HomeMy WebLinkAboutRW090041_068t0000003mO1qAAE_Final Inspection RecordCounty of Orange
OC Public Works Main Office
300 N. Flower Street
Santa Ana, CA 92702-4048
FOR INSPECTIONS Visit us on the web at: http://www.ocplanning.net
WALLS AND FENCES INSPECTION RECORD
Building Permit Number:RW090041 Date:02/08/2013
Description of Use:New Site Retaining Walls for New SFD - Wall C and D - Front Right Side Location, 107' in length, 11' Max Height, 1177 sqft total; REV 1, revised site retaining walls from pour-in place to CMU, revised thickness from 6" to 8" referenced backfill specs to match approved soils report, removed caisson notes on details to match approved soils report
INSPECTION RESULTS
Approved Inspection Items
Inspection Type(s)Inspected On Approved By
PF-Permit Final 02/08/2013 Jeff Heard
195-Structural Final 02/07/2013 Thomas Dawson
965-Miscellaneous 09/27/2012 Thomas Dawson
965-Miscellaneous 09/19/2012 Thomas Dawson
965-Miscellaneous 09/05/2012 Thomas Dawson
965-Miscellaneous 08/27/2012 Doug Scott
965-Miscellaneous 08/15/2012 Thomas Dawson
965-Miscellaneous 08/09/2012 Thomas Dawson
123-Subdrain 05/21/2012 Thomas Dawson
120-Masonry/Grout Lift 05/14/2012 Thomas Dawson
105-Foundation/loc/hardware 05/09/2012 Thomas Dawson
901-Npdes Inspection 01/05/2012 Scott Priegel
901-Npdes Inspection 02/04/2011 Scott Priegel
Page 1 of 2
Building Permit Number:RW090041 Date:02/08/2013
Description of Use:New Site Retaining Walls for New SFD - Wall C and D - Front Right Side Location, 107' in length, 11' Max Height, 1177 sqft total; REV 1, revised site retaining walls from pour-in place to CMU, revised thickness from 6" to 8" referenced backfill specs to match approved soils report, removed caisson notes on details to match approved soils report
INSPECTION HISTORY
All Inspection Items
Requested Assigned Inspection Inspection Inspection Inspection Inspected
On To Order Type(s)On Status By
02/07/2013 Jeff Heard 0/10 PF-Permit Final 02/08/2013 Approved Jeff Heard
02/07/2013 Thomas Dawson 5/11 195-Structural Final 02/07/2013 Approved Thomas Dawson
09/27/2012 Thomas Dawson 3/16 965-Miscellaneous 09/27/2012 Approved Thomas Dawson
09/19/2012 Thomas Dawson 9/17 965-Miscellaneous 09/19/2012 Approved Thomas Dawson
09/05/2012 Thomas Dawson 8/12 965-Miscellaneous 09/05/2012 Approved Thomas Dawson
08/23/2012 Doug Scott 4/18 965-Miscellaneous 08/27/2012 Approved Doug Scott
08/15/2012 Thomas Dawson 6/7 965-Miscellaneous 08/15/2012 Approved Thomas Dawson
08/09/2012 Thomas Dawson 4/11 965-Miscellaneous 08/09/2012 Approved Thomas Dawson
05/21/2012 Thomas Dawson 8/10 123-Subdrain 05/21/2012 Approved Thomas Dawson
05/14/2012 Thomas Dawson 25/28 120-Masonry/Grout Lift 05/14/2012 Approved Thomas Dawson
05/09/2012 Thomas Dawson 13/19 105-Foundation/loc/hardware 05/09/2012 Approved Thomas Dawson
01/05/2012 Scott Priegel 23/49 901-Npdes Inspection 01/05/2012 Approved Scott Priegel
02/04/2011 Scott Priegel 5/20 901-Npdes Inspection 02/04/2011 Approved Scott Priegel
03/26/2009 Jerry Anderson 23/28 899-Inspection Building Plan Check 03/26/2009 Grading Permit
Required Jerry Anderson
02/07/2013 Doug Scott 0/11 PF-Permit Final
Page 2 of 2