Loading...
HomeMy WebLinkAboutRW090042_Final Inspection RecordCounty of Orange OC Public Works Main Office 300 N. Flower Street Santa Ana, CA 92702-4048 FOR INSPECTIONS Visit us on the web at: http://www.ocplanning.net WALLS AND FENCES INSPECTION RECORD Building Permit Number:RW090042 Date:02/08/2013 Description of Use:New Site Retaining Walls for New SFD - Wall E and F, Front Left Side location, 88' in length, 11' Max height, 968 sqft total; REV 1, revised site retaining walls from pour-in place to CMU, revised thickness from 6" to 8" referenced backfill specs to match approved soils report, removed caisson notes on details to match approved soils report INSPECTION RESULTS Approved Inspection Items Inspection Type(s)Inspected On Approved By PF-Permit Final 02/08/2013 Jeff Heard 195-Structural Final 02/07/2013 Thomas Dawson 965-Miscellaneous 09/27/2012 Thomas Dawson 965-Miscellaneous 09/19/2012 Thomas Dawson 105-Foundation/loc/hardware 09/05/2012 Thomas Dawson 123-Subdrain 08/27/2012 Doug Scott 120-Masonry/Grout Lift 08/15/2012 Thomas Dawson 901-Npdes Inspection 01/05/2012 Scott Priegel 901-Npdes Inspection 02/04/2011 Scott Priegel Page 1 of 2 Building Permit Number:RW090042 Date:02/08/2013 Description of Use:New Site Retaining Walls for New SFD - Wall E and F, Front Left Side location, 88' in length, 11' Max height, 968 sqft total; REV 1, revised site retaining walls from pour-in place to CMU, revised thickness from 6" to 8" referenced backfill specs to match approved soils report, removed caisson notes on details to match approved soils report INSPECTION HISTORY All Inspection Items Requested Assigned Inspection Inspection Inspection Inspection Inspected On To Order Type(s)On Status By 02/07/2013 Jeff Heard 0/10 PF-Permit Final 02/08/2013 Approved Jeff Heard 02/07/2013 Thomas Dawson 4/11 195-Structural Final 02/07/2013 Approved Thomas Dawson 09/27/2012 Thomas Dawson 2/16 965-Miscellaneous 09/27/2012 Approved Thomas Dawson 09/19/2012 Thomas Dawson 10/17 965-Miscellaneous 09/19/2012 Approved Thomas Dawson 09/05/2012 Thomas Dawson 7/12 105-Foundation/loc/hardware 09/05/2012 Approved Thomas Dawson 08/23/2012 Doug Scott 5/18 123-Subdrain 08/27/2012 Approved Doug Scott 08/15/2012 Thomas Dawson 5/7 120-Masonry/Grout Lift 08/15/2012 Approved Thomas Dawson 08/09/2012 Thomas Dawson 2/11 105-Foundation/loc/hardware 08/09/2012 Partial Approval Thomas Dawson 01/05/2012 Scott Priegel 24/49 901-Npdes Inspection 01/05/2012 Approved Scott Priegel 02/04/2011 Scott Priegel 6/20 901-Npdes Inspection 02/04/2011 Approved Scott Priegel 03/26/2009 Jerry Anderson 22/28 899-Inspection Building Plan Check 03/26/2009 Grading Permit Required Jerry Anderson 02/07/2013 Doug Scott 0/11 PF-Permit Final Page 2 of 2