HomeMy WebLinkAboutBLD21-2199_Erosion ControlEROSION CONTROL BMPS EC-1 SCHEDULING SCHEDULE PREPARED BY CONTRACTOR SHALL BE ON-SITE DURING CONSTRUCTION. TEMPORARY SEDIMENT CONTROL SE-5 FIBER ROLLS INSTALL WHERE SHOWN ON PLAN. SE-7 STREET SWEEPING AND VACUUMING STREET SHALL BE SWEEPED, SEDIMENT COLLECTED, AND DISPOSED OF OFF-SITE ON A DAILY BASIS. SE-10 STORM WATER INLET PROTECTION ONCE INLET RISERS ARE CONSTRUCTED, SURROUND RISERS WITH GRAVEL BAGS OR CAP THE RISER TO REDUCE SEDIMENT INTRODUCTION TO THE AREA DRAIN SYSTEM. WIND EROSION CONTROL BMPS WE-1 WIND EROSION CONTROL WATER OR COVER MATERIAL SHALL BE USED TO ALLEVIATE DUST NUISANCE ON THE ROUGH GRADED PADS AND ANY STOCKPILE AREAS. TRACKING CONTROL TC-1 STABILIZED CONSTRUCTION EXIT RUMBLE RACK SHALL BE PLACED ON THE DRIVEWAY TO ENSURE THAT ALL VEHICLES LEAVING THE SITE PASS OVER THE DEVICES BEFORE ENTERING THE PUBLIC STREET. NON-STORMWATER MANAGEMENT NS-6 ILLICIT CONNECTION / ILLEGAL DISCHARGE CONTRACTOR SHALL REPORT ILLICIT CONNECTIONS OR ILLEGALLY DUMPED MATERIALS ON SITE TO THE RESIDENT ENGINEER IMMEDIATELY AND CONTRACTOR SHALL TAKE NO FURTHER ACTION UNTIL THE RESIDENT ENGINEER PROVIDE A RESPONSE/ NS-7 POTABLE WATER / IRRIGATION EXCISE CARE DURING CONSTRUCTION TO PREVENT NON-STORMWATER DISCHARGES. NS-8 VEHICLE AND EQUIPMENT CLEANING NS-9 VEHICLE AND EQUIPMENT FUELING NS-3 PAVING AND GRADING OPERATIONS APPLY PARAMETER CONTROLS AND VACUUMING TO PREVENT NON-STORMWATER DISCHARGE. NS-10 VEHICLE AND EQUIPMENT MAINTENANCE ALL VEHICLES AND EQUIPMENT WILL BE MAINTAINED OFF-SITE. NS-12 CONCRETE CURING APPLIES TO ALL CONCRETE CONSTRUCTION. NS-13 CONCRETE FINISHING APPLIES TO ALL CONCRETE CONSTRUCTION. ALL VEHICLES AND EQUIPMENT WILL BE FUELED OFF-SITE. ALL VEHICLES AND EQUIPMENT WILL BE CLEANED OFF-SITE. NS-1 WATER CONSERVATION PRACTICES MAINTAIN WATER EQUIPMENT TO PREVENT NON-STORMWATER DISCHARGES. TRACT NO. 15346 A V A L O N V I S T A C L Δ = 27 ° 1 8'1 0 " R = 9 5.0 0' L = 4 5.2 7' N87°3 2 ' 5 1 " W 5 1 . 6 3 ' N51°54'55"W 263.04' N 3 2 ° 5 2 ' 2 7 " E 9 5 . 4 0 ' N51°54'14"W 315.71' N4 6 °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