HomeMy WebLinkAboutSW110080_Correction List (2)County of Orange
OC Public Works
OC Planning
Main Office
300 N. Flower Street
Santa Ana, CA 92702-4048
Residential Plan Check Corrections
It is the responsibility of the applicant to satisfy the requirements (clearances) of each of the departments listed in this document.
Normally, each section will stamp your plans indicating their approval.
To view your plan check status and the latest correction list on the Internet, please visit: http://www.ocplanning.net and click on
'Plan Check Status' Link.
Please note that Planning and Development Services (PDS) Public Counter Hours are open Monday thru Friday
from 7:30 a.m. to 5:00 p.m. except holidays.
Project Number:SW110080
Submittal Date:Sep 26, 2011
CBC Edition: 2007
Plan Check Date: 9/30/2011 3:23 PM
Description:New gunite swimming
pool with attached
spa (1101 sqft.)
on caissons; new
pool equipment
- heater, filter
and pump.
Job Address
21 AVALON VISTA
NEWPORT COAST, CA
Owner Address
Amir Safaei
250 Baker St.
#200
Costa Mesa CA92626
1st Plan Check 6/24/11 1st Recheck 8/8/11 2nd Recheck 8/9/11 Current - 1st Revision
Plan Checked By Contact Address
Terry Johnson
33881 Mariana Dr., Suite #A
Dana Point CA92629
949-939-7118
949-831-5933 FAX
terryjohnson@cox.net
Page 1 of 5
SW110080
GENERAL INFORMATION
Application for which no permit is issued within 180 days following the date of application shall expire by limitation.
An extension of 180 days may be granted upon written request showing circumstances beyond the control of the applicant
have prevented action being taken. In order to renew action for an application after expiration, the applicant
shall resubmit plans and pay a new plan check fee. Sec. 107.4.
At building permit issuance, one (1) additional set of plans consisting of summary or title sheet, plot plan, floor
plans and elevations shall be required for the Assessor´s Office.
INFORMATION
Valid Worker´s Compensation Certificate or Owner-Builder Verification is required prior to issuance of building
permits.
Recheck by appointment only. Call your Plan Checker for recheck appointment. The correction list is available on
the Internet at www.ocplanning.net
Page 2 of 5 9/30/2011 3:23 PM
SW110080
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) NOTES
Notes must be shown as worded, on the title sheet of the plan
1. In the case of emergency, call___________________at Work Phone #___________________or Home Phone #_________
__________.
2. Sediment from areas disturbed by construction shall be retained on site using structural controls to the maximum
extent practicable.
3. Stockpiles of soil shall be properly contained to minimize sediment transport from the site to streets, drainage
facilities or adjacent properties via runoff, vehicle tacking, or wind.
4. Appropriate BMP's for construction-related materials, wastes, spills shall be implemented to minimize transport
from the site to streets, drainage facilities, or adjoining properties by wind or runoff.
5. Runoff from equipment and vehicle washing shall be contained at construction sites unless treated to reduce
or remove sediment and other pollutants.
6. All construction contractor and subcontractor personnel are to be made aware or the required best management
practices and good housekeeping measures for the project site and any associated construction staging areas.
7. At the end of each day of construction activity all construction debris and waste materials shall be collected
and properly disposed in trash or recycle bins.
8. Construction sites shall be maintained in such a condition that an anticipated storm does not carry wastes or
pollutants off the site. Discharges of material other than stormwater only when necessary for performance and
completion of construction practices and where they do not: cause or contribute to a violation of any water quality
standard; cause or threaten to cause pollution, contamination, or nuisance; or contain a hazardous substance in
a quantity reportable under Federal Regulations 40 CFR Parts 117 and 302.
9. Potential pollutants include but are not limited to: solid or liquid chemical spills; wastes from paints, stains,
sealants, glues, limes, pesticides, herbicides, wood preservatives and solvents; asbestos fibers, paint flakes
or stucco fragments; fuels, oils, lubricants, and hydraulic, radiator or battery fluids; fertilizers, vehicle/equipment
wash water and concrete wash water; concrete, detergent or floatable wastes; wastes from any engine/equipment
steam cleaning or chemical degreasing and superchlorinated potable water line flushing.
During construction, permittee shall dispose of such materials in a specified and controlled temporary area on
-site, physically separated from potential stormwater runoff, with ultimate disposal in accordance with local,
state and federal requirements.
10. Dewatering of contaminated groundwater, or discharging contaminated soils via surface erosion is prohibited.
Dewatering of non-contaminated groundwater requires a National Pollutant Discharge Elimination System Permit from
the respective State Regional Water Quality Control Board.
11. Graded areas on the permitted area perimeter must drain away from the face of slopes at the conclusion of each
working day. Drainage is to be directed toward desilting facilities.
12. The permittee and contractor shall be responsible and shall take necessary precautions to prevent public trespass
onto areas where impounded water creates a hazardous condition.
13. The permittee and contractor shall inspect the erosion control work and insure that the work is in accordance
with the approved plans.
14. The permittee shall notify all general contractors, subcontractors, material suppliers, lessees, and property
owners: that dumping of chemicals into the storm drain system or the watershed is prohibited.
15. Equipment and workers for emergency work shall be made available at all times during the rainy season. Necessary
materials shall be available on site and stockpiled at convenient locations to facilitate rapid construction of
temporary devices when rain is imminent.
16. All removable erosion protective devices shall be in place at the end of each working day when the 5-Day Rain
Probability Forecast exceeds 40%.
Page 3 of 5 9/30/2011 3:23 PM
SW110080
17. Sediments from areas disturbed by construction shall be retained on site using an effective combination of
erosion and sediment controls to the maximum extent practicable, and stockpiles of soil shall be properly containted
to minimize sediment transport from the site to streets, drainage facilities of adjacent properties via runoff,
vehicle tracking, or wind.
18. Appropriate BMPs for construction-related materials, wastes, spills or residues shall be implemented and retained
on site to minimize transport from the site to streets, drainage facilities, or adjoining property by wind or
runoff.
Page 4 of 5 9/30/2011 3:23 PM
SW110080
Residential Plan Check Corrections
Sheet Comments By
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
L. Nguyen1 In your responses, please refer to the alpha-numeric reference numbers that are
shown at the start of each of the following correction items.
Pending L. Nguyen2 Caisson Design : Lateral Load : Revise calculation for revised shorter
Lenghts of Caissons .
Revise Design of Caissons as Concrete Columns with combined Axial Load
and Lateral Creep force load = 1,000 lbs per foot to comply with attached
Section 1810.2 of 2010 CBC : Design and Analysis of Deep Foundation and
Chapter 10 ,Section 10.10.4.1 of ACI 318-08: Structural Concrete ) due
to revised lengths ( shorter) of Caissons
Page 5 of 5 9/30/2011 3:23 PM = Indicates line item not Cleared.