HomeMy WebLinkAboutF2023-0038 - Miscf'- Z_aZ_-t_
CITY OF NEW -PORT BEACH
COM�WNffYDEVELOPAMWDEPARTAONT
BUELDIN G. DIVBION
100 Civic Center Drive I PA Box 1768 1 Newport Beach, CA 92658-8915
www.newpoitbeachca.gov 1 (949) 644-3200
jul
YES
NO
1.
Riser Construction and Location Approval
a. Drain valve
❑
b. Backfiaw device (single check)
El
c. Bell activation device
n
d. Inspector's test valve
F1
a. Riser sized per approved plans
2.
Pressure Test
a. System tested at operating pressure for 2 hours
❑
b. Pressure gauge Installed
El
3.
Sprinkler Heads shall not be Installed In the fittinas r)rlor to the fittinas
being cemented In glace, (temporary test oiggs)
a. Installation and spacing of temporary test plugs
4.
Pi in
a. Material installed per plan
❑
b. Hangers per codes/prevent upward movement
El
c. All CPVC piping shall be installed by persons who have been
certified by the manufacturer for installation of CPVC piping
❑
d. Piping protected from damage
5.
Bell
a. Wiring Installed per code
❑
b. Boxes Installed at proper locations
❑
NOTE:.
CPVC plastic pipe In the garage shall not be exposed. Sprinklers that are listed as
'Quick
Response" or "Residential" must be used.
CORRECTIONS AND NOTES:
FFIRE SPPJNKLER NFPA 130 SYSTEM ROUGH INSPECTION APPROVED.
«A I , PERMIT #-_jE,2_A.2 I --�. 0 0
BY:- IVA XY1411 4v4 ro DATE: 03-1 - a %
Farms\Rre Sprinider NFPA 130 System -Rough Inspection Checklist 05/12/201.5
P0 C11rff 0-F ORT BEACH
COWMIUNM DEVELOPMENT DEPARTMENT
BUILDINGPIVMON
4L40% 100 Civic Center Drive P.O, 86port Beach, CA 92658-8915
1k..1768 I New
www,tiewportheachca..gov ( (949) 644-3200
I . M SPRENICLER NFPA 13D SYSTEM
FINAL CRECKLID A
(RESIDENTIAL)
1.
Water meter proper size
EJ
2.
Fire sprinkler system installed per the approved plans
El
3.
All construction covers removed from sprinkler heads
F-1
4.
Cover plates are NOT to be installed, but shall be available on the jobsite
El
5.
All tape and paint removed from sprinkler heads
El
6.
Finish trim installed around sprinkler heads
E-]
7.
Proper signage posted at all required locations
❑
S.
-
Flow test conducted and bell tested/
El
9.
Location of inspector's testing valve In approved location
El
SYSTEMS:
10.
Clearances around sprinkler heads and riser - no obstructions
El
11.
Operating pressure gauge installed at riser showing proper water pressure
❑
12.
Back flow preventer installed
EJ
13.
System Installed per manufacturers specifications
NOTES:
FIRE SPRINKLER NFPA 13D SYSTEM FINAL APPROVED:
PERMIT
BY: DATE: —L-A
rarms\ Fire Sprinkler NFPA 130 System - FINAL Checklist RESIDENTIAL 05/12/2015