Loading...
HomeMy WebLinkAboutX2022-1163 - MiscXT022. Wo 3 ! ?22 6vrA4 l CITY OF NE PORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT Bi ILDING DIVISION 100 Civic Center Drive ( P.O. Box 1768 Newport Beach, CA 92658 www.newportbeachca.gov (949) 644-3200 Project Address: 1729 Orchard ave Permit Number: X2022-1163 Inspection Type (s): Epoxy set retro fit all thread rod for HDI-12`s,ABs, rebar dowels Inspection Date (s).: 6/22/2022 ( ) Periodic ( N Continuous Describe I.nspection,; Including Cocatitn(s): Installation of epoxy set retro fit all thread rod for HDU2 hold downs & AB's rebar dowels (2p}%8'' a refro fit all thread rod anchor baits installed at 24'`oc w min 8`''embedment ....... .....,.....onto existing faatlrtg. She deta'i1...2/SD.1.................................................................................................. ......................................................._.................. (4,618"'•o retro•fit•ali•thread••rods•for•.new•.HDU2•,hold..downs••installed••w/,,rnin..1.2.1./.2c'....................................... embedment at. e..�4tsting.lopti,n9n. Sep etai{ /SC11.........................,.................................................,............................................... (42) ##4 horizontal rebar dowels installed w/ min 4" embedment into existing foundation o ra o[ O@W Jounclation Tootin 4isY Testy ftadelr Nl.......................... ............................................................................................... ................................................................................ ............................................ ........................:.................... ........ fotal-lnspectfoniirtie'EaCF1 pays. { Date:,W.A.-..... .. ............................:........... ................................ ....................................................... Hours" .I I NA ll'items Reouiting tortection (include Preulously°tasted Uncorrected'Iterns): ........NQJ.P ttrbang.lei..4r d..evlaklo.11a...11le41...fro:CYl.app.0......................... -con,mentsi_, All work done in accordance with City of Newport Beach Building Department approved n'sYrU'0ti�i'h tfitis; tC'C''EV I'G'dtitih...B 't+lick'R'o''ii'rc"2'S�'8';'AB'TIVi"C1'72/C31.y..A.Cl...318-Z'R........................................ 5:87115.9T•5.1,0;: and..GBG secfions.1903/1.704.4..�Holes•wera-drtied..te•-the.•required••diameter-and......................... .m.f Qd nt...apth:,.hQle .w.l~.ra,..the.n.biown gut..at.1Qp..p i,...larusklad..Qut, th.en..blgwn.:nut.again..at........................ 100 psl prior to epoxy application Simpson SET-XP epoxy used Horizontal rebar dowels & "retro"flt all fhe&ad rods uvere'inserted Into" epoxy filled holes and' rotated'l turn: at uistaliation To the best of my knowledge, the work inspected was in accordance with the Building Division approved design drawings, specifications and applicable workmanship provisions of the IJAC. except as noted above. Special Inspection Report 8.24-55 Q�,whokT CITY OF NEWPORT BEACH REPORT OF SPECIAL INSPECTION TYPE OF INSPECTION: Epoxy set horizontal rebar dowels/retro-fit all thread rod DATE: 12/9/2022 OWNER: Private residence REGISTRATION No.: NB0569 PROJECT ADDRESS: 1722 Orchard, Newport Beach CA ARCHITECT: 3JK Design ENGINEER: Shucri "Chuck" Ya hi PROJECT TYPE: Residential remodel/addition BUILDING PERMIT: XR2022-2475 Observation and verification of the following work: Epoxy set horizontal rebar dowels/retro-fit all thread rod for new AB's and HDU2 hold downs NEW TO EXISTING FOOTING CONNECTIONS: (2) #4 horizontal rebar dowels installed T & B at w/min 6" embedment holes drilled angled down into existing exterior/interior footings at new to existing footing connections. (5 locations, 20 dowels total) See detail 10/SD1 NEW INTERIOR FOOTING/GRADE BEAM FOUNDATION PAD & PLUMBING/UTILITY TRENCHES: #4 horizontal rebar dowels installed 16"oc staggered both sides of trench w/ min 4" embedment into interior foundation slab on grade. (44 dowels total) See detail 10/SD1 RETRO-FIT ANCHOR BOLTS: 5/8" 0 retro fit all thread rod anchor bolts installed w/ min 8" embedment into existing footings at garage exterior stem wall footings and existing interior/exterior footings at house at shear wall /9,10,12\ plate breaks, missing bolts, misc locations etc. (32 anchor bolts total) see detail 4/SD1 ADDED HDU2 HOLD DOWNS: 5/8" 0 retro fit all thread rod for new HTT5 hold downs installed w/ min 12 1/2" embedment into existing Exterior/interior footings ay shear wall /9,10,12\ locations. (6 HDU2's total) See detail 3/SD1 All work done in accordance with City of Newport Beach Building Department approved construction plans, ICC Evaluation Service Reports 2508, ASTM C172/C31,AC1 318-5.6, 5.8, 5.9, 5.10, and CBC ,ArfinnG1903/1704.4. 2304.9.5.1-2304.9.5.4, 2304.9.2 Holes were drilled to the required diameter and embedment depth, holes were blown out at 'i uz psi, brushed out, and then blown out again at 99 psi prior to epoxy application. All rebar dowels and retro-fit all thread rods were inserted into epoxy filled holes and rotated 1/2 turn at time of installation. SET-XP was used. No problems noted at time of inspection. Steve Skeffington Deputy Inspector ICBO CERTIFICATIONS: 1030205-10, 20, 30, 40, 49, 50, 51, 55, 60, 89 ICC CERTIFICATIONS: 1030205-133, 135, 136, C5, C8, E5, M5, P5, R5, CB ACI FIELD TECHNICIAN GRADE 1: 0023995 19386 Highridge Way • Trabuco Canyon • CA 92679 • (949) 228-1261 • steve@coastdeveiopment.net