Water meter proper size 1-1
P
-.:_ {. d.." system Y.:'le per the approved plans I.
■
3,
Ali construction covers removed from sprinkler heads
4.
Cover phttes are NOT to be installed, but shall be available on the Y • 7 '. �■
5.
AX tape and paint removed fi-om sprinider heads
&
Finish trim installed around sprinkler heads
7
Proper signage posted at all required locations
0
a.
Flow e conducted and W tested .,
■
9.
Location of inspector's testing valve in approved location
SYSTEMS:
10. Clearances around sprinkler treads and riser -rya obstructions ❑
11. Operating pressure gauge instated at riser shoWng proper grater pressure ❑
12. Back flow preventer installed ❑
13. System installed per manufacturers specdflcations ❑
NOTES:
FIRE SPPJNKLER NFPA 13D SYSTEM APPROVED'
parr*
Farms\ Fire Spdnkfer NFFA M System-FfrgAL ChmkIM RESIDEPMAL USIIVM15
YES
NO
1. Riser Construction and Location Approval
a. Drain valve
❑
b_ Backffow device (single check)
❑
c. sell acfivaWn deEice
❑
d. Inspector's test valve
e. Riser slued per approved plans
2. Pressure Vest
a_ System, tested at operating pressure far 2 hams
❑
b- Pressure gauge instaW
❑
3. Sprinkler Reads shag not be installed in the fffings prior to the fitfig-gg
being cemented in dace (tempgM test MUM
a.. Instat[ation and spacing of tempomry test plugs
u
4_ ff i ffl
a. Material installed per plan F❑
b. Mangers per codes/prevent upward movement El
❑
c. All CPVC gaping shall be installed by persons who have been E I❑
certified by the manufacturer fbr instaltation of CPVC piping
d. Piping protected from damage E I.❑
5. Bell
a. Widng Installed per code
j
❑
b. Boxes installed at proper tacaiions
❑
CPVC plastic piippe�ii�ngthe garage not be exposed. Sprinklers that are fisted as'Quick
[NOTE:
j ,,jshag
Respoi�3s/1�'' or(�'fRG,{t�ideenSa[ l must be used.
CORRECTIONS AND NOTES: