HomeMy WebLinkAboutBALBOA BUSINESS DISTRICT STREET IMPROVEMENT 19921 ti i BALBOA BUSINESS DISTRICT STREET IMPROVEMENT DESIGN STUDY PRELIMINARY FINDINGS REPORT May 29,1992 Prepared for: City of Newport Beach 3300 Newport Boulevard Newport Beach, California 92658-8915 Prepared by: Robert Bein, William'Frost & Associates Professional Engineers, Planners & Surveyors ]N 28A6&M2106 9jgbeA'7BeiA,-Wi11iam cRo- st 6&c�lssociates ' PROFESSIONAL ENGINEERS, PLANNERS & SURVEYORS ' May 29, 1992 JN 28468 1 Mr. Stephen Badum Project Manager Public Works Department CITY OF NEWPORT BEACH 3300 Newport Boulevard ' Newport Beach, CA 92659-1768 ' Subject: Balboa Business District Street Improvement Design Study Preliminary Findings Report 1 Dear Steve: ' Robert Bein, William Frost and Associates (RBF) is pleased to present this preliminary ' findings report on the condition of the existing street improvements within the Balboa Business District. The limits of the Balboa Business District are Adams Street to "A" Street from Ocean Front to Bay Avenue. This report is based on a field review conducted on May ' 19th and 20th that identified existing substandard roadway improvements including pavement requiring rehabilitation, drainage deficiencies, damaged/deteriorated curb and gutter, and damaged sidewalks which may create a tripping hazard. The findings of this ' report have been summarized in a matrix format with each street listed alphabetically for convenience. A three tier ("A", 'B" and "N/A") priority labeling system has been established in concert ' with the City to identify the necessity of replacement for existing street improvements within the Balboa Business District: ' i. Priority "A" indicates the need for replacement due to non- standard and/or non-functional reasons. ' ii. Priority 'B" indicates the need for replacement due to cosmetic reasons. -Preessiortal Service since 1944 ' 14725 ALTON PARKWAY • P.O. BOX 19739 • IRVINE, CALIFORNIA 92713-9739 • (714) 472-3505 • FAX (714) 472-8373 OFFICES IN CORONA • DENVER • PALM DESERT • SACRAMENTO • SAN DIEGO • TEMECULA ' Mr. Stephen Badum May 29, 1992 ' Page 2 iii. "N/A" indicates that no replacement is necessary as the improvements are in good condition, are functional and meet ' current City standards. As directed by the City, a detailed review of Balboa Boulevard is not included in the report as the entire street will be reconstructed utilizing a "tilt" section, in accordance with Alternative IIA of the preliminary design alternatives, submitted to the City by RBF in ' January, 1988. Our field review revealed the following: ' • "A" Street is in good condition requiring improvements for cosmetic reasons only. • Adams Street is also in good condition but requires improvements for both functional and cosmetic reasons in select ' locations. t • Bay Avenue was found to be in relatively poor condition requiring construction of a bulkhead near "A" Street and replacement of the roadway, curb and sidewalks for both functional and cosmetic reasons. ' • Main Street also requires replacement of roadway, curb and gutter for functional and cosmetic reasons. ' • Palm Street is in good condition but requires improvements in ' select locations for both functional and cosmetic reasons. ' • Washington Street is also in good condition and requires improvement in select locations for functional and cosmetic reasons, as well. I■ • The only alley requiring replacement is located just east of Balboa Boulevard between Adams Street and Palm Avenue. This alley does not meet City standards and does not have sufficient grade for drainage. All other alleys appear to be in good condition. ' JN 28468 Mr. Stephen Badum May 29, 1992 Page 3 t We at Robert Bein, William Frost and Associates appreciate this opportunity to be of service to the City of Newport Beach and look forward to assisting you further on this project. In order to accommodate the current project schedule, we would appreciate your ' review and comments regarding the attached matrix by June 17, 1992. If you desire clarification or additional information, we will be glad to meet with you. tSincerely, Michael J. Bru , ' Director Municipal and Traffic Engineering ' Bob Crawford, RBF pc: Lloyd Dalton, CNB Gary Miller, RBF Mike Miller, RBF ' Jamie Price, RBF ' JP:eas/28468.012 I 1 May 29, 1992 JN 28468 I BALBOA BUSINESS DISTRICT STREET IMPROVEMENT DESIGN STUDY CITY OF NEWPORT BEACH Street Eidsting Priority Comments Street Improvement AH STREET ROADWAY B Road is constructed of P.C.C. with an A.C. overlay and patching (Ocean Front to Balboa Blvd.) in various locations. Street has a crown section and appears to be fully functional for both drainage and traffic. Street is somewhat unattractive due to A.C. patchwork but is in good condition with a 2-4% longitudinal grade. CURB RETURNS A Both curb returns are relatively old P.C.C. Curb returns are (Both northerly and southerly non-standard as they are without access ramps. curb returns at intersection of "A" Street and Balboa Blvd.) ALLEY APPROACH N/A Alley approach is constructed of P.C.C. Alley approach appears (On northerly side of "A" Street) to be in good condition without cracking and meets current City Standards. ALLEY APPROACH N/A Alley approach is constructed of P.C.C. Alley approach appears (On southerly side of "A" street) to be in good condition and appears to have been recently constructed concurrent with the new alley. Alley approach meets current City Standards. CURB ONLY N/A Curb is constructed of P.C.C. and was poured monolithically with (Ocean Front to Alley) sidewalk. Curb appears to be in good condition without any cracking or chipping. Curb face varies from 0 to 6 inches due to A.C. overlay. LEGEND A = Replacement Necessary for Non-Standard and/or Non -Functional Reasons Page 1 of 22 B = Improvements Necessary for Cosmetic Reasons N/A = No Improvements Necessary M M M M M M May 29, 1992 Street Fidsting Priority Comments Street Improvement "A" STREET (Cont.) CURB ONLY B Curb is constructed of P.C.C. and was poured monolithically with (Ocean Front to Balboa Blvd.) (Alley to Balboa Blvd.) sidewalk. Curb appears to be in good condition with slight cracking in some spots. Curb is fully functional with the curb face varying between 5 and 6 inches. SIDEWALK N/A Sidewalk is constructed of P.C.C. Sidewalk appears to be in (Ocean Front to Alley) good condition with no cracking and sufficient slope for drainage. SIDEWALK B Sidewalk is constructed of P.C.C. Sidewalk appears to be in (Alley to Balboa Blvd.) good condition with slight cracking in some spots. Sidewalk is fully functional with sufficient slope for drainage. "A"STREET ROADWAY B Roadway is constructed of P.C.C. with A.C. patching in various (Balboa Blvd. to Bay Ave.) locations. Street has a crown section and appears to be fully functional for both drainage and traffic. Street is somewhat unattractive and is slightly cracked, but is in good condition with a 4-6% longitudinal grade. CURB RETURN A Curb return is old P.C.C. Curb return is non-standard as it is (Northerly curb return at without an access ramp. intersection of "A" Street and Bay Avenue) ALLEY APPROACH B Alley approach is old P.C.C. and appears to be in fair condition (Northerly side of "A" street) with slight chipping and markings. CURB ONLY B Curb is constructed of P.C.C. and was poured monolithically with (Northerly side between Balboa sidewalk. Curb is slightly chipped, although it is in good Blvd. and Bay Avenue) condition. 6-inch curb face. LEGEND A = Replacement Necessary for Non -Standard and/or Non -Functional Reasons B = Improvements Necessary for Cosmetic Reasons N/A = No Improvements Necessary Page 2 of 22 May 29, 1992 JN 28468 Street Existing Priority Comments Street Improvement "A" STREET (font.) CURB ONLY B Curb is constructed of P.C.C. and was poured monolithically with (Balboa Blvd. to Bay Ave.) (Southerly side between Balboa sidewalk. Curb appears to be in good condition, although curb Blvd. and Bay Avenue) line does waver slightly. 6-inch curb face. SIDEWALK B Sidewalk is constructed of P.C.C. Sidewalk is in fair condition (Northerly side between Balboa with sufficient slope for drainage. Sidewalk between Balboa Blvd. and Bay Avenue) Blvd. and alley approach should be removed with adjoining curb. SIDEWALK N/A Sidewalk is constructed of P.C.C. Sidewalk appears to be in (Southerly side between Balboa good condition with no cracking and has sufficient slope for Blvd. and Bay Avenue) drainage. ADAMS STREET ROADWAY B Road is constructed of P.C.C. between the alley and Balboa Blvd., and A.C. between Ocean Front and the alley. The street (Ocean From to Balboa Blvd.) has a crown section and appears to be fully functional for both drainage and traffic. The A.C. pavement is in good condition while the P.C.C. pavement is older and slightly cracked. Street is relatively flat with a longitudinal grade of 1-2%. CURB RETURNS A Both curb returns are old P.C.C. and are substandard without (Both northerly and southerly access ramps. curb returns at intersection of Adams Street and Balboa Blvd.) ' ALLEY APPROACH B Alley approach is old P.C.C. but appears to be in fair condition. (Northerly side of Adams Street) Alley approach is chipped and marked up, but is functional. ALLEY APPROACH N/A Alley approach is new P.C.C. and appears to be in good (Southerly side of Adams Street) condition with no cracking. Alley approach meets current City standards. LEGEND A = Replacement Necessary for Non -Standard and/or Non -Functional Reasons B = Improvements Necessary for Cosmetic Reasons N/A = No Improvements Necessary Page 3 of 22 M M M i May 29, 1992 t Street Existing Priority Comments Street Improvement ADAMS ST. (cent.) DRIVE APPROACH A Drive approach is constructed of P.C.C. and appears to be in (Ocean Front to Balboa Blvd.) (Northerly side) good condition without any cracking in apron. Drive approach is old concrete but is fully functional. However, the varying curb face in front of the drive approach is badly cracked and should be replaced. DRIVE APPROACH A Drive approach is constructed of P.C.C. and appears to be in fair (Southerly side) condition without any cracks in apron. However, the varying curb face in front of the drive approach is badly cracked and should be replaced. CURB & GUTTER B Curb and gutter is constructed of P.C.C. and appears to be in (Northerly side from Ocean good condition with very slight cracking around drive approach. Front to Alley) Curb and gutter is older than other improvements but is fully functional. 8-inch curb face. CURB & GUTTER B Curb and gutter is constructed of P.C.C. and appears to be in (Southerly side from Ocean Front good condition with very slight cracking around drive approach. to Alley) Curb and gutter is older than other improvements but is fully functional. 8-inch curb face. CURB ONLY A Curb is constructed of P.C.C. Curb on both sides of the street (Between Balboa and Alley) was poured monolithically with sidewalk. Curb is badly cracked, 8-inch curb face. SIDEWALK N/A Sidewalk is constructed of P.C.C. and appears to be in good (Ocean Front to Alley) condition with no cracking and has sufficient slope for drainage. LEGEND A = Replacement Necessary for Non -Standard and/or Non -Functional Reasons B = Improvements Necessary for Cosmetic Reasons N/A = No Improvements Necessary Page 4 of 22 fo-a m am swim M W! Mr !3 W M May 29, 1992 JN 28468 Street Existing Priority Comments Street Improvement ADAMS ST. (Cont.) SIDEWALK A Sidewalk is old P.C.C. Sidewalk appears to be built to the R/W (Ocean Front to Balboa Blvd.) (Northerly side between Balboa (approximately 6 feet wide) and then widened to 11 feet by Blvd. and Alley) homeowner. Sidewalk is cracked and patched in some areas and could cause tripping. SIDEWALK A Sidewalk is old P.C.C. Sidewalk is cracked and chipped. (Southerly side between Balboa Sidewalk does not appear to drain well and is a tripping hazard. Blvd. and Alley) ADAMS STREET ROADWAY A Roadway is constructed of P.C.C. and has a crown section. Cracking is prevalent throughout street and is severe at this alley (Balboa Blvd. to Bay Ave.) intersection. Street is relatively flat at approximately a 1% longitudinal grade and appears to have drainage problems around the alley intersection due to both subsidence and A.C. patchwork. CURB RETURN N/A Curb return is constructed of P.C.C., appears to be in good (Northerly curb return at condition, and meets current City Standards. intersection of Adams Street and Balboa Blvd.) CURB RETURN A Curb return is old P.C.C. and is substandard without access (Southerly curb return at ramps. intersection of Adams Street and Balboa Blvd.) CURB RETURN N/A Curb returns are constructed of P.C.C. and appear to be in good (Both easterly and westerly curb condition without any cracking and meet current City Standards. returns at intersection of Adams Street and Harding Street) LEGEND A = Replacement Necessary for Non -Standard and/or Non -Functional Reasons B = Improvements Necessary for Cosmetic Reasons N/A = No Improvements Necessary Page 5 of 22 sm PW so we M7 an May 29, 1992 so MW 4M am F Street Fisting Priority Street Improvement AD"S ST (Cont.) CURB RETURN N/A Curb retuf (Balboa Blvd. to Bay Ave.) (Northerly and southerly curb condition. returns between alley and Bay Avenue) ALLEY APPROACH N/A Alley appl (Northerly side of Adams Street) good Bond ALLEY APPROACH N/A Alley appi (Southerly side of Adams Street) good Bond CURB ONLY N/A Curb is re (Northerly side between Balboa with sidev Blvd. and Alley) cracking. CURB ONLY N/A Curb is re (Northerly side between Alley with sidev and Harding Street) cracking. CURB ONLY A Curb is of (Southerly side approximately 65 Curb is cI feet between Balboa Blvd. and Alley) curb face. CURB ONLY N/A Curb is n (Southerly side approximately 85 sidewalk. feet between Balboa Blvd. and Alley) curb face. CURB ONLY A Curb is o (Northerly side between Harding condition. Street and Bay Avenue) LEGEND A = Replacement Necessary for Non -Standard and/or Non -Functional Reasons Page 6 of 22 B = Improvements Necessary for Cosmetic Reasons N/A = No Improvements Necessary am m 00) !low, Im- Aim al 0 410 am so an May 29, 1992 JN 28468 Street Existing Priority Comments Street Improvement ADAMS ST. (cont.) CURB ONLY N/A Curb is relatively new P.C.C. Curb is in good condition without (Balboa Blvd. to Bay Ave.) (Southerly side between Alley any cracking. 6-inch curb face. and Bay Avenue) SIDEWALK N/A Sidewalk is relatively new P.C.C. Sidewalk appears to be in good (Northerly side between Balboa condition with sufficient slope for drainage. Blvd. and Alley) SIDEWALK l N/A Sidewalk is relatively new P.C.C. Sidewalk appears to be in good (Northerly side between Alley condition with sufficient slope for drainage. and Harding Street) SIDEWALK A Sidewalk is old P.C.C. Sidewalk is cracked and is buckling. (Southerly side approximately 65 Sidewalk is a tripping hazard. ' feet between Balboa Blvd. and Alley) SIDEWALK N/A Sidewalk is relatively new P.C.C. Sidewalk is in good condition (Southerly side approximately 85 without cracking and has sufficient slope for drainage. feet between Balboa Blvd. and Alley) SIDEWALK N/A Sidewalk is relatively new P.C.C. Sidewalk is in good condition (Southerly side between Alley and has sufficient slope for drainage. and Bay Avenue) ADAMS STREET ROADWAY N/A Street is relatively new P.C.C. and has a crown section. Street (Bay Street to Edgewater) appears to be fully functional for both traffic and drainage with approximately 1-2% longitudinal grade. No cracking, subsidence or A.C. patchwork present. CURB RETURNS N/A Curb returns are relatively new P.C.C. Curb returns are in good (Both northerly and southerly condition and meet current City Standards. curb =turns at intersection of Bay Avenue and Adams Street) LEGEND A = Replacement Necessary for Non -Standard and/or Non -Functional Reasons Page 7 of 22 B = Improvements Necessary for Cosmetic Reasons N/A = No Improvements Necessary am we N-W 00 May 29, 1992 ow` 100- 'ift MW 00 *one M JN 28468 Street Existing Priority Comments Street Improvement 1 AD"S ST. (Cont.) ALLEY N/A Alley approaches are relatively new P.C.C. and are in good (Bay Street to Edgewater) APPROACHES condition without cracking. Alley approaches meet current City Standards. DRIVE APPROACH N/A Drive approach is relatively new P.C.C. and appears to be in (Southerly side between Bay Avenue and Alley) good condition without cracking. Drive approach meets current City Standards. CURB ONLY N/A Curb is relatively new P.C.C. and appears to be in good condition without cracking. 6-inch curb face. SIDEWALK N/A Sidewalk is relatively new P.C.C. and appears to be in good condition. Sidewalk has sufficient slope for drainage. BALBOA BLVD. ROADWAY A Street is constructed of both P.C.C. and A.C. Street has a crown (Adams Street to "A" Street) section and is relatively flat with approximately 0-2% longitudinal grade. Street drains poorly and is to be reconstructed with a tilt section according to Alternative II -A of the preliminary design alternatives, dated 1/88. CURB A Curb is old P.C.C. and appears to be in fair to poor condition throughout the length of street. To be replaced according to Alternative II -A. 4 to 6 inch curb face. SIDEWALK A Sidewalk is old P.C.C. and appears to be in fair to poor condition throughout length of street. To be replaced according to Alternative II -A. LEGEND A = Replacement Necessary for Non -Standard and/or Non -Functional Reasons Page 8 of 22 B = Improvements Necessary for Cosmetic Reasons N/A = No Improvements Necessary M W M ON M M 4M a am >o an M r at MW Im ar Wi on May 29, 1992 Street Existing Priority Comments Street Improvement BAYAVENUE ROADWAY B Street is constructed of P.C.C. and has a crown section. (Adams Street to Palm Street) Although street is flat, approximately 1% longitudinal grade, it appears to be functional for both traffic and drainage. Street has cracks which have been filled with a joint sealer. CURB ONLY N/A Curb is relatively new P.C.C. Curb was poured monolithically (Easterly side) with sidewalk and is in good condition. 6-inch curb face. CURB ONLY A Curb is old P.C.C. and was poured monolithically with sidewalk. (Westerly side) Curb is badly cracked, chipped and non-functional. 6 to 8 inch curb face. SIDEWALK N/A Sidewalk is relatively new P.C.C. and appears in good condition. (Easterly side) Sidewalk has sufficient slope for drainage. SIDEWALK A Sidewalk is old P.C.C., appears to be in fair to poor condition, is (Westerly side) cracked and patched in miscellaneous forms, and is unattractive. Sidewalk appears to drain reasonably well. BAYAVENUE ROADWAY A Street is constructed of P.C.C. and has a crown section. Street (Palm St. to Washington St.) appears to be in fair condition with approximately 0-2% longitudinal grade. Street drainage is relatively poorly due to A.C. patching, subsidence, and overall flat condition. ALLEY APPROACH B Alley approach is constructed of P.C.C. and appears to be in (Westerly side) good condition with only minor cracking. Alley approach meets current City Standards. LEGEND A = Replacement Necessary for Non -Standard and/or Non -Functional Reasons Page 9 of 22 B = Improvements Necessary for Cosmetic Reasons N/A = No Improvements Necessary mw> � M" M 1 > M�Aw i! "` M M M W i M May 29, 1992 Street Existing Priority Comments Street Improvement BAY AVENUE (Cont.) DRIVE APPROACH N/A Drive approach is relatively new P.C.C. and appears to be in (Palm St. to Washington St.) (Easterly side) good condition with only one small crack in the apron. Approximate 40 foot wide drive approach for underground parking. CURB & GUTTER N/A Curb is relatively new P.C.C. and was poured monolithically with (Easterly side) sidewalk. Curb is in good condition without any cracking (1.5 foot gutter). 6-inch curb face. CURB & GUTTER A Curb is old P.C.C. Curb is badly cracked and is non-functional. (Westerly side between Alley and 6-inch curb face. Washington Strect) CURB ONLY A Curb is constructed of P.C.C. and was poured monolithically with (Westerly side between Palm St. sidewalk. Curb is cracked and worn. 6-inch curb face. and Alley) SIDEWALK N/A Sidewalk is constructed of both red brick pavers and P.C.C. (Easterly side) Sidewalk is in good condition and has sufficient slope for drainage. SIDEWALK B Sidewalk is old P.C.C. Sidewalk is in good condition with slight (Westerly side between Palm St. cracking and has sufficient slope to drain. and Alley) SIDEWALK B Sidewalk is old P.C.C. Sidewalk is in good condition with only (Westerly side between Alley and minor cracking and has sufficient slope for drainage. The last 30 Washington St.) feet of sidewalk at Washington Street is badly cracked and should be removed. LEGEND A = Replacement Necessary for Non -Standard and/or Non -Functional Reasons B = Improvements Necessary for Cosmetic Reasons N/A = No Improvements Necessary Page 10 of 22 IM on" W as M 11 W 1 r May 29, 1992 JN 28468 Street Existing Priority Comments Street Improvement BAYAVENUE ROADWAY A Street is constructed of P.C.C. and has a crown section. Street (Washington St. to Main St.) appears to be in fair condition with approximately 1-2% longitudinal grade. Street drainage is relatively poor due to A.C. patchwork, subsidence, and overall flat condition. DRIVE APPROACH A Drive approach is old P.C.C., is cracked and in poor condition. (Easterly side) Drive approach does not meet current City Standards. DRIVE APPROACH A Drive approach is old P.C.C. and is chipped and cracked. (Westerly side) CURB ONLY B Curb is constructed of P.C.C. and was poured monolithically with (Easterly side) sidewalk. Curb is in fair to good condition. Curb is slightly cracked in places as well as being randomly chipped and marked. 6-inch curb face. CURB ONLY A Curb is old P.C.C. and was poured monolithically with sidewalk. (Westerly side) Curb is cracked and pushed outward past vertical. 6-inch curb face. SIDEWALK B Sidewalk is old P.C.C. Sidewalk is in good condition with only (Easterly side) slight cracks showing in various locations. Sidewalk has sufficient slope for drainage. There is an existing drive approach located approximately 40 feet south of Washington Street that is in poor condition and does not appear to serve a current use. This drive approach should be removed and replaced with standard curb and sidewalk along with approximately 30 feet of badly cracked curb and sidewalk just north of the drive approach. LEGEND A = Replacement Necessary for Non -Standard and/or Non -Functional Reasons Page 11 of 22 B = Improvements Necessary for Cosmetic Reasons N/A = No Improvements Necessary we va N i � M M M! °am am. an Im= 40 No M =I an M May 29, 1992 Street Existing Priority Comments Street Improvement BAYAVENUE (Cont.) SIDEWALK A Sidewalk is old P.C.C. and is badly cracked. Sidewalk is a (Washington St. to Main St) (Westerly side) tripping hazard. BAYAVENUE ROADWAY A Street is constructed of A.C. and has a tilt section. Street is in (Main Street to "A" Street) good condition and appears to be fully functional for traffic and drainage. DRIVE APPROACH N/A Drive approach is relatively new P.C.C. and appears to be in good condition. Drive approach may not meet current City Standards. CURB & GUTTER B Curb and gutter is relatively new P.C.C. and was poured monolithically with sidewalk. Curb and gutter is in good condition. Curb and gutter is slightly cracked in various spots including a 30 foot section which is cracked due to local construction. Curb face varies 3 to 10 inches. SIDEWALK B Sidewalk is relatively new P.C.C. and is in good condition. Sidewalk is slightly cracked in various spots including a 30 foot section which is cracked due to local construction. LEGEND A = Replacement Necessary for Non -Standard and/or Non -Functional Reasons B = Improvements Necessary for Cosmetic Reasons N/A = No Improvements Necessary Page 12 of 22 Im so goa l M M r qm Ift on r M as r M so May 29, 1992 M IN 28468 Existing Priority Comments Street Improvement MAIN STREET ROADWAY A Street is constructed of a combination of P.C.C. and A.C. (Ocean Front to Balboa Blvd.) between Balboa Blvd. and the alley intersection and is constructed of red -stamped P.C.C. from the alley intersection to the Ocean Front. The stamped P.C.C. section of road utilizes a flow line at the center of the street, transitioning to a crown through the A.C. and P.C.C. section between the alley and Balboa Blvd. The entire street between the Ocean Front and Balboa Blvd. is in very poor condition due to numerous cracks, subsidence, and many "dead spots" that do not drain. CURB RETURNS A Both curb returns are old P.C.C. and are substandard without (Northerly and southerly curb returns at interstetton of Main St. and Balboa Blvd.) access ramps. ALLEY A Both alley approaches are old P.C.C. Both are in poor condition APPROACHES and are substandard. DRIVE APPROACH N/A Drive approach is relatively new P.C.C. Drive approach is in good condition with only minor chipping. CURB ONLY A Curb is old P.C.C. and was poured monolithically with sidewalk. Curb is in poor condition with prevalent cracking and chipping. Curb face is non-existent in paver section and has been pushed outward past vertical. 6-inch curb face. SIDEWALK A Sidewalk is old P.C.C. Sidewalk is cracked in numerous locations and poses a tripping hazard. Sidewalk does not drain sufficiently. LEGEND A = Replacement Necessary for Non -Standard and/or Non -Functional Reasons Page 13 of 22 B = Improvements Necessary for Cosmetic Reasons N/A = No Improvements Necessary ffs no a M M � >i = W M so M i� May 29, 1992 JN 28468 Street Existing Priority Comments Street Improvement MAIN STREET ROADWAY B Street is constructed of P.C.C. and has a crown section which (Balboa Blvd. to Bay Avenue) rotates to a tilt section as it approaches Bay Avenue. Street has a longitudinal grade of 2-3% and has no obvious drainage problems. Roadway has patches in various locations and has many cracks. Street is aesthetically unpleasing. CURB RETURNS A Curb returns are old P.C.C. and do not meet current City (Both northerly and southerly Standards. curb returns at intersection of Balboa Blvd. and Main Street) CURB RETURNS A Curb returns are old P.C.C. and do not meet current City (Both easterly and westerly curb Standards. returns at intersection of Main Street and Bay Avenue) CURB RETURNS A Curb return is old P.C.C. and does not meet current City (Southerly curb return at Standards. intersection of Main Street and Bay Avenue) ALLEY APPROACH B Alley approach is old P.C.C. and appears to be in fair condition. Alley approach is chipped and marked, but fully functional. CURB ONLY A Curb is old P.C.C. and was poured monolithically with sidewalk. Curb is badly cracked in many areas and disfigured. Curb does not adequately drain in many spots. 6-inch curb face. SIDEWALK A Sidewalk is old P.C.C. Sidewalk is in poor condition and is very unattractive. Many edges are exposed and have already been identified by the City crews for repair. Many areas do not drain properly. LEGEND A = Replacement Necessary for Non -Standard and/or Non -Functional Reasons Page 14 of 22 B = Improvements Necessary for Cosmetic Reasons N/A = No Improvements Necessary r WE W = May 29, 1992 Street Fidsting Priority Comments Street Improvement PALM STREET (Ocean Front to Balboa Blvd.) ROADWAY 1 B Street is constructed of A.C. from Ocean Front to the alley intersection and is P.C.C. from the alley intersection to Balboa Blvd. Street has a crown section. The A.C. section is in good condition with some patchwork and subsidence evident. The P.C.C. section is in fair to good condition with some cracking that has been filled with joint sealer. Although there were no obvious drainage problems, the street may have some dead spots due to subsidence and flat grade. CURB RETURN B Curb return is old P.C.C. Curb return is not cracked and meets (Northerly curb return at intersection of Palm Street and Balboa Blvd.) City Standards. CURB RETURN B Curb return is old P.C.C. Curb return is slightly cracked but (Southerly curb return at intersection of Palm Street and Balboa Blvd.) meets City Standards. ALLEY APPROACH (Northerly side) N/A Alley approach is relatively new P.C.C. Alley approach is in good condition with no cracking and meets City standards. ALLEY APPROACH A Alley approach is relatively old P.C.C. Alley approach has large (Southerly side) cracks in apron and is unattractive. DRIVE APPROACH N/A Drive approach is relatively new P.C.C. Drive approach is in good condition and meets City Standards. CURB ONLY A Curb is old P.C.C. Curb is badly cracked and worn. 4-inch curb (Between Alley and Balboa Blvd.) face. LEGEND A = Replacement Necessary for Non -Standard and/or Non -Functional Reasons B = Improvements Necessary for Cosmetic Reasons N/A = No Improvements Necessary Page 15 of 22 r = W May 29, 1992 M M s M M M M M M= M r wo so M JN 28468 Street Existing Priority Comments Street Improvement PALM ST. (Cont.) CURB & GUTTER B Curb and gutter is constructed of P.C.C. Curb and gutter (Ocean Front to Balboa Blvd.) (Between Ocean Front and Alley) appears to be in good condition with slight cracking and chipping in some spots. Curb is fully functional. 6-inch curb face. SIDEWALK A Sidewalk is old P.C.C. and is slightly cracked in many areas. (Northerly side between Alley Sidewalk has been previously patched and still poses a tripping and Balboa Blvd.) hazard. Sidewalk is unattractive. SIDEWALK A Sidewalk is old P.C.C. and is cracked and patched in many areas. (Southerly side between Alley Sidewalk poses a tripping hazard and is unattractive. and Balboa Blvd.) SIDEWALK B Sidewalk is old P.C.C. with minor cracking and old chewing gum (Between Ocean Front and Ailey) stuck to the surface. Sidewalk has sufficient slope to drain. PALM STREET ROADWAY B Street is constructed of P.C.C. and has a crown section. Street (Balboa Blvd. to Bay Ave.) has been patched with A.C. due to sewer main construction. Street is in good condition with longitudinal grade of 1-2%. Subsidence is evident in some locations, but there are no obvious drainage concerns. CURB RETURNS N/A Curb returns are constructed of P.C.C. and are in good condition. (Northerly and southerly curb Curb returns meet current City standards. returns at intersection of Balboa Blvd. and Palm Street) CURB RETURN N/A Curb return is constructed of P.C.C. and is in good condition. (Northerly curb =tum at Curb return meets current City standards. intersection of Bay Avenue and Palm Street) LEGEND A = Replacement Necessary for Non -Standard and/or Non -Functional Reasons Page 16 of 22 B = Improvements Necessary for Cosmetic Reasons N/A = No Improvements Necessary Imm m m w i m m r• i m m m as WU M M J• May 29, 1992 Street Existing Priority Comments Street Improvement PALM ST. (Cont.) CURB RETURN A Curb return is old P.C.C. Curb return does not meet current (Balboa Blvd. to Bay Ave.) (Southerly curb return at City standards as it is without an access ramp. intersection of Bay Avenue and Palm Street) ALLEY APPROACH A Alley approach is old P.C.C. Alley approach is cracked and patched with A.C. It is unattractive and does not meet City Standards. DRIVE APPROACH A Drive approach is old P.C.C. Drive approach is cracked and (Northerly side) does not meet current City Standards. DRIVE APPROACH N/A Drive approach is relatively new P.C.C. Drive approach appears (southerly side) to be in good condition and meets City Standards. CURB ONLY A Curb is old P.C.C. and was poured monolithically with sidewalk. (Northerly side between Balboa Curb is severely cracked and chipped. 6-inch curb face. Blvd. and Alley) CURB ONLY B Curb is old P.C.C. and was poured monolithically with sidewalk. (Northerly side between Alley Curb appears to be in fair to good condition with slight cracking. and Bay Avenue) 6-inch curb face. CURB & GUTTER A Curb and gutter is constructed of P.C.C. Curb appears to be in (southerly side) poor condition with cracking and chipping prevalent. SIDEWALK N/A Sidewalk is relatively new P.C.C. Sidewalk appears to be in good (Southerly side between Balboa condition without any cracking and has sufficient slope for Blvd. and Alley) drainage. LEGEND A = Replacement Necessary for Non -Standard and/or Non -Functional Reasons Page 17 of 22 B = Improvements Necessary for Cosmetic Reasons N/A = No Improvements Necessary � M M = M M = M M= M= r M M�=1 M May 29, 1992 Street Existing Priority Comments Street Improvement PALM ST (Cant.) SIDEWALK B Sidewalk is relatively old P.C.C. Sidewalk appears to be in good (Balboa Blvd. to Bay Ave.) (Southerly side between Alley condition except for a small edge that may be a tripping hazard. and Bay Avenue) Sidewalk has sufficient slope for drainage. PALM STREET ROADWAY N/A Street is relatively new P.C.C. Street has a standard section. (Bay St. to Edgewater) Street appears to be in good condition with no apparent drainage problems. CURB RETURNS N/A Curb returns are relatively new P.C.C. Curb returns appear to (Northerly and southerly curb be in good condition and meet current City Standards. returns at intersection of Palm Street and Main Street) CURB & GUTTER N/A Curb and gutter is relatively new P.C.C. Curb and gutter appears to be in good condition without any cracking or drainage problems. SIDEWALK N/A Sidewalk is relatively new P.C.C. Sidewalk appears to be in good condition without any cracking and has sufficient slope for drainage. 6-inch curb face. WASHINGTON ST ROADWAY B Street is constructed of A.C. from Ocean Front to the alley intersection, and is P.C.C. from the alley intersection to Balboa (Ocean Front to Balboa Blvd.) Blvd. Street has a crown section and appears to be in good condition with slight cracking in the P.C.C. section of roadway only. No subsidence evident. Street is fully functional for both traffic and drainage. CURB RETURN N/A Curb return is relatively new P.C.C. Curb return appears to be (Northerly curb return at in good condition and meets current City Standards. intersection of Washington St. and Balboa Blvd.) LEGEND A = Replacement Necessary for Non -Standard and/or Non -Functional Reasons B = Improvements Necessary for Cosmetic Reasons N/A = No Improvements Necessary Page 18 of 22 M = = = = M May 29, 1992 Street Existing Priority Comments Street Improvement WASHINGTON ST_ CURB RETURN (Southerly curb return at A Curb return is relatively old P.C.C. Curb return appears to be in poor condition and does not meet current City Standards as it is (font.) (Ocean Front to Balboa Blvd.) intersection of Washington St. and Balboa Blvd.) without an access ramp. ALLEY APPROACH B Alley approach is old P.C.C. Alley approach appears to be in (Northerly side) fair condition but is slightly cracked. Alley approach is fully functional. ALLEY APPROACH A Alley approach is old P.C.C. Alley approach appears to be in (Southerly side) poor condition with large cracks. DRIVE APPROACH N/A Drive approach is relatively new P.C.C. Drive approach appears (Northerly side) to be in good condition without any cracking. DRIVE APPROACH A Drive approach is relatively old P.C.C. Drive approach appears (Southerly side) to be in poor condition and does not meet current City Standards. CURB & GUTTER N/A Curb and gutter is relatively new P.C.C. Curb and gutter (Northerly side between Ocean appears to be in good condition without any cracking except for Front and Alley) one small crack in gutter. Curb and gutter is fully functional. 4 to 8 inch curb face. CURB & GUTTER B Curb and gutter is both new and old P.C.C. Curb and gutter (Southerly side between Ocean appears to be in fair condition with minor cracking and chipping. Front and Alley) Curb and gutter is fully functional. 6-inch curb face. CURB ONLY N/A Curb is relatively old P.C.C. Curb was poured monolithically (Northerly side between Alley with sidewalk and appears to be in good condition. Curb has no and Balboa Blvd.) I cracking or chipping present. S to 6 inch curb face. LEGEND A = Replacement Necessary for Non -Standard and/or Non -Functional Reasons B = Improvements Necessary for Cosmetic Reasons N/A = No Improvements Necessary Page 19 of 22 M = May 29, 1992 Street Existing Priority Comments Street Improvement WASHINGTON ST. CURB ONLY (Southerly side between Alley A Curb is constructed of relatively old P.C.C. and was poured monolithically with sidewalk. Curb appears to be in poor (font.) (Ocean Front to Balboa Blvd.) and Balboa Blvd.) condition with cracking and chipping. 6-inch curb face. SIDEWALK N/A Sidewalk is relatively new P.C.C. Sidewalk appears to be in good (Northerly side between Ocean condition with no cracking. Sidewalk has sufficient slope for Front and Alley) drainage. SIDEWALK B Sidewalk is relatively old P.C.C. Sidewalk appears to be in fair (Southerly side between Ocean condition with some cracking and chipping. Sidewalk is Front and Alley) functional with sufficient slope for drainage. SIDEWALK N/A Sidewalk is relatively new P.C.C. Sidewalk appears to be in good (Northerly side between Alley condition with no cracks and has sufficient slope for drainage. and Balboa Blvd.) SIDEWALK A Sidewalk is relatively new P.C.C. and appears to be in good (Southerly side between Alley condition with no cracks. Sidewalk has sufficient slope for and Balboa Blvd.) drainage. WASHINGTON ST. ROADWAY I A Street is relatively old P.C.C. and has a crown section. Street appears to be in fair condition with lateral cracks which have (Balboa Blvd. to Bay Avenue) been filled with joint sealer. Street has approximately 2% longitudinal grade and drains relatively well, except at intersection of Washington Street and Bay Avenue where subsidence is causing ponding of water. CURB RETURNS A Curb returns are relatively old P.C.C. Curb returns do not meet (Northerly and southerly curb current City Standards as they are without access ramps. returns at intersection of Balboa Blvd. and Washington Street) LEGEND A = Replacement Necessary for Non -Standard and/or Non -Functional Reasons B = Improvements Necessary for Cosmetic Reasons N/A = No Improvements Necessary Page 20 of 22 M May 29, 1992 Street WASHINGT( (Cont.) (Balboa Blvd. to Ba; LEGEND A = Replacement Necessary for Non -Standard and/or Non -Functional Reasons Page 21 of 22 B = Improvements Necessary for Cosmetic Reasons N/A = No Improvements Necessary i= M = = M= M M M M = = = = M May 29, 1992 t- JN 28468 Street Existing Priority Comments Street Improvement ALLEY ALLEY N/A Alley is constructed of P.C.C. and appears to be in good (East of Balboa Blvd. between condition with sufficient slope for drainage. "A" Street and Main Street) ALLEY ALLEY N/A Alley is constructed of A.C. and appears to be in good condition (East of Balboa Blvd. between with sufficient slope for drainage. Washington Street and Main Street) ALLEY ALLEY N/A Alley is constructed of A.C. and appears to be in good condition (East of Balboa Blvd. between with sufficient slope for drainage. Palm Street and Washington Street) ALLEY ALLEY A Alley is constructed of A.C. and P.C.C. A.C. section appears to (East of Balboa Blvd. between be in poor condition with insufficient slope for drainage. Adams and Palm Street) ALLEY ALLEY N/A Alley is constructed of P.C.C. and appears to be in good (West of Balboa Blvd. between condition with sufficient slope for drainage. "A" Street and Main Street) ALLEY ALLEY N/A Alley is constructed of P.C.C. and appears to be in good (West of Balboa Blvd. between condition with sufficient slope for drainage. Washington St. and Palm St.) ALLEY ALLEY N/A Alley is constructed of P.C.C. and appears to be in good (West of Balboa Blvd. between condition with sufficient slope for drainage. Palm St. and Adams St.) ALLEY ALLEY N/A Alley is constructed of P.C.C. and appears to be in good (West of Balboa Blvd. between condition with sufficient slope for drainage. Main St. and Washington St.) LEGEND A = Replacement Necessary for Non -Standard and/or Non -Functional Reasons Page 22 of 22 B = Improvements Necessary for Cosmetic Reasons N/A = No Improvements Necessary