Loading...
HomeMy WebLinkAboutF2023-0038 - Miscf'- Z_aZ_-t_ CITY OF NEW -PORT BEACH COM�WNffYDEVELOPAMWDEPARTAONT BUELDIN G. DIVBION 100 Civic Center Drive I PA Box 1768 1 Newport Beach, CA 92658-8915 www.newpoitbeachca.gov 1 (949) 644-3200 jul YES NO 1. Riser Construction and Location Approval a. Drain valve ❑ b. Backfiaw device (single check) El c. Bell activation device n d. Inspector's test valve F1 a. Riser sized per approved plans 2. Pressure Test a. System tested at operating pressure for 2 hours ❑ b. Pressure gauge Installed El 3. Sprinkler Heads shall not be Installed In the fittinas r)rlor to the fittinas being cemented In glace, (temporary test oiggs) a. Installation and spacing of temporary test plugs 4. Pi in a. Material installed per plan ❑ b. Hangers per codes/prevent upward movement El c. All CPVC piping shall be installed by persons who have been certified by the manufacturer for installation of CPVC piping ❑ d. Piping protected from damage 5. Bell a. Wiring Installed per code ❑ b. Boxes Installed at proper locations ❑ NOTE:. CPVC plastic pipe In the garage shall not be exposed. Sprinklers that are listed as 'Quick Response" or "Residential" must be used. CORRECTIONS AND NOTES: FFIRE SPPJNKLER NFPA 130 SYSTEM ROUGH INSPECTION APPROVED. «A I , PERMIT #-_jE,2_A.2 I --�. 0 0 BY:- IVA XY1411 4v4 ro DATE: 03-1 - a % Farms\Rre Sprinider NFPA 130 System -Rough Inspection Checklist 05/12/201.5 P0 C11rff 0-F ORT BEACH COWMIUNM DEVELOPMENT DEPARTMENT BUILDINGPIVMON 4L40% 100 Civic Center Drive P.O, 86port Beach, CA 92658-8915 1k..1768 I New www,tiewportheachca..gov ( (949) 644-3200 I . M SPRENICLER NFPA 13D SYSTEM FINAL CRECKLID A (RESIDENTIAL) 1. Water meter proper size EJ 2. Fire sprinkler system installed per the approved plans El 3. All construction covers removed from sprinkler heads F-1 4. Cover plates are NOT to be installed, but shall be available on the jobsite El 5. All tape and paint removed from sprinkler heads El 6. Finish trim installed around sprinkler heads E-] 7. Proper signage posted at all required locations ❑ S. - Flow test conducted and bell tested/ El 9. Location of inspector's testing valve In approved location El SYSTEMS: 10. Clearances around sprinkler heads and riser - no obstructions El 11. Operating pressure gauge installed at riser showing proper water pressure ❑ 12. Back flow preventer installed EJ 13. System Installed per manufacturers specifications NOTES: FIRE SPRINKLER NFPA 13D SYSTEM FINAL APPROVED: PERMIT BY: DATE: —L-A rarms\ Fire Sprinkler NFPA 130 System - FINAL Checklist RESIDENTIAL 05/12/2015