HomeMy WebLinkAbout2801 E COAST HWYy
r
., Plan Check No,
COMMERCIAL/INDUSTRIAL ZONING CORRECTIONS
By: ems, Associate Planner awTelep�h,Cone (714) 6p(44-1100
Date: / Address: o`JJ go/ Z�J/ ��✓��"�"—
�o
Corrections Required:
r
Legal Description: Lot_k_ Block_ Section Tract �� 3
Resubdivision required to combine lots or portions of lots when
construction or alterations are in excess of $5,000.
Lot Size /7
Zone C—_
Proposed Use����
Required Setbacks:
Front
Rear(,Q)IGj to
Right Side .65�1
Left Side I&r
Structural'Area:
Buildable Area
Permitted Area
Proposed Area
Provide tissue overlay of calculations to verify provided square
footage. ,
Required Parking
Proposed parking (Indicate number of stalls provided)
Total On -Site Parking
Standard Compact
In -lieu Parking
I
Dimension building height as measured from natural grade to
average and maximum roof height
Show natural grade line on all elevations
Show all rooftop mechanical equipment and dimension from grade
directly below.
Indicate location of trash containers on site plan.
Number of stories
Floor Plan fully dimensioned showing all room uses.
Plot Plan fully dimensioned showing location of all buildings;
fences, etc. in relatio to ert//y line. ��
Fair Share Contributi n UAL /�2�6/
San Joaquin Hills Transportation Corridor Fee
I
0
SPECIAL APPROVAL REQUIRED THROUGH:
Modifications Committee
Planning Commission:
Use Permit
Variance
Resubdivision - Tract
iJ Site Plan Review
Amendment
Other -
Public Works:
Easement/Encroachment Permit
Curb Cut
Subdivision Engineer
Traffic Engineer
Approval of Landscape Plans
Building Department:
Grading Engineer
Parks Department:
Approval of Landscape Plans
Coastal Development Permits:
Approval in Concept
(Note: File 3 sets of plans: plot la floor plan, elevations).
Coastal Development Permit No. ��(
waiver/Exemption
.(,�r91,� '� C4L-'f�AuS.. �ICfCnLlCL4fUb�.C(�QMci
NOTE: It is the responsibility
obtainithe necessary approvals
have questions regarding your
644-3200.
of the applicant to circulate their plans and
from the departments checked above. If you
application, please contact me at (714)
I
Conditions of Approval
Site Plan Review No. 44
2801 East Coast Hwy.
Plan Check #206A-89
Condition
1. Substantial conformance
4 guest parking spaces on site
3. Soil cleansing
4. On -site parking
5. Handicapped parking
6. Signs
7. Site development
8. Grading plan
9. Haul routes
10. Erosion control plan
11. "Approved as built" grading plans
12. Roof -top and mechanical equipment;
55 dBA
13. Lighting system
14. Improvements
15. Public surety
16. On -site parking
17. Site -distance
18. Sidewalk repairs
Department
Action
Planning
Plans approval
Planning
Plans approval
O.C. Health
Prior to grading or
building permit
issuance
Letter of compliance
Planning
Letter of compliance
Building
Plans approval
Code enforcement
Hold on final
Traffic Eng.
Plans approval
Planning
Separate permit
Building
Grading permit
Grading Eng.
Plans approval
Grading Eng.
Plans approval
Planning
Letter of Compliance
Building
Plans
approvai
Grading Eng.
Plans
approval
Building
Plans
approval
Planning
Letter
from
acoustical eng.
Code Enforcement
Hold on final
Building
Plans
approval
Planning
Letter
of compliance
Public Works
Plans
approval
Public Works
Plans
approval
Traffic Eng.
Plans
approval
Traffic Eng. Plans approval
Public Works Plans approval
Cal -trans Encroachment permit
6
E
Conditions of Approval
Site Plan Review No. 44
Page two
19. Public dedication
20. Vehicular access rights
21. Access ramp
22. Sight distance
23. Sanitation fees
24. Public Works plan check & fees
25. Landscape and irrigation plan
26. Landscape plans
27. Equipment screening
28. Parking
29. Coastal Commission approval
30. No Action
Public Works Plans approval
Public Works Plans approval
Cal -trans Encroachment permit
Public Works Plans approval
Building Prior to building
permits
Public Works Plans approval
Planning Prior to occupancy
Code Enforcement Field check
P.B. & R. Plans approval
Planning Plans approval
Public Works Plans approval
Building Plans approval
Code Enforcement Hold on final
Planning Plans approval
Traffic Eng. Plans approval
Planning Plans approval
Code Enforcement Hold on final
Planning Prior to building
permits
1.
Ile
JMle-
j v Tel 'r.
wr
Ir 'aV I
C-0
A.
If
A
5'� Ire
Ole
4
to,
lit
1 Al'
IR-1
'7-77—
a
•.5
yM ••
L Y
rNw.e1LNY96W� Lyi - �� •+o.f`FI/1 r`. / � \ I • -::ia��; .i
.'•.ri'-+/�qµµ1�"�1 j%fYPY4) � ``(`; wry. IYr . i� N � . , . -� , ' �I •1 �f y
i ft/ALY,Lra+,Wr. V
- - crfa+c ryu+— �F'+• )•r•+_.;' _:.C-G , � ••iYH'l iZ I ___n.....r.. J� � ��� Fi `� �V N-" ,` .�,+ �p`' :, 1 jr ✓:•�YiTCY .�+rj.,�l ... �g`'
.T T/ l'l 3� •, ilW'r W- yIt i1 y,.✓.L FFG •'G,. rL rT) . +_
-- - - iy� •- 'K /s� '^4 �'. � ,-fir
- _ Ih�:�r �' '�.• �`ef' ,:�y, :`s. - i _.,sae'
}
' Ile.
., «. :4. was f 1 �.,�,.�„r.•,...„ ,
YL• •,' ,`�- eYti u.+nvA i tYuv ..
+Q/
Tay u�lr. 4nW""r
•\\ � MQ''�� I �- 1y/ " F. s�I-� - ,�� NKi4Y wt)�- i i •tFWJ iNGa
\c. ` f �--L�fPr'/�!'Pfy. ,LI►�tWYI.1'' - ..- -- ,.InM .x�a.+•1 I_gwl or t'"�r'.h,"--• � �"-' ... .,
uvft�l+/•i Y' •lA'41!P- - ,F �•10(� _ - r _ T �.�„1`• aa..w w-:« j - '. .I�•av--� ` �, -.--u
LR`(i`TL�-fv
mg� ;�—
jfl
Ell
i
e-
.5p -w I -i.4 1, t :
X
I
01
1 0
WAY. 1: --- - ---
J
21LAhL
7 - I
-.QASTT - HIGHWAA,
A,
SCALE.17-20
—MMVLM�
e.
zva�wUN"m W
mt-
W�W�Fta.-;l Rq, 0 TV20;
IM M. yj-�
MgZ
t
4.-
May 29, 1989
TO: GENIA KAZNOCHA
PLANNING DEPARTMENT
FROM: TRAFFIC ENGINEER
SUBJECT: FAIR SHARE 'FEES FOR RETAIL FACILITY AT THE SOUTHWEST CORNER
OF EAST COAST HIGHWAY AND GOLDENROD AVENUE
The Fair Share Fee for the retail facility proposed to be constructed
at the southwest corner or East Coast Highway and Goldenrod Avenue is
$9920.85. This fee was calculated based upon the following:
1. The project will result in a net increase in daily traffic of
95 trips based upon the difference between the trip generation
rates of the existing use as an automobile service facility
and the proposed general retail use. The generation rate for
auto service facilities is 20 trips per day per thousand
square feet compared with 40 trips per day per thousand square
feet for retail.
2. The current Fair Share fee is $104.43 per daily trip.
Please contact me if you have any questions regarding the fee.
Richard M. Edmonston
Traffic Engineer
CHDEVELOPMENT CO.
May 2, 1990
City of Newport Beach
P.O. Box 1768
Newport Beach, CA 92659-1768
Re: Site Plan Review 44, 2801 E. Coast Highway,
Plan Check #282-89 and #206A-89
To Whom It May Concern:
Pursuant to zoning corrections for the subject plan check,
C & H Development confirms hereby that we will uphold the
following conditions of approval TOY Site plan review #44:
Conditions 3, 4, 9 and 13.
Sincerely,
Terry Clingan
TSC:jc
3111 N. Tustin Avenue, Suite 290, Orange, California 92665 • (714) 998-1080 • FAX (714) 998-1655
qq
DEVELOPMENT CO.
May 2, 1990
City of Newport Beach
P.O. Box 1768
Newport Beach, CA 92659-1768
Re: Site Plan Review 44, 2801 E. Coast Highway,
Plan Check #282-89 and #206A-89
To Whom It May Concern:
Pursuant to zoning corrections for the subject plan check,
C & H Development confirms hereby that we will uphold the
following conditions of approval for site plan review #44:
Conditions 3, 4, 9 and 13.
Sincerely,
�r
Terry Clingan
TSC:jc
3111 N. Tustin Avenue, Suite 290, Orange, California 92665 • (714) 998-1080 • FAX (714) 998-1655
5
Absolute Consulting Engineers
Iota( Design and R & D Engineers
MArch 13, 1992
Planning Department
City of Newport Beach, Ca.
Regarding: Commercial Developement at
2801 E. Coast Hwy. for C &
H Development site plan
review # 44 Sept. 8, 1988
Gentlemen:
The lighting design and plans for the above referenced project
have been prepared in our office and it is our openion that they
are in compliance with the intent of the following requirement of
the City of Newport Beach:
" Lighting above shall be designed, directed and maintained in
such a manner as to conceal hight sources and to minimize spillage
and glare to the adjacent residential area."
Sincerely
Absolute Eggineering
ounes S fi
E # E85 1
EXP. DATE: 6/193
CC: FILE
3848 Campus Drive, Suite 219, Newport Beach, CA 92660 • (714) 852-8700 • Fax: (714) 852-1918
ACOUSTICAL IMPACTS INTERNATIONAL
P.O. Box 7246 - Newport Beach, CA, 92658
Telephone (714) 549-4092 - Fax (714) 549-9423
RECORD OF NOISE MEASUREMENTS
On March 18, 1992, property line noise levels were measured at 2801 Pacific Coast
Highway, a commercial building in Corona del Mar, California.
The results of these measurements show that the levels are: 51.7 dBA, resulting from
operations of airconditioning equipment.
Background level without the equipment operation was: 50.2 dBA.
Project: Airconditioning equipment at 2801 Pacific Coast Highway, Corona del Mar,
California.
Client: C & H Development.
Instrument used: Larson Davis Model 800, Serial N° 0486B0368.
Ciro Elgue
General Manager
Technical Consultant
UTES
ROLL CALL
INDEX
11. That the approval of a modification to the Zoning
Code, so as to allow the use of compact and tandem
parking spaces will not, under the circumstances of
the particular case, be detrimental to the health,
safety, peace, comfort and general welfare of
persons residing or working in the neighborhood of
such proposed use or be detrimental or injurious to
property and improvements in the neighborhood or
the general welfare of the City and further that
the proposed modification is consistent with the
legislative intent of Title 20 of this Code.
12. That the approval of Site Plan Review No. 44 will
not, under the circumstances of this case, be
detrimental to the health, safety, peace, morals,
comfort and general welfare of persons residing and
working in the neighborhood, or be detrimental or
injurious to property and improvements in the
neighborhood or to the general welfare of the City.
13. Implementation of the project will result in
demolition of the current structure and excavation
for a subterranean parking structure. Although the
gasoline storage tanks and pump islands have been
removed, there might be a risk of explosion or
release of hazardous substances during
construction.
1
CONDITIONS:
1. That development shall be in substantial
conformance with the approved plot plan, floor
plans, and elevations, except as noted in the
following conditions.
2. That a maximum of four (4) guest compact spaces
shall be permitted on site.
3. That no building or grading permit for the proposed
building shall be issued until soil is cleansed to
the satisfaction of the Orange County Health Care
Agency, Environmental Health.
.i
4. That all employees shall park on -site, and that
employee parking shall be clearly identified.
5. That the required number of handicapped parking
spaces shall be designated within the on -site
parking area. Said parking spaces shall be
accessible to the handicapped at all times. One
-14-
COMMISSIONERS
I0000111
Li O
01'
0
September 8, 1988
MINUTES
yam- ` CITY OF NEWPORT BEACH
INDEX
ROLL CALL
handicapped sign on a post shall be required for
each handicapped space.
6. That all signs shall conform to Chapter 20.06 of
the Municipal Code.
7. That development of the site shall be subject to a
grading permit to be approved by the Building and
Planning Departments.
8. That the grading plan shall include a complete plan
for temporary and permanent drainage facilities, to
minimize impacts from silt, debris and other water
pollutants.
9. The grading permit shall include a description of
haul routes, access points to the site, and a
watering and sweeping program designed to minimize
the impact of haul operations.
10. That an erosion, siltation and dust control plan
shall be submitted and be subject to the approval
of the Building Department and a copy forwarded to
the California Regional Water Quality Control
Board, Santa Ana Region.
11. That the fill, grading and recompaction of the site
shall be conducted in accordance with plans
prepared by a Civil Engineer and based on the
recommendations of a soil engineer or an
engineering geologist subsequent to the completion
of a comprehensive soil and geologic investigation
of the site. Permanent reproducible copies of the
"Approved as Built" grading plans on standard size
sheets shall be furnished to the Building
Department.
12. All rooftop and other mechanical equipment shall be
sound attenuated in such a manner as to achieve a
maximum sound level of 55 dBA at the property line,
and that all mechanical equipment shall be screened
from view.
13. The lighting system shall be designed,directed, and
maintained in such a manner as to conceal light
sources and to minimize light spillage and glare to
the adjacent residential areas. The plans shall be
prepared and signed by a licensed Electrical
Engineer, with a letter stating that, in his
opinion, this requirement has'been met.
-15-
S
COMMISSIONERS
#?
September 8, 1988
MINUTES
CITY OF NEWPORT BEACH
INDEX
ROLL CALL
_.
14. That all improvements be constructed as required by
Ordinance and the Public Works Department.
15. That a standard agreement and accompanying surety
be provided in order to guarantee satisfactory
completion of the public improvements, if it is
desired to obtain a building permit prior to
completion of the public improvements.
16. That the on -site parking, vehicular circulation and
pedestrian circulation systems be subject to
further review by the Traffic Engineer.
17. That the intersection of the street and private
drive be designed to provide sight distance for a
speed of 25 miles per hour. Slopes, landscape,
walls and other obstruction shall be considered in
the sight distance requirements. Landscaping
within the sight line shall not exceed twenty-four
inches in height. The sight distance requirement
may be modified at non -critical locations, subject
to approval of the Traffic Engineer.
18. That deteriorated and tree -damaged portions of
sidewalk be reconstructed along East Coast Highway
and Goldenrod Avenue, and that the parkway be
filled in with concrete sidewalk along the
Goldenrod Avenue frontage with tree wells provided
for the existing palm trees unless otherwise
approved by the Public Works Department. All work
along the East Coast Highway frontage shall be
completed under an encroachment permit issued by
the California Department of Transportation.
19. That a 15 foot radius corner cutoff at the corner
of East Coast Highway and Goldenrod Avenue be
dedicated to the public.
20.'"That all vehicular access rights to East Coast
Highway be released and relinquished to the City of
Newport Beach.
21. That the unused drive aprons be removed and
replaced with curb, gutter and sidewalk along the
East Coast Highway frontage and Goldenrod Avenue
frontage; that the curb return at the intersection
of East Coast Highway and Goldenrod Avenue be
reconstructed with a 25 foot radius and a curb
access ramp' constructed within the return. That
all work within the East Coast Highway right of way
-16-
y
0;d
COMMISSIONERS
September 8, 1988
MINUTES
CITY OF NEWPORT BEACH
INDEX
ROLL CALL
_
be completed under an encroachment permit issued by
the California Department of Transportation.
22. That adequate sight distance be provided for
vehicles exiting the site with the design to be
approved by the Public Works Department and that
the palm trees next to the alley be removed and/or
pruned to provide adequate sight distance.
23. That County Sanitation District fees be paid prior
to issuance of any building permits.
I
24. That the Public Works Department plan check and
inspection fee be paid.
25. That a landscape and irrigation plan for the
project shall be prepared by a licensed landscape
architect. The landscape plan shall integrate and
phase the installation of the landscaping with the
;
proposed construction schedule. Prior to the
occupancy of the structure, the licensed architect
shall certify to the Planning Department that the
landscaping has been installed in accordance with
the prepared plan.
26. That the landscape plan shall be subject to the
review of the Parks, Beaches, and Recreation
Department and the approval of the Planning and
Public Works Departments.
27. That any mechanical equipment or trash containers
shall be screened from view from Goldenrod Avenue,
East Coast Highway, and adjoining properties.
28. That the proposed development shall provide a
minimum of one parking space for each 250 sq. ft.
of floor area (19 spaces).
29. That Coastal Commission approval shall be obtained
prior to the issuance of building permits.
30. This site plan review shall expire within 24 months
from the date of approval as specified in Section
20.01.070 J of the Newport Beach Municipal Code,
unless an extension is granted by the Modifications
Committee prior to the expiration date,
-17-