HomeMy WebLinkAboutGB070012_068t0000003ZMnKAAW_Correction ListCounty of Orange
Resources & Development Management Department
Building Permits Division
Main Office
300 N. Flower Street
Santa Ana, CA 92702-4048
GB070012 (Zoning) Plan Check Corrections
It is the responsibility of the applicant to satisfy the requirements (clearances) of each of the departments listed in this document.
Normally, each section will stamp your plans indicating their approval.
To view your plan check status and the latest correction list on the Internet, please visit: http://www.ocplanning.net and click on
'Plan Check Status' Link.
Please note that Planning and Development Services (PDS) Public Counter Hours are open 7:30am to 4pm,
Monday thru Thursday and Friday by appointment only. (Please call 714 834-5180 to schedule an appointment).
Project Number:GB070012 (Zoning)
Submittal Date:Jan 23, 2007
CBC Edition: 2001
Plan Check Date: 7/9/2007 5:19 PM
Description:Precise Grading
for Custom sfd
Owner Address
Avalon Vista 11, LLC
620 Newport Center Drive
14th Floor
Newport Beach CA92660
Current - 1st Plan Check
Zoning Information For:GB070012
Job Address:11 Avalon Vista , Newport Coast
Parcel Number:15346 11 TR
Zoning: res
PC/SP: NPTC/IRVC
Description:Precise Grading for Custom sfd
School District(s) Elementary or Unified:Newport-Mesa Unified
APN:473-163-15
CAA:00047
CT:626.23
Architect of Record
Designs Northwest Architects, Inc.
P.O. Box 1270
Stanwood WA98292
949-412-8134
360-629-6159 FAX
Engineer of Record
KNA Engineering
28720 Roadside Dr.
Augora Hills CA91301
818-865-7026
Plan Checked By
Dan DeMara
Dan.DeMara@pdsd.ocgov.com
714-834-5057
Contact Address
Richard Pfadt
421 E Cerritos Avenue
Anaheim CA92805
714-491-1317 x352
714-333-9807 FAX
rpfadt@icebuildersinc.com
Page 1 of 5
GB070012 (Zoning)
PA050038 COA
Sheet Comments By
Conditions
T. Sargeant1 3 CP CP NA BASIC/ZONING REG PA050038
This approval constitutes approval of the proposed project only to the extent that
the project complies with the Orange County Zoning Code and any other applicable
zoning regulations. Approval does not include any action or finding as to compliance
of approval of the project regarding any other applicable ordinance, regulation
or requirement.
T. Sargeant2 4 CP CP NA BASIC/TIME LIMIT PA050038
This approval is valid for a period of 36 months from the date of final determination.
If the use approved by this action is not established within such period of time,
this approval shall be terminated and shall thereafter be null and void.
T. Sargeant3 5 CP CP NA BASIC/PRECISE PLAN PA050038
Except as otherwise provided herein, this permit is approved as a precise plan.
If the applicant proposes changes regarding the location or alteration of any use
or structure, the applicant shall submit a changed plan to the Director, PDS, for
approval. If the Director, PDS, determines that the proposed change complies with
the provisions and the spirit and intent of the approval action, and that the action
would have been the same for the changed plan as for the approved plot plan, he
may approve the changed plan without requiring a new public hearing.
T. Sargeant4 6 CP CP NA BASIC/COMPLIANCE PA050038
Failure to abide by and faithfully comply with any and all conditions attached to
this approving action shall constitute grounds for the revocation of said action
by the Orange County Planning Commission.
T. Sargeant5 7 CP CP NA BASIC/OBLIGATIONS PA050038
Applicant shall defend at his/her sole expense any action brought against the County
because of issuance of this permit. Applicant shall reimburse the County for any
court costs and attorneys fees that the County may be required to pay as a result
of such action. The County may, at its sole discretion, participate in the defense
of any action, but such participation shall not relieve applicant of his/her obligations
under this condition.
T. Sargeant6 8 CP CP NA BASIC/APPEAL EXACTIONS PA050038
Pursuant to Government Code Section 66020, the applicant is hereby informed that
the 90-day approval period in which the applicant may protest the fees, dedications,
reservations or other exactions imposed on this project through the conditions of
approval has begun.
T. Sargeant7 9 SG SG G Driveway Design PA050038
Prior to issuance of a grading permit, the applicant shall construct the driveway
per Orange County Zoning Code section 7-9-145.5 (a) (2) (figure on Page 207) in
a manner meeting the approval of the Manager, Subdivision and Infrastructure.
Page 2 of 5 7/9/2007 5:19 PM = Indicates line item not Cleared.
GB070012 (Zoning)
PA050038 COA
Sheet Comments By
T. Sargeant8 10 CP B G Encroachment Permit PA050038
Prior to issuance of a grading permit, the applicant shall receive approval of an
encroachment permit for any and all grading and grading-related activities that
will occur within the County of Orange Scenic Preservation Easement in a manner
meeting the approval of the Manager, Public Property Permits in consulation with
Manager, HBP/Program Management.
T. Sargeant9 11 SG SG G DRAINAGE STUDY PA050038
Prior to the issuance of any grading permits, the following drainage studies shall
be submitted to and approved by the Manager, Subdivision and Grading: A. A drainage
study of the project including diversions, off-site areas that drain onto and/or
through the project, and justification of any diversions; and B. When applicable,
a drainage study evidencing that proposed drainage patterns will not overload existing
storm drains; and C. Detailed drainage studies indicating how the project grading,
in conjunction with the drainage conveyance systems including applicable swales,
channels, street flows, catch basins, storm drains, and flood water retarding, will
allow building pads to be safe from inundation from rainfall runoff which may be
expected from all storms up to and including the theoretical 100-year flood.
T. Sargeant10 12 SG SG G DRAINAGE IMPROVEMENTS PA050038
A. Prior to the issuance of any grading permits, the applicant shall in a manner
meeting the approval of the Manager, Subdivision and Grading: 1) Design provisions
for surface drainage; and 2) Design all necessary storm drain facilities extending
to a satisfactory point of disposal for the proper control and disposal of storm
runoff; and 3) Dedicate the associated easements to the County of Orange,
if determined necessary. B. Prior to the issuance of any certificates of use
and occupancy, said improvements shall be constructed in a manner meeting the approval
of the Manager, Construction.
T. Sargeant11 13 SG SG G DRAINAGE OFFSITE PA050038
Prior to the issuance of any grading permit, and if determined necessary by the Manager,
Subdivision and Grading, the applicant shall record a letter of consent, from the
upstream and/or downstream property owners permitting drainage diversions and/or
unnatural concentrations. The form of the letter of consent shall be approved by
the Manager, Subdivision and Grading Services prior to recordation of the letter.
T. Sargeant12 14 CP CP G COASTAL SAGE SCRUB PA050038
Prior to the issuance of a grading permit or the initiation of any activity that
involves the removal/disturbance of Coastal Sage Scrub (CSS) habitat, including
clearing, grubbing, mowing, discing, trenching, grading, fuel modification, or any
other construction-related activity, whichever occurs first, the applicant shall
obtain the approval of the Manager, Environmental Planning Services Division, that
all requirements of the NCCP have been satisfied or adequately addressed. (Contact
Resource Planning Section at 714-834-2552 for specific requirements).
T. Sargeant13 15 F F RBU AUTOMATIC FIRE SPRINKLER PA050038
A. Prior to the issuance of a building permit, the applicant shall submit plans
for the required automatic fire sprinkler system in the structure to the Orange
Page 3 of 5 7/9/2007 5:19 PM = Indicates line item not Cleared.
GB070012 (Zoning)
PA050038 COA
Sheet Comments By
County Fire Authority for review and approval. Please contact the Orange County
Fire Authority at (714) 573-6100 for additional information.
C. Prior to the issuance of a certificate of use and occupancy, this system shall
be operational in a manner meeting the approval of the Fire Chief.
T. Sargeant14 16 F F BP Residential Site Review PA050038
Prior to the issuance of a building permit, the applicant shall submit a residential
site review and obtain approval of the Orange County Fire Authority for all fire
protection access roads to within 150 feet of all portions of the exterior of the
structure. The plans shall include the location of the nearest fire hydrant to the
property line. The applicant may contact the OCFA at (714) 573-6100 or visit the
OCFA website to obtain a copy of the "Guidelines for Emergency Access," or Bulletin
Number 08-99, "Fire Department Access Requirements for A Single Family Residence."
T. Sargeant15 17 SG SG G GEOLOGY REPORT PA050038
Prior to the issuance of a grading permit, the applicant shall submit a geotechnical
report to the Manager, Subdivision and Grading, for approval. The report shall
include the information and be in the form as required by the Grading Manual.
T. Sargeant16 18 SG SG B ROAD FEE PROGRAM PA050038
Prior to the issuance of building permits, the applicant shall pay fees for the Major
Thoroughfare and Bridge Fee Program listed below, in a manner meeting the approval
of the Manager, Subdivision and Grading.
a. San Joaquin Hills Transportation Corridor
T. Sargeant17 19 BI BI RGB WATER QUALITY MANAGEMENT PLAN PA050038
Prior to the issuance of any grading or building permits, the applicant shall submit
for review and approval by the Manager, Inspection Services Division, a Water Quality
Management Plan (WQMP) specifically identifying Best Management Practices (BMPs)
that will be used onsite to control predictable pollutant runoff. This WQMP shall
identify, at a minimum, the routine structural and non-structural measures specified
in the current Drainage Area Management Plan (DAMP). The WQMP must also: - Address
Site Design BMPs (as applicable) such as minimizing impervious areas, maximizing
permeability, minimizing directly connected impervious areas, creating reduced or
zero discharge areas, and conserving natural areas;- Incorporate applicable Routine
Source Control BMPs as defined in the DAMP;- Include an Operation and Maintenance
(O&M) Plan that identifies the mechanism(s) by which long-term O&M of all structural
BMPs will be provided.
T. Sargeant18 20 BI BI RGB WQMP FOR PRIORITY PROJECTS PA050038
Prior to the issuance of any grading or building permits, the applicant shall include
in the WQMP the following additional Priority Project information in a manner meeting
the approval of the Manager, Inspection Services Division: - Include post-construction
Treatment Control BMP(s) as defined in the DAMP; - For applicants relying on Regional
Treatment Controls, discuss applicable regional water quality and/or watershed program;
Page 4 of 5 7/9/2007 5:19 PM = Indicates line item not Cleared.
GB070012 (Zoning)
PA050038 COA
Sheet Comments By
- Include a Operation and Maintenance (O&M) Plan that (1) describes the long-term
operation and maintenance requirements for post-construction Treatment Control BMP(s);
(2) identifies the entity that will be responsible for long-term operation and maintenance
of the referenced Treatment Control BMP(s); and (3) describes the mechanism for
funding the long-term operation and maintenance of the referenced Treatment Control
BMP(s).
T. Sargeant19 21 BI BI U COMPLIANCE WITH THE WQMP PA050038
Prior to the issuance of a certificate of use and occupancy, the applicant shall
demonstrate compliance with the WQMP in a manner meeting the satisfaction of the
Manager, Inspection Services Division, including: - Demonstrate that all structural
Best Management Practices (BMPs) described in the project s WQMP have been implemented,
constructed and installed in conformance with approved plans and specifications;
- Demonstrate that the applicant has complied with all non-structural BMPs
described in the project s WQMP; - Submit for review and approval an Operations
and Maintenance (O&M) Plan for all structural BMPs for attachment to the WQMP;
- Demonstrate that copies of the project s approved WQMP (with attached O&M Plan)
are available for each of the incoming occupants; - Agree to pay for a Special
Investigation from the County of Orange for a date (12) twelve months after the
issuance of a Certificate of Use and Occupancy for the project to verify compliance
with the approved WQMP and O&M Plan; and - Demonstrate that the applicant has
agreed to and recorded one of the following: 1) the CC&R s (that must include the
approved WQMP and O&M Plan) for the project Home Owner s Association; 2) a water
quality implementation agreement that has the approved WQMP and O&M Plan attached;
or 3) the final approved Water Quality Management Plan (WQMP) and Operations and
Maintenance (O&M) Plan.
T. Sargeant20 22 BI BI GB STORMWATER POLLUTION PREVENTION PLAN PA050038
Prior to the issuance of any grading or building permits, the applicant shall demonstrate
compliance under California s General Permit for Stormwater Discharges Associated
with Construction Activity by providing a copy of the Notice of Intent (NOI) submitted
to the State Water Resources Control Board and a copy of the subsequent notification
of the issuance of a Waste Discharge Identification (WDID) Number or other proof
of filing in a manner meeting the satisfaction of the Manager, Building Permit Services.
Projects subject to this requirement shall prepare and implement a Stormwater Pollution
Prevention Plan (SWPPP). A copy of the current SWPPP shall be kept at the project
site and be available for County review on request.
Page 5 of 5 7/9/2007 5:19 PM = Indicates line item not Cleared.