Loading...
HomeMy WebLinkAboutBALBOA_PENINSULA_PLANNING_STUDYBALBOA PENISULA PLANNIN G_STUDY �J BALBOA PENINSULA PLANNING STUDY prepared for the city of NEWPORT BEACH, CALIFORNIA prepared by Urban Design Camp JANUARY, 1997 CONTENTS Introduction Balboa Peninsula Planning Study Concept Plan Balboa Peninsula Concept Plan Balboa Peninsula Objectives and Recommendations Lido/Civic Center Concept Plan Lido/Civic Center Objectives and Recommendations • Cannery Village Concept Plan Cannery Village Objectives and Recommendations McFadden Square Concept Plan McFadden Square Objectives and Recommendations Central Balboa Concept Plan Central Balboa Objectives and Recommendations Special Studies Implementation Strategies Conclusion Appendix E 1 4 5 6 8 24 26 36 37 48 50 60 62 74 103 109 pIN • Peninsula Concept Plan - Area One 18 • Peninsula Concept Plan - Area Two 19 • Peninsula Concept Plan - Area Three 20 • Peninsula Concept Plan - Area Four 21 • Lido/Civic Center Concept Plan - Short -Term 31 • Lido/Clvic Center Concept Plan - Mid -Term 32 • Lido/Civic Center Concept Plan - Long -Term 33 • Cannery Village Concept Plan - Short -Term 43 • Cannery Village Concept Plan - Mid -Term 44 • Cannery Village Concept Plan - Long -Term 45 • McFadden Square Concept Plan - Short Term 56 • McFadden Square Concept Plan - Mid -Term 57 • McFadden Square Concept Plan - Long -Term 58 • Central Balboa Concept Plan - Short -Term 69 • Central Balboa Concept Plan - Mid -Term 70 • Central Balboa Concept plan - Long -Term 71 • Special Study No. 1 75 Marina Park • Special Study No. 2 77 Fun Zone & Pavilion • Existing Pavilion/Boardwalk 80 • Proposed Pavilion/Boardwalk 81 • Special Study No, 3 - Balboa Village 82 • Existing Balboa Boulevard 84 • Proposed Balboa Boulevard 85 • Existing Central Balboa 86 • Proposed Central Balboa Plan 87 • Special Study No, 4 - Lido/Cannery Village 88 • Existing Peninsula Entry 90 • Proposed Peninsula Entry 91 • • Existing Via Lido Entrance 92 • Proposed Via Lido Entrance 93 • Existing Lido Village 94 • Proposed Lido Village Plan 95 • Special Study No, 5 - Mlx-Master 96 • Proposed Mix Master Options Plan 99 • Existing Mix Master 100 • Proposed Mix Master Plan 101 • Funding Ideas Chart 102 • Special Study No, 6 - Sign Code Regulations 106 • Top Ten Recommendations 108 0 1 � • 0 INTRODUCTION • In May of 1996, the City Council authorized a contract with Urban Design Camp for the expressed purpose of identifying current issues, discovering common concerns and developing alternative concept plans to improve the quality of life on the Balboa Peninsula, The Balboa Peninsula Planning Study is intended to Identify ways in which the area can be improved to the benefit of the entire community, To discover the Peninsula -wide Issues and concerns a series of District by District (Village) planning workshops were conducted. These brainstorming sessions focused primarily on the individual Village Issues, but the District representatives were also challenged to Identify Peninsula -wide concerns, The Planning Study was Initiated by the Balboa Peninsula Planning Advisory Committee (B,P.P.A.C,), a city appointed task force, The Planning Study is a follow-up to a 15 Point Policy Plan, prepared by B.P.P.A.C., intended to establish positive changes on the Peninsula, B.P.P.A,C, representatives have served as advisors, to the consultant, throughout the project and participated in the Individual District meetings. E .I The Planning Study builds on the 15 Point Policy Plan and focuses on the four Districts of the Peninsula (Lido/Civic Center, Cannery Village, McFadden Square and Balboa Village), Over the period of nine months, the consultant team worked with representatives from each District were appointed by the City Council with recommendations from the B,P.P.A.C. A wide variety of Interests have been represented, including; residents, property owners, business tenants and community groups, Throughout the study process the level of participation and enthusiasm was excellent. The planning workshops revealed many issues and concerns common and unique along the Balboa Peninsula. In addition to offering an opportunity for community participation, the planning workshops provided the consultant team a forum for discussing traditional and Innovative planning techniques and Ideas. This combination of desires and techniques can now be balanced with fiscal and political realities forming a cohesive and comprehensive plan to effectuate positive changes for the Peninsula. The recommendations In this study have been reviewed and discussed with the various District representatives and has been well received. • Important to the success of this Planning Study Is the recognition of the characteristics unique to each District; and the need to reinforce and enhance these features in order to preserve them, The modern commercial and entertainment activities of the Lido District are balanced by the historic McFadden Square activities, The potentially active high energy Fun Zone and pier of Balboa Village are nicely contrasted with the quaint shopping and dining to be found in Cannery Village, Respect and understanding of these collective features as a whole Is critical to properly plan for the future of the Balboa Peninsula. •i 2 BALBOA PENINSULA • • BALBOA PENINSULA PLANNING STUDY Newport Beach, California Is a diverse coastal community which has evolved through the assemblage of a number of interrelated villages. Some of the more unique villages are located on the Balboa Peninsula. A composition of waterfront and coastal dependent activities and uses combine to create a unique environment for the city. The Balboa Peninsula Is a community with a long history of coastal related development and activities. The community Is dependent upon various coastal resources for its economic well being. The Peninsula is an area that attracts a wide variety of individuals. It is this diversity that is the basis of many of the area's concerns. The Balboa Peninsula is comprised of four District villages strung along an interconnected spine of roadways, each village offering both unique and similar services and activities for residents and visitors alike. Each District attempts to provide goods and services to their respective residents and to some extent • compete with each other for the attention of visitors to the Peninsula. The similarities of the four Districts are readily apparent, However, the characteristics of each District are very different and 9 is through these shared differences that the unique elements which form and Identify the villages emerge. This combination of different but similar areas make the Balboa Peninsula a worldwide attraction and resource. The Balboa Peninsula Planning Study offers strategic planning recommendations for policies and Ideas to effectuate change on the Peninsula. This study is not intended to be a Master Plan or Specific Plan to guide or regulate development on a District by District, block by block or lot by lot basis. Idealy, a Master Plan for the Balboa Peninsula will be prepared In the near future. A quality Master Plan will effectively influence the quantity, size, variety and liveliness of new and expanded development and activities; stimulate private Investment and leverage the relatively limited public resources. There is also a need to coordinate government activities and responsibilities with Peninsula -wide and District concerns. A Peninsula Master Plan will not only establish a vision and guide the long range physical development of the area, but may also promote timely decisionmaking and a continuity of public improvements, ii 2 C� CONCEPT PLANS The Balboa Peninsula Planning Study presents Concept Plans which identify and highlight general objectives and specific solutions for the Peninsula and each of the four Districts. The Study began with a workshop in each of the four Districts to identify the areas of concern. The planning workshops provided an opportunity for Peninsula District representatives to brainstorm their unique and collective problems. Potential solutions were discussed and characterized according to their importance and priority (low, medium, or high), The priority levels were applied to solutions based on their impact and ability to reach the identified objectives, The Issues were next analyzed for their amenability to change (easy, moderate, or difficult). The goal being to identify the most effective solutions to close the gap between the current problems and the community objectives. Throughout the study many issues were raised and concerns expressed. In order to provide a comparative format for review, the District by District and Peninsula - wide Issues have been categorized into the same major headings (land uses, access/circulation, parking, Image/aesthetics and safety). The study focuses on these common concerns and recommend potential short-term (3-5 years), mid- term (5-10 years), and long-term (10+ years) solutions for consideration. The workshops provided an opportunity for identification of the issues, and when combined with the Independent research, the recommendations became apparent. The list of consultant recommendations and solutions are a result of analyzing the problems which are most amenable to change and achieve the most significant Impact, Following the suggested solutions is a note to Indicate the degree of difficulty for implementation. Many Issues and solutions were Identified, all were evaluated and those which had a reasonable expectation of success have been Included in this study. Strategies to facilitate change have also been identified, An Implementation strategies section has been included which discusses a number of programs and funding sources which may be applicable and should be considered by the city. Finally, the study concludes with recommended next steps, listing special studies, capital Improvement projects and community programs, 5 'BALBOA PENINSULA CONCEPT PLAN The Balboa Peninsula is a very Important component to the City of Newport Beach. In order to adhere to the identified mission statement of the Peninsula, `to establish a quality community; a number of Issues need to be addressed and priorities established. The overriding concern for the Peninsula as a whole Is the need and desire to create a sense of place. Public Improvements need to be employed which establish a unified design theme for landscaping, lighting, and directional signage along the Peninsula's boulevards. Land uses and activities should be established uniquely for each of the Districts, with a greater amount of attention to resident serving needs. Discovering the appropriate mix of retail tenants for each District is critical, The circulation system is in need of major Improvements. Access to and between the Districts is cumbersome and awkward, Pedestrian, boating, • bicycling and public transportation have received little attention. The Peninsula has a substantial supply of parking, however, there is a need to develop a parking management program and plan to optimally use the existing resources, The overall image of the Peninsula Is In need of major upgrading. Peninsula welcome signs and arrival statement signage, along with upgraded landscaping and lighting would greatly Improve the area's Image, Views and access to the water are limited and should be capitalized upon. The family recreation of boating should be considered as a theme, to be Incorporated as a unifying element for the overall Image of the Peninsula. The first priority should be to Improve the area's Image, the overall appearance 1s in need of substantial upgrading. The public image of the Balboa Peninsula begins at the intersection of Newport Boulevard and Pacific Coast Highway. A major entry node statement should be created for this critical site. The City is currently planning improvements to the intersection which makes this an Ideal time to incorporate specific design features Into the bridge elevations, area landscaping and entry signing. 0 The overall Image of the Peninsula to a great extent is determined by the view of and from Newport and Balboa Boulevards, There are many public and private components which comprise the total image; primarily landscaping, lighting, signage, building setbacks and area maintenance. Design guidelines should be prepared for public and private development along the boulevards, The negative Image associated with the boulevards is further compounded by the frustrations associated with the confusing and congested traffic patterns throughout the area, A Circulation Plan to facilitate access to the various Districts In an efficient and effective manner is critical. Newport and Balboa Boulevards should continue to serve as the primary arterials with limited cross traffic and access points into the District villages. Finally, the concerns about parking needs to be fully explored and Investigated, Convenient and accessible parking is critical to the commercial viability of the Peninsula, The Peninsula must achieve and maintain a workable balance of parking availability for visitors, shoppers, employees and residents, There is a real need for a quality Parking Management Plan to develop adequate parking • layouts and regulations to manage the existing supply of parking resources and facilities. • Peninsula -wide objectives should support and strengthen the differences in the Individual Districts, This can be achieved by encouraging unique features and reducing competitive uses. Improvements in one or both of these areas will greatly affect the character and economic well being of the Balboa Peninsula, and help enhance the livability of the Peninsula and create a unique place in which people want to spend time, 7 BALBOA PENINSULA OBJECTIVES & RECOMMENDATIONS OBJECTIVE - LAND USE DEVELOP AN APPROPRIATE MIX OF COMMERCIAL, RECREATION AND RESIDENTIAL USES AND ACTIVITIES. Recommendations; Short -Term • In order to cluster commercial activities into central cores within each District, establish Incentives for commercial enhancement and development within specific District core boundaries (i.e„ facade Improvement, grants or loans, shared parking options, expanded hours of operation, outdoor dining options, etc.), (moderate) • Draft an ordinance permitting bed and breakfast activities in the transition areas between the Districts' commercial core and the residential areas, (moderate) • Permit outdoor dining in select areas without any additional regulations, restrictions, or requirements other than public access, (easy) • Permit outdoor sales without further regulations. (easy) • Prohibit any expansion or new commercial development outside the determined District core boundaries, (moderate) i • Encourage a conversion of commercial to residential use by permtting a higher density of residential, and/or bed and breakfast activities, Note; Any new or expanded residential uses must be able to provide sufficient off-street parking in order to be compatible with surrounding residential uses, (moderate) ) �I 8 L C� • • Encourage portable cart sales in select areas (i.e„ lease public areas in limited amounts). (easy) • Develop a business recruitment committee (through Business improvement Districts) to attract new commercial tenants. (moderate) • Establish Incentives to attract quality hospitality facilities (i,e„ new or Improved adjacent public recreation, use of public parking, etc.). (moderate) • Develop guest boat docking facilities for visiting boaters, in each District throughout the Peninsula. (difficult) Long -Term Orchestrate a Relocation and Acquisition Program to move businesses outside of the central core areas Into existing vacant, underutilized or underdeveloped properties within District cores, (difficult) • Establish a higher density residential or mixed -use area with surplus property from W-Master Street alignment, (difficult) • Master Plan and develop a community recreation boating and conference center around Marina Park, including existing community center, expanded beach, parking, and recreation facilities, (difficult) • Expand pier limit lines for additional public marinas. City should initiate In select locations. (difficult) OBJECTIVE - ACCESS/CIRCULATION IMPROVE ACCESS AND CIRCULATION PATTERNS THROUGHOUT THE PENINSULA Recommendations: Short -Term • Develop a circulation system that prioritizes the movement of traffic along Newport Boulevard first, Balboa Boulevard second, and select collector streets third (i.e„ 32nd Street), (moderate) 6 • Develop Peninsula -wide directional signing program to each District from Newport and Balboa Boulevards In landscaped medians. (moderate) • Reduce the number of curb cuts to access private property along boulevards, If other access points exist. (moderate) • Eliminate on -street parking in select locations along Newport and Balboa Boulevards, preferably outside the commercial core areas. (difficult) • Incorporate a 'Welcome to the Balboa Peninsula" entry statement with the current redesign of Newport Boulevard and P.C.H. (moderate) Mid -Term • Acquire properly for entry node landscaped areas and welcome statements. (moderate) • Acquire additional rights -of -way and develop a landscape median . the length of Newport and Balboa Boulevards. Place directional and District Identification signage in median, (moderate) • Reconfigure Balboa Boulevard to "Tee" Into Newport Boulevard near 26th Street. (difficult) • Reduce cross traffic along the boulevards by connecting medians and limiting Intersections. (moderate) • Limit the number of left turn pockets and pedestrian crossings. (moderate) • Create key entry nodes to each District at 32nd Street, 28th Street, 22nd Street, and Palm Street along the boulevards. (difficult) • Establish a series of Inter -connecting pedestrian walkways throughout the Peninsula, with boardwalks, sidewalks, peseos, etc, (moderate) •t 10 I Long -Term • Create theme structures as entry monuments for each District, (i,e„ archways over the boulevards). (difficult) • Synchronize all traffic signals along Newport and Balboa Blvd, (difficult) • Create a traffic circle or roundabout at the Intersection of Newport Boulevard and Balboa Boulevard, (difficult) • Connect the separated sections of Newport Boulevard, relocate the island of commercial activities. (difficult) • Develop a transportation center near McFadden Square to collect and overlay all public and charter buses and provide shuttles to adjacent Districts. (difficult) • Explore the implementation of an electric vehicle ordinance for the entire Peninsula (i.e„ City of Palm Dessert), (difficult) • • Investigate the re-establishment of a "Red Car" like system along Newport and Balboa Blvds. and connect to "Mariner's Mile." (difficult) OBJECTIVE - PARKING DISCOVER THE PENINSULA'S TRUE YEAR-ROUND AND SEASONAL PARKING DEMAND AND PROVIDE ADEQUATE PARKING OPPORTUNITIES Recommendations; Short -Term • Implement special permit parking program, different from the current program, providing for annual permits for Peninsula residents, Peninsula employees, city residents, visitors/non-residents. (easy) • Install short, mid and long-term parking meters, working 24 hrs, (easy) • Allow compact size parking stalls in select locations, limited to 25% of total spaces in any single location. (easy) 0 • Replace parallel parking with diagonal where appropriate. (moderate) Mid -Term • Consolidate public parking facilities where possible, (moderate) • Replace parallel parking along Newport Boulevard with adjacent parking courts where feasible. (difficult) • Develop a Peninsula -wide Parking Management Plan, including a shared parking program, (moderate) • Provide bicycle parking facilities In the District core areas. (moderate) • Establish resident only parking, by permit for select hours in select locations, (difficult) • Develop a mandatory parking permit purchase program concurrent with business license renewal, (easy) • Develop designated employee parking areas, (easy) • Develop a program to share the public beach parking, (easy) • Eliminate all free public parking areas. (easy) • Establish a parking meter fee of $.25 per quarter hour for most commercial core meters, with a two (2) hour maximum stay. (moderate) • Establish a parking meter fee of $.25 per ten minutes for new Short - Term meters, with a twenty minute maximum stay and locate adjacent to resident serving commercial, (moderate) • Relocate all Long -Term meters (10-12 hours) to beach area or district perimeters. (moderate) • Develop a remote parking facility off the Peninsula, with a shuttle system for special events and activities, (I,e„ county facility, Hoag Hospital). (moderate) 12 • M • • Revise current parking regulations and establish parking meter zones consistent with District boundaries, (easy) • Combine all parking revenues, fees and fines and develop an equitable system for distribution of funds back to the Districts for area Improvements including the creation of new parking opportunities, maintenance, clean up, parking related services, shuttle services, landscaping, sidewalk repair and replacement, and other related expenses, (moderate) Long -Term • Develop a public transit center for passenger transfer to shuttle bus system. Include bus layover areas, airport transfers, commuter parking, etc, (difficult) • Develop consolidated public parking facilities, Including structured parking where warranted near the district cores. (difficult) • Develop a full cost recovery in lieu fee option for new and expanded • commercial activities, (moderate) • Create a parking fund account for the in -lieu fees which can only be used for the creation of new parking opportunities, (moderate) • Eliminate non -essential curb cuts and provide new on -street parking spaces, (moderate) Develop a city parking enforcement and collection program through the Police Department. (difficult) OBJECTIVE - IMAGE/AESTHETICS IMPROVE THE OVERALL IMAGE AND PHYSICAL APPEARANCE OF THE BALBOA PENINSULA Recommendations; Short -Term Street sweep and water down Newport and Balboa Boulevards on a daily basis. (moderate) 13 e, • Replace all public Identification signage with consistent theme signs including: street signs, District identification, building identification and location signs (Le„ blue back ground with white lettering), (moderate) • Remove all non -conforming private signage. (difficult) • Improve the appearance and quality of residential uses by adopting and enforcing the "Uniform Housing Code," (easy) Mid -Term • Unify all street lights along Newport and Balboa Boulevards Including: size, height, spacing, design and color tint of the lights (i.e„ a brighter white). (moderate) Develop a landscaped street tree program for the entire length of Newport and Balboa Boulevards, The design should include a consistent theme Peninsula -wide in the medians (Le„ palm trees and colorful plants) and smaller scale street trees within or behind the sidewalk Individualized in each District, (moderate) • Develop landscape design standards for trees on private property • adjacent to the boulevards, (moderate) • Develop a street tree lighting program In the commercial areas, and uplighting for the palm trees In the landscaped medians. (moderate) • Install standards on the street lights to accommodate display banners and condition all City events to provide banners sufficient to properly Impact the boulevards, (moderate) • Develop new residential regulations and standards unique to the Peninsula as a whole (Le„ parking, outdoor storage, exterior lighting, fencing and walls, landscaping, etc.) (moderate) • Draft new regulations concerning weekly and monthly residential seasonal rentals (Le„ require owner or manager residence on site, payment of transient occupancy tax and business license, etc.), (moderate 0i 14 Establish a proactive code compliance enforcement program for all properties adjacent to the boulevards including; general maintenance and repair, painting, weeding, storage, trash, etc, (moderate) Long -Term Acquire the rights -of -way necessary and construct landscape medians, a minimum of 8 feet wide to an ideal of 14 feet wide. (difficult) Acquire property and construct entry nodes for each District. This can be achieved within the median or proposed traffic circle for McFadden or on adjacent properties to Newport Boulevard like in Lido Village,. Cannery Village and Central Balboa should consider a form of identification signage that would span over the boulevards. (difficult) Establish a limited number of specifically designed pedestrian crossing • locations on the boulevards. Design a special painted area on the pavement and install traffic control devices. (moderate) C� Establish specific zoning regulations for properties adjacent to Newport and Balboa Boulevards (Le., establish uniform setbacks, minimum landscape standards, building height and bulk, limited access, etc.). (moderate) Develop private signage standards and regulations for areas adjacent to and/or, visible from Newport and Balboa Boulevards. These regulations should Include maximum ratio of signage square footage with building facade, maximum intensity of illumination, elimination of free standing signage (except monument signs), roof signs, window displays greater than 15% of the opening, temporary signage, animated signage and inflatable signage. other private signage should be reviewed on a District by District basis. (difficult) 15 OBJECTIVE IMPROVE THE PUBLIC PERCEPTION OF THE BALBOA PENINSULA Recommendations; Short -Term • Incorporate a phrase like "located along the beautiful Balboa Peninsula" in all public advertising and publications, (easy) • Encourage the staging of more year-round special events (Le, a Farmer's Market), The events, although occurring in one District can be used to promote the entire Peninsula, (moderate) Mid -Term • Create an extensive public relations campaign for the Peninsula as a whole, with the Chamber of Commerce, (easy) • Encourage the formation of a Business Improvement District In each of • the four Districts, (moderate) • Expand the Police on Bikes Program for all Districts. Consider combining this service with parking control, (moderate) Long -Term • Create a water oriented boating theme for the Peninsula, (moderate) • Establish specific bay to ocean pedestrian crossings, (moderate) • Acquire property or limit development and expansion on property which provides unique opportunities for public access to the waterfront. This can be visual as well as physical, (difficult) • Expand the number of waterfront access opportunitles, Interconnect the system of boardwalks and Improve the existing view shed along the public rights -of -way, (difficult) 16 OBJECTIVE ENHANCE THE UNIQUE QUALITIES WITHIN THE INDIVIDUAL DISTRICTS TO CREATE A PENINSULA -WIDE SENSE OF PLACE Recommendations; Short -Term Develop specific standards for District by District rehabilitation and development. (moderate) Create different themes for each District that are compatible with the Peninsula as a whole. (easy) Mid -Term Amend current District Specific Area Plans to establish recommended District themes and develop overall Specific Plan for the Peninsula as a whole. (moderate) • • Investigate the formation of a Peninsula -wide Redevelopment Project Area, in order to facilitate physical Improvements. (difficult) L� 17 m F LIDO/ CIVIC CENTER • P LIDO/CIVIC CENTER CONCEPT PLAN The Lido/Civic Center Is a large diverse District Including a major retail area, the City's governmental center and a substantial amount of residential activity. The District is comprised of newer more modern structures distinguishing Itself from the other more historic Districts of the Peninsula. Lido Village and Lido Marine Village offer shopping and dining opportunities for area residents and Visitors alike. The retail shops mostly cater to the year-round needs of the local population, The District also provides many professional offices and daily houses a fairly large work force, Lido Marine Village, developed as a mixed use project, has experienced marginal success, The development needs to capitalize better on the adjacent asset of the bay. Water oriented retail, restaurants, entertainment and recreation seem best suited for the site. • The inclusion of a residential option as a means of occupying vacant office space should be carefully analyzed. The District Is bisected by Via Lido, a major street that serves as a collector to convey residents out of the area. 32nd Street to the south could serve the area better as a through traffic conduit, allowing Via Lido to become a true shopping street with convenient parking, wider sidewalks, street trees and handsome store fronts. There is an abundance of parking in the District; however, it Is comprised of a variety of public, private, on -street, off-street, free and fee spaces. Parking is very poorly organized and has become a detriment to the area, A shared parking facility and plan could greatly enhance the District. Lido Peninsula Is also part of the District and offers the community a special location for future development. The Peninsula should be master planned as a whole and developed in phases, However, it Is unlikely that anything will happen In the near future, 24 n �J The Lido/Civic Center District should continue to serve as the retail hub of the Balboa Peninsula, A series of planning and design recommendations need to be employed to enhance the area and restore its retail prominence, This District has the potential to accommodate the largest buildings and greatest intensity of development on the Peninsula, Parking is the key component to making the District successful, The existing parking resources need to be reconfigured and cleverly managed to address the variety of demands in the District, Short term convenient retail customer parking should be provided along Via Lido and a new shared parking facility should be developed behind Lido Village and City Hall, The existing parking structure should be used for long term parking of area employees, and should be considered for tour and charter boat parking, The current pattern of retail, office and government services should remain and be expanded upon, The District can easily accommodate more entertainment type uses. Residential uses should be allowed as a means of occupying vacant office space, The bayfront Area needs to take more advantage of the location with public walkways, small parks and view sheds, Primary access to the District • should come from Newport Boulevard through 32nd Street, The Lido/Civic Center District is bound by Newport Boulevard, 32nd Street and the bay. In addition, the District includes Lido Peninsula, The District is divided Into three sub areas; Lido Village, City Hall and Lido Peninsula. Each sub area has slightly different designations, Lido Village is designated for recreation, marine, retail and service commercial, City Hall is designated for retail and service commercial, and allows governmental, educational, and institutional facilities, No residential uses are permitted, Lido Peninsula is designated for recreation and marine commercial and single family attached residential, In addition, Lido Peninsula is zoned Planned community anticipating some future change. The following pages identify the objectives and recommendations for the Lido/Civic Center Concept Plan, The recommendations have been categorized as short-term, mid-term, and long-term; and highlighted on maps at the end of the section, The ease or difficulty of accomplishment has also been noted. 25 LIDO/CIVIC CENTER OBJECTIVES & RECOMMENDATIONS OBJECTIVE - LAND USE REESTABLISH AND ENHANCE A MIX OF RETAIL, OFFICE, RESIDENTIAL AND GOVERNMENT ACTIVITIES, Recommendations Short -Term • Create a retail shopping street along Via Lido by reducing street section to one travel lane In each direction with new diagonal parking, (moderate) • Encourage outdoor dining and sales in designated areas, (easy) • • Encourage special events such as sidewalk sales, art exhibits, afternoon concerts, etc, (moderate) Mid -Term • Develop a shared parking program for the site behind the Civic Center adjacent to Via Oporto, (moderate) • Allow residential development and conversion for select upper story locations, (moderate) • Provide public boat docking facilities In Lido Marine Village. (moderate) • Encourage more restaurants, through regulation incentives, (Le„ shared parking), (moderate) u Long -Term • Consolidate public parking uses by eliminating streets and alleyways. (difficult) • Investigate the development of an entertainment center. (difficult) • Develop a waterfront park and assembly area for public gatherings, (i.e., the site next to the Elk% facility). (moderate) • Expand governmental service base, concentrate other civic activities Into District. (moderate) • Allow medium density residential and/ormixed-use activities to replace strip commercial uses on west side of Newport Boulevard. (moderate) OBJECTIVE - ACCESS/CIRCULATION DEVELOP A CIRCULATION SYSTEM WHICH PROVIDES BETTER ACCESS TO AND WITHIN THE DISTRICT. . • Recommendations: C� Short -Term • Redesign 32nd Street to be an east -west collector street and southern access point to the District. (moderate) • Redesignate Via Lido as two lone/two way shopping street with diagonal parking. (moderate) • Maintain Via Oporto in Lido Marine Village for pedestrian and access to the parking structure only. (easy) • Maintain small left turn pocket on Newport Boulevard for entrance to City Hall and Lido Village. The primary access to the District should be from Newport Boulevard through 32nd Street with a double left turn pocket. (difficult) • Maintain small single lane left turn pocket on Newport Boulevard for Via Lido. (moderate) 27 Mid -Term • Establish entrance nodes to the Village from Newport Boulevard at Via Lido and 32nd Streets, (difficult) • Establish a pedestrian priority circulation system using sidewalks, boardwalks and along Via Lido, (moderate) • Create Interconnected waterfront boardwalk through the Village, and connect to Cannery Village, (moderate) • Develop a series of theme directional signs, (moderate) • Redesign the Newport Boulevard/32nd Street intersection and the Via Lldo/32nd Street Intersection to accommodate additional Lido Island traffic and District traffic, (difficult) • Create pedestrian, bicycle, electric cart path across channel to Mariner's Mile, (difficult) Long -Term • • Vacate Via Oporto south of Via Lido and Via Valada and make part of shared parking facility, (difficult) • Investigate a traffic circle at 32nd and Lafayette Avenue, (difficult) OBJECTIVE - PARKING PROVIDE CONVENIENT AVAILABLE PARKING TO FACILITATE ALL RETAIL, RESTAURANT, ENTERTAINMENT, OFFICE AND GOVERNMENT ACTIVITIES, 2i_ecommendations: Short -Term • Increase parking supply by replacing parallel parking with diagonal parking along Via Lido. (moderate) • Allow compact size parking stalls In select locations, (easy) iE • • • Redesignate employee parking at City Hail to public parking. Relocate employee parking to remote areas. (moderate) • Implement special permit parking program (other than existing city program). (moderate) • Install short and long term meters (working 24 hours a day). (easy) • Designate employee only parking areas. (easy) Mid -Term • Review parking patterns and study District parking demand, (moderate) • Develop a parking management plan, including a shared parking resources program (i,e„ designate the parking structure for all District employees). (moderate) • Increase use of parking structure by eliminating public parking facilities along Central Ave, and adjacent to the Elk's facility. (moderate) • Provide bicycle parking facilities, (easy) • Investigate alternative access to exiting parking structure. (easy) Long -Term Develop a combined or shared valet parking system for restaurant and entertainment patrons. (moderate) Remove some on -street parking to accommodate circulation plan along 32nd Street and Newport Boulevard. (moderate) OBJECTIVE - IMAGE/AESTHETICS REESTABLISH AND ENHANCE THE VILLAGE ATMOSPHERE OF RETAIL AND ENTERTAINMENT FOR THE PENINSULA, 0 Recommendations: Short -Term • Limit the amount and type of signing allowed for commercial uses, (moderate) Eliminate non -conforming signs, (difficult) Mid -Term • Develop sign guidelines for the District, encourage an abundant use of lighting Including neon. (moderate) • Develop uniform street and landscape,lighting program. (moderate) • Encourage banners for special events. (easy) • Use special pavers or patterns for pedestrian paths, (moderate) • Develop a street tree program. (moderate) • Encourage quality architectural styles and designs through flexible • design guidelines, (moderate) • Develop a facade Improvement, loans and grants, program. (moderate) • Explore a theme lighting, landscaping and signing for District Identification. (moderate) • Create entry nodes to the Peninsula and District along Newport Boulevard (Le„ Via Lido and 32nd Street), (difficult) Long -Term • Rehabilitate exterior of City Hall and Improve landscaping, (difficult) , • Develop a Business Improvement District, (moderate) • Encourage facade Improvements for District, with special attention to the Newport Boulevard frontage, (difficult) 30 • • • Balboa Peninsula Planning Study K Concept Plans for O , e come e4Aj -to LOO U40960- Lido/Civic Center Q ` ; District Short -Term Yn tti > CQ,&%O3,C4j �4,k2 Otq p,,.s„y �ft« va%lc•�R.S* Recommendations : strVot ��Ic�wcQ,Q Car fftkz CA VI OWVA aft It* �� �t tM�t t11cc Itd10 a V,4k% -iurr► lanR. _ : _ F -' s{dd2uk.( I W. ewFi� -4o A ` -DIVA PdA ellwtivtst{ ojo- taM- ��ytGlScttNocQ w�4c!'iftNS . �--1 r_. y��2t.s Its-tse,c.�(7o►'l _ ;A I I I • w� z taws. v w ILAO i r ' E r.-e ► 41• antS ' CP4�Q�' ' tit 32 - Slas1 eyN 1 1 9i►,Ip��U►Uaaa��e¢ � crQo�4�lol� -i�r►1 ►+ease►"'--E'axt v�awtaet�- bl , Ltdd �sl t -b -3u�V4- dsk;W4 . Si�vtcllvu>7tz2 stg+aRltzrc}tw► ►+uckA 37J� k _ r_ URBAN OF INNING y�y/' URBAN [IFSFGN N-6 IT wlltWAS pVOwk- PpAIV. Ack. s�w+at1 `4°hM1 dOG{CIYt/I prv►� e•t pUbitc/pVttWk dsk � +W $06 u`u1s&�o•�1- ta1M+r4j3 ►NMIVWIS with LJO ONIAV 9(V%1%0Y 1-6 U � °o so. &Ncew**& PWI `; Irpysl�.a +o.wn.tw�tk.�sis�• Balboa Peninsula Planning Study Concept Plans for Lido/Civic Center District Mid -Term Recommendations NINININ WIFITIM YASTIN I[AMMIMG UAOAN OFSIGH n Balboa Peninsula Planning Study Concept Plans for Lido/Civic Center District Long -Term Recommendations `Aq s G J✓ CA 6MgMt Ics _"_ el►►�+tt+�1� v►a G 7l-M' <:Vti� ►� spo35t It_ t�(e�}tpy1 ' jvt+,ayt J?- wt�Y„eo( KSW Sul W, u���sa A Y 1_•\ OWVAAS. 4n$1(P PSG4 IINpOFI nN Of SGN C1 CANNERY VILLAGE M=MEE • 0 CANNERY VILLAGE CONCEPT PLAN Cannery Village Is a unique collection of retail, industrial, office and residential activities, The Village Includes a wide variety of structures and a large amount of under developed sites. The area offers an abundance of character and charm and provides the Peninsula with one of Its most Interesting Districts, The Village started out as the boat yard on the bay across from the active McFadden Pler area. Following the dredging of the Rhine Channel commercial fishing boats began to occupy the waterfront, Fish canneries began operating on docks In the bay and soon an entire marine service Industry dominated the area. Today Cannery Village Is home to many art galleries, art studios, restaurants, curio shops and professional offices along with the remaining marine service uses. The Village should continue to attract art related activities, with specialty food opportunities and limited residential. Incentives should be used to enhance the arts related activities and transition away from the marine industrial uses. The perimeter areas of the Village, along 32nd Street and Newport Boulevard, are well suited for the more Intense restaurant, bar and retail activities. The core area should maintain the quiet and quaint qualities that have evolved over the years, is should be small scale limited to one and two stories, with greater Intensity permitted on the perimeters. Cannery Village needs to develop a more effective vehicular and pedestrian circulation system. Pedestrian movement should have priority over vehicles, therefore, maintain the narrow street system with on -street parking. Also expand sidewalks and develop a system of paseos between blocks and through the alleyways. In addition, the Village should explore the benefits of how detailed specific development regulations and design guidelines can be employed to preserve and enhance a truly unique resource of the Peninsula. The Cannery Village Is bound by 32nd Street on the north, Newport Boulevard on the west, 26th Street to the south and the Rhine channel of the bay on the east. The District Is designated for recreation, marine, retail and service commercial; general industrial (marine Industrial), and two-family residential uses. The following pages Identify the objectives and recommendations for the Cannery Village Concept Plan, The recommendations have been categorized as short-term, mid-term, and long-term; and highlighted on maps at the end of the section. The ease or difficulty of accomplishment has also been noted. 36 CANNERY VILLAGE OBJECTIVES & RECOMMENDATIONS OBJECTIVE --LAND USE MAINTAIN AND ENHANCE A MIXED USE, ART ORIENTED, SPECIALTY RETAIL AND OFFICE DISTRICT. Recommendations; Short -Term • Develop a site specific master plan identifying the optimum mix of retail, restaurant, marine, residential and office uses, (moderate) • Amend Specific Area Plan to restrict activities to specific areas (i.e„ marine industrial only allowed east of Lafayette Avenue and business with later hours of operation should be located on the perimeter of the District), (moderate) • Mid -Term • Allow residential uses on a project by project basis in order to maintain an adequate mix of activity, including residential within commercial projects and stand alone residential. (moderate) • Discourage industrial activities in the Village core. (easy) • Develop a Village square or neighborhood park for public gatherings. (moderate) • Provide for performing arts uses. (moderate) • Provide public boat docking facilities (i.e., 29th Street). (difficult) 37 Develop convenient dry boat storage facilities adjacent to Bayfront. (moderate) Provide for bed & breakfast facilities consistent with Peninsula -wide regulations on a project by project basis. (moderate) • Develop Incentives within the Specific Area Plan to accommodate desired land uses (i.e„ restaurants, art galleries and studios, specialty retail, etc.) to take advantage of shared parking programs, or other Incentives, (moderate) Long -Term • Limit the amount of alcohol related businesses. (difficult) • Discourage storage and Industrial related activities In the commercial core. (difficult) • Discourage the expansion of marine related industrial west of Lafayette Ave, As these activities phase out, encourage a recycling to . restaurant and other visitor serving activities, or office/residential use. (moderate) • Develop incentive program to maintain marine related uses along the bayfront. (difficult) • Relocate commercial uses on Islands within Newport Boulevard to vacant parcels within the Village. (difficult) • Allow medium density residential uses In the surplus right-of-way areas, west of Newport Boulevard (created by proposed new alignment of Newport Boulevard). (moderate) OBJECTIVE - ACCESS/CIRCULATION ACCOMMODATE BETTER ACCESS TO AND WITHIN THE DISTRICT. 4- Recommendations; Short -Term • Develop a collector street system around the District. (moderate) • Redesign 32nd Street to be an east -west collector street and northern access point to the District, (moderate) • Redesign Lafayette as a two-way collector street around the Village core, (moderate) • Redesignate Villa Way to two-way traffic; acquire additional right-of- way on west side to maintain pedestrian sidewalk. (difficult) • Create a primary Village entrance at 29th Street and Newport Boulevard. (moderate) Mid -Term • • Develop an interior pedestrian circulation system, (easy) • Create one-way loop system within the Village by redesignating 31 st Street one-way east and 30th Street one-way west, (easy) C� Maintain 29th Street two-way with access from Newport Blvd, (easy) • Establish secondary entrance nodes to the Village from Newport Blvd. at 32nd and 28th Streets and 32nd Street and Villa Way, (moderate) • Establish a pedestrian priority circulation system using sidewalks, alley ways, boardwalk and paseos, (moderate) Long -Term • Develop a traffic circle at 32nd and Lafayette Avenue as an entrance node to the Village, (difficult) 39 OBJECTIVE --PARKING PROVIDE CONVENIENT AVAILABLE PARKING TO FACILITATE ALL COMMERCIAL, RESIDENTIAL, OFFICE AND INDUSTRIAL ACTIVITIES. Recommendations: Short -Term • Designate parking facilities on the perimeter of the District, (moderate) • Consolidate public parking facilities. (moderate) • Remove some on -street parking to accommodate circulation system (Le„ Lafayette Street). (moderate) • Replace parallel parking with diagonal parking where appropriate. (moderate) • Allow compact size parking stalls In select locations. (easy) • • Implement special permit parking program (for residents and employees), other than existing city program. (easy) • Install short-term meters (on street) and mid-term meters (in lots), working 24 hours a day, (easy) • Relocate long-term parking for non District employees to perimeter parking lots. (moderate) Mid -Term • Develop a parking management plan, Including a shared parking program. (moderate) • Provide bicycle parking facilities. (easy) • Develop a combined or shared valet parking system for restaurant patrons. (moderate) ,N L� • Long -Term • Review parking patterns and study District parking demand. (moderate) • Remove additional on -street parking to accommodate vehicle and pedestrian circulation plan. (moderate) • Develop a shared parking facility and program on the perimeter of the Village and reduce the on -site parking requirement, (moderate) Relocate on -street parking along Newport Boulevard to public parking facilities within the Village, (difficult) OBJECTIVE - IMAGE/AESTHETICS PRESERVE AND ENHANCE THE VILLAGE ATMOSPHERE AND CHARACTER OF THE DISTRICT, Recommendations; Short -Term • Create anew entry statement to Village at 32nd Street and Villa Way. (moderate) • Limit the amount and type of signing allowed for commercial uses. (moderate) • Eliminate non -conforming signs. (difficult) • Maintain small lot development pattern, (easy) • Encourage the use of an "Old Newport' theme in the Village. (easy) • Maintain tight narrow street pattern. (easy) a MId-Term • Develop sign guidelines for District; (I.e., allow only externally Illuminated wall, owning or window signs). (moderate) • Develop uniform interior street lighting program. (moderate) • Encourage banners for special events. (easy) • Use special pavers or patterns for pedestrian paths, (moderate) • Develop a street tree program. (moderate) • Encourage a variety of architectural styles and designs through flexible design guidelines. (easy) • Develop a Business Improvement District. (moderate) • Create new Village entry statements at Newport Boulevard and 32nd and 28th Streets. (moderate) Long -Term • • Discourage boat and vehicle storage in the core area. (difficult) • Underground utilities. (difficult) • Develop a facade Improvement program along Newport Boulevard, (moderate) 42 B Balboa Peninsula Planning Study Concept Plans for Cannery Village District Short -Term Recommendations EBB MASTER MANNING URBAN DESIGN lg�ut%l Kock "*4411-}o VeiVY17 040 uxxt �—il t%o.L 36 to i ,vdu Ct 7-VA Cic- do�cic -ew sw� ill loortt— sw)w4- -wM Ov, VA lK4vW-r- cwcowthan --ss1 s* 41ow� cmiwets-k ��.n N Ltd* Vtpa� Balboa Peninsula Planning Study Concept Plans for Cannery Village District Mid -Term Recommendations Mt "ASI tN ftANN ING NN(AN DESIGN u MCFADDEN SQUARE E MCFADDEN SQUARE CONCEPT PLAN McFadden Square is the heart and center of historic Newport Beach, officially designated as "Old Town" The construction of the Newport Pier and subsequent rail connection brought commerce to the coastal area prior to the turn of the century, The railroad was constructed primarily to transport goods arriving from the ocean. However, passenger travel from Inland areas to the beach for recreation became popular. Land development responded with hotels, retail shops and beach cottages, clustered around McFadden Square, The red car rail lines continued the stream of visitors to the area. The once sparsely populated sandsplt was subdivided into numerous 20 by 85 foot lots to accommodate the new vacationers. Many of the early vacation homes remain today and contribute to the historic character of the District. McFadden Square still serves as the primary destination for beach visitors, This attraction creates numerous traffic, parking, and security problems associated with a beach area. The District has a tremendous opportunity to attract quality commercial and recreational activities providing a greater degree of flexibility Is • employed In the regulation of new Ideas. A greater effort should be exercised to encourage more year-round and less seasonal business. Easy access and convenient parking as suggested In the Peninsula -wide Plan will contribute to the future success of the District. The McFadden Square District Is in need of nurturing attention to once again become the heart of the city. McFadden Square has an opportunity to become the transportation hub for the Balboa Peninsula. The development of a transit center with connecting shuttle service to other Districts will anchor McFadden Square as the central point for Peninsula activity. McFadden Square should continue to function as a location for visitors and residents alike to enjoy a variety of beach related uses and restaurants. The District should take advantage of its unique orientation to both the bay and the ocean. The bayside commercial activities should be expanded and public boat docking facilities should be added. Easy, convenient and safe pedestrian access must be designed to effectively connect the bay and ocean sides of the District. Although parking has always been a concern in the District, a realignment of the circulation system (Newport and Balboa Boulevards 0i intersection) will yield a significant amount of new parking opportunities, The traffic round about proposed for this Interchange will not only facilitate traffic flow but will also provide a unique physical element to create a theme entry monument for the District, Design guidelines should encourage larger buildings to maintain the architectural prominence of the remaining structures, Residential and office space should be encouraged in the upper stories, Higher density residential and bed & breakfast use should be considered as transitional uses between the commercial and residential areas. New development should also maintain view sheds at the ends of public rights -of -way. A shared parking program may need to be developed to provide sufficient Incentive for large scale development. McFadden Square is bound by the ocean and the bay from 19th Street to the alley between 23rd and 24th Streets north along Balboa Boulevard to 21 st Street. The District is designated for recreation, marine, retail, and service commercial; single family attached, two-famlly and multi -family residential land uses. The following pages identify the objectives and recommendations for the • McFadden Square Concept Plan. The recommendations have been categorized as short-term, mid-term and long-term; and highlighted on maps at the end of the section, The ease or difficulty of accomplishment has also been noted. • ,• a MCFADDEN SQUARE OBJECTIVES & RECOMMENDATIONS OBJECTIVE --LAND USE ACHIEVE AND MAINTAIN THE APPROPRIATE MIX OF COMMERCIAL, RESIDENTIAL, AND RECREATIONAL ACTIVITIES. Recommendations: Short -Term • Amend Specific Area Plan (zoning) to be more flexible Including Incentives desired for designed uses. (moderate) • Increase the floor area ratios for commercial development. (moderate) • • Encourage outdoor dining In designated areas. (easy) • Develop public boat docking facilities at the end of 21 stand 26th Streets, (difficult) Mid -Term • Develop a shared parking program and reduce the on -site requirement. (moderate) • Allow residential within commercial projects, second floor and above only, (moderate) • Allow temporary commercial sales from carts or mobile vendors in designated areas (Le., adjacent to the pler). (easy) • Encourage special event activities such as a Farmers Market. (moderate) 01 50 • Encourage more commercial uses on and adjacent to the pier. (moderate) • Allow for the Dory Boat Market area to expand. (difficult) • Draft regulations for bed and breakfast uses, in transitional areas. (moderate) Long -Term • Allow higher density residential as a transition area adjacent to the commercial areas. (moderate) • Discourage commercial uses outside of the core area, (i.e., south of 21 st Street). (difficult) • Develop public/private boat short-term docking facilities at the South Coast Ship Yard property. (moderate) • • Develop a master development plan for the South Coast Ship Yard property. (moderate) • OBJECTIVE - ACCESS/CIRCULATION ACCOMMODATE BETTER ACCESS TO AND THROUGH THE DISTRICT WITH MINIMAL TRAFFIC CONGESTION. Recommendations: Short -Term • Start improvement on the Newport and Balboa Boulevards Interchange. (difficult) • "Tee" Balboa Boulevard Into Newport Boulevard at 26th Street. (difficult) • Redesignate 21 st Street two-way into beach parking facility. (easy) 51 Mid -Term • Explore the use of a traffic circle or roundabout at 26th Street for the Newport and Balboa Boulevards Interchange. (difficult) • Synchronize traffic signals along Newport Boulevard, (difficult) • Designate 22nd Street one-way Into and 23rd Street one-way out of beach parking facilities, (moderate) • Create pedestrian priority areas with specific paver patterns, (I,e„ the alleyways on the beach side of Balboa Boulevard between 21 st and 24th Streets), (moderate) • Develop a system of pedestrian promenades along Newport Boulevard and the oceanfront with connections to the bayfront and pier. (moderate) • Develop a combination pedestrian bikeway system, (moderate) Long -Term • • Explore a shuttle bus system from McFadden to other Districts. (difficult) • Provide tourist and charter bus parking facilities for the Peninsula. (difficult) • Develop a transportation center within District, (difficult) • Develop a pedestrian walkway from McFadden Square to the Bay frontage, along 23rd and 21 st Streets. (moderate) OBJECTIVE - PARKING PROVIDE CONVENIENT AVAILABLE PARKING TO FACILITATE ALL COMMERCIAL, RESIDENTIAL, AND RECREATIONAL ACTIVITIES. •1 52 Recommendations; Short -Term Create new parking courts on bay side of Newport Boulevard (Le„ 26th & 21 st Streets), (moderate) • Replace parallel parking with diagonal parking where appropriate (Le., 22nd Street bayside of Newport Boulevard), (moderate) Allow compact size parking stalls in select locations (easy) • Implement a resident permit parking program. (moderate) • Maintain parallel parking and install short term parking meters adjacent to select commercial locations, (Le„ both sides of Newport and Balboa Boulevards). (easy) Create new parking facilities adjacent to Newport Blvd. (on both sides) • concurrent with a redesign of Newport and Balboa Blvds, (difficult) Mid -Term • Establish seasonal beach parking procedures in select location, (i.e., pay when entering, one daily rate, annual passes, etc.). (moderate) • • Develop a parking management program, including shared facilities, short and long-term meters, etc, (moderate) • Provide bicycle parking facilities. (moderate) • Provide bus parking and layover locations in existing parking lot. (difficult) • Develop a shared valet parking program for area restaurants. (difficult) • Allow a merchant parking validation program. (moderate) Long -Term • Develop a transit center for passenger transfer to shuttle bus system. Include bus layover parking facility. (difficult) 53 OBJECTIVE -IMAGE/AESTHETICS C] UPGRADE AND ENHANCE THE HISTORIC COMMERCIAL CHARACTER OF THE DISTRICT. Recommendations: Short -Term • Develop a proactive plan to improve the Districts' character. • Limit the amount and type of signing allowed for commercial uses (i.e„ signing should be proportional to building size). (moderate) • Eliminate nonconforming slgnoge. (difficult) • Implement a street tree lighting program, (moderate) • Provide additional litter canisters, (easy) • Expand sidewalk areas along Newport Boulevard where feasible. (moderate) Mld-Term • Provide incentives for historic restorations. (moderate) • Underground utility lines. (difficult) • Install theme street lights. (moderate) • Develop restrictive regulations on pier fishing. (moderate) • Organize a Business Improvement District, (moderate) • Develop a regular maintenance program for pedestrian areas, (moderate) • Develop a street tree program different from the boulevard trees and unique to the District. (moderate) 54 WW% *.If 'ice (µa�l�vuL � sexu�cc �I�,ea-st otr% w,k�► UwAct use. cr vv,nbl� ��Srlav via Balboa Peninsula Planning Study Concept Plans for Cannery Village District Long -Term Recommendations MASIIN PINNING NNNAN OF SIGN E • Long -Term • Develop a facade Improvement program for the areas adjacent to Newport Boulevard. (difficult) • Create a major entry node statement at 21 st Street. (difficult) • Establish an architectural review service for new and rehabilitated development projects. (difficult) • Develop a landscape and tree program for the beach parking facility and continue to the pier and around McFadden Square, (difficult) 55 /� �������� ,IIIIINIIilllll �11 ME Balboa Peninsula Planning Study Concept Plans for McFadden Square District Long -Term Recommendations Ewa MNSIIN PINNNING UNOAN UISIGN 0 +s Asv 'r" iOD! -b 4v � (a liiiiiiiiiiii_ r111118111110 will LIN11r, illlll Balboa Peninsula Planning Study Concept Plans for McFadden Square District Mid -Term Recommendations MABI(B .IAMMIBG URBAN DI SIG CENTRAL SOME m :•� • CENTRAL BALBOA CONCEPT PLAN Central Balboa is possibly the best known but least understood District of Newport Beach. Numerous studies and plans have been prepared for the area; but surprisingly little has changed. Central Balboa Iles In the middle of an Intensely developed three mile long narrow spit of land that culminates In a dead end. The District Is rich with unique and diverse features and attractions. The connection and linkage of the bay and the ocean Is more evident In Central Balboa than anywhere else in the city, This feature needs to be reinforced and highlighted. The vast amount of beachfront parking should serve as a staging location for the majority of service, entertainment and recreational activities of the area. Pedestrian linkages, should then extend to the bayfront, reinforcing the bay and ocean connection. The commercial section of Balboa Village continues to offer a vast selection of seasonally popular retail outlets; while the selection of resident serving retail continues to decline. This fluctuation of commercial activity can be better managed with a proactive planning approach to the District The creation of convenient, safe and accessible short term parking may provide sufficient Incentive to attract more resident serving commercial uses, The recommendations from the previous studies have to some extent been Incorporated in the "Central Balboa Specific Area Plan." Many of the recommendations in this study are a repeat of previous conclusions, In particular there are many worthwhile thoughts expressed in the 1993 Regional/Urban Design Assistance Team (R/UDAT) Study. The Fun Zone and related activities around the Pavilion Including the boat docking areas should be expanded toward the water to take better advantage of the Ideal location. Additional recreational activities and more attractive pedestrian areas will attract a greater number of visitors to the area, L 01 The overall appearance of Central Balboa can be greatly enhanced with additional landscaping and improved sidewalks along Balboa Boulevard, A landscape plan should be developed which identifies the village and distinguishes the commercial core from the rest of the Peninsula. New and expanded structures should remain relatively small scale, scattered parking facilities should be clustered and a parking management system employed. Balboa Village is in great need of special attention. An effort needs to be taken to limit commercial activities to a central identifiable core area. Transitional areas should encourage additional hospitality activities, like bed and breakfast facilities. The remaining portions of Central Balboa should be limited to residential uses, with multi -family developments restricted by the ability to provide parking, In order to preserve this community treasure, Central Balboa needs to enhance Its unique character and distinctive collection of structures and features, Central Balboa is bound by the ocean and the bay between Adams Street and W Street, The District is designed for retail and service commercial, single family and two family residential, and allows governmental, educational and • institutional facilities, The following pages identify the objectives and recommendations for the Central Balboa Concept Plan, The recommendations have been categorized as short-term, mid-term and long term; and highlighted on maps at the end of the section. The ease or difficulty of accomplishment has also been noted. fL� 61 CENTRAL BALBOA OBJECTIVES & RECOMMENDATIONS OBJECTIVE - LAND USE ESTABLISH AND ENHANCE THE APPROPRIATE MIX OF RETAIL, RESIDENTIAL, RECREATIONAL ACTIVITIES FOR THE DISTRICT, Recommendations; Short -Term • Encourage the clustering of retail activities in the Village core between Adams and W Streets, • Allow more residential development and conversion for select commercial properties outside the central core, (moderate) • • Encourage outdoor dining and sales In the core area only, (easy) • Encourage special events such as sidewalk sales, art exhibits, afternoon concerts, etc, (moderate) • Encourage larger boats to move to off shore moorings when not loading or unloading, (easy) • Provide public short-term boat docking facilities at the Fun Zone and Pavilion, (moderate) Mid -Term • Consolidate resident serving and compatible commercial adjacent to Balboa Boulevard, (moderate) • Review economic studies and determine the appropriate mix of retail activity, (moderate) 01 62 • Draft regulations for bed and breakfast facilities and provide incentives for activities In transitional areas between commercial core and residential areas, (moderate) • Encourage temporary commercial activity from carts on and adjacent to the pier, (moderate) • Encourage second floor activities in the Village core to help establish a clear architectural mass, (difficult) • Expand the Promenade area in front of the Fun Zone and relocate satellite structures, (moderate) Long -Term • Expand pier limit line and extend the boat docking facilities further Into the bay, (difficult) Create a public walkway system at water level around the Pavilion, (moderate) is • Relocate some boating activities to off shore moorings, (difficult) • • Explore the feasibility of more second story and outdoor areas walkways, (difficult) • Consolidate private parking lots along Bay Street for short term parking facilities, (difficult) • Encourage expansion and upgrading of edgewater Improvements; including the Fun Zone, (difficult) OBJECTIVE - ACCESS/CIRCULATION ACCOMMODATE BETTER ACCESS TO AND THROUGH THE DISTRICT, Recommendations; Short -Term • Develop a Circulation System within the District which allows for adequate traffic flow through the District, 63 • Maintain Palm Street as one-way two lanes Into beach parking and Washington Street as one-way two lanes out. (easy) • Redesignate Main Street south of Balboa Boulevard for pedestrian only (service access may still be permitted), (easy) • Establish entrance node to the Village at Palm Street. (moderate) • Develop new bus drop off and pickup area adjacent to the pier, (moderate) Mid -Term • Create a leaving the Village node with turnaround at "A" St. (difficult) • Establish a pedestrian priority circulation system using sidewalks, boardwalks, and alleyways, (moderate) • Develop a series of theme directional signs. (moderate) • Redesign Bay Street as parking court with short term diagonal parking . between Main and Adams Streets, (moderate) • Synchronize traffic signals along Balboa Boulevard, (difficult) • Develop beach handicap access facilities at 'A' and 'B' Street ends. (moderate) Long -Term • Connect parking lots on the south side of the pier ("A" & "B" Streets. (difficult) • Maintain entrance to beach parking at Palm Street with exit at "A" Street. (moderate) • Redesignate Washington Street to pedestrian only. (easy) • Redesignate 'A' Street as one-way two lanes out of the beach parking facility. (moderate) OBJECTIVE - PARKING PROVIDE CONVENIENT AVAILABLE PARKING TO FACILITATE ALL RETAIL, RESTAURANT, ENTERTAINMENT, AND RECREATIONAL ACTIVITIES IN THE DISTRICT. Recommendations; Short -Term • Redesign beach parking lot with efficient layout, including turnarounds, landscaping, clear entrances, directional signing, pedestrian connections, etc, (moderate) Develop a parking management plan and create a shared parking program that establishes short term parking for retail customers, long term parking for employees in more remote areas, and day parking for visitors to the area, (moderate) • Develop a pool of parking facilities within core area of the District for employees, visitors, and residents alike, • Replace parallel parking with diagonal parking, where appropriate. (moderate) • Allow compact size parking stalls in select locations, (easy) Implement special permit parking program for residents and employees (other than existing city program). (moderate) • Install short and long term meters, (working 24 hours a day), (easy) Mid -Term Provide bicycle parking facilities, (moderate) • Develop a combined or shared valet parking system for restaurant patrons, (difficult) Eliminate some on -street parking along Balboa Boulevard to allow for wider sidewalks and Improved landscaping, (moderate) 65 • Review parking patterns and study parking demand. (moderate) • Create a short term parking court along Bay Street (Le., Palm Street to "A" Street along Balboa Boulevard). (moderate) • Restructure parking fees and collection methods, (easy) • Restripe and configure beach parking facility for maximum efficiency, (moderate) • Explore potential for a parking improvement district. (moderate) Long -Term Encourage shuttle buses Into the District from a remote parking location outside of the District, (difficult) • Explore long term sport fishing and Catalina Flyer parking In remote facilities, (moderate) Connect beach parking facilities on both sides of the pier. (moderate) • • Provide for tour bus parking in remote locations with drop off areas and shuttle service to District. (difficult) • Explore option of additional parking as needed on existing soccer field, recreate soccer field south of current location. (difficult) OBJECTIVE - IMAGE/AESTHETICS REESTABLISH AND ENHANCE THE VILLAGE ATMOSPHERE OF FUN, RETAIL AND ENTERTAINMENT FOR THE COMMUNITY. Recommendations: Short -Term • Develop a 'Welcome to Balboa Village' entry statement at Palm Street and Balboa Boulevard, (moderate) • Limit the amount and type of signing allowed for commercial uses, (moderate) • Eliminate non -conforming sings, (difficult) • Establish a landscape/streetscape master plan for all streets in the Village, (moderate) • Encourage an upgrade of the bayfront and boardwalk areas, (moderate) • Create a landscape buffer area between the ocean side boardwalk and beach parking lot. (moderate) • Create entry and exit nodes for the District along Balboa Boulevard, (difficult) Mid -Term • • Provide wider sidewalks and a landscaped median along Balboa Boulevard between Palm Street and W Street, (difficult) • Develop sign guidelines for the District, (moderate) • Develop uniform street lighting program, (moderate) • Encourage banners for special events, (easy) • Use special pavers or patterns for pedestrian paths, (moderate) • Develop a street tree program, (moderate) Encourage the preservation, enhancement and promotion of historic features, (moderate) • Main recreational ball fields as public open space, (easy) • Maintain a Business Improvement District, encourage property owner participation, (moderate) 67 • Explore a theme lighting, landscaping and signing for District identification. (moderate) • Encourage building facade enhancements. (moderate) • Develop a unique landscape theme, (I.e., preserve existing canopy of trees over Main Street and part of Balboa Boulevard). (moderate) • Expand and upgrade oceanside boardwalk and promenade with landscaping and hardscaping between Adams and "B" Sts. (difficult) Long -Term • Remove overhead utility lines. (difficult) • Establish an architectural review service for new and rehabilitated projects. (moderate) • Maintain grid and small lot development pattern. (easy) • Establish a festive environment with lighting, signing, banners, color . awning, landscaping, etc. (moderate) • Create more water view opportunities, (difficult) • Establish a capital Improvement program to be partially funded through a Village Assessment District. (moderate) • Expand beach front landscape buffer area and create new I pedestrian entry nodes. ' • Explore the use of public open space area for special event or overflow parking. If parking becomes permanent, relocate open space to the east of 'B' Street. (moderate) i �POL ,taw lft" neW 0 4 M:*VIp i- 01 V uWnbeaYtI ftw tr b h dude � shah} -w,wt emkott a em a E Balboa Peninsula Planning Study Concept Plans for Central Balboa District Short -Term Recommendations 11, IMI �f MASIIR PIANNING URBAN Of SIGN I, 0 M- et °'�t- I�brf� FAAV4% talc rock-vr± Balboa Peninsula Planning Study Concept Plans for Central Balboa District Mid -Term Recommendations IMA MASTER PINNING URBAN DISIGH E w t -tAOtr,� s U 11 �a a-w • Balboa Peninsula Planning Study Concept Plans for Central Balboa District Long -Term Recommendations 11, 1 KINUM ,1 M ASI[N PIANNING U Na" III SIGN SPECIAL STUDIES • 11 SPECIAL STUDY AREAS In addition to the development of concept plans for the Peninsula and each of the four Districts, a number of other Interrelated special study areas have been reviewed. These special areas of concern have been Identified and studied in greater detail due to the potential Impact any positive change will have on the entire Peninsula. These catalyst projects for the area should be aggressively pursued and analyzed to better understand their potential Impact on the overall Peninsula's quality of life. The identified special study areas Include; 1, Marina Park (Balboa Boulevard and 15th Street) 2. The Fun Zone and Pavilion (Balboa Village expand pier lines and expand Fun Zone Promenade) 3. Balboa Village (New Streetscape Concept and Beach Parking Plan) . 4. Lido Village (New Circulation Plan) 5. The Mlx-Master (New Circulation and Parking Plan) The City should conduct detailed analysis of the recommended study areas. The studies identify potential development projects and opportunities to Implement community -wide goals. The City should explore ways in which these projects can be encouraged and/or assisted to become feasible, viable community enhancements. The City may need to develop site specific plans and detailed recommendations in order to obtain the optimum benefits for the Peninsula and the City of Newport Beach, 74 11 MARINA PARK SPECIAL STUDY NO. 1 The Marina Park location (Bayside between 19th and 15th Streets), has long been recognized as an under utilized asset for the City, The site provides the City with an opportunity to develop a community boating center. Such a facility take advantage of the existing assembly building and park improvements. The existing marina could be nearly doubled in size and capacity. This would allow for many of the existing moorings to be relocated, allowing for additional boating waterways, The location provides the City with an ideal setting for sailing and other small water craft schools. The academic possibilities and the commercial potential are tremendous, The assembly area can be expanded to accommodate workshop and conference facilities. Depending on market conditions, a small lodging facility and restaurant may also be considered, In addition to the commercial potential for the site, a number of public Improvements should also be proposed. The location is well suited for a small boat launch and guest boat docking facilities (19th - 15th Streets). Additions to the public park may Include additional active sport (I.e„ basketball, tennis, etc.) or larger passive areas (i.e., gardens). The public beach area can be improved with additional convenient public parking and new restroom facilities, The site is well situated to provide the community with a facility which would attract both locals and visitors to the area, 75 ��,�� NT��� �i '•!iflfi •. ,i �?�.•l�'i't3� �_ <.� :i'.(i�i ,�t�i,�a�t: �.��l�t ` .c '�f� . ,_ e.- r _.— .. — • THE FUN ZONE & PAVILION SPECIAL STUDY NO.2 The Fun Zone and Pavilion of Balboa Village have long been landmarks and regional attractions, The area provides an opportunity for a greater intensity and variety of activities, with the proper planning and design. The first step is for the City to initiate an expansion of the pier line an additional 150 feet. This expansion will allow additional boat slips, guest docking facilities, boat and watercraft rental and more. The existing bulkhead line should no longer be the limit line for the Bayside Promenade, The boardwalk should be expanded over the existing dock to provide areas for outdoor dining and other commercial ventures, in addition to new open space, The commercial boating operation should be encouraged to only dock for boarding and disembarking passengers. The remainder of the time these operations should be moored off shore, The Pavilion building should be Included in this expansion of the Boardwalk Promenade, A walkway system should be constructed around the pavilion with new areas for outdoor dining and guest boat docking, Any redesign of the Fun Zone area should Include the installation of a public Information booth and a consolidated activities ticketing operation. This area will continue to serve as an attraction for both locals and visitors and with a little creating effort can offer much more for -the community. "d: 77 `rr - OG r� � 1 r _ s T�ry� T �! t h ' �l P i Est Y:_ i�,••i i M { � ` f is ' y'�'a�3:� r � , �� '' 3S i�3 r r .�+: ' ti 1 n �'� j t� -"f4l! b I r � r - � - �ti'rtC ~ _ l ._ _ _ F �Fr s4 h J. } r � r � - �` i �fju�H✓SJ .r t T"„� � � _ yy'�'' .� e��f". � d � - ` 1 r�` ���r5 t f ` _ .` r�9r )�yd Y �'� ) r .. l�Fr�'S�Ft� iJf i �c: ".. - Il - !': r 1 ��� � r" ! � .. � �f i- �i'. . �.,y �� �R� 0.N - � I `_ � - f '� i ' _ ,r, i . _,• � - �h � Existing • Central Balboa - Pavilion/Boardwalk �I BALBOA VILLAGE I SPECIAL STUDY NO, 3 The Village of Balboa Is the heart of the Central Balboa District, The District has a challenge to retain and attract resident serving commercial operators and provide a sufficient variety of visitor attracting activities to maintain an economic vitality, While market conditions may indicate that there is an insufficient resident population base to attract additional resident serving commercial outlets, there are some planning and design ideas which can be implemented to encourage specialty retailers, These Ideas Include the addition of convenient short-term parking, wider sidewalks, additional landscaping and Interesting building facades, The competition for available parking in the commerclal, residential and beachfront areas, Is probably the single most Important Issue, A parking study needs to be conducted with new parking opportunities Identified and a new parking fee structure implemented, The following pages Illustrate concepts for new parking layouts for the Village, i Balboa Village has had the benefit of numerous studies and special projects and should continue to build on these efforts, The Ideas In the study have evolved from the past efforts, •) 0 Existing • Balboa Blvd. @ Residential Area - Sidewalk/Parking • • V 1S11Y .IIFFIIIC 111111.E 111 '�. �4 • Existing • Central Balboa Public Beach Parking Lot Plan Proposed • Central Balboa Public Beach Parking Lot Plan URBAN uaF �l• r, ar,aua aiFar, FFS.L• 0. LIDO/CANNERY VILLAGE SPECIAL STUDY NO.4 Lido Village Iles at the major entry location to the Balboa Peninsula, This location warrants special design considerations for entry statements and directional signing. Circulation to and through the Village Is one of primary concerns, The primary entryway to the Village should be via 32nd Street from Newport Boulevard, This street has sufficlent right-of-way and also serves as a primary link to Lido Island and Peninsula and can serve as a major entry to Cannery Village, The intersection of 32nd Street, via Lido and Lafayette Avenue needs to be carefully redesigned to direct commercial onto Via Lido. Access to the Village should be maintained from Newport Boulevard at Via Lido, however, limited to a single left turn pocket. Via Lido should be redesigned as a typical shopping street with one travel lane in each direction and new convenient storefront diagonal parking, Additional parking should be provided in shared parking facilities, This clustering of the parking supply allows for a greater portion of the Village to be designed to accommodate pedestrian activities, Expanded public open space facilities • should also be included within the Village to provide the public with additional bayfront recreation. Expansion of the pler line should also be explored to provide for additional permanent and guest boat docking facilities, Lido Village has the potential and opportunity to function as the primary core area for the City of Newport Beach, The following pates offer some Ideas on how the Village entryways can be designed and a conceptual layout for circulation. W. txi sting • Balboa Peninsula Entry M. .Cm u.e•. osw+ Existing • Lido Village -'Via Lido Way Entrance ..v � � J 1L _" ••�. , ,3 11 � ✓ hill `�•i�'• � � • Mal 42 \ 1 URBAN DESIGN CAMP W THE MIX -MASTER SPECIAL STUDY NO.5 The Mix -Master Intersection (the convergence of Newport and Balboa Boulevards) has received a great deal of study and redesign over the years. This study suggests yet another concept, to Incorporate a traffic circle or round- about as a means of efficiently directing traffic through the area. The proposed project can be Implemented In three phases. The first maintains a split Newport Boulevard and has Balboa Boulevard "Tee" Into Newport at 26th Street. This first phase provides for new parking opportunities adjacent to McFadden Square. The second phase proposes the elimination of the split in Newport Boulevard with five -way intersection and the relocation of the existing commercial businesses. Additional property acquisitions may also be necessary to adequately design the new Intersection. The revised alignment of Newport Boulevard will result In surplus properties on the western side of the boulevard. This area would be appropriate for new multi -family residential or mix -use developments. • The final project phase would complete the traffic circle with new theme landscaping and sidewalk areas. On street parking should be preserved, but reconfigured adjacent to commercial areas. This concept also focuses attention on the bayfront area around the South Coast Ship Yard, reinforcing a future potential for a new mixed -use activity area. Designed and constructed, the Mix -Master Project will establish a future landmark for the Peninsula, 01 Existing • Mixmaster Plan URBAN DESIGN FUNDING IDEAS • Community Development Block Grants • Affordable Housing in -lieu fees • Gas tax funds • Measure "M" funds • Underground utility district • Traffic impact fees • Business Improvement District funds • Special Districts tax/fee • Special assessments Revenue Bonds • Parking surcharge • Coastal Conservancy funds • Land and Water Conservation funds • Create a redevelopment area • Facade grants/loans • Tree Forestration program • Donated trash receptacles • Donated trees • Adopt a tree, sidewalk, pavers, benches • Lease rights of way for commercial activity • Raise parking rates • Lease public areas for community events I I :f 1 I , 0. I , 102 IMPLEMENTATION STRATEGIES The Balboa Peninsula has long served as an area of mixed uses and activities, The area contains the Cltys Initial commercial core and the original residential neighborhoods. The Peninsula also became the center for the recreation and marine services which have contributed to the Citys identity. In order for the Peninsula to continue as a community focal point, the recommendations outlined in this study need to be considered, Implementation of the suggested recommendations amount to a significant expense of time, money, energy and commitment, • The following addresses some suggested strategies of Implementation. There are a number of methods to finance public improvements and maintain a quality standard of living for the Peninsula. The most direct means of funding is from the City's General fund which is annually budgeted by the City Council, The revenues which comprise this fund are derived primarily from property taxes, sales taxes and municipal fees. However, there are a number of other monies which the City administers and can be earmarked for select projects. • Community Development Block Grant Funds are available to the City for community enrichment projects; in FY '95296 approximately $300,000 was budgeted for handicap access Improvements. Sidewalks, streetscape Improvements, community parks, and related public Improvements are all eligible projects, The cost for landscaping public areas can be partially subsidized by other programs sponsored by the National Urban Forestration Program, State of California Tree Forestration Program, the Tree Society of Orange County, the Tree People or the formation of a local Adopt A Tree Program. Local nurseries are also a good source of discounts or donations for special projects, A source of inexpensive labor for planting can be found in the California Conservation Corp. This group can also design, construct and install public Information and directional signs. Corporate and individual sponsors are ideal for the acquisition of streetscape items such as litter receptacles, benches, water fountains, transportation shelters, bike racks and plaza pavers. Typically, advertising or recognition is offered in exchange for the acquisition cost. 103 A The City funds transportation and street Improvements projects with Gas Tax Funds, Measure "M" monies and Local Traffic Impact Fees. Allocation of these funds are determined on an annual basis. Streets, sidewalks and other public improvements can also be completed as a condition on new development projects. Overhead utilities lines can be removed by forming an Underground Utility District. Southern California Edison was advancing funds to communities to enable multiblock projects, However, the policies are changing and further investigation is necessary to determine feasibility. There are a number of special waterfront and recreation related funding sources. Land and Water Conservation Funds can be used for many public recreation projects from community buildings to restrooms to parking facilities, Smaller scale coastal access projects such as stairways, walkways, boardwalks, observation areas and boat docks can be funded with Coastal Conservation Funds. The State Waterways and Boating Commission is looking for demonstration projects for new and expanded boat docking and marina developments which could benefit select locations, Possibly the best source of revenues for public Improvements on the Peninsula Is parking related fees and fines. The current parking controls, rates and methods of fee collection are in need of adjusting. Short-term, mid-term, long-term and • overnight parking rates need to be increased. Parking permits should also be required for all residents and employees of the Peninsula. The distribution of parking revenues should be returned to the Districts In which they were generated. These funds can be used for a number of related public Improvements In addition to parking development and maintenance, for example sidewalk paving, landscaping, signing, and entrance monuments. In addition to parking authorities, other special Improvement Districts can be formed. The cost for improvements generated by these Districts are generally financed with funds received from special property tax assessments. Special Assessment Districts can be a very effective means of sharing project costs with the City. Cities can also sell Revenue Bonds for specific types of capital Improvement projects and general obligation bonds for other types of Improvements, An effective way to localize the decisionmaking process Is through the formation of Business Improvement Districts. Funding is obtained from property owners and business tenants within a specific area. Fees are often based on the size (square footage or linear footage) of parficlpating members. Funding can be used for a r ,I • variety of projects, programs and maintenance. A very effective program is a building facade grant or loan program, The option of creating a Redevelopment Agency is often discussed as a method for dramatically changing an area, While redevelopment can be a very effective tool, the continually changing state regulations make the formation of a Redevelopment Project Area very time consuming (approximately two years) and cumbersome. In addition, redevelopment is most effective as a way to subsidize private development projects for public and community betterment. However, if the desire is to finance primarily public Improvements than there is other equally effective legislation available, such as the Street Lighting and Landscape Act. Cities also have the ability to raise funds by leasing or renting community facilities such as parks, plazas, rights -of -way, etc. for special events; and sidewalks and boardwalks, for outdoor dining, and cart sales. Special user fees can also be charged for boat docking and boarding and other unique activities to the area, In addition to raising funds, there are a number of things which can be • considered to achieve a greater degree of economic vitality within each District. The District core areas should continue to serve as commercial centers, with an emphasis on retail activities. The development of second stories (above two stories only in Lido/Civic Center and McFadden square) should be encouraged with an option for office, residential or additional retail activities above the first I floor, This multi -use aspect is intended to create a lively place to be day or night for both visitors and residents. Office uses should be encouraged to Increase the daytime population and help establish the desired vibrant atmosphere. is The commercial emphasis can be achieved by providing an unbroken commercial link in the core areas at the pedestrian level; varying intensities of development can be accommodated as well, The larger scale new development should not detract from smaller infill projects, rehabilitation and new development should be encouraged and designed in a compatible manner, The District cores are surrounded by transitional areas which should be used to coordinate gradual change in terms of buildings, heights, scale and uses between the adjacent residential areas. In order to offer the visual, climatic and recreation amenities of these unique areas to a greater number of people, higher residential densities should be considered, Affordable housing in lieu of fees may be used to facilitate select projects. 105 I SIGN STANDARDS FOR COMMERCIAL USES USE OF SIGN TYPE MAXIMUM NUMBER MAXIMUM SIGN AREA MAXIMUM HEIGHT OTHER STANDARDS I All freestanding signs shall be located in a BusinessF.eestan ding per One Pcase h 15 sQ, or It 6 It landscaped planter with no portion of the sign Ii fieaoon entr P carer the a0 sq. for extending beyond the perimeter of the planter. structure on the wooden Sand - blasted ugns. 2. All freestanding signs must be of the site is setback a monument type. minimum of twenty (201 It 3. Copy shall be limited to Center identification and that the lite andfor major tenantidentificaGan. hare minimum <. Internal Illuminati onis permitted for channet of 100 ft. of letters only. fe nta One per street T. Signs Shelf be channel truest for wall signr. Wall or Awning or parking lot Irantage far 10 sq.,' per lines, loot of 811. 2 Internal illumination iipnmiued for tbnntS each separate budding retire%only. business. frontage 3. No Painted signs permitted. a. Maximum letter height is 18 inches. Under canopy One par business a in ft Minimum 1 No internal illumination permitted. ar projecting gtwnd rSfstance Window One per business ISX at total 6 ft 1 Copy %hall be limited to business name. enntlow seta address, phone number. _ 2. Letters may be vinyl or painted. 1. Sign shall be unillummoted. Tenant Wall One -per $itr 12 cal. ft. all. 2. Sign shall be located andarienled to the ohectoty pedestrian rather than to the street. 3 All freestanding Signs shall be located in a landscaped planter with rso portion extending beyond the perimeter of She planter, Special Flags unspecified Unspecified Unspecified Flags, banners, and pennants see Permitted Banners as temporary signs pursuant to The sign code. Pennants • Balboa Peninsula Planning Study Special Study No. 6 Sign Code Regulations Concept: Establish an overall Peninsula signage theme with different but compatible themes for each District e Prohibit free standingsignsexcept monumentsigns e Prohibit roof topsigas a Limit the amount of window display signs e Encourage flags, banners and other festive signage for special events as Develop unique regulations ineach District addressing sign colors, illumination, materials, tic The Balboa Peninsula Planning Study proposes to continue this combination of uses and activities with designations which provide for mixed -use activities intended to encourage a variety of uses. The amount of residential use permitted should be maximized. A greater amount of homeowner resident patronage and increased pedestrian traffic, created by people living In the Districts, will Improve the area's overall Image, thereby creating a more attractive and safe village environment which local residents can appreciate and recommend to out -of -area visitors. Marketing/promotion/advertising programs need to be developed in conjunction with Business Improvement Districts for promoting/marketing seasonal and off-season events. Events and festivals should Include merchandising and entertainment tie-ins with businesses in the Districts. The future of the Balboa Peninsula, like so many other communities, Iles in the making of effective political decisions, Community leadership is vital for the formulation and Implementation of a concise and clear future vision for the Peninsula. The City and business community have to take the necessary steps to make the Balboa Peninsula the lively, beautiful, fun place it can be. • The overall image of the Peninsula Is a major concern. A Peninsula -wide set of design guidelines, including building architecture, landscaping and signage should be Included. Some thoughts on new sign code regulations have been Included in Special Study No. 6. While many of the design and land use policies can be best developed with a Peninsula -wide set of standards, specific District by District, regulations should be established to enhance the unique area features. A new Specific Plan with Peninsula -wide policies and District by District development regulations should be prepared which combine and modify the current Specific Plans. Design Review Committees should be created in each District to assist City staff in the review process. This review may be voluntary or mandatory depending on how detailed the design regulations become. 107 TOP TEN RECOMMENDATIONS 1. Local Coastal Plan • General Fund 2. Penlnsula-wide Master Plan (Including; • General Fund Design & Landscape Guidelines 3. District by District Specific Plan • New application fees (coordinated with Master Plan and Includinq Development Regulations) 4. Boulevard Beautification Program • Special Assessment (including; Sidewalks, Landscaping, • Parking Revenues and Si na a) Newport & Balboa Blvds. 5. Parking Management Plan (Including; • Parking Revenues supply & demand, parking space study, revenue production, fee schedule, and capital projects) b. Amend Circulation Patterns in each • Parking Revenues District with additional on -street parking 7. Newport Boulevard Intersection • Measure M Funds Improvements - Via Lido & 32nd Street • Gas Tax Monies 8. Newport Boulevard and Balboa • Measure M Funds Boulevard Intersection - Mixed -Master • Gas Tax Monies Improvements 9. Develop public small boat guest • Land & Water Conservation docking facilities (including; Lido Funds Village - 2, Cannery Village - 2, • Coastal Conservancy Funds McFadden Square - 2, and Balboa Village - 1 10, Bayside Balboa Village Improvements • Revenue Bond (including; a new pier line, larger • Special Assessment boardwalk, and expanded boat • State Waterways Commission docking facilities m 0. • •1 CONCLUSION The Balboa Peninsula Planning Study has assembled the various concerns and issues of residents and business owners alike. The Issues have been presented in great detail with a series of recommendations which can be Implemented in future years. A primary recommendation is to develop a new Master Plan and Specific Area Plan (zoning) for the Peninsula as a whole. The current Specific Area Plans for McFadden Square, Cannery Village and Central Balboa should be combined, refined and simplified in order to better regulate a single identifiable Image for the Peninsula. A greater emphasis in the regulations needs to be placed on Identifying, preserving and enhancing the unique qualities of each District. Special concern must be taken in drafting regulations for signing and landscaping. These elements need to be addressed from both a Peninsula - wide approach and on a District by District basis. The Districts need to express unique themes in both signing and landscaping and distinguish their individual character. This can be achieved with different development standards for each • District. However, while individual expressions should be encouraged compatibility with an overall Peninsula design theme must be maintained. Signing, landscaping, lighting, building setbacks and size are key components. The current draft zoning regulations should be modified with these concerns in mind. The City should retain the services of a professional planning consultant to develop a Master Plan theme and propose the necessary regulatory tools. • While the Image and aesthetics of the Peninsula are Important, the functionality of the infrastructure and public facilities are critical. As outlined throughout the study, adequate circulation is vital to maintaining a basic quality of life on the Peninsula. Newport and Balboa Boulevards must be Improved to allow them to function as grand boulevards. Synchronizing traffic signals, limiting curb cuts and conflicting Intersections, limiting on -street parking facilities all contribute to the ease of access to the Districts. The introduction of alternative forms of transportation need to be carefully addressed and accommodated, The circulation and transportation systems suggested in this study should be reviewed by a professional transportation consultant. Specific detailed plans and sections should be developed to better understand the community benefits which can be obtained by the outlined recommendations. 109 rr-1 L-A Historically, parking has been the number one Issue of concern when considering any proposed change. The provision for adequate parking is vital to the successful operation of the entire Peninsula, Residents, business owners, visitors, developers and planners each have a different definition of the word "adequate," pertaining to parking. Parking strategies for the Peninsula are complicated further by the bayfront and beach and the different types of parking needs for these users. Over the years, a number of parking strategies have been prepared. These studies have Identified various means to address the different parking heeds of the various users, however, few of the Ideas have been Implemented, A realistic and practical Parking Management Plan needs to be developed by a professional parking consultant, The basic premise that convenient, safe, and accessible parking should be available for all existing commercial, residential, and recreational activities must be clear, The City should concurrently develop a locally administered Coastal Plan. Local control of all development activity Is the best way for a community to properly anticipate and facilitate the future communities needs and demands, The City of Newport Beach needs to resolve a number of potential conflicts In planning the direction of the various Districts, Future planning and • implementation needs determine how to weigh the balance of needs and demands of property owners, business tenants, area residents and visitors, There Is also the need to understand Inter community competition between the Peninsula and Mariners Mile and Balboa Island, Finally, there Is a need to resolve the conflicts that result from the individual deslres from various groups and the realities of marketability and predictable Impacts, The Planning Study has discussed and Identified a number of special projects and the need for specific studies, The phasing of these projects will occur over many years and will need to be adjusted to address then current concerns. The study has anticipated project phasing and identified short-term projects which will produce the most dramatic positive changes in the most timely and cost effective manner. The study has further analyzed the short-term projects and developed a recommended list of the top ten projects for immediate consideration, The Balboa Peninsula Planning Study has hopefully renewed Interest in discovering ways to revitalize this Important community to the City of Newport Beach. There Is a great deal of additional work which needs to be completed before the City can truly enjoy the fruits of these labors. The recommendations In this report calling for additional studies by professional consultants should not • 110 • • be considered a negative reflection of City staff. City staff has been extremely professional and responsive throughout this study. They have demonstrated the skills and professionalism necessary to perform the recommended studies outlined. However, their current day to day workloads leave little time to prepare objective, proactive and non -political planning studies for the highly controversial topics suggested in this study. The Balboa Peninsula of Newport Beach has been the subject of many special plans and studies for many years, This study attempts to highlight former studies, develop a current consensus on Important Issues and outline strategies for making the necessary community changes. The City needs to accept the responsibility of pursuing these changes. Urban Design Camp would like the opportunity to continue working with the City to Implement creative Ideas and concepts; and establish a framework for Improvements which create an attractive, unique, vibrant and viable community. 111 APPENDIX 11 • is 16 APPENDIX An Appendix has been prepared for this study in two separate volumes. VOLUME 1 CONTENTS • Introduction • District Workshop Issues Identification • B.P.P.A.0 Fifteen Point Plan • Concept Alternative Traffic and Parking Review Linscott, Law and Greenspan VOLUME 2 CONTENTS • District Workshop Agendas and Minutes • District Workshop Exercise Sheets ACKNOWLEDGEMENTS • CITY OF NEWPORT BEACH IKevin J. Murphy City Manager Sharon Wood I Assistant City Manager John Douglas Principal Planner DISTRICT REPRESENTATIVES Lido Village/Civic Center McFadden Square Jerry King Marcia Dossey Bill Dunlap HenryJohnson + John Cotton Fran Ursini John Sipple George McGaffigan Clarence Turner Garold Adams Todd Ridgeway Bob Rubian Cannery Village Central Balboa Jane Elliott Chan LeFebevre I• Steve Lewis Bob Black Bill Hamilton Don Donaldson • John Barry John Wortman Gary DiSano Don Thompson John Curci Ray Handy Russ Fleuter Ron Baers IMichael Porter Michael Kransley Bill Ficker BALBOA PLANNING ADVISORY COMMITTEE Fritz Duda, Chairman Tim Collins, Co -Chairman Rush Hill Tim Strader William Wren Anne Gifford Jim Dobrott Don Dabney URBAN DESIGN CAMP Jack Camp, President + Mike Adams, Associate