Contractor's Material and Test Certificate for Underground Piping
PROCEDURE
Upon completion of work, inspection and tests shall be made by the contractor's representative and witnessed by an owner's
representative. All defects shall be corrected and system left in service before contractor's personnel finally leave the Job.
A certificate shall be filled out and signed by both representatives. Copies shall be prepared for approving authorities, owners, and
contractor. It is understood the owner's representative's signature In no way prejudices any claim against contractor for faulty material, poor
workmanship, or failure to comply with approving authority's requirements or local ordinances.
Property name Clearwater Harbor Point
°ate 08/28/23
Property address 101 Bayview Place Newport Beach, CA 92660
Accepted by approving authorities(names) Newport Beach Fire Department
Address 100 Civic Center Drive, Newport Beach, CA 92660
Plans
Installation conforms to accepted plans Yes No
Equipment used is approved [ Yes No
If no, state deviations
Has person in charge of fire equipment been instructed as to location of (] Yes No
control valves and care and maintenance of this new equipment?
If no, explain
Instructions
Have copies of appropriate instructions and care and maintenance Yes No
charts been left on premises?
If no, explain
Location
Supplies buildings 101 Bayview Place
Pipe types and class C-900 DR-14
Type joint ASTM DR139
Pipe conforms to AWWA standard 0 No
Underground
Fittings conform to ASTMA A536 standard Yes No
pipes and joints
If no, explain
Joints needed anchorage clamped, strapped, or blocked in Yes 0 No
accordance with standard
If no, explain
City of Newport Beach PWD STD-510-L-A
Flushine, Flow the required rate until water is clear as indicated by no collection of foreign material in burlap bags at
outlets such as hydrants and blow -offs. Flush at flows not less than 390 gpm (1476 Umin) for 4-in. pipe, 880 gpm (3331
Umin) for 6-In. pipe, 1560 gpm (5905 Umin) for B-in. pipe, 2440 gpm (9235 Umin) for 10-in. pipe, and 3520 gpm (13,323
Umin) for 12-in. pipe. When supply cannot produce stipulated flow rates, obtain maximum available.
Hydrostatic: Hydrostatic tests shall be made at not less than 200 psi (13.8 bar) for 2 hours or 50 psi (3.4 bar) above
Test
static pressure in excess of 150 psi (10.3 bar) for 2 hours.
description
Leakage: New pipe laid with rubber gasketed joints shall, if the workmanship is satisfactory, have little or no leakage at
the joints. The amount of leakage at the joints shall not exceed 2 quarts per hour (1.89 Uhr) per 100 joints irrespective
of pipe diameter. The leakage shall be distributed over all joints. If such leakage occurs at a few joints, the installation
shall be considered unsatisfactory and necessary repairs made. The amount of allowable leakage specified above can
be increased by 1 fluid ounce per inch valve diameter per hr. (30 mU25 mm/hr) for each metal seated valve isolating the
test section. If dry barrel hydrants are tested with the main valve open so the hydrants are under pressure, an additional
5 ounces per minute (150 mUmin) leakage is permitted for each hydrant.
New prtdprground piping flushed according to NBFD Yes M No
OO�T standard by (company) DELTA PIPELINE
If no, explain
Flushing
How flus ' g flow was obtained
ublic water 0 Tank or reservoir 0 Fire pump
Through what type openin
0 Hydrant butt Open pipe
tests
Lead-ins flushed according to IRWD standard by (company) DELTA jZ Yes 0 No
If no, explain PIPELINE
How fl ing flow was obtained
Through what type opening
ublic water (] Tank or reservoir (] Fire pump
(] Y connection to flange pen pipe
and spigot
Reprinted with permission from NFPA 13, Installation of Sprinkler Systems, Copyright 02002, National Fire Protection Association, Quincy, MA 02269. This reprinted material
is not the complete and official portion of the National Fire Protection Association, on the referenced subject which Is represented only by the standard in its entirety.
American Fire Sprinkler Association AFSA Form #AF064
9696 Skillman Street, Suite 300, Dallas, Texas 75243
F Zoz� - DI-1 75
All new underground piping hydrostatically tested at
Joints covered
Hydrostatic
test
220 psi for 4 hours
Yes
No
Total amount of leakage measured
Leakage
gallons hours `No leakage
test
Allowable leakage
gallons hours
Number installed
Type and make
All operate satisfactorily
Hydrants
O
0 Yes
0 No
Water control valves left wide open
Yes
.Lj No
Control
If no, state reason
valves
Hose threads of fire department connections and hydrants Interchangeable with
2r Yes
No
those of fire department answering alarm
Date left in service
Remarks
Name of installing contractor
Delta Pipeline, Inc. City of Newport Beach - Bldg Department
Signatures
Tests witnessed by
For property owner (signed) Title
Date
For installn wntractor (signed) Title
Date
nary (� eurata Assistant Superintendent
08/28/23
Additional explanation and notes
Contractor's Material and Test Certificate for Underground Piping