Loading...
HomeMy WebLinkAboutBALBOA_PENINSULA_PLANNING*NEW FILE* BALBOA PENINSULA PLANNI PENINSU STUDY CITY OF NEWPORT BEACH, CALIFORNIA INTRODUCTION In May of 1996, the City Council authorized a contract with Urban Design Camp for the expressed purpose of developing alternative concept plans for Improving the quality of life on the Balboa Peninsula. The Balboa Peninsula Planning Study is intended to identify ways In which the area can be improved to the benefit of the entire community. To discover the Peninsula -wide issues and concerns a series of District by District planning workshops were conducted. These brainstorming sessions focused primarily on the Individual village issues but the District representatives were also challenged to identify Peninsula -wide concerns. The Planning Study was initiated by the Balboa Peninsula Planning Advisory Committee (B.P.P.A.C.), a city appointed task force. The study is intended to be a follow up to a 15 point Policy Plan, prepared by B.P.P.A.C., to establish positive changes on the Peninsula. B.P.P.A.C. has served as advisors throughout the project to the consultant and by participating in the individual District meetings. The study focuses on the four Districts of the Peninsula (Lido/Civic Center, Cannery Village, McFadden Square and Central Balboa). Representatives for each District were appointed by the City Council with recommendations from the B.P.P.A.C. A wide variety of interests have been represented, Including; residents, property owners, business tenants and community groups. Throughout the study process the level of participation and enthusiasm has been excellent. The workshops have revealed many issues and concerns common and unique within the Peninsula. The unique characteristics of each District need to be reinforced and enhanced in order to be preserved. The more modern commercial and entertainment activities of the Lido District are balanced by the historic McFadden Square activities. The potentially active high energy Fun Zone and pier of Central Balboa are nicely contrasted with the quaint shopping and dining to be found in Cannery Village. Peninsula -wide planning must recognize and respect the unique District features in order to properly understand the Balboa Peninsula as a whole. BALBOA PENINSULA BALBOA PENINSULA CONCEPT PLAN Newport Beach, California is a diverse coastal community which has evolved through the assemblage of a number of interrelated villages. Some of the more unique villages are located on the Balboa Peninsula. A composition of waterfront and coastal dependent activities and uses combine to create a unique environment for the city. The Balboa Peninsula is a community with a long history of coastal related development and activities. The community is dependent upon various coastal resources for its economic well being. The areas of concern expressed for the Peninsula as a whole have been categorized into the same major headings as identified In the Individual Districts (land uses, access/circulation, parking, image/aesthetics and safety). The Balboa Peninsula is comprised of four District villages strung along an interconnected spine of roadways, each village offering both unique and similar services and activities for residents and visitors alike. Each District attempts to provide goods and services to their respective residents and to some extent compete with each other for the attention of visitors to the Peninsula. The similarities of the four Districts are readily apparent. However, the characteristics of each District are very different and it is through these shared differences that the unique elements which form and identify the villages emerge. This combination of different but similar areas make the Balboa Peninsula a worldwide attraction and resource. Cl The overriding concern for the Balboa Peninsula as a whole is the need and desire to create a sense of place. Public improvements need to be employed which establish a unified design theme for landscaping, lighting, and directional signage for the local and collector street system along the Peninsula. Land uses should be established uniquely for each of the Districts, with a greater amount of attention to resident serving commercial activities. There is a need to discover the appropriate mix of retail tenants. The circulation system is in need of major improvements. Access to and between the Districts is cumbersome and awkward. Pedestrian, boating, bicycling and public transportation have received little attention. The Peninsula has a substantial supply of parking, however, there is a need to develop a parking management program and plan to optimally use the existing resources. The overall image of the Peninsula is in need of major upgrading. Peninsula welcome signs and arrival statement signage, along with upgraded landscaping and lighting would greatly improve the area's image. Views and access to the water are limited and should be capitalized upon. The family recreation of boating should be considered as a theme, to be incorporated as a unifying element for the overall image of the Peninsula. The Primary focus of Peninsula -wide objectives need to deal with pedestrian and vehicular circulation and image. In addition, the Peninsula needs to support and strengthen the differences in the individual Districts. This can be achieved by encouraging unique features and reducing competitive uses. Improvements in one or both of these areas will greatly enhance the character and economic well being of the Balboa Peninsula. BALBOA PENINSULA OBJECTIVES "MA a RECOMMENDATIONS URBAN MASTER PLANNING URBAN DESIGN BALBOA PENINSULA OBJECTIVES AND RECOMMENDATIONS The Balboa Peninsula Planning Study began with a workshop in each of the four Districts to identify the areas of concern. The planning workshops provided an opportunity for Peninsula District representatives to brainstorm their unique and collective problems. Potential solutions were discussed and characterized according to their importance and priority (low, medium, or high). The priority levels were applied to solutions based on their impact and ability to reach the identified objectives. The issues were next analyzed for their amenability to change (easy, moderate, or difficult). The goal being to identify the most effective solutions to close the gap between the current problems and the community objectives. The workshops provided an opportunity for identification of the issues, and when combined with the independent research, the recommendations became apparent. The list of consultant recommendations and solutions are a result of analyzing the problems which are most amenable to change and achieve the most significant impact. Many issues and solutions were identified, all were evaluated and those which had a reasonable expectation of success have been included in this report. The report highlights general objectives or the Peninsula and each of the four Districts. Recommendations are made with identified short-term, mid-term and long-term solutions identified. Following the suggested solutions is a note to Indicate the degree of difficulty for implementation. Strategies to facilitate these changes have been included at the conclusion of the report. SUMMARY OF OBJECTIVES WITH RECOMMENDATIONS FOR THE BALBOA PENINSULA OBJECTIVE - IMPROVE ACCESS AND CIRCULATION PATTERNS THROUGHOUT THE PENINSULA Recommendation, Develop a circulation system that prioritizes the movement of traffic along Newport Boulevard first, Balboa Boulevard second, and select collector streets third (i.e., 32nd Street), Solutions; Short -Term • Develop Peninsula -wide directional signing program to each District from Newport and Balboa Boulevards (Le„ banners hung from street lights), (easy) • Reduce the number of curb cuts to access private property along boulevards, if other access points exist. (moderate) Eliminate on -street parking in select locations along Newport and Balboa Boulevards, (difficult) Incorporate a "welcome to the Balboa Peninsula' entry statement with the current redesign of Newport Boulevard and P,C,H, (moderate) Mid -Term • Acquire property for entry node landscaped areas and welcome statements. (moderate) • Acquire additional rights -of -way and develop a landscape median the length of Newport and Balboa Boulevards, Place directional and District identification signage in median, (moderate) • Reconfigure Balboa Boulevard to "Tee" Into Newport Boulevard near 26th Street, (difficult) • Reduce ctoss traffic along the boulevards by connecting medians and limiting intersections, (moderate) • Create key entry nodes to each District at 32nd Street, 28th Street, 22nd Street, and Palm Street along the boulevards, (difficult) • Develop guest boat dock(ng facilities for visiting boaters in each district throughout the Peninsula, (difficult) • Establish a series of inter -connecting pedestrian walkways throughout the Peninsula, with boardwalks, sidewalks, peseos, etc. (moderate) Long -Term • Create theme structures as entry monuments for each District, (i,e„ archways over the boulevards), (difficult) • Synchronize all traffic signals along Newport and Balboa Boulevards, (difficult) • Create a traffic circle or roundabout at the intersection of Newport Boulevard and Balboa Boulevard, (difficult) • Develop a transportation center near McFadden Square to collect and overlay all public and charter buses and provide shuttles to adjacent Districts, (difficult) • Explore the implementation of an electric vehicle ordinance for the entire Peninsula (Le„ City of Palm Dessert), (difficult) Investigate the re-establishment of a "Red Car like system along Newport and Balboa Boulevards and connect to "Mariners Mile," (difficult) Y OBJECTIVE - IMPROVE THE OVERALL IMAGE OF THE BALBOA PENINSULA Recommendation: Improve the physical appearance of the Peninsula Solutions: Short -Term • Street sweep and water down Newport and Balboa Boulevards on a daily basis. (moderate) • Replace all public Identification signage with consistent theme signs including: street signs, district, identification, building Identification and location signs (i.e., blue back ground with white lettering), (moderate) • Remove all non -conforming private signage. (difficult) Mid -Term • Unify all street lights along Newport and Balboa Boulevards Including: size, height, spacing, design and color tint of the lights (i.e„ a brighter white), (moderate) • Develop a landscaped street tree program for the entire length of Newport and Balboa Boulevards. The design should Include a consistent theme Peninsula -wide in the medians (i.e., palm and colorful plants) and street trees within or behind the sidewalk of a small scale individualized in each District, (moderate) • Develop landscape design standards for trees on private properly adjacent to the boulevards. (moderate) Develop a street tree lighting program for the trees in the commercial areas, and uplighting for the palm trees in the landscaped medians. (moderate) • Install standards on the street lights to accommodate display banners and condition all City events to provide banners sufficient to properly impact the boulevards, (moderate) • Establish a proactive code compliance enforcement program for all properties adjacent to the boulevards including; general maintenance and repair, painting, weeding, storage, trash, etc, (moderate) Long Term • Acquire the rights -of -way necessary and construct landscape medians, a minimum of 8 feet wide to an ideal of 14 feet wide, (difficult) • Acquire properly and construct entry nodes for each District, This can be achieved within the median or proposed traffic circle for McFadden or on adjacent properties to Newport Boulevard like in Lido Village., Cannery Village and Central Balboa should consider a form of Identification signage that would span over the boulevards, (difficult) • Establish a limited number of specifically designed pedestrian crossing locations on the boulevards. Design a special painted area on the pavement and install traffic control devices, (moderate) • Establish specific zoning regulations for properties adjacent to Newport and Balboa Boulevards (Le„ establish uniform setbacks, minimum landscape standards, building height and bulk, limited access, etc,). Signage, although a major concerns, should be reviewed on a District by District basis, (moderate) Recommendation, Improve the public perception of the Balboa Peninsula Solutions; Short -Term • Incorporate a phrase like 'located along the beautiful Balboa Peninsula' in all public advertising and community event publicizing, (easy) Encourage the staging of more year-round special events (i.e. a Farmers Market). The events, although occurring in one District can be used to promote the entire Peninsula. (moderate) Mid -Term Create an extensive public relations campaign for the Peninsula as a whole, with the Chamber of Commerce. (easy) • Encourage the formation of a Business Improvement District in each of the four Districts. (moderate) Expand the Police on Bikes Program for all Districts. Consider combining this service with parking control. (moderate) Long -Term • Create a water oriented boating theme for the Peninsula as a whole, (moderate) • Establish specific bay to ocean pedestrian crossings. (moderate) • Acquire property or limit development and expansion on property which provides unique opportunities for public access to the waterfront. This can be visual as well as physical, (difficult) • Expand the number of waterfront access opportunities. Interconnect the system of boardwalks and Improve the existing view shed along the public rights -of -way. (difficult) Recommendation, Enhance the unique qualities within the individual District to create a Peninsula -wide sense of place, Solutions: Short -Term Develop specific standards for District by District rehabilitation and development. Create different themes for each District that are compatible with the Peninsula as a whole, Mid -Term • Amend current District Specific Area Plans to establish recommended District themes and develop overall Specific Plan for the Peninsula as a whole, (moderate) OBJECTIVE - DEVELOP AN APPROPRIATE MIX OF COMMERCIAL, RECREATION AND RESIDENTIAL USES AND ACTIVITIES, Recommendation, Cluster commercial activities into central cores within each District, Solutions; Short -Term • Establish incentives for cot development within specific facade grants or loans, shared of operation, etc.). (moderate) nmercial enhancement and District core boundaries (i,e„ parking option, expanded hours Mid -Term • Prohibit any expansion or new commercial development outside the determine District core by allowing residential uses, (moderate) • Encourage a more rapid conversion of commercial to residential use by permitting a higher density of residential, Note; Any new or expanded residential uses must be able to provide suff(cienf off-street parking in order to be compatible with surrounding residential uses, (moderate) Long -Term Orchestrate a Relocation and Acquisition Program to move business outside of the central core areas Into existing vacant, underutillzed or underdeveloped properties within the District cores, Recommendation, Encourage desired new and expanded resident compatible commercial activities; Solutions; Short -Term • Draft an ordinance permitting bed and breakfast activities in the transition areas between the Districts' commercial core and the residential areas, (moderate) Permit outdoor dining in select areas without any additional regulations, restrictions, or requirements other than public access, (easy) Permit outdoor sales without further regulations, (easy) Mid -Term • Encourage portable cart sales in select areas (i,e., lease public areas in limited amounts). (easy) • Develop a business recruitment committee to attract new commercial tenants, (moderate) • Establish incentives to attract quality hospitality facilities. (moderate) Long -Term • Master Plan and develop community recreation boating center around marina parking; including existing community, expanded beach and parking with potential small hotel, Recommendation, Enhance and increase the quality and supply of residential uses. Solutions; Short -Term • Adopt and enforce the "Uniform Housing Code." (easy) Mid -Term • Develop new residential standards unique to the Peninsula as a whole, (moderate) Draft new regulations concerning weekly and monthly residential seasonal rentals (i.e., require owner or manager residence on site, payment of transient occupancy tax and business license, etc.), (moderate) LIDO/ CIVIC CENTER LIDO/CIVIC CENTER The Lido/Civic Center District is bound by Newport Boulevard, 32nd Street and the bay. In addition, the District includes Lido Peninsula. The District is divided Into three sub areas; Lido Village, City Hall and Lido Peninsula. Each sub area has slightly different designations. Lido Village is designated for recreation, marine, retail and service commercial. City Hall is designated for retail and service commercial, and allows governmental, educational, and institutional facilities. No residential uses are permitted. Lido Peninsula is designated for recreation and marine commercial and single family attached residential. in addition, Lido Peninsula is zoned Planned community anticipating some future change. • I l} I "` y .l w1[f IMI ' • iI •�� I S N 1 i NEWPORT BAY ' •ldJ .� r 1 p• 1 a ♦ t\ S 1 t , 1 l ' 7 � 1 ♦ • , i 1 • 1 S - ♦ f S ♦♦ 1 ♦ 1 ♦ 1 F I �w 1 •.. .----------- .:.7--w--- � r LIDO/CIVIC CENTER CONCEPT PLAN The Lido/Civic Center is a large diverse District including a major retail area, the City's governmental center and a substantial amount of residential activity. The District is comprised of newer more modem structures distinguishing itself from the other more historic Districts of the Peninsula. Lido Village and Lido Marine Village offer shopping and dining opportunities for area residents and visitors alike. The retail shops mostly cater to the year-round needs of the local population. The District also provides many professional offices and daily houses a fairly large work force. Lido Marine Village developed as a mixed use project has experienced marginal success. The development needs to capitalize better on the adjacent asset of the bay, Water oriented retail, restaurants, entertainment and recreation seem best suited for the site. The inclusion of a residential option as a means of occupying vacant office space should be carefully analyzed. The District is bisected by Via Lido, a major street that serves as a collector to convey residents out of the area. 32nd Street to the south could serve the area better as a through traffic conduit, allowing Via Lido to become a true shopping street with convenient parking, wider sidewalks, street trees and handsome store fronts. There is an abundance of parking in the District; however, it is comprised of a variety of public, private, on -street, off-street, free and fee spaces. Parking is very poorly organized and has become a detriment to the area. A shared parking facility and plan could greatly enhance the District. Lido Peninsula offers the community a special location for future development. The Peninsula should be master planned as a whole and developed in phases. However, it is unlikely that anything will happen in the near future. Overall Lido should continue to serve as the retail hub of the Balboa Peninsula. A series of planning and design recommendations should be employed to enhance the area and restore its retail prominence. LIDO/CIVIC CENTER OBJECTIVES & RECOMMENDATIONS OBJECTIVE - LAND USE TO REESTABLISH AND ENHANCE A MIX OF RETAIL, OFFICE, RESIDENTIAL AND GOVERNMENT ACTIVITIES, Recommendation. Encourage a variety of resident serving commercial and service activities Solutions; Short -Term • Create a retail shopping street along Via Lido by reducing to one travel lane in each direction, (moderate) • Encourage outdoor dining and sales in designated areas, (easy) • Encourage special events such as sidewalk sales, art exhibits, afternoon concerts, etc. (moderate) Mid -Term • Develop a shared parking program for the site behind the civic Center adjacent to Via Oporto, (moderate) • Allow residential development and conversion for select upper story locations, (moderate) • Provide public boat docking facilities In Lido Marine Village, (moderate) Encourage more restaurants, through regulation incentives, i.e., shared parking), (moderate) Long -Term Consolidate public parking uses by eliminating streets and alleyways, (difficult) • Investigate the development of an entertainment center, (difficult) Develop a waterfront assembly area for public gatherings, Le„ the site next to the EIKs facility). (moderate) LIDO/CIVIC CENTER OBJECTIVES & RECOMMENDATIONS OBJECTIVE - ACCESS/CIRCULATION TO ACCOMMODATE BETTER ACCESS TO AND WITHIN THE DISTRICT. Recommendation, Develop a circulation system of local and collector streets, Solutions; Short -Term • Redesign 32nd Street to be an east -west collector street and southern access point to the District, (moderate) • Redesignate Via Lido as two lane/two way shopping street with diagonal parking, (moderate) Maintain Via Oporto in Lido Marine Village for pedestrian and access to the parking structure only, (easy) Maintain entrance to City Hall and Lido Village from Newport Boulevard with additional access points from 32nd Street and Via Lido, (easy) Mid -Term • Establish entrance nodes to the Village from Newport Boulevard at Via Lido and 32nd Streets. (difficult) • Establish a pedestrian priority circulation system using sidewalks, boardwalks and along Via Lido, (moderate) • Create Interconnected waterfront boardwalk through the Village. (moderate) • Develop a series of theme directional signs, (moderate) • Redesign Newport Boulevard and 32nd Street intersection to accommodate additional Lido Island traffic and District traffic (i.e,, two left turn lanes from Newport Boulevard). (difficult) • Create pedestrian, bicycle, electric cart path across channel to Mariner's Mile, (difficult) Long -Term • Reduce left turn pocket from Newport Boulevard to Via Lido from two lanes to one lane. (moderate) • Vacate Via Oporto south of Via Lido and Via Valada and make part of shared parking facility, (difficult) • Investigate a traffic circle at 32nd and Lafayette Avenue, (difficult) LIDO/CIVIC CENTER OBJECTIVES & RECOMMENDATIONS OBJECTIVE - PARKING TO PROVIDE CONVENIENT AVAILABLE PARKING TO FACILITATE ALL RETAIL, RESTAURANT, ENTERTAINMENT, OFFICE AND GOVERNMENT ACTIVITIES. Recommendation: Develop shared public parking facilities in the center of the District. Solutions: Short -Term • Replace parallel parking with diagonal parking along Via Lido. (moderate) • Allow compact size parking stalls in select locations, (easy) • Implement special permit parking program (other than existing city program). (moderate) • Install short and long term meters (working 24 hours a day). (easy) Mid -Term • Develop a parking management plan. including a shared parking resources program (Le„ designate the parking structure for all District employees). (moderate) Provide bicycle parking facilities. (easy) 9 Create new access patterns to exiting parking structure. (easy) Long -Term • Develop a combined or shared valet parking system for restaurant patrons, (moderate) • Review parking patterns and study District parking demand, (moderate) • Remove some on -street parking to accommodate circulation plan (Le„ 32nd Street), (moderate) 0 LIDO/CIVIC CENTER OBJECTIVES & RECOMMENDATIONS OBJECTIVE - IMAGE/AESTHETICS TO REESTABLISH AND ENHANCE THE VILLAGE ATMOSPHERE OF RETAIL AND ENTERTAINMENT FOR THE PENINSULA, Recommendation: Develop a program and plan to improve the Districts character, Solutions: Short -Term • Limit the amount and type of signing allowed for commercial uses. (moderate) • Eliminate non -conforming signs. (difficult) Mid -Term • Develop sign guidelines for the District, (moderate) • Develop uniform street lighting program. (moderate) • Encourage banners for special events. (easy) • Use special pavers or patterns for pedestrian paths. (moderate) • Develop a street tree program, (moderate) • Encourage quality architectural styles and designs through flexible design guidelines. (moderate) • Explore a theme lighting, landscaping and signing for District Identification, (moderate) • Create entry nodes to the Peninsula and District along Newport Boulevard (i,e„ Via Lido and 32nd Street), (difficult) Long -Term • Rehabilitate exterior of City Hall and improve landscaping, (difficult) • Develop a Business Improvement District, (moderate) • Develop a facade improvement for District, with special attention to the Newport Boulevard frontage. (difficult) CANNERY VILLAGE CENTRAL BALBOA Central Balboa is bound by the ocean and the bay between Adams Street and "A" Street. The District is designed for retail and service commercial, single family and two family residential, and allows governmental, educational and institutional facilities. CANNERY VILLAGE CONCEPT PLAN Cannery Village is a unique collection of retail, industrial, office and residential activities, The Village includes a wide variety of structures and a large amount of under developed sites. The area offers an abundance of character and charm and provides the Peninsula with one of its most interesting Districts. Cannery Village started out as the boar yard on the bay across from the active McFadden Pier Area, Following the dredging of the Rhine channel commercial fishing boats began to occupy the waterfront. Fish canneries began operating on docks in the bay and soon an entire marine service industry dominate the area. Today Cannery Village is home to many art galleries, art studios, restaurants, cursor shops and professional offices along with the remaining marine service uses, The Village should continue to attract art related activities, with specialty food opportunities and limited residential. Incentives should be used to enhance the arts related activities and transition away from the marine industrial uses, The perimeter areas of the Village, along 32nd Street and Newport Boulevard, are well sulted for the more intense restaurant, bar and retail activities, The core area should maintain the quiet and quaint qualities that have evolved over the years, Cannery Village needs to develop a more effective vehicular and pedestrian circulation system. Pedestrian movement should have priority over vehicles, therefore, maintain the narrow street system with on -street parking. Also expand sidewalks and develop a system of paseos between blocks and through the alleyways. In addition, the Village should explore the benefits of how detailed specific development regulations and design guidelines can be employed to preserve and enhance a truly unique resource of the Peninsula. The Cannery Village is bound by 32nd Street on the north, Newport Boulevard on the west, 26th Street to the south and the Rhine channel of the bay on the east. The District is designated for recreation, marine, retail and service commercial; general industrial (marine industrial), and two-family residential uses. CANNERY VILLAGE OBJECTIVES & RECOMMENDATIONS OBJECTIVE - LAND USE TO MAINTAIN AND ENHANCE A MIXED USE, ART ORIENTED, SPECIALTY RETAIL AND OFFICE DISTRICT, Recommendation; Develop a site specific master plan identifying the optimum mix of retail, restaurant, residential and office uses, Solutions; Short -Term • Amend Specific Area Plan to restrict activities to specific areas (i.e„ marine industrial only allowed east of Lafayette Avenue and business with later hours of operation should be located on the perimeter of the District). (easy) Mid -Term • Allow residential uses on a project by project basis in order to maintain an adequate mix of activity, including residential within commercial projects and stand alone residential, (moderate) • Discourage industrial activities in the Village core. (easy) Develop a Village square or neighborhood park for public gatherings, (moderate) • Provide for performing arts uses, (moderate) Provide public boat docking facilities (i.e., 29th Street right-of-way), (difficult) • Provide for bed & breakfast facilities consistent with Peninsula -wide regulations on a project by project basis, (moderate) • Develop incentives within the Specific Area Plan to accommodate desired land uses (i.e., restaurants, art galleries and studios, specialty retail, etc,) to take advantage of shared parking programs, or other Incentives. (moderate) Long -Term Limit the amount of alcohol related businesses. (difficult) • Discourage storage and industrial related activities in the commercial core, (difficult) • Discourage the expansion of marine related industrial and encourage a recycling to restaurant and other visitor serving activities, (moderate) CANNERY VILLAGE OBJECTIVES & RECOMMENDATIONS OBJECTIVE - ACCESS/CIRCULATION TO ACCOMMODATE BETTER ACCESS TO AND WITHIN THE DISTRICT. Recommendation: Develop a collector street system around the District. Solutions: Short -Term • Redesign 32nd Street to be an east -west collector street and northern access point to the District. (moderate) • Redesign Lafayette as a two-way collector street around the Village core. (moderate) • Redesignate Villa Way to two-way traffic; acquire additional right-of- way on west side, in necessary, (difficult) • Create a Village entrance at 29th Street and Newport Boulevard. Mid -Term • Develop an Interior circulation system for pedestrian and vehicles. (easy) • Create one-way loop system within the Village by redesignating 31 st Street one-way east and 30th Street one-way west. (easy) • Maintain 29th Street two-way with access from Newport Boulevard. (easy) Establish entrance nodes to the Village from Newport Boulevard at 32nd and 28th Streets and 32nd Street and Villa Way. (moderate) Establish a pedestrian priority circulation system using sidewalks, alley ways, boardwalk and paseos, (moderate) Long -Term • Develop a traffic circle at 32nd and Lafayette Avenue as an entrance node to the Village, (difficult) CANNERY VILLAGE OBJECTIVES & RECOMMENDATIONS OBJECTIVE - PARKING TO PROVIDE CONVENIENT AVAILABLE PARKING TO FACILITATE ALL COMMERCIAL, RESIDENTIAL, OFFICE AND INDUSTRIAL ACTIVITIES. Recommendation: Develop public parking facilities within the District, Solutions: Short -Term • Designate parking facilities on the perimeter of the District, (moderate) • Consolidate public parking facilities, (moderate) • Replace parallel parking with diagonal parking where appropriate, (moderate) • Allow compact size parking stalls in select locations, (easy) • Implement special permit parking program, other than existing city program, (easy) • Install short and longterm meters, working 24 hours a day, (easy) Mid -Term • Develop a parking management plan, including a shared parking program, (moderate) • Provide bicycle parking facilities. (easy) • Develop a combined or shared valet parking system for restaurant patrons, (moderate) Long -Term • Review parking patterns and study District parking demand, (moderate) • Remove some on -street parking to accommodate circulation plan, (easy) • Develop a shared parking facility and program on the perimeter of the Village and reduce the on -site parking requirement, (moderate) CANNERY VILLAGE OBJECTIVES & RECOMMENDATIONS OBJECTIVE - IMAGE/AESTHETICS TO PRESERVE AND ENHANCE THE VILLAGE ATMOSPHERE AND CHARACTER OF THE DISTRICT. Recommendation: Develop a program to improve and enhance the Village character, Solutions: Short -Term • Limit the amount and type of signing allowed for commercial uses, (moderate) • Eliminate non -conforming signs, (difficult) • Maintain small lot development pattern, (easy) • Encourage the use of an "Old Newport" theme in the Village, (easy) • Maintain tight narrow street pattern. (easy) Mid -Term • Develop sign guidelines for District; (i.e., allow only externally Illuminated signs), (moderate) • Develop uniform interior street lighting program, (moderate) 0 Encourage banners for special events, (easy) • Use special pavers or patterns for pedestrian paths, (moderate) • Develop a street tree program, (moderate) • Encourage a variety of architectural styles and design's through flexible design guidelines, (easy) • Develop a Business Improvement District, (moderate) Long -Term • Discourage boat and vehicle storage in the core village area. (difficult) • Underground utilities, (difficult) • Facade improvements along Newport Boulevard, (moderate) MCFADDEN SQUARE MCFADDEN SQUARE McFadden Square is bound by the ocean and the bay from 19th Street to the alley between 23rd and 24th Streets north along Balboa Boulevard to 21 st Street, The District is designated for recreation, marine, retail, and service commercial; single family attached, two-family and multi -family residential land uses, °`c u1fJy'w' i e ♦ a ♦ � y�� r �� �rrrrrrrr�r MCFADDEN SQUARE CONCEPT PLAN McFadden Square is the heart and center of historic Newport Beach, officially designated as "Old Town," The construction of the Newport Pier and subsequent rail connection brought commerce to the coastal area prior to the turn of the century, The railroad was constructed primarily to transport goods arriving from the ocean. However, passenger travel from inland areas to the beach for recreation became popular, Land development responded with hotels, retail shops and beach cottages, clustered around McFadden Square. The red car rail lines continued the stream of visitors to the area. The once sparsely populated sandspit was subdivided into numerous 20 by 85 foot lots to accommodate the new vacationers. Many of the early vacation homes remain today and contribute to the historic character of the District. McFadden Square still serves as the primary destination for beach visitors, This attraction creates numerous traffic, parking, and security problems associated with a beach area, The District has a tremendous opportunity to attract quality commercial and recreational activities providing a greater degree of flexibility is employed in the regulation of new Ideas. A greater effort should be exercised to encourage more year-round and less seasonal business, Easy access and convenient parking as suggested in the Peninsula -wide Plan will contribute to the future success of the District. The McFadden Square District is in need of nurturing attention to once again become the heart of the city, MCFADDEN SQUARE OBJECTIVES & RECOMMENDATIONS OBJECTIVE - LAND USE TO ACHIEVE AND MAINTAIN THE APPROPRIATE MIX OF COMMERCIAL, RESIDENTIAL, AND RECREATIONAL ACTIVITIES, Recommendation: Amend Specific Area Plan (zoning) to be more flexible including incentives desired for designed uses, Solutions: Short -Term • Increase the floor area ratios for commercial development, (moderate) • Encourage outdoor dining in designated areas, (easy) Mid -Term • Develop a shared parking program and reduce the on -site requirement, (moderate) • Allow residential wffhin commercial projects, second floor only, (moderate) • Allow temporary commercial sales from carts or mobile vendors in designated areas, (easy) • Encourage special event activities such as a Farmer's Market, (moderate) • Encourage more commercial activity on and adjacent to the pier. (moderate) • Allow for the Dory Boat Market area to expand. (difficult) • Draft regulations for bed and breakfast facilities, in transitional areas. (moderate) Long -Term • Allow higher density residential as a transition area adjacent to the commercial areas, (moderate) • Discourage commercial uses outside of the core area, (Le., south of 21 st Street), (difficult) • Develop public boat docking facilities at the end of 21 st Street. (difficult) • Develop a master development for the Blurock Property, (moderate) MCFADDEN SQUARE OBJECTIVES & RECOMMENDATIONS OBJECTIVE - ACCESS/CIRCULATION TO ACCOMMODATE BETTER ACCESS TO AND THROUGH THE DISTRICT WITH MINIMAL TRAFFIC CONGESTION, Recommendation, Improve the Newport and Balboa Boulevards interchange, Solutions; Short -Term • "Tee" Balboa Boulevard Into Newport Boulevard at 26th Street, (difficult) • Redesignate 21 st Street two-way into beach parking facility, (easy) Mid -Term • Explore the use of a traffic circle or roundabout at 26th Street for the Newport and Balboa Boulevards interchange, (difficult) Synchronize traffic signals along Newport Boulevard, (difficult) Recommendation; Develop a better system of alternative transportation methods, Solutions; Short -Term Create pedestrian priority areas with specific paver patterns, i,e„ the alleyways on the beach side of Balboa Boulevard between 21 st and 24th Streets), (moderate Develop a bikeway system ub combination with the pedestrian system, (moderate) Mid -Term • Explore a shuttle bus system from McFadden Square to other Districts, (difficult) • Provide tourist and charter bus parking facilities for the entire Peninsula, (difficult) MCFADDEN SQUARE OBJECTIVES & RECOMMENDATIONS OBJECTIVE - PARKING TO PROVIDE CONVENIENT AVAILABLE PARKING TO FACILITATE ALL COMMERCIAL, RESIDENTIAL, AND RECREATIONAL ACTIVITIES, Recommendation: Develop new convenient parking opportunities within the District, Solutions: Short -Term • Create new parking courts on bay side of Newport Boulevard, (easy) • Replace parallel parking with diagonal parking where appropriate (i.e„ 22nd Street bayside of Newport Boulevard), (moderate) • Allow compact size parking stalls In select locations, (i,e„ beach parking 1 st), (easy) • Implement a resident permit parking program, (moderate) • Install short term parking meters adjacent to select commercial locations, (i.e,, both sides of Newport and Balboa Boulevards). (easy) • Create new parking facilities adjacent to Newport Boulevard (on both sides) concurrent with a redesign of Newport and Balboa Boulevards, (difficult) Mid -Term • Establish seasonal beach parking procedures in select location, (l,e., pay when entering, one daily rate, annual passes, etc.). (moderate) • Develop a parking management program, Including shared facilities, short and long-term meters, etc. (moderate) • Provide bicycle parking facilities. (moderate) • Provide bus parking and layover locations in existing parking lot. (difficult) • Develop a shared valet parking program for the various restaurants. (difficult) • Allow a merchant parking validation program. (moderate) Long -Term • Develop a transit center for passenger transfer to shuttle bus system, Include bus layover parking facility. (difficult) MCFADDEN SQUARE OBJECTIVES & RECOMMENDATIONS OBJECTIVE -IMAGE/AESTHETICS TO UPGRADE AND ENHANCE THE HISTORIC COMMERCIAL CHARACTER OF THE DISTRICT, Recommendation: Develop a proactive plan to improve the Districts' character, Solutions: Short -Term • Limit the amount and type of signing allowed for commercial uses, (moderate) • Eliminate non -conforming signage, (difficult) • Implement a street tree lighting program, (moderate) • Provide additional litter canisters, (easy) Mid -Term • Provide Incentives for historic restorations, (moderate) • Underground utility lines, (difficult) • Install theme street lights, (moderate) • Develop restrictive regulations on pier fishing, (moderate) • Organize a Business Improvemerit District, (moderate) Develop a regular maintenance program for the pedestrian areas, (moderate) Develop a street tree program different fromthe boulevard trees and unique to the District. (moderate) Long -Term . Develop a facade Improvement program, (difficult) Create a major entry node statement at 21 st Street, (difficult) Establish an architectural review service for new and rehabilitated development projects. (difficult) CENTRAL BALBOA CENTRAL BALBOA Central Balboa is bound by the ocean and the bay between Adams Street and "A" Street, The District is designed for retail and service commercial, single family and two family residential, and allows governmental, educational and Institutional facilities, 'r � •i e NEWPORT BAY • •30, . � , �+., a f , ice`. 4 . I � I I I I I / I / / PACIFIC OCEAN / / / / CENTRAL BALBOA CONCEPT PLAN Central Balboa is possibly the best known least understood District of Newport Beach, Numerous studies and plans have been prepared for the area; but surprisingly little has changed. Central Balboa Iles in the middle of an intensely developed three mile long narrow. spit of land that culminates in a dead end. the District is rich with unique and diverse features and attractions, The connection and linkage of the bay and the ocean is more evident in Central Balboa than anywhere else in the city. This feature needs to be reinforced and highlighted. The vast amount of beachfront parking should serve as a staging location for the majority of service, entertainment and recreational activities of the area. Pedestrian linkages should then extend to the bayfront, reinforcing the bay and ocean connection. The commercial section of Central Balboa continues to offer a vast selection of seasonally popular retail outlets; while the selection of resident serving retail continues to decline. This fluctuation of commercial activity can be better managed with a proactive planning approach to the District. The recommendations from the previous studies have to some extent been Incorporated in the "Central Balboa Specific Area Plan," Many of the recommendations in this study are a repeat of previous conclusions. in particular there are many worthwhile thoughts expressed in the 1993 RegionaVUrban Design Assistance Team (R/UDAT) Study. Central Balboa is in great need of special attention in order to preserve its unique character and enhance the distinctive collection of structures and features that comprise this community -wide treasure. CENTRAL BALBOA OBJECTIVES & RECOMMENDATIONS OBJECTIVE - LAND USE TO ESTABLISH AND ENHANCE THE APPROPRIATE MIX OF RETAIL, RESIDENTIAL, RECREATIONAL ACTIVITIES FOR THE DISTRICT. Recommendation, Cluster retail activities along Balboa Boulevard between Adams and W Streets, Solutions; Short -Term • Develop a shared parking program in the ocean side parking lot for retail employees, customers, and beach goers, (moderate) • Allow more intense residential development and conversion for select commercial properties outside the central core, (moderate) • Encourage outdoor dining and sales in the core area only. (easy) • Encourage special events such as sidewalk sales, art exhibits, afternoon concerts, etc, (moderate) Mid -Term • Provide public boat docking facilities at the Fun Zone and Pavilion, (moderate) • Consolidate resident serving and compatible commercial, (moderate) • Draft regulations for bed and breakfast facilities, (moderate) • Encourage more commercial activity on and adjacent to the pier, (moderate) • Increase the floor area ratios for commercial development, Particularly encourage second floor activities, (difficult) • Expand the Promenade area in front of the Fun Zone and relocate satellite structures, (moderate) Long -Term • Extend the boat docking facilities further Into the bay, (difficult) • Create a public walkway system at water level around the Pavilion, (moderate) • Relocate the sport fishing fleet and day boat rentals to off shore moorings, (difficult) • Explore the feasibility of a second story interconnecting walkway system, (difficult) • Consolidate private parking lots along Bay Street and allow in fill new developments, (difficult) • Encourage an upgraded Fun Zone expansion, (difficult) CENTRAL BALBOA OBJECTIVES & RECOMMENDATIONS OBJECTIVE - ACCESS/CIRCULATION TO ACCOMMODATE BETTER ACCESS TO AND THROUGH THE DISTRICT. Recommendation: Develop a Circulation System within the District which allows for adequate traffic flow through the District, Solutions: Short -Term • Redesignate Main Street south of Balboa Boulevard for pedestrian only. (easy) Establish entrance node to the Village at Palm Street, (moderate) Mid -Term Create a leaving the Village node with turnaround at W Street, (difficult) • Establish a pedestrian priority circulation system using sidewalks , boardwalks, and alleyways, (moderate) • Develop a series of theme directional signs, (moderate) • Redesign Bay Street as parking court with short term diagonal parking between Main and Adams Streets. (moderate) Long -Term • Connect parking on north and south side of the pler and connect to "B" Street parking, (difficult) • Close "B" Street at the boardwalk, (moderate) • Maintain entrance to beach parking at Palm Street with exit at "K Street, (moderate) • Redesignate Washington Street to pedestrian only, (easy) • Synchronize traffic signals, (difficult) CENTRAL BALBOA OBJECTIVES & RECOMMENDATIONS OBJECTIVE - PARKING TO PROVIDE CONVENIENT AVAILABLE PARKING TO FACILITATE ALL RETAIL, RESTAURANT, ENTERTAINMENT; AND RECREATIONAL ACTIVITIES IN THE DISTRICT, Recommendation: Develop a pool of parking facilities within core area of the District for employees, visitors, and residents alike, Solutions: Short -Term • Create a shared parking program that establishes short term parking for retail customers, long term parking for employees in more remote areas, and day parking for visitors to the area, (moderate) • Replace parallel parking with diagonal parking, where appropriate. (moderate) • Allow compact size parking stalls in select locations, (easy) • Implement special permit parking program (other than existing city program). (moderate) • Install short and long term meters, (working 24 hours a day), (easy) Mid -Term • Develop a parking management plan. (moderate) 9 Provide bicycle parking facilities, (moderate) • Develop a combined or shared valet parking system for restaurant patrons, (difficult) • Review parking patterns and study District parking demand, (moderate) • Create a short term parking court along Bay Street (Le., Palm Street to W Street along Balboa Boulevard), (moderate) • Restructure parking fees and collection methods, (easy) Long -Term • Encourage shuttle buses into the District from a remote location outside of the District, (difficult) • Explore long term sport fishing and Catalina parking In remote facilities, (moderate) • Provide for tour bus parking in remote locations with shuttle service to District, (difficult) • Explore option of additional parking on existing soccer field, recreate soccer field south of current location, (difficult) CENTRAL BALBOA OBJECTIVES & RECOMMENDATIONS OBJECTIVE - IMAGE/AESTHETICS TO REESTABLISH AND ENHANCE THE VILLAGE ATMOSPHERE OF FUN, RETAIL AND ENTERTAINMENT FOR THE COMMUNITY. Recommendation; Develop a series of unique projects that will reestablish a village atmosphere. Solutions; Short -Term • Limit the amount and type of signing allowed for commercial uses, (moderate) Eliminate non -conforming sings, (difficult) Mid -Term • Provide wider sidewalks and a landscaped median along Balboa Boulevard between Palm Street and W Street, (difficult) • Develop sign guidelines for the District, (moderate) • Develop uniform street lighting program, (moderate) • Encourage banners for special events, (easy) • Use special pavers or patterns for pedestrian paths. (moderate) 0 Develop a street tree program, (moderate) , • Encourage the preservation and enhancement and promotion of historic features, (moderate) • Maintain a Business Improvement District, encourage property owner participation, (moderate) • Explore a theme lighting, landscaping and signing for District identification, (moderate) • Create entry and exit node for the District along Balboa Boulevard, (difficult) • Encourage building facade enhancements, (moderate) • Develop a unique landscape theme, i.e,, create a canopy of trees over Main Street and part of Balboa Boulevard, (moderate) • Expand and upgrade oceanside boardwalk and promenade between Adams and "B" Streets, (difficult) Long -Term • Remove overhead utility lines, (difficult) • Establish an architectural review service for new and rehabilitated projects, (moderate) • Maintain grid and small lot development pattern, (easy) • Establish a festive environment with lighting, signing, banners, color awning, landscaping, etc, (moderate) • Create more water view opportunities, (difficult) URBAN MASTER PLANNING URBAN 0ESI6N I A01 QUAIL STREET, SUITE 100 NEWPORT BEACH, CA 92660 TEL )714) 833.9193 FAX )714) 8333098 A PENINSULA PLANNING STUDY ISSUES IDENTIFICATION SUMMARY REPORT August 5, 1996 MASTER PLANNING URBAN DESIGN MASTER PLANNING URBAN DESIGN MEMORANDUM DATE: August 5,1996 TO: Kevin Murphy, City Manager FROM: Jack Camp, President Urban Design Camp SUBJECT: Task 3.2 Work Product No. 7 Balboa Peninsula Planning Study Report Summarizing Round Three District Workshops The round three District Planning Workshops have concluded and modifications have been made to the list of issues and concerns identified in the previous workshops. Planning concept alternative plans were presented and discussed for each District and the Peninsula as a whole. The plans and ideas were well received and a number of comments were generated. These comments will be incorporated into the final document. The workshop also discussed many of the consultants suggested recommendations. Recommendations were offered for each of the major issues identified on the Peninsula and in the Districts. Conceptual plans were also offered for the two special study areas (the Mix -Master intersection and Marina Park). The District and Peninsula plans are currently being modified as discussed in the workshops and will be presented at the August 13,1996 meeting. kbAwpI-mpWpW.dx 1401 QUAIL STREET, SUITE 100 NEWPORT BEACH, CA 92660 TEL (714) 833-9193 FAX (7141 8313098 MASTER PLANNING URBAN 0ES10N Lido Village/Civic Center District Round Three Planning Workshop July 26,1996 (8:00 -10:30 a.m.) Meeting Memorandum Attendance: District Representatives - John Cotton, Bill Dunlap, Jerry King, John Simple, Clarence Turner B.P.P.A.C. -Young Yang City Staff - Sharon Wood Consultant -Jack Camp, Mike Adams (Urban Design Camp) The meeting started with a review of comments generated from the District Round Two Summary Report. Some changes were requested to the previous report. For example: Inclusion of a monorail or other type of transportation link to the rest of the community. Development of a shared parking program. Develop bike and pedestrian paths. The District Representatives next reviewed the Peninsula and District Concept Plans. Concern was expressed for the amount and location of new parking opportunities and impact to the District residents on circulation ideas. The consultants stated throughout the discussion that implementation of the suggested actions could be accomplished in phases. The object of the recommended plan is to provide a variety of solution, small steps, medium steps and grand plans. Overall the plans were well received and many additional thoughts were added for inclusion in the final recommendations including: • The use of new entry nodes as an opportunity to tell the history of the Peninsula. • Enhancement of the public area next to the Elk's Building. • Elimination of the left turn pocket from Newport Boulevard onto Via Lido. Attached to this memorandum is the District Summary Report as amended. 1401 QUAIL STREET, SUITE 100 NEWPORT BEACH, CA 92660 TEL (7141 833.9193 FAX (714) 833-3098 MASTER PLANNING URBAN DESIGN Cannery Village District Round Three Planning Workshop July 24,1996 (4:00 - 6:00 p.m.) Meeting Memorandum Attendance: District Representatives - Michael Porter (Coordinator), John Barry, Gary DiSano, Jane Elliott, Russ Flueter, Bill Hamilton B.P.P.A.C. -Young Yang City Staff - Sharon Wood, John Douglas Consultant - Jack Camp, Mike Adams (Urban Design Camp) The meeting started with a review of comments generated from the District Round Two. Summary Report. Minor changes were suggested to the previous report. The District representatives next reviewed the Peninsula and District Concept Plans. Concern was expressed for the amount and location of new parking opportunities and impact to the District residents on circulation ideas. The consultant stated throughout the discussion that implementation of the suggested actions could be accomplished in phases. The object of the recommended plan is to provide a variety of solutions, small steps, mediums steps and grand plans including: • The need to expand Villa Way to two-way traffic, even at the expense of sidewalks. • The desire for a bayside boardwalk. • Clustering parking opportunities. Attached to this memorandum is the District Summary Report as amended. 1401 QUAIL STREET, SUITE 100 NEWPORT BEACH, CA 92660 TEL )714) 833.9193 FAX )714) 833.3098 MASTER PLANNING URBAN DESIGN McFadden Square District Round Three Planning Workshop July 23, 1996 (4:00 - 6:00 p.m.) Meeting Memorandum Attendance: District Representatives -Marcia Dossey (Coordinator), Henry Johnson, George McGaffigan, Bob Rubian, Fran Ursini B.P.P.A.C. - Rush Hill, Young Yang City Staff - Sharon Wood, John Douglas Consultant - Jack Camp, Mike Adams (Urban Design Camp) The meeting started with a review of comments generated from the District Round Two Summary Report. Minor changes were suggested to the previous report. The District representatives next reviewed the Peninsula and District Concept Plans. Concern was expressed for the amount and location of new parking opportunities and impact to the District residents on circulation ideas. The consultants stated throughout the discussion that implementation of the suggested actions could be accomplished in phases. The object of the recommended plan is to provide a variety of solutions, small steps, medium steps and grand plans. Over all the plans were well received and many additional thoughts were added for inclusion in the final recommendations including: • Providing new parking opportunities on both sides of the redesigned Newport Boulevard. • Exploring a new electric rail line between McFadden and Central Balboa. • Develop a transportation center which serves as a city hub for visitors. • Drop the idea of a sailing theme but develop unifying elements to distinguish Districts. • Reintroduce water taxi service. Attached to this is the District Summary Report as amended. 1401 QUAIL STREET, SUITE 100 NEWPORT BEACH, CA 92660 TEL (714) 833-9193 FAX (714) 833.3098 MASTER PLANNING URBAN DESIGN Central Balboa District Round Three Planning Workshop July 30,1996 (2:00 p.m. - 5:00 p.m.) Meeting Memorandum Attendance: District Representatives - Ron Baers (Coordinator), Bob Black, Don Donaldson, Bill Ficker, Ray Handy, Michael Kransley, Chan LeFebevre, John Wortman B.P.P.A.C. -Tim Collins, Anne Gifford, Young Yang City Staff - Sharon Wood, John Douglas Consultants -Jack Camp, Mike Adams (Urban Design Camp) The meeting started with a review of comments generated from the District Round Two Summary Report. A number of changes were suggested to the prioritization in the report of certain issues. In addition, other items were added or amended. A general concern was expressed that the Peninsula wide issues were too general and needed to provide greater detail. Discussion of the following issues resulted in a change to a higher priority: • Redesign of the beach parking lot. • Development of a remote parking facility with shuttle. • Development of wider sidewalks. • Upgrading the Fun Zone. • Sign code violation enforcement. • Development of new resident compatible retail. • Elimination of over head power lines. The District Representatives next reviewed the Peninsula and District Concept Plans. Concern was expressed for the amount and location of new parking opportunities and impact to the District residents on circulation ideas. The consultant stated throughout the discussion that implementation of the suggested actions could be accomplished in phases. The object of the recommended plan is to provide a variety of solutions, small steps, medium steps, and grand plans. 7401 QUAIL STREET, SUITE 100 NEWPORT BEACH, CA 92660 TEL (714) 833-9193 FAX )714) 833-3098 Overall the plans were well received and many additional thoughts were added for inclusion in the final recommendations for example: • The need for wide sidewalks, even at the expense of on street parking. • Parkway landscaping or landscaping behind the property line. • Landscaping between the curb and house important. • Diagonal parking in front of residential property not a good idea. • The Central Balboa residential area adjacent to the commercial core should have a special treatment. Attached to this memorandum is the District Summary Report as amended. kg\wp\mm&ppsl l.do • A PENINSULA PLANNING WORKSHOP EXERCISE ISSUE IDENTIFICATION BALBOA PENINSULA PLANNING WORKSHOP'EXERCISE The Balboa Peninsula Planning Study began with a planning workshop in each of the four Districts to identify areas of concern. The workshops employed a group of problem solving exercise to provide a systematic, easily understood, and practical method for addressing problems. The planning workshop exercise is designed to continually move problems toward solutions by breaking them down into manageable pieces, identifying responsibilities and determining relevant concerns. This type of analysis brings vague discussions into focus and ideally ends with clear direction. The results of all the brainstorming and discussions of the Balboa Peninsula have evolved into the development of a series of concept alternatives, action plans and strategies to effectuate change. The planning workshops provided an opportunity for the Balboa Peninsula District representatives to describe their unique and collective problems. The consultant team then conducted an analysis and evaluation of the issues and problems identified. In the final round of planning workshops, potential solutions were discussed and characterized according to their importance and priority (low, medium, high)). The priority levels were applied to solutions based on their impact and ability to reach the identified objectives. The issues were next analyzed for their amenability to change (easy, moderate, or difficult). The goal being to identify the most effective solutions to close the gap between the current problems and the community objectives. Three rounds of planning workshops were conducted for each of the four Districts. The concerns presented and discussed on the following pages originated from the District representatives: The issues, objectives and solutions have been reviewed and amended by the District representatives, and reflect a group consensus of those in attendance at the workshops. PENINSULA PENINSULA WIDE CONCERNS LAND USES (6128/96) (Revised 8/2/96) Balboa Peninsula Issue Description • The desire to enhance and develop resident serving commercial activity The need to develop an appropriate mix of commercial tenants • The lack of harbor entrances and bayfront activities Objectives To encourage and enhance waterfront uses • To attract higher quality tenants and more varied users To increase property values • To encourage the consolidation of commercial uses • To create a viable commercial atmosphere Solutions High Priority • Develop incentives to encourage a greater variety of resident serving commercial • Develop a visitor marina with guest docking • Rewrite regulating ordinances to facilitate and encourage desired activities Provide for higher density residential opportunities in transitional areas (The area between commercial and lower density residential) • Explore all possible regulating options for alcohol related sales Develop a bed and breakfast facility ordinance • Investigate enhancement and expansion of Marina Park at 15th Street • Develop regulations for weekly vacation rentals ACCESS/CIRCULATION (6/28/96) Peninsula (Revised 812/96) Issue Description • The circulation patterns are confusing and destinations are poorly defined • Need to accommodate various forms of individual and public transit • Poor circulation to and within Districts Objectives • To facilitate resident access on the peninsula • To attract more retail shoppers • To accommodate area visitors • To improve the visual appearance of the streetscape • To create more pedestrian ways Solutions High Priority • Prepare a traffic implementation plan • Develop an interconnective series of pedestrian walkways • Establish a system of public boat docking facilities • Install an integrated directional signage program • Design a number of entry and arrival monuments • Encourage alternative forms of transportation • Reconfigure the Newport and Balboa Boulevards interchange • Improve Newport Boulevard and PCH interchange • Synchronize traffic signals Balboa 1 PARKING (6/28/96) (Revised 8/2/96) Issue Description • The peninsula has a competition for available parking spaces Objectives • To discover the peninsula's true parking demand To create additional parking opportunities To improve the usage of existing parking facilities Solutions High Priority Balboa Peninsula Provide short term convenient parking adjacent to resident serving commercial uses Consolidate longterm parking facilities Develop shared parking programs and facilities in select locations Develop a parking management plan for existing parking facilities Redirect parking revenues back to the areas which,generated them Preserve residential parking facilities Investigate a transit center Provide charter bus layover areas IMAGE / AESTHETICS Balboa (6/28/96) Peninsula (Revised 8/2/96) Issue Description • The character of the area is lacking a sense of community and linkage The need for water quality improvement Objectives To create a sense of place To create a quality image for the water • To develop better views of the water To upgrade the village character of the individual districts To upgrade the peninsula's infrastructure Solutions High Priority • Develop a peninsula wide lighting and public signage theme Develop unique but compatible individual village themes throughout the peninsula L Develop consistent and/or compatible streetscape plans • Develop a theme landscaping or street tree program • Develop a uniform maintenance and repair program for all public improvements peninsula wide Provide a strider enforcement of various code compliance • Develop a sign code program the provide a uniform compatibility without inhibiting creativity • Provide landscaped medians where feasible • Develop entry nodes for each village • Improve the visual appearance of Newport and Balboa Boulevards VILLAGE LAND USES (Revised 6/14/96) (Revised 7/26/96) Issue Description Lido Village/ Civic Center District • The District needs to identify a distinct purpose and direction. Objectives: • To attract more resident serving and visitor serving commercial uses • To attract higher quality tenants, more varied users and design professionals • To increase property values • To accommodate more residential opportunities Solutions High Priority • Develop more family restaurants and theaters (one-two additional screens) • Discourage additional night club activities • Permit more residential in fill projects • Provide for mixed use projects • Review zoning ordinances and explore appropriate changes • Determine the appropriate mix of residential and commercial uses • Develop a visitor's Marina and short term docking spaces • Reinforce the concept of being a "point of destination" • Develop a pedestrian friendly environment Medium Priority • Develop and Entertainment Center Master Plan (i.e. Triangle Square) Encourage hotel development Install fiber optic system underground to encourage more professional offices and internet occupancies Expand the public area next to the Elk's Building Low Priority • Designate an additional gas station site (prefer central location) Develop a new City Hall and Civic Center ACCESS/CIRCULATION Lido Village/ (Revised 6/14/96) Civic Center (Revised 7/26/96) District Issue Description • Poor circulation to and within the District Objectives • To improve pedestrian and vehicular patterns • To improve access to Lido Island and Lido Peninsula • To guide visitors to select areas of the District Solutions High Priority • Install directional signal • Develop signage specific for the Village Develop an organized circulation plan • Block off Via Oporto to vehicles Create pedestrian ambiance in Lido Village and Marina. Correct bottleneck at Arches Bridge • Install traffic control devices for pedestrian crossings • Remove left turn pocket from Newport Blvd. to Via Lido Medium Priority Review one and two way circulation patterns Develop a footbridge to the Mariners Mile area • Improve access to Lido Island from 32nd Street • Develop a. mono -rail from Mariner's Mile • Develop a bicycle circulation plan PARKING (Revised 6/14/96) (Revised 7/26/96) Lido Village/ Civic Center District Issue Description • The District has a continuous hassle over available parking spaces Objectives • To improve shared usage of existing parking facilities • To develop free, convenient and available parking for resident serving commercial Solutions High Priority • Review parking utilization patterns • Develop a managed parking program • Short and longterm meters • Develop joint use parking plans with reciprocal agreements • Develop a shared parking plan for Lido Village, Marina and Elks Club. • Provide free church parking on Sundays • Develop user friendly safe access to well lit parking facilities • Develop District wide shared parking program Medium Priority • Close certain streets to create more parking • Expand existing parking structure for Lido Marina, Lido Village and City Hall Low Priority • Install charter boat parking IMAGE/AESTHETICS (Revised 6/14/96) (Revised 7/26/96) Issue Description . The District needs to preserve the Village character Objectives • To establish a pedestrian friendly environment • To bring back the former commercial luster to the area To improve the area infrastructures To make the area more attractive Solutions Lido Village/ Civic Center District High Priority Develop a standardized streetscape design for area Reevaluate current codes Establish theme lighting, landscaping, signing for community identification Create a pedestrian environment • Improve streetscape and landscaping on Newport Blvd. Develop a better integration of commercial areas • Upgrade area infrastructure Develop a theme for the area Medium Priority • Redesign 32nd Street improve streetscape and preserve parking Develop entry nodes with historic story of Peninsula with statues Low Priority . Redesign or rebuild City Hall CANNERY VILLAGE LAND USES Cannery (Revised 6/12/96 Village (Revised 7/24/96) District Issue Description • The District has a number of objectionable, marginal and under utilized land uses Objectives • To maintain a mixed use area • To create more art studios, design uses and specialty retailers • To limit manufacturing and warehousing uses Solutions High Priority • Review zoning ordinances and explore appropriate zone changes • Determine the appropriate mix of residential and commercial uses • Explore incentive programs for property owners to help implement the ideal mix of uses • Do not allow more night clubs • Enhance marine retail • Discourage hard liquor establishments • Maintain marine light industrial as visitor attraction Medium Priority • Encourage the relocation of construction, service and storage uses • Review ABC regulations • Encourage bed and breakfast uses • Encourage more outdoor uses • Relax marine incentive provisions of the zoning • Encourage performing art uses ACCESS/CIRCULATION (Revised 6/12/96) (Revised 7/24/96) Issue Description • Access to the Village is poor Objectives • To improve visitor access to the Village • To keep the notion of "Newport Beach's best kept secret" Solutions High Priority • Maintain narrow streets • Install directional signage • Promote the Village location with advertising • Review one and two way circulation patterns • Develop an organized circulation plan • Install wider sidewalks • Improve access from Newport Boulevard • Make Villa Way and LaFayette two-way • Develop bayside boardwalk Medium Priority • Develop signage specific for the Village • Eliminate the triangle island adjacent to the Village Cannery Village District PARKING Cannery (Revised 6/12/96) Village (Revised 7/24/96) District Issue Description . The Village has an adequate parking supply with spot areas of concern Objectives • To improve the usage of existing parking facilities • To develop a clear definition of public parking Solutions High Priority • Maintain public parking facilities • Review parking utilization patterns Develop a managed parking program • Install short and longterm meters • Develop a parking permit program • Resolve parking issues on 29th and 30th Street • Review parking along Villa Way Medium Priority • Develop nighttime parking plan • Review the parking utilization in private lots Low Priority • Develop remote parking facilities for buses IMAGE/AESTHETICS Cannery (Revised 6/12/96 Village (Revised 7/24/96) District Issue Description Objectives • The Village atmosphere needs preservation • The water quality of "The Rhine" needs improvement • To upgrade the Village character • To eliminate litter problem • To maintain the great sense of community • To stop vandalism in Village Solutions High Priority • Reevaluate current codes Establish Village identification signage Establish theme lighting, landscaping, signing for community identification • Enforce clean up laws • Develop a letter clean up program ("Litter -Free Zone") • Enforce noise ordinance • Develop a marketing program • Develop a merchants association • Create a walking environment • Conduct community fairs • Install public trash receptacles Medium Priority • Develop a standardized sign code but avoid "sameness" • Reinforce small lot provisions • Reinforce historic elements "Old Newport" • Review the amount of public storage • Rename Lafayette Street to "Cannery Row" Low Priority 0 Explore a canal or pipeline to circulate water better SAFETY (Revised 6/12/96) (Revised 7/24/96) Cannery Village District Issue Description • The Village needs continuous police enforcement of existing, regulations Objectives To increase police visibility • To reduce crime incidences • To reduce police response time Solutions High Priority Increase police awareness of Village concerns Create positive police visibility Patrol bars more frequently Medium Priority • Improve area lighting • Add one police unit specifically for the Cannery • Implement bicycle police patrol on weekends • Enforce traffic laws on bicyclers • Install pedestrian crossings on Newport Blvd. MCFADDEN SQUARE LAND USES (Revised 6/11/96) (Revised 6/18/96) (Revised 7/23/96) McFadden Square District Issue Description • The need to develop away of achieving the appropriate mix of commercial, residential and recreational uses • The lack of a Harbor entrance and public dock space in the District. Objectives • To encourage the consolidation of commercial uses in the District's core area and accommodate higher density residential uses on the periphery • To improve access to the District • To create better access to the Bay and Bayfrontage • To improve the retail tenant mix by creating more upscale specialty retail opportunities Solutions High Priority • Develop a Balboa Peninsula entrance • Develop a peninsula wide consistent lighting theme • Develop public boat docking facilities at 19th Street • Develop boat and vehicle parking facilities for public dock users • Explore appropriate zone changes • Allow higher density residential in the transitional areas • Organize regularly scheduled special events with City sponsorship and assistance • Encourage bed and breakfast facilities, and good transition zone use • Enhance and provide more space for the Doryman's Fish Market. • Encourage outdoor dining • Propose more flexibility with variances and ordinance to upgrade retail activity • Encourage commercial uses on and adjacent to the pier • Explore alternative uses for Marina Park • Review ordinances to determine inhibitors to new development and rehabilitation • Review mixed used provisions in zoning ordinance • Investigate Farmer's Market potential and alternative locations LAND USES con't. (Revised 6/11/96) (Revised 6/18/96) (Revised 7/23/96) McFadden Square District Solutions Medium Priority • Develop more public restroom facilities • Increase usage of bayfrontage private and public Extend public boardwalk on bayfront and wider boardwalk on oceanfront Increase usage of oceanfront property for recreational activities and special events • Develop buffers between residential and commercial uses Explore the potential for additional surface and structured parking at inland locations Low Priority • Explore incentive programs for property owners to help implement the ideal mix of uses • Redesign and rebuild pier for various commercial and recreational activities ACCESS/CIRCULATION McFadden (Revised 6/11/96) Square (Revised 6/18/96) District (Revised 7/23/96) Issue Description • Access and flow to the District and between areas of the District is poor and awkward • Need to be able to accommodate boat, bicycle, pedestrian, public transit and individual vehicle transportation Objectives • To improve resident and visitor access by boat • To maintain McFadden Square as a destination • To create safe and attractive pedestrian walkways • To develop a better use of the alleys for pedestrians, cars and service vehicles Solutions High Priority • Reconfigure traffic patterns • Reconfigure Balboa Blvd. and Newport Blvd. • Provide more signalized crosswalks • Reconfigure pedestrian flow • Install better street lighting • Develop parking lot control system which discourage vehicle circling looking for a vacant space • Restrict, regulate and enforce activities in the alleys • Need for better pedestrian access from the bay to the beach Medium Priority • Develop uniform entrance signs and directional signs • Develop pedestrian circulation system with pavers, lighting, etc. • Explore shuttle transportation system from a centralized transportation center Low Priority 6 Explore pedestrian malls or mini malls on 22nd and 23rd Streets PARKING McFadden (Revised 6/11/96) Square (Revised 6/18/96) District (Revised 7/23/96) Issue Description • The District experiences competition for the available parking spaces • Peninsula wide parking is limited and expensive, the City supplies parking with a double standard city wide Objectives • To improve the usage of existing parking facilities • To provide new convenient parking areas • To develop a transportation center Solutions High Priority Develop a managed parking program including: Short and longterm meters Parking permit program Pay as you exit program A validation program Location and amount of change machines Signage to better explain parking rules Special parking for boat patrons, transients and locals that travel by boat Direct district parking revenues to district parking improvements Explore the acquisition and consolidation of parking areas 23rd -28th Street including a new parking structure Provide bicycle parking facilities Medium Priority • Develop long term parking area for buses • Explore options and facilities necessary for a transportation center IMAGE/AESTHETICS (Revised 6/11/96) (Revised 6/18/96) (Revised 7/23/96) Issue Description • The commercial character of the District needs enhancing • The water quality in ocean and bay needs improvement Objectives McFadden Square District • To eliminate non -conforming signage and prohibit excess signage • To establish a village character with consistent lighting • To establish better lighting for pedestrian convenience and safety • To eliminate the litter problem Solutions High Priority • Reevaluate current codes • Establish consistent lighting standards with fixtures and illumination • Enforce clean up laws - empower additional individuals • Require individual trash cans for all tenants • Investigate water quality concerns with the county • Implement boat dumping policies and enforcement program • Enhance beach recreational activities, volleyball, fire rings, basketball, etc. • Discourage resident use of public trash facilities • Develop a charming old world pier • Keep the pier clean • Limit fishing hours on the pier • Enforce fishing rules • Create special fishing areas • Develop a maintenance program • Organize a Business Improvement District • Prohibit skateboarding in pedestrian areas • Steam clean sidewalks • Increase Harbor patrol and monitoring debris • Underground utilities • Upgrade entire city infrastructure • Direct community and police involvement to identify hot spots and issues and establish tolerance levels for enforcement • Implement noise ordinance IMAGE/AESTHETICS contd. (Revised 6/11/96) (Revised 6/18/96) (Revised 7/23/96) Medium Priority McFadden Square District • Develop a standardized sign code to encourage clean and simple signing without a contrived look • Create a citizens committee to provide input on a new sign code and possibly oversee sign approvals • Develop a litter clean up program • Hire a cleaning contractor to maintain sidewalks and alleys • Enforce noise ordinance of public speakers and provide a designated area • Empower lifeguards to cite litter violators • Develop wider sidewalks • Improve pedestrian, bicycling and in -line skating flow and safety, develop minimum width standards for these activities • Prepare a marketing program with the Chamber of Commerce city wide or peninsula wide • Provide public refuse bags for dogs • Develop Harbor boardwalk on public and private land in commercial areas • Install two entrance way signs for the Peninsula • Develop landscape guidelines and material pallet unique to area weather conditions • Develop District design review guidelines as suggestions only • Replace existing street trees and explore tree lighting Low Priority Explore skateboard parks SAFETY (Revised 6/11/96) (Revised 6/18/96) (Revised 7/23/96) McFadden Square District Issue Description • The relationship of the police with the public needs improvement Objectives To enhance the police image and enforcement attitude • To reduce District crime • To reduce police response time • To prohibit transient sleeping • To improve the relationships and correct the fear of repercussions concern Solutions High Priority Increase police visibility in a positive manner Increase police patrol time in area during peak times Continue with education of police Medium Priority • Develop a police substation in the District with good visibility • Investigate community oriented policing • investigate the role of alcohol in the Districts crime rate LAND USES Central (Revised 6/4/96) Balboa (Revised 7/30/96) District Issue Description • The area has an over supply of commercial space • The District needs to identify the appropriate mix of retail, residential and recreational uses Objectives • To encourage more attractive/new commercial development • To capitalize on bayfront and beachfront exposure • To create a viable commercial atmosphere Solutions High Priority • Develop a greater variety of resident serving commercial • Develop incentives to upgrade retail areas • Develop a visitor marina with guest -docking or provide off shore moorings with dinghy docking • Reviewzoning • Support the establishment of a property owner based Business Improvement District (B.I.D.) • Investigate the formation of an assessment District for capital improvements • Upgrade the existing Fun Zone • Upgrade the Balboa Inn • Tie together village, bay and beach activities • Encourage more hotel development • Encourage bed and breakfast activity in transitional areas Medium Priority • Reduce the amount of designated commercial space in isolated areas • Review alternative pier and beach area uses ACCESS/CIRCULATION Central (Revised 6/4/96) Balboa (Revised 7/30/96) District Issue Description • The District experiences traffic congestion summer, holidays and peak hours • The area circulation patterns are confusing and destinations are poorly defined Objective • Resident, merchants, and the city all view the circulation issues differently • To facilitate resident access to Peninsula Point and reduce the number of misdirected visitors • To attract more retail shoppers • To improve the visual appearance of the streetscape Solutions High Priority • Improve Balboa Boulevard by eliminating some parking and creating wider sidewalks • Develop directional signing program • Develop a traffic management plan on and off the Peninsula • Synchronize traffic signals Enhance pedestrian walkways • Develop traffic turn arounds • Develop an arrival statement in Village Use bay/water taxis Medium Priority • Maintain the basic grid pattern Discourage block consolidation • Encourage alternate forms of vehicular transportation PARKING Central (Revised 6/4/96) Balboa (Revised 7/30/96) District Issue Description • The District has a continual competition for available parking spaces • The District's public parking facilities are poorly designed and manager with too much emphasis on beach demand Objectives • To discover the District's true parking demand based on land use policies and market conditions • To provide adequate resident and visitor parking opportunities To maintain sufficient parking for the "Catalina Flyer" • To improve parking for Central Balboa merchants Solutions High Priority Develop a program and plan to address parking needs Develop a parking management plan for existing supply Develop tour bus parking areas • Develop a parking adjusted to. specific users Conduct a parking user survey • Develop a parking validation system • Issue resident parking stickers • Develop parking regulations and enforcement for charter boat and sport fishing boat passengers • Redesign beach parking lot Develop a remote parking facility with shuttle into District Medium Priority • Create employee parking areas • Develop special dock areas for boat patrons • Implement a free parking program for the offseason IMAGE/AESTHMCS (Revised 6/4/96) (Revised 7/30/96) Issue Description • The character of the area is lacking a sense of community • The District needs to develop an image of a family oriented water recreation place to go with more than a beach Objectives • To create a quality image for the area • To improve the design of new and remodeled buildings • To develop better views of the harbor and from the harbor To establish a clean and secure feeling • To preserve the historic image Solution High Priority • Upgrade the appearance of Balboa Boulevard • Organize on street parking • Develop gateways to the village • Remove overhead utility lines • Replace old sidewalks and streets • Create wider sidewalks • Designate no parking areas • Emphasize pedestrian activities and experience • Add landscaped frontages and medians • Develop streetscape and lighting plans • Relocate small buildings along bayfront boardwalk • Improve the Fun Zone and boardwalk • Develop a sign program which addresses murals • Appoint an architectural committee to review changes Medium Priority $6Jwp1r-mpXbpps10 Central Balboa District Develop consistent landscaped parkways along Balboa Boulevard • Develop a District theme • Develop regulations for the operation of sport fishing boats • Explore the creation of a Redevelopment Agency to work along with the Business Improvement District • Develop design guidelines Develop a public art program • Highlight the District's history, and showcase as potential theme URBAN DESIGN MASTER PLANNING URBAN DESIGN 1401 QUAIL STREET, SUITE 100 NEWPORT BEACH, CA 92660 TEL (714) 833.9193 FAX (7141 8333098 PENINSULA PENINSULA WIDE CONCERNS Balboa Peninsula Wide Land Uses (6-28-96) Issue Description • The desire to enhance and develop resider serving commercial activity • The need to develop an appropriate mix of enants • The lack of harbor entrances and bayfront a ivities �A , Objectives 0 • To encourage and enhance waterfront uses • To attract higher quality tenants and more varied us A • To increase property values , • To encourage the consolidation of commercial uses To create a viable commercial atmosphere Solutions • Develop incentives to encourage a greater variety of resident serving commercial • Develop a visitor marina with guest docking • Rewrite regulating ordinances to facilitate and encourage desired activities • Provide for higher density residential opportunities in transition areas (The area between commercial and lower density residential) • Explore all possible regulating options for alcohol related sales Balboa Peninsula Wide Access / Circulation (6-28-96) Issue Description • The area circulation patterns are confusing and destinations are poorly defined • Need to accommodate various forms of individual and public transit • Poor circulation to and within districts Objectives • To facilitate resident access on the peninsula • To attract more retail shoppers • To accommodate area visitors • To improve the visual appearance of the streetscape • To create more pedestrian ways Solutions • Prepare a traffic implementation plan • Develop an interconnective series of pedestrian walkways • Establish a system of public boat docking facilities • Install an integrated directional signage program • Design a number of entry and arrival monuments • Encourage alternative forms of transportation • Reconfigure the Newport and Balboa Boulevards interchange Balboa Peninsula Wide Parking (6-28-96) Issue Description • The peninsula has a competition for available parking spaces Objectives • To discover the peninsula's true parking demand • To create additional convenient parking opportunities • To improve the usage of existing parking facilities Solutions • Provide short term convenient parking adjacent to resident serving commercial uses • Consolidate long term parking facilities • Develop shared parking programs and facilities in select locations • Develop a parking management plan for existing parking facilities • Redirect parking revenues back to the areas which generated them • Preserve residential parking facilities Balboa Peninsula Wide Image / Aesthetics (6-28-96) Issue Description The character of the area is lacking a sense of community A need for water quality improvement Objectives • Create a sense of place • To create a quality image for the area • To develop better views of the water • To upgrade the village character • To upgrade the peninsula's infrastructure zS" y �d .a Solutions • Develop a peninsula wide lighting and public signage theme • Develop unique but compatible individual village themes throughout the peninsula • Develop consistent and/or compatible streetscape plans • Develop a theme landscaping orstreet tree program • Develop a uniform maintenance and repair program for all public improvements peninsula wide • Provide a stricter enforcement of various code compliance • Develop a sign code program that provides a uniform compatibility without inhibiting creativity � 0P 4, Balboa Peninsula Special Study Areas In addition to the unique and peninsula wide issues expressed at the District Planning Workshops, the Balboa Peninsula Planning Advisory Committee has identified select special areas for individual attention and study. 1. Marina Park and Mobile Home Park 18th -15th Streets (Redesign options) 2. Balboa Boulevard Beatification (Continuation of the two block project) 3. Newport Boulevard and Balboa Boulevard interchange (Redesign options) 4. Tour boat/charter boat (Competition with other visitor activities) S. Residential weekly rentals (Means of regulation) PENINSULA PLANNING STUDY CITY OF NEWPORT BEACH, CALIFORNIA MASTER PLANNING URBAN 0ESIGN MEN MASTER PLANNING URBAN DESIGN MEMORANDUM DATE: June 14,1996 TO: Kevin Murphy, City Manager City of Newport Beach FROM: Jack Camp, President Urban Design Camp SUBJECT: Work Product No. 5 Balboa Peninsula Planning Study Report Summarizing Four District Workshops Orientation Meetin The District Planning Workshops began with an orientation meeting on May 15,1996. Kevin Murphy, City Manager stated the City was making a commitment that this was not going to be another planning study to be conducted and later shelved. The City has expressed the need for change particularly economic change. He stated that the desire is to find the ways for the Balboa Peninsula to improve and Newport Beach to age gracefully. Tim Collins, representing the Balboa Peninsula Planning Advisory Committee (B.P.P.A.C.) expressed the desire for economic development which is resident serving. The B.P.P.A.C. developed a 15 Point Plan which was discussed and reviewed for those in attendance. In addition the Linda S. Congleton economic analysis of the retail patterns and expectations for Central Balboa was reviewed. Finally Jack Camp (Urban Design Camp) serving as a planning consultant outlined the new planning study and explained the process by which the issues for each District will be obtained and potential solutions formulated. The meeting concluded with each District's representatives gathering to select a District Coordinator and schedule meeting dates. 1401 QUAIL STREET, SUITE 100 NEWPORT BEACH, CA 92660 TEL (714) 833-9193 FAX (714( 833.3098 Mr. Kevin Murphy June 14,1996 City of Newport Beach Page 2 Round One District Planning Workshops All individual District meetings started with an orientation, by the consultant, to the process and explanation of the forms to be filled out. Each of the sessions lasted about2-3 hours with the consultant available at the beginning to start exercise and toward the end to address any questions. Many of the Districts conducted additional first round meetings in order to be assured that all the issues were presented. First round meetings were conducted as follows: Central Balboa May 21,1996 Cannery Village May 22,1996 McFadden Square May 23,1996 Lido Village May 24, 1996 Round Two District Planning Workshops These individual District meetings reviewed summary sheets prepared by the consultant from the issues sheets completed by the District representatives. The issues werefurther explained with additional concerns being. addressed. The solutions presented were also discussed as to priority and ability for implementation. Mr. Kevin Murphy June 14,1996 City of Newport Beach Page 3 Second round meetings were conducted as follows: Central Balboa June 4,1996 McFadden Square June 11, 1996 and June 18, 1996 Cannerywllage June 12,1996 Lido Village June 14,1996 The planning workshops have proven to be a very effective tool for the gathering of all the various issues important to the Peninsula. The level of participation and enthusiasm has remained high throughout the process. The individual districts are working hard to achieve a group concensus on the various issues and the results to date are very encouraging. A meeting summary has been attached to this memo. cc: Sharon Wood John Douglas CENTRAL BALBOA URBAN DE IGN MASTER PLANNING URBAN DESIGN Central Balboa District Round Two Planning Workshop June 4, 1996 (1:30 - 6:30 p.m.) Summary Report Attendance: District Representatives - Ron Baers (coordinator), Bob Black, Don Donaldson, Bill Ficker, Ray Handy, Michael Kransley, Chan LeFebevre, Dan Thompson, John Wortman City Staff - Sharon Wood, John Douglas Consultant - Jack Camp, Mike Adams (Urban Design Camp) The meeting started with a review of the exercise and a more detailed explanation of the process. The objective of the round two meeting was explained and a brief overview of the issues were discussed. In response to an expressed concern about potential funding for various project, the consultant team prepared and presented an overview of possible funding sources for consideration by the District and the City. Issue Identification The District completed 22 issues sheets. A summary sheet was prepared from the groups round one workshop, May 21,1996 meeting and distributed to each District representative. The consultant further summarized the district issues into four major topics (land uses, access/ circulation, parking, image/aesthetics). The major topics were then presented by issue descriptions, objectives and potential solutions. The highlights for further refinement came from the district issues sheets. The issues sheets have been attached to this report. The exercise next challenged the group to review and discuss each issue and evaluated the identified solutions. This resulted in a prioritization of potential solutions (high, medium, or low). The discussion then focused on the difficulty to implement the identified soltuions (easy, difficult or impossible). The meeting concluded with a consensus of those participating, that all the major issues and concerns of their District and the Peninsula as whole had been adequately expressed. A summary of the district's issues objectives and solutions is attached to this report. 1401 QUAIL STREET, SUITE 100 NEWPORT BEACH, CA 92660 TEL (71 A) 833.9193 FAX i714) 8333098 LAND USES (Revised 6/4/96) Issue Description Objectives Solutions High Priority Medium Priority Low Priority • To encourage more attractive/new commercial development • To capitalize on bayfront and beachfront exposure • • To create a viable commercial atmosphere • Develop a greater variety of resident serving commercial • Develop incentives to upgrade retail areas • . Develop a visitor marina with guest docking • Highlight the districts history • Reviewzoning • Support the establishment of a business improvement districtn n • Tie together village, bay and beach activities • Encourage more hotel development • Encourage bed and breakfast activity d ' • Reduce the amount of designated commercial space in isolated areas • Reduce amount of commercial zoning • Review alternative pier and beach area uses Central Balboa District • Over supply of commercial space. The District needs to identify the appropriate mix of retail, residential and recreational uses. -1 V� ACCESS/CIRCULATION Central (Revised 6/4/96) Balboa District Issue Descriptions • The District experiences traffic congestion summer, holidays and peak hours • The area circulation patterns are confusing and destinations are poorly defined • Residents, merchants, and the city all view the circulation issues differently Objective • To facilitate resident access to Peninsula Point • To attract more retail shoppers • To improve the visual appearance of the streetscape Solutions High Priority • Develop directional signing program • Develop a traffic management plan on and off the Peninsula • Synchronize traffic signals • Enhance pedestrian walkways • Develop traffic turn arounds • Develop an arrival statement in Village • Use bay/water taxis Medium Priority • Maintain the basic grid pattern • Discourage block consolidation Low Priority • Encourage alternate forms of transportation PARKING Central (Revised 6/4/96) Balboa District Issue Description Objectives Solutions High Priority Medium Priority Low Priority • The District has a continual competition for available parking space • The District's public parking facilities are poorly designed and managed with too much emphasis on beach demand • To discover the District's true parking demand based on land use policies and market conditions • To create additional resident and visitor parking opportunities • Develop a program and plan to address parking needs • Develop a parking management plan for existing supply • Develop tour bus parking areas • Develop a parking adjusted to specific users • Conduct a parking user survey • Develop a parking validation system • Issue resident parking stickers • Redesign beach parking lot • Start valet parking service • Create employee parking areas • Develop special areas for boat patrons • Develop off site parking facilities • Implement a free parking program for the off season IMAGE/AESTHETICS Central (Revised 6/4/96) Balboa District Issue Description Objectives Solution High Priority Medium Priority Low Priority • The character of the area is lacking a sense of community. The area needs places to go to other than the beach • To create a quality image for the area • To improve the design of new and remodeled buildings • To develop better views of the harbor and from the harbor • To establish a clean and secure feeling • To preserve the historic image • Organize a street parking • Develop gateways to the village • Remove overhead utility lines • Replace old sidewalks and streets • Create wider sidewalks • Designate no parking areas • Emphasis pedestrian activities and experience • Add landscaped frontages and medians • Develop streetscape and lighting plans • Develop consistent parkways • Appoint an architectural committee to review changes • Develop a district theme • Develop design guidelines • Develop a public art program • Develop a sign program MCFADDEN SQUARE MASTER PLANNING URBAN DESIGN McFadden Square District Round Two Planning Workshop June 11,1996 (1:00 - 5:00 p.m.) Continued June 18,1996 (4:00 - 6:00 p.m.) Summary Report Attendance: District Representatives - Marcia Dossey (Coordinator), Henry Johnson, (6/11/96) Garold Adams (late) CityStaff- Sharon Wood, John Douglas Consultant - Jack Camp, Mike Adams (Urban Design Camp) Attendance: District Representatives - Marcia Dossey (Coordinator), Garold Adams, (6/18/96) Rush Hill, Henry Johnson, George McCaffigan, Bob Rubian City Staff - Sharon Wood, John Douglas Consultant - Mike Adams (Urban Design Camp) The meeting started with a review of the exercise and a more detailed explanation of the process. The objective of the round two meeting was explained and a brief overview of the issues were discussed. In response to an expressed concern about potential funding for various projects, the consultant team prepared and presented an overview of possible funding sources for consideration by the District and the City. Issue Identification The district completed 32 issues sheets. A summary sheet was prepared from the groups round one workshop, May 23, 1996 and distributed to each District representative. The consultant further summarized the district issues into five major topics (land uses, access/ circulation, parking, image/aesthetics and safety) The major topics were then presented by issue descriptions, objectives and potential solutions. The highlights for further refinement came from the District issue sheets. The issue sheets have been attached to this report. 1401 QUAIL STREET, SUITE 100 NEWPORT BEACH, CA 92660 TEL (714i 833.9193 FAX 17141 833.3098 McFadden Square District Round Two Planning Workshop Summary Report Page 2 The exercise next challenged the group to review and discuss each issue and evaluated the identified solutions. This resulted in a prioritization of potential solutions (high, medium or low). The discussion then focused on the difficulty to implement the identified solutions (easy, difficult or impossible). The meeting concluded with a consensus of those participating that all the major issues and concerns of their District and the Peninsula as a whole had been adequately expressed. A summary of the District issues, objectives and solutions is attached to this report LAND USES (Revised 6/11/96) (Revised 6/18/96) McFadden Square District Issue Description • The need to develop away of achieving the appropriate mix of commercial, residential and recreational uses • The lack of Harbor entrance and public dock space in the District. Objectives • To encourage the consolidation of commercial uses in the District's core area and accommodate higher density residential use's on the periphery • To improve access to the District • To create better access to the Bay and Bayfrontage • To improve the retail tenant mix by creating more upscale specialty retail opportunities Solutions High Priority • Develop a Balboa Peninsula entrance • Develop a peninsula wide consistent lighting theme • Develop public boat docking facilities at 19th Street • Develop boat and vehicle parking facilities for public dock users • Explore appropriate zone changes • Allow higher density residential in the transitional areas • Organize regularly scheduled special events with City sponsorship and assistance • Encourage bed and breakfast facilities, and good transition zone use • Enhance and provide more space for the Doryman's Fish Market. • Encourage outdoor dining • Propose more flexibility with variances and ordinance to upgrade retail activity • Encourage commercial uses on and adjacent to the pier • Explore alternative uses for Marina Park • Review ordinances to determine inhibitors to new development and rehabilitation • Review mixed used provisions in zoning ordinance • Investigate Farmer's Market potential and alternative locations LAND USES con't. (Revised 6/11/96) (Revised 6/1 8/96) McFadden Square District Solutions Medium Priority • Develop more public restroom facilities • Increase usage of bayfrontage private and public • Extend public boardwalk on bayfront and wider boardwalk on oceanfront • Increase usage of oceanfront property for recreational activities andg'`c special events ��� • Develop buffers between residential and commercial uses • Explore the potential for additional surface and structured parking at u inland locations Low Priority • Explore incentive programs for property owners to help implement the ideal mix of uses • Redesign and rebuild pier for various commercial and recreational activities ACCESS/CIRCULATION (Revised 6/11/96) (Revised 6/18/96) McFadden Square District Issue Description • Access and flow to the District and between areas of the District is poor and awkward • Need to be able to accommodate boat, bicycle, pedestrian, public transit Objectives and individual vehicle transportation • To improve resident and visitor access by boat • To maintain McFadden Square as a destination • To create safe and attractive pedestrian walkways • To develop a better use of the alleys for pedestrians, cars and service vehicles Solutions High Priority • Reconfigure traffic patterns • Reconfigure Balboa Blvd. and Newport Blvd. • Provide more signalized crosswalks • Reconfigure pedestrian flow • Install better street lighting • Develop parking lot control system which discourage vehicle circling looking for a vacant space • Restrict, regulate and enforce activities in the alleys • Need for better pedestrian access from the bay to the beach n , Medium Priority �,t��jJj'�r` • Develop uniform entrance signs and directional signs / u • Develop pedestrian circulation system with pavers, lighting, etc. • Explore shuttle transportation system from a centralized transportation center Low Priority Explore pedestrian malls or mini malls on 22nd and 23rd Streets PARKING McFadden (Revised 6/11/96) Square (Revised 6/18/96) District Issue Description • The District experiences competition for the available parking space • Peninsula wide parking is limited and expensive, the City supplies parking with a double standard city wide Objectives • To improve the usage of existing parking facilities • To provide new convenient parking areas • To develop a transportation center Solutions High Priority • Develop a managed parking program including: Short and longterm meters Parking permit program Pay as you exit program A validation program Location and amount of change machines Signage to better explain parking rules Special parking for boat patrons, transients and locals that travel by boat • Direct district parking revenues to district parking improvements • Explore the acquisition and consolidation of parking areas 23rd -28th Street including a new parking structure • Provide bicycle parking facilities -- �- U414 Medium Priority • Develop long term parking area for buses • Explore options and facilities necessary for a transportation center IMAGE/AESTHMCS McFadden (Revised 6/11/96) Square (Revised 6/18/96) District Issue Description • The commercial character of the District needs enhancing • The water quality in ocean and bay needs improvement Objectives • To eliminate non -conforming signage and prohibit excess signage • To establish a village character with consistent lighting • To establish better lighting for pedestrian convenience and safety • To eliminate the litter problem Solutions High Priority • Reevaluate current codes • Establish consistent lighting standards with fixtures and illumination • Enforce clean up laws - empower additional individuals • Require individual trash cans for all tenants • Investigate water quality concerns with the county • Implement boat dumping policies and enforcement program %4` • Enhance beach recreational activities, volleyball, fire rings, basketball, etc • Discourage resident use of public trash facilities • Develop a charming old world pier • Keep the pier clean • Limit fishing hours on the pier • Enforce fishing rules • Create special fishing areas • Develop a maintenance program • Organize a Business Improvement District • Prohibit skateboarding in pedestrian areas • Steam clean sidewalks • Increase Harbor patrol and monitoring debris • Underground utilities • Upgrade entire city infrastructure • Direct community and police involvement to identify hot spots and issues and establish tolerance levels for enforcement • Implement noise ordinance IMAGE/AESTHETICS contd. McFadden (Revised 6/11/96) Square (Revised 6/18/96) District Medium Priority • Develop a standardized sign code to encourage clean and simple signing without a contrived look • Create a citizens committee to provide imput on a new sign code and possibly oversee sign approvals • Develop a litter clean up program • Hire a cleaning contractor to maintain sidewalks and alleys • Enforce noise ordinance of public speakers and provide a designated area • Empower lifeguards to cite litter violators • Develop wider sidewalks • Improve pedestrian, bicycling and in -line skating flow and safety, develop minimum width standards for these activities • Prepare a marketing program with the Chamber of Commerce city wide or peninsula wide • Provide public refuse bags for dogs • Develop Harbor boardwalk on public and private land in commercial areas • Install two entrance way signs for the Peninsula Low Priority • Develop landscape guidelines and material pallet unique to area weather conditions •' Develop District design review guidelines as suggestions only • Explore skateboard parks • Replace existing street trees and explore tree lighting SAFETY (Revised 6/11/96) McFadden Square (Revised 6/18/96) Issue Description • Police relations with public Objectives • To enhance the police image and enforcement attitude • To reduce District crime • To reduce police response time • To prohibit transient sleeping . • To improve the relationships and correct the fear of repercussions concern Solutions High Priority • Increase police visibility in a positive manner • Increase police patrol time in area during peak times • Continue with education of police Medium Priority • Develop a police substation in the District with good visibility • Investigate community oriented policing • Investigate the role of alcohol in the Districts crime rate CANNERY VILLAGE MASTER PLANNING URBAN DESIGN Cannery Village District Round Two Planning Workshop June 12,1996 (5:00 - 7.00 p.m.) Summary Report Attendance: District Representatives - Michael Porter (Coordinator), Gary DiSano, Jane Elliott, Russ Flueter, Steve Lewis, Buss Person City Staff - Sharon Wood, John Douglas Consultant -lack Camp, Mike Adams (Urban Design Camp) The meeting started with a review of the exercise and a more detailed explanation of the process. The objective of the round two meeting was explained and a brief overview of the issues were discussed. In response to an expressed concern about potential funding for various projects, the consultant team prepared and presented an overview of possible funding sources for consideration by the District and the City. Issue Identification The District completed 11 issues sheets. A summary sheet was prepared from the groups May 22, 1996 meeting and distributed to each District representative. The consultant further summarized the District issues into five major topics (land uses, access/ circulation, parking, image/aesthetics and safety) The major topics were then presented by issue descriptions, objectives and potential solutions. The highlights for further refinement came from the district issue sheets. The issue sheets have been attached to this report. The exercise next challenged the group to review and discuss each issue and evaluate the identified solutions. This resulted in a prioritization of potential solutions (high, medium or low). The discussion then focused on the difficulty to implement the identified solutions (easy, difficult or impossible). The meeting concluded with a consensus of those participating, that all the major issues and concerns of their District and the Peninsula as a whole had been adequately expressed. A summary of the District's issues, objectives and solutions are attached to this report. 1401 QUAIL STREET, SUITE 100 NEWPORT BEACH, CA 92660 TEL 17141 833.9193 FAX 1714) 833.3098 LAND USES (Revised 6/12/96 Cannery Village District Issue Description • The District has a number of objectionable, marginal and under utilized land uses Objectives • To maintain a mixed use area • To create more art studios, design uses and specialty retailers • To limit manufacturing and warehousing uses Solutions High Priority • Review zoning ordinances and explore appropriate zone changes • Determinelhe appropriate mix of residential and commercial uses • Explore incentive programs for property owners to help implement the ideal mix of uses • Do not allow more nightclubs • Enhance marine retail ? • Discourage hard liquor establishments Medium Priority • Encourage the relocation of construction, service and storage uses • Review ABC regulations • Encourage bed and breakfast uses �� °_ ,� Encourage more outdoor uses — Relax marine incentive provisions of he zoning Encourage performing art uses — ACCESS/CIRCULATION (Revised 6/12/96) Issue Description Objectives Poor access to the Village • To improve visitor access to the Village • To keep the notion of "Newport Beach's best kept secret" Solutions High Priority • Maintain narrow streets • Install directional signage • Promote the Village location with advertising • Review one and two way circulation patterns • Develop an organized circulation plan • Install wider sidewalks Medium Priority • Develop signage specific for the Village • Eliminate the triangle island adjacent to the Village Cannery Village District PARKING Cannery (Revised 6/12/96) Village District Issue Description Objectives • The Village has an adequate parking supply with spot areas of concern • To improve the usage of existing parking facilities • To develop a clear definition of public parking Solutions High Priority • Maintain public parking facilities • Review parking utilization patterns • Develop a managed parking program • Install short and long term meters pr�v • Develop a parking permit program — P • Resolve parking issues on 29th and 30th Street -2 Medium Priority ��w* • Develop nighttime parking plan Review the parking utilization in private lots Low Priority • Develop remote parking facilities for buses IMAGE/AESTHETICS Cannery (Revised 6/12/96 Village District Issue Description Objectives • The Village atmosphere needs preservation • To improve the water quality in "The Rhine" • To upgrade the Village character • To eliminate litter problem • To maintain the great sense of community • To stop vandalism in Village Solutions High Priority • Reevaluate current codes • Establish Village identification signage • Establish theme lighting, landscaping, signing for community identification • Enforce clean up laws • Develop a letter clean up program ("Litter -Free Zone") • Enforce noise ordinance • Develop a marketing program • Develop a merchants association • Create a walking environment • Conduct community fairs • Install public trash receptacles Medium Priority • Develop a standardized sign code but avoid "sameness" • Reinforce small lot provisions • Reinforce historic elements "Old Newport" • Review the amount of public storage Low Priority 0 Explore a canal or pipeline to circulate water better SAFETY Cannery (Revised 6/12/96) Village District Issue Description • The Village needs continuous police enforcement of existing regulations Objectives • To increase police visibility • To reduce crime incidences • To reduce police response time Solutions High Priority -t t� • Increase police awareness of Village concerns • Create positive police visibility • Patrol bars more frequently Medium Priority • Improve area lighting • Add one police unit specifically for the Cannery • Implement bicycle police patrol on weekends • Enforce traffic laws on bicyclers Install pedestrian crossings on Newport Blvd. LIDO VILLAGE' IRON MASTER PLANNING URBAN DESIGN Lido Village/Civic Center District Round Two Planning Workshop June 14, 1996 (7:30 -10:30 a.m.) Summary Report Attendance: District Representatives - Todd Ridgeway (Coordinator), John Cotton, Bill Dunlap, Tony Shaw, Clarence Turner City Staff - Sharon Wood, John Douglas Consultant - Jack Camp, Mike Adams (Urban Design Camp) The meeting started with a review of the exercise and a more detailed explanation of the process.. The objective of the round two meeting was explained and a brief overview of the issues were discussed. In response to an expressed concern about potential funding for various project, the consultant team prepared and presented an overview of possible funding sources for consideration by the District and the City. Issue Identification The District completed 12 issues sheets. A summary sheet was prepared from the groups May 24,1996 meeting and distributed to each District representative. The consultant further summarized the District issues into four major topics (land uses, access/ circulation, parking, image/aesthetics). The major topics were then presented by issue descriptions, objectives and potential solutions. The highlights for further refinement came from the District issues sheets. The issues sheets have been attached to this report. The exercise next challenged the group to review and discuss each issue and evaluate the identified solutions. This resulted in a prioritization of potential solutions (high, medium or low). The discussion then focused on the difficulty to implement the identified solutions (easy, difficult or impossible). The meeting concluded with a consensus of those participating that all the major issues and concerns of their District and the Peninsula as whole had been adequately expressed. A summary of the Districts issues, objectives and solutions is attached to this report. 1401 QUAIL STREET, SUITE 100 NEWPORT BEACH, CA 92660 TEL (714) 833.9193 FAX (714) 8333098 LAND USES Lido Village/ (Revised 6/14/96) Civic Center District Issue Description The District needs to identify a distinct purpose and direction. Objectives: • To attract more resident serving and visitor serving commercial uses • To attract higher quality tenants, more varied users and design professionals • To increase property values • To accommodate more residential opportunities Solutions High Priority • Develop more family restaurants and theaters (one-two additional screens) • Discourage additional night club activities • Permit more residential in fill projects • Provide for mixed use projects • Review zoning ordinances and explore appropriate changes • Determine the appropriate mix of residential and commercial uses • Develop a visitor's Marina and short term docking spaces • Reinforce the concept of being a "point of destination" • Develop a pedestrian friendly environment Medium Priority • Develop and Entertainment Center Master Plan (i.e. Triangle Square) • Encourage hotel development • Install fiber optic system underground to encourage more professional offices and internet occupancies Low Priority Designate an additional gas station site (prefer central location) Develop a new City Hall and Civic Center ACCESS/CIRCULATION (Revised 6/14/96) Issue Description Objectives Poor circulation to and within the District • To improve pedestrian and vehicular patterns • To improve access to Lido Island and Lido Peninsula Solutions High Priority • Install directional signal • Develop signage specific for the Village • Develop an organized circulation plan • Block off Via Oporto to vehicles • Create pedestrian ambiance in Lido Village and Marina • Correct bottleneck at Arches Bridge • Install traffic control devices for pedestrian crossings Medium Priority • Review one and two way circulation patterns • Develop a footbridge to the Mariners Mile area • Improve access to Lido Island from 32nd Street Low Priority Develop a mono -rail from Mariner's Mile Lido Village/ Civic Center District PARKING (Revised 6/14/96) Issue Description Objectives Lido Village/ Civic Center District The District has a continuous hassle over available parking • To improve shared usage of existing parking facilities • To develop free, convenient and available parking for resident serving commercial Solutions High Priority • Review parking utilization patterns • Develop a managed parking program • Short and long term meters • Develop joint use parking plans with reciprocal agreements • ' Develop a shared parking plan for Lido Village, Marina and Elks Club. • Provide free church parking on Sundays • Develop user friendly safe access to well lit parking facilities Medium Priority • Close certain streets to create more parking • Expand existing parking structure for Lido Marina, Lido Village and City Hall Low Priority • Install charter boat parking IMAGE/AESTHETICS Lido Village/ (Revised 6/14/96) Civic Center District Issue Description Objectives • The District needs to preserve the Village character • To establish a pedestrian friendly environment • To bring back the former commercial luster to the area • To improve the area infrastructures • To make the area more attractive Solutions High Priority • Develop a standardized streetscape design for area • Reevaluate current codes • Establish theme lighting, landscaping, signing for community identification • Create a pedestrian environment • Improve streetscape and landscaping on Newport Blvd. • Develop a better integration of commercial areas • Upgrade area infrastructure • Develop a theme for the area Medium Priority • Redesign 32nd Street improve streetscape and preserve parking Low Priority • Redesign or rebuild City Hall 0 J MASTER PLANNING URBAN DESIGN Meeting Agenda Central Balboa Planning Workshop No. 3 July 30, 1996 2:00 p.m. 1. Review summary reports from Planning Workshop No. 2. 2. Explain status of overall planning study and "Planning Concept Alternatives" report. 3. Review preliminary recommendations for the Balboa Peninsula. 4. Review and discuss specific recommendations for the District 5. Explain next phase of the study. 6. Question and answers. 7. Adjourn to Peninsula Wide Planning Workshop scheduled for Tuesday, August 13,1996 @5:00 p.m. (Location to be determined.) 1401 QUAIL STREET, SUITE 100 NEWPORT BEACH, CA 92660 TEL (714) 833-9193 FAX (714) 8333098 101MA IX70VA PENINSULA DRAFT PLAN JULY 22, 1996 INTRODUCTION Newport Beach, California is a diverse coastal community which has evolved through the assemblage of a number of interrelated villages. Some of the more unique villages are located on the Balboa Peninsula. A composition of waterfront and coastal dependent activities and uses that create a unique environment for the city. The Balboa Peninsula is comprised of four District villages strung along an interconnected spine of roadways, each village offering similar services and activities for residents and visitors alike. Each District (village) attempts to provide goods and services to their respective residents and to some extent compete with each other for the attention of visitors to the Peninsula. The similarities of the four Districts are readily apparent. However, the characteristics of each District are very different and it is through these shared differences that the unique elements which form and Identify the villages emerge. This combination of different but similar areas make the Balboa Peninsula a worldwide attraction and resource. PURPOSE The Balboa Peninsula Planning Study is intended to identify ways in which the area can be Improved to the benefit of the entire community. To discover the Peninsula -wide issues and concerns a series of District by District planning workshops were conducted. These brainstorming sessions focused primarily on the Individual village issues but the District representatives were challenged to identify Peninsula -wide concerns. The Planning Study was initiated by the Balboa Peninsula Planning Advisory Committee (B.P.P.A.C.), a city appointed task force. The study Is Intended to be a follow up to a 15 point Policy Plan, prepared by B.P.P.A.C., to establish positive changes on the Peninsula. B.P.P.A.C. has served as advisors throughout the project to the consultant and by participating in the individual District meetings. The study focuses on the four Districts of the Peninsula (Lido/Civic Center, Cannery Village, McFadden Square and Central Balboa). Representatives for each District were appointed by the City Council with recommendations from the B.P.P.A.C. A wide variety of Interests have been represented, and the levelof participation and enthusiasm has been excellent. The workshops have revealed many issues and concerns common and unique throughout the Peninsula. These unique characteristics of each District need to be reinforced and enhanced in order to be preserved. The more modern commercial and entertainment activities of the Lido District are balanced by the historic McFadden Square activities. The potentially active high energy Fun Zone and pier of Central Balboa are nicely contrasted with the quaint shopping and dining to be found in Cannery Village. Peninsula -wide planning must recognize and respect the unique District features in order to properly understand the Balboa Peninsula as a whole. ISSUE IDENTIFICATION EXERCISE The Balboa Peninsula Planning Study began with a workshop in each of the four Districts to Identify the areas of concern. The workshops employed a group problem solving exercise to provide a systematic, easily understood, and practical method for addressing issues. The exercise continually moves problems toward solutions by breaking them down into manageable pieces, identifying responsibilities and determining relevant concerns. This type of analysis brings vague discussions into focus and ideally ends with clear direction. The results of all the brainstorming and discussions have evolved into the development of a series of concept alternatives, action plans and strategies to effectuate change. The planning workshops provided an opportunity for the Peninsula District representatives to brainstorm their unique and collective problems. The next step was to conduct an analysis and evaluation of the issues and problems Identified. Potential solutions were discussed and characterized according to their importance and priority (low, medium, or high). The priority levels were applied to solutions based on their impact and ability to reach the identified objectives. The Issues were next analyzed for their amenability to change (easy, difficult, or impossible). The goal being to identify the most effective solutions to close the gap between the current problems and the community objectives. The workshops provided an opportunity for identification of the Issues, and when combined with the independent research, the recommendations became apparent. The list of consultant recommendations and solutions are a result of analyzing the problems which are most amenable to change and achieve the most significant impact. Many issues and solutions were Identified, all were evaluated and those which had a reasonable expectation of success have been included in this report. PENINSULA PLANNING CONCEPT ALTERNATIVES BALBOA PENINSULA CONCEPT PLAN The Balboa Peninsula is a community with"a long history of coastal related development and activities. The community is dependent upon various coastal resources for its economic well being. The areas of concern expressed for the Peninsula as a whole have categorized Into the same major headings as identified in the individual Districts (land uses, access/circulation, parking, Image/aesthetics and safety). The overriding concern for the Peninsula is the need and desire to create a sense of place. Public Improvements need to be employed which establish a unified design theme for landscaping, lighting, and directional signage for the linking and collector street system along the Peninsula. Land uses should be established uniquely for each of the Districts, with a greater amount of attention to resident serving commercial activities. There is a need to discover the appropriate mix of retail tenants. The circulation system is in need of major Improvements. Access to and between the Districts Is cumbersome and awkward. Pedestrian, boating, bicycling and public transportation have received little attention. The Peninsula has a substantial supply of parking, however, there is a need to develop a parking management program and plan to optimally use the existing resources. The overall image of the Peninsula is in need of major upgrading. Peninsula welcome signs and arrival statement signage, along with upgraded landscaping and lighting would greatly improve the area's image. Views and access to the water are limited and should be capitalized upon. The recreation of sailing should be considered as a theme, to be incorporated as a unifying element for the overall Image of the Peninsula. The Primary focus of Peninsula -wide objectives need to deal with circulation and image. In addition, the Peninsula needs to support and strengthen the differences in the Individual districts. Encouragement should be extended for some uses while others are discouraged. This can be achieved by supporting and to some extent regulating unique features and by reducing if not eliminating competitive uses. Improvements In one or both of these areas will greatly enhance the character and economic well being of not only the Balboa Peninsula but the entire community of Newport Beach. SUMMARY OF OBJECTIVES WITH RECOMMENDATIONS FOR THE BALBOA PENINSULA 1. Improve access and circulation patterns throughout the Peninsula Recommendations: Implement a circulation system with a combination of Boulevards, collector and local streets. • Reconfigure the Intersection of Balboa and Newport Boulevards. Investigate a traffic circle or roundabout. Create a series of directional theme signage to identify specific Districts. Create a major "welcome to the Peninsula" entry statement P.C.H./Newport Boulevard. • Establish key intersection Into each District. . 32nd Street/Newport Boulevard • 28th Street/Newport Boulevard • 22nd Street/Newport Boulevard • Washington Street/Balboa Boulevard Create major and minor entry/exit nodes with theme structures to Identify Districts. P.C.H./Newport Boulevard 32nd Street/Newport Boulevard Traffic Circle/Newport Boulevard 22nd Street & 21 st Streets/Newport Boulevard 15th Street/Balboa Boulevard Adams, Washington & A & B Streets/Balboa Boulevard • Synchronize the traffic signals along the Newport Boulevard. • Develop guest docking facilities for visiting boaters to the Peninsula. • Develop a system of public transportation shuffles. • Develop bus route and parking facilities. • Create a series of Inter -connecting pedestrian walkways. 2. Improve the area's image and physical appearance. Recommendations: • Establish a street tree program for the entire length of Newport Boulevard. • Design a street lighting program with tree lighting. • Provide for the option of banners on the street lights or across the boulevard. • Develop a uniform sidewalk and pedestrian walkway design with special paving materials, • Develop a uniform maintenance and repair program of existing public areas. • Implement a stricter compliance with maintenance codes on private property. • Explore the possibility of incorporating a sailing theme throughout the public areas. • Establish a uniform setback regulation adjacent to Newport Boulevard. 3. Develop an appropriate mix of commercial and recreational uses. • Implement specific zoning codes to encourage and discourage specific activities within the individual Districts. • Provide Incentives in the zoning codes for desired activities in select areas. • Draft new regulations for desired uses (i.e., bed and breakfast facilities). • Draft more restrictive regulations for less desirable activities (1.e., alcohol sales). • Create new higher density residential opportunities adjacent to the District cores. • Establish a new public marina in a central location on the Peninsula. CENTRAL BALBOA CENTRAL BALBOA The District is bound by the ocean and the bay between Adams Street and "A" Street. The District is designated for retail and service commercial, single family and two family residential, and allows governmental, educational and institutional facilities. CENTRAL BALBOA CONCEPT -PLAN Infamous Central Balboa is possibly the best known least understood District of Newport Beach. Numerous studies and plans have been prepared for the area; but surprisingly little has changed. Central Balboa lies in the middle of an intensely developed three mile long narrow spit of land that culminates in a dead end. The District is rich with unique and diverse features and attractions. The connection and linkage of the bay anal the ocean is more evident in Central Balboa that anywhere else in the city. This feature needs to be reinforced and highlighted. The vast amount of beachfront parking should serve as a staging location for the majority of service, entertainment and recreational activities of the area. Pedestrian linkages should then extend to the bayfront, reinforcing the bay and ocean connection. The commercial section of Central Balboa continues to offer a vast selection of seasonally popular retail outlets; while the selection of resident serving retail continues to decline. This fluctuation of commercial activity can be better managed with a proactive planning approach to the District. The recommendations from the previous studies have to some extent been incorporated in the "Central Balboa Specific Area Plan". Many of the recommendations in this study are a repeat of previous conclusions. In particular there are many worth while thoughts expressed in the 1993 Regional/Urban Design Assistance Team (R/UDAT) Study. Central Balboa is in great need of special attention in order to preserve its unique character and enhance the distinctive eclectic collection of structures and features that comprise this community wide treasure. CENTRAL BALBOA OBJECTIVES & RECOMMENDATIONS Land Uses -1. To establish and enhance the appropriate mix of retail, residential, recreational activities for the District. Recommendations: • Cluster retail activities along Balboa Blvd. between Adams and "A" Streets. • Develop a shared parking program for the ocean side parking area. • Allow more intense residential development and conversion for select commercial properties outside the central core. • Encourage outdoor dining and sales in designated areas. • Encourage special events such as sidewalk sales, art exhibits, afternoon concerts, etc. • Provide public boat docking facilities at the Fun Zone and Pavilion. • Encourage more resident serving commercial. • Draft regulations for bed and breakfast facilities. • Encourage more commercial activity on and adjacent to the pier. • Increase the floor area ratios for commercial development. Particularly encourage second floor activities. • Expand the Promenade area in front of the Fun Zone and relocate satellite structures. • Extend the boat docking facilities further into the bay. • Create a public walkway system at water level around the Pavilion. • Relocate the sport fishing fleet and day boat rentals to off shore moorings. • Explore the feasibility of a second story interconnecting walkway system. • Consolidate private parking lots along bay streets and allow in fill new developments. • Expand and upgrade oceanside boardwalk between Adams and Main Streets. • Relocate soccer field south of present site. • Encourage an upgraded Fun Zone expansion. Access/ Circulation CENTRAL BALBOA OBJECTIVES & RECOMMENDATIONS To accommodate better access to and through the District. Recommendations: • Redesign the Newport and Balboa Boulevards interchange. • Redesignate Main Street south of Balboa Boulevard for pedestrian only. • Establish entrance nodes to the Village at Adams Street and Main Street. • Create a leaving the Village node with turn around at "A" Street. • Establish a pedestrian priority circulation system using sidewalks boardwalks and alleyways. • Develop a series of theme directional signs. • Maintain entrance to beach parking at Palm Street with exit at "A" Street. • Redesginate Washington Street to pedestrian only. Redesign Bay Street as parking court with short term diagonal parking, between Main and Adams Streets. • Connect parking on north and south side of the pier and connect to "B" Street parking. • Close "B" Street at the boardwalk. Synchronize traffic signals. Parking CENTRAL BALBOA OBJECTIVES & RECOMMENDATIONS To provide convenient available parking to facilitate all retail, restaurant, entertainment, and recreational activities in the District. Recommendations: • Develop shared public parking facilities on the oceanside lots. • Replace parallel parking with diagonal parking where appropriate. • Allow compact size parking stalls in select locations. • Implement special permit parking program (other than existing city program). • Install short and long term meters, (working 24 hours a day). • Develop a parking management plan. • Provide bicycle parking facilities. • Develop a combined or shared valet parking system for restaurant patrons. • Review parking patterns and study District parking demand. • Remove some on street parking to accommodate circulation plan. • Create new access patterns to exiting parking structure. • Cluster employee parking to remote facility and use on site parking for short term customer parking. • Restructure parking fees and collection methods. • Encourage shuttle buses into the District from a remote location outside of the District. • Explore long term parking in remote facilities. CENTRAL BALBOA OBJECTIVES & RECOMMENDATIONS Image/ Aesthetics 1. To reestablish and enhance the Village atmosphere of fun, retail and entertainment for the community. Recommendations: Limit the amount and type of signing allowed for commercial uses. • Eliminate non -conforming signs. Develop sign guidelines for the District. • Develop uniform street lighting program. Encourage banners for special events. • Use special pavers or patterns for pedestrian paths. • Develop a street tree program. Encourage a continuation of eclectic architectural styles and designs through flexible design guidelines. • Encourage the preservation and enhancement of historic features. • Maintain a Business Improvement District. • Explore a theme lighting, landscaping and signing for District identification. Create entry and exit node for the District along Balboa Boulevard. Remove overhead utility lines. • Establish an architectural review service for new and rehabilitated projects. • Maintain grid and small lot development pattern. Establish a festive environment with lighting, signing, banners, color, awning, landscaping, etc. • Create more water view opportunities. • Encourage building facade enhancements. • Develop a unique landscape theme, i.e., create a canopy of trees over Main Street and.part of Balboa Boulevard. MASTER PLANNING URBAN DESIGN Meeting Agenda CanneryVillage Planning Workshop No.3 July 24,1996 4:00 p.m. 1. Review summary reports from Planning Workshop No. 2. 2. Explain status of overall planning study and "Planning Concept Alternatives" report. 3. Review preliminary recommendations for the Balboa Peninsula. 4. Review and discuss specific recommendations for the District. 5. Explain next phase of the study. 6. Question and answers. 7. Adjourn to Peninsula Wide Planning Workshop scheduled for Tuesday, August 13,1996 @5:00 p.m. (Location to be determined.) 1401 QUAIL STREET iMA PENINSULA DRAFT PLAN JULY 22, 1996 INTRODUCTION Newport Beach, California is a diverse coastal community which has evolved through the assemblage of a number of Interrelated villages. Some of the more unique villages are located on the Balboa Peninsula. A composition of waterfront and coastal dependent activities and uses that create a unique environment for the city. The Balboa Peninsula is comprised of four District villages strung along an Interconnected spine of roadways, each village offering similar services and activities for residents and visitors alike. Each District (village) attempts to provide goods and services to their respective residents and to some extent compete with each other for the attention of visitors to the Peninsula. The similarities of the four Districts are readily apparent. However, the characteristics of each District are very different and It Is through these shared differences that the unique elements which form and identify the villages emerge. This combination of different but similar areas make the Balboa Peninsula a worldwide attraction and resource. w PURPOSE The Balboa. Peninsula Planning Study is intended to identify ways in which the area can be improved to the benefit of the entire community. To discover the Penlnsula-wide Issues and concerns a series of District by District planning workshops were conducted. These brainstorming sessions focused primarily on the individual village issues but the District representatives were challenged to identify Peninsula -wide concerns. The Planning Study was initiated by the Balboa Peninsula. Planning Advisory Committee (B.P.P.A.C.), a city appointed task force. The study is intended to be a follow up to a 15 point Policy Plan, prepared by B.P.P.A.C., to establish positive changes on the Peninsula. B.P.P.A.C. has served as advisors throughout the project to the consultant and by participating in the Individual District meetings. The study focuses on the four Districts of the Peninsula (Lido/Civic Center, Cannery Village, McFadden Square and Central Balboa). Representatives for each District were appointed by the City Council with recommendations from the B.P.P.A.C. A wide variety of Interests have been represented, and the level of participation and enthusiasm has been excellent. The workshops have revealed many issues and concerns common and unique throughout the Peninsula. These unique characteristics of each District need to be reinforced and' enhanced in order to be preserved. The more modern commercial and entertainment activities of the Lido District are balanced by the historic McFadden Square activities. The potentially active high energy Fun Zone and pier of Central Balboa 'are nicely contrasted with the quaint shopping and dining to be found in Cannery Village. Peninsula -wide planning must recognize and respect the unique District features in order to properly understand the Balboa Peninsula as a whole. W ISSUE IDENTIFICATION EXERCISE The Balboa Peninsula Planning Study began with a workshop in each of the four Districts to Identify the areas of concern. The workshops employed a group problem solving exercise to provide a systematic, easily understood, and practical method for addressing Issues. The exercise continually moves problems toward solutions by breaking them down into manageable pieces, Identifying responsibilities and determining relevant concerns. This type of analysis brings vague discussions into focus and Ideally ends with clear direction. The results of all the brainstorming and discussions have evolved into the development of a series of concept alternatives, action plans and strategies to effectuate change. The planning workshops provided an opportunity for the Peninsula District representatives to brainstorm their unique and collective problems. The next step was to conduct an analysis and evaluation of the issues and problems identified. Potential solutions were discussed and characterized according to their importance and priority (low, medium, or high). The priority levels were applied to solutions based on their impact and ability to reach the Identified objectives. The issues were next analyzed for their amenability to change (easy, difficult, or Impossible). The goal being to identify the most effective solutions to close the gap between the current problems and the community objectives. The workshops provided an opportunity for identification of the issues, and when combined with the independent research, the recommendations became apparent. The list of consultant recommendations and solutions are a result of analyzing the problems which are most amenable to change and achieve the most significant Impact. Many issues and solutions were identified, all were evaluated and those which had a reasonable expectation of success have been Included in this report. W BALBOA PENINSULA PLANNING CONCEPT ALTERNATIVES .. •' i W BALBOA PENINSULA CONCEPT PLAN The Balboa Peninsula is a community with'a long history of coastal related development and activities. The community Is dependent upon various coastal resources for Its economic well being. The areas of concern expressed for the Peninsula as a whole have categorized into the same major headings as Identified in the individual Districts (land uses, access/circulation, parking, image/aesthetics and safety). The overriding concern for the Peninsula is the need and desire to create a sense of place. Public improvements need to be employed which establish a unified design theme for landscaping, lighting, and directional signage for the linking and collector street system along the Peninsula. Land uses should be established uniquely for each of the Districts, with a greater amount of attention to resident serving commercial activities. There Is a need to discover the appropriate mix of retail tenants. The circulation system is in need of major Improvements. Access to and between the Districts is cumbersome and awkward. Pedestrian, boating, bicycling and public transportation have received little attention. The Peninsula has a substantial supply of parking, however, there is a need to develop a parking management program and plan to optimally use the existing resources. The overall image of the Peninsula Is in need of major upgrading. Peninsula welcome signs and arrival statement signage, along with upgraded landscaping and lighting would greatly improve the area's image. Views and access to the water are limited and should be capitalized upon. The recreation of sailing should be considered as a theme, to be Incorporated as a unifying element for the overall image of the Peninsula. The Primary focus of Peninsula -wide objectives need to deal with circulation and image. in addition, the Peninsula needs to support and strengthen the differences in the Individual districts. Encouragement should be extended for some uses while others are discouraged. This can be achieved by supporting and to some extent regulating unique features and by reducing if not eliminating competitive uses. Improvements in one or both of these areas will greatly enhance the character and economic well being of not only the Balboa Peninsula but the entire community of Newport Beach. SUMMARY OF OBJECTIVES WITH RECOMMENDATIONS FOR THE BALBOA PENINSULA 1. Improve access and circulation patterns throughout the Peninsula Recommendations: • Implement a circulation system with a combination of Boulevards, collector and local streets. • Reconfigure the intersection of Balboa and Newport Boulevards. • Investigate a traffic circle or roundabout. • Create a series of directional theme signage to identify specific Districts. • Create a major "welcome to the Peninsula" entry statement P.C.H./Newport Boulevard. • Establish key intersection into each District. 32nd Street/Newport Boulevard 28th Street/Newport Boulevard 22nd Street/Newport Boulevard Washington Street/Balboa Boulevard • Create major and minor entry/exit nodes with theme structures to Identify Districts. P.C.H./Newport Boulevard 32nd Street/Newport Boulevard Traffic Circle/Newport Boulevard 22nd Street & 21 st Streets/Newport Boulevard 15th Street/Balboa Boulevard Adams, Washington & A & B Streets/Balboa Boulevard Synchronize the traffic signals along the Newport Boulevard. • Develop guest docking facilities for visiting boaters to the Peninsula. • Develop a system of public transportation shuttles, • Develop bus route and parking facilities. • Create a series of inter -connecting pedestrian walkways. 2. Improve the area's image and physical appearance. Recommendations: • Establish a street tree program for the entire length of Newport Boulevard, • Design a street lighting program with tree lighting. • Provide for the option of banners on the street lights or across the boulevard. • Develop a uniform sidewalk and pedestrian walkway design with special paving materials. • Develop a .uniform maintenance and repair program of existing public areas. • Implement a strictbr compliance with maintenance codes on private property. • , Explore the possibility of Incorporating a sailing theme throughout the public areas. • Establish a uniform setback regulation adjacent to Newport Boulevard. W 3. Develop an appropriate mix of commercial and recreational uses. • Implement specific zoning codes to encourage and discourage specific activities within the individual Districts. • Provide Incentives in the zoning codes for desired activities in select areas. • Draft new regulations for desired uses (i.e., bed and breakfast facilities). • Draft more restrictive regulations for less desirable activities (i.e., alcohol sales). • Create new higher density residential opportunities adjacent to the District cores. • Establish a new public marina in a central location on the Peninsula. CANNERY VILLAGE CANNERY VILLAGE The District is bound by 32nd Street on the north, Newport Boulevard on the west, 26th Street to the south and the Rhine channel of the bay on the east. The District is designated for recreation, marine, retail and service commercial; general industrial (marine industrial), and two-family residential uses. ,• F9 t �s s: N • � MC/// .bIO `� .. , �{♦♦ 4 � �� rLTllf o ♦ n .. ter + ♦♦♦ � ♦yt ti yr ;� . ti • A .:-r " � . w .. rr 4 a4,'. '_ nYr .r. •Y+w.. I wwrm.q rnr • -� � I v t. .WO �� • ` rn• �nnr � CANNERY VILLAGE CONCEPT PLAN Cannery Village is a unique collection of retail, industrial, office and residential activities. The Village includes a wide variety of structures and a large amount of under developed sites. The area offers an abundance of character and charm and provides the Peninsula with one of its most interesting Districts. Cannery Village started out as the boat yard on the bay across from the active McFadden Pier Area. Following the dredging of the Rhine channel commercial fishing boats began to occupy the waterfront. Fish canneries began operating on docks in the bay and soon an entire marine service industry dominate the area. Today Cannery Village is home to many art galleries, art studios, restaurants, curior shops and professional offices along with the remaining marine service uses. The Village should continue to attract art related activities, with specialty food opportunities and limited residential. Incentives should be used to enhance the arts related activities and transition away from the marine industrial uses. The perimeter areas of the Village, along 32nd Street and Newport Boulevard, are well suited for the more intense restaurant, bar and retail activities. The core area should maintain the quiet and quaint qualities that have evolved over the years. Cannery Village needs to develop a more effective vehicular and pedestrian circulation system. Pedestrian movement should have priority over vehicles, therefore maintain the narrow street system with on street parking. Also expand sidewalks and develop a system of paseos between blocks and through the alleyways. In addition, the Village should explore the benefits of how detailed specific development regulations and design guidelines can be employed to preserve and enhance a truly unique resource of the Peninsula. CANNERY VILLAGE OBJECTIVES & RECOMMENDATIONS Land Uses 1. To maintain and enhance a mixed use, art oriented, specialty retail and office district. Recommendations: • Develop a site specific master plan identifying the optimum mix of retail, restaurant, residential and office uses. • Develop a shared parking program and reduce the one site parking requirement • Allow a greater amount of residential within commercial projects and to a limited extent stand alone residential. • Encourage outdoor dining and sales in designated areas. • Encourage special events such as sidewalk sales, art walk nights, jazz afternoon, etc. • Provide public boat docking facilities at the end of 29th Street. • Allow restaurants and bars with later hours on the outer edges of the District. • Draft regulations for bed and breakfast facilities. • Encourage performing arts uses in specific locations. • Develop a Village Square or neighborhood park area for public gatherings. • Consolidate public parking uses. • Discourage industrial activities in the -core of the Village. • Limit marine uses to the area east of Lafayette Avenue. CANNERY VILLAGE OBJECTIVES & RECOMMENDATIONS Access/ Circulation 1. To accommodate better access to and within the District. Recommendations: • Redesign the Newport and Balboa Boulevards interchange. • Redesign 32nd Street to bean east -west collector street and northern access point to the District. • Redesignate Villa Way to two-way traffic. • Redesign Lafayette as a two-way collector street around the Village core. • Redesignate 31 st Street as one-way west and 30th Street as one-way east. • Maintain 29th Street two-way with access from Newport Boulevard. • Establish entrance nodes to the Village from Newport Boulevard at 32nd, 29th and 28th Streets. • Establish a pedestrian priority circulation system using sidewalks, alley ways, boardwalk and paseos. • Develop a series of theme directional signs. • Investigate a traffic circle at 32nd and Lafayette Avenue. CANNERY VILLAGE OBJECTIVES & RECOMMENDATIONS Parking 1. To provide convenient available parking to facilitate all commercial, residential, office and industrial activities. Recommendations: • Develop public parking facilities on the perimeters of the District. • Replace parallel parking with diagonal parking where appropriate. • Allow compact size parking stalls in select locations. • Implement special permit parking program (other than existing city program). • Install short and long term meters, (working 24 hours a day). • Develop a parking management plan. • Provide bicycle parking facilities. • Develop a combined or shared valet parking system for restaurant patrons. • Review parking patterns and study District parking demand. • Remove some on street parking to accommodate circulation plan. CANNERY VILLAGE OBJECTIVES & RECOMMENDATIONS Image/ Aesthetics 1. To preserve and enhance the Village atmosphere and character of the District. Recommendations: • Limit the amount and type of signing allowed for commercial uses. • Eliminate non -conforming signs. • Develop sign guidelines for District; (i.e., allow only externally illuminated signs). • Develop uniform street lighting program. • Encourage banners for special events. • Use special pavers or patterns for pedestrian paths. • Develop a street tree program. • Encourage a variety of architectural styles and designs through flexible design guidelines. • Discourage boat and vehicle storage in the core village area. • Develop a Business Improvement District. • Maintain small lot development pattern. • Encourage the use of an "Old Newport" theme in the Village. • Maintain tight narrow street pattern. MASTER PLANNING URBAN DESIGN Meoting Agenda McFadden Square Planning Workshop No. 3 July 23,1996 4:00 p.m. 1. Review summary reports from Planning Workshop No. 2. 2. Explain status of overall planning study and "Planning Concept Alternatives" report. 3. Review preliminary recommendations for the Balboa Peninsula. 4. Review and discuss specific recommendations for the District. S. Explain next phase of the study. 6. Question and answers. 7. Adjourn to Peninsula Wide Planning Workshop scheduled for Tuesday, August 13,1996 @5:00 p.m. (Location to be determined.) 1401 QUAIL STREET, SUITE 100 NEWPORT BEACH, CA 92660 TEL (714(833-9193 FAX (7141 833-3098 BALBOA PENINSULA DRAFT PLAN JULY 221- 1996 INTRODUCTION Newport Beach, California is a diverse coastal community which has evolved through the assemblage of a number of Interrelated villages. Some of the more unique villages are located on the Balboa Peninsula. A composition of waterfront and coastal dependent activities and uses that create a unique environment for the city. The Balboa Peninsula is comprised of four District villages strung along an interconnected spine of roadways, each village offering similar services and activities for residents and visitors alike. Each District (village) attempts to provide goods and services to their respective residents and to some extent compete with each other 'for the attention of visitors to the Peninsula. The similarities of the four Districts are readily apparent. However, the characteristics of each District are very different and it is through these shared differences that the unique elements which form and Identify the villages emerge. This combination of different but similar areas make the Balboa Peninsula a worldwide attraction and resource. W PURPOSE The Balboa Peninsula Planning Study Is intended to Identify ways in which the area can be improved to the benefit of the entire community. To discover the Peninsula -wide issues and concerns a series of District by District planning workshops were conducted. These brainstorming sessions focused primarily on the Individual village Issues but the District representatives were challenged to Identify Peninsula -wide concerns. The Planning Study was initiated by the Balboa Peninsula Planning Advisory Committee (B.P.P.A.C.), a city appointed task force. The study is Intended to be a follow up to a 15 point Policy Plan, prepared by B.P.P.A.C., to establish positive changes on the Peninsula. B.P.P.A.C. has served as advisors throughout the project to the consultant and by participating in the individual District meetings. The study focuses on the four Districts of the Peninsula (Lido/Civic Center, Cannery Village, McFadden Square and Central Balboa). Representatives for each District were appointed by the City Council with recommendations from the B.P.P.A.C. A wide variety of interests have been represented, and the level of participation and enthusiasm has been excellent. The workshops have revealed many Issues and concerns common and unique throughout the Peninsula. These unique characteristics of each District need to be reinforced and enhanced In order to be preserved. The more modern commercial and entertainment activities of the Lido District are balanced by the historic McFadden Square activities. The potentially active high energy Fun Zone and pier of Central Balboa are nicely contrasted with the quaint shopping and dining to be found in Cannery Village. Peninsula -wide planning must recognize and respect the unique District features in order to properly understand the Balboa Peninsula as a whole. W ISSUE IDENTIFICATION EXERCISE The Balboa Peninsula Planning Study began with a workshop In each of the four Districts to identify the areas of concern. The workshops employed a group problem solving exercise to provide a systematic, easily understood, and practical method for addressing issues. The exercise continually moves problems toward solutions by breaking them down into manageable pieces, identifying responsibilities and determining relevant concerns. This type of analysis brings vague discussions into focus and ideally ends with clear direction. The results of all the brainstorming and discussions have evolved Into the development of a series of concept alternatives, action plans and strategies to effectuate change. The planning workshops provided an opportunity for the Peninsula District representatives to brainstorm their unique and collective problems. The next step was to conduct an analysis and evaluation of the Issues and problems identified. Potential solutions were discussed and characterized according to their importance and priority (low, medium, or high). The priority levels were applied to solutions based on their impact and ability to reach the identified objectives. The issues were next analyzed for their amenability to change (easy, difficult, or Impossible). The goal being to identify the most effective solutions to close the gap between the current problems and the community objectives. The workshops provided an opportunity for Identification of the issues, and when combined with the independent research, the recommendations became apparent. The list of consultant recommendations and solutions are a result of analyzing the problems which are most amenable to change and achieve the most significant impact. Many issues and solutions were Identified, all were evaluated and those which had a reasonable expectation of success have been included in this report. BALBOA PENINSULA PLANNING CONCEPT ALTERNATIVES BALBOA PENINSULA CONCEPT PLAN The Balboa Peninsula Is a community with' a long history of coastal related development and activities. The community is dependent upon various coastal resources for Its economic well being. The areas of concern expressed for the Peninsula as a whole have categorized into the some major headings as identified in the individual Districts (land uses, access/circulation, parking, Image/aesthetics and safety). The overriding concern for the Peninsula is the need and desire to create a sense of place. Public improvements need to be employed which establish a unified design theme for landscaping, lighting, and directional signage for the linking and collector street system along the Peninsula. Land uses should be established uniquely for each of the Districts, with a greater amount of attention to resident serving commercial activities. There is a need to discover the appropriate mix of retail tenants. The circulation system is in need of major Improvements. Access to and between the Districts is cumbersome and awkward. Pedestrian, boating, bicycling and public transportation have received little attention. The Peninsula has a substantial supply of parking, however, there is a need to develop a parking management program and plan to optimally use the existing resources. The overall image of the Peninsula Is in need of major upgrading. Peninsula welcome signs and arrival statement signage, along with upgraded landscaping and lighting would greatly improve the area's image. Views and access to the water are limited and should be capitalized upon. The recreation of sailing should be considered as a theme, to be incorporated qs a unifying element for the overall image of the Peninsula. The Primary focus of Peninsula -wide objectives need to deal wi AcirculatIon and image. In addition, the Peninsula needs to support and strengthen the D differences in the individual districts. encouragement should be extended for f " some uses while others are discouraged. This can be achieved by supporting and to some extent regulating unique features and by reducing if not eliminating competitive uses. Improvements in one or both of these areas will greatly enhance the character and economic well bein9�of not only the Balboa Peninsula but the entire community of Newport Beac � �p W SUMMARY OF — OBJECTIVES WITH RECOMMENDATIONS FOR THE BALBOA PENINSULA 1. Improve access and circulation patterns throughout the Peninsula Recommendations: • Implement a circulation system with a combination of Boulevards, collector and local streets. • Reconfigure the intersection of Balboa and Newport Boulevards. • Investigate a traffic circle or roundabout. • Create a series of directional theme signage to identify specific Districts. • Create a major "welcome to the Peninsula" entry statement P.C.H./Newport Boulevard. • Establish key intersection into each District. 32nd Street/Newport Boulevard 28th Street/Newport Boulevard 22nd Street/Newport Boulevard Washington Street/Balboa Boulevard • Create major and minor entry/exit nodes with theme structures to identify Districts. P.C.H./Newport Boulevard 32nd Street/Newport Boulevard Traffic Circle/Newport Boulevard 22nd Street & 21 st Streets/Newport Boulevard 15th Street/Balboa Boulevard Adams, Washington & A & B Streets/Balboa Boulevard . Synchronize the traffic signals along the Newport Boulevard. • Develop guest docking facilities for visiting boaters to the Peninsula. . Develop a system of public transportation shuffles. . Develop bus route and parking facilities. . Create a series of inter -connecting pedestrian walkways. 2. Improve the area's image and physical appearance. Recommendations: • Establish a street tree program for the entire length of Newport Boulevard. . Design a street lighting program with tree lighting. • Provide for the option of banners on the street lights or across the boulevard. Develop a uniform sidewalk and pedestrian walkway design with special paving materials. Develop a uniform maintenance and repair program of existing public areas. • Implement a stricter compliance with maintenance codes on private property. Explore the possibility of incorporating a sailing theme throughout the public areas. Establish a uniform setback regulation adjacent to Newport Boulevard. W 3. Develop an appropriate mix of commercial and recreational uses. • Implement specific zoning codes to encourage and discourage specific activities within the individual Districts. • Provide Incentives in the zoning codes for desired activities in select areas: • Draft new regulations for desired uses (i.e., bed and breakfast facilities). • Draft more restrictive regulations for less desirable activities (i.e., alcohol sales). • Create new higher density residential opportunities adjacent to the District cores. • Establish a new public marina in a central location on the Peninsula. W MCFADDEN SQUARE MCFADDEN SQUARE The District Is bound by the ocean and the bay from 19th Street to the alley between 23rd and 24th Streets north along Balboa Boulevard to 21 st Street. The District is designated for recreation, marine, retail, and service commercial; single family attached, two-family and multi -family residential land uses. p G�' MCFADDEN SQUARE CONCEPT PLAN (1 McFadden Square is the heart and center of historic Newport Beach. NThe construction of the Newport Pier and subsequent rail connection brought commerce to the coastal area prior to the turn of the century. The railroad was constructed primarily to transport goods arriving from the ocean. However, passenger travel from Inland areas to the beach for recreation became popular. Land development responded with hotels, retail shops and beach cottages, clustered around McFadden Square. The red car rail lines continued the stream of visitors to the area. The once sparsely populated sandspit was subdivided into numerous 20 by 85 foot lots to accommodate the new vacationers. Many of the early vacation homes remain today and contribute to the historic character of the District. McFadden Square still serves as the primary destination for beach visitors. This attraction creates numerous traffic, parking, and security problems associated with a beach area. The District has a tremendous opportunity to attract quality commercial and recreational activities providing a greater degree of flexibility Is employed in the regulation of new ideas. A greater effort should be exercised to encourage more year-round and less seasonal business. Easy access and convenient parking as suggested in the Peninsula -wide Plan will contribute to the future success of the District. The McFadden Square District Is In need of nurturing attention to once again become the heart of the city. MCFADDEN SQUARE OBJECTIVES RECOMMENDATIONS Land Uses 1. To achieve and maintain the appropriate mix of commercial, residential, and recreational activities. Recommendations: • Amend Specific Area Plan (zoning) to be more flexible for desired uses, including incentives. For Example: • Increase the floor area ratios for commercial development. • Develop a shared parking program and reduce the on site requirement. • Allow higher density residential as a transition area adjacent to the commercial areas. • Allow residential within commercial projects. • Allow temporary commercial sales from charts or mobile vehicles in designated areas. • Encourage special event activities such as a Farmer's Market. • Encourage more commercial activity on and adjacent to the pier. • Allow for the dory boat market area to expand. • Draft regulations for bed and breakfast facilities. • A'llMoutdoor dining in designated areas. �• Discourage commercial uses outside of the core area, for example south of 21 st Street. • Develop public boat docking facilities at the end of 21 st Street. W MCFADDEN SQUARE OBJECTIVES RECOMMENDATIONS Access/ Circulation 1. To accommodate better access to and through the District with minimal traffic congestion. Recommendations: • Redesign the Newport and Balboa Boulevards Interchange. • Explore the use of a traffic circle or roundabout. • Synchronize traffic signals along Newport Boulevard. • Develop a series of theme directional signs. • Reconfigure parking circulation patterns. 2. To develop a better system of alternative transportation methods. Recommendations: • Establish pedestrian paths Including waterfront boardwalks. • Create pedestrian only areas with specific paver patterns. • Develop a bikeway system. • Explore a shuttle bus system. • Provide bus parking facilities. W MCFADDEN SQUARE OBJECTIVES RECOMMENDATIONS Parking 1. To provide convenient available parking to facilitate all commercial, residential, and recreational activities. Recommendations: • Develop new parking opportunities by redesigning the Newport and Balboa Boulevard Interchange. • Replace parallel parking with diagonal parking where appropriate. • Allow compact site parking stalls in select locations. • Implement a permit parking program. • Install short term parking meters adjacent to select commercial locations. • Establish seasonal beach parking procedures in select location. For example: Pay when entering, one daily rate, annual passes, etc. • Develop a parking management program. • Provide bicycle parking facilities. • Provide bus parking locations. • Develop valet parking programs. • Allow a merchant validation program. MCFADDEN SQUARE OBJECTIVES RECOMMENDATIONS Image/ Aestheticq 1. To upgrade and enhance the historic commercial character of the District. Recommendations: • Limit the amount and type of signing allowed for commercial uses. • Eliminate nonconforming signage. • Implement a street tree lighting program. • Provide incentives for historic restorations. • Underground utility lines. • Provide additional litter canisters. • Install theme street lights. • Develop restrictive regulations on pier fishing. • Organize a business improvement District. • Develop a regular maintenance program for the pedestrian areas. • Establish an architectural review service for new and rehabilitated projects. 2. To improve the water quality of the bay. Recommendations: • Work with county to develop and implement boating regulations. For example: Boat dumping policies, and storm drain dumping. :1111MMA I PENINSULA W INTRODUCTION Newport Beach, California is a diverse coastal community which has evolved through the assemblage of a number of interrelated villages. Some of the more unique villages are located on the Balboa Peninsula. A composition of waterfront and coastal dependent activities and uses that create a unique environment for the city. The Balboa Peninsula is comprised of four District villages strung along an Interconnected spine of roadways, each village offering similar services and activities for residents and visitors alike. Each District (village) attempts to provide goods and services to their respective residents and to some extent compete with each other for the attention of visitors to the Peninsula. The similarities of the four Districts are readily apparent. However, the characteristics of each District are very different and It is through these shared differences that the unique elements which form and Identify the villages emerge. This combination of different but similar areas make the Balboa Peninsula a worldwide attraction and resource. PURPOSE The Balboa Peninsula Planning Study is intended to identify ways In which the area can be improved to the benefit of the entire community. To discover the Peninsula -wide issues and concerns a series of District by District planning workshops were conducted. These brainstorming sessions focused primarily on the individual village issues but the District representatives were challenged to identify Peninsula -wide concerns. The Planning Study was Initiated by the Balboa Peninsula. Planning Advisory Committee (B.P.P.A.C.), a city appointed task force. The study is intended to be a follow up to a 15 point Policy Plan, prepared by B.P.P.A.C., to establish positive changes on the Peninsula. B.P.P.A.C. has served as advisors throughout the project to the consultant and by participating in the Individual District meetings. The study focuses on the four Districts of the Peninsula (Lido/Civic Center, Cannery Village, McFadden Square and Central Balboa). Representatives for each District were appointed by the City Council with recommendations from the B.P.P.A.C. A wide variety of interests have been represented, and the level of participation and enthusiasm has been excellent. The workshops have revealed many issues and concerns common and unique throughout the Peninsula. These unique characteristics of each District need to be reinforced and enhanced In order to be preserved. The more modern commercial and entertainment activities of the Lido District are balanced by the historic McFadden Square activities. The potentially active high energy Fun Zone and pier of Central Balboa are nicely contrasted with the quaint shopping and dining to be found in Cannery Village. Peninsula -wide planning must recognize and respect the unique District features In order to properly understand the Balboa Peninsula as a whole. W ISSUE IDENTIFICATION EXERCISE The Balboa Peninsula Planning Study began with a workshop in each of the four Districts to identify the areas of concern. The workshops employed a group problem solving exercise to provide a systematic, easily understood, and practical method for addressing issues. The exercise continually moves problems toward solutions by breaking them down into manageable pieces, Identifying responsibilities and determining relevant concerns. This type of analysis brings vague discussions Into focus and Ideally ends with clear direction. The results of all the brainstorming and discussions have evolved into the development of a series of concept alternatives, action plans and strategies to effectuate change. The planning workshops provided an opportunity for the Peninsula District representatives to brainstorm their unique and collective problems. The next step was to conduct an analysis and evaluation of the Issues and problems identified. Potential solutions were discussed and characterized according to their importance and priority (low, medium, or high). The priority levels were applied to solutions based on their impact and ability to reach the identified objectives. The issues were next analyzed for their amenability to change (easy, difficult, or impossible). The goal being to identify the most effective solutions to close the gap between the current problems and the community objectives. The workshops provided an opportunity for identification of the issues, and when combined with the Independent research, the recommendations became apparent. The list of consultant recommendations and solutions are a result of analyzing the problems which are most amenable to change and achieve the most significant impact. Many issues and solutions were Identified, all were evaluated and those which had a reasonable expectation of success have been Included In this report. BALBOA PENINSULA PLANNING CONCEPT ALTERNATIVES W BALBOA PENINSULA CONCEPT PLAN The Balboa Peninsula is a community with'a long history of coastal related development and activities. The community is dependent upon various coastal resources for Its economic well being. The areas of concern expressed for the Peninsula as a whole have categorized into the same major headings as identified In the individual Districts (land uses, access/circulation, parking, Image/aesthetics and safety). The overriding concern for the Peninsula is the need and desire to create a sense of place. Public improvements need to be employed which establish a unified design theme for landscaping, lighting, and directional signage for the linking and collector street system along the Peninsula. Land uses should be established uniquely for each of the Districts, with a greater amount of attention to resident serving commercial activities. There Is a need to discover the appropriate mix of retail tenants. The circulation system is in need of major Improvements. Access to and between the Districts is cumbersome and awkward. Pedestrian, boating, bicycling and public transportation have received little attention. The Peninsula has a 'substantial supply of parking, however, there is a need to develop a parking management program and plan to optimally use the existing resources. The overall image of the Peninsula is In need of major upgrading. Peninsula welcome signs and arrival statement signage, along with upgraded landscaping and lighting would greatly improve the area's image. Views and access to the water are -limited and should be capitalized upon. The recreation of sailing should be considered as a theme, to be incorporated as a unifying element for the overall image of the Peninsula. The'Primary focus of Peninsula -wide objectives need to deal with circulation and Image. In addition, the Peninsula needs to support and strengthen the differences in the individual districts. Encouragement should be extended for some uses while others are discouraged. This can be achieved by supporting and to some extent regulating unique features and by reducing if not eliminating competitive uses. Improvements in one or both of these areas will greatly enhance the character and economic well being of not only the Balboa Peninsula but the entire community of Newport Beach. W SUMMARY OF OBJECTIVES WITH RECOMMENDATIONS FOR THE BALBOA PENINSULA 1. Improve access and circulation patterns throughout the Peninsula Recommendations: • Implement a circulation system with a combination of Boulevards, collector and local streets. • Reconfigure the Intersection of Balboa and Newport Boulevards. • Investigate a traffic circle or roundabout. • Create a series of directional theme signage to Identify specific Districts. • Create a major "welcome to the Peninsula" entry statement P.C.H./Newport Boulevard. • Establish key intersection Into each District. . 32nd Street/Newport Boulevard . 28th Street/Newport Boulevard • 22nd Street/Newport Boulevard . Washington Street/Balboa Boulevard Create major and minor entry/exit nodes with theme structures to Identify Districts. P.C.H./Newport Boulevard 32nd Street/Newport Boulevard Traffic Circle/Newport Boulevard 22nd Street & 21 st Streets/Newport Boulevard 15th Street/Balboa Boulevard Adams, Washington & A & B Streets/Balboa Boulevard • Synchronize the traffic signals along the Newport Boulevard. • Develop guest docking facilities for visiting boaters to the Peninsula. • Develop a system of public transportation shuffles. • Develop bus route and parking facilities. • Create a series of inter -connecting pedestrian walkways. 2. Improve the area's image and physical appearance. Recommendations: • Establish a street tree program for the entire length of Newport Boulevard. Design a street lighting program with tree lighting. • Provide for the option of banners on the street lights or across the boulevard. • Develop a uniform sidewalk and pedestrian walkway design with special paving materials. • Develop a uniform maintenance and repair program of existing public areas. • Implement a stricter compliance with maintenance codes on private properly. • , Explore the possibility of Incorporating a sailing theme throughout the public areas. • Establish a uniform setback regulation adjacent to Newport Boulevard. W 3. Develop an appropriate mix of commercial and recreational uses. • Implement specific zoning codes to encourage and discourage specific activities within the individual Districts. • Provide incentives in the zoning codes for desired activities In select areas. • Draft new regulations for desired uses (i.e., bed and breakfast facilities). • Draft more restrictive regulations for less desirable activities (i.e., alcohol sales). • Create new higher density residential opportunities adjacent to the District cores. • Establish a new public marina In a central location on the Peninsula. LIDO/ CIVIC CENTER LIDO/CIVIC CENTER The District is bound by Newport Boulevard, 32nd Street and the bay. In addition, the District includes Lido Peninsula. The District is divided into three sub areas; Lido Village, City Hall and Lido Peninsula. Each sub area has slightly different designations. Lido Village is designated for recreation, marine, retail and service commercial. City Hall is designated for retail and service commercial, and allows governmental, educational, and institutional facilities. No residential uses are permitted. Lido Peninsula is designated for recreation and marine commercial and single family attached residential. In addition Lido Peninsula is zoned Planned Community anticipating some future change. I• N `♦ i I ♦ NEWPORT BAY 'A^'� t ie0 ♦ ' a ♦ t\ S' � 1 ♦ i Y ; •'a PI ♦ t s t • ♦ s t a % t II�fY IY( t ♦♦ ♦ ]mot 1 t b ♦ t ♦ .I •IFFd 111 YIIIO/ FF i. LIDO/CIVIC CENTER CONCEPT PLAN The Lido/Civic Center is a large diverse District including a major retail area, the City's governmental center and a substantial amount of residential activity. The District is comprised of newer more modern structures distinguishing itself from the other more historic Districts of the Peninsula. Lido Village and Lido Marine Village offer shopping and dining opportunities for area residents and visitors alike. The retail shops mostly cater to the year around needs of the local population. The District also provides many professional offices and daily houses a fairly large work force. Lido Marine Village developed as a mixed use project has experienced marginal success. The develop needs to capitalize better on the adjacent asset of the bay. Water oriented retail, restaurants, entertainment and recreation seem best suited for the site. The inclusion of a residential option as a means of occupying vacant office space should be carefully analyzed. The District is bisected by Via Lido, a major street that serves as a collector to convey residents out of the area. 32nd Street to the south could serve the area better as a through traffic conduit, allowing Via Lido to become a true shopping street with convenient parking, wider sidewalks, street trees and handsome store fronts. There is an abundance of parking in the District; however it is comprised of a variety of public, private, on street, off street, free and fee spaces. Parking is very poorly organized and has become a detriment to the area. A shared parking facility and plan could greatly enhance the District. Lido Peninsula offers the community a special location for future development. The Peninsula should be master planned as a whole and developed in phases. However, it is unlikely that anything will happen in the near future. Overall Lido should continue to serve as the retail hub of the Balboa Peninsula. A series of planning and design recommendations should be employed to enhance the area and restore its retail prominence. LIDO/CIVIC CENTER OBJECTIVES & RECOMMENDATIONS Land Uses 1. To reestablish and enhance a mix of retail, office, residential and government activities. Recommendations: • Create a linear retail street along Via Lido. • Develop a shared parking program for the site behind the Civic Center adjacent to Via Oporto. • Allow residential development and conversion for select upper story locations. • Encourage outdoor dining and sales in designated areas. • Encourage special events such as sidewalk sales, art exhibits, afternoon concerts, etc. • Provide public boat docking facilities in Lido Marine Village. • Consolidate public parking uses by eliminating streets and alleyways. • Encourage more restaurants. • Investigate the development of an entertainment center. • Develop a waterfront assembly area for public gatherings. LIDO/CIVIC CENTER OBJECTIVES & RECOMMENDATIONS Access/ Circulation 1. To accommodate better access to and within the District. Recommendations: • Redesign the Newport and Balboa Boulevards interchange. • Redesign 32nd Street to be an east -west collector street and southern access point to the District. • Redesignate Via Lido as shopping street with diagonal parking. • Redesign Central Avenue for entry and exit from the parking structure. • Maintain Via Oporto in Lido Marine Village for pedestrian and access to the parking structure only. • Establish entrance nodes to the Village from Newport Boulevard at Via Lido and 32nd Streets. • Establish a pedestrian priority circulation system using,sidewalks boardwalks and along Via Lido. • Develop a series of theme directional signs. • Investigate a traffic circle at 32nd and Lafayette Avenue. Maintain entrance to City Hall and Lido Village from Newport Boulevard with additional access points from 32nd Street and Via Lido. • Vacate Via Oporto south of Via Lido and Via Valada and make part of shared parking facility. Parking LIDO/CIVIC CENTER OBJECTIVES & RECOMMENDATIONS To provide convenient available parking to facilitate all retail, restaurant, entertainment, office and government activities. Recommendations: • Develop shared public parking facilities in the center of the District. • Replace parallel parking with diagonal parking where appropriate. • Allow compact size parking stalls in select locations. • Implement special permit parking program (other than existing city program). • Install short and long term meters, (working 24 hours a day). • Develop a parking management plan. • Provide bicycle parking facilities. Develop a combined or shared valet parking system for restaurant patrons. • Review parking patterns and study District parking demand. • Remove some on street parking to accommodate circulation plan. • Create new access patterns to exiting parking structure. LIDO/CIVIC CENTER OBJECTIVES & RECOMMENDATIONS Image/ Aesthetics 1. To reestablish and enhance the Village atmosphere of retail and entertainment for the Peninsula. Recommendations: • Limit the amount and type of signing allowed for commercial uses. • Eliminate non -conforming signs. Develop sign guidelines for the District. • Develop uniform street lighting program. • Encourage banners for special events. • Use special pavers or patterns for pedestrian paths. • Develop a street tree program. • Encourage quality architectural styles and designs through flexible design guidelines. • Develop a Business Improvement District. • Explore a theme lighting, landscaping and signing for District identification. • Rehabilitate ekterior of City Hall and improve landscaping. • Create entry node to the Peninsula and District along Newport Boulevard. MASTER PLANNING URBAN DESIGN June 18, 1996 4:00 - 6:00 p.m. MCFADDEN SQUARE DISTRICT PLANNING WORKSHOP - PART TWO Meeting Agenda 1. Define meeting objectives 2. Review part one of District Planning Workshop on issue identification Work through each identified issue as a group using the following process: • Define the objective and review solutions • Rate the need for change • Determine implementability 4. Explain next project phase - concept alternatives 5. Questions and answers 6. Adjournment k&wpkamp\igend1 1401 QUAIL STREET, SUITE 100 NEWPORT BEACH, CA 92660 TEL (7141833.9193 FAX 1714) 8333098 o Issue Description • Need to maxim • Lack of Harbor • Lack of public d McFadden Square District LAND USES (Revised 6/11/96) 'a iz commer ial tyse entrance ockspace` Objectives �g • Improve access to the Village • Improve accessibility for boat visitors • Create more access to the Bay auiL" wa*"I- • Create more upscale specialty retail Solutions alvl Develop a Balboa Peninsula entrance,iv i4i-Peninsula wide -theiwsignage and lighting (��' • Develop public boat docking facilities at 19th Street • Develop boat and vehicle parking facilities for public dock users Explore appropriate zone changes Develop more public restroom facilities Determine the appropriate mix of V residential/commercial/recreational uses Explore incentive programs for property owners to he implement the ideal mix of uses P Organize regularly scheduled special events with City sponsorship and assistance SZ04&-V"-- Increase usage of ocea f ont per y, recreational activities I and special events, yui� Increase usage of bayfrontage private and public, extend Ilic boardwalk • Encourage bed and breakfast facilities I -Enlarge and enhance Doryman's Fish M aket A G LAND USES cont. (Revised 6/11/96) Solutions McFadden Square District Develop buffers between residential and commercial uses Propose more flexibility with variances and ordinance to upgrade retail activity Explore the potential for a parking structure at an inland location Encourage commercial uses on and adjacent to the pier Explore alternative uses for Marina Park Review ordinances to determine inhibitors to new development and rehabilitation establish mixed use.provisions in zoning ordinance Investigate Farmer's Market potential and alternative location McFadden S uare District ACCESS/CIRCULATION (Revised 6/11/96) Issue Description Y • Poor access and flow to area and between areas. (Ocean - Bay) • Poor signage • Better use of alleys Objectives • Improve visitor access • Maintain McFadden Square as a destination • Create a safe and attractive pedestrian area • Develop a creative use of the alleys for pedestrians, cars and service vehicles Solutions • Reconfigure traffic patterns • Reconfigure Balboa Blvd. and Newport Blvd. • Signalize crosswalks • Reconfigure pedestrian flow • Install better lighting • Develop entrance signs and directional signs • Develop pedestrian circulation system • Explore pedestrian malls on 22nd and 23rd Streets • Develop parking lot control system which discourage vehicle circling looking for a vacant space • Restrict and regulate activities in the alleys • Need for pedestrian access bay to beach • Explore shuttle tra sport tion system PARKING (Revised 6/11/96) McFadden Square District V II Issue Description fV1V • Competition for available space • Poor public parking layout • Parking limited nd expensive, Doub stan ar Objectives • Improve usage of parking facilities • Increase new parking areas • Develop a transportation center Solutions wide • Better signage (electronic) • Develop a managed parking progratp • Short and longterm meters • Parking permit program • Pay as you exit • Develop validation program • Install more change machines • Explain parking rules with b er signage • District direct parking revenues to district parking improvements • Develop special parking area for boat patrons, transients and locals that travel by boat • Acquire and consolidate parking areas 23rd - 28th Street • Explore a new parking structure between Newport & Balboa Blvds. • Develop long term parking area for buses • Explore options and facilities necessary for a transportation center I • Investigate status of former assessment district • Explore the potential for a neighborhood enhancement program McFadden Square District IMAGE/AESTHETICS (Revised 6/11/96) Issue Description • Commercial character needs enhancing • Improve water quality in ocean and bay Objectives • Prohibit excess signage • Eliminate non -conforming signage • Establish a village character with consistent lighting • Establish better lighting for pedestrian convenience and safety • Eliminate litter problem Solutions • Develop a standardized sign code but avoid "sameness" • Reevaluate current codes • Create a citizens committee to provide imput on a new sign code and possibly oversee sign approvals • Establish lighting standards with fixtures and illumination • Establish theme lighting • Enforce clean up laws - empower additional individuals • Develop a litter clean up program • Require individual trash cans for all tenants • Hire a cleaning contractor to maintain sidewalks and alleys • Enforce noise ordinance on public speakers and provide a designated area • Investigate water quality concerns with the county • Implement boat dumping policies and enforcement program • Empower lifeguards to cite litter violators • Enhance beach recreational activities, volleyball, fire rings, basketball, etc. • Discourage resident use of public trash facilities Develop landscape guidelines and material pallet unique to area weather conditions F Ao McFadden Square Di ict IMAGE/AESTHETICS cont. ��'"� (Revised 6/11/96) Solutions: • Develop design review dui ?andprocess with local architects and designers • Develop a charming old world pier • Keep the pier clean • Limit fishing hours on the pier • Enforce fishing rules • Create special fishing areas • Develop a maintenance program • Organize a B.I.D. • Prohibit skateboarding in pedestrian areas • Explore skateboard parks • Steam clean sidewalks • Develop wider sidewalks • Improve pedestrian, bicycling and in -line skating flow and safety, develop minimum width standards • Increase Harbor patrol and monitoring for debris • Prepare a marketing program with the Chamber of Commerce city wide or peninsula wide • Underground utilities • Upgrade entire city infrastructure • Provide public refuse bags for dogs • Direct community and police involvement and establish tolerance levels and enforcement • Identify hot spots and issues • Implement noise ordinance • Develop Harbor boardwalk on public and private land in commercial areas. Investigate over crossings • Replace existing street trees • Determine area boundaries for special design standards McFadden Square District SAFETY (Revised 6/11/96) Issue Description • Police relations with public Objectives • Increase police image and attitude (soften "John Wayne" approach) • Reduce crime • Reduce response time • Prohibit transient sleeping • Correct the current enforcement double standard • Recognize and correct the fear of reprocussions concern Solutions • Develop substation with good visibility • Increase police visibility • Create positive visibility • Increase patrol time in area during peak times • Continue with education of police • Investigate community oriented policing MASTER PLANNING URBAN DESIGN June 14, 1996 LIDO VILLAGE/CIVIC CENTER DISTRICT PLANNING WORKSHOP Meeting 1. Define meeting objectives 2. Review first phase District Planning Workshop issue identification 3. Work through each identified issue and potential new issues as a group using the following process: • Identify the issue • Define the objective • Brainstorm effects • Determine change potential • Create solutions/action plans 4. Explain next project phase - concept alternatives 5. Questions and answers 6. Adjournment k6A*Campy8end2 6A� r1401 QUAIL STREET, SUITE 100 NEWPORT BEACH, CA 92660 TEL 17141 833.9193 FAX 1714i 833 3096 T FUNDING IDEAS • Community Development Block Grants • Affordable Housing in -lieu fees • Gas tax funds • Measure "M" funds • Underground utility district • Traffic impact fees • Business Improvement District funds • Special Districts tax/fee • Special assessments • Revenue Bonds • Parking surcharge • Coastal Conservancy funds • Land and Water Conservation funds • Create a redevelopment area • Facade grants/loans • Tree Forestration program • Donated trash receptacles Donated trees • Adopt a tree, sidewalk, pavers, benches • Lease rights of way for commercial activity • Raise parking rates • Lease public areas for community events LAND USES Issue Description • Direction and purpose of District Objectives • Create more uses that keep customers in the area • Attract more design professionals • Attract higher quality tenants and more varied users • Increase property values Solutions • Develop more restaurants and theaters • Do not allow more night clubs • Permit more residential activity (allow high density) • Provide. for mixed use projects • Review zoning ordinances and explore appropriate changes • Determine the appropriate mix of residential and commercial uses • Develop a visitors Marina • Develop an Entertainment Center Master Plan • Encourage hotel development • Install fiber optic system underground to encourage more professional offices and internet occupancies • Reinforce the concept of being a "point of destination" • Determine the city's needs and desires • Develop a people friendly environment • Develop a new City Hall and Civic Center ACCESS/CIRCULATION Issue Description • Poor circulation patterns Objectives • Improve area circulation • Improve access to Lido Island and Lido Peninsula Solutions • Install directional'signage • Develop signage specific for the Village • Review one and two way circulation patterns • Develop an organized circulation plan • Redesign roadways to put through traffic under bridge plaza for shopping • Block off Via Oporto to vehicles • Create pedestrian ambiance in Lido Village and Marina • Correct bottleneck at Arches Bridge • Develop a mono -rail from Mariners Mile • Improve access to Lido Island from 32nd Street PARKING Issue Description • Continuous hassle over available parking Objectives • Improve shared usage of parking facilities • Develop cheap, available parking for non-residential uses Solutions • Review parking utilization patterns • Develop a managed parking program • Short and longterm meters • Close certain streets to create more parking • Develop joint use parking plans with reciprocal agreements • Expand existing parking structure for Lido Marina, Lido Village and City Hall • Develop a shared parking plan for Lido Village, Marina and Elks Club • Provide free church parking on Sundays • Develop user friendly access to parking facilities • Remove on street parking IMAGE/AESTHETICS' Issue Description • Village character needs preservation 1'�Objiectives • Create village atmosphere • Create a pedestrian friendly environment ^ • Bring back commercial luster ,A dL 1 • Improve area infrastructures to the area • Make the area more attractive Solutions • Develop a standardized,streetscape design for area • Reevaluate current codes • Establish theme lighting, landscaping, signing for community identification • Create a walking environment • Redesign 32nd Street improve streetscape and preserve parking • Improve streetscape and landscaping on Newport Blvd. • Develop a better integration of commercial areas • Upgrade area infrastructure • Redesign or rebuild City Hall • Develo a theme for the area .-�v I ' MASTER PLANNING URBAN DESIGN June 12, 1996 CANNERY VILLAGE DISTRICT PLANNING WORKSHOP Meeting Agenda 1. Define meeting objectives 2. Review first phase District Planning Workshop issue identification 3. Work through each identified issue and potential new issues as a group using the following process: • Identify the issue • Define the objective • Brainstorm effects • Determine change potential • Create solutions/action plans 4. Explain next project phase - concept alternatives 5. Questions and answers 6. Adjournment kB\wpkampWgend2 1401 QUAIL STREET, SUITE 100 NEWPORT BEACH, CA 92660 TEL (7141 833.9193 FAX (7141 833.3098 FUNDING IDEAS • Community Development Block Grants • Affordable Housing in -lieu fees • Gas tax funds • Measure "M" funds • Underground utility district • Traffic impact fees • Business Improvement District funds • Special Districts tax/fee • Special assessments • Revenue Bonds • Parking surcharge • Coastal Conservancy funds • Land and Water Conservation funds • Create a redevelopment area • Facade grants/loans • Tree Forestration program • Donated trash receptacles • Donated trees • Adopt a tree, sidewalk, pavers, benches • Lease rights of way for commercial activity • Raise parking rates • Lease public areas for community events LAND USES dlssue Description • Objectionable, marginal and under utilized land uses Objectives GJ�C • Create more art studios and specialty retailers"- Solutions • Review zoning ordinances and explore appropriate zone changes • Determine the appropriate mix of residential and commercial uses • Explore incentive programs for property owners to help - implement the ideal mix of uses • Do not allow more night clubs • Enhance marine retail • Encourage the relocation of construction, service and storage uses n `Q f or �Cce^^- • Review AB Aregulations ACCESS/CIRCULATION Issue Description • Poor access to the Village Objectives • Keep the notion of "Newport Beach's best t secret." • Improve visitor access j4.,,1W Solutions • Maintain narrow streets • Install directional signage • Develop signage specific for the Village • Promote the Village,location with advertising • Review one and two way circulation patterns • Eliminate the triangle adjacent to the village • Develop an organized circulation plan PARKING Issue Description • Parking limited with "spot area" concerns Objectives • Improve usage of parking facilities • Develop a clear definition of public parking Solutions • Review parking utilization patterns • Develop a managed parking program • Short and longterm meters • Permit parking • Develop night time parking plan • Develop remote parking facilities for buses • Resolve parking issues on 29th and 30th Streets • Review the utilization in private lots Y SAFETY Issue Description • Police enforcement of existing regulations Objectives • Increase police visibility • Reduce crime • Reduce response time Solutions 0 • Increase police awareness • Create positive visibility • Improve area lighting ,. • Patrol bars more frequently • Add one police unit specifically for the Canner ,. , IMAGE/AESTHETICS Issue Description • Village character needs preservation • Improve water quality in "The Rhine" Objectives • Upgrade the village character with consistent lighting • Eliminate litter problem • Maintain the great sense of community • Stop vandalism in village Solutions • Develop a standardized sign code but avoid "sameness" • Reevaluate current codes • Establish Village identification signage • Establish theme lighting, landscaping, signing for community identification • Enforce clean up laws Develop a litter clean up program ("Litter Free Zone") • Enforce noise ordinance • Develop a marketing program • Reinforce small lot provisions • Reinforce historic elements "Old Newport"' • Develop a merchants association • Create a walking environment • Conduct community fairs • Explore a canal or pipeline to circulate water better • Install public trash receptacles • Review the amount of public signage MASTER PLANNING URBAN DESIGN June 11,1996 MCFADDEN SQUARE DISTRICT PLANNING WORKSHOP Meeting Agenda 1. Define meeting objectives 2. Review first phase District Planning Workshop issue identification 3. Work through each identified issue and potential new issues as a group using the following process: • Identify the issue • Define the objective • Brainstorm effects • Determine change potential • Create solutions/action plans 4. Explain next project phase - concept alternatives 5. Questions and answers 6. Adjournment 1401 QUAIL STREET, SUITE 100 NEWPORT BEACH, CA 92660 TEL (714) 833.9193 FAX (7141 833.3098 K FUNDING IDEAS • Community Development Block Grants • Affordable Housing in -lieu fees • Gas tax funds • Measure "M" funds • Underground utility district • Traffic impact fees • Business Improvement District funds • Special Districts tax/fee • Special assessments • Revenue Bonds • Parking surcharge • Coastal Conservancy funds • Land and Water Conservation funds • Create a redevelopment area • Facade grants/loans • Tree Forestration program • Donated trash receptacles • Donated trees • Adopt a tree, sidewalk, pavers, benches • Lease rights of way for commercial activity • Raise parking rates • Lease public areas for community events LAND USES Issue Description • Need to maxim izeiCom mercial us • Lack of Harbor entrance • Lack of public, dock space Objectives e 01 • Improve accessibility for boat visitors • Create more access to the Bay Ij ' Solutions d d- • Develop a Harbor friendly entrance P ith signage and lighting Develop public boat docking facilities Develop parking facilities for public dock Explore appropriate zone changes Develop more public restroom facilities Determine the appropriate mix of residential/commercial/recreational uses Explore incentive programs for property owners to help implement the ideal mix of uses Organize regularly scheduled special events with City sponsorship and assistance • Increase usage of oceanfront property • Increase usage of bayfrontage • Encourage bed and breakfast facilities _%�, Qr AJ4+4�51 _131- N FUNDING IDEAS • Community development block grants • Affordable housing in lieu fees • Gas tax • Measure "M" funds • Underground utility district • Traffic impact fees • Business improvement district funds • Special districts tax/fee • Special assessments • Revenue bonds • Parking surcharge • Coastal conservancy funds • Land and water conservation funds • Create a redevelopment area • Facade grants/loans • Tree forestration program • Donated trash receptacles • Donated trees • Adopt a tree, sidewalk, pavers, benches • Lease rights of way for community activity • Raise parking rates • Lease public areas for community events 6-04-1996 9:19AM FROM J.T. DEVELOMENT LLC 714 SSSG321 P. S , ... . ...... ........ . .. 1:5mov'm 0�4 5 -AiA4uOL-rz+.. b -"i R uq. o 4�.DQ r-ltOriAL l%+5+-ro-a.. �,o"P .� r.rt� MA��►r -motS +4A "�'S' EL- 't Arzkrnic{ LOT 'DC-4oSLct' 4 ?AfWk. AvJus-r � To smrrc+C oJzr.-S . �or��tk 4-- -mg-,A oxt,- SuRtne"`;' • n t�!-a,�tof� �. ^tA�a�Ct b�L.►'t7;�+'r4r{ �iutit4, ... � • � S'T'�f�T �4t�'r '�tu�c4 Sid cCrz ... . _....... .... .�. C.tt-�'1k7'�G �Fi�!'i'c.'�.� �Ak'�r-r�cc4 � � • • '1X0C4vr -4 ffZ(At... A9jCArT ':disc._ 'VCW ?A:rn9 t) + 6-04-1996 9:18AM FROM J.T. DEVELOMENT LLC 714 8956321 P. 1 S TStTara�1,.- stc,xf�4 tcG�, ql tr" 1A�7�As 5 . i 6-04-1996 9:17AM FROM J.T. DEVELOMENT LLC 714 SGSS321 C.rt?7 u S-S C3"f��i'�'t�J�j o '��.�s+A�iL. ^"tC'�l�-• �t�AC't'�-��W �rl,v'ji."�(.`J - • - - ' o "�t►l�cres,A,'4�. , w'' �CSi`rwL. 'i��1, . e �ir.Ov��ti ► t'�"C �' ""}SF.AS"f' L1• Cr't u o tatt�i'' .d...4 crby- cm-� ✓s`�z t�rY St . SATr20tt.lc� • 'C}F r p A�- is titt tit4Tt..t A — . ca - c.* A- i3,�5tNa""efa'j, P. 2 I 6-04-1996 9:18AM FROM J.T. DEVELOMENT LLC 714 8956321 P. 3 ,%Orr �16 . 1 �1 �r ' ,ram, �-T�. - � cr•t � . t�sJ .. ._.. • . Cxr�...t� -r� �: Ta � cam- _ o C�'IZt�AN 12 c>>c,t 'S'T1Z£ T 'Pc k,r.A<f " '73�L�Fc, �►7� C/15T9fit�Ac'i'5 A'r�':� '"i%3"�. �% / VL..A��,. n AP t.�}1L"r".JfZl4L C�A.+.1rK .7•i -��D �At�tix.�.Ac?'tscar,t7'1+�(�S M�r+at�li►,iNS ... • '�i�i't.Ls� s?�i! . 1"''l,)4r.1 S r-P-d� �i c rl 51� t -I!vp _ City of Newport Beach Balboa Peninsula Planning Study MASTER PLANNING uRG-AN DESIGN District IC_,O,�141a G)MF District Issue / .15UV41126- 77fU-7- �!�f/O'y / Number Issue Description: N,+I) V OF T4/C / 0l c AA) 4 ..%'Lit '-1,OAJ j- ?o // 4t1tW1ld 2A59V11WA� 1<O- A1A,f 1,dwvel�- /1,4Ur[lr- Alk /A�v/0��/,C4 %H�l/1jE ,z/ItJ4N�'.�S A2� /J�/d, 4je �%�7Zg/�tJ�d _ Positive Aspects (Works well -can improve) Objectives/Strategies Possible Solutions or Improvements �l Ty 6.+�L ¢llB6S Q �11 �fi �U�A(Q Sdt1(L�E D>= Th•!/4 ,l �v/L G C�2w,� M011� ���t19- Q C(O L-�/--r p 1f.4INi /vilD 19tl,Ldev OF (�P�2�4� D� IAXI1A�iJ/�llW;X/ E �(P�C'/.+�L —Moir ��oy G&L<J?-/,t /2FW/l4) Olc.1 t/%l, /I)CF /°,f44 GI&A, adPeILTx M� 7- /� fdtil� �1'�.f �/ �D,e6/��1L7/C S l OlnJT/F}' SDtIICL' 1 O/c Jk%L'dhA:L i3Lx ar-C1_JW_S - /A)F em ,ee(1,O6A rs Q,� �d4-r- vx. Te) F1,,1 � �c4f 4 .(L A)1 a 70 �e.4j -i7- f •iz(' aj- o/ Status Quo • Current Level of Activity • No Change Negative Aspects (Doesn't work -well - Objectives/Strategies Possible Solutions or Improvements needs improvement/change) /IC'crtlfafi� jK ,Q�,(1� F� t�/�tcti'� ' JACEX'%7j'' �' '/¢CT- P2tu t f f(j'w ,tRc /N! G: ,W /£six /L'Caa/� Ijil aG/�-Y 7`d fVY t/,06E ��'VZ( — EIZi?C� �'G/<L T fills �� ,` r.� !/LT12.IrtrcF2 Cd 1JU� %G'11/-/S0B7_/4 e112c e S •r- r; Fz h�1 �c� � �c /ZL.JTLi`C= �2� /2/�/zr C , F21EL Ar, 4F2,F41 . i i �/� TJ F �,. L S• -, Fc.ti F//�,�1.c'L'2 z2 /3z'Cti'L Conclusions: PU41k1C1U'C!LlLS, 9`UIIA 11U6 (;tA2 euUkiL 1L'r���'/1 JZC:S �/� 1( l�1 Fz cS•�t,�,�/,T� p'rLL.' ICLLT--((Alc. (-aA,,iuti'tr -(dUfi-d I' AIM4r- 13� /✓/cFi, 7,C/7,c/-j 6VF7-C-12-�CL'� •tl %�1P61;i��E71 it C /=r)/ l6llt' G --OV L46,f Action Plan: �'J 1= .i irlLtk FIJV4jvel�7/ /� ((�f� Si7-lr.t %i�x ,d.c14 ' ll10Ei'9L y/�`�XP�/Z/ Z ,.5'T1[j �i _1C k.�e /T- 'x-4 /z-/L- eC'l/!L �,71c �' ?"ic A I _ t ACCESS/CIRCULATION Issue Description • Poor access and flow to area and between areas (Ocean - Bay) • Poor signage • C.-47 d>use of alleys Objectives • Improve visitor access • Maintain McFadden Square as a destination • Create a safe and attractive pedestrian area • Develop a creative use for the alleys Solutions -114V4, • Reconfigure traffic patterns' 0 • Reconfigure Balboa Blvd. and Newport Blvd. • Signalize crosswalks • Reconfigure pedestrian flow • Install better lighting • Develop entranceeugns U PARKING Issue Description • Competition for available space • Poor public parking layout • Parking limited and expensive Objectives • Improve usage of parking facilities • Increase new parking areas • Consolidate parking area 26th and 28th Street • Develop a transportation center Solutions • Better signage (electronic) • Develop a managed parking program • Short and longterm meters • Permit parking • Pay as you exit • Validation program • Install change machines • Explain rules with signage • Direct district parking revenues to district parking improvements • Develop special area for boat patrons IMAGE/AESTHETICS Issue Description • Commercial character needs enhancing • Improve water quality in ocean and bay Objectives • Prohibit excessive signage • Eliminate non -conforming signage • Establish a village character with consistent lighting • Establish better lighting for pedestrian convenience and safety • Eliminate litter problem Solutions • Develop a standardized sign code but avoid "sameness" • Reevaluate current codes • Create a citizens committee to develop a new sign code and oversee sign approvals • Establish lighting standards with fixtures and illumination • Establish theme lighting • Enforce clean up laws - empower additional individuals • Develop a litter clean up program • Require individual trash cans for all tenants • Hire a cleaning contractor • Enforce noise ordinance on public speakers IMAGE/AESTHETICS Solutions: • Develop a charming old world pier • Keep the pier clean • Limit fishing hours on the pier • Enforce fishing rules • Develop a maintenance program • Organize a B.I.D. • Prohibit skateboarding • Steam clean sidewalks • Develop wider sidewalks • Improve pedestrian, bicycling and in -line skating flow and safety • Increase Harbor patrol and monitoring for debris • Prepare a marketing program • Underground utilities • Provide public refuse bags for dogs • Direct community and police involvement and establish tolerance levels and enforcement • Develop Harbor boardwalk SAFETY Issue Description • Police relations with public Objectives • Improve police image • Reduce crime • Reduce response time • Prohibit transient sleeping Solutions • Develop substation with good visibility • Increase police visibility • Create positive visibility • Increase patrol time in area during peak times • Continue with education of police City of District % !% dJ�l���'-j� � C e,�,f Newport �/`d_ Issue _ I L� �f.��� C_ . 6 l� Beach Balboa Peninsula Planning Study MASTER ® URBAN DESIGN Number Issue Description: , 1 Positive _As�pectes/(W%o�rrkssy�ywell-can /improve) . Objectives/Strategies Possible Solutions or Improvements ��%�������'� TC/ V L.l. y'// /�G'� S/L 1 i Status Quo • Current Level of Activity No Change Negative Aspects (Doesn't work -well - Objectives/Strategies Possible Solutions or Improvements needs improvement/change) do C;e _�j ' %/� .�LZc.Fi 1 � • �' / 1�oe�.���' � ..,, <.� %//! � tl'�L��r� ���lld'G<,. ,y .�. Co sions: d I Action Plan: M M pity of Newport Beach Balboa Peninsula Planning Study MASTER PLANNING URBAN DESIGN Distric7`�C�I�C t. LL -cam Issue\ - Number / Cz'� Issue Description: Positive Aspects (Works well -can improve) Objectives/Strategies Possible Solutions or Improvements�/ /�G'4[-J UL•T-'�nGY'L•L�Y7 (PLC �. '2L� Y e.4u� � ',^ n' IX-�-¢) IXV7 Al, ._7f kk4.�"Ad—t) �Lu er `PLC J4 CG��Zr°c���G � CCaC Cz cep Status Quo Current Level of Activity • No Change Negative Aspects (Doesn't work -well - needs improvement/change) Objectives/Strategies Possible Solutions or Improvements • ��� � � c J is ,o , Conclusions: UU Action Plan: 'a'Lf &( ( City of Newport Beach Balboa Peninsula Planning Study MASTER PLANNING URBAN DE31GN (I L District�� 1 it ct'c( A d l&,� —Issue ' Number l C 3 Issue Description: C-t e..'?7�.�� Positive Aspects (Works well -can improve) Objectives/Strategies Possible Solutions or Improvements 61 Status Quo • Current Level of Activity • No Change Negative Aspects (Doesn't work -well - needs improvement/change) Objectives/Strategies �` Possible Solutions or Improvements �y�/�7 f Conclusion r Action Plan:41 C111! . . Cityof District �. Newpolr`��� —11ssue ` Beach Balboa Peninsula Planning Study MASTED PLANNING URBAN DESIGN Number /` 0 Issue Description: / Positive Aspects (Works well -can improve) Objectives/Strategies Possible Solutions or Improvements I/� � `�/7s"���(.C�d�'L�a �J l�Cl'Ce�j ! � eG�l�'l�l•'�1Z �LJ�C�Cis�J/�fG��J�7v. �*Y�r-71���1���LG �C.�61`� %%�G% 4l � C' � zJlccJ (7 / p / L` �7/,1�' ' '�:z �.t «,: 76V Status Quo • Current Level of Activity • No Change /) z' Negative Aspects (Doesn't work -well - Objectives/Strategies Possible Solutions or Improvements needs improvement/change) / u� Conclusions*`,Wv���rCSc'��LG'�tGCc� Action Plan: C� p Q/nLGi�!� IY City of District — Newport' � -� Beach Balboa Peninsula Planning Study MASTER MANNING URBAN DE316N -Issue Number Issue Description: Positive Aspects (Works well -can improve) Objectives/Strategies Possible Solutions or Improvements Status Quo Current Level of Activity • No Change Negative Aspects (Doesn't work -well - Objectives/Strategies Possible Solutions or Improvements - needs'imprQovement/change) " d/L� U cr.— Action Plan:`���gt W 'Icy of Newpor Beach Balboa Peninsula Planning Study 11111111,11,10 MASTER PLANNING URBAN DESIGN District ssue G�Z� Number Z czJ Issue Description: 4, At-22.7 Positive Aspects (Works well -can improve) Objectives/Strategies /cIlw e, Possible Solutions or Improvements Status Quo Current Level of Activity No Change Negative Aspects (Doesn't work -well - needs improvement/change) Objectives/Strategies Possible Solutions or Improvements Conclusions* Action Plan: Jwulz®� e0A �.ity of C -_z. Newport Beach Balboa Peninsula Planning Study MOTHAM MASTER PLANNING URBAN DESIGN )�2 Issue Description: Positive Aspects (Works well -can improve) Negative Aspects (Doesn't work -well - n/e/�eds improvement/ct�apge) L Objectives/Strategies f l 'l 71�?67LC `CC! C,�zL/Eo.� Number Possible Solutions or Improvements Status Quo • Current Level of Activity No Change Objective/ss/(-Stt�ratte{/giiiee/sJ///y/�� Possible Solutions or Improvements i�VIt Conclusions: ` ,b+) Action Plan: !i �D� � � ' °rn� �G C'Gl�'i.�i fD�, lGo — � `'2 Gl.�� c c4L_-) City of Newport Beach rYY,C 1� District IssueC�������cz% Issue Description: Balboa Positive Aspects (Works well -can improve) Peninsula Planning .r Study g.� MASTER PLANNING URIAN DESIGN Negative Aspects (Doesn't work -well - needs improvement/change) /(Irz) Objectives/Strategies f� , t�i G c l /1 c 1' I, Z Number ` Z� /pPossible SolutionsorImprovements 61 Status Quo • Current Level of Activity . No Change CYYI Jzc ?a Possible Solutions or Improvements �x Cuat.4e case �jC/!i t�lll�j (,�OG�: GU'✓� lCir.'j Az Conclusions: ' . Action Plan: — �f�j�%'yi city of Newpe Beach Balboa Peninsula Planning Study tea_ MASTER PLANNING URBAN DESIGN v Distri -� 1:AZ16 ' —Issue Issue Description: I Positive Aspects (Works well -can im�rove) Objectives/Strategies %«�. Possible Solutions or Improvement �m� lac c �c r' &0 Status Quo • Current Level of Activity No Change Negative Aspects (Doesn't work -well - needs improvement/change) Objectives/Strategies Possible Solutions or Improvements U Conclusions: Action Plan: City of Newport Beach Balboa ?eninsul, Manning Study District District Issue Issue Description: itive Aspects (Works well -can improve) T ; n!/l////)1//l Objectives/Strategies ` ��Cc�tdYis oJup inj__.,lA� Vu,-�A Number � Cr Possible Solutions or Improvements a - Status Quo * Current Level of Activity Negative Aspects D. •. Solutions or Improvements URBANimprovement/change) . , DESIGN MASTER PLANNING URBAN DESIGN Conclusions: ulae4t_e i / i I City of Newport Beach Balboa Peninsula Nanning Study URBAN MASTER PLANNING URBAN DESIGN District ��%��v�7 Q District issue Number Issue Description:. , Positive s� ell-ca improve) Objectives/Strategies Possible Solutions or Improvement pol Status Quo • Current Level of Activity • No Change Negative Aspects (Doesn't work -well needs improvement/change)`� �s c�J�cruS - 1AiS� Y i to ' Possible Solutions or Improvements Conclusions: °bW,Ylti2-,) Al"l�h Action Plan: r 1L 1 V City of Newport Beach Balboa Peninsula Planning Study MASTER PLANNING GRSAN DESIGN District/// District Issue ` Issue . .. .A Status• / / Negative Aspects ... •. .•. . . . . needs�.. i,. / •i= _ — . . .V� u L. City of Newport Beach Balboa Peninsula Planning Study MASTER ►TANNING UR/AN DE $I DN District District Issue Number & l Issue Description: , Positive Aspects (Works well -can improve) Objectives/Strategies / Possible Solutions or Improvements Status Quo • Current Level of Activity • No Change Negative Aspects (Doesn't work -well - needs improvement/change) Objectives/Strategies Possible Solutions or Improvements Conclusions: V UV Action Plan: ' U v Clity of Newport Beach Balboa 3eninsula 'fanning study MASTER PLANNING URBAN DESIGN District Distri ct Issue % �� % �/ LV QOIIJAAQJ�f/l"�` Number Issue Description: Positive Aspects (Works lwell-can improve) l �%d� UJ I Objectives/Strategies (n C�tR1t� GisseS�Jc' Possible Solutions or Improvements �;�2�cfl _ 4_ O �� Status Quo ` • Current Level of Activity • No Change Negative Aspects (Doesn't work -well - needs improvement/change)y� Objectives/Strategies Possible Solutions or Improvements, -_ ` - d Conclusions: - - G� Action Plan• �,Q6�'2—�s�, . City of Newport Beach Balboa Peninsula Planning Rudy MASTER PLANNING URBAN DESIGN 7 A District District IssueiLQit Issue Description PositiveAspects (Works well improve) Objectives/Strategies Possible Solutions or Improvements 7� Status Quo Current Level of Activity • No Change Negative Aspects (Doesn't work -well - needs improvement�chan e� Objectives/Strategies / O✓� ;> Possible Solutions or Improvements Conclusion I Action Pla(�� aa '���- City of Newport Beach Balboa Peninsula Planning Study MAST ER PLANNING URBAN DESIGN District Distric Number Issue Description: Positive Aspects (Works well -can improve) Objectives/Strategies Possibl Sol tions or Improvements _ Status Quo Current Level of Activity • No Change Negative Aspects (Doesn't work -well - Objectives/Strategies needs improvement/change) Possible Solutions or Improvements a cut---> Conclusions* �%� Action Plan:—A3.,JJ AN u City of Newport Beach Balboa Peninsula Planning Study MASTER PLANNING URBAN DESIGN District _, _N e 7% District Number Issue Description: W�//oyrrks well -can improve) Positive ,Assp�Ae/'ct/ts ('/(�/ DW/VVW'_ / Objectives/Strategies T 17 Possible Solutions or Improvements Status Quo • Current Level of Activity • No Change Negative Aspects (Doesn't work -well - needs improvement/change) Objectives/Strategies G,'�� ��D� � Possible Solutions or Ilmprove en � / Conclusions���� G� Action Plat): J City of Newport Beach Balboa Peninsula Planning Study MASTER PLANNING URBAN DESIGN District Issue Number —... 2 Issue Description: Positive Aspects (Works -well -can i prove) Objectives/Strategies Possible Solutions or Improvements , Status Quo • Current level of Activity + No Change Negative Aspects (Doesn't work -well - needs imprt-,c,,,ange�� Objectives/Strategies 977 Possible Solutions or Improvements t Conclusions: < Action Plan:. , • �ti�� � �/,��� GG�'� ��z�� ` l► 'Mr City of Newport Beach Balboa Peninsula Planning Study 0 VI 111016,11 MA S7E bA MIN R PLANNING URBAN DESIGN District District Issue Number l- Issue Description; g7 Z6a�W 7,� i Positive Aspects (Works well -can improve) Objectives/Strategies Possible Solutions or Improvements V A Status Quo • Current Level of Activity • No Change Negative Aspects (Doesn't work -well - Objectives/Strategies , o o J needs im rove ent/chang) Possible Solutions or Improvements Conclusions: Action � n; G�� City of Newport Beach Balboa Peninsula °fanning Study URBAN MASTER PLANNING URBAN DESIGN District District Issue Number Issue Den: 464 Positive Aspects (Works well -can improve) Objectives/Strategies �� Possible Solutions or Improvements Pvm Status Quo • Current Level of Activity . No Change Negative Aspects (Doesn't work -well - needs improvement/change) Objectives/Strategies Possible Solutions or Improvements Conclusions: �� �,�CQ`�92�%ZQ��/�L �� ���G'�� �Z�•t� Action Plan: