HomeMy WebLinkAbout08 - 29th Street Public Pier - Award of Contract No. 8821-2 (19H02)Q �EwPpRT
CITY OF
s NEWPORT BEACH
`q44:09 City Council Staff Report
January 23, 2024
Agenda Item No. 8
TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
FROM: David A. Webb, Public Works Director - 949-644-3311,
dawebb@newportbeachca.gov
PREPARED BY: Chris Miller, Administrative Manager - 949-644-3043,
cmiller@newportbeachca.gov
TITLE: 29t" Street Public Pier — Award of Contract No. 8821-2 (19H02)
ABSTRACT:
The City of Newport Beach received construction bids for the 29t" Street Public Pier
replacement project and staff requests City Council approval to award the construction
contract to Swift Slip Dock & Pier Builders, Inc. of Westminster. This project will remove
the existing and non -operational City float at 2911 Street and Lafayette on the Balboa
Peninsula and replace it with a new public pier platform, gangway and float. The new pier
will enhance public access from the Cannery Village area to and from the water and will
accommodate up to four, smaller -sized vessels.
RECOMMENDATIONS:
a) Find this project exempt from the California Environmental Quality Act (CEQA)
pursuant to Section 15301 (Existing Facilities) and Section 15302 (Replacement or
Reconstruction) of the CEQA Guidelines, because this project has no potential to have
a significant effect on the environment;
b) Approve the project plans and specifications;
c) Award Contract No. 8821-2 to Swift Slip Dock & Pier Builders, Inc. for the total bid
price of $244,890 for the 29t" Street Public Pier, and authorize the Mayor and City
Clerk to execute the contract; and
d) Establish a contingency of $24,500 (approximately 10% of total bid) to cover the cost
of unforeseen work not included in the original contract.
DISCUSSION:
At 3 p.m. on December 13, 2023, the City Clerk opened and read the following bids for
this project:
BIDDER
TOTAL BID AMOUNT
Low
Swift Slip Dock & Pier Builders, Inc.
$ 244,890
2nd
Jilk Heavy Construction, Inc.
$ 369,654
3rd
Power Engineering Construction Co.
$ 539,200
8-1
2911 Street Public Pier — Award of Contract No. 8821-2 (19H02)
January 23, 2024
Page 2
The low bidder, Swift Slip Dock & Pier Builders, Inc. (Swift), submitted a bid that is
37% below the Engineer's Estimate of $388,500. The difference between the low bid and
the Engineer's Estimate was primarily attributed to local sourcing for barge services
therefore minimizing the mobilization expenses.
Swift possesses a California State Contractor's License Classification "A", as required by
the project specifications. A review of references for Swift shows satisfactory completion
of similar contracts for the City and other municipalities. Swift is currently one of the City's
on -call contractors for repair and maintenance of the City's public docks.
The proposed project includes the demolition of the existing City float at the 2911 Street
end, and replacing it with a new pier platform, 30-foot gangway, and a 40-foot
single -finger float centered at the street end.
Pursuant to the contract specifications, the contractor will have 100 consecutive working
days to complete the work. While the actual dock construction is anticipated to take a
minimal amount of time, the lead time for the piles and gangway could be significant. It is
anticipated the project would be completed before the summer season for maximum
boater utilization.
The project plans and specifications will be available for review at the January 23, 2024
City Council meeting or upon request.
FISCAL IMPACT:
The adopted Capital Improvement Program budget includes sufficient funding for the
award of this contract. Tidelands funds will account for all needed funding for this project.
The Tidelands Capital Fund was created to allow for the sequestration of incremental
increases from tidelands rent adjustments solely to finance critical in -harbor capital
improvements, like sea walls repair, dredging, piers, and important amenities.
The following funds will be expensed:
Account Description
Tidelands Capital Fund
Proposed funds uses are as follows:
Vendor
Swift Slip Dock & Pier Builders, Inc
Swift Slip Dock & Pier Builders, Inc
Account Number
10101-980000-19H02
Total:
Purpose
Construction Contract
Construction Contingency
Total:
Amount
$ 269,390
$ 269,390
Amount
$ 244,890
$ 24,500
$ 269,390
Staff recommends including $24,500 (10% of total bid) for contingency purposes and
unforeseen conditions associated with construction.
8-2
291" Street Public Pier — Award of Contract No. 8821-2 (191-102)
January 23, 2024
Page 3
ENVIRONMENTAL REVIEW:
Staff recommends the City Council find this project exempt from the California
Environmental Quality Act (CEQA) pursuant to Section 15301 (Existing Facilities) and
15302 (Replacement or Reconstruction) of the CEQA Guidelines, California Code of
Regulations, Title 14, Chapter 3 because this project has no potential to have a significant
effect on the environment. CEQA Guidelines Section 15301 (Class 1) applies to the
"operation, repair, maintenance, permitting, leasing, licensing, or minor alteration of
existing public or private structures, facilities, mechanical equipment, or topographical
features, including negligible or no expansion of existing or former use." Section 15302
(Class 2) applies to the "replacement or reconstruction of existing structures and facilities
where the new structure will be located on the same site as the structure replaced and
will have substantially the same purpose and capacity as the structure replaced." The
replacement public dock is in the same location and is substantially the same size and
purpose as the dock system it replaces.
NOTICING:
The agenda item has been noticed according to the Brown Act (72 hours in advance of
the meeting at which the City Council considers the item).
ATTACHMENT:
Attachment A — Location Map
8-3
ATTACHMENT A
E#
tElnl"[fll
LIMITS OF WORK
Qe
s
/-29TH ST
-off o PUBLIC PIER
29TH STREET PUBLIC PIER REPLACEMENT
V /A t/o0
CITY OF NEWPORT BEACH
PUBLIC WORKS DEPARTMENT
LOCATION MAP
C-8821-2 191-102 01 /23/24