Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
PA99-0212
*NEW FILE* PA99=0212 Discretionary Accounting t iI I I I I I n 1 H t NEWPORT COAST PLANNING AREA 2C Development Area 2C-1 b SITE DEVELOPMENT PERMIT Submitted to: County of Orange Planning and Development Services Department Current Planning Services Contact: Charles Shoemaker (714) 834-5159 Chief Current Planning Submitted by: TAYLOR WOODROW HOMES 24461 Ridge Route Drive, Suite 100 Laguna Hills, CA 92653 Contact: Dan Hosseinzadeh (949) 581-2626 Prepared by: FORMA 17500 Redhill Avenue, Suite 100 Irvine, CA 92614-5645 Contact: Craig Hoffman (949) 660-1900 December 1999 TABLE OF CONTENTS Section Title I: INTRODUCTION A. Purpose B. Background C. Existing Conditions II: CURRENT PLAN DESCRIPTION A. Site Plan B. Architectural Elevations and Floor Plans C. Grading Plan III: CONSISTENCY ANALYSIS n 968/04.I00 Dxcmbcr 1999 NCPC DA 2C-lb SDP 1 W:\climmkmylorwdlncomt\DA2C-Ib.SDP.wpd LIST OF EXHIBITS Exhibit On or Number Title Following Page I: INTRODUCTION 1.1 Regional Location Map 1-2 1.2 Project Location Map I-3 H: CURRENT PLAN DESCRIPTION 2.1 Development Plan II-2/MP 2.2 Model Complex Location Plan U-3 2.3 Architectural Elevation — Plans 1, 2 & 3 II-6 2.4 Architectural Floor Plan — Plan 1 II-7 2.5 Architectural Floor Plan — Plan 2 11-8 2.6 Architectural Floor Plan — Plan 3 II-9 2.7 Grading Plan II-ll/MP III: CONSISTENCY ANALYSIS LIST OF TABLES Table On or Number Title Following Page 2-A Planning Area 2C Statistical Summary 11-4 (MP = Also provided at large-scale in the map pocket at the back of this document) 968/04.100 D=mber 1999 NCPC DA 2C-lb SDP 11 W:\climnlmylolwdlnwntlDA2C-lb.SDP.wpd SECTION I: Introduction Page I-1 ' A. PURPOSE ' A Site Development Permit (SDP) is requested for Development Area 2C-lb which is located within the Newport Coast Planned Community Residential Planning Area 2C, as ' shown on Exhibit 1.1, Regional Location Map, and Exhibit 1.2, Project Location Map. The Newport Coast Local Coastal Program designates Planning Area 2C for Medium - ' Density Residential development (3.5 to 6.5 DU/Ac). This land use designation provides for single-family detached, attached and multi -family housing projects. The proposed SDP reflects modifications to the Site Plan, Grading Plan and project architecture, while maintaining the currently approved forty-one (41) single-family detached homes. ' ' This SDP has been prepared to provide the Director, Orange County Planning and Development Services with the necessary background and supporting information to ' permit the following refinements in Development Area 2C-lb: ' ■ Revision of the previously -approved lotting design to accommodate new architecture on lots averaging 9,000 square feet; ■ Revised architectural elevations and floor plans; and ' ■ Modification of the Grading Plan to add seventeen (17) retaining walls internal to the site to support varying pad elevations and increased lot sizes. ' This document has been prepared to be consistent with the previously -approved Coastal Development Permit (CDP) (PA 970077) and to meet the requirements for a Site Development Permit, as set forth in the Newport Coast Local Coastal Program, Chapter II 10-13. ' 11 NCPC A CPC DA 2C-lb SDP December 1999 W:\cliens\mylorwd\ncont\DA2C-lb.SDP.wpd CHICA MUNTOM0700 H BEACH SANTA ANA HEIGHTS NEWPORT DI Co8Tca HISS NEWPORT BEACH EMERALD TUSTON ORIVIIHE L AGUHA BEACH SOUTH LAGUNfi LAGUNA -NEWPORT RIDGE PLANNED COMMUNITY -NEWPORT COAST PLANNED COMMUNITY LACp1NA HILLS DANA -' P011IM7 CAPISTRANO LAKE FOf;EST Exhibit 1.1 REGIONAL LOCATION MAP NCPC Development Area 2C-1 b Site DevelopmentPermit Not t� o� Wnet/ ...t/2a-1b/1080.dp/mQlaadwq I II P A C I F I C O C E A N Exhibit 12 ECT LOCATION MAP ® NCT T� O Su CALF , KR% mmnml/oou.I/sc—lb/MRadp/aropoodwq n ' SECTION I: Introduction Page 1-4 ' B. BACKGROUND 1 F I 1 The Master CDP - Fifth Amendment for Planning Area 2C (Planning Application 970076), was approved by the Orange County Planning Commission on September 23, 1997 (Resolution No. 97-06). PA 970076 permitted construction of a total of 490 residential units in five subareas, including a combination of detached and attached housing products, infrastructure and residential collector streets. A CDP for Development Area 2C-lb (PA 970077) was approved concurrently with the Master CDP - Fifth Amendment permitting the development of 41 single-family detached units on 21.5 acres in DA 2C-lb. In its approval, the Planning Commission determined that the development proposal for the construction of 41 units in DA 2C-lb was consistent with the certified Local Coastal Program (LCP), Master Coastal Development Permit - Fifth Amendment and EIR No. 544A. Subsequent to the Planning Commission approval, the Orange County Subdivision Committee conditionally approved Tentative Tract Map No. 15394 on October 29, 1997. Final Map No. 15394 was recorded on December 22, 1998 (Instrument No. 19980885199, Book 778, Page 12-17 MM). ' 101 NCPC DA DA 2C•16 SDP D¢ bcr 1999 W.Ncikms%mylorwdlncomt%DA2C-Ib.SDP.wpd I ' SECTION I: Introduction Page I-5 tC. EXISTING CONDITIONS ' Construction of Vista Ridge Road from the southern limits of DA 2C to the intersection ' with Ridge Park Road is complete. Rough grading activity is completed in DA 2C-lb in conformance with approved Tentative Tract Map No. 15394. A Precise Grading Permit ' GB 990185 is currently being reviewed by the County of Orange Development and Planning Services Department which proposes minor modifications to the existing grades and construction of additional retaining walls to accommodate the revised lotting design and architectural product types within DA 2C-lb. Construction is currently underway in all adjoining Phase III Residential Development Areas. F L ' 111/04,100 NCPC DA 2C-Ib SDP Dw bcr 1999 W:\climts\uylomd\ncowt\DA2C-Ib.SDP.wpd SECTION II: Current Plan Description Page H-1 ' A. SITE PLAN 1 As shown on Exhibit 2.1, Development Plan, the approved plan for 37 single-family detached units (4 of the approved 41 units were constructed as part of the Perazul I ' project in accordance with PA 960155) have been modified to reflect new architectural products consistent with the product types constructed with adjacent Development Area ' 2C-la. Four cul-de-sac streets provide access to lots averaging 9,000 square feet. Residential Development Area 2C-lb remains at approximately 21.5 acres (gross) ' resulting in an overall density of 1.9 dwelling units per acre for the site (see Table 2-A). ' Consistent with LCP residential development standards, building site areas will be a minimum of 2,500 square feet with 10-foot minimum building setbacks from any exterior ' property line abutting a street. Straight -in garages will be setback a minimum of 20 feet, and side entry garages are a minimum of 10 feet. All units will utilize roll -up style ' garage doors with automatic door openers. t Minor modifications to the internal grades will not require any modifications to the previously -approved cul-de-sac street design, infrastructure systems for drainage, water ' and wastewater. Similarly, the approved landscape palette and design remain unchanged from the current approval. ' As shown on Exhibit 2.2, Model Complex Location Plan, the Development Area 2C-lb ' (Perazul II) project will utilize the existing model/sales complex located in adjacent Development Area 2C-la. I I 968/04.100 December 1999 ' NCPC DA 261b SDP W.\clim3\laylmwd\ncmt\DA2C16.SDP.wpd , 1 PA 2B- \ ' Reside?>j�aL\ CD 92=0g ♦ \, ' C-1 b Red al ' (Approved as rt of DA 2G1 P 0155) ' m ft Q' �8 S� I, ■ Sarca: ,� G ee TAY,t40R- oo LEGEND f /.:/i / r BUILDING FOOTPRINTAND l ; ;� �f/ DA 2C-1 b ® UNrrTYPE Residential DEVELOPMENTAREA BOUNDARY I, o , ♦ t Residentia4 ' co a PA 970078 y ZS , , 1 I 11 HEf 11 At ■ ��hs �•. i S ,yy 3 rr j a DR, •\ \ { — .� A2C-1a Red I601 / '• �.. � -Exhibit2.1 DEVELOPMENT PLAN CPC Development Area 2C-1 b Site Development Permit ®o '` 120 ICIRW o-sut/coaee/zo-te/taavwon�•.vaaa.o 1 1 1 DA 2G1 b Residential 1 (Approved ash: Part of DA 2G a PA 960151 1 PdNafe Acc Driveway / Res deC 1 CD 92-015P a100) rWSrSrs Lc 1 soiuce: nuwo•Str�e/ inure ca. 1 TAYLOr9 {�1/000RG 1 H 14 Irjj 9 DA 2C-2 Residential PA 970078 PA 12A Los Trancos Canyon Public Open -Space LEGEND MODEL COMPLEX �� DEVELOPMENTAREA BOUNDARY \ 2C-4 /\ uture idential < 1 Exhibit"2.2 MODEL COMPLE)C LOCATION PLAN Ievelopment Area 2C-1 b Site Development Permit ®07"—�22 o KV^ `•m.i/moVx—te/iocw.p/m°ax.aq II SECTION II: Current Plan Description Page II-4 TABLE 2-A PLANNING AREA 2C STATISTICAL SUMMARY DEVELOPMENT LAND USE/HOUSING TYPE ACRES PROPOSED DWELLING - PROPOSED DENSITY AREAS UNITS 2C MEDIUM DENSITY 257.3 490 1.9 TOTAL PA RESIDENTIAL 2C-lb Single -Family Detached 21.5 41 1.9 (Subject Site) 2C-la Single -Family Detached 35.0 57 1.6 2C-2 Single -Family Detached 43.5 66 1.5 2C-3 Single -Family Attached 17.7 42 2.4 2C-4 Single -Family Detached 34.6 61 1.8 2C-5 Single -Family Detached 47.6 47 1.0 2C-6 Single -Family Detached 36.3' 151" — 2C-7 Single -Family Detached 2C-8 Temporary Sales Trailer 12.5 N/A N/A 2C-9 Single -Family Detached 8.6 25 2.9 NOTE: The proposed units in PA 2C are consistent with the proposed 490 units and maximum of 905 units permitted by the Newport Coast LCP for PA 2C. Acreage and dwelling units proposed for Development Areas 2C-6 and 2C-7 are consistent with previously approved PA 940149 for Planning Area 2C. %8104.100 December 1999 NCPC DA 2C-lb SDP W:\climm XmylmwdWmmlXDA2C-lb.SDP.wpd ' SECTION Il: Current Plan Description Page II-5 ' B. ARCHITECTURAL ELEVATIONS AND FLOOR PLANS The previously -approved architecture for Development Area 2C-lb has been replaced with the three distinct plans currently under construction as part of the Perazul I project ' in adjoining Development Area 2C-la. ' The proposed plans are shown on Exhibits 2.3 through 2.6, Architectural Elevations/ Floor Plans. The two-story residential units range in size from 3,800 square feet to 4,400 square feet. The proposed plans replace previously -approved architecture with ' three different floor plans providing options for up to 4 bedrooms and three garage spaces. All are consistent with the Newport Coast LCP Site Development Standard of 35 ' feet. 1 1 1 C G 1 1 118/04.100 Dm=bcr 1999 NCPC DA 2C4b SDP W.\clicna%myimwd\ncont\DA2C-lb.SDP.wpd ii a Optional Masonry fireplace Optional Fountain FIRST FLOOR once: A InWne CA TAYLOr W00AOROAW, 52' — SECOND FLOOR NCPC Exhibit 2.4 PLAN 1 - FLOOR PLAN e 20 �•/�Ro-nnoaw/M�-ww FIRST FLOOR TAYLOR W00,0ROW110"AFS N pl/ 1 NCPC ZI V�/ SECOND FLOOR Exhibit JCX PLAN 2 - FLOOR PLAN Area 2C-1 b Changed Plan to PA 970077 � 20 FIRST FLOOR TAYLOR IWYOOOROAWIIOMAES r NCPC SECOND FL60K PLAN 2 - FI Fxhlblt 2.5 —r— 20 �Rlvi<1 wwJ•ur/ae-ro/�mre/mu-b�w FIRST FLOOR arcs: Icrcir Irvins G NCPC TAYLOR WOO,OROW110",EN SECOND FLOOR 2.6 t*U:kv .{ r�--rho 1�RM� ' SECTION II: Current Plan Description Page II-10 I 1 H 1 11 C. GRADING PLAN The revised Grading Plan, Exhibit 2.7, reflects minor changes to the internal lot grading design to support increased building pads and modified pad elevations. Seventeen side - yard retaining walls are proposed as part of this DA 2C-lb Site Development Permit. The proposed retaining walls vary in height from 1.5 to 5 feet. In all instances, pad elevations are within 5-feet of those shown on approved Tentative Tract Map No. 15394. No modifications are required to external grades to accommodate the modifications to individual pad grades. 91i6/CDA Dambcr b.SD .wpd 999 NCPCDA 2C-lb SDP W:\clienu\uylolwdlnwsst\DA2GI 1 -------- 899.3 1 900.0 PA 2B-\ 1 Reside\ Li\ 902.3 CD 92=0 1� 1 905.4 p! 1 1 / � 90944 - 4- WALL 1 917.4 4' WALL 1 , i C-1 b ' 925.1 1 Resi al W Ii 5' RET.WALL (Approved as ;1 rt of DA 2C-1 P 0155) j; 934.4 iErwnLL S¢' . x 1 � � 941.0 ♦` 1 • �i 943.0 1 -®® 1.5' RET.WALL 1 r 941.0 ■ 1 � 1 TAYLORWOOZ7RVAW110"ESY 1 1 934.5 n p59 aII II935.409LL 7. 93.5 ERAx LL 944.5 950.7 4' REMALI 960.5 3.5' REi.W 970.0 S 7 969.5 -970 970.5 972.2 1a I 155 983.5 A85-- 985.2 =9If� 987.8 993.8 ft 1007 1008.0 1009.5 1010.0 9= 1014.0 -REi' e6_ 1019.6 mmaT.WAL REL 1022.6 1025.0 1026.0 -�1027.5 f f%� LEGEND J i'DA 2C-1 b EXISTING CONTOURS Residential ■ _ _ e $ a ® PROPOSED CONTOURS C a$ RETAINING WALL ,. ` COFFEE WALL ♦ 1010 PROPOSED PAD ELEVATION 1 ■ DA 2C-2 Residential PA 970078 I I Exhibit 2.7 GRADING PLAN UCPC Development Area 2C-1 b Site Development Permit ®r FCRNN Irvin�l/cep�t/1c-10/IOYG�<p/ROC�pp60p ' SECTION III: Consistency Analysis Page III-1 ' This SDP for Development Area 2C-lb has been prepared in accordance with the 1996-certified ' Local Coastal Program (LCP) - Second Amendment, Master Coastal Development Permit (Master CDP) — Fifth Amendment (PA 970076) as amended, and the previously -approved CDP (PA 970077) prepared for Development Area 2C-lb. ' The total number of units proposed in DA 2C-lb is consistent with the Medium -Density Residential land use designation in the LCP and the previously approved CDP (PA 970077). In terms of overall design, this proposed SDP is intended to be fully consistent with the ' previously -approved land use descriptions and Conditions of Approval for Development Area 2C-lb and the processing procedures outlined in Orange County Zoning Code Section 7-9- ' 161.3. The proposed plan is consistent with the approved CDP for Development Area 2C-lb (PA 970077) in that the limits of grading within DA 2C-lb remains consistent and the changes to the Site Plan, Grading Plan and architecture will not affect the functioning or visual character along the frontal edge of the project. Approved infrastructure is adequately sized and located to ' permit the changes proposed. ' The proposed plan is consistent with the analysis completed in EIR No. 544A and subsequent Initial Study/Addendum (PA 970076) prepared for the Master CDP — Fifth Amendment. F ' NCPC DA Dttan DP.wpd NCPC DA 2C-lb SDP W:\<Iirntcltayl«wd\ncom11DA2C-Ib.SDP.wpd ago / 865 25 �J, wwe�. pen 94 1- 1005 - jI\ /i/�/ s5 % ��/tea !1t 1 I 23.3' {' in _ ,' / /j'.` / � \ �/' \tom. - ___ � 1 I 7�' � 96� ___ _■-- � ( 1 ��1' �-' �I //� 1, -� I l ! I �-` . 111, �� •` `` n I ' ( ' r 1 / 4. "Vi's1 29.7' 28.3' 34.2' - 22.4 -'� - ! /!M',r i i , L - - ♦ ` r ♦ ♦ , \ vv I I �! 20' n r.n�L.Y]r✓ r 36.6' i� i l 28.2' ,I 00 • . - /r� 4 \�r.45.6' Q / / / f' I. cza I .o -.35. ' ' ,? hXr "r 41.2' 41.5 - o r �2.1'---�� Nrl 27.8' 45.7' 7� 9,,.,,J 20''�# _ 1�'1' ,I 223• d \ QQa 48.3' 20.1 �.: PA L� V 1t` \ `` 42' - 30.1 i - - V r lnr c 28.3 w °yry '�' ` ` \\ 9 y II , /r J r / i C�4l \ l // �'l \ ,D -� _ -,. }11 "\ I o > !� 20 \ I \� l' \\ n •--�. - L6 30' , !- t I 24.2- :t S K. i�}�,� 1\0 �97C-'' ,i, t'' v v / I e �l f. Reside .� _ -�... __ _ _ i 1•" y """ CD 92 \7 \1P x } 1l, v r �= 31.2'� ---- r o x in � � ' 36.2' � � �' 'i ' � - i 36.3' •�'7�� 20' �� �' �( !/ 35 �97 -a'- - �1'-935 9,1.75 J - - '�y' / �� o � �P ��r I '. o K, 28.3' I 'I `� y _ /-�' C 49.2' _� C. c.,C roti _ 1--1 I i 1 ` ` 1. I I ' f II n b 25.9 ,� +,' I` 20.1' 2Z7,� 5 �i /� _ 7t oea / / /l /� ��. ,j/ / c" �- A /� I(� r !r ( •r - _ -- � r f• 1 1 ! �__ ' 35.6'-�e �- 32' l l i�rl'f' � �r I / l J ''�' '/I �/ l �i Yn�'� L 46 A� y 4 _ I �`lll �1 = I� I 11` �'/� • � 1 j a `3�:t�.,' c � % �' / % l �� j ( ) 41.2' -.- t h 40.2' y Q!� ��T� 1r1' ; l s c , 16.9 ily, �14' 49.8' '3t.{5.r�o'nd`I� �i �� '1 �; 1 _ /! !i /i / l //• t= _ _ i( 29.1'� C w i ci 47 4. 0 21 d k 1 LIU 11 26.3 ��; Q ' r "l G 20.1' [_ 44.7' 1 Ci lq C-1b _- ZA a t I ' 34.5'�-� sff 20' r�j o� r ... - • • I'i I 19. 7'22.8�•- --al . R e s i a I 39' _ It r 't4 ' --� - -�' _ I 49.2' - - ;�_�� ' - 1 ro ;n � / _ 3?:1''J r �, (Approved as � ---- -- __ � � _ k I t t'' i r t. -� // r� c n 4.4' t' 1 ;'1324 �� - j /! �J m 28, ;; _-rcm _a�J�r 15.7' ;' 5 �I - rt of DA 2C-1 a �-� -- f I w ���_ �� I 14 � r r ; P 60155) i� ' { i ' - - ---- - �'� 26.2' r 'I 20.TI- Qi 64' - !J o ! '/0 7� ` ^ 31.6'-+,--,,a�-ni 97 01 36.1 _ 34.2' o ® ��.■ ■ \ \ \ \ 57' / oz GHTS 26.5� 36.6'I 0 �\ v, . �\ o°j/p/ • - _ i/ ` 0 \ I IF,i % f -�-46' O J DRI 17.5' i (� 6S� - f1 .� U DA 2C 1 \ .r'�I, a Resi ial I 1 1 'r 21.8 I r , 20'1 ; I , 41.3' DA 2C-2 CIO Residential PA 970078 ' r x 30' 21.3' 29.6'� f 28' l \ r \ o Exhibit 1 DEVELOPMENT PLAN NCPC Development Area 2C-1 b Site Development Permit ® 0 50 100 IVi�tvi 1 :.00TOBER 1999 - - - - irvinel/toast/2a-lb/1099sdp/50devgrad.dwg ' 11 /_1 "/ - " .� ") - ----� .�-' 8e . .. ---`�,:\ ` a15--"'' - _ / / \ �/�J i i, ago / - .- /// - - - � -- f - -� D�5 ., DA 2 1 b w , o Q /� o , �, = oo� -'��� -fi e - _ a - f / / i ` . . . w n ?G O / i / i ,, / / _ice' / '1, , , -- � �. � 94' - I _// / /� PROPOSED CONTOURS , I I _ ��� _� -- f5 =' ; - '4� _ % %�-_ - _,0�5- , Residential A - �-i. _8�� V' i i �� �_ -/ ,A� .-- _c.�i^ � ' �� 1 I !:(P 11 i CIII _j / - - - - cs. S - - -. i 5 A A NNN ' '� - - // " 0 90 N� - - ��� /ZI - - i i "` °55 - %'' ^w)P f I � o 1 I �-��-�- ' _ „ y =� y o r - RETAINING WALL " �-,`_, -, - " � , . /" j ;, �� - � :.....■ ■ v /�� -_ - / / r rr 10 0 7 . i � I I - c � : 1./ - � ���71", J/1� -� _ 'Y- ; ; , ��_--- : I; ; I , '.� �,� COFFEE WALL - 11 ��r- � �; , 1 V'��- � i1 ,� I \ ; i I l , I /�_ ,, I A ` \ v - s- i l ' �� I1 r \ , v1 I �` 969 5 % l � � \ v .� �1 Z�,1 1 it 899.3 . �� i �� j '`;; 1008.0 \v�\ v ,0,3.0 ATION �,, ; I Ir 934.5 1 �, PROPOSED PAD ELEV I \ X\\,\\��� _ I'll , � � :.� l 1 -i i - l / j� i' % - I j �._-- .970 _� � �y r I _. -____ I �, A - ., ; - (� i i ��r )) ,/ 1 �' �--'._ 1 i I 1 i j { a A' II ' -/� to t - r � i E l i �: / I. - h / /, / / i 1 :i 'i 'I 1 it - I ,ix '� 1 �V�V' r 1 I V� I r - A O / / I 1 I. - - 1 xy .`�/ . A - , 1.' r; �� ' 1 9 0 0: 0 ' 9 7 0.5` r �� \ v y 1 - j ' , �� i 1009.5 •v, .. _ I f` j ; - .\ "_ - - , ' �' / % /-`^i' 9 3 5 . 4 �i •' I' •I r\ ', `., ' �',, r ,,i , i •'\ `' ,\ ; I [:1 _ - .: - I ' 1. 11 3, \ � , °COS/ I i I/ I I a - '1 I, � \ \ \ I'Al '� - - .I'� <� 1r I \_` . 902.3� «� 972.2 �g I 1010.0 ' ;� ' ,\ \ I f Reslde�� �, II _ p ��� ; C61,\�� lv /��� A ' \ _-r-- t 3' ; _ t 1 L r✓ J /"1 __� �1 - ' �. �! ; 1 - J I a.`�, �r - - .. ., C D" 92-s s . __ y; - a � DA 2C-2 , _ - _ '\ i I�� A\ -I � _ 1 rn I _ _______ / ! �-975 --�/- � 1 -s , x< J l !i I r • - _ ; -. - - - �V I �` 11 riI { 0 7 �"935-� � % - I C�n�� l i . - ' ,�, , , �9L'S ; r / / , ;i y75.0 /� �.i= - Residential - . �� I I '� i k 9 0 5.4 ; i ; i �i,',: r � � 'r ' 1014. 0 � �' ,r r . .I f � 938.5 ! l/ ;' 975-- ;; % % ��'I /" PA 97007� �'V' 1 ' 1 i .3 Rr i A/ i -' ' r - �-,_: rx' l P r; , n ---` I j1 r 7 �r r - _ _ - . . C _ ., , . �. 11 f1 ,_ _ r -r p r f' - �" r imp_ I--?'�'�." i�'11�1 � ii ) / r - 'r . , � .1 r I I : 1 - � Wv s- - - .. i G 1�L. I. . �' y F1 L L - l � l,r` rj mC�r r .� r" r 1 �� �-�7 �: m j , l - _ , ;.. / /r I�f I 1'/. 'l a,n 1 I I : MANU 1 r=„ I % - ✓ ]`(L i. V'�Y'.LL i i!: /�.° j i ___- .. - 7�„�j l ) j ., if i - - - . _ - ' - , -' / / -1 / l II I ( _ ✓- I I i i i t-efr___ 30-'I I / LvLZ�,jl \� / :--I uil I I % �� i � � i _ - - - - - - - �' I 909.4 i I ; \; / ; ;((( /! 101911 .6 . hI�r I P 4- i 1 ) ! r -r I 'i i r - a,C✓v '.: '! A 1 i O q.. t - ,< I - I IL.y�rr I � i r _r I11 _ , „� i 9 4 4.5 .- ,1 o rr; I ;i __� i I- r " - - r "�I f ��` 1. ✓//-i + I I ` ) J I ��'}�� I i i f/ � r_ 5' , �_ �020 , i I� . - o �' - _, ,! A i - - "- ". " ` �riiiiiiiiiiiiiii --`J 1�=-�r"t>•7 J `T97g I 1'I i i r'`\ _ ' '-'� , /I, I I '� ,aa5 i 7 I I/ _-.----__9H5 T I j?l, it I ! t7rt7t7C=�_�� r _ - - i I J .fir I !r ! c - 'v A f, / , I y ) C i 1 I 1 / f_t Awmi_m=1 i +LJ y. -- I � y'I, t i �' a /l-+�� n'1/�1 I I ^t - t /� / it'. E j , �_ 917.4 cj Irk i : `v ;� : 9 8 5.2 � ;' ' I ; � 10 2 2.6 i �,'I = -� I ,. , y 1 - I v._, 11 I I r II i o50 I 1 I 1 r i r - I I I err i V - - . f L I p r - 1 �/ ( _ pp - ! 0 r I 950.7 r ���85 - y1 1 - 2-' r�L I 1�11 /"� - ._-_ -� P. �I I l 11 II %I' �. - _ _ s y - �___ I Y i . ��hi _ r� i tl I - Ii-t----- 1 7 r '),r p� 7 f-� f_ J i Ii ; i i '`k - - - I r .,I • - � �s-t9��Z_�7_-� / i 1 r � i I r 1 l l •. N ,f."L-� - I II i r I , . - - _ " - . - i p �', r1 11 t I' I II?'• - -925J 11 I r� s 1l. a i a85 Ir I t�,'' 955 r 9 8 7: 8 `r� 925.1 I .j ;I ;r I) I I I I ' 1 1025.0 �\ yI'1 \ A. '. _ _.. RVVI lal - � 'V' - i_.< nr_' ,/ / I °� Ir 9V0.5 \ U � r� 'v .J.J __ �-VIVA I�� / r i f" i J •V w A - I - ' •! , qq - .. r r1_ v/'.L� -I - 1 F . (Approved as ; ), 11 - - __ _ � / o I . ; / � ` y ' v �li, . I I j 7 F �r / r / ! � r: w rt of DA 2C-1 a �\ a I , j ::� - 1 a. \ ,\ _ . r P 60155)lr;i ( ,; 934.4 / , ' ; ; ; �- -- 993.8 \'r`\\ ` \ \ ti / ( "- % G4A/ 1 \ �-- 1 \ . - _ // c, i/; ( i , - _ ,°G`'v I I i i i °. i \ �'�. r ,\ \ \ ""� - \ \ "",\ \ \ '\ ,\ \ //\C25- - - 11 , _ y 1 ` �'Ar '1 l I � I , ; ,� i�� ��.■ \ \ \ � < 1027. 5 _s\\� \ \\\ , i ' �r ' i fm 941.0_ \ \ \ i\ �• �, � HEGHTS / / `\ \ �, \\,\\ } 1 r 1 ° �o / D I � -M11i1Ij I . ,0,)i11 1!��I /.. / .,II I", A� f ,'; y, - / Rl I . - 943.0 . oI , , I -- - _� _I __.___ - II I � -� ,�\ DA 2C 1 a N 1 I (( , - . . ' i 60155 / V) r. ca County of Orange JAV?( 7DATE February 18, 2000 TO: William Melton, PDSD/Site Planning Section FROM: PDS/Environmental & Project Planning Services Division SUBJECT: Project Title: PA 990212 for NCPC-Planning Area 2C-1b, TTM 15394 Initial Study No. PA 990212 PROJECTDESCRIPTION. Coastal Development Permit (PA 990212) proposes to modify previously approved Planning Application (PA) 970076-81 (Orange County Planning Commission-9/23/97, Resolution 97-06) which proposed to establish 41 residential units Planning Area 2C-lb. PA 990212 proposes to construct the remaining 37 detached Single Family (SFD) units (4 of the previously approved 41 were constructed with PA 960155), modifying only the architecture and proposing minor modifications to grading. Tentative Tract Map No. 15394 for PA 2C-lb was conditionally approved by the Subdivision Committee on October 29, 1997 and subsequently recorded on December 22, 1998 (Instrument No. 19980885199, Book 778, Pages 12-17 MM). The proposed modifications are only to the architecture; the minor modifications to grading will not require revisions to the recorded Tract Map 15394. Minor modifications to the internal grades will not require any modifications to the previously approved cul-de-sac street design, or infrastructure systems for drainage, water and wastewater. The approved landscape palette and design remain unchanged from the current approval. The proposed revision are to portions of the Newport Coast Planned Community, Planning Area 2C lb. • The revised plan proposes modifications to PA 970077 for architecture, minor grading, and the addition of retaining walls on lots 1, 4-8, 15-18, 21, 24 & 25, 31-34. PROJECTLOCATION: The project is located in the coastal area of south unincorporated Orange County between the cities of Newport Beach/Corona del Mar and Laguna Beach. The project site in on the inland side of Pacific Coast Highway, easterly of the intersection of Pacific Coast Highway and Crystal Cove Drive. CEQA DETERMINATION- The CEQA documentation for your proposed project has been completed by the Environmental Planning Division. Based upon its review, E&PPSD has determined that the proper CEQA documentation for the Project is previously certified FEIR 544A. The following information is attached to this memo for your consideration: I. Instructions for Filing CEQA Documents with the County Clerk; and II. CEQA Statement, Action and Findings which should be used for Staff Reports and AITs for the Project, including: A. CEQA Compliance Statement for AIT and Staff Report; and B. Recommended Action for Decision-maker(s) to Re -Certify EIR; and C. Fish and Game Code Finding for Approval of Project; and D. NCCP Findings for Approval of Projects. III. Initial Study Analysis. If clarification is needed regarding this Memo or if there are questions, please contact the following staff person from PDS/Environmental & Project Planning Services Division: E&PPSD Staff Contact: Lyn Ahrens Telephone Number: (714) 834-5154 George Britton, Manager PDS/Environmental & Project Planning Services Division ate::-/ le: �Q(M VJ. Qn',mw Q � Attachments: Attachment A: Filing Instructions for County Clerk Attachment 1: Recommended CEQA Statements, Actions, Findings Attachment 2: Initial Study Analysis FILING CEQA DOCUMENTS WITH THE COUNTY CLERK Your division will be responsible for filing the CEQA documentation and paying its related $38.00 filing fee with the County Clerk for your project. The County Clerk now only needs your CEQA document(s) with your project charge number in the upper right corner in order to post the document and recover this fee. You must, however, obtain a fee receipt from the County Clerk, which must then be turned in immediately to Management Services/Accounting Services. The County Clerk requires the $38.00 documentary handling fee for the following items: * Negative Declarations (ND); * Notices of Determinations (NOD); and * Notices of Exemption (NOE) Please note the following: 1. Within 5 days of approval action by the decision -making authority (e.g. Board, Planning Commission, Zoning Administrator) on a project, a Notice of Determination (NOD) must be filed with the County Clerk. 2. E&PPSD has determined that your project is exempt from the Department of Fish and Game (DFG) fees because the required fees were previously paid, a memo will be provided by E&PPSD and must accompany your projects NOD. You will need to fill in the information on the NOD form and get an original authorizing signature from your division after the approval action on your project. You will need to take the original set, and at least one set of copies to the EIR Clerk located in the Recorders/Clerks Office, Building 12, Civic Center Plaza. The Clerk will stamp the NOD, and keep the original set. The Clerk will issue a receipt for the Environmental document which must be returned to Management Services/Accounting Services by the end of the day. A copy of a stamped NOD must be sent to E&PPSD for the file. PA RECOMMENDED CEQA STATEMENTSAND FINDINGS FOR STAFFREPORTSIAITs A. CEQA COMPLIANCESTATEMENT (FOR TEXT OFSTAFFREPORTIAIT): The CEQA compliance statement, located in the text of the staff report shall include the following statement unless advised otherwise by County Counsel or the Manager, Environmental & Project Planning Services Division. The proposed project is covered by Final EIR 544A, previously certified on 6/27/95, appealed, the appeal was denied and Final EIR 544A recertified 8/8/95. Prior to project approval, the decision -maker must assert that this EIR is adequate to satisfy the requirements of CEQA for the proposed project. I find that following is true of this proposed project: (1) No substantial changes are proposed in the project which will require major revisions of the previous EIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects; (2) No substantial changes have occurred with respect to the circumstances under which the project is undertaken, which will require major revisions of the previous EIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects; or (3) No new information of substantial importance which was not known and could not have been known with the exercise of reasonable diligence at the time the previous EIR was certified as complete was adopted, shows any of the following: (A) The project will have one or more significant effects not discussed in the previous EIR; (B) Significant effects previously examined will be substantially more severe than shown in the previous EIR; (C) Mitigation Measures or alternatives previously found not to be feasible would in fact be feasible, and would substantially reduce one or more significant effects of the project, but the project proponents decline to adopt the mitigation measure or alternative; or (D) Mitigation measures or alternatives which are considerable different from those analyzed in the previous EIR would substantially reduce one or more significant effects on the environment, but the project proponents decline to adopt the mitigation measure or alternative. B. RECOMMENDED ACTION STATEMENT FOR APPROVING PROJECT: State law requires that action on a CEQA document be taken by the decision -maker prior to approval of the project for which it has been prepared. The following action must be taken before action on the project, unless directed otherwise by County Counsel or the Manager, Environmental & Project Planning Services Division. • The decision -maker has determined that Final EIR 544A, previously certified on 6/27/95, appealed, the appeal denied and Final EIR 544A re -certified 8/8/95, satisfies the requirements of CEQA and has been approved as the Program EIR for the proposed project based upon the following findings: a, Based on the Initial Study, it is found that the EIR serves as the Program EIR for the proposed project; and b. The approval of the previously certified Final EIR for the project reflects the independent judgment of the Lead Agency. C. FISHAND GAME CODE FINDING FORAPPROVAL OFPROJECT.- Find that pursuant to Section 711A of the California Fish & Game Code, this project is exempt from payment of required fees as it has been determined that the required fees have been paid, EIR 544A, Receipt Document Number No. D. NCCP FINDING FOR APPROVAL OFPROJECT: Find that the proposed project will not have a significant unmitigated impact upon Coastal Sage Scrub habitat and, therefore, will not preclude the ability to comply with approved Coastal/Central Subregional Natural Communities Conservation Planning (NCCP) Program Newport Coast PC, PA 3A-2a.b,c Page 3 PA 990152 ENVIRONMENTAL ANALYSIS CHECKLIST The following checklist takes into consideration the preparation of an environmental document preparedatan earlier stage of the proposed project. This checklist evaluates the adequacy of the earlier document pursuant to Section 15162 of the California Environmental Quality Act (CEQA) Guidelines. New hrure No Subst.vthd New Mom No Subshvtul S iiul.it Severe Cbmge From Signifiesvt severe Change From ISSUES& SUPPORTING DATA SOURCES: Imv.ets Imv.cis Provio.Amlysis ISSUES& SUPPORTING DATA SOURCES: Imnaetr hnD.eb P.-A..Amiysl 1. LAND USE & PLANNING. Would the project: 5. HYDROLOGY&DRAINAGE. Would the a)Conflict with general plan designation or zoning! ❑ Elproject: (cow #: ) a) Substantially all" the existing drainage pattern of the site or area, including the alteration of the course of steam or river, in b) Conflict with applicable environmental plans or policies ❑ ❑ ® insurer which would result in: of agencies with jurisdiction over the project?( ) i) substantial erosion or siltation on- oroff-site?( ❑ ❑ e) Disrupt or divide the physical arrangement of an ❑ ❑ ® ir) a substantial increase in the rate or amount of surface mooffin ❑ ❑ El established community(e g. low income, minority)?( ) manaer which would result in flooding on- or off -site? ( ) d)Conflict with adjacent, existing or planned land uses?( ) ❑ ❑ ® b)Create or contribute runoff waterwhich would exceed the capacity El❑ 23 of existing or planed stormwater drainage systems orprowde 2. AGRICULTURE. Would project: substantial additional sources of polluted runoff?( ) a) Convert Farmlmdslistedas"Prime","Unique"orof"Statewide ❑ ❑ ® c) Place within a 100-year flood hazard men structures which would Importance," as shown on the State Farmland Mapping and impede or redirect flood flows?( ) ❑ ❑ Monitoring Program, to non-ag icultural use? d)Expose people or structures to asignifieant risk of loss, injury or ❑ ❑ b) Involve other changes in the ezistngenvironmentwhich, due to ❑ ❑ ® deathinvolvmg flooding, including flooding as aresult of the their location ornatune. could result in conversion ofFamdand failum of a levee or dam, or inundation by seiche, tsunami, or to non-agricultural use? ( ) mudflow? ( ) 3. POPULATION & HOUSING. Would project: 6. WATER QUALITY. Would the project: a) Cumulatively exceed adopted regional or local population ❑ ❑ ® a) Violate any water quality standards or waste discharge projectiow?( ) requirements?( ) ❑ ❑ b) Induce substantial growth in an area duectly or indirectly through ❑ ❑ ® b) Substantially deplete groundwater supplies or interfere with project in an undeveloped area or extension of major infrastructure? groundwater recharge such that there would be a net deficit in ❑ ❑ ( ) aquifer volume or a lowering of a local groundwater table level? c) Displace existing housing affecting a substantial number of people? ❑ ❑ ® ( ) c) Otherwise substantially degrade water quality? ) qu ❑ ❑ 4. GEOPHYSICAL. Would project result in or expose 7. TRANSPORTATION/CIRCULATION. Would people to impacts involving: the project result in: a) Local fault rupture?( ) ❑ ❑ ® a) Increased vehicle tips or traffic congestion beyond adopted policies and(or forecasts? ( ) ❑ ❑ IR b) Seismicity: ground shaking or liquefaction?( ) ❑ ❑ b) Exceed, either individually or cumulatively, a level of service c) Have soils incapable of adequately supporting the use of septic ❑ ❑ ® standard established by the wanly congestion management agency ❑ ❑ tanks or alternative waste water disposal systems where sewers are for designated roads or highways? ( ) not available for the disposal ofwaste water!( ) c) Safety hazards from design features (e.g. sharp curves or d) Landslides or mudslides?( ) ❑ ❑ ® dangerous intersection) or incompatible was(e.g. farm ❑ ❑ 19 equipment)? ( ) e) Erosion, changes intopographyorunstable sad conditions from ❑ ❑ excavation, grading or fill?( ) d) Inadequate emergency access or access to nearby uses?( ) ❑ ❑ 1) Subsidence of the land?( ) ❑ ❑ ® e) hisuffrciamparking capacity on -site oroff-site?( ) g) Expansive soils?( ) ❑ ❑ ® f) Hazards "barriers forpedestrims orbicyclists?( ) h) Unique geologic orpbysical features? ( ) ❑ ❑ 1 ENVIRONMENTAL ANALYSIS CHECKLIST New Mole No Substantial Sigviaeant Severe C rage Fsom ISSUES & SUPPORTING DATA SOURCES: Impact, Impacts Previom Amlysv ISSUES & SUPPORTING DATA SOURCES: New Sigvtfinot Impacts More Severe Impacts No Snhatanttal Change Frem Previous Analysts g) Conflicts with adopted policies supporting alternative transportation ❑ ❑ El 11. AESTHETICS. Would the project: (e g. bus turnouts, bicycle racks)? ( j a) Affect a scenic vista orview open to the public?( ) ❑ ❑ h) Rail, waterbome or air buffic impacts?( ) ❑ ❑ b) Affect adesignated scenic highway? ❑ ❑ 21 i) Change in air traffic patterns, including eitheran increase in traffic ❑ ❑ ® c) Substantially degrade the existing visual character or quality of ❑ ❑ levels or a change in location that results in substantial safety risks? the site and its surroundings? ( ) d) Create light or glare beyond the physical limits of the project ❑ ❑ S. AIR QUALITY. Would the project: site? ( ) a) Exceed any SCAQMD standard orcontribute to air quality ❑ ❑ ® 17. CULTURALISCIENTIFIC RESOURCES. deterioration beyond projections ofSCAQMD?( ) Would the project: b) Expose sensitive population groups to pollutants in excess of ❑ ❑ ® a) Disuub arobaw or paled resom<es7( ) ❑ ❑ acceptable levels?( ) b) Affect hutoncalresoru¢es?( ) ❑ ❑ c) Alter air movement, moisture, mtem pernime, or pose any change ❑ ❑ ® in climate? ( ) c) have the potential ease a physical change which would affect ❑ Elunique ethnic <ulturaml values? ( ) d) Create objectionable odors affecting a substantial number of ❑ ❑ ® People? ( ) 13. RECREATION. Would project: 9. NOISE. Would the project: a) Increase theme of existing neighborhood and regional parks or ❑ ❑ other recreational facilities such that substantial physical a) Increase existing noise levels?( ) ❑ ❑ ® detenomtion of the facility would occur or be accelerated? b) Expose people to noise levels exceeding adopted County standards? ❑ ❑ ® b) Include recreational facilities orrequire the construction or ❑ ❑ ( ) expansion of recreational facilities which might have an adverse c) Iflocmtedwithin an airport land use plan or, where such pin has ❑ ❑ ® Physical effect on the environment?( ) not been adopted, within two miles ofa public airport or public use c) Conflict with adopted recreational plans or policies? ( ) El ❑ airport, expose people residing or working in the project area to excessive nmselevels? ( ) 14. MINERAL RESOURCES. Would the project: 10. BIOLOGICAL RESOURCES. Would the project a) Result in the loss ofavailability of a known mineral resource that ❑ ❑ impact: would be ofvalue to the region and the residents of the state? a) Endangered, threatened or ram species or thew habitats (including but not limited to plants, fish, insects, animals and birds)?( ) ❑ ❑ ® b) ofaa lntineml eecothe ess ❑ ❑ ID resResurlt local general resource recovery site delineated on a local ge¢eml plan, specific site delineated b) Locally designated species (e.g. heritage trees)? ( ) ❑ ❑ ® Plan or other land use plan? ( ) c) Locally designated natural communities (e g oak forest, coastal El ❑ ® 15. HAZARDS. Would the project: habitat, etc.)?( ) d) Weiland habitat (e.g. marsh, riparian and vernal pool)?( ) ❑ ❑ ® a) Create a haxard to the public or the environment through the routine transport, use, or disposal ofharmdousmaterlalsv ❑ El e) Wildlife dispersal or migration corridors? ( ) ❑ ❑ ® ( ) ro 0 Ado Pled or P Posail conservation plans and policies (a g. Natural ❑ ❑ ® b) Create aha=d to the public or the environment through reasonably foreseeable upset and accident conditions involving ❑ ❑ Community Conservation Plan or Resource Management Plan)? the release of hazardous materials into the environment? c) Emithazardouscmissionsorhandlehau omoracutely ❑ ❑ hamrdous materials, substances, or waste within one-quartermde of an Insisting or proposed school?( ) Initial ENVIRONMENTAL ANALYSIS CHECKLIST New Mort No Substantial NM M. No Substm" Signfrant Severe Change From Significant Severe Change Fmm ISSUES & SUPPORTING DATA SOURCES: Impacts Impacts Previous Audyeu ISSUES & SUPPORTING DATA SOURCES: Impacts Impacts Pmious Analysis d) Expose people to existing sources of health hazards? ( ) e) If located within an airport land use plan or, where such plan has not been adopted, within two miles of public airport or public use airport, result in a safety hazard forpeople residing or working in the project area?( ) t) If located within the vicinity of a private airship, result in a safety hazard for people residing or working in the project area?( ) g) Impair implementation of or physically interfere with an adopted emergency response plan or emergency evacmtion plan?( ) 16. PUBLIC SERVICES. Would project result in ❑ ❑ El ❑ ❑ ❑ El El ❑ ® ® ® e) Does the project have possible environmental effects which are individually limited but cumulatively considerable? (*emulatively considerable" means that the incremental effects of an individual project are considemble when viewed in camection with the effects of past projects, the effects of other current pmjects, and the effects of probable fxtureprojects) d) Does project have eavwnmental effects which will cause substantial adverse effects on human beings, either directly or mdimedy? ❑ ❑ ❑ ❑ _ Choose one of the following: need(s) for new/altered government facilities/servicesin: DETERMINATION: a) Fimprotection4( ) ❑ ❑ ® Eased upon the evidence in light ofthe whole record documented in the attached environmental checklist explanation, cited incorporations b) Police protection? ( ) ❑ ❑ and attachments, I find that the proposed project. c) Schools?( ) has previously been analysed as part of an earlier CEQA document ❑ ❑ ® (which either mitigated the project or adopted impacts pursuant to d) Maintenance ofpublic facilities, including roads? ( ) ❑ ❑ ® findings) adopted/certified pmsuantto State and County CEQA Guidelines. The proposed project is a component of the whole action e) Other government services?( ) ❑ ❑ ® analysed in the previously adopted/cenified CEQA document has previously been analyzed as part of an earlier CEQA document 17. UTILITIES& SERVICE SYSTEMS. Would (which either mitigated the project or adopted impacts pursuant to ❑ project result in needs for new or substantial alterations findings) adopted(certified pursuant to Stine and County CEQA in: Guidelines. Minor additions and/or clatirutions are needed to make the previous documentation adequate to cover the project wluch a) Power or natural gas?( ) ❑ ® are documented in this addendum to the earlier CEQA document (CEQA §15164). b) Communications systems?( ) ❑ ❑ has previously been analyzed as part ofanearher CEQA document c) Local orregionalwatert=trnentordistributionfacilities?( ) ❑ ❑ ® (which either mitigated the project or adopted impacts pusamtto ❑ findings)adopted/certified pursuaatto State and County CEQA d) Sewer or septic tanks?( ) ❑ ❑ ® Guidelines. However, there is important new information and(or substantial changes have occurred requiring the preparation of an e) Solid waste disposal? ( ) ❑ ❑ ® additional CEQA document (ND or Efit) pursuant to CEQA Guidelines Sections 0162 throueh 15I63.1 — 0 I MANDATORY FINDINGS. a) Does the project have the potential to degrade the quality of the ❑ ❑ ® Planner. Lyn Ahrens environment, substantially reduce the habitat of fish or wildlife Environmental & Project Planning Division population to drop below selfsustaining levels, threaten to eliminate Telephone: (714) 834-5154 a plant or animal community, reduce the number or restrict the range ofaram or endangered plant oranimal, oreliminate NOTE: All refenmcedmidlormcorponneddocunenu maybe important examples ofthe major periods ofCalifonnia historyor revnewedbyappoinment only, at the County ofOrmige Planning & prehistory? DevelopmmtServrce Depam m4360N.P7ower&ma..SmRaAno, Callfarnia, unlessotherwise spec fed An appointment ran, bemade b) Does the project have the potential to achieve the short-term ❑ ❑ ® by comacaug the CEQA ConmctPersun identfedabove. environmental goals to the disadvantage of the long -tam environmental goals? 3 of3 NEWPORT COAST PLANNED COMMUNITY, PHASE III, REVISION )DENDUM INITIAL STUDY PA 970076-970081 to EIR 544A CERTIFIED FOR the NEWPORT (IRVINE) COAST PLANNED COMMUNITY, PHASE III MASTER CDP FIFTH AMENDMENT AND COASTAL DEVELOPMENT PERMITS FOR DEVELOPMENT AREAS 2C-1B, 2C-2, 2C-3, 2G4, AND 2C-5 LEAD AGENCY: ORANGE COUNTY, PLANNING & DEVELOPMENT SERVICES DEPARTMENT Environmental & Project Planning Services Division George Britton, Division Manager Environmental Planning Section Raymond H. C. Brantley, Chief Contact Person: Lyn Ahrens, CEQA Project Manager 300 Flower Street Room 321 Santa Ana, CA 92702-4048 (714) 834-5154 PROJECT APPLICANT: Irvine Community Development Company 550 Newport Center Drive Newport Beach, CA 92660 Contact: Norm W-itt (714) 720-2129 ' September 15, 1997 LSAAmdates, Ina TABLE OF CONTENTS PAGE I. PREFACE................................................I H. INTRODUCTION.........................................5 M. CEQA BASIS FORAN ADDENDUM ..........................11 IV. ANALYSIS OF IMPACTS/MITIGATION ........................ 16 V. FINDINGS.................................................70 LIST OF FIGURES PAGE 1 - PA 2C Coastal Development Permits Boundary Comparison Map ... 2 2 - Project Location Map ...................................... 6 3 - Proposed Boundary Adjustments ................ I ............9 4 - The Master CDP - Fifth Amendment Master Grading Plan ......... 22 5 - Cut and Fill Plan ......................................... 23 6 - Key Map - Development Sections ............................ 25 7 - Development Sections .................................... 26 8 - Cross Section Key Map .................................... 54 9 - Section A A.............................................55 10 - Section B-B.............................................56 it- Section C-C.............................................57 9/15t97«1.%CCE63%0UnIIQE.WPD» i I LFA.tes,,= I. PREFACE In 1995, the County of Orange (County) approved Planning Application No. PA 94 0149, a Coastal Development Permit/Site Development Permit for the devel- opment of the 360 acre "Phase III" area of the Irvine Coast Planned ' Community/Local Coastal Program (changed to Newport Coast Planned Com- munity per LCP - Second Amendment). The overall project included a Master Plan for 635 homes and private open space on 360 acres with an overall density of 2.2 dwelling units per acre. At the time of project approval, it was anticipated that the project would be developed by The Irvine Company and sold as pre -graded sites to individual builders. Included was a Coastal Development Permit for 490 units in Medium Density Residential Planning Area 2C of the Irvine (Newport) Coast and 92 units in Medium Density Planning Areas 14 and 15 of the San Joaquin Hills Planned Community. The previous discretionary approval was processed concurrently with the 1 Master Coastal Development Permit (Master CDP) - Fourth Amendment. The amendment included realignment of common boundaries for Newport Coast PAs 2C, 6, 12A, and 12D and modifications to the alignment of Vista Ridge ' Road. Included in the infrastructure portion of this Master CDP - Fourth Amendment was a replacement of Vista Ridge Road with a circulation system that eliminated a through connection to Ridge Park Road from Newport Coast Drive. Additionally, EIR No. 544A was prepared and certified, outlining mitiga- tion and project design features allowing for construction of roadways, master infrastructure improvements, and the subdivision and construction of individ- ual building sites. Since the time of the Phase III project approvals, Assessment District No. 88-1 has completed construction of Ridge Park Road to the Signal Peak area and residential construction is underway in DA 2C-9 and PA 14 San Joaquin Hills Planned Community (SJHPC) ("Campobella"), an 89 single family unit project on 28 acres. Additionally, with the Planning Commission's approval of Planning ' Application PA 960155 on June 24, 1997, grading operations will commence shortly for 57 single family units on 35 acres in DA 2C-la. As exemplified by the two above referenced projects, the market for large-scale development has changed such that smaller development increments are re- quired for builders to obtain construction financing. As a result, five (5) Coastal Development Permits for Development Areas 2C-lb, -2, -3, -4, and-5 (PA ' 970077-970081) are proposed to replace a major portion of the previously approved large-scale development plan in the western and central portions of PA 2C in the NCPC. The proposed PA 2C CDPs Development Area boundaries ' are substantially consistent with the LCP - Second Amendment and cover ap- proximately the same development limits (approximately 200 acres) as DAs 2C- 1, -2, -3, -4. -6, and -7 in the previous Phase III approval (see Figure 1). I To facilitate the PA 2C CDP projects, the Master CDP - Fifth Amendment (PA 97 0076) is being processed concurrently. Access to PA 2C will be provided by 9/15N701.\CCB638\0U UNE.WPD» Coastal Zane Boundary t 2C-10; 12D • , _J tom•-►�..i 2C-3 / 2C-4 r; , 2G1 �. / 2C-7 • �" . �� 2C-6 � APPROVED DEVELOPMENT AREA BOUNDARIES PA 94-0149 Source: FORMA, Sept 1997. orn,oWr TIAIc, N Scale in Feet L ['rA Coiestel Zane Boundary SanHug 1'IerrteU Corrcnua _ "� s- Plarroetlily Plan T� 1 ' j PA 12D 1 PA 970078 •' ! 2C-5 J ` 2C-6 .`" / 6.1 � ' _�- • - I ' / PA 970081 / 'PA 6.1 �1t1 2C-lbPA 970077 s 2C-1 a PA960155 2C 8# v .� PA 90080 ,. PROPOSED DEVELOPMENT AREA JUNE 1997 Figure 1 i Planning Area 2C Coastal Development Permits Boundary Comparison Map U rsaAmdates, Inc. II II II U Vista Ridge Road, a 40 foot wide (pavement only) major collector currently being constructed by the Irvine Coast Assessment District. The Master CDP - Fifth Amendment reestablishes the previously approved Master CDP - First Amendment (CD 89-11P) alignment for Vista Ridge Road. Approval of the Master CDP - Fifth Amendment will establish two 40 foot wide (pavement) collectors to provide interior circulation for PA 2C. The Master CDP will also provide for mass grading of the entire PA 2C area; adjustment to exterior Plan- ning Area boundaries (12D and 2C) will include areas proposed for grading and fuel modification within residential development areas. The project proposals are similar to the previous Phase III approval; all Devel- opment Areas are being developed with the Medium Density Residential land use designated for PA 2C (3.5 to 6.5 units per acre) on minimum building sites of 2,500 square feet. The proposed PA 2C project actually decreases the overall density within the same limits of development. The projects have also been designed to be consistent with all applicable site development standards of the Newport Coast PC. LCP Second Amendment A second amendmentto the Irvine Coast LCP has been approved by the Califor- nia Coastal Commission (October, 1996), and certified by the County Board of Supervisors and California Coastal Commission (December, 1996). None of the LCP Second Amendment changes substantively affect the Newport Coast Phase III projects. As noted below, there are a number of name changes; however, no land use policies or dwelling unit counts changed with respect to Phase III or PA 2C. The changes are described for informational purposes. This second amendment affects a number of land use planning aspects of the Newport Coast, including, among others, the adjustment of development/open space boundaries adjacent to Crystal Cove State Park to improve habitat con- nectivity; an increase in the maximum number of dwelling units allowed in undeveloped planning areas to match the low end of density ranges established by the land use categories while maintaining the maximum allowed 2,600 total residential units in the NCPC; adjust/expand the types of recreational uses allowed in PA 12 C; add equestrian centers as a permitted use in PAs 5, 6 and 12C. The project location map, Figure 2, also illustrates the land use plan of the LCP Second Amendment. The second amendment also provides for some technical revisions to the LCP, including name changes to roads and planned communities, and designation of new planning area numbers for El Morro Elementary School and Laguna Beach Water District sites. The technical changes most relevant to the revised Phase III project include the changing of the name "Irvine Coast Planned Community" to "Newport Coast Planned Community," and "Pelican Hill Road" to "Newport Coast Drive." What was formerly called "Lower Loop Road" is now called "Pelican Hill Road," and "Upper Loop Road" is now Vista Ridge and Ridge Park Roads. References in this Addendum/inidal Study shall be made to the new names of these areas and roads, other than when citing the titles of prior environmental documents. 9/15y97«I:\CCB638\0UnINE.WPD" II LtAA=dlaf#4 !MG Since certification, the LCP Second Amendment Is the guiding document for development of the Newport Coast and, unless otherwise noted in the text, all references to the Newport Coast LCP ace to the Second Amendment. I 11 I El t' 11 11 9/1$/P74(I:\CCB63MUTLIN&WPD» LSAAmdares, Inc. ' LOCATION II II II II �I H. INTRODUCTION The Newport Coast Planned Community (NCPC) contains 9,493 acres of unin- corporated land in the coastal foothills of Orange County. The Newport Coast is bordered on the north by the City of Newport Beach, on the west by the Pacific Ocean, on the south by the City of Laguna Beach, and on the east by San Joaquin Hills Planned Community. Planning Area 2C is located within the northern portion of the NCPC on the east side of Newport Coast Drive, south of Ridge Park Road, and north of Vista Ridge Road (see Figure 2, Project Location Map). Private Open Space Planning Area 12D and Development Area 2C-9 (under construction) lie to the north, Public Open Space Planning Area 12A (Los Trancos Canyon) lies to the south, Planning Area 2B-3 (developed) lies to the west. The remaining undeveloped Planning Areas in 2C (DAs 7 and 8) and PA 6-1 and 15 (SJHPC) lie to the east. The Master CDP project area includes all of PAs 2C, 12D and 6-1 (see Figure 2). ZUS27NG CONDITIONS 4T71U# The elevation of the site ranges from about 840 feet above sea level to approxi- mately 1,166 feet above sea level. There are existing residential developments in Planning Area 2B-3 to the west, and construction underway in Development Area 2C-9 and Planning Area 14 (SJHPC) north of Ridge Park Road. Rough grading activity is underway in the western portion of DA 2C-1a per Grading Permit No. GA 95-0046 issued consistent with the Master CDP - Fourth Amendment and approval PA 96.0155. Grading is also currently underway in conjunction with the extension of Vista Ridge Road (Grading Permit No. GA 96- 0040). The Master CDP amendment focuses primarily on a 310 acre (gross) subarea in the undeveloped northeastern portion of the Master CDP area and provides for the following: • Reestablishment of Vista Ridge Road (formerly Upper Loop Road) as a public street with the 'alignment approved in the Master CDP - First Amendment (CD89-11P); Construction of a community collector ("A" Street) through the western portion of Planning Area 2C; Establishes an additional community collector street C'B" Street) provid- ing access from Vista Ridge Road to the eastern portions of PA 2C; 9/15,97KI:\CCB638\OUTLINE.WPD» 5 1 ' - -'-•- i. ta0 at ' atr.t u y OmVrtOYtNMWd'11 t 14 � 1 17 e 711 10 at 7 e is I 4 ° xit■ 7 1e n a � 10 7 1a a We to 1-0 7 202 292 DEVELOPMEM•AFFAS 2Glb,-2,•3,-4and-6 12E Moor CANYON Nv�a� lAe�� 1 �tY z1•t mte 1tA 2Eu iFt ' 1I 1D2 44 P618CY7 ryey iiO 1702 11a it ' tA 17E7 1761 17D@ ta\ 48 1ea1 170-1 17F1 1ea2 13F 178 ' UA 1M 179 °ELICANHILL 17A2 PIEUCµH1 DDIrWCOLNISE GOLF 7A: taa 17 31 PA= a ww..r 344 14 e2 77 (RfarHDNEafA7EPARt ' POW at .—. P A C / F / C i O C 6 A N ' Source: FORMA, Juba 1997. 9/4/97(CCB638) Figure 2 N LSA Project Location Map Not to Scale - ,saamrares� r= ' Allows for construction of required infrastructure within Vista Ridge Road and two community collector streets to serve future residential ' development in NCPC Planning Areas 2C and 6-1; • Reconfigures Planning Area 2C boundaries to incorporate future con- struction level site planning and grading projects using similar parame- ters analyzed in Phase III EIR No. 544A; and ' Incorporates provisions from the LCP - Second Amendment, adopted subsequent to the 1995 Phase III CDP approval. The Master CDP - Fifth Amendment is proposed as the entitlement document for the following development rights: • Updates to technical data contained in the Master CDP (CD 88-11P) and ' subsequent amendments including tables, exhibits, and text to maintain consistently with the LUP - Second Amendment; • Serves as a basis for approval of Vesting "A" Tentative Tract Map No. 15393 by the Orange County Subdivision Committee, providing for the subdivision of the undeveloped portion of the Master CDP project area ' (and areas within the San Joaquin Hills PC to the north) into large par- cels for financing, sale to builders, grading, or dedication to the County of Orange; ' Permit construction of remaining backbone domestic and reclaimed water distribution systems from existing storage facilities constructed by the Irvine Ranch Water District and The Irvine Company; ' Permit construction of master drainage and sewer systems within pro- posed streets to serve future development; and • Incorporates minor revisions to acreages and Planning Area boundaries as shown on the PC Development Map and Statistical Table as provided ' for in LCP Chapter II-11. Natural Communities Conservation Program ' The Master CDP - Fifth Amendment includes grading for roads, mass -graded building pads for future residential construction, and future fuel modification I' zones. Pursuant to Section 10.1(b) of,the NCCP/HCP Implementation Agree- ment, a minor amendment will be processed to permit boundary adjustments that result in no net loss of reserve system acreage and no long-term net loss of subregional habitat value. The minor amendment will be processed concur- rently with this Master CDP - Fifth Amendment application and approved by the NCCP non-profit corporation prior to issuance of any applicable grading per- mits. The total acreage of the Los Trancos Canyon dedication area will not change as a result of the Master CDP - Fifth Amendment. As provided for in Chapter 3 of 'I 9l15i97<ACCE6M0VTLINE.WPD» 11 MAnoaraetr, Ina the LCP - Second Amendment, adjustments to the boundary of Los Trancos Canyon will be Incorporated into a phased irrevocable offer of dedication program (Parcel A and B sequence) to the County. The overall Newport Coast Dedication Program will maintain approximately 7,234 acres devoted to open space and ration use, which includes 2,807 areas In Crystal Cove State Park, 2,666 acres in wilderness open space, 1,161 areas in special use open space dedications, and over 600 acres in the golf course and other non -dedicated recreation areas. Planning Area Boundaries, Adjustments; Units, and Acreages Figure 1 illustrates the approved and proposed development area boundaries. Planning area boundaries have been modified due to the proposed roadway alignments and more detailed engineering study, yet proposed acreages remain within the requisite ten percent (10%) of planning area acreage approved in the NCPC as described below. The Master CDP - Fifth Amendment does not pro- pose changes In units permitted by the LCP - Second Amendment. 1. Planning Area 2C The Amendment to the Master CDP addresses the approximately 261.5 acres in PA 2C located in the northeastern portion of the MCDP. As shown on Figure 3, the refitted project boundary in this application varies from the existing LCP - Second Amendment in three (3) areas: The western boundary with existing residential development in DA 2B-3 shows a 0,7 acre net reduction resulting from modifications to the planning area boundary that incorporate grading and slope area for future fuel modification. Other minor adjustments in this area establish consistency with the construction level CDP submitted for DA 2C-1a (Planning Application PA 960155 approved on June 24, 1997). A boundary adjustment is also proposed along the southern boundary with Los Trancos Canyon to facilitate construction level grading and fuel modification. This boundary adjustment results In approximately 3.7 acres (0.6 percent) reallocated from Los Trancos Canyon PA 12A to PA 2C with no net change in overall open space acreage. Approximately 5.1 acres of large existing slopes in private open space have been reallocated from PA 2C to PA 12D. The revised PA 2C acreage, from 258.9 to 261.5 acres, represents a one percent (1.0%) increase from the LCP - Second Amendment. 9/15N791ACCB6M0UUWE.WFD» 8 L F 11 lJ U C C F PA 13 19 �\ RESIDENTIAL ; RECREATOW Q PRIVATE OPEN SPACE Plerc Coax t BourOWY ---- ,, PA14 1 BPlanix=qlolyalloundety — - - — + ` RESIDENTIAL t PA 8-1- RESIDENTIAL ^`\ LOCAL PARK PA 12D RECREATION imma AC PRIVATE OPEN SPACE 34.5 (+1.8ACIncrease) 26-3 lu RESIDENTIAL .8AC 203.3 AC (-0.7AC Decrease) PA 12A PUBLIC OPEN SPACE 606.0 AC (-3.7AC Demase) SOURCE CDC ENGINEERING INC. IRMNE, CA 9/4/97(CC8638) LSD Scale in Feet 0 450 9110 N 2 AC r-1AC --- i.1AC .1 AC DA2" Not a Part , :•3.0 AC•: DA2G2 DA 2G1 b ; DA2F1a Not Part .9 AC 2 AC / ' DA2C-3 1 PA 2C RESIDENTIAL 258.9 AC (+2.6 AC Increase) DA 2C-4 SAN i -�O UIN HILLS TRANSp0R7ATIO N CORRIDOR PA 20 PA 15 RECREATIOWOPEN SPACE RESIDENTIAL +� CoasllZoneBatnd_ty _- -.`--------- DA2G10 j Not aPart� DA2G6 Not Part r ` 6-1 ' \ , �` • RESIDENTIAL ' 14.5 AC (No Change) / DA2G5 '' \ DA2G7 J Not a Part /10 ,r IM PA 6 , RESIDENTIAL i .3AC , , , r PA 5 / RESIDENTIAL , , i LEGEND - Areas of Planning Area 2C to be included in Planning Area 12D � ng Area 12D to be included in PAlreasW dng Areas of Planning Area 2C to be included in PlernirgArea2B-3 Areas of Planning Area 2133 to be included in PlarWngArea2C Aram of WMArea 2C to be Included in Planning Areas of Planning Area 12A to be included in Planning Area 2C LCP 2nd Amendment Planning Area Boundary Proposed Master CDP Planning Area Boundery rigure Proposed Boundary Adjustments ' MA Associate; Inc. 2. Planning Area 12D ' The LCP - Second Amendment allocates 32.7 acres to Private Open Space Plan- ning Area 12D. After boundary adjustments, the Master CDP - Fifth Amendment proposes PA 12D as 34.7 acres. This acreage change represents a six percent ' (6%) increase in acreage, consistent with the maximum of ten percent (10%) permitted by the LCP - Second Amendment. PA 12D boundaries are proposed to be realigned because grading to establish residential pads in PA 2C resulted ' in a large manufactured slope on the southern edge of PA 12D, which was approved for grading based on EIR 544A. ' COASTAL DEVELOPMENT PERMITS Approval of the proposed Coastal Development Permits (CDP Nos. 970077-81) ' provides for development on portions of Planning Area 2C, and supports the following entitlements (addressed in the CDPs) without further Planning Com- mission approval: L I II �I A. Orange County Subdivision Committee approval of Tentative Tract Map (TTM) Nos. 15394, 15400, 15401, 15467, and 15509 (Vesting) consis- tent with the roadway alignments, mass grading, and large lot subdivi- sion shown on Tentative "A" Tract Map No. 15393 (Vesting);' B. Permit grading, remedial excavation, borrow and slope stabilization, on - site and off -site; C. Permit construction of the private streets, infrastructure, backbone drainage facilities, water/wastewater systems and master utilities; D. Final Tract Map (Vesting) recommendations for all development areas; E. Permit the construction of all community walls, gated entries, buildings, and landscaping; F. Permit construction of individual model/sales office complexes, signage and off-street parking for each residential project; and G. Permit construction of residential and associated structures. Associated Tentative Tract Maps will require separate approval by the Orange County Subdivision Committee. Tract Map No. 15393 indicates that it isfor grading, conveyance, and finance purposes. 9/15N7kI.%CCB6390UTI.INE.wPD0 WE II =A=Odatm; Z= III. CEQA BASIS FOR AN ADDENDUM The potential impacts of the project have been evaluated in terms of the criteria outlined in CEQA Guidelines Sections 15162 (Subsequent EIRs and Negative Declarations) and 15164 (Addendum to an EIR or Negative Declaration). Between the time an EIR is certified and a project moves to the implementation stage, a number of different things can occur. As identified in CEQA Guidelines Section 15162, these changes might include changes in the project itself, changes in the circumstances under which the project is undertaken, or new information becoming available. These changes in and of themselves would require a subsequent EIR only where the changes will result in new or in- creased significant effects. The analysis for the Master CDP Fifth Amendment and the five PA 2C CDPs, as provided in Section IV (Analysis of Impacts/ Mitigation) of this Addendum, demonstrates that these changes do not trigger the need for a subsequent EIR based on the following key criteria: ' No new significant impacts will result from the project or from new mitigation measures; ' There is not a substantial increase in the severity of an environmental impact; • There are no new feasible alternatives or mitigation measures that would reduce impacts that the proponent declines to adopt. ' Any impacts that may be significant either can be mitigated to an acceptable level by adherence to mitigation measures previously identified and adopted in connection with EIR No. 544A or will not be substantially more severe than previously analyzed and discussed in EIR No. 544A. Section IV includes all of the standard conditions and mitigation measures from EIR No. 544A that apply to the project. No additional mitigation measures are required. Based on the evaluation contained in this document, the County has deter- mined that an Addendum, pursuant to CEQA guidelines Section 15164, is the appropriate environmental document for the project because some minor technical changes or additions are necessary, but none of the conditions trig- gering preparation of a subsequent EIR are present. I Ir l II 9/15i97K1.\CCE638\OUTLINEMFD» 11 II PLANNINGANDDEVELOPMENTSERVICESDEPARTMENT INITIAL STUDY# PA 970076— P.O. BOX 4(.48 • SANTA ANA, CA 92762-4048 PROJECT REF. INITIAL STUDY 1. PROJECT TITLE: Newport Coast Phase III PROJECT NUMBER: 2. LEAD AGENCY: Orange County LEAD DIVISION: 3. CEQA CONTACT PERSON: PRONE NUMBER: i 4. PROJECT LOCATION: Newport Coast — east of Newport ._.. Coast Drive " S. PROJECT SPONSOR'S NAME: Irvine Community Development Company 6. GENERAL PLAN DESIGNATION: IC —Urban Residential Communities 8. DESCRII'•1'ION OF PROJECT: (Describe the whole action involved) Amendment to Master CDP. Five CDP's to allow construction of 265 single family units 9. SOURCES OF INFORMATION: (Numbered) EIR No. 544A (Certified 1995) 10. RESPONSIBLE AGENCIES: ADDRESS: 550 Newport Center Drive Newport Beach, CA 92660 7. ZONING: Newport Coast Planned Community The environmental factors checked below would be potentially affected by this project, involving at least one impact that is a "Potentially Significant Impact" or Potentially Significant Unless Mitigated," as indicated on the attached Environmental Analysis Checklist. Land Use & Planning _ Air Quality _ Recreation Population & housing Geophysical, _ Noise Biological Resources Energy & Mineral -Resources Hazards Water Aesthetics Public Services Transportation/Circulation _ Cultural/Scientific Resources _ Utilities & Service Systems * No impacts beyond FEIR No. 544A ENVIRONMENTAL FINDINGS POTENTIALLY SIGNIFICANT LESS TITAN SIGNIFICANT UNLESS SIGNIFICANT NO IMPACT MITIGATED IMPACT IMPACT A. POTENTIAL TO DEGRADE: Does the project have ilia potential to degrade lite quality of ilia environment, substantially reduce the habitat of a fish or wildlife species, cause a fish or wildlife population to drop below self-sustaining levels, threaten to eliminate a plant or animal community, reduce the'nuntber or restrict the range of a rare or endangered plant or animal, or eliminate important examples of the major periods of California history or prehistory? D. SHORT-TERM: Does the project have the potential to achieve short-tcmt, to ilia disadvantage of long -tens, environmental goals? x C. CUMULATIVE IMPACTS: Does the project have impacts that are individually limited, but cumulatively considerable? ("Cumulatively considerable" means that the incremental effects of a " project are considerable when viewed in connection with the effects of past projects, the effects of other current projects, and the effects of probable future projects.) x D. ADVERSE IMPACTS ON HUMANS: Does die project have environmental effects which will cause substantial adverse effects on human beings, either directly or indirectly? x DETERMINATION I find that the proposed project COULD NOT have a significant effect on the environment, and a NEGATIVE DECLARATION will be prepared. I rind that although die proposed,project COULD have a significant effect on the environment, there will not be a significant effect in this case because Mitigation Measures have been added to Ilia project. A MITIGATED NEGATIVE DECLARATION will be prepared. 1 find that the proposed project MAY have a significant effect on -the environment which has not been analyzed previously. 77tcrcfore, an ENVIRONMENTAI. IMPACT REPORT is required, I find that although the proposed project could have significant effects) on the envirorument, all project impacts have becri adequately analyzed and mitigated in a PREVIOUS CEQA DOCUMENT prepared and approved/certified pursuant to State and County CL•QA Guidelines. I find that although [lie proposed project has been analyzed and mitigated as pan of an earlier document prepared and approved/certified pursuant to State and County CH()A Guidelines. minor additions amVor clarifications are needed to make llte previous documentation adequate to cover the project. '1 herefore, an ADDENDUM will be prepared for cite proposed project. x Sigma !)ate Rig lidIVITI I'M414178) * No impact beyond FEIR No. 544A M M M M M M M M M M M M M M M M w M M ENVIRONMENTAL ANALYSIS CHECKLIST ....�....:.. SignrcnL ISSUES &SUPPORTING DATA SOURCES: Impact uq;mcm. 1. "In Unless Si treat. No Mligicd Impact Impact* Potential SignCenL ISSUES & SUPPORTING DATA SOURCES: Impact SixnCcnL Less 77un Unless Signfcnt. No Mtigted Impact Impae L LAND USE At PLANNING. Would (fie proposal: 4. WATER (Conl•d) ' a) Conflict wide general plan designation or zoning (source fi(s): ) c) Discharge into wrthec waters or otter alteration or _X surface water quality (temperature, dissolved oxygen Ill CmnOiclwith applicablecnvirouncnlal plans or turbidity)? ( ) X — — olicy,f agencies widt jurisdiction over the projeet7 Fg d) Changes in die amount of surface water in any water body' ( ) X c) Affect agricultural resources or operations (e.g,, impacts to soil or farmlands, or impacts front e) Changes in currents or We course or direction or water movements? ) X incompatible land uses)7 ( ) X — ' d) Disruppt or divide the physical arrangemeut of an established community (such as a low-income or r) Change in We quantity orground water, tidier through direct additions or withdrawals, or ihrough interce bon oran aquifer by cuts or excavations? minority community)?( ) X ( X e) Conflict i(t wilft ) djacent, existing or planned, land g) Altered direction or rate of (low orgroondwaler?uses( ) — g 2. POPULATION & HOUSING. Would project: It) Impacts to groundwater quality? ( ) —X a) Cumulatively exceed adopted regional or local 5. TRANSPORTATION/CIRCULATION. Would the proposal result in: population projections? ( ) $ b) Induce substantial growth in an velocity or a) Increased vehicle n7�s f traffic congestion beyond adopted policies and/or forecasts? ( ) X indirectly Uvough project in an undeveloped area nd — orextension of major infrasWclurc7 ( ) $_ b) Safety hazards from design features (e.g. shop c) Displace existing housing? ( ) $ curves or dangerous intersections) or incompatible uses (e.g. farm equipoent)7 ( ) 3. GEOPHYSICAL. Would project result in or impacts involving: ' c) Inadequate emergency access or access to nearby expose people to •- �.. uscs?l X a) Local fault rupture? ( ) — — — X d) Insufficient parking capacity ou-silt or off --site? ( ) — — — X b) Seismicity: ground shaking or liquefaction? ( ) X e) hazards or barriers for pedestrians or bicyclists?( c) Seismic: sciche or tsunami? ( ) X 9 Conflicts with adopted policies supporting d) Landslides or mudslides? ( ) — �_ alternative transportation (e.g. bus turnouts, bicycle racks)7 ( ) X e) Erosion, changes in topography or unstable soil conditions from excavation, grading or rill? ( ) •X g) Rail, waterborne or air traffic impacts? ( ) — X 9 Subsidence of tine land? ( ) g G. AIR QUALITY. Would the proposal: g) Expansive soils? ( ) X a) Violate any SCAQMD standard or contribute to air ualil deterioration beyond projections of 9CA&MD7 h) Unique geologic or physical features? ( ) .X— ( ) X — 4. WATER. Would llte proposal result in: b) Expose sensitive pryopulation groups to pollutants in excess ofacccptablc levels? ( ) AL a) Changes in absorption rotas, drain -age paltems, or the rate and amount surface '7 X c) Alter air movement, moisture, or temperature, or of mnof t ) cause any change in climate? ( ) X b) Exposure orpeopple or property to water related hazards such as Ilooding7 ( ) $ d Create objectionable odors? ) 1 ( ) X — 1 t M� M r M M t• M M M M M M M M M Potential Sh nfcnl I,csSThan Signfent. Unless Signfent No * Palendal Signfont. Signkaf. lAnThan Unless Sigurent. No ISSUES & SUPPORTING DATA SOURCES: Impact hftigted Impact Impact ISSUES & SUPPORTING DATA SOURCES: Impact Mtigled Impact Impact 7. NOISE. Would theproposal: - 12. ENERGY &MINERAL RESOURCES. Would _ a) Increase existing noise levels? ( ) X Project: b) Expose people to noise levels exceeding adopted a) Conflict widladopted energy conservation plans? ( )— — — X County standards? ( ) — ' X b) r our in a wasteful and 8. BIOLOGICAL RESOURCES. Would Project impact: inefficient manner? — � — — — a) L•ndangered,Uuealrnedortare species orUxir t3. HAZARDS. Would the proposal involve: habitats (including but not limited toplants, Lsh, insecls,animals and birds)?( ) X a) Arisk ofaccidental explosion orreleaseofhazardous — . — substances (including, but not limited to: oil, 6) Locally designated species (e.g. heritage him)? ( ) % pesticides, as orradiatian)7 ( chemical, g ) X— natural ural co e) Locally designated natural communities e.. oak (g des W X b) Possible interferetcemith an emergency plan oremergency evacuation plan? ( ses)ronsc X hted forest, coastal at. ) ' — d) Wctandhabitat (e.E.hwsh, riparian and vernal c) 17te creation orany identified health hazard)? ( ) X — pool)?( ) X d) Exposure ofpeopletoexisting sources orhealth e Wildlifed' ) dispersal ormigralion corridors? ( ) �[ hazards?( ) —$- 1) Adopted conservation plans and policies (e g. e) Inaeased fire hazard in designated high fire hazard Resource Management Ptan)? ( ) X areas (m& flammable brush, grass, or trees)? ( ) X 9. AEMIEIICS. Would the proposal: 14. PUBLIC SERVICES. Would Project result in neat(s) for new/altered government services in: a) `B'e; asxnievista orviw eopentothe public? X a) Fire proleUion7 ( ) —X b) Afrectadesigna(edseenicltiennyT ( ) X b) Poli=protection?( ) X c) Result in anolkasiveaesthetic c1lect?( ) — — — �_ c) Schools?( ) — — — X d) Create light orglambeyond the physicallimits ofUhe d) Maintenance ofpublicfacilities, including roads?( )— — — X projectsrte7( ) X e) OUxrgovanmcntalservi u?( ) X 10.CULTURALISCIEtMFICRESOURCES.Would the Project: 15. UTILITIES &SERVICE SYSTEMS. Would Project result in needs for new or substantial attentions: a) Disturb palco srsourees7 ( ) _ — _ _ X a) Pawerornaturalgas7( ) X b) Disturb arehno msmuea? ( ) — ' _ X b) Communications systems? ( ) X e) Affect historical resources?( ) X c) Local or regional water treatment or distribution — d) Ilave the potential to muse a �physical change which would affect unique etude cultural values? ' X facilities? ( ) -X ( ) — - d) Sewer or septic tanks? ( ) X e) Restrict existing religious orsacmd uses within the potential impact area?( ) X e) Solid waste disposal?( ,) X 11. RECREATION. Would Proposah PERSONS/AOEN I _S CONSULTED a) Increase demand for local or rogfonai parks or other recreational facilities? ( ) X b) Affect existing mcrealionalopportmtities7( ) — — — X c) Conflictwidh adopted recreational plans and policies? • No-immint beYond FEIR No. 544A % 4.1 W. ANALYSIS OF IMPACTS/MITIGATIONI LAND USE (CHECKLIST: L LAND USE AND PLANNING, a - e, NO IMPACT) (CHECKLIST II. POPULATTONAND HOUSING, a - c; NO IMPACT) EIR No. 544A Impacts Previously Ident{Fted No significant land use impacts were identified; therefore, no project specific ' land use mitigation measures are required. Project Impacts Compared to Impacts Described in EIR No. 544A 1 The proposed CDP project, development and construction of 265 single family units, is consistent with and in conformance with the General Plan and its ' implementing documents: Land Use Element: (1C) Urban Residential Commu- nities; and Community Profile (1.5) Medium High Density Residential. The density range is within the designated 3.5 to 6.5 units per acre on minimum ' building sites of 2,500 square feet. There are no conflicts with zoning or Gen- eral Plan designation or with existing or planned land uses. The surrounding area either is currently being developed for residential use or is planned for permanent open space. The reconfiguration of the Planning Area 2C boundaries does not affect the land use designation and does not alter the types or intensities of these land ' uses within any of the sub -planning areas involved. EIR No. 544A provides adequate documentation for the project refinements as currently proposed. ' Project Design Features/Standard Conditions/Mitigation Measures - MCDP and PA 2C CDPs ' PDF 1-1 The project implements the approved LCP and the SJHPC Planned Community Program through the location of residential develop- ment, recreation and open space. The County will determine com- pliance with this PDF through approval of the project CDP/SDP. 1 fl C 4.2 GEOLOGY/SOILS (CHECKLIST: III. GEOLOGICAL PROBLEMS a - i; NO IMPACT BEYOND FEIR NO 544A) EIR No. 544A Impacts Previously Identified Impact 2.1: Expansion Potential The proposed project will be constructed on areas, within PAs 2C, 6-1, and 12D, in which the expansion potential of the soil materials is in the high to very Note: PDFs, SCs, and mitigation measures have been updated to reflect changes in County departments. 9/15/97c1ACCB638\0UTLJNE.WPD» 16 II LUA=X1W4%Inc high range which could result in unstable earth conditions. Highly expansive soils should not be at or near final grades where structures or other improve- ments are planned, unless special design and construction procedures to mitigate the effects ofhighly expansive soils are planned. Impact 2 Z Rlppability ofDlabase and Bedrock wltbin the Project Site The proposed project will probably require very heavy ripping and blasting in the diabase and the bedrock of the Bommer Member and parts of the Los Tran. cos Member of the Topanga Formation which may result in groundshaking in the developed properties adjacent to the site. In addition, moderate to large quantities of oversize materials will be generated by ripping hard bedrock and will require special handling and disposal. Over- sized material may be placed in deep -fill areas as rock windrows or In pits. Alternate handling of oversized materials includes crushing or disposal off site. Impact 2.3. Secondary Seismic Hazards Liquefaction is not considered to be a hazard at the site. Some slight potential for seismically induced settlement is present in existing uncertified fill, topsoil, colluvium, alluvium, and weathered bedrock. Impact2.4. Slope Stability Removal of landslide materials, construction of shear keys, and placement of design fill in canyon areas are necessary to offset existing landslide hazards within the site. ,Impact2.5. Settlement The overburden soils have moderate to high compressibility characteristics, and settlement could occur if foundations, fill embankments or other Improve- ments were placed directly on these materials. Compressible/collapsible mate- rials will require excavation and removal or recompaction. Project Impacts Compared to Impacts Described in EIR No. 544A The proposed revisions will change the topography and ground surface relief features somewhat differently than identified In EIR No. 544A. However, the magnitude of these changes does not result in significant new impacts. The refinements to the project do not change any of the analysis or conclusions In EIR No, 544A. EIR No. 544A provides adequate documentation for the project refinements as currently proposed. 9/11N71(JACCB638\OUndNE.wPD» 17 ISAA=dates, Inc Project Design Features/Standard Conditions/Mitigation Measures - MCDP and PA 2C CDPs Project Design Features PDF 2-1 Per the CDP, contour grading techniques will be used whenever possible along Vista Ridge and Ridge Park Roads, as well as along the interior private streets to achieve the appearance of a gradual transition between manufactured and natural slopes. This PDF will be verified through plan check by the Manager, Planning & Devel- opment Services Department (PDS)/Subdivision and Grading Ser- vices, for grading plans along these roads. Note that this is no longer relevant for Vista Ridge and Ridge Park roads because of previous and current road construction. PDF 2-2 Per the CDP, there will be remedial grading to correct several areas of geologic instability within and adjacent to the project site. Ap- proximately 1,194,000 cubic yards of earth will require removal and replacement according to Orange County Standards. This PDF will be verified through the grading permit process by the Manager, PDS/Subdivision and Grading Services, prior to issuance of applica- ble grading permits. PDF 2-3 The project design will conform with the recommendations of the geotechnical and structural engineers and geologists of this project, the Structural Engineers Association of California, and the Uniform Building Code 1991 and/or other local governing agencies' codes or requirements. This PDF will be verified through the grading permit process by the Manager, PDS/Subdivision and Grading Services, prior to issuance of grading permits. C373i�`��3Z`�A' SC 2-1 Prior to the recordation of the first final tract/parcel map or issuance of the first grading permit for projects located immediately adjacent to or including portions of regional parks, significant open space corridors, or other environmentally sensitive areas, the project proponent shall provide evidence acceptable to the Manager, Devel- opment Services, in consultation with the Manager, Harbors Beaches and Parks Division, that graded areas will be compatible with natural land characteristics of the adjacent areas. Treatment to achieve the desired effect shall include: a. Smooth and gradual transition between graded slopes and exist- ing grades using variable slopes ratios (2:1-4.1); and b. Urban Edge Treatment/Landscaping Plan(s) for all graded areas adjacent to open space; and 9/15H7<ACCB639\0UTLINE.WPDn 18 LFAAnoclaff; Ift c. Incorporating architectural and design techniques into the pro- ject in order to enhance off -site views attained from within parks and other environmentally sensitive areas. (SC G3) SC 2-2 Prior to the issuance of a grading permit, the applicant shall submit a geotechnical report to the Manager, Development Services, for ap- proval. The report shall include the information and be in a form as required by the Grading Manual (SC Gl). Mitigation Measures Mitigation Measure 2-1. RVanslon Potential Prior to issuance of a grading permit, the project applicant shall submit plans Indicating measures to avoid expansion potential. Measures should include pre -saturation of sub -grade soils, increased reinforcement of concrete elements, increased foundation embedment, use of post -tensioned grade beams and floor slabs, blanketing the surface with non -expansive compacted fill, blending ex- pansive soils with non -expansive soils, chemical stabilization, and increased jointing of buildings and improvements, as recommended by the geotechnical engineer. In addition, during project grading operations, placing expansive soils near basement walls or other retaining walls will be avoided. Lateral expansion pressures caused by wetting of expansive soils may over stress retaining walls unless walls are designed to resist the solid expansion. A buffer zone of non - expansive fill adjacent to retaining walls will limit lateral pressures against these walls. The above plan measures shall meet the approval of the Manager, PWISubdiuision and Grading Services. Mitigation Measure 2 2a: Rippability Prior to the issuance of a grading permit, in locations where harder earth and rock materials are noted and difficult ripping may be encountered, a geophysi- cal survey shall be required to identify areas requiring blasting. Any necessary blasting will be done utilizing COSHA and County standards regarding accept- able levels of associated shaking. The survey shall meet the approval of the Manager, PDS/Subdioision and Grading Services. Mitigation Measure22b: Rippability Prior to the issuance of a grading permit, the applicant shall Indicate on the grading plans the location of proposed oversized placement. The geotechnical review report for the grading plan should include the specific details for place- ment of oversized materials. This measure will be verified during plan check by the Manager, PDS/Subdivision and Grading Services. 9/1$,9MACCB638WU7i&JLVPD» 19 L4AA=date.; Z= I I IJ I LJ I Mitigation Measure 23. Remedial Grading The Project Design plans shall specify removal of existing uncertified fill, top- soil, colluvium, alluvium, and weathered bedrock prior to the development of areas proposed to support structures and other improvement areas. This measure will be verified prior to issuance of a grading permit, thereby meeting the approval of the Manager, PDS/Subdivision and Grading Services. Mitigation Measure 2-4a: Remedial Grading, PA 15 (SJHPQ Stability hazards in cut and fill slopes will be mitigated by construction of but- tresses, stabilization fills, fill keys, and conversion of cut slopes to fill slopes. Canyon filling and building setbacks may be necessary above steep natural slopes. Construction of a buttress and/or replacement of all or a portion of the cut slope with a stabilization fill will be implemented so that the slope meets the minimum 1.5 factor of safety. Preliminary buttress designs are planned for the graded SJHTC slope condition, as well as for a daylight to the existing condi- tion, should construction of the SJHTC be delayed. This measure will be veri- fied through plan check by the Manager, PDS/Subdivision and Grading Ser- vices, Grading Section, prior to issuance of grading permits in PA 15. Mitigation Measure 2-4b Temporary back cut slopes steeper than 1:1 should not be constructed during ' remedial grading for bedding conditions and, depending on field conditions, may need to be less steep. Stability of critical back cut slopes should be addi- tionally analyzed during final grading design, and mitigation measures should be provided on a case by case basis. Stability hazards in retaining wall back cuts and trenches may be satisfactorily mitigated by observing safe standard con- struction regulations and procedures, such as those of COSHA and local gov- ernmental agencies. This measure will be verified through the grading permit ' process by the Manager, PDS/Subdivision and Grading Services, prior to issu- ance of applicable grading permits. I LJ II It II Mitigation Measure 2 5 Compressible/collapsible materials will be excavated and removed, or recom- pacted to prevent ground settlement in all areas of project development. The type and sizes of all foundations for structures in the area of project develop- ment will be designed in accordance with design recommendations of the project geotechnical engineer to minimize the potential for ground settlement impacts. This measure will be verified through the grading permit process, by the Manager, PDS/Subdivision and Grading Services, prior to issuance of applicable grading permits. 9/15i97«I:\CCE638\otT LUiE.wPD» 20 II I MAssodaM; Ina 4.3 LANDFORMIMPOGRAMW (NO CIMCKUST SECTION, NO IMPACTBEYOND PEIR 544A) AIR No. 544A Impacts Previously Ident(/%d Impact 3a Major Cut andYW Areas Major cut and fill locations 50 feet or greater will be implemented. Project grading-wlll recontour the existing landform elevations (1,180 to 840 feet) to range between approximately 1,130 and 850 feet. A significant cut of approximately 55-60 feet is planned for construction of "A" Street. Roadway grades will range between one and ten percent. Impact3.2 Sign(/%antLam(form Mod(/7cations The proposed project grading will result in significant modifications of existing knolls and drainage areas on -site. The modified features are part of contiguous landform features in the Newport Coast, Including Signal Peak, Los Trancos Canyon, Buck Gully, and several unnamed ridge/hill formations. Project Impacts Compared to Impacts Described in EfR No. 544A Master Grading Plan The Master Phase III Master Grading Plan (Figure 4) establishes the concept for development of large lot pads and major collector roads to service planned development in NCPC PA 2C and PA 6.1. The Master Grading Plan, consistent with Tentative "A" Tract Map No. 15393 will establish existing grades for future development of individual Development Areas. The mass grading operation Is planned to proceed from the lower elevations at the southwest portion of the site (west of Vista Ridge Road) to the higher eleva• tions at the future Intersection of Vista Ridge and Ridge Park Roads. Grading Is also phased east of Vista Ridge Road, moving up the existing rise from the south to higher elevations near Signal Peak. Figure 5, Cut and Fill Plan, demonstrates this concept. Cuts from approximately 20 to 60 feet will provide fill material to develop gradually sloping mass graded pads that blend with natural rises sur. rounding the Phase III CDP area. The eastern limits of the Phase III CDP area will serve as a portion of a borrow site providing approximately 1.3 cubic yards of fill material to establish mass graded building pads in the central areas of PA 2C on both sides of Vista Ridge Road. The borrow site shows daylight cuts within the limits of the Master CDP - Fifth Amendment area and off site in SJHPC PA 15. A balanced grading opera- tion will be achieved with a total of approximately 4,000,000 cubic yards of material and remedial grading. The amount of earthwork for the Amendment 9/15,97«1ACC0638WUTUNLWPD» 21 LcAScale in Feet O 250 500 N Master Grading Plan PA 13 PA 19 Residential Private l Open Sp San Joaquin Hills Planned Community Boundary Na,,,Port coast - - Planned ConrrKmfty Boundary DA 8-1 Residential \`.. •oval P'ar— ::��'' �: s rh-•-- S # # + Y S r Co 0 + + + # a + + # + + ''�• '` a + + + + + + + + + # f nY # 4i WIT \\ LiJ11 scAe;ar�c � ' �r o 250 soo N a S Z i I LEGEND CUT AREA = 4,000,000 C.Y. i,''if.9;�i,•'',I. ! ++++ FILL AREA =4,000,OOOCY. rigure :) Cut and Fill Plan JSAA=date; Ire J Ii II II to the Master CDP, when combined with the individual CDP grading (see be- low), is almost the same as the approximately 4.4 million yards of cut and fill approved for the previous Phase III CDP (PA 940149 and EIR 544A). The grading concept includes construction of several Loffel walls to stabilize terraced slopes between future residential pads and local streets. Loffel walls with variable heights ranging from approximately 5 to 21 feet are proposed mid -slope on manufactured slopes that front Ridge Park Road to the north and Vista Ridge Road in the central Area of PA 2C. A Loffel wall ranging from ap- proximately 3 to 13 feet will also be constructed adjacent to "A" Street to facili- tate a terrace approximately 30 feet high between development pads. Several spans of Loffel walls approximately 10 to 15 feet high will also be con- structed on slopes establishing future building sites in the western limits of PA 2C. Planting and maintenance of the Loffel walls will occur with construction in individual development areas per separate Coastal Development Permit submittals. Figures 6 and 7 show three development sections to demonstrate how the mass grading operation will provide for the terracing of large pads to facilitate future development and ensure effective drainage and compatibility with existing grades surrounding the site. Some manufactured slopes will utilize retaining walls in lieu of terrace drains. (wading Plan - CDPs The mass grading of all PA 2C CDP areas enables each individual development area to proceed independently with precise grading. The individual develop- ment areas each require less than 10,000 cubic yards of balanced grading to groom mass graded slopes, establish building sites, and install local streets and cul-de-sacs. Contour grading techniques will be used along interior private streets to reflect natural topography and achieve the appearance of a gradual transition between manufactured and natural slopes. Project Impacts Compared to Impacts Described in EIR No. 544A The refinements to the project do not change any of the analysis or conclusions in EIR No. 544A. EIR No. 544A provides adequate documentation for the project refinements as currently proposed. 9/15H7«L•\CCB638\OUT11NE.WPD» 24 II { PA 13 PA 19 Residential Private Open Spa San Joaquin Hius Planr,aa community Boundary --Newport Coast --- Planned Comnmhy Boundary DA 8-1 Residential 2C ' J/•�/J /t VI.D VJD� Scale in Feet 41�- L A 0 250 500 N 15 r, BOn'OW'�i(iti LEGEND © SECTION LINE Figure 6 Key Map Development Sections IVISTA RIDGE o I ROAD z DI SECTION A A SCALE:1=400 OR NATURALGRADE DESIGN GRADE- MCDP6M AMENDMENT m NATURALGRADE IN STREET VISTA RIDGE _ — \ TRANCOS 03 ROAD CANYON t5t I — — — PA 12A I-76 NATURAL GRADE I! " — } z i mI UI OmaI l SECTION C-C SCALE. 1=200 Sour«: FORMA, June I997. 9/4/97(CCB638) LSA PA2C VISTA RIDGE ROAD DESIGN GRADE- MCDP5TH AMENDMENT OAS DESIGN GRADE - STREET MCDP 5TH AMENDMENT RIDGE PARK SIGNAL PEAK ROAD BORROW SITE 1 ----�_ z — m iF I� VISTA RIDGE ROAD DETENTION 3BN BASIN STREET Io RIDGE PARK I z ROAD Im 1 1 LOS TRANNCOS I} CANYON PA 12A Source: CDC Engineering. Inc. Irvine, CA Figure 7 Development Sections I LSA Amdate; I= Project Design Features/Standard Conditions/Mitigation Measures - MCDP and PA 2C CDPs Project Design Features PDF 3-1 As specified in the LCP, Resource Management and Conservation Policies, the special provisions of the SJHPC Program document, as well as the Master CDP, the overall massing of the development will conform to the existing landform (characteristic of Mediterranean hilltowns) to form a gradual transition between manufactured and natural slopes. To implement this feature, the following aspects are included in the project design: • Contour grading of residential areas to implement a smooth and gradual transition between graded and natural slopes; undulat- ing fills blending into adjacent contours; • A variety of slopes to reflect a more natural appearance; • A series of cul-de-sacs terracing into hillsides and integrating into the natural topography of the site; • Numerous overviews within development areas result from topographically conforming site layout and earthwork. • Retaining walls only as required to achieve the topographic variation within each of the Development Areas. • Contour grading along "A" Street, Ridge Park Road and interior private streets to enact a gradual transition between manufac- tured and natural slopes. The project will be developed in accordance with the grading plan and tentative tract maps, which reflect the landform design features above. The Manager, PDS/Subdivision and Grading Services will ' verify these features during the plan check process. PDF 3-2 The project grading will be balanced overall among PAs 2C, 6-1, 14, ' 15, and 20. This feature will be approved during plan check of the final project grading plans. II II II II PDF 3-3 The PDF for the extension of Vista Ridge Road is no longer relevant. The road is -being constructed in accordance with previ- ous approval as part of Vesting Tentative Map No. 13337, FEIR No. 485. PDF 3-4 Grading will be permitted within the Planned Community outside of an area of immediate development provided that a) grading shall be confined to the development planning areas shown on the Concept Grading Plan (or as directed by the geologist in the field to meet code requirements), except in areas that are designated for open 9/15t97<ACCB638\OUTLINEA/rD» 27 U LSAIilJOdatH, Im space used and b) the Coastal Development Permit shows all areas of grading inside and outside of the immediate area of develop. ment. PDF 3.5 The landscape and grading plans shall include provisions for tem- porary erosion control consistent with LCP Land Use Plan require. ments on all graded sites which are scheduled to remain unim- proved between October 15 and April 15 of any year. Standard Conditions SC 3-1 Prior to the issuance of any [applicable] grading permits, if review of the grading plan for this property by the Manager, PDS/Subdivision and Grading Services, indicates significant deviation from the pro- posed grading illustrated on the approved tentative tract map, spe- cifically with regard to slope heights, slope ratios, and pad evalua- tions and configuration, the plan shall be reviewed by the Subdivi- sion Committee for finding of substantial conformance. Failure to achieve such a finding will require processing a revised tentative tract map; or, if a final tract/parcel map has been recorded, a new tentative tract/parcel map or a site development permit application per Orange County Zone Code Section 7-9-139 and 7-9-150 (SC G2). SC 3-2 Grading plans for all projects in the Irvine Coast Planned Communi- ty shall be consistent with the County of Orange Grading Code and LCP Land Use Plan Grading Policies Section I-3-L. Grading plans shall be accompanied by geological and soft engineer reports (refer to SC 2.2 in Section 4.2), and shall incorporate all pertinent rec- ommendations. The soils engineer and engineering geologist must certify the suitability of a graded site prior to clearance for issuance of a building permit. 4.4 HYDROLOGYIWATER QUALITY (CHECKUIS . IVV, wATER, a . i; NO IMPACT BE. , POND FEW 544A) EM No. 544A Impacts Previously Identoed , Impact 4.1- Runoff Volumes and Associated Streambed Impacts Development of the project area will result in a substantial increase in the total ' quantity or volume of water draining into Buck Gully, Los Trancos Canyon, and Muddy Canyon due to construction of impervious surfaces and less infiltration , of water into the soil and more water flowing over the surface. An estimated three fold increase in the total runoff volume is projected. 1 Grading is permitted in open space areas for infrastructural facilities pursuant to LCP Policy I-3-C-2b.3. , 9/1597«1.\CCB638WUTLINLWPD» 28 r MA.=odate.;1= 7 L I Direct offsets for the increase in runoff volumes are not feasible since increases in stormwater runoff and reductions in sediment production are inherent in the development of a natural area. This change was recognized by the County of Orange in previous approvals of the ICPC and SJB PC, and is not a significant adverse impact. Impact 4.2 - Peak Discharge Rates and Streambed Impacts The peak rate of runoff from the watersheds within the project boundary will experience an overall increase under post -development conditions. Detention basins will attenuate increases in peak discharges by reducing the post -develop- ment discharges at the basin outlets to rates less than the existing, natural discharge rates. Impact 4.3 - Sediment Yield With construction of the proposed project, the overall sediment yield from Buck Gully, Los Trancos Canyon, and Muddy Canyon is expected to decrease as compared to existing conditions. Impact 4.4 - Beach Sand Replenishment The continuation of natural landslide and sheet erosion processes in the natu- ral canyons downstream of the project is expected to supply the streams with sufficient quantities of sand materials to ensure the replenishment of beach sands continues. Impact 4.5 - Water Quality Urban runoff from developed areas carries pollutants from man-made surfaces and chemicals used in urban areas. It is anticipated that a majority of these pollutants will be assimilated and will infiltrate into the streambed soils before reaching the ocean. Impact 4.6 - Marine Environment Impacts Past studies concluded that no significant impacts to the marine environment would occur as the result of the Irvine Coast planned development (EIR No. 485). In the Los Trancos and Buck Gully watersheds, source controls as well as stream assimilation would limit the amount of chemical pollutant loads reach- ing these watersheds and Areas of Significant Biological Sensitivity (ASBS) (Rivertech, 1991). 9/15i974<I:\CCB638\OUTLME.WPD» 29 lSAArroclareglna ' ' Project Impacts Compared to Impacts Described to ErR No. 544A The refinements to the project do not change any of the analysis or conclusions in EIR No. 544A. EIR No. 544A provides adequate documentation for the project refinements as currently proposed. Master Drainage Improvements The Master CDP will construct storm drains in the backbone streets only. When development comes on-line in individual development areas, additional facilities will tie into the overall drainage system. The majority of storm runoff in PA 2C will be captured in underground pipes and facilities in "A" Street, "B" Street, or Vista Ridge for temporary holding In a series of detention basins and eventual release into Los Trancos Canyon, In DA 2C-1a (Planning Application PA 960155), two detention facilities are approved to be created by a natural land depression and Vista Ridge Road canyon fill. Two detention facilities in the southern region of PA 2C may also be built with grading for development. These facilities can reduce the peak runoff flows during major storms. Two major 30 inch storm drains with energy dissipators will discharge into Los Trancos Canyon from these areas. The energy dissipa- tors at the terminus of these facilities will be partially buried concrete struc- tures, about 10 feet by 10 feet. Storm drainage from the northern areas of PA 2C (west of Signal Peak) will be collected in streets and underground pipes, and connect to the existing system in Ridge Park Road, which will connect to Newport Coast Drive drains for discharge through an existing 45 inch outlet into Buck Gully. DA 2C-2 Surface runoff generated in DA 2C-2 will be collected in a series of catch basins located at low points throughout neighborhood streets and into 24 to 30 inch storm drain lines that connect to existing storm drain lines in Vista Ridge and Ridge Park Road (see CDP, Exhibit 3.21), DA 2C-2 Drainage Plan). Drainage collected in "A" Street will be conveyed to two detention basins ap- proved as part of the DA 2C-1a (PA 960155) development project located adja- cent to Ridge Park Road. A storm drain will then be extended from the deten- tion basins beyond the development limits, and discharge directly into Los Trancos Canyon through an energy dissipator being constructed as part of Vista Ridge Road improvements. DA,2C3 Storm runoff from DA 2C-3 will be captured in a series of catch basins located at the entry cul-de-sac intersections and flow in two directions. Some drainage Is via "A" Street in 24 to 36 inch storm drain lines into existing lines in Ridge 9/1597*1ACCB638\0UTUNLWPD» 30 11 ' MAsrodate; Ina Park Road, and additional flow is accommodated through the entry plaza to lines in Vista Ridge Road (see Exhibit 3.31)) provided by the Master CDP. Drainage collected in "A" Street will be conveyed to two detention basins ap- proved as part of the DA 2C-1a (PA 960155) development project located adja- cent to Vista Ridge Road. A storm drain will then be extended from the deten- tion basins beyond the development limits, and discharge directly into Los Trancos Canyon through an energy dissipator being constructed as part of Vista Ridge Road improvements. ' Drainage flowing to existing facilities in Ridge Park Road will be conveyed to an existing detention basin in DA 2B-3 adjacent to Newport Coast Drive for dis- charge into Buck Gully. ' DA2C-4 Surface runoff generated in DA 2C-4 will be collected in concrete gutters in each cul-de-sac to catch basins located in "B" Street that flow to 24 to 30 inch ' storm drain lines. Grades decrease from north to south, facilitating gravity flow into two proposed detention basins in DA 2C-4 and located adjacent to Vista Ridge Road. Consistent witli the Master Drainage and Runoff Management Plan (October, 1988), a storm drain will then be extended from the detention basins beyond the development limits, and discharged directly into Los Trancos Can- yon (PA 12A) through an energy dissipator. ' DA2C-S ' Surface runoff generated in DA 2C-5 will flow from each cul-de-sac to catch basins located in "B" Street. Twenty-four to 30 inch storm drain lines will flow into two detention basins proposed in DA 2C-4 and located adjacent to Vista ' Ridge Road. Consistent with the Master Drainage and Runoff Management Plan (October, 1988), a storm drain will then be extended from the detention basins beyond the development limits, and discharged directly into Los Trancos Can- yon (PA 12A) through an energy dissipator. ' Project Design Features/Standard Conditions/Mitigation Measures - MCDP and PA 2C CDPs ' Project Design Features PDF 4-1 A project specific Drainage Plan (see the Master CDP and PA 2C CDPs) has been prepared for the project, and the finalized Drainage ' Plan shall be submitted to the Manager, PDS/Subdivision and Grad- ing Services for approval prior to the issuance of grading permits. Drainage from the project site will be collected in catch basins lo- cated throughout the site and conveyed to a system of storm drains, as described above. This plan identifies the locations of proposed catch basins, as well as the locations of the proposed storm drains ' 9/15/97441ACCB638\0UTLIN&.wPD» 31 LCtAWdat*4 Ma within the project area. As can be seen from the Master CDP and PA 2C CDPs, all runoff generated by the site will be conveyed to natural channels or intercepted by storm drains in the coastal devel- opment area that have been constructed or will be installed as part of the Refined MDRMP for the ICPC. The drainage plan will protect on -site structures from flooding hazards. PDF 4-2 In accordance with the Refined MDRMP and storm drain plans pre• pared for the proposed project, four permanent detention basins will be constructed as part of the project (two constructed with PA 2C-1a). Final design plans for the detention basins shallhe submit- ted to the Manager, PDS/Subdivision and Grading Services for review prior to the issuance of grading permits. The purpose of the four proposed detention basins is to reduce the peak flows during storm events. The detention basins would capture the large quanti- ties of water running quickly off the impervious surfaces, and would release the water evenly over a longer period of time. By reducing the peak flows, the maximum rate of water flowing Into the natural drainages will be equal to or less than the existing peak rates. This Is intended to reduce the excessive streambed erosion and potential downstream flooding which would occur if the flows were not de- tained (i.e. if large quantities of water released very quickly). PDF 4-3 The detention basins will be designed as "sediment balance basins," as specified in the Addendum MDRMP for Phase III. Conformance with this design criteria shall be assured by drainage plan checks, prior to the issuance of applicable grading permits, by the Manager, PDS/Subdivision and Grading Services. The basins will be designed to allow sediment flowing into the basins to pass through without being trapped. This design is intended to curb streambed erosion by allowing the incoming bedload to be transported down stream. PDF 4-4 Impact type energy dissipators will be constructed at the outlets of storm drains receiving drainage from Watersheds Bl, L1, L2 A, L4, M1, M2, and M3. The energy dissipators shall be designed to pre- vent excessive erosion adjacent to the pipe outlets. The energy dissipator at the outlet of the 60 inch pipe under Newport Coast Drive draining Watershed Bl has previously been constructed. In addition to providing energy dissipators, the outlets of all storm drains shall be extended to the bottom of the canyons. These de- sign features shall be included on the final drainage plans to be submitted to the Manager, PDS/Subdivision and Grading Services, prior to the Issuance of applicable grading permits. Standard Conditions SC 4-1 Prior to issuance of building permits or precise grading permits, whichever comes first, the permit ,applicant shall submit for ap- proval of the Manager, PDS/Subdivision and Grading Services, a 9/1197«1ACCB63B\OUTUN1WPD» 32 ISAAmdateq Inc. proposal specifically identifying Best Management Practices (BMPs) that will be used on site to control predictable pollutant runoff. This proposal shall identify the structural and non-structural mea- sures specified in the Countywide NPDES Drainage Area Manage- ment Plan Appendix that detail implementation of BMPs whenever they are applicable to a project and the assignment of long-term maintenance responsibilities (specifying the developer, parcel owner, maintenance association, lessee, etc.); and shall reference the location(s) of structural BMPs (SC WQ1). These source control measures are articulated in the NPDES Permit No. CA 09106895, and include such measures as first flush diversion, detention/ retention basins, infiltration trenches/basins, porous pavement, oil/ grease separators, grass swales, wire contractors, education pro- grams, and maintenance practices. Individual merchant builders will be required to demonstrate consistency with the proposal re- quired by this condition. The BMPs shall incorporate the guidelines previously outlined in the Refined Master Drainage and Runoff Management Plan, Irvine Coast Planned Community Development (Rivertech Inc., Septem- ber 1989), and Orange County NPDES Stormwater Program, Drain- age Area Management Plan (April, 1993)• SC 4-2 Prior to issuance of grading permits, applicant shall obtain coverage under the NPDES statewide Industrial Stormwater Permit for Gen- eral Construction Activities Stormwater Permit from the State Water Resources Control Board. Evidence that this requirement has been met shall be submitted to the Manager, Development Services (SC WQ3 - modified). SC 4-3 Prior to the issuance of any building permits, the applicant shall par- ticipate in the applicable Master Plan of Drainage in a manner meet- ing the approval of the Manager, PDS/Subdivision and Grading Services, including payment of fees and the construction of the necessary facilities (SC D4). SC 4-4 Prior to issuance of any grading permit, the developer shall submit to the Manager, PDS/Subdivision and Grading Services, for review/ approval, an Erosion Control Plan that shall identify site -specific measures for the control of siltation, sedimentation and other pol- lutants per the Orange County Grading and Excavation Code. Such a plan shall include preparation and approval of the plan prior to construction, instructions for storm events, normal and emergency procedures, as well as procedures following storm events. Standard erosion control measures shall be installed for the project as re- quired according to County standards. The following erosion con- trol measures shall be incorporated into the project grading plan, as required during construction by the County of Orange and the Regional Water Quality Control Board (Santa Ana Region) during the rainy season (October 15 to April 15). 9/15t9701:\CCB638\0UT1W E.WPDH 33 LX4Awdate* lnc A. Sandbags shall be placed across streets where necessary, de- pending upon size of catchment and sediment yield. B. Erosion control at the sediment sources shall be emphasized during construction. C. A stand-by crew shall be available for emergency work during the rainy season. Necessary materials shall be available on site, and shall be stockpiled at convenient locations to facilitate rapid construction of temporary erosion control devices when rain is imminent. D. Removable protective erosion control devices shall be put in place at the end of each working day when the five day rain probability forecast exceeds 40 percent. E. All erosion control measures shall be implemented in confor- mance with the requirements of the Grading and Excavation Code of the County of Orange. All construction shall be con- ducted with provisions for the control of sand, dust, and debris originating at the construction site. Appropriate areas shall be contained with berms, desilting basins, or similar structures to prevent runoff during construction operations. F. Prior to issuance of the building permits, landscape and erosion control plans shall be reviewed and approved by the Manager, PDS/Subdivision and Grading Services. Temporary mulching, seeding, landscaping, permanent erosion control, or other suit- able stabilization measures shall be included as part of the pro- ject in order to protect exposed areas during and after construc- tion, and shall be noted on project plans. SC 4-5 Prior to the recordation of a final tract/parcel map or to the issuance of any grading permits, whichever comes flat, the applicant shall, in a manner meeting the approval of the Manager, PDS/Subdivision and Grading Services: 1. Design provisions for surface drainage; and 2. Design all necessary storm drain facilities extending to a satis- factory point of disposal for the proper control and disposal of storm runoff; and 3. DedIcate the associated easements to the County of Orange, if determined necessary (SC D2). Prior to the recordation of a final tract/parcel map or to the issuance of any certificates of use and occupancy, whichever occurs first, said improvement shall be constructed in a manner meeting the ap- proval of the Manager, Construction Division. 9/15,9MACCH6380Uli 1NE.WPD» 34 ISAAMdtateg Inc. n 11 SC 4-6 Prior to the recordation of a final tract/parcel map, or prior to the issuance of any grading permit, whichever comes first, and if deter- mined necessary by the Manager, PDS/Subdivision and Grading Services, a letter of consent, in a form approved by the Manager, PDS/Subdivision and Grading Services, suitable for recording, shall be obtained from the upstream and/or downstream property owners, permitting drainage diversions and/or unnatural concentra- tions (SC D3.2 and MCDP EIR, 4.3-133/3-19). SC 4-7 Prior to recordation of any final tract/parcel map, or the issuance of any building permits, whichever occurs first, the applicant shall provide a stormwater quality control plan incorporating structural and non-structural Best Management Practices consistent with the SWRCB General Construction Permit and in accordance with the County's Drainage Area Management Plan and amendments thereto in a manner meeting the approval of the Manager, PDS/Subdivision and Grading Services, in consultation with the Manager, Monitor- ingPrograms Division (SC WQ4). This WQMP shall be similar in scope to the plan previously prepared for Newport Ridge (see Water Quality Control Plan, Newport Ridge (Tract 14509), prepared by Rivertech, April, 1992). Mitigation Measures Mitigation Measure 4-1 . Prior to the issuance of applicable building permits, sediment balance studies similar in scope to the study completed for Chapter VII of the refined MDRMP shall be performed for detention basins Ll, L2-A, L2-B, M-1, and M-2. These studies shall determine the equilibrium discharge rate from the detention basins which will ensure a balanced sediment discharge versus water discharge relationship, thereby preventing downstream channel erosion or degradation. The final designs for the basins shall ensure the peak discharge rates do not exceed the rates defined in the sediment balance study and do not exceed exist- ing, natural rates. Design plans shall be submitted to the Manager, PDS/Subdivision and Grading Services for approval. Mitigation Measure 4-2 A. Prior to issuance of building permits, the developer/applicant shall demonstrate that storm drains, as illustrated in the refined MDRMP, Exhibit V, have been installed to convey runoff to well defined chan- nels. The design of pipes and supporting geotechnical information for proper release point design has been addressed in the required refined MDRMP in compliance with LCP policies I-3-K-5, I-3-K-1, I-3- K-4, I-3-k-6, I-4-B-5, and I-4-F-7 (MCDP EIR, 4.3-131/3-5). 9/15i974(1.\CCB638\OUTIJNE.NPD» 35 UAA=Dddte; Ina B. Prior to issuance of building permits, the developer/applicant shall demonstrate that piping has been constructed to convey water exit- ing the detention basins to energy dissipators and riprap lining (rock) located at the outlets of the piping. These structures shall be constructed in order to reduce the velocity of flow and prevent excessive downstream erosion (MCDP E1R, 4.3-131/3-5 modified). Mitigation Measure 45 As required under the Orange County NPDES Construction Activities Storm - water Discharge Permit, the dischargers (which include the County of Orange) are required to develop and implement Best Management Practices (BMPs) to control the discharge of pollutants (refer to SC 4.1). According to the County NPDES permit, these BMPs shall be required of all new developments both during and after construction. Therefore, as described in the Refined MDRMP, this project will be required to demonstrate that the most appropriate and up- to-date BMPs are implemented in mitigating urban water quality impacts. These BMPs consist of both structural and non-structural measures, including detention basins, first flush diversion devices, porous pavements, public educa- tion, street sweeping, and neighborhood toxic waste collection plans. Imple- mentation of the BMPs will be documented in the Site Specific Water Quality Management Plans (WQMP) which will be submitted prior to the recordation of a final tract/parcel map or issuance of a building or grading permit for each development (refer to SC 4.7), The BMPs shall incorporate the guidelines pre- viously outlined in the Refined Master Drainage and Runoff Management Plan, Irvine Coast Planned Community Development, and Orange County NPDES Stormwater Program, Drainage Area Management Plan meeting the approval of the Manager, PDS/Subdivision and Grading Services. 4.5 TRtIFPICANDCIRCULATION(CHECKLIST. V1, 27UNSPORTATION/CIRCEUTION, a-g; NO IMPACT BEWND EIR NO. 544A) EIR No. 544A Impacts Previously Ident(Fled No significant project related circulation impacts are forecast. Project Impacts Compared to Impacts Described in EIR No. 544A The revision of Street A and reestablishment of Vista Ridge Road result in a slightly different circulation pattern in PA 2C. All circulation needs will be adequately served with these roads, and there are no circulation impacts. EIR No. 544A provides adequate documentation for the project refinements as currently proposed. 9/15i974(1ACCB63MUTU14B.WPD» 36 I Project Design Features/Standard Conditions/Mitigation Measures - MCDP and PA 2C CDPs Project Design Features PDF 5-1 The development of the overall ICPC circulation system, as analyzed in previous documents, is a project design feature that will provide for satisfactory mobility and adequate levels of service. The traffic analysis for FEIR NO. 485 concluded that the implementation of Newport Coast Drive would result in a net benefit to traffic flow on Pacific Coast Highway through Corona del Mar, and the diversion of more traffic to Newport Coast Drive than will be generated on Pa- cific Coast drive by development of the entire ICPC. Furthermore, the design of the local circulation system provides adequate capacity within the ICPC to result in satisfactory levels of service in the long term build out condition. This PDF has been implemented with the construction of Newport Coast Drive and the local circulation system in the Coast. Imple- mentation will continue with the local circulation elements identi- fied on the tentative map and will be verified with approval of Ten- tative "A" map 15393 Vesting. Standard Conditions ' SC 5-1 Access Rights L 7 L U II Prior to the recordation of a final tract/parcel map, vehicular access rights to all arterial highways shall be offered for dedication to the County of Orange, except for access locations approved by the County of Orange, and notes to this effect shall be lettered on the final map and approved by the Manager, Development Services. SC 5-2 Private Street Responsibility Prior to the recordation of a final tract/parcel map, a note shall be placed on the map that states: "The private streets constructed within this map shall be owned, operated and maintained by the developer, successors or assigns. The County of Orange shall have no responsibility therefore unless pursuant to appropriate sections of the Streets and Highways Code of the State of California, the said private streets have been accepted into the County Road System by appropriate resolution of the Or- ange County Board of Supervisors." SC 5-3 Guaranteed Access A. Prior to the recordation of a final tract/parcel map, a method or procedure to assure a guaranteed right of vehicular and pedes- 9/15/97«I:\CCB638\OUIIINE.WPD» II LSAAnodatn, Ina trian access to all building sites for all parcels shall be submitted by the project proponent and approved by the Manager, Cur- rent Planning. Said method or procedure shall be recorded. B. Prior to the issuance of any building permits, a copy of the re- corded document shall be furnished to the Manager, Current Planning. SC 5.4 Public Improvements Prior to the recordation of a final tract/parcel map, the following improvements shall be designed and constructed in accordance with plans and specifications meeting the approval of the Manager, Development Services: A. Streets, bus stops, street names, signs, striping and stenciling. B. The water distribution system and appurtenances which shall also conform to the applicable laws and adopted regulations enforced by the County Fire Chief. C. Underground utilities (including electrical and telephone), street lights, and mailboxes. SC 5-5 Major ThorougbfareandBridgeFee Programs This condition has been satisfied with Board of Supervisors approval of Transportation Element Amendment 95-1 on Au- gust 1,1995 (Resolution No. 95-561). SC 5-6 Sigbt Distance Prior to the issuance of any grading permits, adequate sight distance shall be provided at all street intersections per Standard Plan 1117, in a manner meeting the approval of the Manager, Traffic Engineer- ing, and at all driveways. This includes any necessary revisions to the plan such as removing slopes or other encroachments from the limited use area. SC 5.7 Traffic signal conduit Prior to the recordation of a final tract/parcel map, the subdivider shall Install all underground traffic signal conduits (e.g., signals, phones, power, loop detectors, etc.) and other appurtenances (e.g., pull boxes, etc.) needed for future traffic signal construction at the Intersections listed above, and as needed for future interconnection with adjacent intersections, all In accordance with plans and specifi- cations meeting the approval of the Manager, Development Ser- vices. 9/15i97«1:%CC8638\O3UTL1NLWPn» 38 II LSA Associates, Inc. II II II SC 5-8 Growth Management (Fiftb District) Building permit issuance shall be phased in accordance with any Board of Supervisors approved growth management phasing plan pertaining to the timely provision of public services and facilities. A valid Board of Supervisors approved development agreement per- taining to the property which includes a development phasing plan shall satisfy the requirements of this condition. This condition shall be noted on the final map. SC 5-9 Assessment District Financing Prior to the recordation of a final tract/parcel map, the subdivider shall prepare any required improvement plans and shall identify on the plans the limits of all the facilities which the subdivider intends to fund through a Mello -Roos Community Facilities District (CID) or Assessment District (AD) bond program. In addition, the im- provement plans shall identify the specific CID or AD under which the improvements will be funded, in a manner meeting the approval of the Manager, Development Services. SC 5-10 Assessment District Reapportionment Report Prior to the recordation of a final tract/parcel map within the bound- aries of an assessment district, the subdivider shall provide the County (in a manner meeting the approval of the Manager, Public Facilities & Resources Department (PFR)/Program Development Division) report and revised boundary map that have been certified and processed by the Assessment Engineer of Record. The County may substitute itself as Assessment Engineer of Record, if the Direc- tor, Public Facilities and Resources Department determines that it is in the County's best interest to do so. The subdivider shall reim- burse the County for the cost of providing this service, in a manner meeting the approval of the Manager, PER/Program Development Division. SC 5-11 Assessment District Application Form Prior to the recordation of a final tract/parcel map within the bound- aries of an assessment district, the subdivider shall fill out, sign and submit the required application form for the division of land and assessment, and pay the required fee, in a manner meeting the ap- proval of the Manager, PER/Program Development Division. SC 5-12 Internal Circulation A. Prior to the recordation of a final tract/parcel map or the issu- ance of any building permits, whichever occurs first, the sub- divider shall provide plans and specifications meeting the ap- proval of the Manager, PDS/Subdivision and Grading Services, for the design of the following improvements: 9/15i97«1ACCB638\OUTTJ NEWPD» 39 i1 LYAAsxdateA MQ 1) Internal <street/<common private system. 2) Entrance to the site to emphasize that the development is private by use of signs and other features. B. Prior to the issuance of any building permits, the subdivider shall provide plans meeting the approval of the Manager, PDS%Pransportation Planning Services, for the design of the internal pedestrian circulation system within the development. C. Prior to the Issuance of any certificates of use and occupancy, the above improvements shall be constructed in a manner meet- ing the approval of the Manager, Construction Division. Fur- ther, a copy of the approved plans shall be furnished to the Manager, PDS/Building Inspection Services, prior to the issu- ance of any certificates of use and occupancy. SC 5-13 Traffic Signal Maintenance Basement Prior to the recordation of a final tract/parcel map, the subdivider shall dedicate a signal maintenance easement to the County of Or- ange for all public signalized intersections planned for installation within the project boundary, in a manner meeting the approval of the Manager, PDS/Subdivision and Grading Services. SC 5-14 Access Basement Prior to the recordation of a tract/parcel final map, the applicant shall place a note on the final map and show a two-way reciprocal access and parking easement to all parcels within the map, in a manner meeting the approval of the Manager, PDS/Subdivision and Grading Services. SC 5-15 Off -Site Road Pavement Prior to the recordation of a final tract/parcel map, applicant shalt provide a temporary access to the development by constructing a minimum of 24 feet of pavement and 8 foot graded shoulders, and dedicate the right-of-way necessary with title reports provided to accomplish this, from the map boundary to the nearest fully im- proved arterial highway, all in accordance with plans and specifica- tions meeting the approval of the Manager, Subdivision and Grad- ing services. SC 5-16 Internal Circulation Prior to the recordation of the tentative tract/parcel map, the inter- nal driveway system and parking layout shall be reviewed and ap- proved by the Manager, PFR/Program Development Division, when the site plan for this development is processed. 9/15,97*1.\CCB638wUTUNE.WPD» 40 1 LSAAmdata, Ina ' SC 5-17 Arterial Alignments ' Notwithstanding the conceptual alignment of arterial highways shown on the map, prior to the recordation of any subdivision map adjacent to said arterials, the applicant shall prepare necessary engi- neering plans to support establishment of the final alignments for all arterial highways within the project limits. Said plans shall be provided and approved by the Manager, PDS/Subdivision and Grading Services. 4.6 AIR QUALITY (CHECKLIST: V. AIR QUALITY, a - d, NO IMPACT BEYOND FMR NO. 544A) MR No. 544A Impacts Previously Identified Impact 6.1 - PM-10 Emissions/Pugitive Dust �I 1 1 Il 1 F '1 Without mitigation, fugitive dust emissions are estimated to be approximately 197 pounds/day, which exceed the recommended threshold criteria. With implementation of Standard Conditions SC 6-1 through SC 6-3, these short- term, fugitive dust emissions can be reduced approximately 50 percent, to approximately 98 pounds per day. When combined with fugitive dust the total estimated PM-10 emissions during construction exceed the threshold criteria and are considered short-term signif- icant impacts. Impact 6.2 - NO, Emissions from Construction EquipmentlOff-Site Vebicle Trips Estimated construction equipment emissions of NOx exceed the SCAQMD recommended threshold. Implementation of SCAQMD recommended con- struction mitigation measures (such as using propane, butane or natural gas powered construction equipment instead,of diesel) results in greater emissions of NOx and are not considered feasible mitigation for this impact. Impact 6.3 - Long -Term Emissions Emissions of CO and NOx are estimated to exceed the recommended threshold criteria. The majority of these emissions are expected to result from motor vehicles. Project Impacts Compared to Impacts Described in MR No. 544A The refinements to the project do not change any of the analysis or conclusions in EIR No. 544A. EIR No. 544A provides adequate documentation for the project refinements as currently proposed. 9/15i97«I:\CCB638\OUTLINE.WPD» 41 LR &mdata, Zm , Project Design Features/Standard Conditions/Mitigation Measures - MCDP andPA 2C CDPs Mitigation Measures Mitigation Measure &14 Prior to issuance of a grading permit, the project proponent shall submit to the Manager, PDS/Subdivision and Grading Services for approval a written list of instructions to be carried out by the construction manager specifying measures to minimize emissions by heavy equipment, which Include but are not limited to: maintenance of all construction vehicles and equipment in accordance with manufacturers specifications, connection to existing electrical facilities near the project, use of electrically powered equipment, avoidance of allowing equip- ment to Idle for extended periods of time and avoidance of causing unneces- sary delays of traffic along on -site access roads as a result of heavy equipment blocking traffic. The following mitigation measures are from the prior EIR Nos. 517 and 485 (for the SJHPC and ICPC, respectively). These measures shall be carried for- ward as part of implementation of the Phase III project to reduce potential dust generation from construction. Mitigation Measure 64b (SJHPC FBIR No. 517 Mitigation Measure 4.81; ICPC FHRNo. 485 Mitigation Measure 7-1) Prior to issuance of any grading permit, the developer shall ensure compliance with South Coast Air Quality Management District (SCAQMD) Rule 402 and 403, and Subarticle 13 of the Grading and Excavation Code to the Manager, PDS/Subdivision and Grading Services, and shall identify the dust suppression measures, such as regular watering and early paving of the road, which shall be implemented to reduce emissions during construction and grading. This shall assist in reducing short-term Impacts from particulates that could result in nuisances that are prohibited by Rule 403 and will also provide for effective planting, maintenance, irrigation, and seed germination by the project propo- nent prior to the rainy season in graded areas that would otherwise remain exposed. Notations, included with other notations on the front sheet of grading plans, will be considered as adequate evidence of compliance with this measure. Mitigation Measure GIc (SJHPCFBIR No. 517M(tigation Measure 4.8.2) Prior to Issuance of grading permits, or at a later date as deemed appropriate by the Manager, PDS/Subdivision and Grading Services, the project proponent shall submit an erosion control plan for his approval which shall include a discussion of measures for dust pollution and mitigation of erosion caused by wind and water. The plan shall also provide for effective planting, mainte- 9/15i97«IACCHOSO ME."DM 42 I F MAnodate; r= ' nance, irrigation, and seed germination by the project proponent prior to the rainy season in graded areas which would otherwise remain exposed in accor- dance with Subarticle 13 of the Grading and Excavation Code. This will reduce short-term impacts from particulates. ' Mitigation Measure 61d (SJHPCFEIR No. 517Mitigation Measure 4.&3) Grading and excavation will be halted during periods of high winds. This will ' reduce short-term impacts from particulates. Notations in the above format, included with other notations on the front sheet of grading plans, will be considered as adequate evidence of compliance with this measure. ' Mitigation Measure 6.3a (SJHPCM1tigation Measure 4.&4) Notations in the above format, included with other notations on the front sheet ' of grading plans, will be considered as adequate evidence of compliance with this measure. ' Prior to approval of individual tentative tract maps, the developer shall work with the OCTD in the planning of transit improvements, such as bus shelters, benches, and bus stop pedestrian access, which will facilitate transit usage ' among residents. ' Mitigation Measure G3b (SJHPCMitigation Measure 4.&6) Prior to recordation of the first tract map the applicant shall submit for review and approval by the Manager, PFR/Program Development Division, a docu- ment that provides information on reducing vehicular trips. The document should encourage a reduction of vehicular trips by including information re- garding ride -sharing programs, van pool programs, public transportation ' opportunities, and other trip reducing concepts. The applicant shall distribute the approved information to all future homeowner's associations within the project. ' 4.7 NOISE (CHECKLIST• x NOISE, a - b; NO IMPACT BEFOND FEIR NO.544A) EIR No. 544A Impacts Previously Identified II 11 II Impact 7.1 Short -Term Construction Noise Construction noise will occur as a result of project implementation. Construc- tion noise represents a short-term impact on ambient noise levels. 9/15i97aI:\CCB638\0UTUNE.WPD0 43 II MAwdate;Ina ' Impact 7.2 Short -Term Military Aircraft Noise The project site may experience periodic high noise levels from helicopter flyovers generated by USMCAS-Tustin. Although no specific feasible mitigation is available to reduce the noise level effects on the site, project residents should be notified of the existence of the military flyover corridor, and the potential for significant single event noise exposures while the air station remains in opera- tion. Impact 7.3 Exterior Noise Levels Four of the five modeled noise receptors (Rl, R2, R3 and R4) are anticipated to experience project related noise increases In excess of three dB. The noise increases range from 5.1 dB (at R2 and R4) to 6.0 dB (at R3). Thus, these receptors indicate that the proposed project would result in noticeable (and therefore significant) noise increases within the project site. Of these noise receptors, two (Rl and R3, both along Ridge Park Road) are predicted to ex- ceed the Orange County exterior noise standard of 65 dBA CNEL. Impact 7.4 Interior Noise Levels The proposed residential uses will be subject to meeting the 45 dBA CNEL Interior noise standards specified by the California Noise Insulation Standard and the Noise Element for the County of Orange. The analysis results indicate that all future structures in the proposed project will have exterior noise levels of 66.1 dBA CNEL or lower. Therefore, the Interior noise levels of all planned residential units will be below the 45 dBA CNEL interior noise standard (with windows closed). Project Impacts Compared to Impacts Described in BIR No. 544A The reestablishment of Vista Ridge Road will change the traffic distribution and the location of traffic noise. Traffic volumes would have to double in order to cause a noticeable increase in noise. The traffic volumes are not high enough to change any of the analysis or conclusions in EIR No. 544A. EIR No. 544A provides adequate documentation for the project refinements as currently proposed. Project Design .Features/Staisdard Conditions/Mitigation Measures - MCDP and PA2C CDPs Standard Conditions SC 7-1 A. Prior to the issuance of any grading permits, the project pro- ponent shall produce evidence acceptable to the Manager, Building Permit Services, that: P/15N7«1ACCB638WUILME WPI)» 44 1 MAMdate; l= I 1 I II II I II 'II I I II II 1. All construction vehicles and equipment, fixed or mo- bile, operated within 1,000 feet of a dwelling shall be equipped with properly operating and maintained muf- flers. 2. All operations shall comply with Orange County Codi- fied Ordinance Division 6 (Noise Control). 3. Stockpiling and/or vehicle staging areas shall be located as far as practicable from dwellings. B. Notations in the above format, appropriately numbered and included with other notations on the front sheet of grading plans, will be considered as adequate evidence of compliance with this condition (SC N10). SC 7-2 Prior to the issuance of certificates of use and occupancy, the devel- oper shall produce evidence to the Manager, Building Inspection Services, that the Department of Real Estate has been notified that the project area is adjacent to a regional transportation corridor. The Corridor is expected to be a high capacity, high speed, limited access facility for motor vehicles, and will have provisions for bus lanes and other mass transit type facilities (SC N12). SC 7-3 Prior to the issuance of any certificates of use and occupancy, the developer shall produce evidence acceptable to the Manager, Build- ing Inspection Services, that information stating this property is sub- ject to the overflight, sight, and sound of aircraft operating from U.S. Marine Corps Air Station, Tustin, has been provided to the Department of Real Estate of the State of California for inclusion in the Final Subdivision Public Report (SC N4). Mitigation Measures Mitigation Measure 7-1 Prior to the issuance of the first grading permits, the applicant shall ensure that the noisiest operations shall be arranged to occur together in the construction program (to the extent feasible) to avoid continuing periods of greater annoy- ance, meeting the approval of the Manager, Building Permit Services. Notations in the above format, appropriately numbered and included with other notations on the front street of the grading plans, will be considered as adequate evidence of compliance with this measure. Mitigation Measure 73 Not applicable to these PA 2C CDPs. 9/15t97<.\CCB638\0UTL1NE.wPD» 45 �'I LSAAswiarrf, Ina , , Mitigation Measure 7-4 Mechanical ventilation shall be provided in dwellings that are adjacent to the SJHTC and Ridge Park Road to meet the 45 dBA CNBL interior noise standard. In order that windows can remain closed to achieve this required attenuation, adequate ventilation with closed windows will be provided per the Uniform Building Code. This measure will be verified by the Manager, PDSISubdiviston and Grading Services, prior to issuance of a Use and Occupancy Certificate. 11 11 4.8 BIOLOGICAL RBSOVRC5S (CUECKUST• VII. BIOLOGICAL RESOVRCVS, a - f NO t IMPACT BEYOND FEIR NO. 544A) EIR No. 544AImpacts Previously ldentifted Impact 8.1 - Habitat Fragmentation and Loss of Plant and Animal Resources to the 1CPC (Previously Identified) Impacts of the ICPC to biological resources include fragmentation and loss of habitat, isolation of habitat and associated animal populations, decreases in local plant communities and animal populations, and cumulative impacts. There will also be a loss of habitat for several sensitive plant and animal species. Impact 8.2 - Habitat Fragmentation and Loss of Plant and Animal Resources in the San Joaquin Hills Planned Community and Impact 8.3 - Wildlife Movement Impacts of the SJHPC to biological resources Include loss of habitat accompa- nied by decreases in local plant communities and animal populations. Impact 8.4 - Pffects on Sensitive Species The proposed project will result in a decrease in the range or number of the coastal California gnatcatcher, recently listed by the USFWS as a threatened species. Other listed species are not likely to be affected by project implemen- tation. The proposed project will result In the reduction of habitat for some sensitive non -listed species. Impact 8.5 - Loss of Coastal Sage Scrub Construction of the current Newport Coast residential community in the ICPC PAs and in the previously approved SJHPC PAs will result in the loss of approx imately 162.4 acres of this habitat (including 74.2 acres of southern cactus scrub) on site, and in immediately adjacent areas. The total loss of coastal sage scrub habitat acreage amounts to approximately 174.9 acres when the planned community impacts are added to the previously approved inf-Astrugture development impacts. An additional 5.9 acres will be subject to severe distur- bance as a result of fuel modification activity that requires the removal of high 9/15,97<.-\cC9688\0UTUNLVPD» 46 ,UAAssodate41= fuel volume plants such as California sagebrush and California buckwheat. This impact is considered significant due to continued reduction of this habitat in Southern California and the number of sensitive and special interest species associated with it. Impact 8.6- Loss of Oak Woodlands Grading impacts associated with the proposed development of the SJHPC would result in the removal of approximately 1.5 acres of oak woodlands. Removal of some brush and annual grasses is not expected to have a detrimen- tal effect on this habitat, but will minimize fire hazards to existing trees. Wild- life, which otherwise would potentially frequent this woodland, may avoid using this area due to incidental impacts associated with the proposed project and surrounding development, however. Impact 8.7 - Loss of Native Grasslands Native grasslands and scrub -grasslands are sensitive biological resources, and the loss and disruption of 46.7 acres of these communities represent a sub- stantial loss to these communities in Orange County and cismontane Southern California as a whole. Note: includes impacts from planning areas not part of the Master CDP or PA 2C CDPs. Impact 8.8 - Effects on ESHA Drainages The uppermost reaches, or "headwaters," of three drainages, designated as Category "D" ESHAs, will be directly impacted by the proposed development in PA 2C. Alone, this impact is not considered significant, because these drainages contain water flows only when it rains and have little or no riparian vegetation associated with them. However, the project will contribute to the significant cumulative impact of the loss of Category "D" ESHA drainages. Impacts to the ESHA A drainages within the Newport Coast, including Los Trancos Canyon, will occur as the result of infrastructure development. Planned road construc- tion will require filling of portions of some drainages, as will the construction of water and sewer lines and drainage facilities throughout the Planned Com- munity. Impact 8.9 - Long Term Human Disturbance Long-term human disturbance will have incidental impacts on the surrounding habitats, as recognized and discussed in previous environmental documents. Impact 8.10 - Construction Impacts Construction activities may entail ancillary impacts to sensitive habitat adjacent to the construction area. 9/15/97< -.\CCB638\OU=E.WPD» 47 1 LSAAwOateghm , Impact &11-Bffect on NCCP Program The project grading limits are not within the proposed NCCP Reserve. The project is consistent with the NCCP Program as It has been developed to date. However, continued participation in the NCCP process, through the implemen- tation phase, is required to fully mitigate the projeces impacts to coastal sage scrub habitat. A portion of the project is scheduled for development prior to the Implemen- tation of the Subregional plan. Therefore, these areas must be found to be consistent with the NCCP interim process guidelines. Project Impacts Compared to Impacts Described in EfR No. 544A The revisions to the project do not change any of the analysis or conclusions in EIR No. 544& EIR No. 544A provides adequate documentation for the pro- posed project revisions. Since EIR No. 544A was certified, the NCCP was adopted. Prior to the adoption of the NCCP/HCP in July, 1996, the applicant applied for and obtained approval to remove these resources through an approved 4(d) Detailed Interim Habitat Loss Mitigation Plan (IHLMP) Permit. Findings associated with the 4(d) Permit determined that the project would not preclude the preparation of an effective NCCP/HCP program. In addition, the 4(d) (IHLMP) Permit included certain mitigation measures that were carried out with previous crushing of coastal sage scrub vegetation on the site. The reveg- etation measures are being implemented in the 1996/97 and 1997/98 planting seasons. The applicant, as a participant in the NCCP/HCP program, has applied for and been granted a 10a Permit, which covers impacts within the project site and other development areas. The Amendment to the Master CDP includes grading for roads, mass graded building pads for future residential construction, and future fuel modification zones. Pursuant to Section 10.1(b) of the NCCP/HCP Implementation Agree- ment, a minor amendment will be processed to permit boundary adjustments that result in no net loss of reserve system acreage and no long-term net loss of subregional habitat value. The minor amendment will be processed concur- rently with this Master CDP Amendment application and approved by the NCCP non-profit corporation prior to issuance of any applicable grading permits. The total acreage of the Los Trancos Canyon dedication area will not change as a result of the NCPC Phase III revisions. As provided for in Chapter 3 of the LCP - Second Amendment, adjustments to the boundary of Los Trancos Canyon will be incorporated into a phased Irrevocable offer of dedication program (Parcel A and B sequence) to the County. The overall Newport Coast Dedica- tion Program will maintain approximately 7,234 acres devoted to open space and recreation use, which includes 2,807 areas in Crystal Cove State Park, 2,666 acres in wilderness open space, 1,161 areas in special use open space dedica- 9/15,97«IACCB638WtMJNB.WPD» 48 11 IA 1_1 lions, and over 600 acres in the golf course and other non -dedicated recreation areas. The 1HLMP includes an off -site restoration plan that has been completed for all Planning Areas/Development Areas. On -site restoration in Upper Los Trancos Canyon adjacent to DA 2C-5 and 2C-10 is no longer needed as a result of an amendment to the central/Coastal NCCP/HCP to reflect the LCP Second Amend- ment (amendment approved December, 1996). The possibility for the NCCP Amendment of December, 1996, was acknowledged in EIR No. 544A, in Appen- dix D-2 (Restoration Plan Specifications). Based on the text in Appendix D-2, the IHLMP measure (8-11) is replaced by the following: the upper Los Trancos Canyon open areas shown in the DA 2C-5 Development Plan in the DA 2C-5 CDP, which are graded but are not part of the fuel modification area, will be planted with a basic landscape program, using native plants. Fuel modification areas shall be landscaped in accordance with the current Orange County Fire Authority Fuel Modification zone plant list for areas adjacent to reserve lands. This measure will be implemented via Standard Condition 13-5. Project Design Features/Standard Conditions/Mitigation Measures - NCPC, Phase lll, Revision Project Design Features Project Design Feature 8-IA - Local Coastal Program Open Space Dedication Program The 1988 LCP established the Open Space Dedication Program that, in combi- nation with Crystal Cove State Park, will provide for nearly 7,000 acres of open space within the NCPC. This open space contains a substantial portion of coastal sage scrub habitat, as determined through the subsequent NCCP pro- gram. With this program, the Coastal Commission and County of Orange found the impacts of the Planned Community to non -sensitive and sensitive biological resources to be mitigated to a level of insignificance, according to the "balancing" provision for protection of resources. Also, any impacts to ESHAs caused by development are considered to be mitigated to a level below signifi- cance through implementation of this program. Project Design Feature 83 - Open Space Linkages The provision of nearly 7,000 acres of contiguous habitat through the Open Space Dedication Program and acquisition of Crystal Cove State Park, along with the HMP developed to facilitate wildlife movement between open space in Buck Gully and Los Trancos Canyon through PA 11B, offsets impacts to wildlife movement resulting from the proposed project and reduces them to a level of insignificance. 9/15i97«1ACCB638\0UTUNE.WPD» 49 11 LSAAnodater, Ine. Project Design Feature 8.8 - Continued Implementation of Drainage Resource Protection Measures There are several aspects of the overall ICPC that are designed to mitigate impacts to ESHA drainages: Project Design Feature 8-8C-Implementation of &SHAPolicies The LCP policies governing CategoryA and B drainages dictate that these drain- ages be preserved in their existing state. All development will be set back a minimum of 50 feet from the edge of the riparian habitat, with certain excep- tions, which are detailed in the LCP. ESHA Category C habitats will be protected from degradation of water quality through monitoring of runoff into these habitats, and the restriction of the use and application of chemicals (on the golf course and other areas) to those approved by State, County and federal agencies. ESHA Category D drainages have the lowest quality habitats. These drainages have no riparian habitat or year round surface water. Impacts to Category D ESHAs are mitigated by the open space dedication program and RHCP, as des- cribed earlier. Project Design Feature 89 According to the site development standards in the LCP, all lights shall be designed and located so that light rays are aimed at the development site. Evidence of project conformance with these standards will be provided in the Coastal Development Permit (CDP) documentation approved by the Planning Commission. Standard Conditions Standard Condition 89 Prior to the recordation of the first final tract/parcel map or issuance of the first grading permit for projects located immediately adjacent to or including por- tions of regional parks, significant open space corridors, or other environmen- tally sensitive areas, the project proponent shall provide evidence acceptable to the Manager, PDS/Subdivision and Grading Services, in consultation with the Manager, Harbors Beacbes andParks Division, that graded areas will be com- patible with natural land characteristics of the adjacent areas. Treatment to achieve the desired effect shall include: B. Urban Edge TteatmenULandscaping Plans for all graded areas adjacent to open space (excerpted from Standard Condition G-3, County of Orange Environmental Management Agency Standard Conditions of Approval, January 1, 1994). 9/15/97*1ACCB638W=1NB.WPD» 50 1 11 LSAA%Wdate.% t= ' Mitigation Measures Mitigation Measure 82 Prior to the recordation of an applicable final tract map, the subdivider shall ' dedicate a scenic easement to the County of Orange or its designee over open space lots abutting the northern edge of Los Trancos Canyon (PA 12A) for scenic preservation purposes in a manner meeting the approval of the Man- ager, Harbors Beaches andParks Division, Program Management and Coordi- nation Section. Maintenance, upkeep and liability for said easement area shall remain the responsibility of the subdivider or his assigns and successors (i.e., ' homeowner's association) or current underlying owner(s) of said easement area, and shall not be included in said dedication offer. The subdivider shall not grant any easement except for underground public facilities or irrigation over any property subject to said easement unless such easements are made subordinate to said easement offer in a manner meeting the approval of the Manager, Harbors Beaches and Parks Division, Program Management and Coordination Section. Limitations and restrictions for said easement shall be L] I I I recorded by separate document, concurrent with the recordation of subject map in a manner meeting the approval of the Manager, Harbors Beaches and Parks Division, Program Management and Coordination Section. Mitigation Measure 8-6 (Prior EIR Measure) Prior to issuance of the grading permit for development that impacts oak wood- land habitat, the applicant shall prepare a plan at 1"=200" illustrating the re- placement planting of coast live oaks, for review by the Manager, Environmen- tal and Project Planning Services Division. The plan shall be developed by a qualified professional who is familiar with the requirements of coast live oak revegetation programs. On -site mitigation is preferable to off -site replacement. Mitigation in open space areas within the project boundaries may be appropri- ate (Mitigation Measure 4.8.2 from FEIR No. 517). These implementation details for oak replacement will be incorporated into the final IHLMP. Mitigation Measure 8 9B (Prior EIR Measure) All graded slopes along public open space will be stabilized and revegetated with native plant species. Non-invasive nonnative plant species can be used if approved by a qualified botanist. Revegetation will take place as soon as is practical after grading is complete in compliance with LCP policies I-3-I, I-3 4, I-3-K and I-3-L. Irrigation will be applied where necessary to establish vegeta- tion (Mitigation Measure No. 6-12 in FEIR No. 485). In accordance with the adopted Mitigation Monitoring Program, this measure will he verified after construction through plan check by the County Construction In- spector. Note: Applies to DAs 2C-4 and 2C-5. 9/15i97H1ACCB638\0UT UNE.WPD» 51 ' LUAssodate4Ina Mitigation Measure 8.10A (Prior BLRMeasure) Prior to approval of any grading permit, the developer shall prepare a program that shall be approved by the Manager, Environmental Planning Division, and ' includes either graphically, as notes on grading or building plans, as written construction instructions, or as otherwise deemed appropriate, the following: , A. Prohibit the driving or parking of construction vehicles within the drip lines of the oak woodlands except where necessary to imple- ment the approved grading plan; , B. Avoid unnecessary driving in undisturbed areas outside grading limits; C. Do not remove brush beyond grading limits except where neces- sary, and , D. Do not Intentionally harass wildlife such as deer, foxes, coyotes, snakes, etc. (harassment Includes shooting, throwing rocks, etc). (Mitigation Measure No. 4.4.3 from FBIR No, 517) 4.9 AHSTHETICS (CHECKUSTb XIII. AESTHETICS, a - d; NO IMPACT BEYOND FEIR , NO. 544A) EIR No. 544A Impacts Previously Identified , Impact 9.1 Change in Appearance of Project Area (Previously Identi- fied Impact) 0 Development of the proposed project will change the appearance of the project area and alter the site's natural character (Impact Significance Criteria B). Structures and grading associated with the development of the planning areas, roads and Infrastructure systems will alter the graded and natural topography and vegetation of the area. Impact 9.2 Graded Area Left Undeveloped Temporary visual impacts may occur if any areas are graded and then, due to market or other conditions beyond the Applicant's control, left undeveloped for an extended period of time. Impact9.3 Signal Peak Facilities The existing Signal Peak microwave transmission facilities will be a noticeable land use from future residential units and area roadways. These facilities are a pre-existing and indefinite land use, and were taken into consideration during earlier planning of the Irvine Coast. Project landscape plans for PAs surround - I' 9/I50791ACC8639�0Mt EMPD» 52 =Asmdates, Inc. L ing Signal Peak will help screen the facilities from view, thereby reducing their overall visual effect. Project Impacts Compared to Impacts Described in EIR No. 544A A comparison of the differences in design grade between the current project Master CDP Fifth Amendment, Tentative Map No. 15393 and the project ana- lyzed in EIR No. 544A, Tentative Tract No. 14786, is shown in Figures 8-11. The graphics illustrate that the difference in design grade will not result in any new significant impacts. The refinements to the project do not change any of the analysis or conclusions in EIR No. 544A. EIR No. 544A provides adequate documentation for the project refinements as currently proposed. Project Design Features/Standard Conditions/Mitigation Measures - MCDP and PA 2C CDPs Project Design Features PDF 9-1 Visual resources will be protected through development in accor- dance with the LCP land use designations, in particular with respect to location of development and open space/recreation uses, and in accordance with the site plan, which reflects the placement of resi- dential uses designated in the LCP. Concurrent with County approval of the MCDP Fifth Amendment, the County will make findings of consistency with the LCP; this will provide the implementation of this PDF. PDF 9-2 Significant panoramic views that were previously inaccessible to the public will be opened up by this development and the related road network. Implementation of other LCP policies through PDFs will further enhance visual resources by reestablishing native vegetation through a revegetation program, locating development to provide maximum preservation of and conformance with natural topogra- phy, and implementing the open space dedication program de- scribed in the LCP. Implementation of the open space program -described in the LCP has occurred through certification of the LCP and irrevocable offers of dedication of the open space. The other LCP policies listed ,in this PDF will be implemented as described in various sections of this EIR. 9/1597«I:\CCB638\OUTLINE.WPD» 53 1 4 ,may- =�'= •- • �• Mug r .1�'Y {• •�.�^�:�r; ICI 31 '- LOCATIONS OF 'W{:4 •��, • i _ - CROSS SECTIONS ."s{ CUT AREA Q FILL AREA CUT= 4,000,000 CY v � .•�.� �-� ! FILL= 4,000,000 CY i yrvrrr(��uoaa� N LSD Scale in Feet 0 200 400 Figure 8 Cross Section Key Map NATURAL GRADE\ ,�•Srn1=.eT� Y.UQTfte:CT IOW 'A STREET Q ow VISTA —_—_ -- ESIGN GRADE M 147Sa DEB GN GRADE-TTM 16393 800 ow wo KIM Iwo 20M 2600 SECTION A -A a STREET NATURAL GRADE\ MM taael RIDGE PARK ROAD —� DESIG GRADE-TTM 1 86 DESi N GRADE-TTM 115393 360D 4000 4600 6000 66M SECTION A -A L(y� Scale in Feet 1�\1J =- 0 150 300 Figure 9 Cross Section A -A m = = m= r m m m m m m m m = = m m m VISTA RIDGE ROAD 'A' STREET DESIGN GRADET m Z,.DESIGN GRADETTM sm 14788 _r LSD Scale in Feet 0 150 300 Figure 10 Cross Section B-B Y200 'A' STREET DESIGN TTM 147M 7000 F I — ---- VISTA RIDGE F15AD ` NATURAL GRADE ~-- — �. _4 SOO DE51GN GR TTµ 15393 -- "'••ti• 000 500 q00 1500 2000 2500 3000 35W SECTION C-C 9/4/97(CCB638) Figure 11 (_�` Scale in Feet LS ISO 300 Cross section C—C MA=date;1= t t U PDF 9-3 This PDF for relocation of "A" Street is no longer relevant due to the alignment of Vista Ridge Road to a previously approved design. Standard Conditions SC 9-1 Prior to issuance of building permits, landscape plans for landscape areas that will be maintained privately shall be prepared by a li- censed landscape architect, taking into account approved prehmi- nary landscape plans (if any), County Standard Plans, adopted planned community regulations, scenic corridor and Specific Plan requirements, Grading Code, recreation trail and erosion control requirements, Subdivision Code, Zoning Code and conditions of approval. (County Standard Conditions of Approval LA3A). SC 9-2 Privately maintained slopes and slopes facing the Los Trancos Cany- on open space shall be landscaped, equipped for irrigation as appropriate, and improved in accordance with an approved plan as stated below: 1) Preliminary Plan - Prior to the recordation of an applicable final tract/parcel map, an agreement shall be entered into and finan- cial security posted guaranteeing landscape improvements and the maintenance thereof based on a preliminary landscape plan showing major plant material and uses, with a cost estimate for the landscape improvements. The preliminary plan and cost estimates shall be reviewed and approved by the Manager, De- velopment Services, in consultation with the Manager, Harbors Beaches and Parks Division. Said plan shall take into account the previously approved landscape plan for the Irvine Coast P.C., the County Standard Plans for landscape areas, adopted plant palette guides, applicable scenic and specific plan require- ments, Water Conservation Measures contained in Board Reso- lution 90-487 (Water Conservation Measures), and Board Reso- lution 90-3141 (Water Conservation Implementation Plan). 2) Detailed Plan - Prior to the issuance of any building permit(s), a detailed landscape plan shall be submitted to and approved by the Manager, Development Services, in consultation with the Manager, Harbors Beaches and Parks Division. Detailed plans shall show the detailed irrigation and landscaping design. 3) Installation Certification - Prior to the issuance of final certifi- cates of use and occupancy and the release of the financial secu- rity guaranteeing the landscape improvements, said improve- ments shall be installed and shall be certified by a licensed land- scape architect or licensed landscape contractor, as required, as having been installed in accordance with the approved detailed plans. Said certification, including an irrigation management report for each landscape irrigation system, and any other re- 9/1597«I:\CCB638\OUTLINE.WPD» 58 11 LCtAttodate; @ic quired implementation report determined applicable, shall be furnished in writing to the Manager, Construction Division, and the Manager, Buildinglnspection Services, prior to the issuance of any certificates of use and occupancy (County Standard Con- dition of Approval LA 1.1). SC 9.3 Prior to issuance of certificates of use and occupancy, the applicant shall install said landscaping and irrigation system and verify that the landscaping and irrigation system was installed in accordance with the approved plan. (Excerpted from County Standard Condi- tion of Approval LA2). SC 94 Prior to the recordation of an applicable final tract/parcel map, the subdivider shall dedicate an easement to the County of Orange or its designee over lot(s) abutting Los Trancos Canyon for scenic preservation purposes in a manner meeting the approval of the Manager, Harbors Beaches and Parks Division. Maintenance, upkeep and liability for said easement area shall remain the respon- sibility of the subdivider or assigns and successors (i.e., home- owner's association) or current underlying owner(s) of said ease- ment area and shall not be included in said dedication offer. The subdivider shall not grant any easement over any property subject to said easement unless such easements are made subordinate to said easement [excluding utility easements] offer in a manner meet- ing the approval of the Manager, HB&P/Program Management and Coordination Section. Limitations and restrictions for said ease- ment shall be recorded by separate document concurrent with the recordation of the subject final map, in a manner meeting the ap- proval of the Manager, Harbors Beaches and Parks Division (County Standard Condition of Approval HP 10). Prior to recordation of any map that is adjacent to lots designated for scenic preservation purposes, the subdivider shall survey and monument all adjacent parcels of the land to be dedicated for sce- nic preservation easement purposes, and submit plans showing how the development boundaries of the scenic preservation easement parcel(s) is [SIC] marked to be visible for monitoring purposes by Grantee to the satisfaction of the Manager, Harbors Beaches and Parks Divlslon/Program Management and Coordination Section, in consultation with Manager, Harbors Beaches and Parks Divi- sion, Coastal andHistorical Parks Section. Mitigation Measures Mitigation Measure9.2 Prior to the issuance of any grading permit, a revegetation plan shall be submit- ted to and approved by the Manager, PDS/Subdivision and Grading Services. This plan will provide for revegetation of all graded and cut and fill areas where structures or improvements are not constructed within a two year period. The 9/1597«1ACM638W UYLIN6.WPD» 59 LSAAsmdates, Ina revegetation will be composed of drought adaptive plant materials, including but not limited to California buckwheat, coyote bush or native grasses. If native species are not used, non-invasive, drought tolerant species will be used. If irrigation is required, drip systems shall be installed where feasible. Upon plan approval, a note included with other notations on the front sheet of grading plans under GENERAL NOTES will be considered as adequate evi- dence of compliance with this mitigation measure. 4.10 CULTURAL/SCIENTIFIC RESOURCES (CHECKLIST• MV. CULTURAL RESOURCES, a-b, NO IMPACT BEYOND FEIR NO.544 A) EIR No. 544A Impacts Previously Identified Impact 10.1 Arcbaeological Sites Requiring Testing Test excavations will be conducted for sites not already tested pursuant to the procedures specified in Mitigation Measure 10.1 which is based on Mitigation Measure 4-1 of EIR No. 485. Impact 10.2 Arcbaeological Sites Requiring Data Recovery Data recovery excavations for CA ORA-668, CA-ORA 669, and CA-ORA-930 will be conducted pursuant to the procedures specified in Mitigation Measure 10-2 which is based on Mitigation Measure 4.5.1 from EIR No. 517. ' Project Impacts Compared to Impacts Described in EIR No. 544A C II II Since certification of EIR No. 544A, cultural resource testing and data recovery for the area has been completed. The refinements to the project do not change any of the analysis or conclusions in EIR No. 544A. EIR No. 544A provides adequate documentation for the project refinements as currently proposed. Project Design Features/Standard Conditions/Mitigation Measures - MCDP and PA 2C CDPs Project Design Features PDF 10-1 The proposed project will implement the Irvine Coast Data Recov- ery Program, which will provide for the testing and salvaging, if determined to be required, of all archaeological sites that will be impacted by the proposed project. At the present time, the follow- ing sites have been fully mitigated by the Irvine Coast Data Recovery Program: CA-ORA-679, CA ORA 681, CA-ORA 1364, CA ORA 1365, CA-ORA 1366, CA ORA 1367, and CA ORA 1372. Since these sites have been fully mitigated, no other verification of this PDF is neces- sary. 9/15H7H1ACCB638\011=E.WPD» rfol II LSAAnodatb; Ina Standard Conditions SC 10.1 Prior to the issuance of a grading permit, the project applicant shall provide written evidence to the Manager, PDS/Subdivision and Grading, that a County certified archaeologist has been retained, shall be present at the pre -grading conference, shall establish proce- dures for archaeological resource surveillance, and shall establish, In cooperation with the project developer, procedures for tempo- rarily halting or redirecting work to permit the sampling, identifi- cation, and evaluation of the artifacts as appropriate. If additional or unexpected archaeological features are discovered, the archaeo- logist shall report such findings to the project developer and to the Manager, ,FIW/Coastal and Historical Parks Section. If the ar- chaeological resources are found to be significant, the archaeologi- cal observer shall determine appropriate actions, In cooperation with the project developer, for exploration and/or salvage. Prior to the issuance of a precise grading permit, the archaeologist shall sub- mit a follow-up report to the Manager, HB&P/Coastal andHistorl- cal Parks Section, which shall include the period of inspection, an analysis of any artifacts found, and the present repository of the artifacts. Excavated finds shall be offered to the County of Orange, or its designee, on a first refusal basis. Applicant may retain said finds if written assurance Is provided that they will be properly pre- served in Orange County, unless said finds are of special signifi- cance or a museum in Orange County indicates a desire to study and/or display them at this time, In which case items shall be donat- ed to the County, or designee. These actions, as well as final miti- gation and disposition of the resources, shall be subject to the ap- proval of the Manager, HB&P/Coastal and Historical Parks Section (SC A4.2, and Mitigation Measures 4-2 through 4-4 of EIR No. 485). SC 10-2 Prior to the issuance of a grading permit, the project applicant shall provide written evidence to the Manager, PDS/Subdiuision and Grading Services, that a County certified paleontologist has been re- tained to observe grading activities and salvage and catalogue fossils as necessary. The paleontologist shall be present at the pre•gmding conference, shall establish procedures for paleontological resource surveillance, and shall establish, in cooperation with the project developer, procedures for temporarily halting or redirecting work to permit sampling, identification, and evaluation of the fossils. if major paleontological resources that require long-term halting or redirecting of grading are discovered, the paleontologist shall report such findings to the project developer and to the Manager, HB&P/ Coastal and Historical Parks Section. The paleontologist shall determine appropriate actions, in cooperation with the project developer, which ensure proper exploration and/or salvage. Exca- vated finds shall be offered to the County of Orange, or its designee, on a first refusal basis. Applicant may retain said finds if written assurance is provided that they will be properly preserved In Orange 9/15i9MNCC0638WUT41NLVPD» 61 LJI I II LSAAssodates,laa County, unless said fords are of special significance or a museum in Orange County indicates a desire to study and/or display them at ' this time, in which case items shall be donated to the County or designee. These actions, as well as final mitigation and disposition of the resources, shall be subject to approval by the Manager, HB&P/Coastal and Historical Parks Section. Prior to the issuance ' of a precise grading permit, the paleontologist shall submit a follow- up report for approval by the Manager, HB&P/Coastal and Histori- cal Parks Section, which shall include the period of inspection, a catalogue and analysis of the fossils found, and present repository of the fossils. Monthly grading observation reports shall be submitted to the grading inspector on all projects that exceed 100,000 cubic ' yards, unless no earthwork has been done during the month. These reports shall include the period of inspection, the list of fossils col- lected, and their present repository (SC A7.1, and Mitigation Mea- sure 4.5.2 from EIR No. 517 and Mitigation Measure 4-5 from EIR No. 485). 4.11 RECREATION (CHECKLIST• XV. RECREATION, a, b AND c, NO IMPACT) EIR No. 544A Impacts Previously Identified ' No significant recreation impacts will occur. Project Impacts Compared to Impacts Described in EIR No. 544A ' The refinements to the project do not change any of the analysis or conclusions in 'EIR No. 544A. EIR No. 544A provides adequate documentation for the project refinements as currently proposed. Project Design Features/Standard Conditions/Mitigation Measures - MCDP and PA 2C CDPs ' Project Design Features ' PDF 11-1 The project implements the approved LCP and the SJHPC Planned Community Program through the provision of recreation facilities and open space as described in the CDP/SDP. Prior to the recor- dation of an applicable final tract map, the subdivider shall dedicate an easement to the County of Orange or its designee over the lots in PA 12D for scenic preservation purposes in a manner meeting the ' approval of the Manager, Harbors Beaches and Parks, Program Management and Coordination Section. Maintenance, upkeep and liability for said easement area shall remain the responsibility of the subdivider or his assigns and successors (i.e., homeowner's associ- ation) or current underlying owner(s) of said easement area, and shall not be included in said dedication offer. The subdivider shall not grant any easement except for underground public facilities or ' 9/15/97<ACCB638\0U ME.WPD» 62 LSAAuoC19t#A Ina irrigation over any property subject to said easement unless such easements are made subordinate to said easement offer in a manner meeting the approval of the Manager, Harbors Beaches and Parks, Program Management and Coordination Section. Limitations and restrictions for said easement shall be recorded by separate docu- ment, concurrent with the recordation of subject map in a manner meeting the approval of the Manager, Harbors Beaches andParks, Program Management and Coordination Section. Prior to the recordation of an applicable final tract map, the subdi- vider shall dedicate an easement to the County of Orange or its designee over the lots in PA 19 and PA 20 for scenic preservation purposes In a manner meeting the approval of the Manager, Harbo. rs Beaches and Parks, Program Management and Coordination Section. Maintenance, upkeep and liability for said easement area shall remain the responsibility of the subdivider or his assigns and successors (i.e., homeowner's association) or current underlying owner(s) of said easement area, and shall not be included in said dedication offer. The subdivider shall not grant any easement ex- cept for underground public facilities or irrigation over any property subject to said easement unless such easements are made subordI- nate to said easement offer in a manner meeting the approval of the Manager, Harbors Beaches and Parks, Program Management and Coordination Section. Limitations and restrictions for said ease- ment shall be recorded by separate document, concurrent with the recordation of subject map in a manner meeting the approval of the Manager, Harbors Beaches and Parks, Program Management and Coordination Section, The Phase III project continues the ICPC compliance with the Local Park Code requirements (refer to discussion in Section 4,1, Land Use). STANDARD CONDA71ONS SC 11.1 A. Prior to the recordation of an applicable final tract/parcel map, the subdivider shall dedicate an easement over PAs 121), 19 and 20 for scenic preservation purposes to the County of Orange in a form approved by the Manager - harbors, Beaches and Parks (HB&P) Program Planning. The subdivider shall not grant any other easement [excluding utility easements] over the private park easement which is inconsistent with the site for local park uses, unless that easement is made subordinate to said easement in a manner meeting the approval of the Manager, Harbors Beaches and Parks Division (HP4). B and C. Not Applicable 9/15i97*1ACCB63WUnINE.WPt)» r 63 t LSAA wdates, 1= I 11 n 11 SC 11-2 A. Not Applicable B. Prior to recordation of any [adjacent or applicable] map, the subdi- vider shall survey and monument all lots dedicated for regional open space purposes, and stake the property line of the dedication area(s) with durable, long-lasting, high visibility markets at all angle points and line of sight obstructions to the satisfaction of the Man- ager, HB&P Coastal Facilities/Open Space/rrails Operations (HP7). 4.12 ENERGY (CHECKLIST: VIIL ENERGYAND MINERAL RESOURCES, a AND b, NO IMPACT) EIR No. 544A Impacts Previously Identi, Jed None identified. Project Impacts Compared to Impacts Described in EIR No. 544A The refinements to the project do not change any of the analysis or conclusions in EIR No. 544A. EIR No. 544A provides adequate documentation for the project refinements as currently proposed. Project Design Features/Standard Conditions/Mitigation Measures - MCDP and PA 2C CDPs Project Design Features PDF 12-1 Southern California Edison will utilize the 66 kilovolt (kV) transmis- sion line south of the project to supply power, and the existing and proposed 12 kV distribution facilities in Ridge Park and Vista Ridge Roads. The utility plan check approval process will verify connection of proposed development areas to the existing and planned transmis- sion line and distribution lines. Standard Conditions SC 12-1 Prior to the issuance of building permits, the project proponent shall demonstrate to the Manager, Development Services that all buildings will comply with the Energy Conservation Standards set forth in Title 24 of the California Code of Regulations. 9/15/97« I.\CCB638\OUTLB4E.WPD» «, II IMAuo"#4Ine. 4.13 PUBLIC HEALTH AND SAPBTY (CRUCKUdST.- LIC HAZARDS, a - e, NO IMPACT BMUAFD EIR NO. 544A) EIR No. 544A Impacts Previously Identffl%d Impact 13.1- Fire Hazards The project site is located in a high fire hazard area. Fuel modification zones and incorporated into the project design. Project Impacts Compared to Impacts Described in EIR No. 544A The refinements to the project do not change any of the analysis or conclusions In EIR No. 544A. EIR No. 544A provides adequate documentation for the project refinements as currently proposed. Project Design Features/Standard Conditions/Mitigation Measures - MCDP and PA 2C CDPs Project Design Features PDF 13-1 The project plans specify the establishment of fuel modification zones bordering Planning Areas 2C, 6-1, 12D, 14, 15, 19, and 20 in order to buffer the project area from the high fire danger in open space areas surrounding,the project. The fuel modification program has been developed in coordination with the Orange County Fire - Autbority. The final fuel modification program shall be approved by the Chief of the Orange County FireAutborfty prior to the recorda- tion of applicable final tract/parcel maps. Standard Conditions SC 13.1 Prior to the issuance of any building permits for combustible con- struction, evidence that a water supply for &e protection is avail- able shall be submitted to and approved by the Fire Chief. Fire hydrants shall be in place and operational to meet required fire flow prior to commencing construction with combustible materials. SC 13.2 Prior to the recordation of a final tract/parcel map, a fire protection access easement shall he approved by the fire Chief and dedicated to the County of Orange. The CC&Rs shall contain provisions pro- hibiting obstructions within the fire protection access easement and also requiring Fire Chief approval for any modifications such as speed bumps, control gates, or changes in parking plan within said easement. SC 13-3 Prior to the issuance of any building permits, a construction phasing plan shall be submitted to and approved by the Fire ChieE The put. 9/15,97«1ACC86380UTUN9.VVPD» 65 MAA=dates, Inc. I I'D FI F F Imo, H 1 I II II pose of this review is to evaluate the adequacy of emergency vehicle access for the number of dwelling units served. SC 13-4 Prior to the recordation of a final tract/parcel map, a note shall be placed on the map meeting the approval of the Fire Chief that the property is in a very high fire hazard due to wildland exposure (SC FP16). SC 13-5 Prior to the issuance of any grading permits, a fuel modification plan.and program shall be submitted and approved by the Fire Chief in consultation with the Manager, Environmental and Project Plan- ning Services. The plan shall indicate the proposed means of achieving an acceptable level of risk to structures by vegetation. The method (mechanical or hand labor) for removal of flammable vegetation and the planting of drought tolerant fire resistant plants from an approved non-invasive plant palette, which includes native vegetation, shall be included. The approved fuel modification plan shall be installed prior to the issuance of building permits, under the supervision of the Fire Chief, and completed prior to the issu- ance of any use and occupancy permits. The CC&Rs shall contain provisions for maintaining the fuel modification zones, including the removal of all dead and dying vegetation and the inspection and correction of any deficiencies in the irrigation system three times a year (SC FP17). Mitigation Measures Mitigation Measure 13-1 Prior to the recordation of an applicable final tract map for lots that abut off -site fuel modification zones, the subdivider shall dedicate an easement to an appli- cable property owners association for fuel modification purposes, in a manner meeting the approval of the Manager, Harbors, Beaches and Parks/Program Management. 4.14 PUBLIC SERVICES AND UTILITIES (CHECKLIST. XI. PUBLIC SERVICES, a-3, XII. UTTLWES AND SERVICE SYSTEMS, ag, NO IMPACT BEYOND EIR NO. 544A) MR No. 544A Impacts Previously Identified Impact 14.1: Adequate Provision of Emergency Services These services will require additional personnel. Development Agreement (DA) 87-16 requires the construction of Fire Station No. 52 to serve the fire service needs of the Irvine Coast area. Note: the fire station has been completed. 9/1597«<1ACCB638\OUn1NE.WPD» 66 =Awdetsj; Inc ' Impact 14.2. Use and Supply of Domestic Water Service to the project will be supplied by domestic water lines to be located in NCD, Ridge Park Road and Vista Ridge Road. The source of water for domestic and fire prevention service for the project will be facilities constructed as part of the overall Irvine Coast project, and as identified in previous subarea Master Plans (SAMP). This reservoir is sized to provide a fireIlow of 5,000 gallons per minute for a duration of four hours. Although adequate water wiU be supplied to the project, the State Department of Water Resources recommends that water conservation measures be incorporated into the project. In accordance with the MCDP, the project will incorporate the use of reclaimed water for irrigation of landscaping. Impact 14.3t Adequacy of Wastewater Collection System Based on Orange County Sanitation District (OCSD) generation factors, the project is estimated to generate 29,250 gallons of sewage per day or approxi- mately 10.68 million gallons per year. It should be noted that the OCSD has Indicated that the proposed project has been anticipated in its future service parameters. The California Regional Water Quality Control Board and the United States Environmental Protection Agency place discharge limits on biochemical oxygen demand (BOD) and suspended solids (SS). The Huntington Beach and Foun- tain ValleyfacilIdes are near allowed limits. On -site measures to reduce sewage load strength will be implemented through domestic water conservation mea- sures as outlined in the mitigation section. Project Impacts Compared to Impacts Described in EIR No. 544A The refinements to the project do not change any of the analysis or conclusions in EIR No. 544A. BIR No. 544A provides adequate documentation for the project refinements as currently proposed. Project Design Features/Standard Conditions/Mitigation Measures - MCDP and PA 2C CDPs Project Design Features PDF 14-1 Prior to the issuance of building permits, the project proponent shall provide evidence for verification by the County of Orange Fire Autbority and Sheriff -Coroner's Departments, that the project incorporates security measures into building plans. Security mea- sures may Include the following: security gates, lighting, deadbolt locks, alarms, etc. 9/15t9MACC13638\0UT1JN9.WPD» 67 !SA Amdates, Inc. ' PDF 14-2 Prior to issuance of building permits for any public uses, the project proponent shall provide evidence for verification by the Manager, PDS/Subdivision and Grading Services, that the project provides, where applicable, water conservation measures described in the Memorandum of Understanding Regarding Urban Water Conserva- tion in California as recommended by the Orange County Board of Supervisors and adopted by the Municipal Water District of Orange County. ' Standard Conditions ' SC 14-1 Prior to the recordation of an applicable final tract/parcel map and issuance of any building permits, an agreement shall be entered into and financial security posted guaranteeing landscape improvements ' and the maintenance thereof based on a detailed landscape plan showing landscape design and irrigation with a cost estimate for the landscape improvements. The plan and cost estimates shall be reviewed and approved by the Manager, PDS/Subdivision and Grad- ing Services, in consultation with the Manager, PFR/Harbors Beach- es and Parks, Program Management and Coordination Section. Said plan shall take into account any previously approved landscape ' plans and County Standard Plans for landscape areas, adopted plant palette guides, applicable scenic and specific plan requirements, water conservation measures contained in Board Resolution 90-487 ' (Water Conservation Measures), and Board Resolution 90-1341 (Water Conservation Implementation Plan) (SC I.AI.I(A)). Mitigation Measures Mitigation Measure 14-1a. Emergency Services ' Prior to the recordation of a final tract map, water improvement plans and sewer improvement plans shall be submitted by the developer and approved by ' the Fire Chief in consultation with the Manager, HCA/Environmental Health Division, for adequate fire protection and financial security posted for the installation. Mitigation Measure 14-1 b. Emergency Services ' Prior to the recordation of any final tract map, water improvement plans shall be submitted to and approved by the Fire Chief for adequate fire protection and financial security posted for installation. The adequacy and reliability of the water system design, location of valves, and the distribution of fire hydrants will be evaluated in accordance with Insurance Services Office suggested stan- dards contained in the "Grading Schedule" for Municipal Fire Protection. II II 9/15i97HI.%CCB638\OUTLINE.WPD» II LSAAtWdateRGla , Mitigation Measure 14.1c: Emergency Services Prior to the recordation of any final tract map, construction details for any controlled entry access shall be approved by the Fire Chief. These details shall include width, dear height, and means of emergency vehicle override. Mitigation Measure 14-2a: Water Prior to the recordation of any final tract map, plans showing the location of all proposed reclaimed water lines, if required by the Irvine Ranch Water District, shall be submitted to and approved by the Manager, EMA/Environmental Health. Mitigation Measure 14 2b: Water Prior to the recordation of any final tract map, the subdivider shall provide proof of approval by the applicable water/wastewater district to the Director, Planning andDevelopment Services Department, and shall obtain approval by the Subdivision Committee of a master plan of water and wastewater works. The master plan shall include all on -site and off -site facilities necessary to serve the short and long-term needs of the project, and a general financing program for those facilities which demonstrates sufficient entitlements and wastewater collection and treatment capacity to serve the project. Mitigation Measure 14-2c: Water Prior to issuance of building permits for any public uses, the project proponent shall provide evidence for verification by the Manager, PDS/Subdivision and Grading Services, that the project provides, where applicable, Department of Water Resources recommended water conservation measures: 1 A. Low -flush toilets and urinals (Health and Safety Code Section 17921.3); ' B. Maximum flow rate of all new showerheads, lavatory faucets, and sink faucets (Title 20, California Code of Regulations Section ' 1604[f]); C. Appliances certified by manufacturer to comply with regulations es- , tabilshed by applicable efficiency standards (Title 20, California Code of Regulations Section 1606[b]); D. Public lavatories equipped with self -closing faucets that limit the ' flow of hot water; E. Conservation reminders posted in rooms and restrooms; and ' F. Thermostatically controlled mixing valve for bath/shower. 9n5N7«1Xcs638wtmwewrD» 69 ' L5AAmdate*,1= Mitigation Measure 14.3a. Wastewater Prior to the recordation of each final map, sewer lines, connections, and stru- ctures shall be of the type, and shown on the plans in the location as specified in the "Guidelines Requiring Separation Between Water Mains and Sanitary Sewers, Orange County Health Department 1980," in a manner meeting the approval of the Manager, Environmental Health, Health Care Agency (HCA) and in compliance with LCP policies I-4-F-6 and I-4-13-13. V. FINDINGS A. The proposed project will not significantly jeopardize any fish or wildlife population or habitat, nor will it affect any period of Califor- nia history or prehistory beyond those addressed in FEIR No. 544A. B. The project has been redesigned to have as little impact as possible to the surrounding environment, thus achieving both short-term and long-term goals. C. EIR Nos. 460, 485, 486, and 544A with Addendum PA 970076- 970081 satisfied the requirements of CEQA for this project. The revision to Planning/Development Area PA 2C (NCPC) of the Phase III project's specific impacts is considered to be individually limited, and not cumulatively considerable. The project is not expected to result in any impacts beyond those previously analyzed in FEIR No. 544A Addendum PA 970076-970081 has been prepared to address minor technical revisions to the previously approved Phase III pro- ject. The Statutory Findings found in EIR No. 486 (prepared for the Irvine Coast Planned Community Development Agreement) stated that no overriding considerations have been specifically identified for this project; therefore, the overriding considerations set forth in FEIR Nos. 485 and 544A are hereby incorporated by reference. The Board of Supervisors found that the benefits of the project will outweigh the adverse environmental effect found to be unavoidable. Based on this finding, the Board of Supervisors found that the un- avoidable adverse environment effect would be acceptable and, therefore, approved the project. D. The project, as proposed, will not have any unmitigated adverse affects or impacts on humans or otherwise. The project will not have impacts on fish or wildlife habitats or communities, rare or endangered species, or any periods of California history. Pursuant to Section 711.4 of the Fish and Game Code, the applicant shall comply with the requirements of AB 3158 prior to the filing of the Notice of Determination for the project in a manner meeting the approval of the Manager of the Environmental Planning Division. 9/15/97«I:\CCB638\OUT7.INE.WPD» 70 O c, /11�.vv M IU PLANNING AND DEVELOPMENT SERVICES 9LlFOR� APPLICATION Application #: PA990212 Date Filed: 12/30/1999 Application Type: COASTAL DEVELOPMENT TO PC Application Name: AREA 2C-1B NEWPORT COAST Parcel(s): 15394 OTM 05/22/97 IRVCPLNG 05/29/97 Address(es): Location: PA 2C-1B NEWPORT COAST; TTM15394 Project Area: 21.50 ACRE Public Project: N Initial Study Required: Y IS Charge #: P53921 IS Summary #: 082 Application Charge #: P55582 Summary #: 404' Owner Information Applicant/Agent Information Name: IRVINE COMMUNITY DEVELOP. COI Name: FORMA Address: 550 NEWPORT CENTER DR. I Address: 3100 BRISTOL STREET STE:100 NEWPORT BEACH CA I COSTA MESA CA ATTN: NORM WITT I ATTN: CRAIG HOFFMAN Zip: 92660 I Zip: 92626 Phone: 714 720-2129 I Phone: 714 540-4700 Zoning: PC CAA: 47 LUE: 1B1A Previous Appry / PA 2C APN: 47804128 Census Tract: 626.17 Supv District: 5 Coastl Zone: YES Comm Profile: 1.4/5. PC/SP: NEWPORT COAST PA970077; PA970076; PA940149; MCDP 5TH AMEND.; EIR 511r4 PA960155 1 r 7 Project Proposal: COASTAL DEVELOPMENT PERMIT FOR CONSTRUCTION OF 41 r UJ DET SINGLE FAMILY RESIDENTIAL UNITS IN TTM 15394. J Q DEVELOPMENT AREA 2C-1B OF THE NEWPORT COAST PC. UJ DEVELOPMENT MODIFICATIONS FROM THOSE PREVIOUSLY APPROVED IN PA974077. DEPOSIT SUMMARY Total Deposit: 4,087.00 "" L�Lw t Payments: 4,087.00 Q Balance Due: .00 0 Z m LU � �7 6.7 CERTIFICATION I acknowledege that: 1. There are no assurances at any time, implicitly or otherwise, regarding final staff recommendations to the decision -making body about this application. 2. Major changes of the proposed project may require a new application and payment of new fees. 3. The County charges an hourly rate for processing applications based upon actual staff time expended. Money deposited with this application is a deposit only, as described in the processing fee deposit section of the filing instructions. 4. Board of Supervisors policy contained in Resolution 79-1242 states that except for cases in which an important County policy or other extraordinary interest is determined to be present, the County will not provide an active legal defense to lawsuits arising out of the issuance of permits or other entitlements for the use of development of real property or zoning or General Plan Amendments. I hereby certify that to the best of my knowledge the information I have presented in this form and accompanying materials is true and correct. I also understand that additional data and information may be required �. prior to final action on this application. I have read and understand the contentswcbntained in the above statements III through (41, C. " Lq ftr rJ tin PYdVerty Owner Date Date 4�� 4 op a '1�n '�li��.lir V " County of Orange k)lroev FILE: PA99-0212 DATE: February 9, 2000 TO: File/Record/Applicant FROM: Thomas B. Mathews, Director, Planning and Development Services Department SUBJECT: Planning Application PA99-0212 for Site Development Permit APPLICANT: Taylor Woodrow Homes, Inc I. NATURE OF PROJECT: Revisions to a residential project in Development Area (DA) 2C-lb of the Newport Coast Planned Community to reflect a revised product type. The project was originally approved by the Planning Commission under Planning Application PA 97-0077, a Coastal Development Permit to permit the development of 41 single-family homes. Subsequent to approval of PA 97-0077, 4 of the approved 41 units were constructed as part of the Perazul I project in accordance with PA 96-0155. The revised project maintains the same number of lots and proposes the following revisions to the above referenced approved CDP: • Revisions to the approved Site Plan to reflect new architectural products consistent with three product types constructed by the same builder in adjacent Development Area 2C-la. The two- story residential units range in size from 3,800 square feet to 4,400 square feet. The three different floor plans provide options for up to 4 bedrooms and garage parking for up to three - cars; • Deletion of the proposed model/sales complex (project will use the existing model/sale complex in DA 2C-la); and Revisions to the approved Grading Plan to modify internal lot grades supporting increased building pads averaging 9,000-square feet and the addition of 17 side -yard retaining walls varying in height from 1.5 to 5-feet. The Master Coastal Development Permit of the Newport Coast Planned Community/Local Coastal Program permits modifications to a previously approved Coastal Development Permit by Site Development Permit. Consistent with the original Coastal Development Permit, this Site Development Permit is in conjunction with Vesting Tentative Tract Map 15394. (Final Map 15394 was recorded on December 22, 1998.) The Conditions of Approval and the Findings for this proposal are carried forward from Planning Commission Resolution No. 97-07 which was for development of Development Area 2C-lb approved under Planning Application PA 97-0077. PA99-0212 -- DA2C-lb, NCPC Page 2 Planning Area 2C is located east -of Newport Coast Drive and north of Vista Ridge Road. Access to the site is provided by Ocean Heights Drive from Vista Ridge and Ridge Park Roads. H. REFERENCE: (Authority for Administrative action is given by what ordinance, regulation, etc.) Orange County Zoning Code sections and 7-9-150 "Discretionary Permits and Procedures", Newport Coast Planned Community/Local Coastal Program, and the Newport Coast Master Coastal Development Permit. III. ENVIRONMENTAL DOCUMENTATION: The proposed project is covered by Final EIR 544A previously certified on June 27, 1995. Prior to project approval, this EIR was found adequate to satisfy the requirements of CEQA by the Director. Attachment A contains the required CEQA Finding. IV. CERTIFICATION: I hereby certify that the subject proposal has been Conditionally Approved as noted below. I� WVM FOLDER: Newport Coast ATTACHMENTS: Thomas B. Mathews, Director Planning and Development Services Department Planning Section Attachments A-1 -- Findings and A-2 -- Conditions of Approval from Planning Commission Resolution No. 97-07 ADDED CONDITION OF APPROVAL: The "plan type" shown on each lot on the approved site plan may be substituted with a different plan provided the revised plan conforms to the applicable site development standard. APPEAL PROCEDURE Any interested person may appeal the decision of the Director on this permit to the Orange County Planning Commission within 15 calendar days of the decision upon submittal of required documents and a filing fee of $760.00 filed at the Development Processing Center, 300 N. Flower St., Santa Ana. ATTACHMENT A-1 -- FINDINGS PLANNING COMMISSION RESOLUTION NO. 97-07 PLANNING APPLICATION 970077 FOR NEWPORT COAST DEVELOPMENT AREA 2C-lb CDP That the Planning Commission makes the following Findings with respect to Planning Application 970077 for a Coastal Development Permit: 1. County Requirements are being met as follows: a. General Plan. The use or project proposed is consistent with the General Plan. b. Zoning_ Code. The use, activity or improvement proposed by the application is consistent with the provisions of the Orange County Zoning Code. c. CEOA. The approval of the permit application is in compliance with the requirements of the California Environmental Quality Act as demonstrated in Resolution No. 95-12. d. Compatibility. The location, size, design and operating characteristics of the proposed use will not create significant noise, traffic or other conditions or situations that may be objectionable, detrimental or incompatible with other permitted uses in the vicinity. e. General Welfare. The application will not result in conditions or circumstances contrary to the public health and safety and the general welfare. f. Development Fees for Provision of Public Facilities. The requirements of Orange County Code Section 7-9-711 have been met. g. Mitigation Measure Monitoring. The monitoring requirements of Public Resources Code Section 21081.6 have been met in that a Mitigation Measure Monitoring and Reporting Plan, has been prepared. 970077FN.US 9197 ATTACHMENT A-1 -- FINDINGS PA 970077 / DA 2C-lb Page 2 h. Local Coastal Program. The project proposed by the application conforms with the certified Second Amendment to the Newport Coast Local Coastal Program in a manner as approved by the Orange County Planning Commission in Resolution No. 96-04 dated May 21, 1996 and by the Orange County Board of Supervisors in Resolution No. 96-861 dated December 3, 1996 and in Ordinance No. 96-3974 dated December 3, 1996. i. master Coastal Development Permit. The original Master Coastal Development Permit (MCDP) for Newport Coast (MCDP 88-11P) and Vesting Tentative Tract Map 13337 established master utilities and backbone infrastructure, allowing large-scale land subdivision for the overall Newport Coast community. The Master Coastal Development Permit — Fifth Amendment (PA 970076) and Vesting Tentative Tract Map No. 15393 established the boundary lines between Planning Areas ("PA") 2C and 12A, 2C and 12D, 2C and 6-1, updated the Planned Community Development Map and Planned Community Statistical Table contained within the Newport Coast Master Coastal Development, expanded the Master CDP boundary to include a portion of PA 6; and modified the alignment of Vista Ridge Road. j. Newport Coast Development Agreement. The project proposed by the application conforms with the Newport Coast Development Agreement (DA 87-16) approved by the Board of Supervisors on April 20, 1988 (Resolution No. 96-537) and the Development Agreement First Amendment (DA 96-03), approved on December 3, 1996 (Resolution No. 96-861), and as demonstrated in the following findings. 2. Based on the information and analysis contained in Initial Study/Addendum PA 970076 and EIR 544A, the project will have no new significant adverse to environmental effects beyond those identified, mitigated, or for which overriding considerations were adopted in connection with previous environmental documentation prepared for the Newport Coast LCP — Second Amendment, the Irvine Coast Master Coastal Development Permit, and the Irvine (Newport) Coast Development Agreement. The findings approving the LCP — Second Amendment and contained in Board of Supervisors' Resolution No. 87-1327 and the findings certifying EIRs 485 486, 511 and 528 contained in Resolution Nos. 88-24, 88-45, 89-38, 92-07 are hereby incorporated by reference. 970077M.US 9/97 ATTACHMENT A-1 -- FINDINGS PA 970077 / DA 2C-lb Page 3 3. All development projects within the Newport Coast Planned Community are subject to approval of a Coastal Development Permit in compliance with Chapter 10 of the Newport Coast LCP and the County's "Coastal Development" District Regulations, Orange County Zoning Code Section 7-9-118. 4. This Coastal Development Permit is for the development proposal in The Newport Coast Planned Community Medium Density Residential Planning Area 2C, Development Area 2C-lb. 5. Development within Newport Coast Development Area 2C-lb, related to residential development and providing fuel modification will modify category "D" ESHAs. No other category of ESHA will be affected, and the development within Development Area 2C-lb complies with LCP ESHA policies in that development is permitted to modify or eliminate vegetation and drainage courses in category "D" ESHAs, which have little or no riparian habitat value; and all development impacts will be mitigated by the Open Space Dedication and Riparian Habitat Creation Programs (LCP I-2-A-2a [page I-2.4]). 6. Development within Development Area 2C-lb complies with LCP Visual Quality polices which protect views of major landforms in a comprehensive manner as depicted in LCP Exhibit C. DA 2C-lb is not depicted on Exhibit C as containing visually significant lands. 7. Development within Development Area 2C-lb complies with LCP Appendix Item 6, "Visual Analysis; The Newport Coast Proposed Land Use Element" in that residential development has been pulled back from Newport Coast Drive, Ridge Park Road and Vista Ridge Road, and clustered on the ridgetops. 8. Development within Development Areas 2C-lb is consistent with LCP Special Use Open Space policies in that an offer of dedication for Los Trancos Canyon Planning Area 12A has been made to the County of Orange in a form approved by the Manager, Public Facilities and Resources Department/HBP-Program Management (LCP I- 3-A-2b [page 1-3.5]). 9. Development Area 2C-lb is proposed for development as a single-family residential housing project, with a total of 41 dwelling units on approximately 21.5 acres with an overall density of 1.9 dwelling units per acre. 970077M.MS 9/97 ATTACHMENT A-1 -- FINDINGS PA 970077 / DA 2C-lb Page 4 10. In terms of adopted procedure, this CDP sets forth certain elements of planning approval and is processed as a large-scale plan that implements the Newport Coast LCP Chapter II-10, Discretionary Permits and Procedures; Section II-10-A-2 and -3, Coastal Development Permits and Applications. 11. The portion of the CDP encompassing the proposed residential housing project within Development Area 2C-lb is consistent with the applicable LCP Site Development Standard provisions (LCP II-4-C-6)based on the following: a. Under the LCP, the DA 2C-lb site is designated for Medium Density Residential development, which permits a maximum density of 6.5 dwelling units per gross acre. b. No building site area will be less than 2,500 square feet for detached/attached single-family, or non- residential development. c. Regardless of the slope of the land, the gross land area per dwelling unit is above the 1,000 square feet minimum. d. Building height will be consistent with the maximum 35 feet standard as defined in LCP Chapter II-14 (page II-4.17). e. Two or more car garages will be provided for all units. f. Street lights will be designed and located so that rays are aimed at the site. g. Areas of disturbed soil will be hydro -seeded to control erosion. h. Manufactured slopes along development edges will incorporate contour -grading techniques. i. The principle project collector road will maintain 36 feet of paving with a 48-inch sidewalk on one side of the street. Single -loaded cul-de-sacs maintain 28 feet of pavement with 48-inch sidewalks on one side of the street. Lighting along the streets will be limited to intersections and cul-de-sacs. 970077FN.RES 9/97 ATTACHMENT A-1 -- FINDINGS PA 970077 / DA 2C-1b Page 5 12. The proposed residential housing project is consistent with the LCP Archeological policies in that: a. The MCDP 89-26P conditions of approval require that a County -certified archeologist complete a literature and records search and a field survey. The search and survey for DA 2C-lb has been completed. b. The MCDP 89-26P conditions of approval require that a County -certified archeologist conduct subsurface tests prior to grading and determine site disposition. Subsurface excavations have been complete and analyzed, and reports are being prepared. Resource surveillance will be provided during grading operations. 13. The proposed residential housing project's improvements are consistent with the LCP Paleontological policies in that: a. The MCDP 89-26P conditions of approval require that a County -certified paleontologist complete a literature and records search and a field survey. This search and survey had been completed. No paleontological resources were identified. b. The MCDP 89-26P conditions of approval required that a County -certified paleontologist conduct pregrading salvage and resource surveillance if necessary. Since no resources were identified, no pregrading activities are required. During grading, resource surveillance will be conducted. 14. The proposed project complies with the LCP Erosion, Sediment, Grading and Runoff policies in that the project will be developed in accordance with the Refined Master Drainage and Runoff Management Plan (MDRMP) prepared by Rivertech Inc. Storm runoff from Residential Development Area 2C-lb will be captured in a series of catch basins located at the end of each cul-de-sac and routed to detention basins in DA 2C-la via easements at the lowest perimeter. Storm flows will be detained in two detention basins in DA 2C-la. The MDRMP was approved by the County in connection with approval of the Master CDP 88-11P. The MDRMP addresses, in a comprehensive manner, the'policies contained in Sections I-3-E, -I, -J, -K, and -L of the LCP. It provides data on existing water quality and quantity, and an assessment of project impacts on water resources, existing and proposed riparian habitats, and off -shore 970077M.RES 9/97 ATTACHMENT A-1 -- FINDINGS PA 970077 / DA 2C-lb Page G marine life. Mitigation measures, long-term maintenance, and a monitoring program are described. This report demonstrates compliance with the applicable LCP policies, and its findings demonstrating such compliance are incorporated herein by reference. Specifically: a. Plans for sedimentation and erosion control will respond to requirements for reseeding and planting disturbed soil. (LCP I-3-I-2 [page I-3.29]). b. Erosion control devices will be installed. Additional preventive erosion control measures described in the Orange County Grading Manual and the City of Irvine's Sedimentation and Erosion Control Manual will be integrated into the site plan, as appropriate. (LCP I-3-I-3, -4, and -5 [page I-3.30]). c. The MDRMP recommends that detention basins be converted to desilting basins during construction. During the design stage and prior to the initial grading operations, configurations and structural details of these desilting basins will be prepared as part of the submitted design. The erosion control design plans for each development cluster will identify additional desilting basins in accordance with Orange County's Grading Manual. (LCP I-3-J-1 [page I-3.30]). d. Vegetative cover and temporary mechanical means of controlling sedimentation will be established and conducted as described in the MDRMP and in accordance with Orange County's Grading Manual. (LCP I-3-J-2 and -3 [pages I-3.30 and I-3.31]). e. In order to maintain channel stability, Rivertech has identified a number of locations where detention basins may be constructed. Chapter VII of the MDRMP includes a detailed study of the mechanics of Buck Gully downstream from Newport Coast Drive. That chapter identifies and describes size and configuration of the facility required to maintain the stability of the downstream reach of Buck Gully. The sediment yield to the beach is expected to be less than existing and will approximate natural conditions. (LCP I-3-J-5 [page I-3.31]). 970077FN.MS 9/97 ATTACHMENT PA 970077 Page 7 N A-1 -- FINDINGS / DA 2C-lb 9• Except during the construction, Rivertech foresees no long term need for sediment catch basins. (LCP I-3-J- 5 [page I-3.31]). Development Area 2C-lb drains into DA 2C-la as approved under Master CDP 89-26P. h. Hydrologic computations performed by The Keith Companies revealed that peak discharges from the study area at Pacific Coast Highway after development would not exceed the existing peak discharges by more than 10 percent in the major canyons. The Keith Companies utilized a number of swales in the golf course and Lower Wishbone as detention basins to achieve further reduction to the less than existing within Pelican Hill and Wishbone Hill watersheds. Subsequent to The Keith Company's hydrology computations, Rivertech has identified a number of additional potential locations for detention basins. These detention basins are proposed to achieve channel stability. (LCP I-3-K-1 [page I-3.31]). i. No retention basins will be required on -site. (LCP I- 3-K-2, -3 and -4 [page I-3.32]). j. Impact type energy dissipators with riprap are proposed to reduce the flow velocity and shear stress to non -eroding values at the outlet of storm drains. (LCP I-3-K-5 [page I-3.321). k. Based on analysis performed by The Keith Companies, all structures draining into the study area have adequate capacity to convey the design discharges. Runoff from the proposed development will be released to the natural water courses. The exact terminus location of each storm drain will be determined during the design stage, based on geotechnical, hydraulics, and stream mechanics analyses. (LCP I-3-K-6 [page I- 3.32]). 1. Soils and engineering studies have been submitted to the County (LCP I-3-K-6 [page I-3.321). 970071FN.RES 9/97 ATTACHMENT A-1 -- FINDINGS PA 970077 / DA 2C-lb Page 8 m. The MDRMP addresses grading from October 15 through April 15, and identifies those measures necessary for adequate erosion control. (LCP I-3-L-2 [page I- 3.33]). n. Project plans call for appropriate permanent and temporary stabilization techniques as identified in the soil and geotechnical reports for DA 2C-lb. (LCP I-3-L-3, -5, and -6 [pages I-3.33 and I-3.34]). o. Stockpile locations for topsoil will be identified in the final landscape plans. p. The grading for DA 2C-lb will be terraced to conform to the general topography. Terraces will have variable heights to avoid uniformity. Through the use of a meandering interior roadway, a stair -stepped appearance will be avoided. Perimeter edges will be treated with daylight cuts and fills following the existing topography where possible. Slopes will be varied from 2:1 and flatter, and contoured into the existing topography. Slopes will be terraced along the project interface with Vista Ridge Road, integrating the slopes created by roadway construction with grading for residential projects. Thus, the graded slopes will appear natural, blending into the existing environment and mitigating the potential visual effects of grading. (LCP I-3-L-8 [page I- 3.34]). 15. The proposed project complies with the LCP Circulation policies (LCP I-4-E [pages I-4.19 through I-4.34]. a. Roads are designed to meet County safety standards; b. Roads will be landscaped; c. All internal roadways are curvilinear and all slopes contoured into the existing topography; d. Residential areas are served by private streets an/or driveways; e. All modifications to existing roadway standards have been carefully considered and justified by safety and circulation conditions. 970077MUS 9/97 ATTACHMENT A-1 -- FINDINGS PA 970077 / DA 2C-lb Page 9 f. Roadway grading has been blended into existing topography by contour grading, where feasible. Retaining walls and other structures have been used to minimize grading impacts. g. Traffic Management Program measures have been incorporated into the project where appropriate. h. Road design and sections for entry roads, collector roads, residential streets, and private driveways have been designed to be consistent with LCP Exhibit P, Residential Entry Road & Residential Streets - Typical Sections. i. All roadway improvements established in LCP Exhibit Q, Newport Coast Arterial Roadway Phasing Summary, will be installed on or before the triggering mechanisms called for in Exhibit Q. 16. The proposed project complies with the LCP Public Works/Infrastructure policies in that it includes necessary sewer improvements and drainage improvements. All public works/infrastructure is provided in the major public roadways approved under Master CDP 89-26P and the Pelican Hill Road CDP (for Newport Coast Drive ), and the roadways proposed in this project. (LCP I-4-F-1 through -7 [pages I-4.19 through I-4.34]) 17. The proposed project complies with the LCP ESHA policies in that development in DA 2C-1b is permitted to modify or eliminate vegetation and drainage courses within category "D" ESHAs. The Newport Coast Open Space Dedication Program and Riparian Habitat Creation mitigate habitat lost as a result of development. (I-3-F [pages I-3.24 and I-3.25]) 18. The LCP Development/Open Space Edge policies apply to the Fuel Modification Zone along the northwestern and southeastern limits of PA 2C, including DA 2C-lb, in that: a. The use of trees will help screen the edge of development from off -site views. b. The fuel modification program utilized at the northern and western 'edge, as approved in Master CD 89-26P, will consist of the following zones: Zone A provides a 20-foot setback as defensible space immediately adjacent to private yards and residences. The down 970077M.MS 9/97 ATTACHMENT A-1 -- FINDINGS PA 970077 / DA 2C-lb Page 10 slope in this zone is planted and irrigated. Zone B is 50 feet of permanently irrigated landscaping to be maintained by the homeowners association. Zone B may include medium height, open tree groups near common property lines. Drought -tolerant and fire-resistant plant materials are required. Zone C is a 50-foot-wide thinning zone (with plants thinned to 50 percent of existing density) that will be maintained by the master community association. Natural vegetation is thinned to reduce the fuel load, and all dead and dying vegetation, debris and trimmings shall be removed from the site. Zone D is a 50-foot-wide thinning zone to 30 percent, immediately adjacent to native open space. The depth of fuel modification will meander depending upon topography. Conceptual Fuel Modification Plans for the project site have been approved by the County Fire Authority. Emergency access points to the fuel modification edges have been identified and annual maintenance will be a responsibility of the Homeowners Association. (LCP I-3-M-4 through -10 [pages I-3.36 through I-3.401) 19. Pursuant to Section 711.4 of the California Fish and Game Code, there is no evidence that this project will have any potential for adverse effects on wildlife resources. 20. The proposed project maintains the ability to promote an effective subregional natural Communities Conservation Planning (NCCP) Program and will not have a significant unmitigated impact upon Coastal Sage Scrub habitat. 21. Residential uses approved as part of the LCP were found consistent with the requirement of Coastal Act Section 30250 in that development within the Newport Coast has been clustered near existing residential areas and existing employment centers. Clustering of residential units preserves open space, reduces grading impacts, and enhances the compatibility of private development with public open space. By clustering residential uses on the ridges away from sensitive habitat areas in the canyon bottoms the LCP complies with Coastal Act Section 30240. Approval of this CDP carries out these policies. 970077M.069 9/97 ATTACHMENT A-1 -- FINDINGS PA 970077 / DA 2C-lb Page 11 22. In accordance with Section 30007.5 of the Coastal Act, the LCP Open Space Dedication Program protects certain specified coastal resources and offsets adverse environmental impacts in residential development and recreation areas which are otherwise not mitigated. Permanent protection and preservation of major canyon watersheds, visually significant ridgelines, stream courses, archeological and paleontological sites, riparian vegetation, coastal chaparral and wildlife habitat is provided by dedication to a public agency. Large-scale master planning and dedication programming for The Newport Coast enables the permanent protection of large, contiguous open space areas rather than the protection of smaller, discontinuous habitat areas that might result from a project -by -project site mitigation approach. A much greater degree of habitat and open space protection can be achieved by dedication programs that assemble large blocks of habitat area contiguous to Crystal Cove State Park than would be possible with project -by - project mitigation measures. The Newport Coast Dedication Program will result in approximately 7,234 acres devoted to open space and recreation use which includes 2,807 acres in Crystal Cove State Park, 2,666 acres in Wilderness Open Space, 1,161 acres in Special Use Open Space Dedications, and over 600 acres in the Golf Course and other non -dedicated recreation areas. 970007FN.AE9 9/97 ATTACHMENT A-2 -- CONDITIONS OF APPROVAL PLANNING COMMISSION RESOLUTION NO. 97-07 PLANNING APPLICATION 970077 FOR NEWPORT COAST DEVELOPMENT AREA 2C-lb CDP 1. LP NA NA BASIC This approval constitutes approval of the proposed project only to the extent that the project complies with the Orange County Zoning Code and any other applicable zoning regulations. Approval does not include any action or finding as to compliance of approval of the project regarding any other applicable ordinance, regulation or requirement. 2. LP NA NA BASIC This approval is valid for a period of 36 months from the date of final determination. If the use approved by this action is not established within such period of time, this approval shall be terminated and shall thereafter be null and void. 3. LP NA NA BASIC Except as otherwise provided herein, this permit is approved as a precise plan. After any application has been approved, if changes are proposed regarding the location or alteration of any use or structure, a changed plan may be submitted to the Director of Planning for approval. If the Director of Planning determines that the proposed change complies with the provisions and the spirit and intent of the approval action, and that the action would have been the same for the changed plan as for the approved plot plan, he may approve the changed plan without requiring a new public hearing. 4. LP NA NA BASIC Failure to abide by and faithfully comply with any and all conditions attached to this approving action shall constitute grounds for the revocation of said action by the Orange County Board of Supervisors. 5. LP NA NA BASIC Applicant shall defend at his/her sole expense any action brought against the County because of issuance of this permit or, in the alternative, the relinquishment of such permit. Applicant will reimburse the County for any court costs and attorney's fees which the County may be required by a court to pay as a result of such action. County may, at its sole discretion, participate in the defense of any such action, but such participation shall not relieve applicant of his obligations under this condition. 970077.COA 9/97 ATTACHMENT A-2 -- CONDITIONS OF APPROVAL PA 970077 / DA 2C-lb Page 2 6. LP LP NA SPECIAL All drainage and grading shall be consistent with the provisions of the Newport Coast Planned Community/Local Coastal Program — Second Amendment and the Master Coastal Development Permit. ARCHEO/PALEO 7. HP HP G ARCHEO SALVAGE Prior to issuance of a grading permit, the project applicant shall provide written evidence to the Manager, Subdivision and Grading that a County -certified archaeologist has been retained to conduct salvage excavation of the archaeological resources in the permit area. Excavated finds shall be offered to the County of Orange, or designee, on a first refusal basis. Applicant may retain said finds if written assurance is provided that they will be properly preserved in Orange County, unless said finds are of special significance, or a museum in Orange County indicates a desire to study and/or display them at this time, in which case items shall be donated to the County, or designee. A final report incorporating the results of the salvage operation and grading observation shall be submitted to and approved by the Manager, Coastal and Historical Programs, prior to the final certification of grading in the archaeological site areas. 8. HP HP G ARCHEO GRD OBS Prior to the issuance of a grading permit, the project applicant shall provide written evidence to the Manager, Subdivision and Grading, that a County -certified archaeologist has been retained, shall be present at the pregrading conference, shall establish procedures for archaeological resource surveillance, and shall establish, in cooperation with the project developer, procedures for temporarily halting or redirecting work to permit the sampling, identification, and evaluation of the artifacts as appropriate. If additional or unexpected archaeological features are discovered, the archaeologist shall report such findings to the project developer and to the Manager, Coastal and Historical Programs. If the archaeological resources are found to be significant, the archaeological observer shall determine appropriate actions, in cooperation with the project developer, for exploration and/or 'salvage. Prior to the issuance of a precise grading permit, the archaeologist shall submit a follow-up report to the Manager, Coastal and Historical Programs, which shall include the period of inspection, an analysis of any artifacts found and the present repository of the artifacts. Excavated finds shall be offered to the County 970077.COA 9/97 ATTACHMENT A-2 -- CONDITIONS OF APPROVAL PA 970077 / DA 2C-lb Page 3 of Orange, or designee, on a first refusal basis. Applicant may retain said finds if written assurance is provided that they will be properly preserved in Orange County, unless said finds are of special significance, or a museum in Orange County indicates a desire to study and/or display them at this time, in which case items shall be donated to the County, or designee. These actions, as well as final mitigation and disposition of the resources, shall be subject to the approval of the Manager, Coastal and Historical Programs. 9. HP HP G PALEO SURV Prior to the issuance of a grading permit, the project applicant shall provide written evidence to the Manager, Subdivision and Grading, that a County -certified paleontologist has been retained to observe grading activities and salvage and catalogue fossils as necessary. The paleontologist shall be present at the pregrading conference, shall establish procedures for paleontological resource surveillance, and shall establish, in cooperation with the project developer, procedures for temporarily halting or redirecting work to permit sampling, identification, and evaluation of the fossils. If major paleontological resources are discovered, which require long-term halting or redirecting of grading, the paleontologist shall report such findings to the project developer and to the Manager, Coastal and Historical Programs. The paleontologist shall determine appropriate actions, in cooperation with the project developer, which ensure proper exploration and/or salvage. Excavated finds shall be offered to the County of Orange, or its designee, on a first -refusal basis. Applicant may retain said finds if written assurance is provided that they will be properly preserved in Orange County, unless said finds are of special significance, or a museum in Orange County indicates a desire to study and/or display them at this time, in which case items shall be donated to the County, or designee. These actions, as well as final mitigation and disposition of the resources, shall be subject to approval by the Manager, Coastal and Historical Programs. Prior to the issuance of a precise grading permit, the paleontologist shall submit a follow-up report for approval by the Manager, Coastal and Historical Programs, which shall include the period of inspection, a catalogue and analysis of the fossils found, and present repository' of the fossils. Monthly grading observation reports shall be submitted to the grading inspector on all projects which exceed 100,000 cubic yards, unless no earthwork has been done during the month. These reports shall include the period of inspection, the list of fossils collected, and their present repository. 970077.COA 9/97 ATTACHMENT A-2 -- CONDITIONS OF APPROVAL PA 970077 / DA 2C-lb Page 4 BUYER NOTIFICATION 10. GROWTH MANAGEMENT Building permit issuance shall be phased in accordance with any Board of Supervisors .approved growth management phasing plan pertaining to the timely provision of public services and facilities. A valid Board of Supervisors approved development agreement pertaining to the property which includes a development phasing plan shall satisfy the requirements of this condition. This condition shall be noted on the final map. 11. AP AP B BUYER NOTIF MAP Prior to the issuance of any building permits for residential construction, the developer shall comply with Board of Supervisors Resolution 82-1368 (Buyer Notification Program) which requires the developer to prepare a map denoting the existing and proposed land uses, arterial highways, and public facilities within the surrounding area for the approval of the Director of Planning. The map content, display, and distribution shall be in accordance with the Buyer Notification Program guidelines approved by the Board of Supervisors and available at the Development Processing Center. 12. TE BI U SPEC TAX NOTIF Prior to the issuance of any certificates of use and occupancy, the developer shall provide evidence to the Manager, Building Inspection, that the Department of Real Estate has been notified that the project area is within the boundaries of a Community Facilities District (CFD), and will be subject to special taxes for public facilities and/or services. 13. DS DS R ASSESSMENT DISTRICT FINANCING Prior to the recordation of a final tract/parcel map, the subdivider shall prepare any required improvement plans and shall identify on the plans the limits of all the facilities which the subdivider intends to fund through a Mello -Roos Community Facilities District (CFD) or Assessment District (AD) bond program. `In addition, the improvement plans shall identify the specific CFD or AD under which the improvements will be funded, in a manner meeting the approval of the Manager, Subdivision and Grading. 970077.COA 9/97 ATTACHMENT A-2 -- CONDITIONS OF APPROVAL PA 970077 / DA 2C-lb Page 5 DRAINAGE 14. SD SD RG DRAINAGE STUDY Prior to the recordation of the final tract map or prior to the issuance of any grading permits, whichever comes first, the following drainage studies shall be submitted to and approved by the Manager, Subdivision and Grading: A. A drainage study of the subdivision including diversions, off -site areas that drain onto and/or through the subdivision, and justification of any diversions; and B. When applicable, a drainage study evidencing that proposed drainage patterns will not overload existing storm drains; and C. Detailed drainage studies indicating how the tract map grading, in conjunction with the drainage conveyance systems including applicable swales, channels, street flows, catch basins, storm drains, and flood water retarding, will allow building pads to be safe from inundation from rainfall runoff which may be expected from all storms up to and including the theoretical 100- year flood. 15. SD SD R DRAINAGE IMPROV A. Prior to the recordation of a final tract map or prior to the issuance of any grading permits, whichever comes first, the applicant shall in a manner meeting the approval of the Manager, Subdivision and Grading: 1) Design provisions for surface drainage,; and 2) Design all necessary storm drain facilities extending to a satisfactory point of disposal for the proper control and disposal of storm runoff; and 3) Dedicate the associated easements to the County of Orange, if determined necessary. SD SD RU DRAINAGE IMPROVE B. Prior to the recordation of a final tract map, or prior to the issuance of any certificates of use and occupancy, whichever occurs first, said improvements shall be constructed in a manner meeting the approval of the Manager, Construction Division. 970077.COA 9/97 ATTACHMENT A-2 -- CONDITIONS OF APPROVAL PA 970077 / DA 2C-lb Page 6 16. DS DS RG NPDES PERMIT As required under the Orange County NPDES Construction Activities Stormwater Discharge Permit, the dischargers (which include the County of Orange) are required to develop and implement Best Management Practices (BMPs) to control the discharge of pollutants (refer to SC 4-1). According to the County NPDES permit, these BMPs shall be required of all new developments both during and after construction. Therefore, as described in the Refined MDRMP, this project will be required to demonstrate that the most appropriate and up-to- date BMPs are implemented in mitigating urban water quality impacts. These BMPs consist of both structural and non- structural measures, including detention basins, first flush diversion devices, porous pavements, public education, street sweeping, and neighborhood toxic waste collections plans. Implementation of the BMPs will be documented in the Site Specific Water Quality Management Plans (WQMP) which will be submitted prior to the recordation of a final tract/parcel map or issuance of a building or grading permit for each development (refer to SC 4-7). The BMPs shall incorporate the guidelines previously outlined in the Refined Master Drainage and Runoff Management Plan, Irvine Coast Planned Community Development, and Orange County NPDES Stormwater Program, Drainage Area Management Plan meeting the approval of the Manager, Subdivision and Grading. 17. SD SD RG DRAINAGE OFFSIT Prior to the recordation of a final tract map or prior to the issuance of any grading permit, whichever comes first, and if determined necessary by the Manager, Subdivision and Grading, a letter of consent, in a form approved by the Manager, Subdivision and Grading, suitable for recording, shall be obtained from the upstream and/or downstream property owners permitting drainage diversions and/or unnatural concentrations. 18. SD SD R MPD PARTICIPTN Prior to the recordation of a final tract map, the subdivider shall participate in the applicable Master Plan of Drainage in a manner meeting the approval of the Manager, Subdivision and Grading, including payment of fees and the construction of the necessary facilities. 19. SD SD R EASMT SUBORD Prior to the recordation of a final tract map, the subdivider shall not grant any easements (except utilities) over any property subject to a requirement of dedication or irrevocable 970077.00 9/97 ATTACHMENT A-2 -- CONDITIONS OF APPROVAL PA 970077 / DA 2C-lb Page 7 offer to the County of Orange or the Orange County Flood Control District, unless such easements are expressly made subordinate to the easements to be offered for dedication to the County. Prior to the granting any of said easement, the subdivider shall furnish a copy of the proposed easement to the Manager, Subdivision and Grading, for review and approval. 20. EH EH R SEWER LINES Prior to the recordation of the final tract map, sewer lines, connections and structures shall be of the type installed in the location as specified in the "Guidelines Requiring Separation Between Water Mains and Sanitary Sewers, Orange County Health Department 1980," in a manner meeting the approval of the Manager, Environmental Health. 21. EH EH G VECTOR CONTROL Prior to the issuance of the first grading permit, the Manager, Environmental Health, shall be requested to initiate the survey process of the tract site to determine if vector control measures are necessary. If warranted, such measures shall be conducted by the developer is a manner meeting the approval of the Manager, Environmental Health. ENVIRONMENTAL PLANNING 22. EP EP NA NOTICE OF DETERMINATION Pursuant to Section 711.4 of the Fish and Game Code, the applicant shall comply with the requirements of AB 3158, prior to the filing of the Notice of Determination for the project, in a manner meeting the approval of the Manager, Environmental and Project Planning. ENVIRONMENTAL RESOURCES 23. ER ER R POLLUTION CONTROL PLNS If determined applicable by the Manager, Environmental Resources, prior to recordation of any final tract map, or the issuance of any building permits if no tentative map is involved, the applicant shall provide appropriate stormwater pollution control plans related to the site's structural and non-structural Best 'Management Practices for compliance with the 1990 National Pollution Discharge Elimination System (NPDES) Stormwater Regulations, in a manner meeting the approval of the Manager, Flood Programs and Environmental Resources. 970017.COA 9/97 ATTACHMENT A-2 -- CONDITIONS OF APPROVAL PA 970077 / DA 2C-lb Page 8 24. ER SG RGB POLLUTANT RUNOFF Prior to the recordation of a subdivision map, or issuance of precise grading permits or building permits, whichever comes first, the applicant shall submit and obtain approval from the Manager, Subdivision and Grading, of a Water Quality Management Plan (WQMP) specifically identifying Best Management Practices (BMPs) that will be used on -site to control predictable pollutant runoff. This WQMP shall identify, at a minimum, the routine, structural and non- structural measures specified in the Countywide NPDES Drainage Area Management Plan (DAMP) Appendix which details implementation of BMPs whenever they are applicable to a project, the assignment long-term maintenance responsibilities (specifying the developer, parcel owner, maintenance association, lessee, etc.); and, shall reference the location(s) of structural BMPs. 25. ER SG G NPDES PERMIT Prior to the issuance of any grading permits, the applicant shall submit evidence to the Manager, Subdivision and Grading, that the applicant has obtained coverage under the NPDES state-wide General Stormwater Permit from the State Water Resources Control Board. EW 26. F F R WATER IMPV PLANS Prior to the recordation of the final tract map, water improvement plans shall be submitted to and approved by the Fire Chief for adequate fire protection and financial security posted for the installation. The adequacy and reliability of water system design, location of valves, and the distribution of fire hydrants will be evaluated and approved by the Fire Chief. 27. F F B CONST PHAS PLAN Prior to the issuance of any building permits, a construction phasing plan shall be submitted to approved by the Fire Chief. The purpose of this review is to evaluate the adequacy of emergency vehicle access for the number of dwelling units served. 28. F F R SPECIAL FIRE PROTECTION AREA NOTIF Prior to the recordation of any final tract map, the subdivider shall place a note on the map meeting the approval of the Fire Chief that the property is in a Special Fire Protection Area and must meet all requirements for development within the area or file for an exclusion with the Fire Chief. 970077.COA 9/97 ATTACHMENT A-2 -- CONDITIONS OF APPROVAL PA 970077 / DA 2C-1b Page 9 29. F F B SPECIAL FIRE PROTECTION AREA DEVELOPMENT Prior to the issuance of any building permits, the applicant shall meet all requirements for development and construction within a Special Fire Protection Area, including street widths, Class A roof assemblies, fire sprinklers, etc. 30. F F R FUEL MODIFICATION Prior to the recordation of any subdivision map, the applicant shall obtain the Fire Chief 's approval, ins consultation with the Manager, Environmental and Project Planning of a conceptual fuel modification plan and program. Contact the Orange County Fire Authority Development Review Section at (714) 744-0477 for requirements and clearance of this condition. 31. •F F G FUEL MODIFICATION Prior to the issuance of any grading permits, the applicant shall obtain the Fire Chief's approval, in consultation with the Manager, Environmental and Project Planning of a precise fuel modification plan and program. The plan shall indicate the proposed means of achieving an acceptable level of risk to structures by vegetation. Include the method (mechanical or hand labor) for removal of combustible vegetation and the planting of drought tolerant, fire resistant plants. 32. F F B FUEL MODIFICATION Prior to the issuance of building permits, the developer shall have completed, under the supervision of the Fire Chief, that portion of the approved fuel modification plan determined to be necessary by the Fire Chief before the introduction of any combustible materials into the project area. 33. F F B FUEL MODIFICATION Prior to the issuance of any certificate of use and occupancy, the remainder of the fuel modification shall be installed and completed under the supervision of the Fire Chief. Further, the installed fuel modification shall be established to a degree meeting the approval of the Fire Chief. The CC&Rs shall contain provision for maintaining the fuel modification zones including the removal of all dead and dying vegetation and the inspection and correction of any deficiencies in the irrigation system three times a year. 34. FIRE ACCESS Prior to the recordation of a subdivision map, the applicant shall obtain approval of the Fire Chief of all fire protection access easements and shall dedicate them to the County. The CC&Rs shall contain provisions which prohibit obstructions 9700774O 9/91 ATTACHMENT A-2 -- CONDITIONS OF APPROVAL PA 970077 / DA 2C-lb Page 10 within the fire protection access easement. The approval of the Fire Chief is required for any modifications such as speed bumps, control gates or other changes in within said easement. 35. ACCESS GATES Prior to the issuance of any grading permits, the applicant shall submit and obtain the Fire Chief's approval of the construction details for any access gate. 'Contact the Orange County Fire Authority Plan Review Section at (714) 744-0403 for a copy of the "Guidelines for Fire Authority Emergency Access". 36. F F R FIRE HYDRANTS Prior to the recordation of subdivision map or the issuance of any building permits, whichever occurs first, the applicant shall submit to the Fire Chief evidence of the on -site fire hydrant system and indicate whether it is public or private. If the system is private, the system shall be reviewed and approved by the Fire Chief prior to issuance of building permits. Provisions shall be made by the applicant for the repair and maintenance'of the system, in a manner meeting the approval of the Fire Chief. 37. F F BU AUTO FIRE EXT If determined applicable by the Fire Chief that automatic fire extinguishing is needed for fire protection, then prior to the issuance of any building permits, all underground piping for automatic fire extinguishing systems shall be approved by the Fire Chief. Plans for automatic fire extinguishing systems shall be approved by the Fire Chief prior to installation. Notification of the Fire Chief's approval shall be forwarded to the Manager, Building Inspection Division, prior to the issuance of any certificates of use and occupancy. Further, such systems shall be operational prior to the issuance of a certificate of use and occupancy. 38. FIRE SPRINKLER SYSTEM Prior to the issuance of any building permits for all applicable lot(s) plans for the automatic fire sprinkler system shall be submitted to and approved by the Fire Chief prior to installation. This system shall be operational prior to the issuance of a certificate of use and occupancy. 39. F F G STREET PLANS Prior to the issuance of grading permits, the applicant shall submit and obtain approval of preliminary plans for all streets and courts, public or private, from the Fire Chief in consultation with the Manager, Subdivision and Grading. The 910097.CM 9/97 ATTACHMENT A-2 -- CONDITIONS OF APPROVAL PA 970077 / DA 2C-lb Page 11 plans shall include the plan view, sectional view, and indicate the width of the street or court measured flow line to flow line. All proposed fire apparatus turnarounds shall be clearly marked when a dead-end street exceeds 150 feet or when other conditions require it. 40. F F G STREET MARKINGS Prior to the issuance of any grading permits, the applicant shall submit and obtain approval from the Fire Chief for street improvement plans with fire lanes shown. The plans shall indicate the locations of red curbing and signage. A drawing of the proposed signage with the height, stroke and color of lettering and the contrasting background color shall be submitted to and approved by the Fire Chief. 41. F F U STREET MARKINGS Prior to the issuance of the certificate of use and occupancy, the approved fire land marking plan shall be installed. The CC&R's shall contain a fire lane map and provisions which prohibit parking in the fire lanes. A method of enforcement shall be included. 42. F F B COMBUSTIBLE CONSTRUCTION LETTER Prior to the issuance of any building permits for combustible construction, the developer shall submit and obtain the Fire Chief's approval of a letter and plan stating that water for fire fighting purposes and an all weather fire access road shall be in place and operational as required by the Uniform Fire Code before any combustible materials are placed on the site. 43. F F B WATER AVAILABILITY Prior to the issuance of any building permits, an Orange County Fire Authority Water Availability Form shall be submitted to and approved by the Plan Review Section of the Orange County Fire Authority. If sufficient water to meet fire flow requirements is not available, an automatic fire extinguishing system shall be installed in each structure, in a manner meeting the approval of the Fire Chief. 44. F F U FIRE HYDRNT MKRS Prior to the issuance of any certificates of use and occupancy, all fire'hydrants shall have a "Blue Reflective Pavement Marker" indicating its location on the street or drive per the Orange County Fire Authority Standard and approved by the Fire Chief. On private property these markers are to be maintained in good condition by the property owner. 970077.COA 9/97 ATTACHMENT A-2 -- CONDITIONS OF APPROVAL PA 970077 / DA 2C-lb Page 12 45. F F U FIRE LANES Prior to the issuance of any certificates of use and occupancy, any private street(s) having a curb -to -curb width of less than 36' shall be posted "No Parking —Fire Lane" as per 1988 Uniform Fire Code Section 10.207, in a manner meeting the approval of the Fire Chief. 46. DS DS G GEOLOGY RPT Prior to the issuance of a grading permit, the applicant shall submit a geotechnical report to the Manager, Subdivision and Grading, for approval. The report shall include the information and be in a form as required by the Grading Manual. 47. DS DS G GRADING DEVIATION Prior to issuance of any grading permits, if review of the grading plan for this property by the Manager, Subdivision and Grading, indicates significant deviation from the proposed grading illustrated on the approved tentative tract map, specifically with regard to slope heights, slope ratios, and pad elevations and configuration, the plan shall be reviewed by the Subdivision Committee for a finding of substantial conformance. Failure to achieve such a finding will require processing a revised tentative tract map; or, if a final tract map has been recorded, a new tentative tract map or a Site Development Permit application per Orange County Zoning Code Section 7-9-139 and 7-9-150. 48. EP DS B GRADING PLAN Prior to the issuance of a building permit, the applicant shall submit detailed grading plans, including and off -site haul route, approved off -site disposal site and an erosion control plan, further defining the extent of earthwork requirements for the project meeting the approval of the manager, Subdivision and Grading Services. The plan shall be in accordance with stated grading concepts as required by the Orange County Grading and Excavation Code. 970077.COA 9/97 ATTACHMENT A-2 -- CONDITIONS OF APPROVAL PA 970077 / DA 2C-lb Page 13 49. DS DS G GRADING Prior to the recordation of the first final tract map or issuance of the first grading permit for projects located immediately adjacent to or including portions of regional parks, significant open space corridors, or other environmentally sensitive areas, the project proponent shall provide evidence acceptable to the Manager, Subdivision and Grading, in consultation with the Manager, Public Facilities and Resources Department/HBP-Program Management, that graded areas will be compatible with natural land characteristics of the adjacent areas. Treatment to achieve the desired effect shall include: A. Smooth and gradual transition between graded slopes and existing grades using variable slopes ratios (2:1-4:1.); and B. Urban Edge Treatment/Landscaping Plan(s) for all graded areas adjacent to open space; and C. Preservation of visual opportunities from hillsides by providing for panoramic views from selected locations such as view corridors and sensitive landscape placement. 50. DS DS G CONST NOISE A. Prior to the issuance of any grading permits, the project proponent shall produce evidence acceptable to the Manager, Subdivision and Grading, that; 1) All construction vehicles or equipment, fixed or mobile, operated within 1,000' of a dwelling shall be equipped with properly operating and maintained mufflers. 2) All operations shall comply with Orange County Codified Ordinance Division 6 (Noise Control). 3) Stockpiling and/or vehicle staging areas shall be located as far as practicable from dwellings. B. Notations in the above format, appropriately numbered and included with other notations on the front sheet of grading plans, iaill be considered as adequate evidence of compliance with this condition. 970077.= 9/97 ATTACHMENT A-2 -- CONDITIONS OF APPROVAL PA 970077 / DA 2C-1b Page 14 51. HP SD RBU PUB INT LNSCP Prior to the recordation of the final tract map, a landscape plan shall be required for all slopes created in conjunction with construction of roadways and shall be landscaped and equipped for irrigation and improved in accordance with the following: HP SD R PRELM LNSCP PLN A. Preliminary Plan — Prior to the recordation of an applicable final tract map, an agreement shall be entered into and financial security posted guaranteeing landscape improvements and the maintenance thereof based on a preliminary landscape plan showing major plant material and uses, with a cost estimate of the landscape improvements. The preliminary plan and cost estimates shall be reviewed and approved by the Manager, Subdivision and Grading, in consultation with the Manager, Public Facilities and Resources Department/HBP- Program Management. Said plan shall take into account the previously approved landscape plan for Newport Coast Planned Community, the Standard Plans for landscape areas, adopted plant palette guides, applicable scenic and specific plan requirements, Water Conservation Measures contained in Board Resolution 90-487 (Water Conservation Measures), and Board Resolution 90-1341 (Water Conservation Implementation Plan). HP SD B DTAL LNSCP PLN B. Detailed Plan — Prior to the issuance of any building permits(s), a detailed landscape plan shall be submitted to and approved by the Manager, Subdivision and Grading, in consultation with the Manager, Public Facilities and Resources Department/HBP-Program Management. Detailed plans shall show the detailed irrigation and landscaping design. HP CBI U LNDSCP INSTALL C. Installation Certification — Prior to the issuance of final certificates of use and occupancy and the release of the financial security guaranteeing the landscape improvements, said improvements shall be installed and shall be certified by a licensed landscape architect or licensed landscape contractor, as required, as having been installed in accordance with the approved detailed plans. Said certification, including an irrigation management report for each landscape irrigation system, and any other required implementation report determined applicable, shall be furnished in writing to the Manager, 970077.CM 9/97 ATTACHMENT A-2 -- CONDITIONS OF APPROVAL PA 970077 / DA 2C-lb Page 15 Building Inspection, prior to the issuance of any certificates of use and occupancy. 52. HP SD G SPECIAL Prior to the issuance of any grading permit, a revegetation plan shall be submitted to and approved by the Manager, Subdivision and Grading. This plan will provide for revegetation of all graded and cut and fill areas where structures or improvements are not constructed within a two- year period. The revegetation will be composed of drought - adaptive plant materials, including but not limited to California buckwheat, coyote bush or native grasses. If native species are not used, non-invasive, drought -tolerant species will be used. If irrigation is required, drip systems shall be installed where feasible. NOISE COMPATIBILITY 53. All residential lots and dwellings shall be sound attenuated against present and projected noise which shall be the sum of all noise impacting the project so as not to exceed an exterior standard of 65 db CNEL in outdoor living areas and an interior standard of 45 dB CNEL in all habitable rooms. Evidence prepared by a County -certified acoustical consultant, that these standards will be satisfied in a manner consistent with applicable zoning regulations, shall be submitted as follows: DS DS RG ACOUSTICAL RPT A. Prior to the recordation of a final tract map or prior to the issuance of grading permits, as determined by the Manager, Subdivision and Grading, for approval. The report shall describe in detail the exterior noise environmental and preliminary mitigation measures. Acoustical design features to achieve interior noise standards may be included in the report in which case it may also satisfy "B" below. DS DS B ACOUSTICAL RPT B. Prior to the issuance of any building permits for residential construction, an acoustical analysis report describing the acoustical design features of the structure required to satisfy the exterior and interior noise standards shall be submitted to the Manager, Subdivision and Grading, for approval along with satisfactory evidence which indicates that the sound attenuation measures specified in the approved acoustical 970077.COA 9/97 ATTACHMENT A-2 -- CONDITIONS OF APPROVAL PA 970077 / DA 2C-lb Page 16 report have been incorporated into the design of the project. DS DS G ACOUST BARRIERS C. Prior to the issuance of any building permits, all freestanding acoustical barriers must be shown on the project's plot plan illustrating height, location and construction in a manner meeting the approval of the Manager, Subdivision and Grading. TRAFFIC 54. TE TE G SIGHT DISTANCE Prior to issuance of a grading permit, adequate sight distance shall be provided at all intersections per Orange County Standard- Plan 1117 in a manner meeting the approval of the Manager, Subdivision and Grading; this include any necessary revision to plan to remove slopes or other encroachment from the Limited Use Area. 55. TP SD R PVT ST NOTIF Prior to the recordation of a final tract map, a note shall be placed on the map that states: "The private streets constructed within this map shall be owned, operated and maintained by the developer, successors or assigns. The County of Orange shall have no responsibility therefore unless pursuant to appropriate sections of the Streets and Highways Code of the State of California, the said private streets have been accepted into the County Road System by appropriate resolution of the Orange County Board of Supervisors." 56. TE TE G MANEUVERING AREA Prior to issuance of a grading permit, adequate maneuvering area shall be provided to all garages per Orange County Standard Plan 1209 and Orange County Zoning Code 7-9-145.3 in a manner meeting the approval of the Manager, Subdivision and Grading. 57. DS DS R GUARANTEED ACCESS A. Prior to the recordation of a final tract/parcel map, a method or procedure to assure a guaranteed right of vehicular and pedestrian access to all building sites for all parcels shall be submitted by the project proponent and approved by the Manager, Current Planning. Said method or procedure shall be recorded. 970077.CM 9197 ATTACHMENT A-2 -- CONDITIONS OF APPROVAL PA 970077 / DA 2C-lb Page 17 B. Prior to the issuance of any building permits, a copy of the recorded document shall be furnished to the Manager, Current Planning. 58. LP LP U MODEL CONDITIONS A. Each sales trailer, if used, and each sales office use approved by this action shall expire two (2) years from the issuance of each temporary certificates of use and occupancy for the temporary commercial coach or the model sales office, which ever comes first. Applicant may apply for one (1) one-year extension for the model sales use. B. A maximum of fifteen (15) on -site pennants and/or flags are permitted in connection with each of the model home sales sites. C. All signs shall be in conformance with Zoning Code Section 7-9-136.1(f), and the sign regulations of the Irvine (Newport) Coast Community Design Program. The applicant shall obtain sign permits for all signs over six (6) square feet in area. D. No sign shall be posted or placed on public or private property advertising or directing people to the development which is the subject of this permit, unless such sign is allowed by all applicable permits and is expressly permitted by written consent of the property owner. It is expressly understood and accepted by the applicant that this condition is applicable to any sign advertising or directing people to the development, regardless of whether the applicant directly posted or placed the sign in question. E. Within 60 days from the issuance of the temporary certificates of use and occupancy for each sales office, the temporary sales trailer and access shall be removed. F. The model home sales trailers and offices will be used solely for the sale of dwelling units approved as part of Planning Application per 970077. 970077.COA 9/97 ATTACHMENT A-2 -- CONDITIONS OF APPROVAL PA 970077 / DA 2C-lb Page 1S G. Within ninety (90) days after the termination of the use of the subject property as a model home complex and real estate sales office, the parking lot, signs, all temporary fencing, the sales office and the parking lot, signs, all temporary fencing, the sales office and the model homes shall be removed or shall be located or revised as necessary to comply with the current applicable zoning regulations. H. All model trap fences shall be behind the sidewalk. 9000MCOA 9/97 County of Orange g Planning and Development Services Department - Grading Section 300 North Flower Street - P.O. Box 4048 Santa Ana, California 927024048 FAX (714) 834-4772 TO: ou �✓� 1 - FROM: "&kY-00z _MV—k %J2QUV BY: T.T. NO. SCTT NO. SCPM .DEIR T.P.M. SrrE PLAN PA GIa O 212 OTHER s� COMMENTS 1. The height, area and configurauon of man-made slopes shall be clearly shown. All slope area shall be shown by type. 2. Typical building pads proposed for the location ofstiuctwas shall be graphically indicated with approximate dimensions and setbacks. 3. Proposed finished grade elevations shall be shown: A Along proposed sweets and drives atone hundred (100) foot intervals or opposite lot comer, and B. On each proposed building pad. 4. Astatement of the estimated volume of export or borrow earth material required and the location of the disposal or borrow site shall accompany the tentative map. S. A statement of the maintenance responsibility for each slope anca shall be made 6. Soils and Geology Report: • A preliminary report, or reports describing the soils and their effect on the feasibility of the plan of development, including the grading concept, shall be submitted with tentative tract map. This report shall be prepared under the supervision of a soil engineer and an engineering geologist. 7. Height and inclination of man-made slopes exceed the requirements: A. Vertical height maximums for slopes in excess of (steeper than) five (5) feet horizontal to one (1) foot vertical. 1) TypeAslope - none. 2) Type B slope - thirty -rive (35) feet 3) Type Cslope — twenty (20)feet. B. Man-made slopes shall not be constructed one on top of another or combined in such a manner so that thev exceed the maximum height specific C. Man-made slope shall be no steeper than two (2) feet horizontal to one (1) foot vertical. a. Hillside Lot Design Criteria: Length and contour of man-made slopes:, A Man-made slopes shall be designed to resemble natural terrain where f uisibli with a minimum of long, flat. inclined plane surface and acute angles. B. Lots shall be designed so that where type C slope are proposed between abutting lots, the common property line shall be the top ofslope. 9. Drainage and Erosion Control Standards: where any lot is designed in such a manner that it will not dram directly to a street or common drainage facility with a min. one percent, it shall be designed In a manner that will conform to the following criteria: A. , Lots shall be designed in such a manner that man-made slopes are not subject to sheet flow or concentrated drainage runoff from the either the the same or adjacent lot B. All drainage flowing down man-made slope except that drainage from water falling on each slope shall be contained within an appropriate drainage device. C. All drainage flowing from one lot to or across another within a properly executed easement, whereappropnate. 10. Recreation Trails: A. A note shall be placed on the tentative map which reads: "Grading of recreation trails shall conform to the requirements of the County of Orange Grading and Excavation code. B. Major cuttfull slope and drainage devices related to recreation trails shall be shown, ADDITIONAL REMARKS { (ay., oriel KAz- sk vS=L 6e, ucicl.t 1✓A,I" W11'/�\Y�. Zf7v�.Pi 1R, ra vl e.a Q �l 4M I Pvj-Y . 4o Imclo— I S�trti a✓2 UUV/1 4 /4ae �r'Old�v� W�O.s1tnG�1, N N � • J Planning and Development Services Department Current Planning Services Division Site Planning And Consistency Section 300 N. Flower Street P. O. Box 4048 Santa Ana, CA, 92702 DATE: JANUARY 10, 2000 TO: 11'00 DEPT./DIST 2— ✓e(o�7t FROM: Chief, Site Planning Section Of SUBJE T PA990212 — ASTAL DEVELOPMENT TO PC File Date December 30, 1999 Response Date: January 31, 2000 Planner: Bill Melton 834-2541 Fax (714) 834-4652 Project Charge No. P55582 Other Dept P55582 PROPOSAL Coastal development permit for construction of•41 DET single-family residential units,in�:TM-1-5394: Development area 2c-lb of the Newport Coast PC. Development modifications from those previously approved in PA970077. LOCATION: PA 2c-lb NEWPORT COAST; TTM15394. Please review the attached proposal and return any comments or recommendations that you might care to offer. Returned comments, including a "no comment" are requested as an indication that you have received the proposal. Comments must be returned by the date indicated or it must be presumed that the project meets with your approval. If you indicate no comment we will not send revised plans for your review unless significant changes are incorporated in such plans or you ask that revised plans be provided. Please direct your comments to the planner assigned as noted above, or myself. Thank you for your cooperation. Charles M. Shoemaker, Section Chief Initial Plans: xx Revised Plans: _ PLEASE RETURN THIS FORM No Comment (, See Attached Comments as follows BY: (� !? Date: / Z 7 ! Total Hours in Review //iL OrangeCounty of DATE: January 11, 2000 MEMO� TO: Bill Melton, Planner, Site Planning Section FROM: Acoustics, Building Permit Services SUBJECT: Planning Application PA990212 Coastal Development to PC TTM15394 Dev. 2c-lb Newport Coast PC (Modification from PA97007) THE SUBJECT HAS BEEN SCREEN: ❑ We have no comments because this property is located: ❑ Not within the noise referral zone of 60 dB CNEL ♦ We have comments because this property is located: ❑ Within area of CNEL 60 dB or higher ❑ Within dB CNEL zone of airport or routine overflight • Is noise sensitive land use, and is large in nature ❑ Is adjacent to proposed transportation corridor. • And may generate noise in excess of Orange County Standards • It is during this initial evaluation of a project that the effect of existing development, topographic features, or other such noise attenuation measures is considered, although at a very general level of details. Acoustical analysis reports shall be prepared in any instances where there is the possibility of unacceptable noise impacts. Thus, unless it can be shown with certainty that the project is outside the area that has a CNEL of 60 or more decibels, an acoustical analysis report will be required. ❑ Others: ♦ We recommended the following conditions: • Detailed Analysis Noise Report ---------- ❑ Acknowledgment of airport activity ------ ❑ Avigation Easement ------------------- ❑ "Aircraft Noise Impact Area" Signs ------- ❑ Statement of overflight acknowledgement • Compliance with Noise Ordinance & Grading Code -- ❑ Statement of proposed transportation Corridor Impact ❑ Notification to Department of Real Estate of property being adjacent to transportation corridor ---------------' • Other fixed not so conditioners (NI) By: Erni . Hernes, P.E. Standard Condition Of Approval (N's) - NI N7 & N9 PDSDfbnnAX99 Planning and Development Services Department Current Planning Services Division Site Planning And Consistency Section 300:N. Flower Street P. O. Box 4048 Santa Ana, CA, 92702 DATE: JANUARY 10, 2000 TO: H DEPT.lDIST FROM: Chief, Site Planning Section SUBJECT PA990212 — COASTAL DEVELOPMENT TO PC File Date December 30, 1999 Response Date: January 31, 2000 Planner: Bill Melton 834-2541 Fax (714) 834-4652 Project Charge No. P55582 Other Dept P55582 PROPOSAL Coastal development permit for construction of 41 DET single family residential units in TTM 15394. Development area 2c-lb of the Newport Coast PC. Development modifications from those previously approved in PA970077. LOCATION: PA 2c-lb NEWPORT COAST; TTM15394. Please review the attached proposal and return any comments or recommendations that you might care to offer. Returned comments, including a "no comment" are requested as an indication that you have received the proposal. Comments must be returned by the date indicated or it must be presumed that the project mee with your approval. If you indicate no comment we will not send revised plans for your review unless significant changes are incorporated in such plans or you ask that revised plans be provided. Please direct your comments to the planner assigned as noted above, or myself. Thank you for your cooperation. Initial Plans: xx Revised Plans: PLEASE RETURN THIS FORM No Comment See Attached BY: Date: - Charles M. Shoemaker, Section Chief Comments as follows Total Hours in Review Planning and Development Services Department Current Planning Services Division Site Planning And Consistency Section 300 N. Flower Street P. O. Box 4048 Santa Ana, CA, 92702 DATE: JANUARY 10, 2000 TO: �Trrfo s 7 DEPT./DIST —vlAp FROM: Chief, Site Planning Section SUBJECT PA990212 — COASTAL DEVELOPMENT TO PC File Date December 30, 1999 Response Date: January 31, 2000 Planner: Bill Melton 834-2541 Fax (714) 834-4652 Project Charge No. P55582 Other Dept P55582 s'�ry� c-es PROPOSAL Coastal development permit for construction of 41 DET single family residential units in TTM 15394. Development area 2c-lb of the Newport Coast PC. Development modifications from those previously approved in PA970077. LOCATION: PA 2c-lb NEWPORT COAST; TTM15394. Please review the attached proposal and return any comments or recommendations that you might care to offer. Returned comments, including a "no comment" are requested as an indication that you have received the proposal. Comments must be returned by the date indicated or it must be presumed that the project meets with your approval. If you indicate no comment we will not send revised plans for your review unless significant changes are incorporated in such plans or you ask that revised plans be provided. Please direct your comments to the planner assigned as noted above, or myself. Thank you for your cooperation. Charles M. Shoemaker, Section Chief Initial Plans: xx Revised Plans: _ PLEASE RETURN THIS FORM No Comment -1— See Attached Comments as follows Date: Z [ t I no Total Hours in Review 0 Planning and Development Services Department Current Planning Services Division Site Planning And Consistency Section 300 N. Flower Street P. O. Box 4048 Santa Ana CA 92702 FROM: Chief, Site Planning Section DATE: JANUARY 10, 2000 SUBJECT PA990212 — COASTAL DEVELOPMENT TO PC File Date December 30, 1999 Response Date: January 31, 2000 Planner: Bill Melton 834-2541 Fax (714) 834-4652 Project Charge No. P55582 Other Dept P55582 PROPOSAL Coastal development permit for construction of 41 DET single family residential units in TTM 15394. Development area 2c-lb of the Newport Coast PC. Development modifications from those previously approved in PA970077. LOCATION: PA 2c-lb NEWPORT COAST; TTM15394. Please review the attached proposal and return any comments or recommendations that you might care to offer. Returned comments, including a "no comment" are requested as an indication that you have received the proposal. Comments must be returned by the date indicated or it must be presumed that the project mee with your approval. If you indicate no comment we will not send revised plans for your review unless significant changes are incorporated in such plans or you ask that revised plans be provided. Please direct your comments to the planner assigned as noted above, or myself. Thank you for your cooperation. Initial Plans: xx Revised Plans: _ Charles M. Shoemaker, Section Chief Comments as follows Date: l 0 OO Total Hours in Review Planning and Development Services Department Current Planning Services Division Site Planning And Consistency Section 300 N. Flower Street P. O. Box 4048 Santa Ana, CA, 92702 DATE: JANUARY 10, 2000 TO: rI2 g 46g DEPT./DIST FROM: Chief, Site Planning Section Services SUBJECT PA990212 — COASTAL DEVELOPMENT TO PC File Date December 30, 1999 Response Date: January 31, 2000 Planner: Bill Melton 834-2541 Fax (714) 834-4652 Project Charge No. P55582 Other Dept P55582 PROPOSAL Coastal development permit for construction of 41 DET single family residential units in TTM 15394. Development area 2c-lb of the Newport Coast PC. Development modifications from those previously approved in PA970077. LOCATION: PA 2c-lb NEWPORT COAST; TTM15394. Please review the attached proposal and return any comments or recommendations that you might care to offer. Returned comments, including a "no comment" are requested as an indication that you have received the proposal. Comments must be returned by the date indicated or it must be presumed that the project meets with your approval. If you indicate no comment we will not send revised plans for your review unless significant changes are incorporated in such plans or you ask that revised plans be provided. Please direct your comments to the planner assigned as noted above, or myself. Thank you for your cooperation. Charles M. Shoemaker, Section Chief Initial Plans: xx Revised Plans: PLEASE RETURN THIS FORM No Comment See Attached Comments as follows BY: Date: Total Hours in Review 0 Planning and Development Services Department Current Planning Services Division Site Planning And Consistency Section 300 N. Flower Street P. O. Box 4048 Santa Ana, CA, 92702 TO: FROM: Chief, Site Planning Section DEPT./DIST DATE: JANUARY 10, 2000 SUBJECT PA990212 — COASTAL DEVELOPMENT TO PC File Date December 30, 1999 Response Date: January 31, 2000 Planner: Bill Melton 834-2541 Fax (714) 834-4652 Project Charge No. P55582 Other Dept P55582 PROPOSAL Coastal development permit for construction of 41 DET single family residential units in TTM 15394. Development area 2c-lb of the Newport Coast PC. Development modifications from those previously approved in PA970077. LOCATION: PA 2c-lb NEWPORT COAST; TTM15394. Please review the attached proposal and return any comments or recommendations that you might care to offer. Returned comments, including a "no comment" are requested as an indication that you have received the proposal. Comments must be returned by the date indicated or it must be presumed that the project mee with your approval. If you indicate no comment we will not send revised plans for your review unless significant changes are incorporated in such plans or you ask that revised plans be provided. Please direct your comments to the planner assigned as noted above, or myself. Thank you for your cooperation. Charles M. Shoemaker, Section Chief Initial Plans: xx Revised Plans: PLEASE RETURN THIS FORM No Comment See Attached Comments as follows BY: Date: Total Hours in Review Filed Case No.: Date Filed: pfF gaozk2 I. GENERAL DISTRIBUTION Date Sent Out: Comments Due By: Reply s from the following: Sent Received Requested Comment [ ] [ ] Board of Supervisors Attn: [ ] [ ] County Executive Office Attn: [V% [ ] Fire Safety Specialist / O.C. F. A Development Review 180 So.Water St. Orange (only if a fee has been paid first) [ ] [ ] Vector Control Disttrict Attn: J. Earnest, horse stables, farms [ ] [ ] HCA/Environmental Health Attn: Director Jack Miller ( ( ] P/DSD Development Services - Acoustics Attn: B. Chin [ ] [ ] PF/RD Public Works - Flood Program Attn: Herb Nakasone PF/RD Public Works - Special Projects Attn: Andy Kerr ✓] [ ] P/DSD Development Services/NPDES - M. Serizawa ( [ ] [ ] P/DSD Environ./Proj. Planning Attn: Marc Esslinger (S.A. Heights) [ [ ] P/DSD Advance Planning - Bob Aldrich P/DSD Traffic Engineering - Attn: Grant Anderson [ ] P/DSD Transportation Planning - H. Persaud ( ] [ ] PF/RD Public Property Permits - Doug Witherspoon [ ] PF/RD HBP - Program Planning - Attn: E. Jessen ( ( [ ] PF/RD HBP - Historical Preservation Attn: M. Brajdic P/DSD Development Services - Grading Attn: J. Earnest ( [ ] P/DSD Development Services - Drainage Attn: R. Young ( ] [ ] P/DSD Development Sevices - Streets Attn: M. Idris ( ] [ ] Orange County Transportation Authority ( (( [ ] E1 Toro ( ] PDSD/ZA Reuse Attn: Bryan Speegle & Resources Planning Attn: Gary Medieros II. SPECIAL DISTRIBUTION Cities Attn: Planning or Development Dept.: IO ( ] [ ] State/Federal Agencies: ( ] [ ] State Permit Assistance Center - Attn: Director Danian M. Hopp ( ] [ ] Special Districts (Schools and Water Districts) [ ] [ ] Review Boards: [ ] [ ] Homeowner Associations: ( ] [ ] Others: ( ] [ ] Others: :cs cr.E x=:r�_ rcRr. rr+ (cc --" C»•tV a : e C:G C=;C' ?:.-A IG: P555�2 Ea �2— ... _ -a3e ea!:: ..sea 3u: a: 7:4.5'3• you reed a33:s:a co y-. cc. _e_-.e -._3 ._ P-- b 21 2, :Lt --�: �. q -c-- !:-- C.'OE FOA�:ti.. YLIt6s =CCSE CAE OF ti (A. t c: C) A. F�NO F=ISI: t, ^xPC'C57 ACA-CC.ti=t FO.^w->r: AG`^ A. PO P OR C-:1 a^-.iGR:r.=-:.Y :7 --`JVC �� r::P=s: 2`�'�61 •, � ,fib. �'• . L v ra il1 s CA C. ,Mr, AC^xCY aA nE2a7.^' cR.1\mac C:S^I CMG . min L•a.-o_-. SCa-csz,, CR-r-:=..'—V - ......... CO.E ...................... ..................................................... � ....................`.... ... £-L4 La:e)............................. Cedes berate iCid a-_ ai 5.: CdZZ, . :ct CODE: - - - - - - - �J. .. . .-.. . ....................................... .......................................... . ... ... .......... :(. A Dv Came e- !:lelsm 2 :Ot C.OE:— — — — — — — my ca..-— — — — — — — — — — — — — — — — — _-----. ................... V. C-e-x ►tsar ...__.....- -------r.1 VS6 DA-: ............................................................... to :De :eb Code '13: as !r!.x cased. Y:. D-n•�::vx y„vft0v+:: 2 Deceby APPcm 'he aba.e add!:!oa/elxa--.gc PACY': ------- Was: APPtO .�- tY: •ixad lxaxxa4e: o: Supe:aase:l tAUSc_ tars rorcia++lava M>,xacVc s=—r.=s APPrtavAL: sos C7L Ass:cz= 212 r_: COUNTY OF ORANGE PLANNING & DEVELOPMENT SERVICES DEPARTMENT PUBLIC FACILITIES & RESOURCES DEPARTMENT * REPRINTED * RECEIPT ------------------------------------------- 12/30/99 15:13 Receipt Number: R9934547 Activity Number: PA990212 Payment Date: 12/30/1999 Payer: TAYLOR WOODROW HOMES,INC. Address: 24461 RIDGE ROUTE DR #100 LAGH,CA OCFA#032357 Phone #: Trust ID: Applicant: FORMA Address: 3100 BRISTOL STREET STE:100 COSTA MESA CA ATTN: CRAIG HOFFMAN 92626 Phone #: 714 540-4700 Job Address: Parcel: 15394- O-TM - Additional Info: ACCUMULATIVE CHARGES Fee Item Description Charges Coding 1060 LAND USE FEE DEPOSIT 2,000.00 300306 92000015 1066 ENV. ANALYSIS - IS TRUST 2,000.00 300306 92000010 8004 FIRE FEE -SITE DEVEL CUP 87.00 113113 91100123 Total Charges: 4,087.00 Total Payment: 4,078.00 CURRENT PAYMENT Method: 66688 Notation: TAYLOR WOODROW Operator: CASTILLA Check/Cash: 4,078.00 Trust: .00 Account No.: Total Paid: 4,078.00 Balance Due: 9.00 The fees, dedications, reservations or other executions imposed by this development approval must be protested, if at all, within the 90 day -approval period imposed by Government Code section 66020. COUNTY OF ORANGE PLANNING & DEVELOPMENT SERVICES DEPARTMENT PUBLIC FACILITIES & RESOURCES DEPARTMENT * REPRINTED * RECEIPT -------------------------------------------------- ------------- 12/30/99 15:14 Receipt Number: R9934548 Activity Number: PA990212 Payment Date: 12/30/1999 Payer: TAYLOR WOODROW HOMES,INC. Address: 24461 RIDGE ROUTE DR #100 LAGH,CA OCFA#032357 Phone #: Trust ID: Applicant: FORMA Address: 3100 BRISTOL STREET STE:100 COSTA MESA CA ATTN: CRAIG HOFFMAN 92626 Phone #: 714 540-4700 Job Address: Parcel: 15394- 0-TM - Additional Info: ACCUMULATIVE CHARGES Fee Item Description Charges Coding 1060 LAND USE FEE DEPOSIT 2,000.00 300306 92000015 1066 ENV. ANALYSIS - IS TRUST 2,000.00 300306 92000010 8004 FIRE FEE -SITE DEVEL CUP 87.00 113113 91100123 Total Charges: 4,087.00 Total Payment: 4,087.00 CURRENT PAYMENT Method: CASH Notation: CRAIG HOFFMAN Operator: CASTILLA Check/Cash: 9.00 Trust: .00 Account No.: Total Paid: 9.00 Balance Due: .00 The fees, dedications, reservations or other executions imposed by this development approval must be protested, if at all, within the 90 day -approval period imposed by Government Code section 66020.