CONFERENCE NOTES
RLuwycu a v
PLANNING DEPARTMENT
CITY OF NEWPORT BEACH
AM APr 011996 PM
718191j Al2i11213141516
tS
PROJECT NAME: HOAG MEMORIAL HOSPITAL PRESBYTERIAN
Package 0: Site Utilities & Site Improvements TAY L O R
Systems Feed to Lower Campus & ASSOCIATES
ARCHITECT'S ARCHITE C 1 5
PROJECT NO.: 1083.10
MEETING DATE: 3/28/96
ATTENDEES: Faysal Jurdi, P.E. - City of Newport Beach
Genia Garcia - City of Newport Beach
Capt. Steve Bunting - Newport Beach Fire Department
Neal Rinella, Bill O'Rourke - Taylor & Associates Architects
ITEMS DISCUSSED:
The purpose of this meeting was to discuss any concerns or issues the City of Newport Beach has
with the Systems Feed to Lower Campus project.
1. The premise of the project is to provide a systems feed trench down the West Service Road
and down the East Loop Road to a Point Of Connection (P.O.C) for the proposed Support
Services building. The trench will contain emergency power conduits and chilled water lines
from the central plant along with fire alarm, data, and communication conduits. The system
will provide emergency power, chilled water, redundant data and communication feeds for
the proposed Support Services building, as well as stub -outs for future lower campus
expansion. Additionally, the system will provide emergency power, chilled water and
conduit feeds to the Cancer Center. The project will be constructed in phases; with the
trench dug, pipe and conduit laid and then back filled, compacted and paved in sections.
The roads will be accessible as much as possible, with traffic reduced to a single lane.
2. Based on this description, Faysal Jurdi stated the City would have no issue with the design.
Per Neal Rinelia's inquiry as to whether the City or OSHPD would have jurisdiction over the
project, Faysal stated that Taylor & Associates should contact OSHPD for a clarification. If
OSHPD wishes to defer, the City will take jurisdiction over the project. Faysal stated a
drainage permit would be required, instead of a grading permit. The City will require both
Electrical and Plumbing inspections. If the trench is required to be deeper than 5', it must be
shored to OSHA standards.
3. Genia Garcia stated that, in terms of planning, she has no issues with the project.
I
CONFERENCE NOTES
HOAG HOSPITAL
System Feed to Lower Campus
31206
Page 2
4. Capt. Bunting requested that he be kept Informed on the phasing of the project. The Fire
Department will require a status updated on the traffic flows and road closures. Also, the
Hospital must inform the Fire'Department before 8:00 a.m. on any day that the road will be
shut down.
5. Faysal-Jurdi submitted a sketch of the Trench Profile, dated 2/14/96, to Ray Baltera, Senior
Building Inspector, for review. Faysal was concerned that the electrical conduit would
required separation from the chilled water lines. On a follow-up phone conversation, Ray
stated that as long as the systems were designed for underground installation, conduits and
pipes could be Installed in the same trench.
The above documents our understanding of Items discussed In the above rofarenced meeting. Unless notice to the contrary is received,
the notations will be considered acceptable and Taylor& Associates Architects will proceed with work based on these understandings.
Any discrepancies should be brought to our attention within seven (7) working days.
By: Bill O'Rourke
Enc: Project Directory
cc: Those present
Refer to attached Project Directory
t
r
ftUwvt:U riv
Hoag Memorial Hospital Presbyterian PLANNING DEPARTMENT
Facilities Design &Construction
CITY OF NEWPORT BEACH
PROJECT DIRECTORY AM APR011996 PM
Prepared by: Taylor & Associates, Architects
Architects Project No.1083.10 11g191101111121112131415i6
Campus Development Master Plan - Package O k
Project No. & Name: 1252.86 - Backbone Feed to Lower Campus
Date: 2/1/96
Hoag Memorial Hospital Presbyterian
Fax: 714-646-7741 (FD&C)
301 Newport Blvd., Box 6100
Newport Beach, California 92658-6100
® Foulke, Peter
Exec. V.P., Administration
714-760-2580
® Cadieux, Bill
FD & C
714-646-8901
® Keeley, Luke
Manager, Plant Operations
714=760.5899
® Koehler, Doug
Director, Facility Operations & Maint.
714-760-2016
® Thompson, Leif
Vice President, FD & C
714-646-8901
S Whisenant, Lloyd
Director, Communications/Security
714-760-2004
® Facilities Design & Const.
Master Plan Implementation Notebook
Package A
Frederick Brown Associates, Electrical Engineers
Fax: 714-852-1657
3420 Irvine Avenue, Suite 200
Newport Beach, CA 92660-3189
® Proctor, Jim
Associate
714-852-9995
J.L. Hengstler Associates, Inc., Consulting Mechanical Engineers
Fax: 310-483-5339
13921 East Artesia Boulevard
Cerritos, CA 90703
Lujan, Bob
Principal
310-483-5333
® Okajima, Tosh
Engineer
310-483-5333
® Okajima, Bob
Engineer
310-483-5333
Tanaka, Gerald
Engineer
310-483-5333
R.E. Wail & Associates
Fax: 714-544-4762
2842-A Walnue Avenue
Tustin, CA 92680
Givens, Russ
President
714-544-2783
® Petersen, Forrest
Vice President
714-544-2783
Taylor & Associates Architects
Fax: 714-574-1325
2220 University Drive, Suite 200
Newport Beach, California 92660
2 O'Rourke, Bill
Project Architect
714-574-1325
® Rinella, Neal
Principal
714-574-1325
0 Simmons, Gary
Project Architect
714-574-1325
® Taylor & Associates
Master Plan Implementation Notebook
Package A
N Indicates your attendance is requested at the next meeting
2 Indicates distribution of minutes.
2220 UNIVERSITY DRIVE, SUITE 200
NEWPORT BEACH, CAUFORNIA 92660
714 574 1325 FAX 714,574,1338
' K�c.e�Yvr.Is R.Aq -
'• ARr llllf GI URE AND INI[R19R DESIGN' - PLANNING DEPARTMENT
CITY OF NEWPORT BEACH -
APR
. ,
A APR G 1996 PM
719091101ll1121112i.31415i6.
MEMORANDUM_
[X]" Memo
[ ] Telephone Conference
Project: HOAG MEMORIAL HOSPITAL PRESB1rTERIAN TAY L O R
System Feed to Lower Campus a AssocIATES
ARCHITECTS
Date: 4/4/96 -
Architect's.
Project No.: 1083.10
Attention: - Faysal Jurdi, Assistant Director
Buildinb Department, City of NewportBeach
Remarks:
Per our discussion on 3/28/96, I,contacted Ted Teshima at OSHPD to determine agency
jurisdictions. -
Ted stated that when a system affects an OSHPD approved building, OSHPD review is
required.. As the system feed includes providing chilled water lines and emergency power
to the Cancer Center (an Occupany I, OSHPD approved building), the project will be
"reviewed byOSHPD'.
Thank you for taking the time to meetwith Taylor & Associates to•discuss.this project.
Please call if you_have any questions.
By: Bill -O'Rourke
cc: see attached Project Directory
Genia Garcia, City of Newport Beach Planning Department
Steve Bunting, Newport Beach Fire Deparment
ri
Hoag Memorial Hospital Presbyterian
Facilities Design & Construction
PROJECT DIRECTORY
Prepared by: Taylor & Associates, Architects
Architects Project No.1083.10
Campus Development Master Plan - Package O
Project No. & Name: 1252.86 - Backbone Feed to Lower Campus Date: 211/96
Hoag Memorial Hospital Presbyterian Fax: 714-646-7741 (FD&C)
301 Newport Blvd., Box 6100
Newport Beach, California 92658-6100
®
Foulke, Peter
Exec. V.P., Administration
714-760.2550
®
Cadieux, Bill
FD & C
714-646.8901
®
Keeley, Luke
Manager, Plant Operations
714-760-5899
®
Koehler, Doug
Director, Facility Operations & Maint.
714-760-2016
®
Thompson, Leif
Vice President, FD & C
714-646.8901
®
Whisenant, Lloyd
Director, Communications/Security
714-760-2004
® Facilities Design & Const. Master Plan Implementation Notebook Package A
Frederick Brown Associates, Electrical Engineers
Fax: 714-852-1657
3420 Irvine Avenue, Suite 200
Newport Beach, CA 92660-3189
® Proctor, Jim
Associate
714-852-9995
J.L. Hengstler Associates, Inc., Consulting Mechanical Engineers
Fax: 310-483-6339
13921 East Artesia Boulevard
Cerritos, CA 90703
® Lujan, Bob
Principal
310-483-5333
® Okajima, Tosh
Engineer
310.483-5333
29 Okajima, Bob
Engineer
310-483-5333
® Tanaka, Gerald
Engineer
310.483-5333
R.E. Wall & Associates
Fax: 714-544-4762
2842-A Walnue Avenue
Tustin, CA 92680
® Givens, Russ
President
714-544-2783
® Petersen, Forrest
Vice President
714-544-2783
Taylor & Associates Architects
Fax: 714-574-1325
2220 University Drive, Suite 200
Newport Beach, California 92660
® O'Rourke, Bill
Project Architect
714-574-1325
® Rinella, Neal
Principal
714.574-1325
® Simmons, Gary
Project Architect
714-574-1325
® Taylor & Associates
Master Plan Implementation Notebook
Package A
X Indicates your attendance is requested at the next meeting
2 Indicates distribution of minutes.
` 2920 UNIVERSITY DRIVE, SUITE 200
NEWPORT BEACH, CAUFORNIA 92660
714.574.1325 FAX 714.574.1338
TnYLOR
i ASSOCIATES
110EITECTS
"M
5" POWFFz 12-1' C, WATER
CONPUITS Iy/ 2" INeiUL.
V 60mm,
CONFUTIv
alz
OO O
�'Il1.Iii�1�.,�j_��`•�•i,r�itl•1;�=�•, tl.• tl�i• I•�
i
!
i
MI
AGENCYNO. DRAWN BY Ocom BY Sru!
nwvF cur-'e�CE
- ,�—
-1111i
CoM�t�CTEc. z
IFAF TH FILL_
,
—
Vim?
12" LoMptiGTED
SANF COVSF-
� ;
lP" COMPPC'i'E�
9ANP pap
vs YINMOA Ti' ll-i
DAIE PRO01,10. WEETNO.
Z .1190.17G I Og3,10 1 oq I