HomeMy WebLinkAboutGA050018_068t0000003ZRAvAAO_Correction ListCounty of Orange Resources & Development Management Department Building Permits Division Main Office 300 N. Flower Street Santa Ana, CA 92702-4048 Grading Plan Check Corrections Corrections shall be made on the tracings and three(3) new sets of plans shall be submitted. If you make changes to the plan other than or in addition to what Plan Check has requested, yellow highlight the changes on one set of the re-submitted plans. Return the original check print with corrected plans. Payment of a new plan check deposit may be required for all plans on which no action is taken by the applicant for a period of 180 days. Applications for which no permit is issued within 180 days following the date of submittal shall expire by limitation, and shall be discarded. Project Number:GA050018 Submittal Date:May 09, 2005 CBC Edition: 2000 Plan Check Date: 5/23/2005 3:24 PM Description:rough grade for lots 12 and 13, TR15346 Job Address 15 AVALON VISTA NEWPORT COAST, CA Owner Address Tushar Patel 620 Newport Center Drive Newport Beach CA92660 Current - 1st Plan Check Plan Checked By Michael Fisher Michael.Fisher@pdsd.ocgov.com 714-834-6156 Contact Address Elaine Krepp 3 Hughes Irvine CA92618-2021 949-768-2561 949-465-1261 FAX ekrepp@hunsaker.com Page 1 of 5 GA050018 GENERAL INFORMATION Please provide 24-hour notice to your plan checker, prior to obtaining the grading Permit.Return the original check print with corrected plans. Payment of a new plan check deposit may be required for all plans on which the applicant takes no action for a period of 180 days. Applications for which no permit is issued within 180 days following date of submittal shall expire by limitation, and shall be discarded. SUBMITTALS, FEES, BOND, INSURANCE AND ISSUANCE Provide three (3) complete sets of corrected plans. Provide minimum 40-scale plan for precise grading. The maximum size shall be 36" x 42". All sheets shall be uniform size. Plans will not be rechecked at the counter. Allow one week for recheck. Plan check and inspection deposit amounts will be calculated by the plan checker based on earthwork quantities or drainage improvements, whichever is greater. The engineer shall provide this information. Surety is required in the amount of $ _________. Surety may be posted in one of the following forms: Bond Certificate of Deposit Letter of Credit Cash or Cashier s Check Personal/Company checks cannot be accepted. County approved forms for the various types of surety are available upon request at the Grading Counter, Station 4, Room 122. Please note all signatures must be notarized. Provide verification of contractor's coverage for Workman's Compensation insurance. If owner is doing work and will not employ other workers, owner must sign exemption statement. Owner or authorized agent and/or contractor must sign the permit at the time of issuance. Authorized agent must have a notarized statement from the owner authorizing the agent to act on behalf of the owner. The permittee and the entity providing the surety must be the same i.e., owner, developer or contractor. Page 2 of 5 5/23/2005 3:24 PM GA050018 Grading Plan Check Corrections Sheet Comments General 1 A) Show Assigned project address on title sheet of plan. 2 B) Show site acreage and earthwork quantities on plans: 2.1 Site Acreage________ Acres 2.2 Overexcavation________ yds. 2.3 Export________ yds. 2.4 Remedial_______ yds. 3 C) Each sheet of all plan sets must be stamped and signed by the Civil Engineer or Architect of Record for the project. 4 E) Submit an itemized summary of the unit and total cost of all drainage devices, grading, paving, and erosion control. 5 F) Show on Plans: 5.1 Grading Legend 5.2 Grading Limits and Off-Site Grading Limits 5.3 Permit Limits (cannot be beyond proprty lines) 5.4 Property Lines (show all P.L.s) 6 G) A notarized letter of permission from adjacent property owner(s) is required for slope encroachment or other off-site grading or work . Include off-site legal description and Assessor´s Parcel Number. 7 H) Show location of retaining walls on grading plan plus top of wall elevations, adjacent finished surface elevations, top of footing elevations, provide a cross section detail showing subdrain design, indicate drainage outlet for all retaining walls. Retaining walls are not a part of the grading permit. Submit for separate building permits; show connection of subdrain to storm drain. Note on plans. (If applicable to this preliminary permit). 8 K) Indicate disposition of excess earth materials. A separate permit may be required. Traffic Studies, Room 210, must approve haul routes over public roadways. Page 3 of 5 5/23/2005 3:24 PM = Indicates line item not Cleared. GA050018 Grading Plan Check Corrections Sheet Comments 9 N) Show all easements, (i.e. drainage, utilities, etc.). 10 Q) Approved erosion control measures are to be installed and functional during the rainy season from October 15 to April 15. Justify design with hydrology and hydraulic calculations. Submit three (3) copies of an erosion control plan and a cost summary of erosion control facilities. If proposed grading will take place after April 15, continue to show erosion control plans. Grading may extend into the next rainy season. Use proper BMPs; provide locations and details on plans. 11 R) Show detail on plan how finished grades meet adjoining property. 12 S) Show on title sheet of plans name, address, and telephone number of: 12.1 Soil Engineer 12.2 Archaeologist & Paleontologist 12.3 Engineering Geologist 12.4 Biological Monitor 13 W) Additional comments may be made after field verification that the plans and soils report accurately reflects existing conditions. 14 Y) The grading concept proposed appears to require a separate Site Development Permit. Verify with Current Planning at Station 1, Room 122. If not required, please provide name of Planner at Station 1, who made the determination and date of determination. Drainage Instructions 15 A) Submittal of an agreement for Drainage Encumbrance is required from adjacent property owner(s) for acceptance of unnatural drainage. Include legal description and Assessor´s Parcel Number. Applicant must have this document recorded. (Form attached to check print). 16 B) Submit a hydrology study and/or hydraulic calculations for this project. Justify your design. 17 E) Show typical detail for the 12" high by 4´ wide berm, which is required at top of slopes. 18 F) Provide one (1) copy of recorded CC&R´s outlining drainage rights and maintenance responsibilities. Page 4 of 5 5/23/2005 3:24 PM = Indicates line item not Cleared. GA050018 Grading Plan Check Corrections Sheet Comments 19 I) Minimum, acceptable gradients: 19.1 Lots sales & preliminary grading 2.00% 20 K) Show drainage conducted to a street, natural watercourse, or other approved location. 21 L) Drainage over a manufactured slope is not permitted except in approved devices. 22 Q) Show the approved non-erosive device where concentrated drainage exceeds 4% gradient. Use concrete, gunite, or other approved materials. 23 R) Revise plans to show complete details of all drainage structures. 24 T) Show detail and locations of extra depth footings. 25 V) Show flow line elevations of all swales and other drainage devices. 26 W) Show retaining wall subdrain details with disposal points, flow line elevations and pipe material (if a part of this permit). Slopes 27 H) Show top and toe of cut and fill slopes. 28 I) Incorporate the following hillside design criteria or justify in writing why it does not apply to your project: 28.1 Manufactured (cut and fill) slopes shall have a maximum slope ratio of 2:1. Geotechnical 29 A) Obtain approval of soils and geology report by County Geotechnical staff. Reports have been forwarded for their review. Page 5 of 5 5/23/2005 3:24 PM = Indicates line item not Cleared.