traffic Control1 TPO Without Project TPO With Project V/C Increase Significant Impact? 1400 Bristol Street North Residences Traffic Impact Analysis 1960432139 1400 Bristol Street North Residences Traffic Impact Analysis 33 19604 7. CEQA ANALYSIS This section presents analysis of Year 2027 cumulative conditions. Detailed intersection Level of Service calculation worksheets for each of the following analysis scenarios are provided in Appendix C. CUMULATIVE PROJECTS In addition to the approved projects in the City of Newport Beach (addressed in the TPO analysis), CEQA requires analysis of cumulative conditions. This CEQA analysis also includes traffic from pending projects in the Cities of Newport Beach and Irvine, in addition to the approved projects. Pending projects consist of projects that are in various stages of the application and approval process but are not yet approved. These projects are considered to be reasonably foreseeable projects in the vicinity of the project and must be included in the Cumulative conditions analysis for CEQA purposes. The Cities of Newport Beach and Irvine were consulted and provided the list of cumulative projects to be included in this analysis. Table 5 includes the trip generation for cumulative projects as provided by the City of Newport Beach, University of California, Irvine, and City of Irvine. Figure 20 shows the cumulative projects location map. Cumulative Projects AM and PM peak hour intersection turning movement volumes are shown on Figure 21 and Figure 22. CEQA YEAR 2027 WITHOUT PROJECT VOLUME FORECASTS CEQA Year 2027 Without Project volume forecasts were developed by adding cumulative projects trips to TPO Year 2027 Without Project volumes. CEQA Year 2027 Without Project AM and PM peak hour intersection turning movement volumes are shown on Figure 23 and Figure 24. CEQA YEAR 2027 WITH PROJECT VOLUME FORECASTS CEQA Year 2027 With Project volume forecasts were developed by adding project trips to CEQA Year 2027 Without Project volumes. CEQA Year 2027 With Project AM and PM peak hour intersection turning movement volumes are shown on Figure 25 and Figure 26. CEQA YEAR 2027 IMPACT ASSESSMENT ICU and Levels of Service at the applicable study intersections for CEQA Year 2027 Without and With Project conditions are shown in Table 6. As shown in Table 6, the study intersections are forecast to operate at Levels of Service D or better during the peak hours for CEQA Year 2027 Without and With Project conditions. Table 6 also calculates the net change in ICU at the applicable study intersections for CEQA Year 2027 With Project conditions. As shown in Table 6, the addition of project-generated trips is not forecast to cause any study intersection to operate deficiently (Level of Service E or F) or worsen a deficient intersection operation by more than one percent of capacity; therefore, the proposed project is forecast to result in no significant Level of Service impacts at the study intersections for CEQA Year 2027 With Project conditions and no new mitigation measures are required. 33 140 Table 5 (1 of 2) Cumulative Projects Trip Generation Project ID In Out Total In Out Total City of Newport Beach Existing Use General Office 60.675 TSF Proposed Use Multifamily Housing (Mid-Rise)249 DU NB2 Sage Hill School Expansion Private School (K-8)150 ST 86 66 152 18 21 39 617 Existing Use Boat Sales 4.487 TSF Proposed Uses Multifamily Housing 36 DU Supermarket 5.096 TSF NB4 Newport Beach Porsche Auto Dealership 143.494 TSF 195 72 267 139 208 347 3,995 Quality Restaurant 10.240 TSF Commercial Retail 0.747 TSF Existing Uses John Siple/Johnson Yacht Sales 0.500 TSF Sun Country Marine 1.000 TSF Powerhouse Vehicle Sales 17.000 TSF WCH-Duffield Marine 2.000 TSF General Office Building 7.185 TSF WCH-A'Maree's 8.100 TSF Marina 68 Berths Proposed Uses Multifamily Housing (Mid-Rise)108 DU General Office 55.280 TSF Car Show Room 7.900 TSF Single-Family Detached Residential 14 DU General Office 36.620 TSF Duffield Marine Sales/Office 2.000 TSF Boat Show Room 10 EMP High-Turnover Sit-Down Restaurant 3.815 TSF Quality Restaurant 9.100 TSF Marina 63 Berths Multifamily Housing 564 DU Single-Family Detached Residential 954 DU 9-36 1,483 29 84 4721600 Dove Street ResidencesNB1 NB3 Mother's Market 11 17 28 29 24 53 690 -59 59 0 45 NB7 Newport Coast 413 932 1,345 926 557 14,778 971 NB6 Newport Village 108 55 163 77 105 NB5 The Garden Restaurant 6 2 8 55 182 2,238 Project Name Land Use Net Trips Generated AM Peak Hour PM Peak Hour DailyQuantity1 1400 Bristol Street North Residences Traffic Impact Analysis 1960434141 Table 5 (2 of 2) Cumulative Projects Trip Generation Project ID In Out Total In Out TotalProject Name Land Use Net Trips Generated AM Peak Hour PM Peak Hour DailyQuantity1 University of California, Irvine Hospital 144 Beds Ambulatory Care 225.000 TSF UCI North Campus Child Health/Medical Office Medical Office Building 168.000 TSF 331 79 410 162 414 576 5,531 City of Irvine IR1 Volar Apartments Multifamily Housing (Mid-Rise)930 DU 79 265 344 221 141 362 4,222 IR2 Futures Academy Private School 5.621 TSF 8 1 9 1 7 8 61 Multifamily Housing (Mid-Rise)593 DU 50 169 219 141 90 231 2,692 General Office Building 2.730 TSF 4 0 4 1 3 4 30 Strip Retail Plaza (<40k)5.000 TSF 7 5 12 16 16 32 272 Coffee Donut Shop w/o Drive-Thru Window 2.730 TSF 130 125 255 44 44 88 1,393 Health Fitness Club 6.900 TSF 5 4 9 14 10 24 205 Hotel 386 RM 138 78 216 116 112 228 3,084 General Office 448.000 TSF 599 82 681 110 535 645 4,856 IR5 Milani Apartments Multifamily Housing (Mid-Rise)287 DU 24 82 106 68 44 112 1,303 IR6 Elements Multifamily Housing (Mid-Rise)700 DU 60 199 259 167 106 273 3,178 IR7 Von Karman Quartz Office General Office 16.538 TSF 22 3 25 4 20 24 179 2,743 2,458 5,201 2,556 2,970 5,526 59,317 Notes: IR3 Elements Phase 3 IR4 Landmark 520 722 Total Sources: Data provided by City of Newport Beach, City of Irvine, and UCI traffic studies. ITE = Institute of Transportation Engineers Trip Generation Manual (11th Edition, 2021); ### = Land Use Code (1) TSF = Thousand Square Feet; DU = Dwelling Units; ST = Students; EMP = Employees; RM = Rooms 8,550202 UCI UCI North Campus Hospital Project 526 163 689 1400 Bristol Street North Residences Traffic Impact Analysis 1960435142 V/C2 LOS3 V/C2 LOS3 V/C2 LOS3 V/C2 LOS3 AM PM 1. Campus Dr (NS) at Bristol St North (EW)TS 0.458 A 0.677 B 0.459 A 0.676 B +0.001 -0.001 No 2. Irvine Ave/Campus Dr (NS) at Bristol St South (EW)TS 0.543 A 0.492 A 0.541 A 0.494 A -0.002 +0.002 No 3. Birch St (NS) at Bristol St North (EW)TS 0.498 A 0.535 A 0.504 A 0.533 A +0.006 -0.002 No 4. Birch St (NS) at Bristol St South (EW)TS 0.361 A 0.364 A 0.361 A 0.365 A 0.000 +0.001 No 5.MacArthur Blvd (NS) at Campus Dr (EW)4 TS 0.441 A 0.669 B 0.441 A 0.669 B 0.000 0.000 No 6. MacArthur Blvd (NS) at Birch St (EW)TS 0.355 A 0.479 A 0.355 A 0.479 A 0.000 0.000 No 7. MacArthur Blvd (NS) at Newport Pl Dr/Von Karman Ave (EW) TS 0.404 A 0.423 A 0.403 A 0.425 A -0.001 +0.002 No 8.MacArthur Blvd (NS) at Jamboree Rd (EW)4 TS 0.557 A 0.620 B 0.556 A 0.625 B -0.001 +0.005 No 9. MacArthur Blvd (NS) at Bison Ave (EW)TS 0.450 A 0.476 A 0.451 A 0.477 A +0.001 +0.001 No 10.Jamboree Rd (NS) at Campus Dr (EW)4 TS 0.574 A 0.622 B 0.574 A 0.622 B 0.000 0.000 No 11. Jamboree Rd (NS) at Bristol St North (EW)TS 0.394 A 0.423 A 0.386 A 0.431 A -0.008 +0.008 No 12. Jamboree Rd (NS) at Bristol St South (EW)TS 0.651 B 0.664 B 0.652 B 0.593 A +0.001 -0.071 No 13. Jamboree Rd (NS) at Eastbluff Dr/University Dr (EW)TS 0.636 B 0.678 B 0.637 B 0.679 B +0.001 +0.001 No Notes: (1) TS = Traffic Signal (2) V/C = Volume/Capacity (3) LOS = Level of Service (4) Level of Service E is acceptable; shared jurisdiction with City of Irvine. AM Peak Hour PM Peak Hour AM Peak Hour PM Peak Hour Table 6 CEQA Year 2027 Intersection Levels of Service and Impact Assessment ID Study Intersection Traffic Control1 CEQA Without Project CEQA With Project V/C Increase Significant Impact? 6 1400 Bristol Street North Residences Traffic Impact Analysis 1960436143 PROJECT SITE Other Development (see Table 5): City of Irvine City of Newport Beach Legend N ____________________________________________________________________________________________________________________________________________________________________________________________________ Figure 20 Cumulave Projects Locaon Map 1400 Bristol Street North Residences Traffic Impact Analysis 19604 MAIN ST37 144 Figure 21 Cumulative Projects AM Peak Hour Intersection Turning Movement Volumes 1400 Bristol Street North ResidencesTraffic Impact Analysis 19604JAMBOREE RDBIRCH STCAMPUS DRMACARTHUR BLVDVON KARMAN AVEB RI ST O L ST N B RI STOL ST S AVEIRVINE BISONAVESPRUCE ST1 2 4 3 5 6 7 12 11 8 10 13 9 Study Intersection Legend # 73 73 EASTBLUFF DRMESA DR UNIVERSITY DR SA N J OA Q U I N H I L L S CORR I DORSite N 5 MacArthur Blvd (NS)/ Campus Dr (EW)024753090251152540 432580 6 MacArthur Blvd (NS)/ Birch St (EW)0289017118-27520 0155 7 MacArthur Blvd (NS)/ Von Karman Ave (EW)-25285800121-33326 51-30 8 MacArthur Blvd (NS)/ Jamboree Rd (EW)020817614111731382600 167148-6 1 Campus Dr (NS)/ Bristol St N (EW)0369802030310 2 Campus Dr (NS)/ Bristol St S (EW)1470080222570 9 MacArthur Blvd (NS)/ Bison Ave (EW)03384020300170 6540 3 Birch St (NS)/ Bristol St N (EW)0291322010-3 10 Jamboree Rd (NS)/ Campus Dr (EW)9515908617916320193 0024 11 Jamboree Rd (NS)/ Bristol St N (EW)-33970211104 Birch St (NS)/ Bristol St S (EW)606723350 12 Jamboree Rd (NS)/ Bristol St S (EW)36002113543 13 Jamboree Rd (NS)/ University Dr (EW)034361020951700 3000 38 145 Figure 22 Cumulative Projects PM Peak Hour Intersection Turning Movement Volumes 1400 Bristol Street North ResidencesTraffic Impact Analysis 19604JAMBOREE RDBIRCH STCAMPUS DRMACARTHUR BLVDVON KARMAN AVEB RI ST O L ST N B RI STOL ST S AVEIRVINE BISONAVESPRUCE ST1 2 4 3 5 6 7 12 11 8 10 13 9 Study Intersection Legend # 73 73 EASTBLUFF DRMESA DR UNIVERSITY DR SA N J OA Q U I N H I L L S CORR I DORSite N 5 MacArthur Blvd (NS)/ Campus Dr (EW)0118400226101352200 512520 6 MacArthur Blvd (NS)/ Birch St (EW)01390726551220 05719 7 MacArthur Blvd (NS)/ Von Karman Ave (EW)241405202632-2-2-16 8420 8 MacArthur Blvd (NS)/ Jamboree Rd (EW)0136139-3210124671790 18928113 1 Campus Dr (NS)/ Bristol St N (EW)02551302230670 2 Campus Dr (NS)/ Bristol St S (EW)7600130179380 9 MacArthur Blvd (NS)/ Bison Ave (EW)02006032600530 5330 3 Birch St (NS)/ Bristol St N (EW)03210300382 10 Jamboree Rd (NS)/ Campus Dr (EW)1482090361791190105 0094 11 Jamboree Rd (NS)/ Bristol St N (EW)22460368384 Birch St (NS)/ Bristol St S (EW)8001024150 12 Jamboree Rd (NS)/ Bristol St S (EW)2340368152-2 13 Jamboree Rd (NS)/ University Dr (EW)022739034719700 6300 39 146 Figure 23 CEQA Year 2027 Without Project AM Peak Hour Intersection Turning Movement Volumes 1400 Bristol Street North ResidencesTraffic Impact Analysis 19604JAMBOREE RDBIRCH STCAMPUS DRMACARTHUR BLVDVON KARMAN AVEB RI ST O L ST N B RI STOL ST S AVEIRVINE BISONAVESPRUCE ST1 2 4 3 5 6 7 12 11 8 10 13 9 Study Intersection Legend # 73 73 EASTBLUFF DRMESA DR UNIVERSITY DR SA N J OA Q U I N H I L L S CORR I DORSite N 5 MacArthur Blvd (NS)/ Campus Dr (EW)4772576198102733136966037 6442865 6 MacArthur Blvd (NS)/ Birch St (EW)2268749807842559824339 1614089 7 MacArthur Blvd (NS)/ Von Karman Ave (EW)972544850581103214146 2135630 8 MacArthur Blvd (NS)/ Jamboree Rd (EW)9779147977477296420922149 5581048165 1 Campus Dr (NS)/ Bristol St N (EW)4181337341429267980167 2 Campus Dr (NS)/ Bristol St S (EW)882207875599091347453 9 MacArthur Blvd (NS)/ Bison Ave (EW)111170480402068174978467 2119340 3 Birch St (NS)/ Bristol St N (EW)786541411553811254157 10 Jamboree Rd (NS)/ Campus Dr (EW)201110656307184513492133226 185194111 11 Jamboree Rd (NS)/ Bristol St N (EW)675162264310284354 Birch St (NS)/ Bristol St S (EW)218240164349519935194 12 Jamboree Rd (NS)/ Bristol St S (EW)20722910359323961242 13 Jamboree Rd (NS)/ University Dr (EW)5714251998118083373789032 25099142 40 147 Figure 24 CEQA Year 2027 Without Project PM Peak Hour Intersection Turning Movement Volumes 1400 Bristol Street North ResidencesTraffic Impact Analysis 19604JAMBOREE RDBIRCH STCAMPUS DRMACARTHUR BLVDVON KARMAN AVEB RI ST O L ST N B RI STOL ST S AVEIRVINE BISONAVESPRUCE ST1 2 4 3 5 6 7 12 11 8 10 13 9 Study Intersection Legend # 73 73 EASTBLUFF DRMESA DR UNIVERSITY DR SA N J OA Q U I N H I L L S CORR I DORSite N 5 MacArthur Blvd (NS)/ Campus Dr (EW)158970607892547329744146 86877140 6 MacArthur Blvd (NS)/ Birch St (EW)72725289286511826521725 62332195 7 MacArthur Blvd (NS)/ Von Karman Ave (EW)3261127933844356285111 5053881 8 MacArthur Blvd (NS)/ Jamboree Rd (EW)2255485041691022494269109756 5821212112 1 Campus Dr (NS)/ Bristol St N (EW)52179670910362811801107 2 Campus Dr (NS)/ Bristol St S (EW)807291123830624868485 9 MacArthur Blvd (NS)/ Bison Ave (EW)153232494591847181170158131 14614167 3 Birch St (NS)/ Bristol St N (EW)1532992735463721608117 10 Jamboree Rd (NS)/ Campus Dr (EW)21117551841621128123168255199 123274345 11 Jamboree Rd (NS)/ Bristol St N (EW)625146395411536664 Birch St (NS)/ Bristol St S (EW)261268202424226942111 12 Jamboree Rd (NS)/ Bristol St S (EW)24627611746186931110 13 Jamboree Rd (NS)/ University Dr (EW)451998384163168938727810012 298106122 41 148 Figure 25 CEQA Year 2027 With Project AM Peak Hour Intersection Turning Movement Volumes 1400 Bristol Street North ResidencesTraffic Impact Analysis 19604JAMBOREE RDBIRCH STCAMPUS DRMACARTHUR BLVDVON KARMAN AVEB RI ST O L ST N B RI STOL ST S AVEIRVINE BISONAVESPRUCE ST1 2 4 3 5 6 7 12 11 8 10 13 9 Study Intersection Legend # 73 73 EASTBLUFF DRMESA DR UNIVERSITY DR SA N J OA Q U I N H I L L S CORR I DORSite N 5 MacArthur Blvd (NS)/ Campus Dr (EW)4773476198102533136966037 6442865 6 MacArthur Blvd (NS)/ Birch St (EW)22687498078225510724639 1614089 7 MacArthur Blvd (NS)/ Von Karman Ave (EW)972544850579103214146 2115630 8 MacArthur Blvd (NS)/ Jamboree Rd (EW)9179147977477292420937154 5581045165 1 Campus Dr (NS)/ Bristol St N (EW)4181337341429269991167 2 Campus Dr (NS)/ Bristol St S (EW)882200875619091341453 9 MacArthur Blvd (NS)/ Bison Ave (EW)111169680402073174978467 2119340 3 Birch St (NS)/ Bristol St N (EW)786541411554131268169 10 Jamboree Rd (NS)/ Campus Dr (EW)201112156307184213492133226 185194111 11 Jamboree Rd (NS)/ Bristol St N (EW)656164264310284234 Birch St (NS)/ Bristol St S (EW)218240196349519922194 12 Jamboree Rd (NS)/ Bristol St S (EW)20662910359394021247 13 Jamboree Rd (NS)/ University Dr (EW)5714191998118133373789032 25099142 42 149 Figure 26 CEQA Year 2027 With Project PM Peak Hour Intersection Turning Movement Volumes 1400 Bristol Street North ResidencesTraffic Impact Analysis 19604JAMBOREE RDBIRCH STCAMPUS DRMACARTHUR BLVDVON KARMAN AVEB RI ST O L ST N B RI STOL ST S AVEIRVINE BISONAVESPRUCE ST1 2 4 3 5 6 7 12 11 8 10 13 9 Study Intersection Legend # 73 73 EASTBLUFF DRMESA DR UNIVERSITY DR SA N J OA Q U I N H I L L S CORR I DORSite N 5 MacArthur Blvd (NS)/ Campus Dr (EW)158970607893247329744146 86877140 6 MacArthur Blvd (NS)/ Birch St (EW)72725289287211826521625 62332195 7 MacArthur Blvd (NS)/ Von Karman Ave (EW)3261127933851356285111 5073881 8 MacArthur Blvd (NS)/ Jamboree Rd (EW)2345485041691022504269109850 5821224112 1 Campus Dr (NS)/ Bristol St N (EW)52179670910362761798107 2 Campus Dr (NS)/ Bristol St S (EW)807292123825624877485 9 MacArthur Blvd (NS)/ Bison Ave (EW)153232894591841181170158131 14614167 3 Birch St (NS)/ Bristol St N (EW)1532992735463671600117 10 Jamboree Rd (NS)/ Campus Dr (EW)21117561841621140123168255199 123274345 11 Jamboree Rd (NS)/ Bristol St N (EW)640145895411536974 Birch St (NS)/ Bristol St S (EW)261268197424226953111 12 Jamboree Rd (NS)/ Bristol St S (EW)24667611746246961106 13 Jamboree Rd (NS)/ University Dr (EW)452002384163168538727810012 298106122 43 150 1400 Bristol Street North Residences Traffic Impact Analysis 44 19604 8. GENERAL PLAN COMPARISON ANALYSIS This section presents analysis of Post 2030 General Plan Buildout conditions in support of the project’s proposed addendum to the 2006 General Plan EIR. Detailed intersection Level of Service calculation worksheets for each of the following analysis scenarios are provided in Appendix C. GENERAL PLAN COMPARISON METHODOLOGY This analysis compares the traffic analysis zone (TAZ) as analyzed in the Post 2030 General Plan Buildout traffic analysis with the proposed project. The Newport Beach Traffic Model (NBTM) TAZ 1390 was analyzed with 87 dwelling units of multifamily housing and 99,970 square feet of general office in the 2006 General Plan EIR. Since the project is constructing 230 multifamily housing dwelling units, the project is proposing 143 additional dwelling units compared to the 2006 General Plan EIR analysis. Therefore, Post 2030 General Plan Buildout With Project conditions were determined by adding the net increase in dwelling units proposed within TAZ 1390 to the Post 2030 General Plan Buildout forecasts originally evaluated in the 2006 General Plan EIR. The general office square footage stayed unchanged in this analysis. GENERAL PLAN COMPARISON TRIP GENERATION AND TRIP DISTRIBUTION Table 7 shows the project trip generation based upon trip generation rates obtained from the Institute of Transportation Engineers (ITE) Trip Generation Manual (11th Edition, 2021). Based on review of the ITE land use description, trip generation rates for multifamily housing (mid-rise) not close to transit (Land Use Code 221) were determined to adequately represent the proposed land use and was selected for use in this analysis. The project trip generation forecast is determined by multiplying the trip generation rates by the land use quantity. As shown in Table 7, the proposed increase in General Plan buildout units is estimated to generate approximately 649 additional daily trips, including 53 additional trips during the AM peak hour and 55 additional trips during the PM peak hour. Project residential trip distribution patterns (see Figure 12 and Figure 13) were used for this analysis. POST 2030 GENERAL PLAN BUILDOUT WITHOUT PROJECT VOLUME FORECASTS Post 2030 General Plan Buildout Without Project volume forecasts were provided by the City of Newport Beach based on the 2006 General Plan EIR. Post 2030 General Plan Buildout Without Project AM and PM peak hour intersection turning movement volumes are shown on Figure 27 and Figure 28. POST 2030 GENERAL PLAN BUILDOUT WITH PROJECT VOLUME FORECASTS Post 2030 General Plan Buildout With Project volume forecasts were developed by adding the General Plan Comparison project trips to Post 2030 General Plan Buildout Without Project traffic volumes. Post 2030 General Plan Buildout With Project AM and PM peak hour intersection turning movement volumes are shown on Figure 29 and Figure 30. GENERAL PLAN COMPARISON IMPACT ASSESSMENT ICU and Levels of Service at the applicable study intersections for General Plan Comparison: Post 2030 General Plan Buildout Without and With Project conditions are shown in Table 8. As shown in Table 8, the study intersections are forecast to operate at Levels of Service D or better during the peak hours for Post 2030 General Plan Buildout Without and With Project conditions, except for the following intersections: 44 151 1400 Bristol Street North Residences Traffic Impact Analysis 45 19604 1. Campus Drive (NS) at Bristol Street North (EW) (Both AM/PM Peak Hours) 3. Birch Street (NS) at Bristol Street North (EW) (AM Peak Hour) 5. MacArthur Boulevard (NS) at Campus Drive (EW) (PM Peak Hour) 6. MacArthur Boulevard (NS) at Birch Street (EW) (PM Peak Hour) 10. Jamboree Road (NS) at Campus Drive (EW) (PM Peak Hour) 12. Jamboree Road (NS) at Bristol Street South (EW) (AM Peak Hour) Table 8 also calculates the net change in ICU at the study intersections for Post 2030 General Plan Buildout With Project conditions. As shown in Table 8, the addition of project-generated trips is not forecast to cause any study intersection to operate deficiently (Level of Service E or F) or worsen a deficient intersection operation by more than one percent of capacity; therefore, the proposed project is forecast to result in no significant Level of Service impacts at the study intersections for Post General Plan Buildout With Project conditions and no new mitigation measures are required. 45 152 % In % Out Rate % In % Out Rate Multifamily Housing (Mid-Rise)ITE 221 DU 23% 77% 0.37 61% 39% 0.39 4.54 In Out Total In Out Total Multifamily Housing (Mid-Rise)3 143 DU 13 40 53 34 21 55 649 Notes: (1) ITE = Institute of Transportation Engineers Trip Generation Manual (11th Edition, 2021); ### = Land Use Code (2) DU = Dwelling Units (3) The General Plan comparison analysis evaluates an additional 143 DU to NBTM TAZ 1390. Project (230 DU) - TAZ 1390 (87 DU) = 143 DU. Trips Generated Land Use Quantity Unit2 AM Peak Hour PM Peak Hour Daily Table 7 General Plan Comparison Trip Generation Trip Generation Rates Land Use Source1 Unit2 AM Peak Hour PM Peak Hour Daily 1400 Bristol Street North Residences Traffic Impact Analysis 1960446153 V/C2 LOS3 V/C2 LOS3 V/C2 LOS3 V/C2 LOS3 AM PM 1. Campus Dr (NS) at Bristol St North (EW)TS 1.024 F 0.948 E 1.025 F 0.949 E +0.001 +0.001 No 2. Irvine Ave/Campus Dr (NS) at Bristol St South (EW)TS 0.893 D 0.774 C 0.893 D 0.775 C 0.000 +0.001 No 3. Birch St (NS) at Bristol St North (EW)TS 0.916 E 0.811 D 0.919 E 0.813 D +0.003 +0.002 No 4. Birch St (NS) at Bristol St South (EW)TS 0.547 A 0.625 B 0.554 A 0.627 B +0.007 +0.002 No 5.MacArthur Blvd (NS) at Campus Dr (EW)4 TS 0.809 D 1.241 F 0.809 D 1.241 F 0.000 0.000 No 6. MacArthur Blvd (NS) at Birch St (EW)TS 0.796 C 1.016 F 0.797 C 1.018 F +0.001 +0.002 No 7. MacArthur Blvd (NS) at Newport Pl Dr/Von Karman Ave (EW) TS 0.562 A 0.682 B 0.562 A 0.684 B 0.000 +0.002 No 8.MacArthur Blvd (NS) at Jamboree Rd (EW)4 TS 0.877 D 0.858 D 0.878 D 0.861 D +0.001 +0.003 No 9. MacArthur Blvd (NS) at Bison Ave (EW)TS 0.775 C 0.792 C 0.775 C 0.793 C 0.000 +0.001 No 10.Jamboree Rd (NS) at Campus Dr (EW)4 TS 0.930 E 1.180 F 0.931 E 1.182 F +0.001 +0.002 No 11. Jamboree Rd (NS) at Bristol St North (EW)TS 0.681 B 0.606 B 0.684 B 0.617 B +0.003 +0.011 No 12. Jamboree Rd (NS) at Bristol St South (EW)TS 0.942 E 0.867 D 0.947 E 0.871 D +0.005 +0.004 No 13. Jamboree Rd (NS) at Eastbluff Dr/University Dr (EW)TS 0.681 B 0.667 B 0.681 B 0.667 B 0.000 0.000 No Notes: (1) TS = Traffic Signal (2) V/C = Volume/Capacity (3) LOS = Level of Service (4) Level of Service E is acceptable; shared jurisdiction with City of Irvine. AM Peak Hour PM Peak Hour AM Peak Hour PM Peak Hour Table 8 General Plan Comparison: Post 2030 General Plan Buildout Intersection Levels of Service and Impact Assessment ID Study Intersection Traffic Control1 General Plan Buildout Without Project General Plan Buildout With Project V/C Increase Significant Impact? 1400 Bristol Street North Residences Traffic Impact Analysis 1960447154 Figure 27 Post 2030 General Plan Buildout Without Project AM Peak Hour Intersection Turning Movement Volumes 1400 Bristol Street North ResidencesTraffic Impact Analysis 19604JAMBOREE RDBIRCH STCAMPUS DRMACARTHUR BLVDVON KARMAN AVEB RI ST O L ST N B RI STOL ST S AVEIRVINE BISONAVESPRUCE ST1 2 4 3 5 6 7 12 11 8 10 13 9 Study Intersection Legend # 73 73 EASTBLUFF DRMESA DR UNIVERSITY DR SA N J OA Q U I N H I L L S CORR I DORSite N 5 MacArthur Blvd (NS)/ Campus Dr (EW)1501660120240990550770990200 4063060 6 MacArthur Blvd (NS)/ Birch St (EW)50134014018081023071067060 5031020 7 MacArthur Blvd (NS)/ Von Karman Ave (EW)1301460580606701904017060 17018040 8 MacArthur Blvd (NS)/ Jamboree Rd (EW)21018906001305701306701760160 4201120170 1 Campus Dr (NS)/ Bristol St N (EW)54032205104103102010250 2 Campus Dr (NS)/ Bristol St S (EW)238051011073013701590670 9 MacArthur Blvd (NS)/ Bison Ave (EW)3903680210602710390330270210 16025010 3 Birch St (NS)/ Bristol St N (EW)11012302704004801730820 10 Jamboree Rd (NS)/ Campus Dr (EW)1002030320700171036026028030 800840170 11 Jamboree Rd (NS)/ Bristol St N (EW)114032707307404 Birch St (NS)/ Bristol St S (EW)5003902804508501200210 12 Jamboree Rd (NS)/ Bristol St S (EW)21006070021505701020 13 Jamboree Rd (NS)/ University Dr (EW)601620240130109027051012010 340110170 48 155 Figure 28 Post 2030 General Plan Buildout Without Project PM Peak Hour Intersection Turning Movement Volumes 1400 Bristol Street North ResidencesTraffic Impact Analysis 19604JAMBOREE RDBIRCH STCAMPUS DRMACARTHUR BLVDVON KARMAN AVEB RI ST O L ST N B RI STOL ST S AVEIRVINE BISONAVESPRUCE ST1 2 4 3 5 6 7 12 11 8 10 13 9 Study Intersection Legend # 73 73 EASTBLUFF DRMESA DR UNIVERSITY DR SA N J OA Q U I N H I L L S CORR I DORSite N 5 MacArthur Blvd (NS)/ Campus Dr (EW)3201520801501510910530700160 1601470190 6 MacArthur Blvd (NS)/ Birch St (EW)180103060130128039046048070 1501020360 7 MacArthur Blvd (NS)/ Von Karman Ave (EW)509601801101280110140270100 860210110 8 MacArthur Blvd (NS)/ Jamboree Rd (EW)2908706202601600560240148070 9201570180 1 Campus Dr (NS)/ Bristol St N (EW)6001700185012705402880140 2 Campus Dr (NS)/ Bristol St S (EW)177041031020605501420630 9 MacArthur Blvd (NS)/ Bison Ave (EW)2602710140403090480330210100 22040050 3 Birch St (NS)/ Bristol St N (EW)18060083014805301730160 10 Jamboree Rd (NS)/ Campus Dr (EW)1601950720470266026061085030 360650530 11 Jamboree Rd (NS)/ Bristol St N (EW)9002620146010404 Birch St (NS)/ Bristol St S (EW)3303004409203801490130 12 Jamboree Rd (NS)/ Bristol St S (EW)23601101490118015001010 13 Jamboree Rd (NS)/ University Dr (EW)501940360190192039020011010 340110210 49 156 Figure 29 Post 2030 General Plan Buildout With Project AM Peak Hour Intersection Turning Movement Volumes 1400 Bristol Street North ResidencesTraffic Impact Analysis 19604JAMBOREE RDBIRCH STCAMPUS DRMACARTHUR BLVDVON KARMAN AVEB RI ST O L ST N B RI STOL ST S AVEIRVINE BISONAVESPRUCE ST1 2 4 3 5 6 7 12 11 8 10 13 9 Study Intersection Legend # 73 73 EASTBLUFF DRMESA DR UNIVERSITY DR SA N J OA Q U I N H I L L S CORR I DORSite N 5 MacArthur Blvd (NS)/ Campus Dr (EW)1501666120240992550770990200 4063060 6 MacArthur Blvd (NS)/ Birch St (EW)50134014018081223071667260 5031020 7 MacArthur Blvd (NS)/ Von Karman Ave (EW)1301460580606721904017060 17118040 8 MacArthur Blvd (NS)/ Jamboree Rd (EW)21318906001305701336701770164 4201123170 1 Campus Dr (NS)/ Bristol St N (EW)54032205104103122018250 2 Campus Dr (NS)/ Bristol St S (EW)238051111073213701593670 9 MacArthur Blvd (NS)/ Bison Ave (EW)3903681210602714390330270210 16025010 3 Birch St (NS)/ Bristol St N (EW)11012302704005021740828 10 Jamboree Rd (NS)/ Campus Dr (EW)1002040320700171336026028030 800840170 11 Jamboree Rd (NS)/ Bristol St N (EW)114532847307484 Birch St (NS)/ Bristol St S (EW)5003903024508501203210 12 Jamboree Rd (NS)/ Bristol St S (EW)21016070021675741024 13 Jamboree Rd (NS)/ University Dr (EW)601621240130109427051012010 340110170 50 157 Figure 30 Post 2030 General Plan Buildout With Project PM Peak Hour Intersection Turning Movement Volumes 1400 Bristol Street North ResidencesTraffic Impact Analysis 19604JAMBOREE RDBIRCH STCAMPUS DRMACARTHUR BLVDVON KARMAN AVEB RI ST O L ST N B RI STOL ST S AVEIRVINE BISONAVESPRUCE ST1 2 4 3 5 6 7 12 11 8 10 13 9 Study Intersection Legend # 73 73 EASTBLUFF DRMESA DR UNIVERSITY DR SA N J OA Q U I N H I L L S CORR I DORSite N 5 MacArthur Blvd (NS)/ Campus Dr (EW)3201523801501515910530700160 1601470190 6 MacArthur Blvd (NS)/ Birch St (EW)180103060130128539046348170 1501020360 7 MacArthur Blvd (NS)/ Von Karman Ave (EW)509601801101285110140270100 862210110 8 MacArthur Blvd (NS)/ Jamboree Rd (EW)2978706202601600567240148572 9201579180 1 Campus Dr (NS)/ Bristol St N (EW)6001700185012705412884140 2 Campus Dr (NS)/ Bristol St S (EW)177041231020615501427630 9 MacArthur Blvd (NS)/ Bison Ave (EW)2602713140403092480330210100 22040050 3 Birch St (NS)/ Bristol St N (EW)18060083014805421735164 10 Jamboree Rd (NS)/ Campus Dr (EW)1601955720470266926061085030 360650530 11 Jamboree Rd (NS)/ Bristol St N (EW)9122627146010624 Birch St (NS)/ Bristol St S (EW)3303004529203801499130 12 Jamboree Rd (NS)/ Bristol St S (EW)23631101490119615021012 13 Jamboree Rd (NS)/ University Dr (EW)501943360190192239020011010 340110210 51 158 1400 Bristol Street North Residences Traffic Impact Analysis 52 19604 9. CONGESTION MANAGEMENT PROGRAM This section provides analysis of the project impacts at County facilities in accordance with typical Orange County Congestion Management Program (CMP) requirements. BACKGROUND The Orange County CMP is a result of Proposition 111, which was a statewide initiative approved by the voters in June 1990. To prevent gas tax revenues from being used to promote future development, the legislation requires that a traffic impact analysis be prepared for new development. The traffic impact analysis is prepared to monitor and mitigate traffic impacts caused by new development. In Orange County, the Measure M Growth Management Program requires similar efforts; however, compliance with the CMP is required for local jurisdictions to receive Measure M2 funds. The Legislature requires that adjacent jurisdictions use a standard methodology for conducting a traffic impact analysis. Although details vary from one county to another, the general approach selected by each county for conducting traffic impact analyses has common elements. The Orange County CMP uses the Intersection Capacity Utilization methodology for analysis of intersections within the designated CMP roadway system. CMP-MONITORED INTERSECTIONS The following intersections in the City of Newport Beach are part of the CMP Highway System that require monitoring to ensure that Level of Service standards are maintained: ▪ Newport Boulevard at Coast Highway ▪ MacArthur Boulevard at Jamboree Road ▪ MacArthur Boulevard at Coast Highway REQUIREMENTS FOR IMPROVEMENTS To determine whether the addition of project-generated trips results in an operational impact at a CMP study intersection, and thus requires improvements, the Orange County CMP utilizes the following requirements: ▪ An operational project impact is defined to occur when a proposed project is forecast to increase traffic demand at a CMP study facility by more than three percent of capacity (V/C > 0.03), causing or worsening Level of Service F (V/C > 1.00). CRITERIA FOR PREPARATION OF CMP IMPACT ANALYSIS The Orange County CMP uses the following criteria to determine if a proposed development requires analysis: ▪ Development projects forecast to generate 2,400 daily trips or more and have indirect access to a CMP facility; or development projects forecast to generate 1,600 daily trips or more and have direct access to a CMP facility; or ▪ Projects with a potential to create an impact of more than three percent of Level of Service E capacity. Since the proposed project has indirect access to a CMP facility (e.g., MacArthur Boulevard or Jamboree Road) and is forecast to generate less than 2,400 daily trips, the proposed project does not satisfy the criteria for preparation of a separate CMP impact analysis. 52 159 1400 Bristol Street North Residences Traffic Impact Analysis 53 19604 10. SITE ACCESS AND CIRCULATION This section includes a description of project improvements necessary to provide site access and an evaluation of site access and circulation. The following section is based on the site plan used in this traffic impact analysis. SITE ACCESS Vehicular access is proposed to be maintained at Spruce Street with the existing project driveway on Bristol Street North relocated approximately 65 feet to the northwest. Since Bristol Street North is a one-way street, the relocated project driveway at Bristol Street North will continue to provide right turn in/out only access. The project driveway at Spruce Street will continue to provide full access. Based on review of the adjacent development and lane configurations along Bristol Street North and Spruce Street, the existing lane configurations are anticipated to provide adequate circulation. Based on the forecast project trip distribution patterns, the majority of the project trips, particularly resident trips during the AM/PM peak hours, are expected to access the site via the project driveway at Bristol Street North. Bristol Street North is a three-lane arterial roadway at the project driveway that connects with other arterial and regional roadway facilities. Westbound traffic along Bristol Street North at the project driveway will operate in free-flow conditions. Right turns into the project site from Bristol Street North will have no conflicting vehicular movements and are therefore expected to cause minimal to no delays along Bristol Street North. ON-SITE CIRCULATION The proposed project site plan indicates on-site subterranean drive aisles will be a typical minimum of 26 feet along the drive aisles with perpendicular parking spaces, which is generally adequate for two-way circulation and provides sufficient space for most vehicles to back out and conveniently exit the parking stall. The project site plan proposes drive aisles from Bristol Street North and Spruce Street that terminate at parking garage entrances/exits with perpendicular parking and drive aisles within the parking garage. The final parking layout and circulation will be reviewed and approved by the City of Newport Beach. In accordance with the City of Newport Beach Municipal Code development standards for parking areas (Section 20.40.070.A.1c), both project driveways provide a minimum set back of five (5) feet between the property line and the first parking space accessed from a public street (within the parking garage). Additionally, the two basement level parking layouts proposed allow for full circulation with no dead-end drive aisles. The only dead-end drive aisle located on the proposed ground floor parking layout includes a turnaround parking space. 53 160 1400 Bristol Street North Residences Traffic Impact Analysis 54 19604 11. VEHICLE MILES TRAVELED (VMT) BACKGROUND California Senate Bill 743 (SB 743) directs the State Office of Planning and Research (OPR) to amend the California Environmental Quality Act (CEQA) Guidelines for evaluating transportation impacts to provide alternatives to Level of Service that “promote the reduction of greenhouse gas emissions, the development of multimodal transportation networks, and a diversity of land uses.” In December 2018, the California Natural Resources Agency certified and adopted the updated CEQA Guidelines package. The amended CEQA Guidelines, specifically Section 15064.3, recommend the use of Vehicle Miles Travelled (VMT) as the primary metric for the evaluation of transportation impacts associated with land use and transportation projects. In general terms, VMT quantifies the amount and distance of automobile travel attributable to a project or region. All agencies and projects State-wide are required to utilize the updated CEQA guidelines recommending use of VMT for evaluating transportation impacts as of July 1, 2020. The updated CEQA Guidelines allow for lead agency discretion in establishing methodologies and thresholds provided there is substantial evidence to demonstrate that the established procedures promote the intended goals of the legislation. Where quantitative models or methods are unavailable, Section 15064.3 allows agencies to assess VMT qualitatively using factors such as availability of transit and proximity to other destinations. The Office of Planning and Research (OPR) Technical Advisory on Evaluating Transportation Impacts in CEQA (State of California, December 2018) [“OPR Technical Advisory”] provides technical considerations regarding methodologies and thresholds with a focus on office, residential, and retail developments as these projects tend to have the greatest influence on VMT. VMT ASSESSMENT AND SCREENING The project VMT impact has been assessed in accordance with guidance provided by the City of Newport Beach SB743 Implementation (April 6, 2020) [“the City VMT Guidelines”] and City Council Policy K-3. The transportation guidelines provide a framework for “screening thresholds” for certain projects that are expected to cause a less than significant impact without conducting a detailed VMT study. The proposed project is considered a residential land use. The City VMT Guidelines contain a map of VMT per capita for all existing Newport Beach residential areas (see Appendix F). VMT per capita in each area is compared to the regional average VMT per capita for Orange County. This map shows areas where residential development have a VMT per capita lower than the Orange County regional average and may therefore be presumed to result in a less than significant VMT impact based on guidance provided in the OPR Technical Advisory. The proposed project is in an area with low residential VMT per capita. Therefore, the proposed project is presumed to have a less than significant impact on VMT since it satisfies the City-established screening criteria. No additional VMT modeling or mitigation measures are required. 54 161 1400 Bristol Street North Residences Traffic Impact Analysis 55 19604 12. CONCLUSIONS This section summarizes the findings and mitigation measures (if any) identified in previous sections of this study. PROJECT TRIP GENERATION The existing project site land use is estimated per Table 2 to generate approximately 420 daily trips, including 59 trips during the AM peak hour and 56 trips during the PM peak hour. The proposed project site land use is forecast to generate approximately 1,044 daily trips, including 85 trips during the AM peak hour and 90 trips during the PM peak hour. Therefore, the proposed project is forecast to result in a net increase of approximately 624 net new daily trips, including 26 net new trips during the AM peak hour and 34 net new trips during the PM peak hour. TPO IMPACT ANALYSIS The addition of project-generated trips is not forecast to cause any study intersection to operate deficiently (Level of Service E or F) or worsen a deficient intersection operation by more than one percent of capacity; therefore, the proposed project is forecast to result in no Level of Service impacts at the study intersections for TPO Year 2027 With Project conditions and no improvements are required. CEQA YEAR 2027 IMPACT ANALYSIS The addition of project-generated trips is not forecast to cause any study intersection to operate deficiently (Level of Service E or F) or worsen a deficient intersection operation by more than one percent of capacity; therefore, the proposed project is forecast to result in no significant Level of Service impacts at the study intersections for CEQA Year 2027 With Project conditions and no new mitigation measures are required. CEQA GENERAL PLAN COMPARISON IMPACT ANALYSIS The addition of project-generated trips is not forecast to cause any study intersection to operate deficiently (Level of Service E or F) or worsen a deficient intersection operation by more than one percent of capacity; therefore, the proposed project is forecast to result in no significant Level of Service impacts at the study intersections for General Plan Comparison: Post 2030 General Plan Buildout With Project conditions and no new mitigation measures are required. VMT SCREENING The proposed project is located in an area with VMT per capita lower than the Orange County regional average for residential use. Per the City VMT Guidelines, the project is therefore presumed to have a less than significant impact on VMT. CONGESTION MANAGEMENT PROGRAM Since the proposed project has indirect access to a CMP facility (e.g., MacArthur Boulevard or Jamboree Road) and is forecast to generate less than 2,400 daily trips, the proposed project does not satisfy the criteria for preparation of a separate CMP impact analysis. SITE ACCESS AND CIRCULATION Vehicular access is proposed to be maintained at Spruce Street with the existing project driveway on Bristol Street North relocated approximately 65 feet to the northwest. Since Bristol Street North is a one-way street, the relocated project driveway at Bristol Street North will continue to provide right turn in/out only access. 55 162 1400 Bristol Street North Residences Traffic Impact Analysis 56 19604 The project driveway at Spruce Street will continue to provide full access. Based on review of the adjacent development and lane configurations along Bristol Street North and Spruce Street, the existing lane configurations are anticipated to provide adequate circulation. 56 163 1400 Bristol Street North Residences Traffic Impact Analysis 57 19604 APPENDICES Appendix A Glossary Appendix B Volume Count Worksheets Appendix C Level of Service Worksheets Appendix D Approved Projects List and Cumulative Projects Appendix E TPO One-Percent Threshold Analysis Appendix F Existing VMT Per Population Map Apx-1 164 GANDDINI GROUP INC. 714.795.3100 | ganddini.com 165 Planning Commission Resolution No. PC2023-043 Page 31 of 43 EXHIBIT “H” CONDITIONS OF APPROVAL (Project-specific conditions are in italics) Planning Division 1. The development shall be in substantial conformance with the approved site plan, floor plans, landscape plans, and building elevations stamped and dated with the date of this approval (except as modified by applicable conditions of approval). 2. The Project is subject to compliance with all applicable submittals approved by the City of Newport Beach (“City”) and all applicable City ordinances, policies, and standards, unless specifically waived or modified by the conditions of approval. 3. Entitlements granted under PA2022-0296 shall expire unless exercised within twenty- four (24) months from the date of approval as specified in Section 20.54.060 of the Newport Beach Municipal Code (“NBMC”), unless an extension is otherwise granted by the City for a period of time provided for in the Development Agreement pursuant to California Government Code Section 66452.06(a). 4. The proposed residential development shall consist of 229 apartment units, inclusive of 153 base units (conversion and GPA units) and 77 density bonus units. 5. A minimum of 23 apartment units shall be made affordable to very-low-income households consistent with the approved Residences at 1400 Bristol Street Affordable Housing Implementation Plan and Density Bonus Application dated August 11, 2023. 6. Maximum height of the residential structure shall be 85 feet. No building or any portion of structure, architectural feature or mechanical equipment shall exceed 85 feet. 7. Prior to the issuance of a building permit, an affordable housing agreement shall be executed in a recordable form as required by the City Attorney’s Office. 8. The on-site recreational amenities including private balconies, a clubroom, podium courtyard, a roof deck, media room, business center, etc. as illustrated on the approved plans shall be provided and maintained for the duration of the Project. The exact mix of amenities may be modified from the original approved plans subject to the approval by the Community Development Director. The total floor area or open space area dedicated to on-site recreational amenities shall not be reduced. 9. The residential parking garage shall have the following features: a. A safe, secure and well lighted and signed pedestrian paths for all users. 166 Planning Commission Resolution No. PC2023-043 Page 32 of 43 b. Adequate and uniform lighting throughout each parking level. c. Panic alarms and two-way communication systems in prominent locations on each parking level. 10. Prior to the issuance of a building permit, an acoustical analysis report, prepared by an acoustical engineer, shall be submitted to the Planning Division describing the acoustical design features of the structure that will satisfy the exterior and interior noise standards. The Project shall be attenuated in compliance with the report. 11. The residential structure shall be attenuated to provide an interior noise level of 45 dBA CNEL or less. Use of walls, berms, interior noise insulation, double paned windows, advance insulation systems, or other noise mitigation measures, as deemed appropriate by the City shall be incorporated in the design of the new residential structure to provide adequate noise attenuation. 12. The design of the residential structure shall provide adequate noise attenuation between adjacent units (common floor/ceiling) in accordance with the California Building Code (CBC). 13. Residential uses shall be indoor-oriented to reduce noise impingement on outdoor living areas. 14. Advanced air filtration systems for buildings shall be considered to promote cleaner air without the opening of windows. 15. Prior to the issuance of a building permit, the Applicant shall submit to the Community Development Department a final copy of FAA Determination of No Hazard to Air Navigation reflective of the proposed building height. 16. The Applicant shall comply with all applicable provisions of NBMC Chapter 15.38, Fair Share Traffic Contribution Ordinance, and Chapter 15.42, Major Thoroughfare and Bridge Fee Program. Prior to the issuance of a building permit, Fair Share Traffic Fees and Transportation Corridor Agency fees shall be paid for the Project. 17. Prior to the issuance of a building permit, the Applicant shall pay applicable school fees for the Project. 18. Prior to the issuance of a building permit, the Applicant shall pay applicable property development tax as required pursuant to NBMC Chapter 3.12 (Property Development Tax) for the Project. 19. Prior to the issuance of a building permit, the Applicant shall pay the Project’s fair share of public safety fee, as determined by the Community Development Director, to fund the cost of staffing, services and equipment as necessary for fire-related public safety purposes. 167 Planning Commission Resolution No. PC2023-043 Page 33 of 43 20. The Applicant shall comply with all provisions of the Development Agreement including payment and timing of the public benefit fees. 21. The property management company shall distribute a written disclosure statement prior to lease or rental of any residential unit. The disclosure statement shall indicate that the occupants will be living in an urban type of environment and that the noise, odor, and outdoor activity levels may be higher than a typical suburban residential area. In addition, potential annoyances or inconveniences associated with residing in proximity to airport operations such as noise, vibration, and odor may occur. The disclosure statement shall include a written description of the potential impacts to residents of both the existing environment and potential impacts based upon the allowed uses in the zoning district and proximity to airport. Each and every lessee or renter shall sign the statement acknowledging that they have received, read, and understand the disclosure statement. The Applicant shall covenant to include within all deeds, leases or contracts conveying any interest in the Project: (1) the disclosure and notification requirement stated herein; (2) an acknowledgment by all grantees or lessees that the property is located within an urban type of environment and that the noise, odor, and outdoor activity levels may be higher than a typical suburban residential area; and (3) acknowledgment that the covenant is binding for the benefit and in favor of the City of Newport Beach. 22. Disturbance to or removal of potential bird nesting habitat shall be prohibited during the migratory bird nesting season (February 1 through August 31) unless a migratory bird nesting survey is completed. If demolition and/or vegetation removal is planned to occur during the migratory bird nesting season (February 1 through August 31), then a migratory bird nesting survey shall be completed in accordance with the following requirements: a. Within three (3) days prior to initiating demolition, tree removals and/or vegetation clearing, a nesting bird survey shall be conducted by a qualified biologist within the suitable habitat to be removed and within a 250-foot radius. b. If the survey reveals no active nesting, the proposed action may proceed. c. If the survey identifies the presence of active sensitive bird nests, then the nests shall not be disturbed unless the qualified biologist verifies through non-invasive methods that either (i) the adult birds have not begun egg-laying and incubation; or (ii) the juveniles from the occupied nests are capable of independent survival. d. If the biologist is not able to verify any of the conditions from sub-item “b,” above, then no disturbance shall occur within a buffer zone specified by the qualified biologist for each nest or nesting site. The buffer zone shall be species- appropriate (no less than 100-foot radius around the nest for non-raptors and no more than a 500-foot radius around the nest for raptors, or as otherwise determined by the qualified biologist) and shall be sufficient to protect the nest from direct and indirect impacts from construction activities. The nests and buffer zones shall be field checked approximately weekly by a qualified biological monitor. The approved buffer zone shall be marked in the field with construction 168 Planning Commission Resolution No. PC2023-043 Page 34 of 43 fencing, within which no vegetation clearing or ground disturbance shall commence until the qualified biologist with City concurrence verify that the nests are no longer occupied and/or juvenile birds can survive independently from the nests. 23. Any substantial modification to the approved Site Development Review plans, as determined by the Community Development Director, shall require an amendment to this Site Development Review application or the processing of a new application. 24. The project is subject to all applicable City ordinances, policies, and standards unless specifically waived or modified by the conditions of approval. 25. The applicant shall comply with all federal, state, and local laws. A material violation of any of those laws in connection with the use may be caused the revocation of the approved entitlements. 26. All proposed signs shall be in conformance with the provisions of Chapter 20.42 (Signs) of the Newport Beach Municipal Code. 27. A copy of the Resolution, including conditions of approval Exhibit “A” shall be incorporated into the Building Division and field sets of plans before issuance of the building permits. 28. Prior to the issuance of a building permit, the applicant shall submit a landscape and irrigation plan prepared by a licensed landscape architect. These plans shall incorporate drought-tolerant plantings and water-efficient irrigation practices, and the plans shall be approved by the Planning Division. 29. All landscape materials and irrigation systems shall be maintained by the approved landscape plan. All landscaped areas shall be maintained in a healthy and growing condition and shall receive regular pruning, fertilizing, mowing, and trimming. All landscaped areas shall be kept free of weeds and debris. All irrigation systems shall be kept operable, including adjustments, replacements, repairs, and cleaning as part of regular maintenance. 30. The site shall not be excessively illuminated based on the luminance recommendations of the Illuminating Engineering Society of North America, or, in the opinion of the Director of Community Development, the illumination creates an unacceptable negative impact on surrounding land uses or environmental resources. The Director may order the dimming of light sources or other remediation upon finding that the site is excessively illuminated. 31. Prior to the issuance of a building permit, the Applicant shall prepare photometric study for the Project in conjunction with a final lighting plan for approval by the Planning Division. All outdoor lighting fixtures shall be designed, shielded, aimed, located, and maintained to shield adjacent properties and to not produce glare onto adjacent 169 Planning Commission Resolution No. PC2023-043 Page 35 of 43 properties or roadways. Parking lot light fixtures and light fixtures on buildings shall be full cut-off fixtures. 32. Prior to the issuance of Final Certificate of Occupancy, the Applicant shall schedule an evening inspection by the Code Enforcement Division to confirm control of light and glare specified in conditions of approval. 33. Prior to the issuance of a building permit, the Applicant shall pay any unpaid administrative costs associated with the processing of this application to the Planning Division. 34. All noise generated by the proposed use shall comply with the provisions of Chapter 10.26 and other applicable noise control requirements of the Newport Beach Municipal Code. The maximum noise shall be limited to no more than depicted below for the specified periods unless the ambient noise level is higher: Between the hours of 7:00 AM and 10:00 PM Between the hours of 10:00 PM and 7:00 AM Location Interior Exterior Interior Exterior Residential Property 45dBA 55dBA 40dBA 50dBA Residential Property located within 100 feet of a commercial property 45dBA 60dBA 45dBA 50dBA Mixed Use Property 45dBA 60dBA 45dBA 50dBA Commercial Property N/A 65dBA N/A 60dBA 35. Should the property be sold or otherwise come under different ownership, any future owners or assignees shall be notified of the conditions of this approval by either the current business owner, property owner or leasing agent. 36. Construction activities shall comply with Section 10.28.040 of the Newport Beach Municipal Code, which restricts hours of noise-generating construction activities that produce noise to between the hours of 7:00 a.m. and 6:30 p.m., Monday through Friday, and 8:00 a.m. and 6:00 p.m. on Saturday. Noise-generating construction activities are not allowed on Sundays or Holidays. 37. All trash shall be stored within the building or within dumpsters stored in the trash enclosure (three walls and a self-latching gate) or otherwise screened from view of neighboring properties, except when placed for pick-up by refuse collection agencies. The trash enclosure shall have a decorative solid roof for aesthetic and screening purposes. Refuse collection shall comply with the loading a pick up location identified on approved plans. The Applicant’s property management company shall contract with a franchised hauler on the City list of authorized companies. 38. The applicant shall ensure that the trash dumpsters and/or receptacles are maintained to control odors. This may include the provision of either fully self-contained dumpsters or periodic steam cleaning of the dumpsters if deemed necessary by the Planning Division. Cleaning and maintenance of trash dumpsters shall be done in compliance 170 Planning Commission Resolution No. PC2023-043 Page 36 of 43 with the provisions of Title 14, including all future amendments (including Water Quality related requirements). 39. A qualified monitor, one from each consulting tribe (the Juaneño Band of Mission Indians - Acjachemen Nation, Gabrieleno Band of Mission Indians - Kizh Nation, and Gabrielino Tongva Indians of California), shall be retained and compensated as Native American Monitors for the project site prior to the commencement of any ground-disturbing activity to the completion of ground disturbing activities to monitor grading and excavation activities. A rotation schedule between the three tribes shall be established with the applicant. Voluntary monitoring by each consulting tribe is permitted on days that the tribe(s) is not scheduled to monitor. 40. The rotating monitors, one from each consulting tribe, shall be retained prior to the commencement of any “ground-disturbing activity” for the subject project at all project locations (i.e., both on-site and any off-site locations that are included in the project description/definition and/or required in connection with the project, including public improvement work if undertaken by the applicant). “Ground-disturbing activity” shall include, but is not limited to, any demolition that includes subterranean impacts, potholing, auguring, boring, grading, excavation, drilling, and trenching. 41. A copy of the executed monitoring agreement shall be submitted to the City prior to the commencement of any ground-disturbing activity, or the issuance of any permit necessary to commence a ground-disturbing activity. 42. The monitors shall complete daily monitoring logs that will provide descriptions of the relevant ground-disturbing activities, the type of construction activities performed, locations of ground-disturbing activities, soil types, cultural-related materials, and any other facts, conditions, materials, or discoveries of significance to the Tribe. Monitor logs will identify and describe any discovered TCRs, including but not limited to, Native American cultural and historical artifacts, remains, places of significance, etc., (collectively, tribal cultural resources, or “TCR”), as well as any discovered Native American (ancestral) human remains and burial goods. Copies of monitor logs shall be shared between the three monitors and provided to the project applicant/lead agency upon written request to the monitors. 43. On-site tribal monitoring shall conclude upon the latter of the following (1) written confirmation to the consulting tribes from a designated point of contact for the project applicant/lead agency that all ground-disturbing activities and phases that may involve ground-disturbing activities on the project site or in connection with the project are complete; or (2) a determination and written notification by the consulting tribes to the project applicant/lead agency that no future, planned construction activity and/or development/construction phase at the project site possesses the potential to impact TCRs of the consulting tribes. 44. Upon discovery of any TCRs, all construction activities in the immediate vicinity of the discovery shall cease (i.e., within the surrounding 50 feet) and shall not resume until the discovered TCR has been fully assessed by the monitor and/or archaeologist. The 171 Planning Commission Resolution No. PC2023-043 Page 37 of 43 monitors will recover and retain all discovered TCRs in the form and/or manner the tribes deem appropriate, in the tribes’ sole discretion in coordination with the applicant, and for any purpose the tribes deem appropriate, including for educational, cultural and/or historic purposes. 45. Native American human remains are defined in PRC 5097.98 (d)(1) as an inhumation or cremation, and in any state of decomposition or skeletal completeness. Funerary objects, called associated grave goods in Public Resources Code Section 5097.98, are also to be treated according to this statute. 46. If Native American human remains and/or grave goods are discovered or recognized on the project site, then Public Resource Code 5097.9 as well as Health and Safety Code Section 7050.5 shall be followed. 47. Human remains and grave/burial goods shall be treated alike per California Public Resources Code section 5097.98(d)(1) and (2). 48. Preservation in place (i.e., avoidance) is the preferred manner of treatment for discovered human remains and/or burial goods. 49. Any discovery of human remains/burial goods shall be kept confidential to prevent further disturbance. 50. To the fullest extent permitted by law, the applicant shall indemnify, defend and hold harmless the City, its City Council, its boards and commissions, officials, officers, employees, and agents from and against any claims, demands, obligations, damages, actions, causes of action, suits, losses, judgments, fines, penalties, liabilities, costs, and expenses (including without limitation, attorney’s fees, disbursements, and court costs) of every kind and nature whatsoever which may arise from or in any manner relate (directly or indirectly) to City’s approval of Residences at 1400 Bristol Street including, but not limited to General Plan Amendment, Planned Community Development Plan Amendment, Major Site Development Review, Affordable Housing Implementation Plan, Development Agreement, Addendum to the 2006 General Plan Update Program Environmental Impact Report, and Traffic Study, PA2022-0296. This indemnification shall include, but not be limited to, damages awarded against the City, if any, costs of suit, attorney’s fees, and other expenses incurred in connection with such claim, action, causes of action, suit, or proceeding whether incurred by the applicant, City, and/or the parties initiating or bringing the such proceeding. The applicant shall indemnify the City for all the City's costs, attorneys' fees, and damages that which City incurs in enforcing the indemnification provisions outlined in this condition. The applicant shall pay to the City upon demand any amount owed to the City under the indemnification requirements prescribed in this condition. Public Works Department 172 Planning Commission Resolution No. PC2023-043 Page 38 of 43 51. All improvements shall be constructed as required by Ordinance and the Public Works Department. 52. An encroachment permit shall be required for all work activities within the public right of way. 53. The final Construction Management Plan (CMP) shall be reviewed and approved by the Community Development Director and the City Traffic Engineer prior to building permit issuance. 54. A Parking Management Plan (PMP) shall be reviewed and approved by the Community Development Director and City Traffic Engineer prior to building permit issuance. The PMP shall include information regarding gate operation, move-in and move-out, ride share area, guest parking areas and residential parking areas. 55. Parking layout and ramp slopes shall comply with the City Parking Lot Standard 805. Dead-end drive aisle in public areas and/or unassigned parking areas shall provide a dedicated turn around space and minimum 5-foot drive aisle extension. 56. The applicant shall reconstruct all existing broken and/or otherwise damaged curb, gutter and sidewalk along the Spruce Street and Bristol Street North frontages per City Standards. 57. The applicant shall construct an 8-foot wide sidewalk along the Bristol Street North frontage and dedicate all applicable easements to the City to accommodate the 8-foot wide sidewalk. 58. The applicant shall provide an additional 2-foot wide easement along the Bristol Street North frontage for sidewalk purposes to accommodate a 10-foot wide sidewalk. The applicant shall construct a 10-foot wide sidewalk along the Bristol Street North project frontage when other developments in the area occurs and/or future pedestrian/cyclist volumes/usage increase, as directed by the Public Works Department. 59. The applicant shall provide a 6-foot wide sidewalk around the proposed pull-out area. The applicant shall dedicate all applicable easements to the City to accommodate the 6-foot wide sidewalk. 60. All deliveries shall be accommodated on-site and prohibited from parking or stopping within the public right of way. Only ride share vehicles shall be permitted to utilize the pull-out area located on Spruce Street. 61. The proposed driveway shall be constructed per City Standard 161. The radius for the Bristol Street North driveway shall be minimum 20-foot radius and the radius for the Spruce Street driveway shall be 15-foot minimum. 62. All on-site fire hydrants shall be privately owned and maintained. 173 Planning Commission Resolution No. PC2023-043 Page 39 of 43 63. An encroachment permit and encroachment agreement shall be obtained for the proposed pedestrian bridge located across Spruce Street. The bridge vertical clearance heights shall comply with latest Caltrans Highway Design Manual. 64. All landscaping along the Spruce Street and Bristol Street North frontages shall comply with the City’s line of sight standard 105. 65. Final design of the water and sewer services is subject to further review by the Public Works Department during plan check. 66. Final design of the modified storm drain inlets is subject to further review by the Public Works Department during plan check. 67. The Spruce Avenue entrance shall be designed to accommodate a turnaround area prior to the garage entry and a minimum 3 vehicle queue prior to the call box. The turnaround shall comply with the AASHTO turning templates. The vehicle queue shall be located entirely outside of the Spruce Avenue right-of-way. 68. Prior to the issuance of a Certificate of Occupancy, the Applicant shall coordinate with the City to complete the required off-site improvements identified in the Sewer Capacity Study dated August 11, 2023, to the satisfaction of the Public Works and Utilities Directors. The Applicant shall be responsible for their fair share cost of the improvements as determined by the City, which may include the payment and construction of the entire improvement. Building Division 69. The applicant is required to obtain all applicable permits from the City’s Building Division and Fire Department. The construction plans must comply with the most recent, City- adopted version of the California Building Code. The construction plans must meet all applicable State Disabilities Access requirements. Approval from the Orange County Health Department is required before the issuance of a building permit. 70. The applicant shall employ the following best available control measures (“BACMs”) to reduce construction-related air quality impacts: Dust Control • Water all active construction areas at least twice daily. • Cover all haul trucks or maintain at least two feet of freeboard. • Pave or apply water four times daily to all unpaved parking or staging areas. • Sweep or wash any site access points within two hours of any visible dirt deposits on any public roadway. • Cover or water twice daily any on-site stockpiles of debris, dirt, or other dusty material. • Suspend all operations on any unpaved surface if winds exceed 25 mph. Emissions • Require 90-day low-NOx tune-ups for off-road equipment. 174 Planning Commission Resolution No. PC2023-043 Page 40 of 43 • Limit allowable idling to 30 minutes for trucks and heavy equipment Off-Site Impacts • Encourage carpooling for construction workers. • Limit lane closures to off-peak travel periods. • Park construction vehicles off traveled roadways. • Wet down or cover dirt hauled off-site. • Sweep access points daily. • Encourage receipt of materials during non-peak traffic hours. • Sandbag construction sites for erosion control. Fill Placement • The number and type of equipment for dirt pushing will be limited on any day to ensure that SCAQMD significance thresholds are not exceeded. • Maintain and utilize a continuous water application system during earth placement and compaction to achieve a 10 percent soil moisture content in the top six-inch surface layer, subject to review/discretion of the geotechnical engineer. 71. All new construction shall comply with 2022 California Code Edition. 72. A grading bond shall be required prior to grading permit issuance. 73. A geotechnical report shall be submitted to the Building division for review prior to grading permit issuance. 74. A Water Quality Management Plan (WQMP) shall be submitted for review prior to grading permits issuance. 75. A drainage and hydrology study shall be submitted prior to grading permit issuance. 76. The Applicant is required to obtain all applicable permits from the City’s Building Division and Fire Department. The construction plans must comply with the most recent, City- adopted version of the California Building Code. The construction plans must meet all applicable State Disabilities Access requirements. Approval from the Orange County Health Department is required prior to the issuance of a building permit. 77. The Applicant shall employ the following best available control measures (“BACMs”) to reduce construction-related air quality impacts: Dust Control • Water all active construction areas at least twice daily. • Cover all haul trucks or maintain at least two feet of freeboard. • Pave or apply water four times daily to all unpaved parking or staging areas. • Sweep or wash any site access points within two hours of any visible dirt deposits on any public roadway. • Cover or water twice daily any on-site stockpiles of debris, dirt or other dusty material. • Suspend all operations on any unpaved surface if winds exceed 25 mph. 175 Planning Commission Resolution No. PC2023-043 Page 41 of 43 Emissions • Require 90-day low-NOx tune-ups for off road equipment. • Limit allowable idling to 30 minutes for trucks and heavy equipment. Off-Site Impacts • Encourage carpooling for construction workers. • Limit lane closures to off-peak travel periods. • Park construction vehicles off traveled roadways. • Wet down or cover dirt hauled off-site. • Sweep access points daily. • Encourage receipt of materials during non-peak traffic hours. • Sandbag construction sites for erosion control. Fill Placement • The number and type of equipment for dirt pushing will be limited on any day to ensure that SCAQMD significance thresholds are not exceeded. • Maintain and utilize a continuous water application system during earth placement and compaction to achieve a 10 percent soil moisture content in the top six-inch surface layer, subject to review/discretion of the geotechnical engineer. 78. Prior to the issuance of a grading permit, a Storm Water Pollution Prevention Plan (SWPPP) and Notice of Intent (NOI) to comply with the General Permit for Construction Activities shall be prepared, submitted to the State Water Quality Control Board for approval and made part of the construction program. The Project Applicant will provide the City with a copy of the NOI and their application check as proof of filing with the State Water Quality Control Board. This plan will detail measures and practices that will be in effect during construction to minimize the project’s impact on water quality. 79. Prior to the issuance of a grading permit, the Applicant shall prepare and submit a Water Quality Management Plan (WQMP) for the proposed project, subject to the approval of the Building Division and Code and Water Quality Enforcement Division. The WQMP shall provide appropriate Best Management Practices (BMPs) to ensure that no violations of water quality standards or waste discharge requirements occur. 80. A list of “good housekeeping” practices will be incorporated into the long-term post- construction operation of the site to minimize the likelihood that pollutants will be used, stored or spilled on the site that could impair water quality. These may include frequent parking area vacuum truck sweeping, removal of wastes or spills, limited use of harmful fertilizers or pesticides, and the diversion of storm water away from potential sources of pollution (e.g., trash receptacles and parking structures). The Stage 2 WQMP shall list and describe all structural and non-structural BMPs. In addition, the WQMP must also identify the entity responsible for the long-term inspection, maintenance, and funding for all structural (and if applicable Treatment Control) BMPs. 81. Prior to the building plan check submittal, the Applicant shall submit the Project for Building Code Preliminary Review. 176 Planning Commission Resolution No. PC2023-043 Page 42 of 43 82. The residential dwelling units and their common use areas shall comply with Housing Accessibility per Chapter 11A. 83. The nonresidential portion of the development shall comply with the public accommodation requirements per Chapter 11B. 84. The new bridge over Spruce Street shall comply with CBC Section 3104 and all of its sub-sections under the Pedestrian Walkways and Tunnels requirements. 85. The pedestrian bridge shall comply with accessibility requirements. Electrical, Mechanical, Plumbing 86. Prior to building permit issuance, project plans shall demonstrate compliance with the following: a. Below grade enclosed parking garage requires exhaust and ventilation per CMC 403.7.1 and Energy Code 120.6(c). b. Parking exhaust / ventilation from below grade must meet termination requirements based off CMC 502.2.2. Make up air for below grade parking garage shall be placed to avoid recirculation of contaminated garage air. c. Indoor air quality requirements for dwelling units shall follow Energy code section 160.2 which states that operable windows are not allowed as means for providing outside air to dwelling areas. d. Multifamily buildings shall meet the mandatory requirements for Electric Ready Buildings per Energy code section 160.9. Real Property Division 89. Prior to issuance of building permits for the pedestrian bridge, the Applicant shall demonstrate compliance with the following: a. Applicant shall enter a lease agreement with the City for use of air rights over the Spruce Street right-of-way. b. Applicant shall pay for the appraisal of air rights required prior to negotiation of lease terms. c. Insurance and surety bonds shall be required. 90. Final details of bridge design, including materials used, height and other dimensions shall be subject to landlord (City) review and approval. Fire Department 177 Planning Commission Resolution No. PC2023-043 Page 43 of 43 87. systems, and the emergency responder radio system shall be inspected and approved by the Fire Marshal. 88. Prior to the building permit issuance, a fire master plan shall be submitted and approved by the Fire Marshall. 89. Prior to any foundation permit issuance for the garage basement area, a temporary fire department access way, as approved by the Fire Department, shall be provided until the permanent fire access way is installed. Required fire and life safety systems, including the fire sprinkler system, shall be operational in the garage basement areas used for parking by the construction crews and for storage of building materials and construction equipment. 90. One elevator shall be gurney sized and equipped as a medical emergency elevator as CBC Section 3002. 91. Emergency responder radio coverage shall be required to comply with NBFD Guideline D.05 “Public Safety Radio Coverage” and CFC Section 510. 92. Emergency power and Standby Power System shall be required as per CFC Section 604.2.14. 93. An automatic sprinkler system shall be installed in accordance with CFC Section 903.2 amendment shall be provided throughout all buildings. 94. A standpipe system shall be required and installed as per CFC Section 905.3.1. 95. Fire Alarm system shall be provided as per CFC Section 907.2.9. 96. New pedestrian bridge shall meet all fire department access requirements and shall not obstruct access. 178 Attachment No. PC 2 Applicant’s Project Description 179 INTENTIONALLY BLANK PAGE180 1400 Bristol Street North Project Supplemental Project Description The Picerne Group Inc. (“Applicant”), applicant of the proposed project at 1400 Bristol Street North (the “Property”), hereby submits the following supplemental project description to the City of Newport Beach, Community Development Department. The 1400 Bristol Street North Project is a proposed 6-story apartment building comprised of 229 residential units, podium level amenity space, a business center, and 422 parking spaces within an on-grade parking garage with two subterranean levels (the “Project”). Residential units within the Project will include a mix of studios, one-bedroom units, and two-bedroom units ranging from 515 square feet (“sq. ft.”) to 1,469 sq. ft. The Project is located on 2.38 acre site at the corner of Bristol St N. and Spruce Ave. The current use is two, 2-story office buildings consisting of 38,764 sq. ft. and a surface parking lot. The Property is currently zoned Planned Community ("PC")-11 and designated as Industrial Site 3A, and is designated as General Commercial-Office (“CO-G”) under the City’s General Plan. Applicant proposes a PC Amendment to include the Property in the PC-11 Residential Overlay, and a General Plan Amendment to redesignate the property as Mixed Use Horizontal 2 (“MU- H2”) and obtain additional density, as described below. Of the 229 total units, 206 will be market rate units and 23 will be affordable units. The Project’s base density consists of 153 units (89 units from the conversion of the office building to residential and 64 additional units allocated to the Airport Area (Statistical Area L4), which are sought via a General Plan Amendment. The Project qualifies for a 50% density bonus (i.e., 77 units, of which 76 units are being utilized) in exchange for providing the necessary level of affordable housing. The 64 additional base units referenced above will not constitute a "major amendment" for purposes of Section 423 of the City's Charter. Under the State Density Bonus Law (“SDBL”),1 the Project is entitled to a 50% density bonus, three (3) concessions/incentives,2 and unlimited waivers from development standards that would physically preclude construction of the Project at the density sought.3 Applicant is requesting the following six (6) development waivers for the Project consistent with Government Code Sec. 65915(e)(1): 1. General Plan Park Dedication Requirement: Pursuant to General Plan Policy LU 16- 15.13, a public park equal to 8 percent of the gross land area of the total development, or a minimum one-half-acre, whichever is greater, shall be provided. This requirement would mandate a one-half-acre park on the 2.38 acre project site. The General Plan allows a waiver of its park dedication requirement where it can be demonstrated that the development parcels are too small to feasibly accommodate the park or inappropriately located to serve the needs of local residents. Here, the 2.38 acre Property is too small to feasibly accommodate a half- acre park with the 229 dwelling unit density that the Project proposes. Applicant therefore 1 Gov. Code §§ 65915 et seq. 2 Gov. Code § 65915(d)(2)(C). 3 Gov. Code § 65915(e). 181 requests a waiver of the General Plan Policy LU 16-15.13 public park dedication requirement. 2. PC-11 Development Standards Deviation (30-foot Street Setback): PC-11 development standards require street setbacks of 30 feet from the property line. A 30-foot setback would substantially reduce the Project’s development footprint, making it infeasible and impossible to support the proposed 229 dwelling units. Applicant therefore requests a waiver of the PC- 11 30-foot setbacks in favor of the following setbacks: (1) Spruce Avenue – 8 feet to the building; and (2) Bristol Street – 18 feet to the building. Balconies shall be allowed to encroach into the setbacks up to 5 feet. 3. PC 11-Development Standards Deviation (Building Height): PC-11 development standards limit building heights to 55 feet. Given the constraints imposed by the street setbacks, the perimeter road, and the utilities required to serve the Property, imposition of the 55 foot height limit would physically preclude the development of the proposed 229 dwelling units. The proposed building height is 85 feet. 4. Newport Beach Municipal Code Private Open Space: Newport Beach Municipal Code Section 20.18.030 (Table 2-3) requires a minimum of 5% of the gross floor area of each unit to be set aside as private open space with a minimum dimension of 6 feet. The Project’s studio dwelling units and 9 two-bedroom units (including 4 units which provide 2 square feet less than the private open space requirement) are unable to achieve these minimum private open space standards given their size and location. Therefore, Applicant requests a waiver from this private open space requirement since adherence to this development standard would physically preclude the Project as proposed. 5. Newport Beach Municipal Code Common Open Space: Newport Beach Municipal Code Section 20.18.030 (Table 2-3) requires a minimum of 75 square feet/unit (17,175 sf total) to be designated as common open space. The applicant requests a waiver to reduce the 75 square feet/unit (17,175 sf total) requirement to approximately 60 square feet/unit (13,800 sf total, or 3,375 sf less than the City requirement). This waiver is necessary in order to accommodate the project’s proposed density given the constraints imposed by the street setbacks, the perimeter road, and the utilities required to serve the project site. 6. General Plan Land Use Policy 6.15.7: General Plan Land Use Policy 6.15.7 (Overall Density and Housing Type) and Section IV.A.4 of the PC-11 zoning standards prescribe a density range of 30-50 dwelling units per acre ("du/ac"). The Project proposes 153 “base” units on a 2.38 acre parcel, which equates to 64 du/ac. The Project's 153 base units are comprised of 89 units from the conversion of the office building to residential and 64 additional units allocated to the Airport Area (Statistical Area L4) under the General Plan. The Project qualifies for a 50% density bonus (i.e., 77 units) in exchange for providing the necessary level of affordable housing. To the extent required, Applicant requests a waiver from the maximum base density standards under LU Policy 6.15.7 and Section IV.A.4 of the PC-11 in order to construct the Project at the density sought. In addition, Applicant requests the following concession/incentive under SDBL and Newport Beach Municipal Code Section 20.32.050: allow for a range of affordable unit sizes that does not proportionally reflect the range of unit sizes provided in the project as a whole, as required by Newport Beach Municipal Code Section 20.32.070.A. The range of affordable unit sizes will be reflected in the Project’s Affordable Housing Implementation Plan (“AHIP”). Consistent with 182 Newport Beach Municipal Code Section 20.32.050, this concession/incentive (1) is necessary in order to make the housing units economically feasible; (2) would not have a specific adverse impact (as defined in Government Code Section 65589.5(d)(2)) upon public health and safety or the physical environment, or on any real property listed in the California Register of Historical Resources; and (3) would not be contrary to State or Federal law. Specifically, by reducing construction costs associated with larger affordable unit sizes and the project’s development fees, the requested concession/incentive would result in an actual and identifiable cost reductions for the provision of affordable housing at the Project.4 Applicant reserves the right to request additional waivers and use remaining concessions/incentives to the extent required. 4 Gov. Code § 65915(k). 183 INTENTIONALLY BLANK PAGE184 Attachment No. PC 3 Construction Management Plan 185 INTENTIONALLY BLANK PAGE186 PRELIMINARY CONSTRUCTION MANAGEMENT PLAN for 1400 Bristol 1400 Bristol St N. Newport Beach, CA 92660 187 Table of Contents 1.0 PROJECT INTRODUCTION 1.1 Project Location 1.2 Construction Project Description 1.3 Scope of Work 1.4 Sequence of Developer Work 2.0 PROJECT IMPLEMENTATION 2.1 Dates of Construction 2.2 Hours of Construction 2.3 Sequence of Site Improvement Construction 2.4 Construction Schedule 2.5 Construction Equipment 3.0 PARKING MANAGEMENT 3.1 Construction Parking Details 3.2 Staging Areas 3.3 Construction Trailer, Materials Storage, and Waste Management 4.0 TRAFFIC CONTROL 4.1 Haul Routes 4.2 Delivery Requirements 4.3 Traffic Control Plan 5.0 SAFETY AND SECURITY 5.1 Pedestrian Protection 5.2 Project Fencing 5.3 Safety and Security 6.0 AIR QUALITY CONTROL, FUGITIVE DUST CONTROL, NOISE SUPPRESSION, AND VIBRATION MONITORING 6.1 Emissions/Air Quality Control 6.2 Fugitive Dust Control 6.3 Noise Control 6.4 Noise Control Consideration 7.0 ENVIRONMENTAL COMPLIANCE/ PROTECTION 7.1 Erosion, Sediment Control and Beach Protection 7.2 Water Quality Control 188 1.0 PROJECT INTRODUCTION Developer: The Picerne Group, Inc. 5000 Birch Street Suite 600 Newport Beach, CA 92660 Attn: Satish Lion Facsimile: 949-487-6263 Phone: 949-267-1553 General Contractor: Picerne Construction Company LLC 1.1 Project Location The subject property (the "Site") consists of Parcel 427-332-02 project location is shown below in Figure 2. 1.2 Construction Project Description The construction project (the "Project") consists of 229 for lease apartments. The structure consists of a single Type III wood framed building over a Type I subterranean parking garage. Site work shall consist of connections for electrical, internet, domestic and fire water, and sewer. 1.3 Construction Management Plan This Construction Management Plan (“CMP”) is designed to minimize the Project's impact to the public. The General Contractor and all sub-contractors shall adhere to all provisions as stated in this CMP. This CMP shall remain in effect from start of demolition through Certificate of Occupancy. 1.4 Sequence of Work Phase I Site Improvements Site Improvement Construction includes excavation, shoring, retaining walls, wet utilities, dry utilities, and interior access road, curbs, and gutters. Construction of the building structure may or may not be concurrent. Phase II Residential Building The building structure consists of the parking garage, wood framed structure and all mechanical, electrical, and plumbing work associated for a complete product. The entrances from Spruce and Bristol Street N. will be utilized during construction as stabilized construction entrances. Permanent driveway construction to be completed at the end of the project to avoid damage. Construction fence and gates will be installed along the perimeter limits of the project improvements. The pedestrian bridge is to be constructed entirely offsite and be installed over the course of one week following top out of the podium structure. (Figure 1) 189 Figure 1 - Fencing Requirements *Final location of construction fence to be approved by Public Works to ensure fencing will not impact line of sight, including the intersection of Spruce Street and Bristol Street N Figure 2 - Site Location and Boundaries 190 Figure 3 - Building Site Plan 2.0 PROJECT IMPLEMENTATION 2.1 Project Duration The project duration is appx. 26 months. Start date is TBD. 2.2 Hours of Construction Site improvement construction activities will be restricted to Weekdays from 7:00 am to 6:30 pm and Saturdays from 8:00 am to 6:00 pm per City of Newport Beach Municipal Code 10.28.040. 2.3 Sequence of Construction Demo and Site Work (2 months) • Demo of parking area and office buildings Shoring and Excavation (2 months) – 10 workers • Export and Shoring - Soil export of garage will be approximately 60,000CY. It is anticipated that as much as 2,240 CY per day or 120 loads/trips. Shoring construction along four sides will be concurrent with the export activities. No staging in public right-of-way. Staging will occur entirely on site. • Haul route permit shall be obtained from Public Works department prior to hauling. Garage Concrete Construction (7 months) – 30 Workers • This operation includes foundation excavations, forming, foundation steel, concrete, shot-crete, post tensioned concrete and structure backfill. • Approximately 1,308 concrete truck trips. • No staging in the public right-of-way. Staging will occur entirely on site. 191 Vertical Wood Framing and MEPS (15 months) – 75 Workers • Wood framing, Mechanical, Electrical, Plumbing, Fire sprinklers • Approximately 75 delivery trips. Exterior and interior finishes (4 months) – 75 Workers • This operation includes exterior facades, roofing, drywall, interior finishes, and landscaping and overlaps with the vertical wood framing construction and MEPS • Approximately 125 delivery trips. 192 2.4 Construction Schedule A complete and final building schedule will be generated by the General Contractor. Below is a typical one building structure schedule. Dates subject to change. 2.6 Construction Equipment Construction equipment for the Project can include the following: Compressors Concrete Mixer and pumper Conveyor (electrical) Dozer Drill Rig Dump Trucks Excavator Flatbed delivery trucks Loader Ram Hoe Backhoe Hand Tools Pneumatic Nailers Drills Crane Man-lift All Terrain Forklift 193 Pick Up Truck 194 3.0 PARKING MANAGEMENT 3.1 Construction Parking Details 3.1.1 On-Site Parking for contractor employees and construction crew members Construction parking will be accommodated at 1300 Bristol during garage construction and will move into the garage upon completion. No shuttle will be required. There is sufficient parking to accommodate the workforce for the duration of the project. Construction workers shall not park in the public streets. See Figure 4 for parking layout. 3.1.2 Short Term Parking Short-term visitors to the Site such as City inspectors, City staff, engineers, consultants, and owner’s representatives will be accommodated on-site at the construction office trailer location. Figure 4 - Parking During Construction 195 3.2 Staging Areas During the duration of construction for the building improvements described in this CMP, all equipment and material shall be staged on site. During the initial stages of concrete construction, framing and drywall materials will be located approximately in Area #1. Staging of materials on interior street shall not interfere with emergency access for first responders. After framing and drywall, most materials will be placed as needed into units and corresponding locations as required and in temporarily in Area #2 on the podium deck. No staging of materials shall be permitted within the public right-of-way (Figure 5) Figure 5 - Staging Area During Construction 3.3 Construction Trailer, Materials Storage, and Waste Management A temporary field office will be set up on the Site within the property and will be equipped with power, phone, and internet. Temporary toilet facilities will be provided on the Site near the construction office. See Figure 4. 196 4.0 TRAFFIC CONTROL 4.1 Haul Routes and Deliveries Haul operations shall be monitored by the General Contractor. The following conditions shall apply with respect to haul routes and hauling activities when applicable (see Figure 6 for haul map): • The haul route to and from the project site for all dirt haul operations will be from California State Route 73 South, exiting on SE Bristol St, making a left turn onto Jamboree Road, then a left turn to Bristol St N. and entering from Spruce. Trucks will exit from Spruce, making a right-hand turn to Bristol St N and back onto the 73 North. The contractor will obtain a Haul Route Permit from the City of Newport Beach as required. • For the export portion of the project, General Contractor will hire a hauling contractor. The hauling contractor will prepare a truck haul route plan, which would include the approximate number of truck trips, the hours during which transport activities are expected to occur and measures to keep all haul routes clean and free of debris/gravel/dirt attributable to the hauling operation of the project site including required sweeping. It is anticipated that export hauling will commence with the beginning of the residential project and consist of approx. 60,000 cubic yards of export. A haul route permit shall be obtained from the Public Works Department prior to any hauling activity. • During the excavation and hauling phase, the staging of construction vehicles will always be accommodated on-site. No staging of haul vehicles will be done in public right-of-way, and it will be ensured that they will not arrive prior to 7:00 a.m. on weekdays and 8:00 a.m. on weekends consistent with the municipal code. • The City of Newport Beach Public Works Department will be notified prior to beginning any haul period of more than ten trucks per day. If hauling is suspended, the City will be notified when hauling will resume. • All trucks leaving the Site during excavation operations will be watered down before entering the City streets and shall be covered or have water applied to the exposed surface to prevent dust from impacting the surrounding areas. A minimum of 6” freeboard will be maintained between the top rail of the trailer and the surface of the material loaded. If there is any accumulation of construction mud at the entrances to the project site or nearby streets, such areas shall be cleaned (swept). The contractor will comply with the Best Management Practices (BMPs) as stipulated in the approved SWPPP and Water Quality Management Plans. The street shall be swept daily. • Deliveries to the Site during the construction period will be scheduled to minimize the impact to the public when at all possible. • All trucks and construction personnel traffic will enter and exit the site using the existing driveways. All truck traffic will be coordinated at times which will cause the least inconvenience to the public. • All trucks and construction-related vehicles exiting the project site shall yield to public traffic. • Traffic control plans will be submitted to the City prior to building permit issuance. • The General Contractor will maintain the temporary green screen chain link fence along the project site perimeter during excavation as a pedestrian safety precaution located out of the line of sight. This will not impact the line of sight at the entrances and intersection of Spruce Street and Bristol Street N. • The General contractor will have a designated flagman controlling the logistics of all deliveries. The designated employee shall be responsible for controlling vehicular traffic as required for the duration of the project. 197 Figure 6 - Haul Route 4.2 Delivery Requirements • All deliveries will use the Haul Route (Figure 6) • All delivery of material and storage of material will occur on-site. • No deliveries before 7:00 AM on weekdays and 8:00 AM on Saturdays. 4.3 Traffic Control Plan • A traffic control plan will be prepared, signed, and stamped by a California Registered Traffic Engineer for any temporary street, sidewalk, parking, or lane closures. A Temporary Street and Sidewalk Closure Permit will be obtained from the City of Newport Beach Public Works Department, Traffic Engineering Division for the above-mentioned closures. No full street closures are anticipated. • General Contractor will monitor to ensure safe and efficient traffic flow and, if necessary, meet with the City Traffic Engineer / Community Development Director to propose any necessary modifications. The City Traffic Engineer / Community Development Director shall monitor the ongoing construction operation and, if necessary, is authorized to modify the construction traffic management and control plan to ensure safe and efficient traffic flow. • Traffic control will be coordinated with the Police Department and Public Works Department, Traffic and Development Services Division, to minimizes public impact. 198 5.0 SAFETY AND SECURITY 5.1 Pedestrian Protection Currently, there is a pedestrian sidewalk adjacent to the Site, along Bristol St N. and Spruce Ave. Secure fencing will be installed to foster pedestrian safety. At various times prior to the construction buildings, a temporary street and or sidewalk closure permit may be required so that the walk may be closed for pedestrian use due to the installation of landscaping, permanent public sidewalks, and other misc. activities. 5.2 Project Fencing The entire perimeter of the Site will be fenced with a 6’ foot high fence. Two gates, one at Bristol St N and one at Spruce St. (see Figure 1). will provide access into the Site and will be locked for security at the end of each day. Final location of construction fence to be approved by Public Works to ensure fencing will not impact line of sight. This also applies to the intersection of Spruce Street and Bristol Street N. 5.3 Safety and Security Appropriate signage will be posted at the Site indicating "No Trespassing," "Hard Hat Required," "Authorized Personnel Only," and other visitor and delivery information. Daily safety inspections will be done by the onsite superintendent as well as monthly inspections by the contractor provided safety consultant. 6.0 AIR QUALITY CONTROL, FUGITIVE DUST CONTROL AND NOISE SUPPRESSION 6.1 Emissions/Air Quality Control Construction activities will follow the 2022 Air Quality Management Plan (AQMP) adopted by the South Coast Air Quality Management District and all Mitigation Measure and Conditions of Approval to reduce air pollution and emissions impact. 6.2 Fugitive Dust Control The project shall comply with the Fugitive Dust Emission and Control Plan approved by the South Coast Air Quality Management District (under District Rule 403) and all Mitigation Measure and Conditions of Approval. Dust will be minimized using water as control. During grading activities, any exposed soil areas shall be watered as needed daily. Stockpiles of crushed cement, dirt or other materials shall be covered or watered as needed daily. In addition, trucks carrying soil and debris shall be wetted or covered prior to leaving the Site. On windy days, or when fugitive dust can be observed leaving the Site, additional applications of water shall be applied to maintain minimum moisture content as defined by SCAQMD Rule 403. Soil disturbance shall be terminated whenever wind conditions exceed 25 miles per hour. 6.3 Noise Control Construction activities will adhere to the hours prescribed by the City of Newport Beach's Noise Ordinance (Municipal Code Section 10.28.040). Specifically, construction activities will be restricted to Weekdays from 7:00 am to 6:30 pm and Saturdays from 8:00 am to 6:00 pm. No work on Sundays or holidays. 6.4 Noise Control Consideration Noise from construction activities on this project will be a function of the noise generated by individual construction equipment items (as listed in Section 2.6 Construction Equipment), the equipment location (much of this construction noise 199 will be insulated by distance from buildings and the depth of the excavation), and the timing and duration of noise-generated activities. It is important to note that all equipment is not generally operated continuously or used simultaneously. The number, type, distribution, and usage of construction equipment will differ from phase to phase. The noise generated is both temporary in nature and limited in hours by the City's Noise Ordinance (Section 10.28.040). 7.0 ENVIRONMENTAL COMPLIANCE/ PROTECTION 7.1 Erosion, Sediment Control and Beach Protection Per the State's NPDES permit, the project has prepared a Storm Water Pollution Prevention Plan (SWPPP) with erosion control measures to ensure soils resulting from grading and earthwork activities are prevented from leaving the Site In addition, an erosion control plan will be provided with the project's rough grading plan per the project's conditions of approval. Please refer to Storm Water Pollution Prevention Plan prepared by Hall & Foreman for more detailed information. 7.2 Water Quality Control The Project has prepared a Water Quality Management Plan which incorporates a variety of BMPs that will be used onsite to control predictable pollutant runoff. Please refer to conceptual Water Quality Management Plan (WQMP). General Contractor shall hire a third-party inspector to inspect compliance with the projects SWPPP and BMPs weekly and before any rain event. 200 Attachment No. PC 4 Addendum to the 2006 General Plan EIR Available separately due to bulk at: www.newportbeachca.gov/ceqa 201 INTENTIONALLY BLANK PAGE202 Attachment No. PC 5 Fiscal Impact Analysis 203 INTENTIONALLY BLANK PAGE204 3527 Mt. Diablo Blvd. #248, Lafayette, CA 94549 ◼ Tel 925.934.8712 www.adeusa.com MEMO TO: Liz Westmoreland, Senior Planner City of Newport Beach FROM: Doug Svensson DATE: August 14, 2023 SUBJECT: Fiscal Analysis for the 1400 Bristol St. North Project INTRODUCTION The fiscal analysis uses the Newport Beach Fiscal Impact Model to help calculate revenue and cost impacts of the proposed project. This model was initially developed in support of the General Plan Update, which was adopted in 2006.1 The model has been updated to reflect Fiscal Year 2023-2024 costs and revenues from the Adopted Newport Beach City Budget. The fiscal impact model calculates public service impacts for specific land uses that support the residential population, the employment base and the visitor population in Newport Beach. It also calculates the public revenues that each type of land use typically generates for the City, including property taxes, sales taxes and other taxes as well as a variety of user charges and fees. The fiscal impact model is designed to calculate the average cost of public services required by new development, on the assumption that new development affects City services in approximately the same way that existing development does. The model nets out certain costs that are unlikely to change with expansion of City government, such as the number of City Department Directors and Division managers, as well as the City Council and City Clerk expenditures, but otherwise assumes that City administrative support and overhead tends to increase as City government activities grow to provide services to an expanding population and employment base. Over the long term, this is clearly the dynamic that local governments experience. In the short term, development projects may have 1 A technical description of the fiscal impact model may be found in: Applied Development Economics, Fiscal Impact Analysis and Model, Newport Beach General Plan Update, January 2004. 205 A p p l i e d D e v e l o p m e n t E c o n o m i c s | P a g e 2 lower or higher cost impacts depending on the existing capacity of City services to accommodate more development, and the level of expenditure needed to expand services incrementally if existing capacity is not available. PROJECT DESCRIPTION THE PROPOSED PROJECT The proposed project would convert two existing 2-story office buildings, with a total of 38,764 sq. ft., to a 6-story apartment building comprised of 230 residential units, podium level amenity space, a business center and parking. Residential units within the project will include a mix of studios, one- bedroom units, and two-bedroom units ranging from 515 sq. ft. to 1,469 sq. ft. Of the 230 total units, 207 will be market rate units and 23 will be affordable units. SOCIOECONOMIC CHARACTERISTICS In order to calculate the fiscal effects of the proposed changes, it is necessary to estimate certain socio-economic characteristics of the land uses, including population and employment, assessed value, household spending on taxable retail goods in Newport Beach, and direct sales taxes from the existing non-residential uses. Based on 2023 data from the State Department of Finance, the average household size in Newport Beach is 2.17 persons, which would imply the proposed project would have a resident population of 499 persons. The existing office uses are estimated to support 141 jobs based on standard employee density ratios for office space. The assessed value for the proposed project has been derived from analysis of estimated rents for the proposed project and multifamily unit sales in Newport Beach over the past year July 2022 – July 2023. The project sponsor provided bedroom counts and units sizes in square feet for one model of studio and six models each for one-bedroom and two-bedroom units. The average units sizes are 515 sq. ft. for studios, 776 sq. ft. for one-bedroom and 1,250 sq. ft. for two-bedrooms. ADE researched current asking rents for several major apartment complexes in Newport Beach on the Zillow website (Table 1). The average rents for units that are available ranged from $5.54/sq. ft. for studios to $3.87/sq. ft. for two-bedroom units. Applying these averages to the units in the proposed project, average rents would range from $2,850 for studios to $4,840 for two-bedroom units (Table 2). These are market rate rents. The rents for affordable units are specified under HUD guidelines for Orange County and range from $1,042 for studios (1-person household) to $1,340 for two bedroom units (combined 3- and 4-person households). In terms of assessed value for the units for property tax purposes, ADE obtained sales records for 198 multi-family and condominium units that sold between July 2022 and July 2023 in Newport Beach. As shown in Table 3, while there is some variation in sales price for condos based on the age of the units, there is no correlation with age for units classified as multi-family units in this sample. Also, there is no correlation based on whether the units are owner occupied or rented. In most market settings, however, we would expect for-sale units to carry a higher value than rental units. 206 A p p l i e d D e v e l o p m e n t E c o n o m i c s | P a g e 3 TABLE 1: SELECTED APARTMENT ASKING RENTS, NEWPORT BEACH, AUGUST 2023 PROJECT/SIZE STUDIO 1 BDRM 2 BDRM One Uptown Newport - 21 Units Sq. Ft. 515 839 1,147 Monthly Rent $3,039 4,079 5,313 Rent/Sq. Ft $5.90 $4.86 $4.63 Newport North - 18 Units Sq. Ft. 779 1,056 Monthly Rent 3,170 3,756 Rent/Sq. Ft $4.07 $3.56 Colony at Fashion Island - 28 Units Sq.Ft. 1,087 1,395 Monthly Rent $4,480 5,095 Rent/Sq. Ft $4.12 $3.65 Newport Bluffs - 46 Units Sq. Ft. 549 795 1,104 Monthly Rent $3,050 3,429 4,141 Rent/Sq. Ft $5.56 $4.31 $3.75 Park Newport - 51 Units Sq. Ft. 513 745 1,163 Monthly Rent $2,650 3,120 3,951 Rent/Sq. Ft $5.17 $4.19 $3.40 Total Average Rent/Sq. Ft $5.54 $4.38 $3.87 Source: ADE, Inc., based on data obtained from Zillow.com TABLE 2: AVERAGE UNIT SIZES AND PROJECTED RENT LEVELS FOR PROPOSED 1400 BRISTOL PROJECT UNIT TYPE SIZE MARKET RATE AFFORDABLE TOTAL UNITS NO. RENT/ SQ. FT. RENT/ UNIT NO. RENT/ SQ. FT. RENT/ UNIT Studio 515 36 $5.54 $2,850 4 $2.02 $1,042 40 1 Bdrm 776 110 $4.38 $3,400 12 $1.53 $1,191 122 2 Bdrm 1,250 61 $3.87 $4,840 7 $1.07 $1,340 68 207 23 230 Source: ADE, Inc. In order to correlate the anticipated rent levels for the proposed units with the sales data in Table 3, ADE researched recent cap rates in the multi-family real estate market.2 Data published by CBRE, Inc. indicate that cap rates for multi-family developments in the Los Angeles market area in 2022 ranged from 4.0% to 4.5%.3 Based on the rent levels estimated for the proposed project in Table 2, the overall average building value of $1,111 per sq. ft. shown in Table 3 would be equivalent to a cap rate 2 In investment terms, rental projects create a stream of revenue for the building owner and the capitalization (“cap”) rate calculates how much an investor would be willing to pay for that income stream. 3 CBRE Research, “Underwriting Assumptions Exceed Pre-Pandemic Levels or Prime Multifamily Assets”. January 13, 2023. 207 A p p l i e d D e v e l o p m e n t E c o n o m i c s | P a g e 4 of about 4.2%, which falls within the reported range. Therefore, for the property tax analysis in this report, we have used an average assessed value for the proposed project market rate units of $1,100 per sq. ft. For the affordable units, the value is prorated to $364 per sq. ft. based on the difference in rent levels. Based on these values, the apartment units would have an aggregate assessed value of $205.6 million. TABLE 3: AVERAGE SALES PRICES PER SQ. FT. FOR MULTI-FAMILY SALES IN NEWPORT BEACH, 2022-2023 UNIT CLASSIFICATION YEAR BUILT NO. OF ADDRESSES AVERAGE SALES PRICE PER SQ. FT. Multi-Family 1924-1977 37 $1,337 Condominium 1960-1997 140 $981 Condominium 2001-2012 12 $1,098 Condominium 2015-2021 9 $1,392 Total Average 198 $1,111 Value Assumed for 1400 Bristol Market Rate Units $1,100 Value Assumed for 1400 Bristol Affordable Units $364 Source: ADE, Inc., based on data obtained from CoreLogic, Inc. The analysis uses the monthly rent levels to estimate household income and taxable retail spending, as shown in Table 4. We assume that monthly housing cost comprises 30 percent of household income, resulting in household incomes ranging from $47,450 to $193,500 per year. ADE has analyzed consumer expenditure surveys published by the Bureau of Labor Statistics, and at these income levels, households typically spend less than 30 percent of their income on taxable retail goods, and the percentages decline as income goes up. We have assumed for purposes of these calculations that households would spend two-thirds of their annual retail budget in Newport Beach, and the remaining one-third would be spent at retail centers in other cities or on out-of-town trips. The City receives sales tax at the rate of one percent of taxable sales. FISCAL IMPACTS The analysis, summarized in Table 5 below, estimates the projected fiscal impact of the proposed project as well as the estimated current impact of the existing office use on the site. For the residential project and office buildings, the primary revenue source generated for the City is the property tax. The City receives about 16 percent of the base property tax that property owners pay, but in addition the City gets a share of property tax from the state in lieu of vehicle license fees, which adds about ten percent to the total property tax revenues for Newport Beach. 208 A p p l i e d D e v e l o p m e n t E c o n o m i c s | P a g e 5 TABLE 4: ESTIMATES OF HOUSEHOLD INCOME AND SALES TAX GENERATION FOR NEWPORT BEACH UNIT TYPE INCOME PERCENT TAXABLE SALES UNITS TOTAL ANNUAL SALES TAX Affordable Units Studio $47,450 27.5% 4 $350 1 Bdrm $54,200 24.6% 12 $1,090 2 Bdrm $64,375 23.5% 7 $689 Market Rate Units Studio $114,124 20.0% 36 $5,499 1 Bdrm $135,955 19.9% 110 $19,910 2 Bdrm $193,500 18.4% 61 $14,607 Total 230 $42,145 Source: ADE, Inc. In addition to the property tax and sales tax, the residents of the proposed project would be expected to generate a variety of other more incidental revenues for the City General Fund, including fees for recreation programs, parking fees and fines, utility franchise fees and other permit revenue. The total General Fund revenue is projected to exceed $513,800 per year. In terms of non-General Fund revenue, the added population will contribute to the City receiving additional Gas Tax revenues from the state for street maintenance. Also, Measure M is a countywide sales tax fund which is used for transportation projects. The added taxable sales purchases made by project residents will add to these funds. The proposed project is estimated to cost the City more than $728,300 per year for services. The bulk of these costs are for police and fire protection, but they also include street maintenance and costs for recreation, library, and senior services as well as general government functions. The project site is in an intensely developed urban area of the City and existing service capacities are likely sufficient to provide services to the proposed uses on the site. However, with the more intensive residential uses, it may be expected that there would be some additional calls for service, particularly for public safety and perhaps traffic related incidents, compared to the existing use on the site. The service cost figures by Department in Table 5 are generally below levels equivalent to hiring an additional fulltime staff person, and it is possible that the service impacts would be an incremental increase of service activity for existing personnel. However, based on the fiscal model analysis the proposed project may cost the City nearly $174,000 per year over and above the revenues it generates. The existing office use is also estimated to generate a negative fiscal impact for the City, estimated at about $56,000 per year. This is consistent with the original General Plan Fiscal Analysis for office uses. Office uses have lower assessed values that residential and therefore create less property taxes. The figures in Table 5 are based on the assessed value of the site in 2022 prior to the recent purchase by 209 A p p l i e d D e v e l o p m e n t E c o n o m i c s | P a g e 6 the proposed project sponsors. At $11.85 million, the assessed value is equivalent to about $306 per sq. ft. for the office space. Office uses also generate much less sales tax than do retail uses, which generate a high positive fiscal benefit for the City. At times, office-based businesses have a point of sale operation that generates sales tax even though it is not a store front retail operation, but most often professional services, financial offices and other businesses that occupy office space do not provide taxable goods or services. Office workers do generate some sales taxes in restaurants and other retail stores. In terms of municipal services, however, the high employee densities in offices increase costs for traffic related services. The post-pandemic trends toward increased remote working may lessen this impact, but it also further reduces market values for office real estate. TABLE 5: PROJECTED FISCAL IMPACT OF THE PROPOSED PROJECT AT 1400 BRISTOL AND THE EXISTING OFFICE USE Budget Category Annual Revenues/Costs Proposed Project Existing Office Use REVENUES GENERAL FUND Property Tax $328,565 $18,940 Property Tax in lieu of Vehicle License Fees $33,686 $1,942 Sales Tax $42,145 $17,507 Transient Occupancy Tax $0 $0 Franchise Fees $4,681 $4,551 Business Licenses $0 $8,165 Other Intergovernmental $6,224 $1,762 Charges for Service $49,767 $14,086 Fines, Penalties, and Forfeitures $10,331 $2,924 Licenses and Permits $1,160 $328 Use of Property $24,649 $6,976 Other Revenue $9,699 $2,745 Interest Income $2,941 $460 SUBTOTAL GENERAL FUND $513,848 $80,386 GAS TAX $24,304 $0 MEASURE M $16,368 $2,249 SUBTOTAL OTHER FUNDS $40,672 $2,249 TOTAL REVENUE $554,519 $82,636 EXPENDITURES GENERAL FUND General Government $49,778 $9,479 Police $201,057 $40,762 Fire $171,664 $41,071 Public Works $136,667 $38,680 Community Development $9,918 $2,807 Community Services $150,527 $0 SUBTOTAL GENERAL FUND $719,610 $132,800 GAS TAX $5,095 $3,439 MEASURE M $3,639 $2,456 SUBTOTAL OTHER FUNDS $8,734 $5,896 TOTAL EXPENDITURES $728,343 $138,695 NET (COST)/REVENUE ($173,824) ($56,059) Source: ADE, Inc. 210 A p p l i e d D e v e l o p m e n t E c o n o m i c s | P a g e 7 CONCLUSION The proposed rental residential use of the site would generate a negative fiscal impact for the City, substantially higher than the negative fiscal impact of the existing office use of the site. This consistent with the original fiscal analysis of residential uses in the 2006 General Plan, although in recent years some very high value luxury residential projects have shown a positive fiscal benefit. The 2006 General Plan designated the site for non-residential use, consistent with the office use. Overall, the General Plan increased development potential for commercial and lodging uses substantially, in addition to the new residential units it would permit. The net impact of the growth in land uses at buildout of the General Plan compared to existing land uses in 2006 when the plan was adopted, would result in a positive fiscal impact for the General Fund of $21.7 million per year.4 Therefore, the negative fiscal impact of the proposed project is well below the potential upside of other sites designated for non-residential development throughout the City. 4 Applied Development Economics, Fiscal Impact Analysis Land Use Element Amendment, April 4, 2014. p. 3. 211 Attachment No. PC 6 Public Comments 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 INTENTIONALLY BLANK PAGE232 Attachment No. PC 7 Project Plans 233 INTENTIONALLY BLANK PAGE234 1400 BRISTOL ST. N 3RD ENTITLEMENT SUBMITTAL AUGUST 11, 2023 SITE BR I S T O L S T . N 73 T O L L R O A D SPRUCE AVE235 TPG 1400 BRISTOL N. NEWPORT BEACH, CA TCA # 2022-144 3RD ENTITLEMENT SUBMITTAL AUGUST 11, 2023 G-0.1PROJECT INDEX PROJECT TEAM DEVELOPER: ARCHITECT: LANDSCAPE ARCHITECT: CIVIL ENGINEER: PROJECT DESCRIPTION VICINITY MAP INDEX COVER SHEET GENERAL: ARCHITECTURE: LANDSCAPE: CIVIL: FIRE: Co r o n a D e l M a r F r e e w a y ay So u t h e a s t Br i s tol S t r e e t N ort h B r i s t ol St r e e t MacArthur BoulevardJam boree RoadNewport Place DriveBirch Stre etBows prit Drive Qu a i l Street DoveStreetZe n i t h Ave n u e eAvenueSpruceAvenueOrchid Street The Picerne Group 5000 Birch St. East Tower, Suite 600 Newport Beach, CA 92660 Contact: Satish Lion P: 949.910.3428 www.thepicernegroup.com slion@picernegroup.com TCA Architects 19782 MacArthur Blvd., Suite 300 Irvine, CA 92612 Contact: Cory Bitting P: 949.862.0270 P: 760.828.0738 www.tca-arch.com cbitting@tca-arch.com L-1.1 L-1.2 L-1.3 L-1.4 L-1.5 L-1.6 L-1.7 L-1.8 COMPOSITE LANDSCAPE PLAN GROUND LEVEL LANDSCAPE PLAN PODIUM LEVEL LANDSCAPE PLAN CHARACTER IMAGES TREE PLANT IMAGERY SHRUB PLANT IMAGERY TREE PLAN HYDROZONE PLAN TITLE SHEET EXISTING CONDITION CONCEPTUAL GRADING PLAN CONCEPTUAL UTILITY PLAN CONCEPTUAL WQMP PLOT PLAN ALTA/NSPS LAND TITLE SURVEY COVER SHEET OVERALL FIRE MASTER PLAN LAYOUT AT GRADE LEVEL 2 & LEVEL 6 LAYOUTS BUILDING ELEVATIONS Lifescapes International Inc 4930 Campus Drive Newport Beach, CA 92660 Contact: Mike Meyers P: 949.476.8888 Ext. 217 P: 949-351-4389 www.lifescapesintl.com mike@lifescapesintl.com TAIT & Associates, Inc. 801 N Parkcenter Drive Santa Ana, CA 92705 Contact: David Sloan, PE P: 714.560.8643 P: 562.547.0705 www.tait.com dsloan@tait.com C1.01 C2.01 C3.01 C4.01 C5.01 C6.01 F-1 F-2 F-3 F-4 A-0.1 A-1.1 A-1.2 A-1.3 A-1.4 A-1.5 A-1.6 A-1.7 A-1.8 A-1.9 A-2.1 A-2.2 A-2.3 A-2.4 A-3.1 A-4.1 A-5.1 A-5.2 A-5.3 A-5.4 A-5.5 A-5.6 G-0.1 G-0.2 G-0.3 ARCHITECTURAL SITE PLAN BUILDING PLAN B2 - BASEMENT FLOOR PLAN BUILDING PLAN B1 - BASEMENT FLOOR PLAN BUILDING PLAN LEVEL 1 - GROUND FLOOR PLAN BUILDING PLAN LEVEL 2 - PODIUM FLOOR PLAN BUILDING PLAN LEVEL 3 - FLOOR PLAN BUILDING PLAN LEVEL 4 - FLOOR PLAN BUILDING PLAN LEVEL 5 - FLOOR PLAN BUILDING PLAN LEVEL 6 - FLOOR PLAN CONCEPTUAL ROOF PLAN WEST ELEVATION NORTH ELEVATION EAST ELEVATION SOUTH ELEVATION BUILDING SECTIONS PEDESTRIAN BRIDGE - SECTION & FLOOR PLAN MATERIALS ALLOWABLE AREAS HEIGHT ANALYSIS COMMON OPEN SPACE AND AMENITY AREAS PRIVATE OPEN SPACE EXHIBIT CIRCULATION DIAGRAM PROJECT INDEX PROJECT SUMMARIES PROJECT PERSPECTIVE - VIEW FROM BRISTOL SI T E The proposed “1400 Bristol” project is a luxury apartment community located on a 2.38 acre site at the North-West corner of Bristol Street North and Spruce Avenue in Newport Beach, California. The current land use is a 2 story office complex with surface parking. The project will be a 6-story 229-unit podium building, with 5 levels of residential apartment (type III) over 1 level on-grade parking garage and 2 levels of sub-terranean parking (type I). The project will offer a mix of unit types including Studios, One-Bedrooms, and Two-bedroom units ranging from 515 s.f. to 1469 s.f. Vehicular entries to the building are via driveways on Spruce Avenue and Bristol Street. Ground-level amenities will include a business center, lobby, and mail room. Additional amenities on the podium level include a large, programmed club room with an outdoor “California room” and a media center. The podium level will also have a resort-style pool, spa and outdoor seating and cabanas. The architectural design approach at 1400 Bristol reflects the surrounding office context. Its contemporary forms complement the existing office buildings to create a building that respects the current condition while creating a distinctly unique identity. The Project corners are enhanced with rich materials to bring attention to and articulate the prominent areas of the Project. The approach to the building site orientation was to create a sheltered refuge in the greater business development by enclosing the courtyards from the busy roadways of Spruce Avenue and Bristol Street. The project will connect to the adjacent 1300 Bristol residential project via a new pedestrian bridge. The Project will comply with the Cal-Green building code and utilize the following sustainable features: • Low flow plumbing fixtures • Moisture-based irrigation controller • Stormwater infiltration • EV parking stalls • Low-E glazing • Low VOC paint & coatings • LED light fixtures • Low VOC emitting finished (carpet, resilient flooring, wood) • Building PV ready • Energy Star appliances and bathroom fixtures 236 TPG 1400 BRISTOL N. NEWPORT BEACH, CA TCA # 2022-144 3RD ENTITLEMENT SUBMITTAL AUGUST 11, 2023 G-0.2PROJECT SUMMARIES GARAGE: CONSTRUCTION TYPE: I-B OCCUPANCY TYPE: S-2 PRIMARY STRUCTURAL FRAME: 2-HOURS BEARING WALLS: 2-HOURS NON-BEARING WALLS: NON-RATED FLOOR CONSTRUCTION: 2-HOURS ROOF CONSTRUCTION: 1-HOUR EXTERIOR WALL AGAINST APT: 2-HOURS APARTMENTS AND RESIDENTIAL AMENITIES CONSTRUCTION TYPE: III-A OCCUPANCY TYPE: R-2 B (LEASING/AMENITIES) A-3 (CLUB ROOM) PRIMARY STRUCTURAL FRAME: 1-HOUR BEARING WALLS (EXTERIOR): 2-HOURS BEARING WALLS (INTERIOR): 1-HOUR NON-BEARING WALLS (INTERIOR): NON-RATED FLOOR CONSTRUCTION: 1-HOUR ROOF CONSTRUCTION: 1-HOUR FIRE WALLS: 3-HOURS PROJECT ADDRESS: 1400 BRISTOL ST N. PARCEL NUMBER: 427-332-02 ZONING: PC-11 EXISTING LAND USE: Office, surface parking PROPOSED LAND USE: Multi-story Residential GOVERNING CODES: 2022 CBC, 2022 CRC, 2022 CA Mechanical Code, 2022 CA Plumbing Code, 2022 CA Electrical Code, 2022 CA Energy Code, 2022 CALGreen, City of Newport Beach Municipal Code. Project Does Not Receive Any Public Funding. TYPES OF CONSTRUCTION: Type III-A Residential, Residential Amenities Type I-B Parking Garage NFPA-13 fire sprinkler system throughout. OCCUPANCY CLASSIFICATION: R-2 Residential Units B Leasing A-3 Residential Amenities S-2 Garage (Mechanically Ventilated), Storage SITE AREA: 103,500 SF 2.38 ac BUILDING AREAS: Total Building Area 485,909 SF Garage Area 205,078 SF Net rentable 196,700 SF ALLOWED DENSITY: (PER PC-11) Max Density 50 du/ac 119 units PROPOSED DENSITY: Proposed Density 96 du/ac 229 units BUILDING HEIGHT LIMITATION: (PER PC-11) Height Limit: 55’-0” PROPOSED BUILDING HEIGHT PROPOSED: 85’-0” 6-STORIES REQUIRED SETBACKS:(PER PC-11) Street: 30’-0” Interior: 10’-0” PROPOSED SETBACKS: Bristol Street: 18’-0” to bldg Spruce Ave: 8’-0” Side yard: 10’-0” Rear yard: 10’-0” Balconies Shall be Allowed to Encroach Into the Bristol St and Spruce Ave setbacks up to 5 Feet. PARKING SUMMARY BUILDING GROSS AREAS AMENITY AREAS COMMON OPEN SPACE UNIT SUMMARY CODE ANALYSISPROJECT DATA Business Center/Mail/Dog Spa - Type I (Level 1)4,867 SF Residential 266,076 SF Garage (Level 1)65,229 SF Garage (Level B1 & B2)139,849 SF Amenity - Type III (Levels 2 & 5)9,888 SF TOTAL 485,909 SF 5(48,5(' 6)81,7 [ 81,76 6) 3529,'(' %XVLQHVV&HQWHU 6) 0DLO5RRP 6) &OXE5RRP 6) &DOLIRUQLD5RRP 6) 0HGLD&HQWHU 6) 3RRO556KRZHUV 6) 5RRI/RXQJH$UHD 6) 5RRI'HFN 6) 'RJ6SD 6) 727$/ 6) 5(48,5(' 6)81,7 [ 81,76 6) 3529,'(' 3RGLXP&RXUW\DUG 6) 727$/ 6) REQUIRED RESIDENTIAL PARKING Unit Type # Units Ratio Total Studio 40 1.0 40 1-Bedroom 126 1.0 126 2-Bedrooms 63 1.5 95 229 261 TOTAL RESIDENTIAL REQ. 1.14 261 REQUIRED ACCESSIBLE PARKING (PART OF REQUIRED PARKING SPACES) Unit Type # of Stalls Ratio Total Assigned 376 0.02 8 Unassigned 46 0.05 3 TOTAL 422 11 1 accessible van stall required for residential parking* REQUIRED EV PARKING Ratio Resident Guest Total EV Capble 0.1 35 5 40 EV Ready 0.25 87 10.5 98 EV Chargers 0.05 21 TOTAL 122 15.5 159 PROVIDED RESIDENTIAL PARKING Standard ADA EV Charger Guest Guest ADA G EV Charger Total Basement level 21600000 0 160 Basement level 1 131 5 17 0 0 0 153 Level 1 57 3 3 42 3 1 109 TOTAL 348 8 20 42 3 1 TOTAL RESIDENTIAL 376 TOTAL GUEST 46 422 Ratio 1.84 NET Total # % of Total Net S.F.* Units Unit Mix Rent. STUDIO: S101 40  SUBTOTAL 40 17.5% 20,600 515 1 BR: A105 15  A110 29  A406 15  A505 20  A602 29   A710 18  SUBTOTAL 126 55.0% 96,549 766 2 BR: B103 20  B601 4  B709 15  B921 A 10  B935 5  B936 9  SUBTOTAL 63 27.5% 79,551 1,263 PROJECT TOTAL 229 100.0% 196,700 859 15,135 6TXDUHIRRWDJHLVWDNHQIURPFHQWHUOLQHRISDUWLZDOOVDQGRXWVLGHRIH[WHULRUZDOOVH[FOXGLQJGHFNVDQGEDOFRQLHV 'HFNVTXDUHIRRWDJHLVDQDYHUDJHDVPRVWGHFNVZLOOYDU\VOLJKWO\LQVL]HDQGLVQRWLQFOXGHGLQ1HW5HQWDEOH6TXDUH)RRWDJH Req. Balcony S.F. Provided Balcony S.F.Total Balcony S.F.AVG. S.F.UNIT TYPE 237 TPG 1400 BRISTOL N. NEWPORT BEACH, CA TCA # 2022-144 3RD ENTITLEMENT SUBMITTAL AUGUST 11, 2023 G-0.3PROJECT PERSPECTIVE VIEW FROM BRISTOL 238 TPG 1400 BRISTOL N. NEWPORT BEACH, CA TCA # 2022-144 3RD ENTITLEMENT SUBMITTAL AUGUST 11, 2023 A-0.120’0’40’80’ARCHITECTURAL SITE PLAN PA DRIVEWAYSTAIR 2ROOF ACCESS STAIR 1ROOF ACCESS ELEV 3 ELEV 1 RESIDENT GARAGE ENTRY RESIDENT & GUEST GARAGE ENTRY GATEPODIUM ABOVE, TYPICAL 5-STORY APARTMENTS (TYPE-III)OVER 1-STORY AT GRADE PARKING GARAGE (TYPE-I) OVER 2 LEVELS SUB-T PARKING GARAGE (TYPE-I) BRISTOL STREET N SPRUCE AVENUESTAIR 3 LOADING15'-0"13'-5" OVERHANG BUILDING SETBACK 10'-0"BUILDING SETBACK10'-0"-NOT A PART --NOT A PART -60'-0"VEHICLE TURNAROUND ELEV2 ACCESSIBLE PATH OF TRAVEL SITE PLAN LEGEND PODIUM ABOVE 239 TPG 1400 BRISTOL N. NEWPORT BEACH, CA TCA # 2022-144 3RD ENTITLEMENT SUBMITTAL AUGUST 11, 2023 A-1.120’0’40’80’BUILDING PLANS LEVEL B2 - BASEMENT FLOOR PLAN STORAGE STORAGESTORAGEBIKE STORAGESTORAGEMECHANICAL STORAGEUTILITY UTILITY UTILITYELEV 3 26'-0"26'-0"26'-0"26'-0"BRISTOL STREET N SPRUCE AVENUE28'-0"SPEED RAMPUP TO B1 STAIR 1ROOF ACCESS ELEV 1 STAIR 3 VENTHILATION SHAFT (TO ROOF)BUILDING SETBACK10'-0"STAIR 2ROOF ACCESS 10'-0" 15% 7.5% 26'-0" ELEV2 BUILDING SETBACK10'-0"BUILDINGSETBACK18'-0"BUILDING SETBACK8'-0" 28'-0" /2%%</($6,1*$0(1,7< 5(6,'(17,$/9(57&,5& .(< 3$5.,1* %2+ PROVIDED STALL HC VAN HC STALL SIZES: 9'-0"9'-0"8'-0"9'-0"5'-0"18'-0"18'-0"WALL OR OBSTRUCTION *CITY OF NEWPORT BEACH MUNCIPAL CODE CH20.40 TABLE 3-13 *WHERE LENGTH OF PARKING SPACE ABUST A WALL, OR SIMILAR OBSTRUCTION, THE REQUIRED WIDTH SHALL BE 9'-0" 8’-6”17’-0”240 TPG 1400 BRISTOL N. NEWPORT BEACH, CA TCA # 2022-144 3RD ENTITLEMENT SUBMITTAL AUGUST 11, 2023 A-1.220’0’40’80’BUILDING PLANS LEVEL B1 - BASEMENT FLOOR PLAN /2%%</($6,1*$0(1,7< 5(6,'(17,$/9(57&,5& .(< 3$5.,1* %2+ PROVIDED STALL HC VAN HC STALL SIZES: 9'-0"9'-0"8'-0"9'-0"5'-0"18'-0"18'-0"WALL OR OBSTRUCTION *CITY OF NEWPORT BEACH MUNCIPAL CODE CH20.40 TABLE 3-13 *WHERE LENGTH OF PARKING SPACE ABUST A WALL, OR SIMILAR OBSTRUCTION, THE REQUIRED WIDTH SHALL BE 9'-0" 8’-6”17’-0”28'-0" 26'-0" 28'-0"26'-0"26'-0"26'-0"ELEV 3 ELECTRICAL ABOVESTORAGE MECHANICAL UTILITY STORAGESTORAGESTORAGEUTILITY BIKE STORAGE STAIR 3 VENTHILATION SHAFT (TO ROOF) EMERGENCY ELEC.28'-0"SPEED RAMP UP TO L1 SPEED RAMP DN TO B2 ELEV 1 STAIR 1 ROOF ACCESSBUILDINGSETBACK10'-0"STAIR 2ROOF ACCESS 15%7.5% 15% BRISTOL STREET N SPRUCE AVENUE7.5% 10'-0"10'-0" 26'-0" ELEV2 BUILDING SETBACK10'-0"BUILDINGSETBACK18'-0"BUILDING SETBACK8'-0"28'-0"241 TPG 1400 BRISTOL N. NEWPORT BEACH, CA TCA # 2022-144 3RD ENTITLEMENT SUBMITTAL AUGUST 11, 2023 A-1.320’0’40’80’BUILDING PLANS LEVEL 1 - GROUND FLOOR PLAN /2%%</($6,1*$0(1,7< 5(6,'(17,$/9(57&,5& .(< 3$5.,1* %2+ PROVIDED STALL HC VAN HC STALL SIZES: 9'-0"9'-0"8'-0"9'-0"5'-0"18'-0"18'-0"WALL OR OBSTRUCTION *CITY OF NEWPORT BEACH MUNCIPAL CODE CH20.40 TABLE 3-13 *WHERE LENGTH OF PARKING SPACE ABUST A WALL, OR SIMILAR OBSTRUCTION, THE REQUIRED WIDTH SHALL BE 9'-0" 8’-6”17’-0”DOG SPA 463 SF TRASH 938 SF UTILITY PUMP ROOM MECHANICAL POOL EQUIPMENT TRASH 930 SF RESIDENT PARKING GUEST PARKING HIGH SPEED ROLL-UP GATE OPEN DURING BUSINESS HOURS 15%7.5% HIGH SPEED ROLL-UP GATE (CONTROLLED ACCESS ONLY) GATE ELEC. SUB-E. SUB-E. SUB-ELEC. MAINT. STAIR 3 STAIR 1ROOF ACCESS VENTILATIONSHAFT (TO ROOF) ELEV 3 ELEV 1 ELEV2 28'-0" RESIDENT GARAGE ENTRY RESIDENT & GUEST GARAGE ENTRY GATELOADING/ TRASH STAGING/DELIVERYFREE STANDING CALL BOX 3 CAR QUEUING PODIUM ABOVE, TYPICAL VENTILATION SUPPLY SHAFTVENTILATION SUPPLY SHAFT PODIUM ABOVE,TYPICAL DN28'-0"SPEED RAMP DN TO B1 26'-0" 26'-0"26'-0"26'-0"26'-0" RESIDENT PARKING MAIL BUSINESS CENTER 3,400 SF 749 SF FIRE UTILITY TURNAROUND SPACE 8'-6" 8'-6" 5'-6" 5'-0"7'-11" BUILDING SETBACK10'-0"BUILDINGSETBACK10'-0"STAIR 2ROOF ACCESS PEDESTRIAN BRIDGE ABOVE FENCE -NOT A PART - TURNAROUND SPACE BRISTOL STREET N SPRUCE AVENUE10'-0"BUILDINGSETBACK18'-0"BUILDING SETBACK8'-0" 5'-0" 5'-0"12'-1" 12'-0" TURNAROUND SPACE 242 TPG 1400 BRISTOL N. NEWPORT BEACH, CA TCA # 2022-144 3RD ENTITLEMENT SUBMITTAL AUGUST 11, 2023 A-1.420’0’40’80’BUILDING PLANS LEVEL 2 - PODIUM FLOOR PLAN /2%%</($6,1*$0(1,7< 5(6,'(17,$/9(57&,5& .(< 3$5.,1* %2+ (1-STORY)BEEZEWAYELEV 3 STAIR 3 STAIR 1 ROOF ACCESS (SGL VOLUME) OPEN TO BELOW LOW ROOF ELEV 1 POOL RR 964 SF CLUBROOM 3,256 SF (DBL. VOLUME) CALIFORNIA ROOM1,850 SF B936 B103 S101 S101 B103 S101 S101 B935 A406 A406 A406 S101 A710 A710 A602 A710 B103 A505 A602 B709 B709 A505 MEDIA CENTER 1,467 SF10'-1"7'-2" 7'-11"7'-6"7'-2"206'-6" A110BEEZEWAYBEEZEWAYTPEDESTRIAN BRIDGEBUILDINGSETBACK10'-0"7'-7"S101A105A105S101 POOL STAIR 2ROOF ACCESS B103A110 A110 A110 S101 A110 A110 8'-9" 7'-9" A105 A602A602 B921 A B921 A A505 A505 B7099'-4"77'-10"A110 -NOT A PART - BRISTOL STREET N SPRUCE AVENUEELEV2 BUILDING SETBACK10'-0"BUILDINGSETBACK18'-0"BUILDING SETBACK8'-0" 243 TPG 1400 BRISTOL N. NEWPORT BEACH, CA TCA # 2022-144 3RD ENTITLEMENT SUBMITTAL AUGUST 11, 2023 A-1.520’0’40’80’BUILDING PLANS LEVEL 3 - FLOOR PLAN /2%%</($6,1*$0(1,7< 5(6,'(17,$/9(57&,5& .(< 3$5.,1* %2+ OPEN TO BELOW ELEV 3 STAIR 3 STAIR 1ROOF ACCESS ELEV 1 OPEN TO BELOW OPEN TO BELOWOPEN TO BELOWT BUILDINGSETBACK10'-0"POOL COURTYARD BELOW STAIR 2ROOF ACCESS PEDESTRIAN BRIDGE BELOW B936 B103 S101 S101 B103 S101 S101 B935 A406 A406 A406 S101 A710 A710 A602 A710 B103 A505 A602 B709 B709 A505 A110S101A105A105S101 B103A110 A110 A110 S101 A110 A110 A105 B93610'-1"7'-2" 7'-11"7'-6"7'-2"7'-7"8'-9" 7'-9" A602A602 B921 A B921 A A505 A505 B709 B6019'-4"A110 -NOT A PART - BRISTOL STREET N SPRUCE AVENUEELEV2 BUILDING SETBACK10'-0"BUILDINGSETBACK18'-0"BUILDING SETBACK8'-0" 244 TPG 1400 BRISTOL N. NEWPORT BEACH, CA TCA # 2022-144 3RD ENTITLEMENT SUBMITTAL AUGUST 11, 2023 A-1.620’0’40’80’BUILDING PLANS LEVEL 4 - FLOOR PLAN /2%%</($6,1*$0(1,7< 5(6,'(17,$/9(57&,5& .(< 3$5.,1* %2+ ELEV 3 STAIR 3 STAIR 1ROOF ACCESSELEV 1 T BUILDINGSETBACK10'-0"POOL COURTYARD BELOW STAIR 2 ROOF ACCESS B936 B103 S101 S101 B103 S101 S101 B935 A406 A406 A406 S101 A710 A710 A602 A710 B103 A505 A602 B709 B709 A505 A110S101A105A105S101 B103A110 A110 A110 S101 A110 A110 A105 A710A602 B936 A602A602A602A602 B921 A B921 A A505 A505 B709 B601 A110 -NOT A PART - BRISTOL STREET N SPRUCE AVENUEELEV 2 10'-1"7'-2" 7'-11"7'-6"7'-2"7'-7"8'-9" 7'-9"9'-4"BUILDING SETBACK10'-0"BUILDINGSETBACK18'-0"BUILDING SETBACK8'-0" 245 TPG 1400 BRISTOL N. NEWPORT BEACH, CA TCA # 2022-144 3RD ENTITLEMENT SUBMITTAL AUGUST 11, 2023 A-1.720’0’40’80’BUILDING PLANS LEVEL 5 - FLOOR PLAN /2%%</($6,1*$0(1,7< 5(6,'(17,$/9(57&,5& .(< 3$5.,1* %2+ DN POOL COURTYARD BELOW ELEV 3 STAIR 3 STAIR 1ROOF ACCESS ELEV 1 T BUILDINGSETBACK10'-0"STAIR 2ROOF ACCESS LOUNGE AREA817 S.F. ROOFDECK1,510 S.F. B936 B103 S101 S101 B103 S101 S101 B935 A406 A406 A406 S101 A710 A710 A602 A710 B103 A505 A602 B709 B709 A505 A110S101A105A105S101 B103A110 A110 A110A105 A710A602 B936 A602A602A602A602 B921 A B921 A A505 A505 B709 B601 -NOT A PART - BRISTOL STREET N SPRUCE AVENUEELEV2 7'-2" 7'-11"7'-6"7'-2"7'-7"8'-9" 7'-9"9'-4"S101 BUILDING SETBACK10'-0"BUILDINGSETBACK18'-0"BUILDING SETBACK8'-0" 246 TPG 1400 BRISTOL N. NEWPORT BEACH, CA TCA # 2022-144 3RD ENTITLEMENT SUBMITTAL AUGUST 11, 2023 A-1.820’0’40’80’BUILDING PLANS LEVEL 6 - FLOOR PLAN /2%%</($6,1*$0(1,7< 5(6,'(17,$/9(57&,5& .(< 3$5.,1* %2+ ELEV 3 STAIR 3 STAIR 1ROOF ACCESS ELEV 1 T BUILDINGSETBACK10'-0"STAIR 2 ROOF ACCESS POOL COURTYARD BELOW B936 B103 S101 S101 B103 S101 S101 B935 A406 A406 A406 S101 A710 A710 A602 A710 B103 A505 A602 B709 B709 A505 A110S101A105A105S101 B103A110 A110 A110 S101 A105 A710A602 B936 OPEN TO BELOW OPEN TO BELOW A602A602A602A602 B921 A B921 A A505 A505 B709 B601 -NOT A PART - BRISTOL STREET N SPRUCE AVENUEELEV2 10'-1"7'-2" 7'-11"7'-6"7'-2"7'-7"8'-9" 7'-9"9'-4"BUILDING SETBACK10'-0"BUILDINGSETBACK18'-0"BUILDING SETBACK8'-0" 247 TPG 1400 BRISTOL N. NEWPORT BEACH, CA TCA # 2022-144 3RD ENTITLEMENT SUBMITTAL AUGUST 11, 2023 A-1.920’0’40’80’BUILDING PLANS CONCEPTUAL ROOF PLAN STAIR TO ROOF ROOF LEGEND MECHANICAL EQUIPMENT UTILTIY SHAFT TO ROOF RAISED PLATE HEIGHTS AT CORNER UNITS, TYPICAL LINE OF CORRIDOR BELOW ELEVATOR OVERRUNVENTILATION SHAFT AWNING LOW ROOF ELEVATOR OVERRUN ELEVATOR OVERRUN 42" HIGH PARAPET MIN. ABV. FINISHED ROOF LOW ROOF TRASH CHUTE VENTILATION SHAFT MECHANICAL EQUIPMENT ON PLATFORM, TYP. RAISED PLATE HEIGHTS AT CORNER UNITS, TYPICAL TRASH CHUTE VENTILATION SHAFT STAIR 3HATCH ACCESS BRISTOL STREET N SPRUCE AVENUESTAIR 2ROOF ACCESS STAIR 1ROOF ACCESS AWNING POOL COURTYARD BELOW LOUNGE ROOF BELOW ROOF-DECK BELOW LOW ROOF PEDESTRIAN BRIDGE BELOW -NOT A PART -BUILDINGSETBACK18'-0"BUILDING SETBACK8'-0" BUILDING SETBACK10'-0" 248 TPG 1400 BRISTOL N. NEWPORT BEACH, CA TCA # 2022-144 3RD ENTITLEMENT SUBMITTAL AUGUST 11, 2023 A-2.116’0’32’64’1400 BRISTOL WEST ELEVATION  !"#$%&'()*(%+),-.%')/0" !#1 !#" !#" !#" !# !"#" !#1 !#" !#" !#" !#S-1 SN-1R-1 CS-1P-1SF-1 SF-1 SF-1P-1 P-1A-1 P-1G-1 1 2 SPRUCE AVE.BRISTOL ST. KEY PLAN MATERIAL LEGEND: EXTERIOR PLASTER CEMENTITIOUS SIDING STONE/TILE VENEER STORE FRONT METAL AWNING METAL RAILING GLASS RAILING GARAGE SCREENS PROPOSED SIGN LOCATIONS METAL PANEL P-1: CS-1: S-1: SF-1 A-1: R-1: GR-1: G-1: SN-1: MP-1: 1) 1400 BRISTOL WEST ELEVATION 2) 1400 BRISTOL PERSPECTIVE N.A.P. 249 TPG 1400 BRISTOL N. NEWPORT BEACH, CA TCA # 2022-144 3RD ENTITLEMENT SUBMITTAL AUGUST 11, 2023 A-2.220’0’40’80’1400 BRISTOL NORTH ELEVATIONS !"#$%&'()*(%+),-.%')/0" !#1 !#" !#" !#" !# !"#" !# !#" !#" !#" !#S-1P-1P-1 MP-1 SN-1SN-1 GR-1R-1A-1 A-1SF-1SF-1 SF-1G-1 2) 1400 BRISTOL PERSPECTIVE SPRUCE AVE.BRISTOL ST. KEY PLAN MATERIAL LEGEND: EXTERIOR PLASTER CEMENTITIOUS SIDING STONE/TILE VENEER STORE FRONT METAL AWNING METAL RAILING GLASS RAILING GARAGE SCREENS PROPOSED SIGN LOCATIONS METAL PANEL P-1: CS-1: S-1: SF-1 A-1: R-1: GR-1: G-1: SN-1: MP-1: 1) 1400 BRISTOL NORTH ELEVATION 1 2 250 TPG 1400 BRISTOL N. NEWPORT BEACH, CA TCA # 2022-144 3RD ENTITLEMENT SUBMITTAL AUGUST 11, 2023 A-2.320’0’40’80’1400 BRISTOL EAST ELEVATIONS  !"#" !# !#" !#" !#" !# !"#" !# !#" !#" !#" !#S-1SN-1 R-1 P-1P-1 P-1P-1SN-1P-1A-1 A-1 A-1G-1 G-1SN-1 1 2 SPRUCE AVE.BRISTOL ST. KEY PLAN MATERIAL LEGEND: EXTERIOR PLASTER CEMENTITIOUS SIDING STONE/TILE VENEER STORE FRONT METAL AWNING METAL RAILING GLASS RAILING GARAGE SCREENS PROPOSED SIGN LOCATIONS METAL PANEL P-1: CS-1: S-1: SF-1 A-1: R-1: GR-1: G-1: SN-1: MP-1: 1) 1400 BRISTOL EAST ELEVATION 2) 1400 BRISTOL PERSPECTIVE N.A.P. 251 TPG 1400 BRISTOL N. NEWPORT BEACH, CA TCA # 2022-144 3RD ENTITLEMENT SUBMITTAL AUGUST 11, 2023 A-2.420’0’40’80’1400 BRISTOL SOUTH ELEVATIONS !"#$%&'()*(%+),-.%')/0" !#1 !#" !#" !#" !#   )   SN-1 SN-1SN-1 P-1 P-1MP-1 CS-1 R-1A-1 SF-1SF-1 G-1 S-1 1 2SPRUCE AVE.BRISTOL ST. KEY PLAN MATERIAL LEGEND: EXTERIOR PLASTER CEMENTITIOUS SIDING STONE/TILE VENEER STORE FRONT METAL AWNING METAL RAILING GLASS RAILING GARAGE SCREENS PROPOSED SIGN LOCATIONS METAL PANEL P-1: CS-1: S-1: SF-1 A-1: R-1: GR-1: G-1: SN-1: MP-1: 2) 1400 BRISTOL PERSPECTIVE 1) 1400 BRISTOL SOUTH ELEVATION 252 TPG 1400 BRISTOL N. NEWPORT BEACH, CA TCA # 2022-144 3RD ENTITLEMENT SUBMITTAL AUGUST 11, 2023 A-3.130’0’60’120’BUILDING SECTIONS 3RD STORY 4TH STORY 5TH STORY 2ND STORY 1ST STORY 6TH STORY BASEMENT B1 BASEMENT B2 ROOF 11'-1"10'-1"10'-1"10'-1"10'-1"15'-0"10'-0"9'-0"UNITS COURTYARD UNITS BRISTOL ST.PROPERTY LINEPROPERTY LINEPARKING PARKING PARKING AMENITY 3RD STORY 4TH STORY 5TH STORY 2ND STORY 1ST STORY 6TH STORY BASEMENT B1 BASEMENT B2 ROOF 11'-0"10'-1"10'-1"10'-1"10'-1"15'-0"10'-0"9'-0"UNITS COURTYARD UNITS PARKING PARKING PARKINGPROPERTY LINEPROPERTY LINESPRUCE AVE.UPDATE A A B B SECTION B SECTION A KEY PLAN 253 TPG 1400 BRISTOL N. NEWPORT BEACH, CA TCA # 2022-144 3RD ENTITLEMENT SUBMITTAL AUGUST 11, 2023 A-4.110’0’20’40’PEDESTRIAN BRIDGE SECTION & FLOOR PLAN STAIR 1 (SGL VOLUME) ELEV 1EEEVEEELEV A406 MEDIA CENTER 1,467 SF 31'-11"31'-8"" 54.500'55 52.97'52.30'52.03'5 53.50'17'-6"@ SHOULDER16'-5"@ SHOULDER@ SHOULDER16'-5"PRROPERTY LINEPRROPERTY LINEBACK OF WALK BACK OF WALK +/- 108'-2"+/108'2"CLEAR AT R.O.W.15'-0"CLEAR AT R.O.W.15'-0"99'-3"70.00'69.50'6 772.17'CLEAR17'-0"ROOF ACCE PED ESS DESTRIAN BRIDDGE   5$035$03 A A A A A) SECTION & FLOOR PLAN -NOT A PART- APPROVED UNDER SEPARATE SUBMITTAL SPRUCE AVE.N.A.P.BRISTOL ST. KEY PLAN 254 TPG 1400 BRISTOL N. NEWPORT BEACH, CA TCA # 2022-144 3RD ENTITLEMENT SUBMITTAL AUGUST 11, 2023 A-5.1MATERIALS G-1 GARAGE SCREENSA-1 METAL AWNINGS GR-1 GLASS RAILINGS R-1 METAL RAILINGS P-1 EXTERIOR PLASTER CS-1 CEMENTITIOUS SIDINGSF-1 STOREFRONTMETALS(RAILINGS/AWNINGS/TRIM)RAILINGSOMEGA PRODUCTS - EXTERIOR PLAS- TER 20/30 SAND FINISH OR SIMILAR JAMES HARDIE PLANK - SMOOTH HORIZONTAL LAP SIDING OR SIMILAR MP-1 MAC- METAL ARCHITECTURAL VERSA-TITANIUM BLACK OR SIMILAR SHERWIN-WILLIAMS SW6258 - TRICORN BLACK OR SIMILAR. SHERWIN-WILLIAMS SW7005 - PURE WHITE OR SIMILAR. SHERWIN-WILLIAMS SW6254 - OR SIMILAR.ACCENT COLORSPRIMARY COLORSSHERWIN-WILLIAMS SW9148 - SMOKY AZURITE OR SIMILAR. SHERWIN-WILLIAMS SW9148 - SMOKY AZURITE OR SIMILAR. SHERWIN-WILLIAMS SW7069 - IRON ORE OR SIMILAR. SHERWIN-WILLIAMS SW6256 - SERIOUS GRAY OR SIMILAR.S-1 STONE/TILE VENEEREMSER TILE - MILESTONE DUST - 12X24 PORCELAIN TILE OR SIMILAR 255 TPG 1400 BRISTOL N. NEWPORT BEACH, CA TCA # 2022-144 3RD ENTITLEMENT SUBMITTAL AUGUST 11, 2023 A-5.2ALLOWABLE AREAS A-5.1NOT TO SCALE POOL COURTYARD BELOW ELEV 3 ELEV 1 STAIR 2ROOF ACCESS STAIR 3 STAIR 1 ROOF ACCESS 3HR FIRE WALL, TYP. BRISTOL STREET N SPRUCE AVENUEELEV2FIRE AREA 1: LVL 2: 11,169 S.F. LVL 3: 11,169 S.F. LVL 4: 11,169 S.F.LVL 5: 11,169 S.F.LVL 6: 11,169 S.F. TOTAL AREA: 55,847 S.F. FIRE AREA 2: LVL 2: 9,231 S.F. LVL 3: 9,231 S.F.LVL 4: 9,231 S.F.LVL 5: 9,231 S.F. LVL 6: 9,231 S.F. TOTAL AREA: 46,155 S.F. FIRE AREA 3: LVL 2: 8,884 S.F.LVL 3: 8,884 S.F. LVL 4: 8,884 S.F. LVL 5: 8,884 S.F. LVL 6: 8,884 S.F. TOTAL AREA: 44,420 S.F. FIRE AREA 5: LVL 2: 14,132 S.F. LVL 3: 9,383 S.F.LVL 4: 14,132 S.F. LVL 5: 14,132 S.F. LVL 6: 14,132 S.F. TOTAL AREA: 65,911 S.F. FIRE AREA 4:LVL 2: 11,195 S.F. LVL 3: 11,195 S.F. LVL 4: 11,195 S.F. LVL 5: 11,195 S.F. LVL 6: 11,195 S.F. TOTAL AREA: 55,975 S.F. ALLOWABLE BUILDING AREA: EQUATION 5-2 PER CBC 506.2.3:AA = [AT + (NS X IF)] X SA, WHERE... AA = ALLOWABLE AREA (SQUARE FEET) AT = TABULAR ALLOWABLE AREA FACTOR PER TABLE 506.2 NS = TABULAR AREA FACTOR PER TABLE 506.2 FOR NON SPRINKLERED BUILDING IF = AREA FACTOR INCREASE DUE TO FRONTAGE PER 506.3 SA = 2 CODE ANALYSIS: CONSTRUCTION TYPE: TYPE-IIIA(APARTMENTS) O/ TYPE-I (PODIUM) OCCUPANCIES: R-2 (APARTMENTS) S-2 (GARAGE) B (LEASING, DOG WASH, BIKE SHOP) A-3 (AMENITIES) EGRESS NOTES: THE PROPOSED BUILDING WILL UTILIZE 2 HORIZONTAL EXITS, EACH EXIT COMPARTMENT WILL CONTAIN 2 EGRESS STAIRS PROVIDING 2 POINTS OF CONTINUOUS EGRESS TO THE PUBLIC RIGHT OF WAY. ALL EGRESS TRAVEL DISTANCES WILL BE WITHIN THE DISTANCES ALLOWABLE BY CODE. EXIT ACCESS TRAVEL DISTANCE: 250’ ADDITIONALLY, EACH EXIT COMPARTMENT PROVIDES 1 STAIR WITH ROOF ACCESS. AA = [24,000 S.F. + (24,000 S.F. X 0)] X 2 = 48,000 SF TOTAL ALLOWABLE AREA PER BUILDING =48,000 SF AA = [24,000 S.F. + (24,000 S.F. X .5)] X 2 =72,000 SF AA = [24,000 S.F. + (24,000 S.F. X .5)] X 2 =72,000 SF AA = [24,000 S.F. + (24,000 S.F. X .5)] X 2 =72,000 SF PERIMETER LENGTH = 506’ PERIMETER LENGTH = 527’ PERIMETER LENGTH = 585’ AREA INCREASE FOR FIRE AREA 1 AREA INCREASE FOR FIRE AREA 4 AREA INCREASE FOR FIRE AREA 5PERIMETER OF BUILDING WITH FRONTAGE > 30’ = 253’ (50%) PERIMETER OF BUILDING WITH FRONTAGE > 30’ = 261’ (50%) PERIMETER OF BUILDING WITH FRONTAGE > 30’ = 285’ (50%) If per TABLE 506.3.3 = .50 If per TABLE 506.3.3 = .50 If per TABLE 506.3.3 = .5 TYPICAL LEVEL 256 TPG 1400 BRISTOL N. NEWPORT BEACH, CA TCA # 2022-144 3RD ENTITLEMENT SUBMITTAL AUGUST 11, 2023 A-5.3HEIGHT ANALYSIS 132.5'135.0' 50.72'54.0' 132.5' 132.5' 53.0'50.05' POOL COURTYARD BELOW RAISED PLATE HEIGHTS AT CORNER UNITS, TYPICAL LINE OF CORRIDOR BELOW ELEVATOR OVERRUNVENTILATION SHAFT AWNINGLOW ROOF ELEVATOR OVERRUN ELEVATOR OVERRUN 42" HIGH PARAPET MIN. ABV. FINISHED ROOF LOW ROOF TRASH CHUTE VENTILATION SHAFT MECHANICAL EQUIPMENT ON PLATFORM, TYP. RAISED PLATE HEIGHTS AT CORNER UNITS, TYPICAL TRASH CHUTE VENTILATION SHAFT STAIR 3HATCH ACCESS BRISTOL STREET N SPRUCE AVENUESTAIR 2ROOF ACCESS STAIR 1ROOF ACCESS AWNING T.O.P.T.O.P. T.O.P. T.O.P.    ( ) ( +,-./0,1+234-2+ -25-6+34-2+8 (-25-6+34-2+8 : (   (   ( -25-6+34-2+8 ( -25-6+34-2+8 : ( -25-6+34-2+8  ( ) ( +,-./0,1+234-2+    ( ) ( +,-./0,1+234-2+ 8  ( !"#=-!."0/2031+031#) (=-!0="= 8  ( !"#=-!."0/2031+031#) (=-!0="= !"#=-!."0/2031+031#) (=-!0="= 8  (8  ( ) ( +,-./0,1+234-2+ #) (=-!0="= !"#=-!."0/2031+031PEDESTRIAN BRIDGE A NOT TO SCALE 1) ELEVATION A 2) ELEVATION B 3) ELEVATION C 4) ELEVATION D B C D ESTABLISHED GRADE NBMC 20.30.050 HIGHEST GRADE ELEVATION 54.00’LOWEST GRADE ELEVATION 50.05’ SITE SLOPE +/-1.08% ESTABLISHED GRADE CACLULATION:54.00’ + 50.72’ + 50.05’ + 53.00’ = 207.77’/4 = 51.94’ ESTABLISHED GRADE 257 TPG 1400 BRISTOL N. NEWPORT BEACH, CA TCA # 2022-144 3RD ENTITLEMENT SUBMITTAL AUGUST 11, 2023 A-5.430’0’60’120’COMMON OPEN SPACE AND AMENITY AREAS AMENITY AREAS COMMON OPEN SPACE 5(48,5(' 6)81,7 [ 81,76 6) 3529,'(' 3RGLXP&RXUW\DUG 6) 727$/ 6) BUSINESS CENTER 3,400 SF PUMP ROOM DOG SPA 463 SF BRISTOL STREET N SPRUCE AVENUE15%7.5% 7.5% DN SPEED RAMP DN TO B1 MAIL1,004 SF (DBL. VOLUME) POOL RR.960 SF (DBL. VOLUME)(DBL. VOLUME) BRISTOL STREET N SPRUCE AVENUECOURTYARD+/- 13,800 SF CALIFORNIA ROOM1,850 SF CLUBROOM3,282 SF MEDIA CENTER1,469 SF DN POOL COURTYARD BELOW ELEV 3 ELEV 2 STAIR 3 STAIR 1ROOF ACCESS ELEV 1 T BUILDING SETBACK10'-0"BUILDIUILDINGSETBACK18'-0"LOUNGE AREA817 S.F. ROOFDECK1,510 S.F. 7'-9"9'-4"BRISTOL STREET N SPRUCE AVENUE5(48,5(' 6)81,7 [ 81,76 6) 3529,'(' %XVLQHVV&HQWHU 6) 0DLO5RRP 6) &OXE5RRP 6) &DOLIRUQLD5RRP 6) 0HGLD&HQWHU 6) 3RRO556KRZHUV 6) 5RRI/RXQJH$UHD 6) 5RRI'HFN 6) 'RJ6SD 6) 727$/ 6) 258 TPG 1400 BRISTOL N. NEWPORT BEACH, CA TCA # 2022-144 3RD ENTITLEMENT SUBMITTAL AUGUST 11, 2023 A-5.5PRIVATE OPEN SPACE                             S101 STUDIO UNITS 1 BEDROOM UNITS 2 BEDROOM UNITS A105 A110 A406 A602 A710 B103 B921 AB709 B935B601 A505 B936 NET RENTABLE AREA 515 SFREQUIRED BALCONY (5%) 26 SFPROVIDED BALCONY 0 SF NET RENTABLE AREA 613 SFREQUIRED BALCONY (5%) 31 SFPROVIDED BALCONY 62 SF NET RENTABLE AREA 1,270 SFREQUIRED BALCONY (5%) 63 SFPROVIDED BALCONY 52 SF NET RENTABLE AREA 1,341 SFREQUIRED BALCONY (5%) 67 SFPROVIDED BALCONY 92 SF NET RENTABLE AREA 1,309 SFREQUIRED BALCONY (5%) 65 SFPROVIDED BALCONY 85 SF NET RENTABLE AREA 1,413 SFREQUIRED BALCONY (5%) 71 SFPROVIDED BALCONY 58 SF NET RENTABLE AREA 1,469 SFREQUIRED BALCONY (5%) 73 SFPROVIDED BALCONY 261 SF NET RENTABLE AREA 1,049 SFREQUIRED BALCONY (5%) 52 SFPROVIDED BALCONY 63 SF NET RENTABLE AREA 663 SFREQUIRED BALCONY (5%) 33 SFPROVIDED BALCONY 62 SF NET RENTABLE AREA 823 SFREQUIRED BALCONY (5%) 41 SFPROVIDED BALCONY 68 SF NET RENTABLE AREA 715 SFREQUIRED BALCONY (5%) 36 SFPROVIDED BALCONY 46 SF NET RENTABLE AREA 896 SFREQUIRED BALCONY (5%) 45 SFPROVIDED BALCONY 65 SF NET RENTABLE AREA 861 SFREQUIRED BALCONY (5%) 43 SFPROVIDED BALCONY 134 SF PRIVATE OPEN SPACE REQUIRED PRIVATE OPEN SPACE PER NBMC SHALL BE 5% OF UNIT AREA 259 TPG 1400 BRISTOL N. NEWPORT BEACH, CA TCA # 2022-144 3RD ENTITLEMENT SUBMITTAL AUGUST 11, 2023 A-5.6PARKING CIRCULATION DIAGRAM GROUND FLOOR LEGEND BASEMENT 1 BASEMENT 2 28'-0" 26'-0" 28'-0"26'-0"26'-0"26'-0"ELEV 3VV ELECTRICAL ABOVESTORAGE MECHANICAL UTILITY STORAGESTORAGERASTORAGEUTILITY BIKESTORAGE STAIR 3 VENTHILATION SHAFT (TO ROOF)( EMERGENCY ELEC.28'-0"SPEED RAMPRPUP TO L1OSPEED RAMPDN TO B2 ELEV 1EEELEV STAIR 1SROOF ACCERRBUIUULIIDINIIGSETBTT10'-0"STAIR 2ROOF ACCESS 15%7.5%15%7.5% 10'-0"10'-0" 26'-0" ELEVEE222 BUILDING SETBACK10'-0"TBTTABBCKKKBUILDING SBU8'-028'-0"STORAGE STORAGESTORAGERABIKE STORAGESTORAGEMECHANICAL STORAGEUTILITY UTILITY UTILITYELEV 3VV 26'-0"26'-0"26'-0"26'-0"28'-0"SPEED RAMPRUP TO B1O STAIR 1SROOF ACCERR ELEV 1EEELEV STAIR 3 VENTHILATION SHAFT (TO ROOF)(BUILDING SETB10'-0"STAIR 2ROOF ACCESS 10'-0" 15% 7.5% 26'-0" ELEVEE222 BUILDING SETBACK10'-0"TBTTABBCKKKBUILDING SBU8'-0 28'-0" DOG SPAA 463 SF TRASH938 SF UTILITY MPUMP ROOMMMMMM MECHANICAL POOL EQUIPMENT TRASH 930 SF RESIDENT PARKING GUEST PARKING HIGH SPEED ROLL-UP GATEOPEN DURINGBUSINESS HOURS 15%7.5% HIGH SPEED ROLL-UP GATE(CONTROLLED ACCESS ONLY) GATE ELEC. SUB-E. SUB-E. SUB-ELEC. MAINT. . STAIR 3 STAIR 1ROOF AC VENTILATIONSHAFT (TO ROOF)(TO ROOSHA ELEV 3VV ELEV 1EELEV ELEVEEEL222 28'-0" RESIDENT GARAGE ENTRY RESIDENT & GUESTRNTGARAGE ENTRYEEENTTRYY GATELOADING/ TRASH STAGING/DELIVERYFREE STANDING NSTACALL BOX 3 CAR QUE PODIUM ABDTYPICALP VENTILATION SUPPLY SHAFTVENTLATIONSUPPLVENTILATION SUPPLY SHAFT PODIUM ABOVEPODIUM ABOVE,TYPICAL DN28'-0"SPEED RAMP DN TO B1 26'-0" 26'-0"26'-0"26'-0"26'-0 RESIDENT PARKING MAIL MAA BUSINESS CENTER3,400 SF 749 SF49 FIRE UTILITY TURNAROUND SPACE 8'-6"86" 8'-6"8'-6" 5'-6" 5'-0"5 "7'-11" BUILDING SETBACKIILL10'-0"BUIUULIIDDINIIGSETBTT10'-0"STAIR 2ROOF ACCESS PEDE FENCE TURNAROUND SPACE 10'-0"TBTTABBCKKKBUILDING SBU8'-0 5'-0""5 5'-0"5 "5 12'-1" 12'-0"12-0" TURNAROUND SPACEACUND SPAARTURNA 0" OUR ROENGOUR IGH SPEED U * * PEDESTRIAN ACCESSIBILITY TRASH PATH RESIDENT VEHICLE ACCESSIBILITY RESIDENT/GUEST VEHICLE ACCESSIBILITY TRASH BIN INDICATES GATE LOCATION PACKAGES DELIVERY DROP-OFF 260 1400 BRISTOL N. NEWPORT BEACH, CA TCA # 2022-144 SITE DEVELOPMENT REVIEW August 11, 2023 L-1.101020 40 SCALE 1”=20’NORTH COMPOSITE LANDSCAPE PLAN LINE OF SIGHT- ALL SHRUBS TO BE MAINTAINED AT A 24” MAXIMUM HEIGHT WITHIN LIMITED USE AREA LEVEL 2- PEDESTRIAN CONNECTION GARAGE VEHICLE ENTRYGARAGE VEHICLE ENTRY LINE OF SIGHT- ALL SHRUBS TO BE MAINTAINED AT A 24” MAXIMUM HEIGHT WITHIN LIMITED USE AREA GROUND LEVEL- SEE SHEET L1-2 PODIUM LEVEL- SEE SHEET L1-3 PALMS AND COLUMNAR TREES PROPOSED ALONG FIRE LANE TO PREVENT OBSTRUCTING ACCESS 261 1400 BRISTOL N. NEWPORT BEACH, CA TCA # 2022-144 SITE DEVELOPMENT REVIEW August 11, 2023 L-1.201020 40 SCALE 1”=20’NORTH GROUND LEVEL LANDSCAPE PLAN ENTRY DRIVE - ENHANCED PAVING ENTRY DRIVE- ENHANCED PAVING ENTRY DRIVE- ENHANCED PAVING TRANSFORMERSTO BE SCREENED WITH PLANTING - MOVE IN / LOADING WATER QUALITY BASIN ROCK GROUPINGSCOBBLE/ROCK MULCH WITH LOW WATER PLANTING AND GROUNDCOVER PASSENGER DROP-OFF RAISED PLANTERS (TYP.) HTS VARY 12” - 18” HIGH DOG EXERCISE AREA ENHANCED PLANTING 262 1400 BRISTOL N. NEWPORT BEACH, CA TCA # 2022-144 SITE DEVELOPMENT REVIEW August 11, 2023 L-1.30 NORTH 20105 SCALE 1”=10’ PODIUM LEVEL LANDSCAPE PLAN POOL DECK- CONCRETE POOL DECK- GLASS POOL ENCLOSURE- CHAISE FURNITURE & UMBRELLAS- ENHANCED PLANTING - 50’X20’ POOL FIRE PIT WITH BENCH SEATING POOL CABANAS10’X10’ SHADE CABANAS OUTDOOR CLUB ROOM & LOUNGE AREA SHADE COVERED LOUNGE AREA SHADE UMBRELLAS 5’ HIGH POOL BARRIER ACCENT WALL SHADE TRELLIS OUTDOOR FUNCTION SPACE RAISED PLANTERS SHADE TRELLIS BBQ AREA FIRE PLACE W/ LOUNGE SEATING SPA DECKCHAISE LOUNGES -14’X14’ SPA - SPA 263 1400 BRISTOL N. NEWPORT BEACH, CA TCA # 2022-144 SITE DEVELOPMENT REVIEW August 11, 2023 L-1.4CHARACTER IMAGES 264 1400 BRISTOL N. NEWPORT BEACH, CA TCA # 2022-144 SITE DEVELOPMENT REVIEW August 11, 2023 L-1.5TREE PLANT IMAGERY AGAVE SPECIE AGAVE BUTIAGRUS NABONNANDIMULE PALM MAGNOLIA GRANDIFLORA‘LITTLE GEM’LITTLE GEM SOUTHERN MAGNOLIA AGONIS FLEXUOSA PEPPERMINT TREE CASSIA LEPTOPHYLLAGOLD MEDALLION TREE MICHELIA CHAMPACA CHAMPACA ALOE BANSEIITREE ALOE CYCAS THOURIIMADAGASGAR CYCAD OLEA EUROPEA OLIVE ARBUTUS MARINA MARINA STRAWBERRY TREE ARCHONTOPHOENIX ALEXANDREA KING PALM DRACENA DRACODRAGON TREE YUCCA FAXONIANASPANISH DAGGER YUCCA ROSTRATABEAKED YUCCATECOMA STANSYELLOW BELLS QUERCUS ILEXHOLLY OAKMETROSIDEROS EXCELSANEW ZEALAND CHRISTMAS TREE WASHINGTONIA FILIFERACALIFORNIA FAN PALMSOPHORA SECUNDIFLORATEXAS MOUNTAIN LAUREL PARKINSONIA X ‘DESERT MUSEUM’DESERT MUSEUM PALO VERDE PROSOPIS SPECIESMESQUITE TREE SCHINUS MOLLECALIFORNIA PEPPER TREE RHUS LANCEAAFRICAN SUMACPHOENIX DACTYLIFERA ‘MEDJOOL’MEDJOOL DATE PALM SYAGRUS ROMANZOFFIANAQUEEN PALM TRISTANIA CONFERTABRISBANE BOX 265 1400 BRISTOL N. NEWPORT BEACH, CA TCA # 2022-144 SITE DEVELOPMENT REVIEW August 11, 2023 L-1.6 ACORUS GRAMINEUS ‘OGON’GOLDEN VARIEGATED SWEET FLAG AGAVE ‘BLUE GLOW’AGAVE AGAVE OVATIFOLIAWHALE’S TONGUE AGAVE AGAVE PARRYIPARRY’S AGAVEAGAVE ANGUSTIFOLIACARIBBEAN AGAVE ALOE SPECIESALOE BELOPERONE GUTTATA SHRIMP PLANT CARISSA MACROCARPA ‘GREEN CARPET’GREEN CARPET NATAL PLUM CASSAVA SPECIESCASSAVA CISTUS ‘LITTLE MISS SUNSHINE’ROCKROSE CISTUS ‘MICKIE’ROCKROSE DUDLEYA BRITTONIIGIANT CHALK DUDLEYA LOTUS BERTHELOTIIPARROT’S BEAK PHORMIUM ‘YELLOW WAVE’NEW ZEALAND FLAX POLYGALA FRUITICOSA‘PETITE BUTTERFLY’SWEET PEA SHRUB COPROSMA REPENS ‘MARBLE QUEEN’ DWARF VARIEGATED MIRROR PLANT GAZANIATREASURE FLOWERS MYOPORUM PARVIFOLIUM YAREENACREEPING MYOPORUM PORTULACARIA AFRA ‘AUREA’YELLOW RAINBOW BUSH GREVILLEA LANIGERA ‘COASTAL GEMWOOLLY GREVILLEA NANDINA DOMESTICA ‘NANA’HEAVENLY BAMBOO NANA PORTULACARIA AFRA ‘PROSTRATA’DWARF ELEPHANT FOOD CUPHEA AUREAGOLDEN CUPHEA HELICHRYSUM PETIOLARE ‘LIMELIGHT’LIMELIGHT LICORICE PLANT OLEA ‘LITTLE OLLIE’DWARF FRUITLESS OLIVE OPUNTIA BASILARISBEAVERTAIL CACTUS CUPHEA IGNEACIGAR PLANT LANTANA ‘NEW GOLD’NEW GOLD LANTANA LEUCOPHYLLUM FRUTESCENSTEXAS SAGE SEDUM COPPERTONECOPPERTONE STONECROP CYCAS THOUARSIIMADAGASCAR CYCAD DASYLIRION WHEELERISPOON YUCCA SENECIO SERPENSBLUE CHALKSTICKS STENOCEREUS THURBERIORGAN PIPE CACTUS TECOMA STANS ‘ORANGE JUBILEE’ CAPE HONEYSUCKLE SENECIO SERPENSCOAST ROSEMARY DIANELLA ‘CASSA BLUE’BLUE FLAX LILY LIROPE VARIEGATEDVARIEGATED LILY TURF PHILODENDRON XANADUWINTERBORN PHILODENDRON TRACHELOSPERMUM ASIATICUMASIATIC JASMINE YUCCA FILAMENTOSA ‘GOLDEN SWORD’ ADAM’S NEEDLE SHRUB PLANT IMAGERY 266 1400 BRISTOL N. NEWPORT BEACH, CA TCA # 2022-144 SITE DEVELOPMENT REVIEW August 11, 2023 L-1.7TREE PLAN BOTANICAL NAME COMMON NAME SIZE QTY WUCCOLS ACACIA SALICINA WILLOW ACACIA 24 14 LOW ACACIA PENDULA WEEPING ACACIA 24 LOW ACACIA STENOPHYLLA SHOE-STRING ACACIA 24 11 LOWARBUTUS UNEDO MARINA STRAWBERRY TREE 24 LOW PROSOPIS GLANDULOSA HONEY MESQUITERHUS LANCEA AFRICAN SUMAC WILLOW AGAVE SPECIE AGAVE 24 27 LOWCACTUS SPECIES CACTUSYUCCA SPECIES YUCCA ALOE BANSEII TREE ALOE 24 7 VERY LOW ERIOBOTRYA DEFLEXA BRONZE LOQUAT 24 MEDIUM RHAPHIOLEPIS MAJESTIC HAWTHORN 24 MEDIUMBEAUTYTECOMA STANS YELLOW ELDERCASSIA LEPTOPHYLLA GOLD MEDALLION TREE CYCAS THOURII MADAGASGAR CYCAD 24 0 MEDIUM STRELITZIA SPECIES BIRD OF PARADISE 24 MEDIUM DRACENA DRACO DRAGON TREE 24 4 VERY LOWCITRUS SPECIES CITRUS 24 LOW MAGNOLIA GRANDIFLORA LITTLE GEM SOUTHERN 24 2 MEDIUM ‘LITTLE GEM’ MAGNOLIASOPHORA SECUNDIFLORA TEXAS MOUNTAIN LAURELLIRIODENDRON TULIPIFERA TULIP TREE MEDIUM OLEA EUROPEA OLIVE 24 32 LOWMAGNOLIA SPECIES MAGNOLIA QUERCUS ILEX HOLLY OAK 24 MEDIUM PHOENIX DACTYLIFERA MEDJOOL DATE PALM 24 34 LOW‘MEDJOOL’ RHUS LANCEA AFRICAN SUMAC 13 LOWMETROSIDEROS EXCELSUS NEW ZEALAND TEA TREE 24 LOWQUERCUS ILEX HOLLY OAK 24 MEDIUM SYAGRUS ROMANZOFFIANA QUEEN PALM 24 37 MEDIUMWASHINGTONIA FILIFERA CALIFORNIA FAN PALM TO LOW YUCCA SPECIES YUCCAARCHONTOPHOENIX KING PALM 24 0 MEDIUMALEXANDREA HOWEA FORSTERIANA KENTIA PALM 15 BTHSYAGRUS ROMANZOFFIANA QUEEN PALM TRISTANIA CONFERTA BRISBANE BOX 24 16 MEDIUMPARKINSONIA X DESERT MUSEUM PALO VERDE TO LOW‘DESERT MUSEUM’SCHINUS MOLE CALIFORNIA PEPPER TREEBRACHYCHITON SPECIES BOTTLE TREE 24 MEDIUM AGONIS FLEXUOSA WESTERN AUSTRALIAN PEPPERMINTMICHELIA CHAMPACA CHAMPACA PLANTING NOTES: ALL PLANTS ARE CAL-IPC NON-INVASIZE AND WUCCOLS MEDIUM/LOW WATER CONSUMPTION (REGION 3- SOUTH COASTAL) VARITIES FOR THEIR PROPOSED GROWING CONDITIONS. THESE PLANTS ARE WATER CONSERVING AND USED FOR THEIR DEEP ROOT SYSTEMS WHICH STABILIZES SOIL AND MINIMIZES EROSION IMPACTS. NO TREES TO BE PLANTED IN THE PUBLIC RIGHT-OF-WAY THIS LEGEND IS TO DEMONSTRATE GENERAL DESIGN INTENT. FINAL PLANTING DESIGN WILL BE ESTABLISHED BASED ON MATERIAL AVAILABILITY AND WATER USE REQUIREMENTS. FINAL PLANTING DESIGN & SPECIES SELECTION WILL BE SHOWN ON PERMIT DRAWINGS. 267 1400 BRISTOL N. NEWPORT BEACH, CA TCA # 2022-144 SITE DEVELOPMENT REVIEW August 11, 2023 L-1.801020 40 SCALE 1”=20’NORTH HYDROZONE PLAN WATER CONSERVATION FEATURES The following measures will be incorporated into the project to conserve water: 1. Installation of “smart” irrigation controller with rain-sensor. 2. The use of low precipitation / low angle irrigation spray heads. 3. The use of low water consuming plants.4. Soil amendment to achieve good soil moisture retention. 5. Mulching to reduce evapotranspiration from the root zone. 6. Installation of automatic irrigation system to provide deep-root watering to trees is required. WATER CONSERVATION STATEMENT Purpose: To provide the maintenance staff a mechanical device to distribute water and ensure plant survival in the most efficient manner and within a time frame that least interferes with the activities of the community. The irrigation system for each hydrozone will be automatic and incorporate low volume drip emitters, bubblers and high efficiency low angle spray heads at turf only. Drip irrigation systems may be employed where considered to be effective and feasible. Irrigation valves shall be separated to allow for the systems operation in response to orientation and exposure. Planting will be designed to enhance the visual character of the site and the architectural elements. Plants shall be grouped with similar water, climatic and soil requirements to conserve water and create a drought responsive landscape. Each hydrozone consists of moderate to low water consuming plants. In areas of moderate water consuming plants they shall be properly amended to retain moisture for healthy growth and to conserve water. Plant material with each hydrozone shall be specified in consideration of north, south, east and west exposures. Soil shall be prepared and amended to provide for maximum moisture retention and percolation. Planted beds shall be mulched to retain soil moisture and reduce evapotranspiration. To avoid wasted water, the controls will be overseen by a flow monitor that will detect any broken sprinkler heads to stop that station’s operation, advancing to the next workable station. In the event of pressure supply line breakage, it will completely stop the operation of the system. All material will be nonferrous, with the exception of the brass piping into and out of the backflow units. All work will be in the best acceptable manner in accordance with applicable codes and standards prevailing in the industry. WATER USE CLASSIFICATION OF LANDSCAPE SPECIES (WUCOLS): WUCOLS, Water Use Classification of Landscape Species, is a University of California Cooperative Extension Publication and is a guide to the water needs of landscape plants. CROP FACTOR PERCENT OF ETo H – HIGH 70% - 90% M – MEDIUM 40% - 60% L – LOW 10% - 30% VL – VERY LOW < 10% IRRIGATION HYDROZONES: HYDRO-ZONE 1 : South West Perimeter - Sub Surface Irrigation - 8,301 S.F. HYDRO-ZONE 2 : North East Perimeter - Sub Surface Irrigation - 6,568 S.F. HYDRO-ZONE 3 : Podium Level Landscape - Sub Surface Irrigation - 3,978 S.F HYDRO-ZONE 4 : Water Features - Pool/Spa - 1,196 S.F. 268 DN UP UP DN UP DN 2 A 21 21 NN 3 3 20 20.59'-0"4 4 4.2 5 5 7 7 8 8 9 9 10 10 11 11 12 12 13 13 15 15 16 16 17 17 18 18 19 192.1 4.7 6 13.2 14 16.7 19.8 BBB.2 B.3B.5 CC DD EE FF GG HH JJ KK LL MM L.8 K.4 J.5 C.8 K.3 H.8 K.2 C.5 10'-2"NO. DESCRIPTION BY DATE CHKREVISIONS1400 BRISTOL STREETTPG (KCN) ACQUISITION, LLC TWO WORKING DAYS BEFORE YOU DIG Call: TOLL FREE 1-800-422-4133 LEGAL DESCRIPTION SCALE: 1" = 40' INDEX MAP FLOOD NOTE APPLICANT CIVIL SHEET INDEX ARCHITECT LANDSCAPE ARCHITECT LAND AREA UTILITY COMPANIES VICINITY MAP NOT TO SCALE BASIS OF BEARINGS ASSESSOR'S PARCEL NUMBER GEOTECHNICAL ENGINEER 269 NO. DESCRIPTION BY DATE CHKREVISIONS1400 BRISTOL STREETTPG (KCN) ACQUISITION, LLC TWO WORKING DAYS BEFORE YOU DIG Call: TOLL FREE 1-800-422-4133 N 270 DN UP UP DN UP DN 2 A 21 21 NN 3 3 20 20.59'-0"4 4 4.2 5 5 7 7 8 8 9 9 10 10 11 11 12 12 13 13 15 15 16 16 17 17 18 18 19 192.1 4.7 6 13.2 14 16.7 19.8 BB B.2 B.3B.5 CC DD EE FF GG HH JJ KK LL MM L.8 K.4 J.5 C.8 K.3 H.8 K.2 C.5 10'-2"NO. DESCRIPTION BY DATE CHKREVISIONS1400 BRISTOL STREETTPG (KCN) ACQUISITION, LLC N CONCEPTUAL GRADING NOTES 271 DN UP UP DN UP DN 2 A 21 21 NN 3 3 20 20.59'-0"4 4 4.2 5 5 7 7 8 8 9 9 10 10 11 11 12 12 13 13 15 15 16 16 17 17 18 18 19 192.1 4.7 6 13.2 14 16.7 19.8 BB B.2 B.3B.5 CC DD EE FF GG HH JJ KK LL MM L.8 K.4 J.5 C.8 K.3 H.8 K.2 C.5 10'-2"NO. DESCRIPTION BY DATE CHKREVISIONS1400 BRISTOL STREETTPG (KCN) ACQUISITION, LLC TWO WORKING DAYS BEFORE YOU DIG Call: TOLL FREE 1-800-422-4133 N 272 DN UP UP DN UP DN 2 A 21 21 NN 3 3 20 20.59'-0"4 4 4.2 5 5 7 7 8 8 9 9 10 10 11 11 12 12 13 13 15 15 16 16 17 17 18 18 19 192.1 4.7 6 13.2 14 16.7 19.8 BB B.2 B.3B.5 CC DD EE FF GG HH JJ KK LL MM L.8 K.4 J.5 C.8 K.3 H.8 K.2 C.5 10'-2"N CONCEPTUAL DRAINAGE NOTES: NO. DESCRIPTION BY DATE CHKREVISIONS1400 BRISTOL STREETTPG (KCN) ACQUISITION, LLC TWO WORKING DAYS BEFORE YOU DIG Call: TOLL FREE 1-800-422-4133 273 2 3 4 5 6 4 46 6 BY: CHICAGO TITLE COMPANY ORDER NO.: 00183740-987-OC1-JS94911 BIRCH STREET TITLE OFFICER: JASON SILVANEWPORT BEACH, CA 92660 DATED: SEPTEMBER 14, 2022(949) 724-3100 206 ft73 ft 55 ft(THIS ITEM IS CORRECT) (THIS ITEM IS CORRECT) (THIS ITEM IS CORRECT) (THIS ITEM IS PLOTTED CORRECTLY) (THIS ITEM IS PLOTTED CORRECTLY) SURVEYOR'S BOUNDARY NOTE: THE BOUNDARY SHOWN HEREON MATCHES RECORD DATAEXACTLY AS SHOWN ON A MAP FILED IN BOOK 54, PAGE 11 OF PARCEL MAPS IN THE OFFICE OF THE COUNTY RECORDER OFORANGE COUNTY, CALIFORNIA. THERE IS SUFFICIENT FOUND MONUMENTS SHOWN HEREONTO ESTABLISH SAID BOUNDARY. C6.01274 08/10/2023 SHEET: OF 4NEWPORT BEACH FIRE DEPARTMENT The use of these plans and specifications shall be restricted to the original site for which they were prepared and publication thereof is expressly limited to such use. Reproduction, publication, or re-use by any method, in whole or in part without the express consent of FIRESAFE PLANNING SOLUTIONS is prohibited. PREPARED FOR:PREPARED BY:DATE:TITLE:ARCHITECTURE/PLANNING: 28486 AIROSO STREETRANCHO MISSION VIEJO, CA 92694OFFICE: (949) 240-5911 CIVIL ENGINEER:FIRE MASTER PLANSHEET INDEX F-1F-2F-3F-4 COVER SHEETOVERALL FIRE MASTER PLAN LAYOUT AT GRADELEVEL 2 & LEVEL 6 LAYOUTSBUILDING ELEVATIONS 19782 MACARTHUR BLVD. SUITE 300 IRVINE, CA 92612P: 949.862.0270 5000 BIRCH ST. EAST TOWER, SUITE 600 NEWPORT BEACH, CA 92660P: 949.267.1573 801 N PARKCENTER DRIVE SANTA ANA, CA 92705P: 714.560.8643 1400 BRISTOL STREET NORTHNEWPORT BEACH, CAPARCEL NO.: 427-332-02 CIVIL ENGINEER: 4930 CAMPUS DRIVE NEWPORT BEACH, CA 92660P: 949.476.8888 COVER SHEET F-1  A. APPROVED NUMBERS OR ADDRESSES SHALL BE PLACED ON THEFRONT ELEVATION OF ALL BUILDINGS IN SUCH A POSITION THAT IS PLAINLY VISIBLE AND LEGIBLE FROM THE STREET OR ROAD ONWHICH THE PROPERTY IS ADDRESSED. B. THE NUMBERS SHALL CONTRAST WITH THEIR BACKGROUND.C. THE NUMBERS SHALL BE A MINIMUM OF 6 INCHES OR MORE INHEIGHT FOR RESIDENTIAL STRUCTURES WITH A ONE-INCH STROKE OR AS REQUIRED BY LOCAL ORDINANCE, WHICHEVER IS MORERESTRICTIVE. BUILDING SETBACKS, ELEVATION AND LANDSCAPING CAN AFFECT THESE MINIMUM REQUIREMENTS.D. NUMBERS FOR NEW BUILDINGS SHALL BE INTERNALLY OR EXTERNALLY ILLUMINATED TO BE VISIBLE AT NIGHT.E. NUMBERS/LETTERS SHALL BE OF NON-COMBUSTIBLE MATERIALS. IN ADDITION TO COMMON REQUIREMENTS SPECIFIED ABOVE, THEFOLLOWING ADDITIONAL REQUIREMENTS PERTAIN TO EACH BUILDING CONFIGURATION:A. MULTI-UNIT BUILDINGS - SUITE/APARTMENT NUMBERS SHALL BE PLACED ON OR ADJACENT TO THE PRIMARY ENTRANCE FOR EACHSUITE/APARTMENT AND ANY OTHER DOOR PROVIDING ACCESS TO FIRE DEPARTMENT PERSONNEL DURING AN EMERGENCY.B. MULTIPLE RESIDENTIAL AND COMMERCIAL UNITS HAVING ENTRANCE DOORS NOT VISIBLE FROM THE STREET OR ROAD SHALL, INADDITION, HAVE APPROVED NUMBERS GROUPED FOR ALL UNITSWITHIN EACH STRUCTURE AND POSITIONED TO BE PLAINLY VISIBLE FROM THE STREET OR ROAD.C. MULTI-BUILDING CLUSTERS - APPROVED NUMBERS OR ADDRESSEES SHALL BE PLACED ON THE FRONT ELEVATION(S OF ALL BUILDINGSTHAT FORM THE CLUSTER. NOTE: BUILDING NUMBERS ATTACHED TO BUILDING IN CONTRASTINGCOLOR PER NEWPORT BEACH FIRE DEPT. SPECIFICATIONS NOTE: MINOR ADJUSTMENTS SHALL BE ALLOWED IN THE FIELD, PER THEDISCRETION OF NEWPORT BEACH FIRE DEPT. FIELD INSPECTOR 1. ACTUAL BUILDING ADDRESSES WILL BE COORDINATED WITH THE CITYOF NEWPORT BEACH AND THE POSTAL SERVICE. PLANS SHOWING THESE ADDRESSES WILL BE SUBMITTED TO THE NEWPORT BEACH FIREDEPARTMENT UNDER A SEPARATE REVIEW. BUILDING IDENTIFICATION SIGNAGE EXAMPLE 6" HIGH MINIMUM LETTERS BUILDING IDENTIFICATION SIGN WITH 6" TALL MINIMUM LETTERING 1400 BRISTOL STREET N. FIRE MASTER PLAN CITY OF NEWPORT BEACH BUILDING DATA TABLE FIRE DEPARTMENT NOTES 1. NEWPORT BEACH FIRE DEPARTMENT SITE INSPECTIONS ARE REQUIRED FOR THIS PROJECT. PLEASE SCHEDULE ALL FIELD INSPECTIONS AT LEAST 48 HOURS IN ADVANCE. INSPECTIONS CANCELED AFTER 1 P.M. ON THE DAY BEFORE THE SCHEDULED DATE WILL BE SUBJECT TO A RE-INSPECTION FEE. CALL NEWPORT BEACH FIRE DEPARTMENT INSPECTION SCHEDULING AT (714) 644-3255. 2. A LUMBER DROP INSPECTION SHALL BE PERFORMED PRIOR TO BRINGING COMBUSTIBLE MATERIALS ON-SITE (OR DRYWALL FOR STRUCTURES OF NON-COMBUSTIBLE CONSTRUCTION). ALL-WEATHER ACCESS ROADS CAPABLE OF SUPPORTING 72,000 LBS., TOPPED WITH ASPHALT, CONCRETE, OR EQUIVALENT SHALL BE IN PLACE AND HYDRANTS SHALL BE TESTED AND MADE SERVICEABLE PRIOR TO AND DURING TIME OF CONSTRUCTION. 3. PHASED INSTALLATION OF FIRE ACCESS ROADS REQUIRES ADDITIONAL INSPECTIONS NOT COVERED BY THE FEES PAID AT PLAN SUBMITTAL. CONTACT INSPECTION SCHEDULING TO ARRANGE FOR ADDITIONAL INSPECTIONS THAT MAY BE NEEDED AND ANY FEES THAT MAY BE DUE. 4. AN ORIGINAL APPROVED, SIGNED, WET-STAMPED NEWPORT BEACH FIRE, FIRE MASTER PLAN SHALL BE AVAILABLE ON-SITE AT TIME OF INSPECTION. 5. ACCESS ROADS AND HYDRANTS SHALL BE MAINTAINED AND REMAIN CLEAR OF OBSTRUCTIONS AT ALL ITEMS DURING AND AFTER CONSTRUCTION. AREAS WHERE PARKING IS NOT PERMITTED SHALL BE CLEARLY IDENTIFIED AT ALL TIMES. OBSTRUCTION OF FIRE LANES AND HYDRANTS MAY RESULT IN CANCELLATION OR SUSPENSION OF INSPECTIONS. 6. FIRE APPARATUS ROADS SHALL BE DESIGNED AND MAINTAINED TO SUPPORT THE IMPOSED LOADS OF FIRE APPARATUS (72,000 LBS) AND TRUCK OUTRIGGER LOADS OF 75 LBS. PER SQUARE INCH OVER A TWO FOOT AREA. CALCULATIONS STAMPED AND SIGNED BY A REGISTERED PROFESSIONAL ENGINEER SHALL CERTIFY THAT THE PROPOSED SURFACE MEETS THE CRITERIA OF AN ALL WEATHER DRIVING SURFACE AND IS CAPABLE OF WITHSTANDING THE WEIGHT OF 72,000 LBS. THESE LOADS ARE ALSO REQUIRED IF SURFACE IS TURF BLOCK OR OTHER ENGINEERED ALTERNATE SURFACE. 7. TEMPORARY FUEL TANKS OF 60 OR MORE GALLONS SHALL BE REVIEWED, INSPECTED, AND PERMITTED BY NEWPORT BEACH FIRE PRIOR TO USE.8. THE PROJECT ADDRESS SHALL BE CLEARLY POSTED AND VISIBLE FROM THE PUBLIC ROAD DURING CONSTRUCTION. 9. ALL GATES IN CONSTRUCTION FENCING SHALL BE EQUIPPED WITH EITHER A KNOX OR BREAKAWAY PADLOCK. 10. BUILDINGS OF FOUR OR MORE STORIES SHALL BE PROVIDED WITH STAIRS AND A STANDPIPE BEFORE REACHING 40 FEET IN HEIGHT. 11. FIRE LANE WIDTHS SHALL BE MEASURED FROM TOP FACE OF THE CURB TO TOP FACE OF THE CURB FOR FIRE LANES WITH STANDARD CURBS AND GUTTERS AND FROM FLOW-LINE TO FLOW-LINE FOR FIRE LANES WITH MODIFIED CURB DESIGNS (E.G., ROLLED, RAMPED, ETC). THE DEVELOPER IS RESPONSIBLE TO VERIFY THAT ALL APPROVED PUBLIC WORKS OR GRADING DEPARTMENT STREET IMPROVEMENT PLANS OR PRECISE GRADING PLANS CONFORM TO THE MINIMUM STREET WIDTH MEASUREMENTS PER THE APPROVED CITY OF NEWPORT BEACH FIRE MASTER PLAN AND STANDARDS FOR ALL PORTIONS OF THE FIRE ACCESS ROADS. 12. PERMANENT, TEMPORARY, AND PHASED EMERGENCY ACCESS ROADS SHALL BE DESIGNED AND MAINTAINED TO SUPPORT AN IMPOSED LOAD OF 72,000 LBS. AND SURFACED TO PROVIDE ALL-WEATHER DRIVING CAPABILITIES. 13. FIRE LANE SIGNS AND RED CURBS SHALL MEET THE SPECIFICATIONS SHOWN ON DETAIL AND NEWPORT BEACH FIRE STANDARDS, AND SHALL BE INSTALLED AS DESCRIBED THEREIN. ADDITIONAL FIRE LANE MARKINGS MAY BE REQUIRED AT THE TIME OF INSPECTION DEPENDING ON FIELD CONDITIONS. 14. ALL ONSITE FIRE HYDRANTS SHALL HAVE A "BLUE REFLECTIVE PAVEMENT MARKER" INDICATING THEIR LOCATION PER THE NEWPORT BEACH FIRE STANDARD. ON PRIVATE PROPERTY MARKERS ARE TO BE MAINTAINED IN GOOD CONDITION BY THE PROPERTY OWNER.15. ADDRESS NUMBERS SHALL BE LOCATED AND BE OF A COLOR AND SIZE SO AS TO BE PLAINLY VISIBLE AND LEGIBLE FROM THE ROADWAY FROM WHICH THE BUILDING IS ADDRESSED. ADDRESS NUMBERS SHALL BE ILLUMINATED AT NIGHT. FIRE DEPARTMENT SHALL HAVE INPUT ON BUILDING ADDRESSING. 16. ACCESS GATES SHALL BE APPROVED PRIOR TO INSTALLATION AND SHALL BE IN COMPLIANCE WITH CHAPTER 5 OF THE CFC. 17. VEGETATION SHALL BE SELECTED AND MAINTAINED IN SUCH A MANNER AS TO ALLOW IMMEDIATE ACCESS TO ALL HYDRANTS, VALVES, FIRE DEPARTMENT CONNECTIONS, PULL STATIONS, EXTINGUISHERS, SPRINKLER RISERS, ALARM CONTROL PANELS, RESCUE WINDOWS, AND OTHER DEVICES OR AREAS USED FOR FIREFIGHTING PURPOSES. VEGETATION OR BUILDING FEATURES SHALL NOT OBSTRUCT ADDRESS NUMBERS OR INHIBIT THE FUNCTIONING OFALARM BELLS, HORNS, OR STROBES. 18. DUMPSTERS AND TRASH CONTAINERS LARGER THAN 1.5 CUBIC YARDS SHALL NOT BE STORED IN BUILDINGS OR PLACED WITHIN 5 FEET OF COMBUSTIBLE WALLS, OPENINGS OR COMBUSTIBLE ROOF EAVE LINES UNLESS PROTECTED BY AN APPROVED SPRINKLER SYSTEM. 19. ANY FUTURE MODIFICATION TO THE APPROVED FIRE MASTER PLAN OR APPROVED SITE PLAN, INCLUDING BUT NOT LIMITED TO ROAD WIDTH, GRADE, SPEED HUMPS, TURNING RADII, GATES OR OTHER OBSTRUCTIONS, SHALL REQUIRE REVIEW, INSPECTION, AND APPROVAL BY THE NEWPORT BEACH FIRE DEPARTMENT. 20. APPROVAL OF THIS PLAN SHALL NOT BE CONSTRUED AS APPROVAL OF ANY INFORMATION OR PROJECT CONDITIONS OTHER THAN THOSE ITEMS AND REQUIREMENTS IDENTIFIED IN NEWPORT BEACH FIRE STANDARDS AND RELATEDPORTIONS OF THE CFC AND CBC. THIS PROJECT MAY BE SUBJECT TO ADDITIONAL REQUIREMENTS NOT STATED HEREIN UPON EXAMINATION OF ACTUAL SITE AND PROJECT CONDITIONS OR DISCLOSURE OF ADDITIONAL INFORMATION. 21. A “KNOX” KEY STORAGE BOX WILL BE REQUIRED FOR EACH BUILDING. KEYS SHALL BE PROVIDED FOR ALL EXTERIOR ENTRY DOORS, FIRE PROTECTION EQUIPMENT CONTROL ROOMS, MECHANICAL ROOMS, EQUIPMENT ROOMS, PEDESTRIAN GATES, POOL GATES AND ADDITIONAL AREAS THE FIRE INSPECTOR UPON INSPECTION FINAL FINDS NECESSARY FOR EMERGENCY RESPONSE PERSONNEL. THE KNOX BOXES SHALL BE LOCATED ON EACH BUILDING IN THE SAME CONSISTENT LOCATION. E.G. MAIN ENTRANCE ETC. 22. AN UNDERGROUND PIPING PLAN IS REQUIRED FOR THE INSTALLATION OF AN AUTOMATIC FIRE SPRINKLER SYSTEMOR FOR A PRIVATE FIRE HYDRANT SYSTEM. A SEPARATE PLAN SUBMITTAL IS REQUIRED. 23. AN ARCHITECTURAL PLAN IS REQUIRED TO BE SUBMITTED TO THE NEWPORT BEACH FIRE DEPT. FOR REVIEW AND APPROVAL. 24. AUTOMATIC FIRE SPRINKLER SYSTEM SHALL BE INSTALLED IN COMPLIANCE WITH NFPA FULL 13, WITH APPLICABLE CODES AND LOCAL ORDINANCES, AMENDMENTS, AND GUIDELINES. A SEPARATE PLAN SUBMITTAL IS REQUIRED. 25. SEPARATE PLAN SUBMITTAL AND PERMITS WILL BE REQUIRED FOR THE FOLLOWING ITEMS: FIRE ALARM SYSTEM, STANDPIPE SYSTEM. 26. A CHEMICAL CLASSIFICATION AND HAZARDOUS MATERIALS COMPLIANCE PLAN SHALL BE APPROVED BY THE NEWPORT BEACH FIRE DEPARTMENT PRIOR TO ANY HAZARDOUS MATERIALS BEING STORED OR USED ON SITE. ASEPARATE PLAN SUBMITTAL IS REQUIRED. 27. CONSTRUCTION GATES WILL BE PROVIDED WITH A KNOX OR BREAKAWAY PADLOCK. 28. STANDPIPES SHALL BE PROVIDED FOR ALL BUILDINGS AS PER C.F.C. SEC. 905.3.1. 29. EMERGENCY RESPONDER RADIO COVERAGE (800 MHZ WILL BE REQUIRED AND SHALL COMPLY WITH NEWPORT BEACH FIRE DEPARTMENT GUIDELINE & STANDARDS D.05 PUBLIC SAFETY RADIO SYSTEM COVERAGE. 30. STAIRWELL SIGNAGE SHALL MEET NEWPORT BEACH FIRE DEPARTMENT GUIDELINE & STANDARDS D.01. FIRE LANE SIGN DETAILS NOTE:FIRE LANE SIGNS SHALL MEETSPECIFICATIONS PER NBFDGUIDELINES AND SHALL BEINSTALLED AS DESCRIBEDTHEREIN. ADDITIONAL FIRELANE MARKINGS MAY BEREQUIRED AT THE TIME OFINSPECTION DEPENDING ONFIELD CONDITIONS. FIRE LANE ENTRANCE ARE REQUIRED AT ENTRY POINTS TO PROPERTIES THAT CONTAIN FIRE LANESIGNS OR RED CURBS. SIGNS MUST BE APPROVED BY LIFE SAFETY SERVICES AND MUST BE A MINIMUMOF EIGHTEEN (18) INCHES WIDE BY TWENTY-FOUR (24) INCHES HIGH. 1 2 3 4 5 A B C A B C FIRE LANE SIGN MOUNTING DETAIL FIRE LANE SIGN MOUNTING LEGEND THE WORDS "FIRE LANE" SHALL BE WHITE ON REDBACKGROUND, NO SMALLER THAN 4 INCHES IN HEIGHT. LETTERING SHALL BE BOLD, CONDENSED REDON WHITE REFLECTIVE BACKGROUND,(2) INCHES IN HEIGHT. "CVC SECTION 22500.1" SHALL BE ON THE BOTTOMLEFT OF THE SIGN AND "NBPD 949-644-3717" SHALLBE ON THE BOTTOM RIGHT IN RED WITH MINIMUM3/4" LETTERS. LETTERING SHALL BE BOLD, CONDENSED WHITEREFLECTIVE LETTERING ON RED BACKGROUND,(2) INCHES IN HEIGHT. DEPTH OF SIGN SHALL BE 18 INCHES FROM STANDARD CURB AND 24 INCHES WITH ROLLED CURB TO CENTEROF POST UNLESS INDICATED ON PLAN WITH THE LETTER "L", INDICATING PLACEMENT IN LANDSCAPEDIRECTLY ADJACENT TO SIDEWALK OR CURB HEIGHT OF SIGN IN SIDEWALK OR PEDESTRIAN AREA SHALL BE 7"-0", AND 5"-0" IN ALL OTHER AREAS. LETTERING SHALL BE RED ON WHITE BACKGROUND,NO SMALLER THAN 2 INCHES IN HEIGHT. BURY DEPTH SHALL BE A MINIMUM OF 24 INCHES AND REBAR, A CONCRETE FOOTING, OR ANOTHER METHODTO PREVENT REMOVAL OF THE SIGN IS RECOMMENDED. FOOTINGS FOR SIGNS LOCATED IN THE PUBLICRIGHT-OF-WAY SHALL BE PER THE LOCAL JURISDICTION'S REQUIREMENTS. NO STOPPING SIGNFIRE LANE 4 5 3 12"18"2 CVC 22500.1 N.B.P.D. 949-644-3717 STOPPING FIRE LANE NO NO STOPPING SIGNFIRE LANE 'END' 4 5 3 12"18"4 CVC 22500.1 N.B.P.D. 949-644-3717 STOPPING FIRE LANE NO NO STOPPING SIGNFIRE LANE 'BEGIN' 4 5 3 12"18"3 CVC 22500.1 N.B.P.D. 949-644-3717 STOPPING FIRE LANE NOBEGIN END 66 6 LETTERING SHALL BE BOLD, CONDENSED WHITEREFLECTIVE LETTERING ON RED BACKGROUND,(1) INCH IN HEIGHT. CVC 22500.1 FIRE LANE NOTICE 24" 18" MINIMUM M.C. 12.40.190 F N.B.P.D. 949-644-3717 MIN. FIRE LANE ENTRY SIGN1 1 2 2 2 2 PREMISES IDENTIFICATION & ADDRESSING COMBUSTIBLE CONSTRUCTION LETTER MAY 31, 2023 NEWPORT BEACH FIRE DEPARTMENT 100 CIVIC CENTER DRIVENEWPORT BEACH, CA 92660 SUBJECT: COMBUSTIBLE CONSTRUCTION LETTER, 1400 BRISTOL STREET N., NEWPORT BEACH, CA. THE PURPOSE OF THIS LETTER IS TO NOTIFY YOU THAT THE 1400BRISTOL STREET N. SHALL INSTALL ALL REQUIRED PAVED FIRE ACCESSROADS THAT MEET NEWPORT BEACH FIRE DEPARTMENT ACCESS REQUIREMENTS PER THE APPROVED PLANS. ALL FIRE HYDRANTS ANDWATER SUPPLY FOR FIREFIGHTING PURPOSES SHALL BE INSTALLED PER THE APPROVED PLANS AND SHALL MEET ALL FIRE FLOWSREQUIREMENTS, PRIOR TO ANY COMBUSTIBLE CONSTRUCTION MATERIALS BEING DELIVERED FOR CONSTRUCTION. PARKING ENFORCEMENT LETTER MAY 31, 2023 NEWPORT BEACH FIRE DEPARTMENT100 CIVIC CENTER DRIVENEWPORT BEACH, CA 92660 RE: 1400 BRISTOL STREET N., NEWPORT BEACH, CA. PARKING ENFORCEMENT PLAN THE FIRE LANE PARKING ENFORCEMENT PLAN FOR THE ABOVEREFERENCED PROJECT IS STATED AS FOLLOWS: ALL FIRE LANES WITHIN PROJECT SHALL BE MAINTAINED AND IN NO EVENT SHALL PARKING BE PERMITTED ALONG ANY PORTION OF ASTREET OR DRIVE THAT REQUIRED FIRE LANES OR ANY AREADESIGNATED AS A FIRE LANE FOR TURN-AROUND OR DRIVE THROUGH PURPOSES. ONSITE MANAGEMENT SHALL ADOPT REASONABLE RULES ANDREGULATIONS REGARDING THE PARKING OF VEHICLES ALONG THE STREETS, ROADS AND OR DRIVES WITHIN THE PROJECT THAT ARE NOTIN CONFLICT WITH APPLICABLE LAW. IN FURTHERANCE THEREOF, PROJECT ONSITE MANAGEMENT, THROUGH ITS OFFICERS, COMMITTEES AND AGENTS WILL ESTABLISH THE“PARKING” AND “NO PARKING” AREAS WITHIN THE PROPERTY INACCORDANCE WITH SECTION 22658.2 OF THE CALIFORNIA VEHICLECODE AND NEWPORT BEACH FIRE DEPARTMENT STANDARDS. THE LAWSHALL BE ENFORCED THROUGH SUCH RULES AND REGULATIONS BY ALL LAWFUL MEANS, INCLUDING, WRITTEN WARNINGS, CITING, LEVYINGFINES AND TOWING VEHICLES IN VIOLATION. ONSITE MANAGEMENT WILL CONTRACT WITH A CERTIFIED PATROL AND TOWING COMPANY TO REMOVE VEHICLES THAT VIOLATE NO PARKINGRESTRICTIONS. FIRST TIME VIOLATORS WILL RECEIVE A WRITTEN WARNING AND WITH SUBSEQUENT VIOLATIONS, THE VEHICLE SHALL BESUBJECT TO TOWING. THE VEHICLE OWNER SHALL BE RESPONSIBLEFOR ALL COSTS INCURRED IN REMEDYING SUCH VIOLATION, INCLUDING WITHOUT LIMITATION TOWING COST, CITATIONS AND LEGAL FEES. VICINITY MAP NORTH 405 405 55 73 MAIN S T JAMBOREE R D EASTBLUFF DRUNIVERSITY DRIRVINE AVEJAMBOREE RDBAKER ST VON KARMAN A VE MACARTHUR BLVDRED HILL AVE CAMPUS DR BIR C H S T ME S A D R MO N T E V I S T A A V E 23 R D S TFAIRVIEW DRMIC H E L S O N D R DOVE STBRISTOL STCULVER DRJOHN WAYNEAIRPORT UPPER NEWPORT BAYSTATE MARINE RESERVE SAN DIE G O CREEK CA M P U S D R IRVINE AVEJAMBOREE RDMACARTHURBLVDBONITA CAN Y O N D RBISON A VE SA N J O A Q U I N H I L L S R D PA C I F I C C O A S T H W Y NEWPORT COAST DRIVEBR I S T O L S T N . PROJECTLOCATION ST. SPRUCE QU A I L AVE. BUILDING DESCRIPTION CONSTRUCTION TYPE OCCUPANCY TYPE FIRE SPRINKLERS GROSS SQUARE FOOTAGE PARKING GARAGESUBTERRANEAN LEVELS B1 & B2 NFPA 13 I-A 139,849 LEVEL 1 AT GRADE S-2 NFPA 13 I-A 65,674 LEVELS 2 THRU 6 A & R-2 NFPA 13 III-A 268,061 MINIMUM FIRE FLOW OF 3,000 GPM AT 20PSI FOR 4 HOURS REQUIRED PER THE LARGEST BUILDING OF APPROXIMATELY 268,061 SQ.FT. AND TYPE III-A CONSTRUCTION. A MINIMUM OFTHREE (3) FIRE HYDRANTS ARE REQUIRED SPACED NO MORE THAN 450-FEET FROMHYDRANT TO HYDRANT IN A THRU ROAD, AND NO MORE THAN 175-FEET FROM THE END OF ADEAD-END FIRE ACCESS ROAD. MIN. FIRE FLOW AND FIRE HYDRANT SPACING REQUIREMENTS S-2 NOT TO SCALE 275 DOG SPA 463 SF TRASH 938 SF UTILITY PUMP ROOM MECHANICAL POOL EQUIPMENT TRASH 930 SF RESIDENT PARKING GUEST PARKING HIGH SPEED ROLL-UP GATE OPEN DURINGBUSINESS HOURS 15%7.5% HIGH SPEED ROLL-UP GATE (CONTROLLED ACCESS ONLY) GATE ELEC. SUB-E. SUB-E. SUB-ELEC. MAINT. STAIR 3 STAIR 1 ROOF ACCESS VENTILATIONSHAFT (TO ROOF) ELEV 3 ELEV 1 ELEV 2 RESIDENT GARAGEENTRY RESIDENT & GUEST GARAGE ENTRY GATELOADING/ TRASH STAGINGFREE STANDINGCALL BOX 3 CAR QUEUING PODIUM ABOVE,TYPICAL VENTILATION SUPPLY SHAFTVENTILATION SUPPLY SHAFT PODIUM ABOVE,TYPICAL DN SPEED RAMP DN TO B1 RESIDENT PARKING MAIL BUSINESS CENTER 3,400 SF 749 SF FIRE UTILITY STAIR 2ROOF ACCESS FENCE  R40 ' R2 0 ' R40' R20'R20'R20'R40'R40' 26' 36' 220' FIRE HYDRANT TO FIRE HYDRANT EXISTING BRISTOL STREET N. 350' FIRE HYDRANT TO FIRE HYDRANT EXISTING SPRUCE AVENUE275'FIRE HYDRANT TOFIRE HYDRANT20'28'26'37'141'R40'R20'R 2 0 'R4 0 ' 1 2 4 2 PROJECTBOUNDARYPROJECTBOUNDARY PROJECTBOUNDARY PROJECTBOUNDARY 2 2 2 12 ROOFLINE ABOVE 2 2 5 5 6 7 3 6 6 26'67'120'6 5' WIDE WALKABLESURFACE. REFER TOLEGEND FORREQUIREMENTS. EXISTING COMMERCIALPARKING LOT. NOT A PART 400'400' INDICATES PROPOSED BUILDING (RESIDENTIAL AND INTERIOR COMMON USE) INDICATES PROPOSED PRIVATE FIRE HYDRANT WITH BLUE REFLECTIVE FIRE HYDRANTMARKER. MARKER SHALL BE PLACED 6" FROM CENTERLINE OF HYDRANT SIDE OF STREET AERIAL TRUCK LADDER ACCESS TO BUILDING (BETWEEN 20' - 40' FROM ACCESS ROAD) INDICATES EXISTING PUBLIC FIRE HYDRANT WITH BLUE REFLECTIVE MARKER INDICATES LIMITS OF BUILDING ROOFLINE INDICATES PROPOSED PARKING GARAGE INDICATES STAIR LOCATIONS INDICATES ELEVATOR LOCATIONS INDICATES PROPOSED FIRE ACCESS LANE WITH AN ALL WEATHER PAVED SURFACE CAPABLE OFSUPPORTING 72,000 LBS FORE FIRE APPARATUS AND TRUCK OUTRIGGER LOADS OF 75 POUNDS PER SQUARE INCH OVER 2-FOOT AREA. FIRE ACCESS LANES DO NOT REQUIRE A FIRE DEPARTMENTTURNAROUND SINCE THEY LESS THAN 150-FEET IN LENGTH PER CFC SECTION 503.2.5. INDICATES PROPOSED DOUBLE DETECTOR CHECK FOR AUTOMATIC FIRE SPRINKLER RISER CONNECTION AND PRIVATE FIRE HYDRANTS R4 0 ' R2 0 ' INDICATES FIRE APPARATUS PATH OF TRAVELWITH A 20-FOOT WIDE PATH, 20-FOOT INSIDE RADIUS AND 40-FOOT OUTSIDE RADIUS INDICATES 'NO STOPPING - FIRE LANE' SIGNS PER DETAILS SHT. F-1 INDICATES PROPOSED FIRE DEPARTMENT CONNECTION FORAUTOMATIC FIRE SPRINKLER RISER CONNECTION INDICATES PROPOSED POST INDICATOR VALVE LOCATED BETWEEN THE DOUBLEDETECTOR CHECK AND FIRE DEPARTMENT CONNECTION TO ISOLATE THE AUTOMATIC FIRE SPRINKLER RISER CONNECTION FROM THE BALANCE OF THE PRIVATE FIRE LINE FIRE DEPARTMENT HAMMERHEAD TURNAROUND PERTHE CITY OF NEWPORT GUIDELINE AND STANDARDS 60' 20' 60'20'30' R30'R INDICATES FIRE DEPARTMENT HOSE PULL WALKABLE ACCESS - 150' MAXIMUM INDICATES 5' WIDE WALKABLE PATH OF TRAVEL. FINISH SURFACE SHALL BE OFCONCRETE, PAVERS OR DECOMPOSED GRANITE. VEGETATION IS NOT PERMITTED. 0 GRAPHIC SCALE 1 inch = ft. 20'40' 20 DRAWING SCALE 08/10/2023 SHEET: OF 4NEWPORT BEACH FIRE DEPARTMENT The use of these plans and specifications shall be restricted to the original site for which they were prepared and publication thereof is expressly limited to such use. Reproduction, publication, or re-use by any method, in whole or in part without the express consent of FIRESAFE PLANNING SOLUTIONS is prohibited. PREPARED FOR:PREPARED BY:DATE:TITLE:ARCHITECTURE/PLANNING: 28506 AIROSO STREETRANCHO MISSION VIEJO, CA 92694OFFICE: (949) 240-5911 CIVIL ENGINEER:FIRE MASTER PLANSHEET INDEX F-1F-2F-3F-4 COVER SHEETOVERALL FIRE MASTER PLAN LAYOUT AT GRADELEVEL 2 & LEVEL 6 LAYOUTSBUILDING ELEVATIONS 19782 MACARTHUR BLVD. SUITE 300 IRVINE, CA 92612P: 949.862.0270 5000 BIRCH ST. EAST TOWER, SUITE 600 NEWPORT BEACH, CA 92660P: 949.267.1573 801 N PARKCENTER DRIVE SANTA ANA, CA 92705P: 714.560.8643 1400 BRISTOL STREET NORTHNEWPORT BEACH, CAPARCEL NO.: 427-332-02 CIVIL ENGINEER: 4930 CAMPUS DRIVE NEWPORT BEACH, CA 92660P: 949.476.8888 LAYOUT PLAN F-2 FIRE LANE ENTRANCE SIGN PER CITY OF NEWPORT BEACH FIRE DEPARTMENT. SEE DETAILS SHT. F-1.1 7 INSTALL FIRE HYDRANT MARKER THAT SHALL BE PLACED 6" FROM CENTERLINE OF STREET. 3 LEGEND CONSTRUCTION NOTES INSTALL KNOX KEY SWITCH.5 4 INDICATES GATE ENTRY TO PARKING GARAGE INDICATES APPROXIMATE LOCATION OF KNOX BOX WITH 3-SETS OF ENTRY DOOR/GATE KEYS OR KNOX KEY SWITCH. SEE CONSTRUCTION NOTES FOR DESIGNATION. INSTALL KNOX BOX WITH 3-SETS OF ENTRY DOOR/GATE KEYS.6 FIRE LANE 'NO STOPPING' SIGN PER CITY OF NEWPORT BEACH FIRE DEPARTMENT. SEE DETAIL SHT. F-1.2 FIRE LANE 'NO STOPPING BEGIN' SIGN PER CITY OF NEWPORT BEACH FIRE DEPARTMENT. SEE DETAIL SHT. F-1. FIRE LANE 'NO STOPPING END' SIGN PER CITY OF NEWPORT BEACH FIRE DEPARTMENT. SEE DETAIL SHT. F-1. INDICATES APPROXIMATE LOCATION OF THE BUILDING ADDRESS, MINIMUM 6" IN HEIGHT MEETING CITY OFNEWPORT BEACH REQUIREMENTS PROVIDED ON SHEET F-1. FINAL DESIGN AND LOCATION BY OTHERS INDICATES FIRE CONTROL ROOM LOCATION INDICATES NOT A PART OF FIRE ACCESS 276 (1-STORY)BEEZEWAYELEV 3 ELEV 2 STAIR 3 STAIR 1ROOF ACCESS (SGL VOLUME) OPEN TOBELOW LOW ROOF ELEV 1 POOL RR 964 SF CLUBROOM 3,256 SF(DBL. VOLUME) CALIFORNIA ROOM1,850 SF B936 B103 S101 S101 B103 S101 S101 B935 A406 A406 A406 S101 A710 A710 A602 A710 B103 A505 A602 B709 B709 A505 MEDIA CENTER 1,467 SF A110BEEZEWAYBEEZEWAYT PEDESTRIAN BRIDGE S101A105A105S101 POOL STAIR 2ROOF ACCESS B103A110 A110 A110 S101 A110 A110 A105 A602A602 B921 A B921 A A505 A505 B709 A110    EXISTING BRISTOL STREET N.EXISTING SPRUCE AVENUE6 6 DN POOL COURTYARD BELOW ELEV 3 ELEV 2 STAIR 3 STAIR 1ROOF ACCESS ELEV 1 T STAIR 2ROOF ACCESS LOUNGE AREA817 S.F. ROOFDECK1,510 S.F. B936 B103 S101 S101 B103 S101 S101 B935 A406 A406 A406 S101 A710 A710 A602 A710 B103 A505 A602 B709 B709 A505 A110S101A105A105S101 B103A110 A110 A110 S101 A105 A710A602 B936 A602A602A602A602 B921 A B921 A A505 A505 B709 B601   EXISTING BRISTOL STREET N.EXISTING SPRUCE AVENUE0 GRAPHIC SCALE 1 inch = ft. 30'60' 30 DRAWING SCALE 08/10/2023 SHEET: OF 4NEWPORT BEACH FIRE DEPARTMENT The use of these plans and specifications shall be restricted to the original site for which they were prepared and publication thereof is expressly limited to such use. Reproduction, publication, or re-use by any method, in whole or in part without the express consent of FIRESAFE PLANNING SOLUTIONS is prohibited. PREPARED FOR:PREPARED BY:DATE:TITLE:ARCHITECTURE/PLANNING: 28506 AIROSO STREETRANCHO MISSION VIEJO, CA 92694OFFICE: (949) 240-5911 CIVIL ENGINEER:FIRE MASTER PLANSHEET INDEX F-1F-2F-3F-4 COVER SHEETOVERALL FIRE MASTER PLAN LAYOUT AT GRADELEVEL 2 & LEVEL 6 LAYOUTSBUILDING ELEVATIONS 19782 MACARTHUR BLVD. SUITE 300 IRVINE, CA 92612P: 949.862.0270 5000 BIRCH ST. EAST TOWER, SUITE 600 NEWPORT BEACH, CA 92660P: 949.267.1573 801 N PARKCENTER DRIVE SANTA ANA, CA 92705P: 714.560.8643 1400 BRISTOL STREET NORTHNEWPORT BEACH, CAPARCEL NO.: 427-332-02 CIVIL ENGINEER: 4930 CAMPUS DRIVE NEWPORT BEACH, CA 92660P: 949.476.8888 UPPER LEVEL FLOORPLANS F-3 LEVEL 6 FLOORPLAN LEVEL 2 FLOORPLAN INDICATES PROPOSED BUILDING(RESIDENTIAL AND INTERIOR COMMON USE) INDICATES STAIR LOCATIONS INDICATES ELEVATOR LOCATIONS LEGEND INDICATES APPROXIMATE LOCATION OF KNOX BOXWITH 3-SETS OF ENTRY DOOR/GATE KEYS. LEGEND AERIAL TRUCK LADDER ACCESS TO BUILDING(BETWEEN 20' - 40' FROM ACCESS ROAD) CONSTRUCTION NOTES INSTALL KNOX BOX WITH 3-SETS OF ENTRY DOOR/GATE KEYS.6 SCALE: 1"=30'SCALE: 1"=30' 277 0 GRAPHIC SCALE 1 inch = ft. 30'60' 30 DRAWING SCALE 08/10/2023 SHEET: OF 4NEWPORT BEACH FIRE DEPARTMENT The use of these plans and specifications shall be restricted to the original site for which they were prepared and publication thereof is expressly limited to such use. Reproduction, publication, or re-use by any method, in whole or in part without the express consent of FIRESAFE PLANNING SOLUTIONS is prohibited. PREPARED FOR:PREPARED BY:DATE:TITLE:ARCHITECTURE/PLANNING: 28486 AIROSO STREETRANCHO MISSION VIEJO, CA 92694OFFICE: (949) 240-5911 CIVIL ENGINEER:FIRE MASTER PLANSHEET INDEX F-1F-2F-3F-4 COVER SHEETOVERALL FIRE MASTER PLAN LAYOUT AT GRADELEVEL 2 & LEVEL 6 LAYOUTSBUILDING ELEVATIONS 19782 MACARTHUR BLVD. SUITE 300 IRVINE, CA 92612P: 949.862.0270 5000 BIRCH ST. EAST TOWER, SUITE 600 NEWPORT BEACH, CA 92660P: 949.267.1573 801 N PARKCENTER DRIVE SANTA ANA, CA 92705P: 714.560.8643 1400 BRISTOL STREET NORTHNEWPORT BEACH, CAPARCEL NO.: 427-332-02 CIVIL ENGINEER: 4930 CAMPUS DRIVE NEWPORT BEACH, CA 92660P: 949.476.8888 UPPER LEVEL FLOORPLANS F-4 SOUTH ELEVATION WEST ELEVATION NOT TO SCALE NOT TO SCALE EAST ELEVATION NOT TO SCALE NORTH ELEVATION NOT TO SCALE SPRUCE AVE. FUTURE 1300 BRISTOL SPRUCE AVE. FUTURE 1300 BRISTOL BRISTOL ST.BRISTOL ST. 278 December 4, 2023 City of Newport Beach Planning Commission and City Council 100 Civic Center Drive Newport Beach, California 92660 Re: The Picerne Group — 1400 Bristol Street Dear Members of the Newport Beach Planning Commission: I am writing this letter to express our support for The Picerne Group's proposed luxury apartment community development at 1400 Bristol Street in Newport Beach. I expect this project will bring new life to the area, expand the customer base for local retail businesses, and provide needed housing for the Airport Area employment base. Newmeyer Dillion's headquarters at 895 Dove Street is within a few city blocks of the proposed development. As a law firm, we employ a variety of people who would be attracted to the walkability to our office while also enjoying the retail choices in the immediate area and access to the Newport Beach lifestyle. We have come to know The Picerne Group as a committed community member that takes a strong interest in the wellbeing of Newport Beach. We also understand that they are self­ funded, which is atypical in today's development industry, and that they buy their Southern California properties to hold for the long term. We encourage you to approve this development, which we regard as a positive step towards creating an airport market village where people will live, work, and shop. Michael B. McClellan Planning Commission - December 7, 2023 Item 4a - Additional Materials Received Residences at 1400 Bristol Street (PA2022-0296) Planning Commission - December 7, 2023 Item No. 4b - Additional Materials Received Residences at 1400 Bristol Street (PA2022-0296) December 7, 2023, Planning Commission Item 4 Comments These comments on a Newport Beach Planning Commission agenda item are submitted by: Jim Mosher (jimmosher@yahoo.com ), 2210 Private Road, Newport Beach 92660 (949-548-6229). Item No. 4. RESIDENCES AT 1400 BRISTOL STREET (PA2022-0296) Skimming portions of the proposed resolution, I have these preliminary comments: 1. In the “General Plan Amendment” section starting on handwritten page 34, the description in fact or finding 1 that “The request is to amend the General Plan Land Use designation from General Commercial Office (CO-G) to Mixed-Use Horizontal 2 (MU-H2)” seems incomplete. First, the request is to do that only at 1400 Bristol Street. And second, per Section 1.2 (page 31), it is to do that and to add 64 dwelling units not currently in the General Plan or allotted to the MU-H2 designation. 2. On handwritten page 45, the “Traffic Study” portion of Section 3 of the proposed resolution begins with a lettered finding “A”, then skips to a finding “D” and follows that by a finding “B”. As it serves no obvious purpose, I suspect this non-sequential lettering is a typo. 3. Fact D.1.c on page 50 says the 64 non-replacement dwellings are expected to add 624 average daily vehicle trips. In light of that, it is interesting to me that in Tables 3.12-2, 3.12-3 and 3.12-4 of Section 3.12 (Noise) of the Addendum (No. 6) to the 2006 EIR, the only neighboring streets on which those vehicles consistently produce increased trips (300 ADT) is Bristol, although in Table 3.12-4 (but strangely, not in the others – likely due to rounding the numbers to 100), they also add 100 ADT on Jamboree. 4. Considering the effort the City has gone to to move this site outside the airport’s 65 dB CNEL contour, it is interesting to note that in the tables of the Addendum just referenced, traffic on Bristol Street itself, without counting airport noise, is expected to produce 64.8 dB CNEL at the project site on opening day, increasing to 65.5 dB at buildout of the current General Plan, without all the additional housing the City hopes to add. Although the purpose of those tables is to predict if the project traffic will increase noise on selected streets, it is also interesting that the adjacent 73 freeway is not listed in them. But I see now that is consistent with the Noise Element of our General Plan, which does not identify freeways as sources of traffic noise (see Figure N5). 5. On handwritten page 51, under “Development Agreement,” finding or fact 2 refers to a “public safety fee” implying it is part of the Development Agreement. Yet Condition of Approval 19 on handwritten page 167 suggests it is an obligation separate from the DA. 6. On handwritten page 58, the proposed amendment to Anomaly 16 does not appear clearly written to me. It suggests two office buildings of 38,764 sf each were demolished. But from the last paragraph on page 37 it is a total of 38,764 sf. It is also unclear where in Anomaly 16 1 the 89 units referred to are. I would suggest something like: “At 1400 Bristol Street, 89 dwelling units were converted from two existing office buildings totaling 38,764 square feet and 64 units were added through a GPA (PA2022-0296).” 1 Anomaly 16 is the entire area bounded by Birch, Quail, Spruce and N. Bristol. Planning Commission - December 7, 2023 Item No. 4b - Additional Materials Received Residences at 1400 Bristol Street (PA2022-0296) RESIDENCES AT 1400 BRISTOL STREET Planning Commission, Public Hearing December 7, 2023 Planning Commission - December 7, 2023 Item No. 4c - Additional Materials Presented at Meeting Residences at 1400 Bristol Street (PA2022-0296) PROJECT LOCATION 2 Project Site Planning Commission - December 7, 2023 Item No. 4c - Additional Materials Presented at Meeting Residences at 1400 Bristol Street (PA2022-0296) PROJECT DESCRIPTION •Demolition of existing two office buildings •Totaling 38,764 SF •Construction of 229 apartment units•203 market rate units•23 affordable units (very-low income households) •Podium style construction•Five levels of residential units •One level of on grade parking•Two levels of subterranean parking•422 parking spaces total •Pedestrian bridge over Spruce Street 3 Planning Commission - December 7, 2023 Item No. 4c - Additional Materials Presented at Meeting Residences at 1400 Bristol Street (PA2022-0296) ENTITLEMENTS REQUESTED •General Plan Amendment•General Commercial Office (CO-G) to Mixed-Use Horizontal (MU-H2)•Add 64 dwelling units •Planned Community Amendment•Residential Overlay •Major Site Development Review •Affordable Housing Implementation Plan •Traffic Study •Development Agreement •Addendum to the 2006 General Plan EIR•CEQA 4 Planning Commission - December 7, 2023 Item No. 4c - Additional Materials Presented at Meeting Residences at 1400 Bristol Street (PA2022-0296) Units Based on Existing Nonresidential Uses 89 Additional Units Per Proposed General Plan Amendment1 64 Total Base Units 153 Density Bonus (50%)77 Total Units Permitted 230 Total Units Provided 229 DWELLING UNIT SUMMARY 5 Planning Commission - December 7, 2023 Item No. 4c - Additional Materials Presented at Meeting Residences at 1400 Bristol Street (PA2022-0296) 6 Spruce StreetBristol Street Planning Commission - December 7, 2023 Item No. 4c - Additional Materials Presented at Meeting Residences at 1400 Bristol Street (PA2022-0296) PEDESTRIAN BRIDGE 7 Planning Commission - December 7, 2023 Item No. 4c - Additional Materials Presented at Meeting Residences at 1400 Bristol Street (PA2022-0296) RENDERINGS (BRISTOL/SPRUCE INTERSECTION) 8 Planning Commission - December 7, 2023 Item No. 4c - Additional Materials Presented at Meeting Residences at 1400 Bristol Street (PA2022-0296) DENSITY BONUS AND AHIP 9 Development Standard Waivers:•Park dedication requirement•½ Acre•Residential density•50 DU/AC vs. 96 DU/AC•Street setbacks•30 feet required vs. 8 feet (Spruce) and 18 feet (Bristol)•Building height•55 feet vs. 85 feet•Private open space•Studios •Common open space•17,175 SF vs. 13,800 SF Incentive/concession•Modify Affordable Unit Mix Planning Commission - December 7, 2023 Item No. 4c - Additional Materials Presented at Meeting Residences at 1400 Bristol Street (PA2022-0296) DEVELOPMENT AGREEMENT 10 •Under negotiation•10-year term•Includes public safety fee•Includes park fee•Similar to Newport Airport Village:•General Public Benefit Fees: $13,513.51/unit•Public Safety Fees: $2,252.25/unit•Adjusted by CPI Planning Commission - December 7, 2023 Item No. 4c - Additional Materials Presented at Meeting Residences at 1400 Bristol Street (PA2022-0296) CEQA ADDENDUM AND TRAFFIC STUDY 11 Addendum to the 2006 General Plan EIR•No new environmental analysis is necessary unless certain thresholds are triggered.•All potential impacts associated with this Project would either be the same or less than those described in the EIR that have been appropriately mitigated•No substantial changes to the circumstances and no new information regarding the potential for new or more severe significant environmental impacts been identified Traffic Study•Net increase of 624 trips•No impacts to local intersections•No mitigation required Planning Commission - December 7, 2023 Item No. 4c - Additional Materials Presented at Meeting Residences at 1400 Bristol Street (PA2022-0296) REVISIONS TO CONDITIONS OF APPROVAL 12 •Typographical errors and repetitive conditions•Numbering Planning Commission - December 7, 2023 Item No. 4c - Additional Materials Presented at Meeting Residences at 1400 Bristol Street (PA2022-0296) REVISIONS TO CONDITIONS OF APPROVAL 13 Planning Commission - December 7, 2023 Item No. 4c - Additional Materials Presented at Meeting Residences at 1400 Bristol Street (PA2022-0296) REVISION TO “EXHIBIT C” OF RESOLUTION 14 Table LU2 Anomaly Locations AnomalyNumber StatisticalArea Land Use Designation DevelopmentLimit (sf)Development Limit (Other)Additional Information 16 L4 CO-G/MU- H2 344,231 64 Dwelling Units 89 dwelling units were converted from two existing office buildings totaling 38,764 square feet consistent with LU 6.15.5 and 64 dwelling units were added through a GPA at 1400 Bristol Street (PA2022-0296) Planning Commission - December 7, 2023 Item No. 4c - Additional Materials Presented at Meeting Residences at 1400 Bristol Street (PA2022-0296) RECOMMENDATION AND NEXT STEPS Recommendation •Planning Commission adopt resolution recommending approval of project to City Council Next Steps •Airport Land Use Commission Review•City Council Public Hearing(s) 15 Planning Commission - December 7, 2023 Item No. 4c - Additional Materials Presented at Meeting Residences at 1400 Bristol Street (PA2022-0296) THANK YOU Liz Westmoreland, Senior Planner 949-644-3234 or lwestmoreland@newportbeachca.gov 16 Planning Commission - December 7, 2023 Item No. 4c - Additional Materials Presented at Meeting Residences at 1400 Bristol Street (PA2022-0296) Planning Commission - December 7, 2023 Item No. 4d - Additional Materials Presented at the Meeting Residences at 1400 Bristol Street (PA2022-0296) 2023 1400 Bristol 2 Project Team Project Sponsor Project Advancement Project Design Highlights Community Support Project Commitments Planning Commission - December 7, 2023 Item No. 4d - Additional Materials Presented at the Meeting Residences at 1400 Bristol Street (PA2022-0296) 2023 1400 Bristol 3 Planning Commission - December 7, 2023 Item No. 4d - Additional Materials Presented at the Meeting Residences at 1400 Bristol Street (PA2022-0296) 2023 1400 Bristol 4 ONE UPTOWN (NEWPORT BEACH, CA) BLU (LAGUNA NIGUEL, CA) Planning Commission - December 7, 2023 Item No. 4d - Additional Materials Presented at the Meeting Residences at 1400 Bristol Street (PA2022-0296) 2023 1400 Bristol Street 5 Planning Commission - December 7, 2023 Item No. 4d - Additional Materials Presented at the Meeting Residences at 1400 Bristol Street (PA2022-0296) 2023 1400 Bristol 6 Planning Commission - December 7, 2023 Item No. 4d - Additional Materials Presented at the Meeting Residences at 1400 Bristol Street (PA2022-0296) 2023 1400 Bristol 7 Planning Commission - December 7, 2023 Item No. 4d - Additional Materials Presented at the Meeting Residences at 1400 Bristol Street (PA2022-0296) 2023 1400 Bristol 8 Planning Commission - December 7, 2023 Item No. 4d - Additional Materials Presented at the Meeting Residences at 1400 Bristol Street (PA2022-0296) 2023 1400 Bristol 9 Planning Commission - December 7, 2023 Item No. 4d - Additional Materials Presented at the Meeting Residences at 1400 Bristol Street (PA2022-0296) 2023 1400 Bristol 10 Planning Commission - December 7, 2023 Item No. 4d - Additional Materials Presented at the Meeting Residences at 1400 Bristol Street (PA2022-0296) 2023 1400 Bristol 11 N Planning Commission - December 7, 2023 Item No. 4d - Additional Materials Presented at the Meeting Residences at 1400 Bristol Street (PA2022-0296) 2023 1400 Bristol 12 Planning Commission - December 7, 2023 Item No. 4d - Additional Materials Presented at the Meeting Residences at 1400 Bristol Street (PA2022-0296) 2023 1400 Bristol 13 Planning Commission - December 7, 2023 Item No. 4d - Additional Materials Presented at the Meeting Residences at 1400 Bristol Street (PA2022-0296) 2023 1400 Bristol 14 Planning Commission - December 7, 2023 Item No. 4d - Additional Materials Presented at the Meeting Residences at 1400 Bristol Street (PA2022-0296) 2023 1400 Bristol 15 Planning Commission - December 7, 2023 Item No. 4d - Additional Materials Presented at the Meeting Residences at 1400 Bristol Street (PA2022-0296) 2023 1400 Bristol 16 Planning Commission - December 7, 2023 Item No. 4d - Additional Materials Presented at the Meeting Residences at 1400 Bristol Street (PA2022-0296) 2023 1400 Bristol 17 Planning Commission - December 7, 2023 Item No. 4d - Additional Materials Presented at the Meeting Residences at 1400 Bristol Street (PA2022-0296) 2023 1400 Bristol 18 Planning Commission - December 7, 2023 Item No. 4d - Additional Materials Presented at the Meeting Residences at 1400 Bristol Street (PA2022-0296) 2023 1400 Bristol 19 Planning Commission - December 7, 2023 Item No. 4d - Additional Materials Presented at the Meeting Residences at 1400 Bristol Street (PA2022-0296) 2023 1400 Bristol 20 Planning Commission - December 7, 2023 Item No. 4d - Additional Materials Presented at the Meeting Residences at 1400 Bristol Street (PA2022-0296)