Loading...
HomeMy WebLinkAboutRS071331_Correction Notice3,6439 MRISTIINSPK51Cell (9C9)63A1i95AlgrStrest PM1one&FAK19A91837-7ii onief(CA.93691 eTCjA Observation Report Iobetlkill 15 Avalon Vista Newport Coast, CA M Nu r. RS071331&RW1ID057 Jpplyna Avalon Vista II Project pdytst pesign When Architecture MSIcalRmlpnai: ASTM A615 Grade 60 polar original KNA Engin enn9, Inc expenses Name: Ropers Getz (muaamr: NatM1U Development Sample, % recen y` fu4unlnrmn KP Constmctlon. TyggYMkObuwd: StrWtural Masonry/ Epoxy DOW¢I Installation qte 08-17-11 I. Verifed the laying -up a8" x W x 16' block$ at the 1stlM section Implies 1-5) of the proposed new CMU Well secfnn of the Main Entry Fountain of the proposed new Main Residence of Petcel 1 Comedy Lot 12 & 13). 2. Observed molar, SpecMixType "S" Appear, for proper mixing and handling. 2 Verified reinforcing settled size, grade, lap location and clearance. l Observed the installation of (8)-34 velicel dowels & (4) -NG Mnzontal dowels with a min. 6" embed. inb the existing comet, fooling & wall sections for the new to existing structural bclm of M1e cast In- lace wall & CMU wall section of the Main Entry Fountain of the proposed new Main Residence of Parcel t (immerly fed 12 & 13). 5. exceed the size, depth, and tleenlineea M holes ones to the application of Simpson SET.X? Epoxy Lot #12302481. 02-211. B. Vedhed the placement of rarlorcing steel at the following local the in Floor foundation level slabon-grade section 0the proposed new CourtyaM of the Main Residence of Parcel 1 (formerly Lot 12 & 13). 9. Verified reinforcing steel for size, grade, cep, locaeoo aM chre ance. B. Wmk observed. Unless noted Openers is in acceptance with the approved plans and specifications. y upW Still 1n232u4r" I.C.C. Mpwallry: hxblb s4 Kr^n Nolea Supadmm�amr IIPoSTA INSPECTION Sa1YKF3 tNC, Ce4l:(9wVy 633-I439 23M5AIgiers S[reet �T Pbone&FAX1939)03)-)934 1� Mission VleI4CA.9M91 L'1N SeiA Observation Report maY4m 15 Avalon Vista Newport Coast, CA isi Narrowed RS071331& RW110057&RS071332 lopNnue Avalon Vista II Parent apedemod Design West Architecture Marshall Oexnplm Concrete Mix Design RRS500P44 bgla. KNA Engineering Inc. DaIwNS Naive, Robed Ge12 ( ed w F Natnu Development Minyec 4' % &" puenuy= 4 Submmarme KP Constmctlan Tyq NV/ekONee� Reinforced Concrete Placement pya 09-1911 1. ObseNe the placement & consplldMion &20 cu. ytls. orconcrete, mu design #RS500P44 (5000 PSI), at the holidaying locations: the tat Floor IouMabon alatoon9mtle settled of the Courtyard and the tat 10 added (courses 1-5) of the CIVIL wall & cast uni wall reasons of the Mein Entry Fountain on the east aide of the propmed cew Main Presence a Parcel i (formerly not 12 & 13) and the let Floor foundation (2)- pedesta s and (2)- lower reap sections at the West Entry of he proposed new Red. Center of Parcel 1 (formerly Lot 12 & 2. One set of 4 - x @=4 teat cylinders was taken from Load %1 (10 on ytls.), ticket #7697547, duck #1112, placed at the 1at Floor foundation slabon-grade section of the Crunched of the proposed new Main Residence of Parcel 1 Rascally Lot 12 & 13 3. Slump test result, 4-112". 4. Concrete was supplied by Processed s Ready Mlx. 5. WDM observed, unla er noted Mhervnbe, is In accordance win the approved plans and specification star, 0 RC 5102324d/ LC.C, ma4N Spedalb ern All 11PoST119NSP5 9FIIYK6INC. pFone& FpZ(949)&3J-434 MlsbnVkjp,C0.93691 ARISTA r Observation Report lobal3esse 15 Avalpn Vista Newport Coast,CA AM of Newmann RS071332 IobNede Awlon Vista II Project format Design West Architecture taeteiat pocbpFn; FCAW A520 elerVWes E31 T-8 Engineer KNA Engineeringlnc. wpurp Nam, Robes Gen Conuaamo Natbo Development 9^ple, x amMy- 5u![onlntbn Gana Steel TypotWetObww3 Swctmel Steel is Welding IIa¢ 0e-17-11 1. Verified the field welding of the beanng-rype connections of me Root Level framing M the proposed new Roo Center M Pi I po merly Lot 12 & 13) at the (dlowng locations. the (4)- iN" shear plates to me web of Me (2) (E)W14x68 beam @CA(4)&C6(4), and the (2)-4"diameter pipe columns with 114" gusset plates to the Mtlwn of the (E) W14x68 beams a B (4) & E (4), and the (2)-114" softer Plates to the web of the (N) W 10x26 beam @ C.6 (4), and the (N) MC 12x68 channels he the tap & bottom flanges of the Rif W 14x66 beams between 2. Gamed w iddeq Kwan Young Lee %P018292 exit. 05-24-13, was Obsessed for potter welding social & techniques. 3. Completed angles were venfrad for size, slogan, location, antl, unless noted otherwise, are free of Nsde deism 4. The (N) SCUM channels were not welded to the tap & bottom flanges of the (E) W 14afie beams appmx_ 3 ft on each end, one to the existing Root framing previding no laterair whim requires an RFI form the engsneer. 5. Work observed, unless noted otherwise above, is in accordance with the approved plane and specR¢adons. saw awkwi ne b 9GBW 5f 02324- ICC. Nmmndow wedalb Nn a9a^b Peke� MISTIIINSPECl10N 5FAVICES INC. IDI(99) &336i39 I31»SNgleraSVeet AMSTA �'�ne$F(4)&32->9 Mksion YrefgCA92691 seECTMN SEMMES INC Observation Report Iob M]rms 15 Avalon Vista Newcan Coati CA Pezmk Rumsm RS0]1332 Epronc. Avalon Vista ll Plates radiative Design West Architecture MuvlalCarlptlon: FCAWA520eleNmdes E]1T-8 FrpFxv. l(NA Engineering, Inc. pwyaNmv Robert Gem eaTocbn Nathu Development Samples X Wendy= SUNamravw, Gana Steel rypbNbhONervvk Structural Steel It Welding/ Epoxy Dowel Installation Para 08-16-11 1. Verified the held welding of the beatlog-type corrections of the Mezzanine taming of the proposed new Rae Center of Parcel 1 (fomarly Lot 12 & 13) at tle Wllowing battens the (to)-1/4'st8tcr plates B the (2)-1/4' end plates to the was of (N) W hOG6 beam between 4 (B-E), and the W diameter pipe columns with 114" gusset plates to Na tap M the (N)yiIDw26 beam and M the top & botlom of the IS) W14x68 beams ® B (4) & E (4). 2 Camfied weds, Kean Young Lee IXP018292 exp. 05 24-13, was observed br proper welding procedures & 3. ComplNed "Ids was verified fur size, length, location, and unless noted otherwise, are free of visible dalects 4. observed the installation of (6)-a5 vemcel dowNa & (7) -N4 vemcal dowels & (19) - M honzomal dowels Mth SITE embedinto the wasting concrete foundation for the added (2) -lower steps &(2)-cedestalsatthe west Entry of proposed new Rec. Center a Parcel 1(brmedy Let 12 & 13t 5. Verified the size depth and cleanliness of holes prior to the application of Simpson SET%P Epoxy, Let N123G2460 exp. 02-28-13. 6. Work observed unless noted otherwise Is in accurnounce with the approval plans and apenficatlem s ��N�W�� 1WEN lYF1M Ipi'IMtllb ftwovisowa. Ell ® 3 M. spatO/C 91320 SS&W P TO2324 CC. AMMI W. aP ft raw A9emy a^r