Loading...
HomeMy WebLinkAboutM2022-0059 - Misc (6)80' ADA GANGWAY PROPERTY LINE 6057938.6510, 2171797.7000 LIMIT OF LAND SIDE EXCAVATION PROPOSED BULKHEAD WALL ALIGNMENT TEMPORARY SHORING (IF REQUIRED) GRADE AND COMPACT SLOPE AND PLACE GEOTEXTILE FILTER FABRIC AND ARMOR ROCK PER SECTION CALLOUTS. 2H:1V SLOPE ROCK REVETMENT EXISTING FACE OF SEAWALL TO BE DEMOLISH PROPOSED FLOATING DOCK EXPANSION BULKHEAD LINE 2' WALL OFFSET Ø6' DSM COLUMN (TYPICAL) 4' DSM SPACING (TYPICAL) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 SCALE IN FEET 0 10'-0" 20'-0" N No. Description Date Sheet No. Project Number: Engineer of Record: THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED USING A DIGITAL SIGNATURE. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES. Use of Proposals and Designs Designs, sketches, specifications, and/or proposals ("Designs") prepared by Keller North America ("KNA") and/or it's employees have been prepared for exclusive use by KNA and based upon, and in anticipation of, KNA performing the work called for in such Designs. KNA makes no warranties or guarantees as to the suitability of the Design for use by others. The Designs are subject to protection under the Copyright Act of 1976 and Architectural Works Copyright Protection Act of 1990. Use, control, reproduction, publication, or dissemination of such Designs without the prior written consent of an authorized representative of KNA is strictly prohibited. KNA is, and shall continue to be, the sole owner of the Designs. Date: Cr e a t e d B y : Drawn by: Design by: Checked by: Approved by: 1" 0" 1" 1/ 2 " BA L B O A M A R I N A E X P A N S I O N 20 1 E C O A S T H W Y N E W P O R T B E A C H , C A 9 2 6 6 0 16121145 06/19/2023 Jim Gingery Fi r s t I n t i a l L a s t N a m e JRGMM JRGSPB 17461 DERIAN AVENUE SUITE 106 IRVINE, CA 92614 909-393-9300 California 0 FOR REVIEW 05/10/2023 C: \ U s e r s \ J o h n . I n t r i e r i \ A p p D a t a \ L o c a l \ M i c r o s o f t \ W i n d o w s \ I N e t C a c h e \ C o n t e n t . O u t l o o k \ V 7 H F 1 7 C J \ 1 6 1 2 1 1 4 5 B a l b o a M a r i n a E x p a n s i o n R e v . 0 . d w g 6/ 1 4 / 2 0 2 3 9 : 3 9 : 4 2 A M www.Keller-na.com TA S T N LFEOCA RFIO AI JAM E S R .GIN G E R Y REGISTER E D P RO FESSIONAL E N G I N E ER G EOTECHN I C A L EXPIRES: 12/31/2023 KNA-2 DS M L A Y O U T LEGEND: Ø6' DEEP SOIL MIX COLUMN (DSM). INSTALL 30.5' FROM THE EXISTING GROUND SURFACE EL. 10.5' Ø6' DEEP SOIL MIX COLUMN (DSM). INSTALL 18' FROM THE EXISTING GROUND SURFACE EL. 10.5' 1 AS-BUILT 06/19/2023 1 Atwell, Lauren From:Grace Bowman <Bowman@PowerEngConstruction.com> Sent:Wednesday, August 30, 2023 9:11 AM To:Atwell, Lauren; Josh Westling Cc:Scott Williams; Joe Macias; Holcomb, Jerry Subject:RE: Balboa Marina - Bulkhead Wall Footing Pour #2 CAUTION: This email originated from outside of the organiza on. Hi Lauren, Please see photo of dowels installed for foo ng pour #2: Thank you, Grace Bowman Project Engineer cell: (831) 818-9168 4 4 EJ From: Grace Bowman <Bowman@PowerEngConstruc on.com> Sent: Tuesday, November 28, 2023 9:26 AM To: Atwell, Lauren; Josh Westling Cc: Sco0 Williams; Joe Macias; Holcomb, Jerry Subject: RE: Balboa Marina - Bulkhead Wall Foo ng Pour #3 CAUTION: This email originated from outside of the organiza on. Hi Lauren, I am compiling all stem wall reports/inspec ons and no ced Foo ng Pour #3 correc on photos never went through, so we have not received this M&N report. Please see photos below for addressed comments. Please confirm if you have received these photos. Thanks, Grace Bowman Project Engineer cell: (831) 818-9168 _________________________________________ Power Engineering Construction Co. 1501 Viking Street, Suite 200, Alameda, CA 94501 From: Atwell, Lauren <latwell@moffattnichol.com> Sent: Tuesday, September 12, 2023 1:51 PM To: Grace Bowman <Bowman@PowerEngConstruction.com>; Josh Westling <josh@westlingcm.com> Cc: Scott Williams <Williams@PowerEngConstruction.com>; Joe Macias <macias@PowerEngConstruction.com>; Holcomb, Jerry <jholcomb@moffattnichol.com> Subject: Balboa Marina - Bulkhead Wall Footing Pour #3 Hi All, Following-up from my site visit this morning to inspect rebar in the Bulkhead Wall Foo ng prior to concrete foo ng Pour #3. The rebar arrangement looked adequate for the segment I observed (approx.. STA -0+20 to STA 0+42.92). The concrete pour may con nue as planned given the notes below are addressed. 4 4 EJ 80' ADA GANGWAY PROPERTY LINE 6057938.6510, 2171797.7000 LIMIT OF LAND SIDE EXCAVATION PROPOSED BULKHEAD WALL ALIGNMENT TEMPORARY SHORING (IF REQUIRED) GRADE AND COMPACT SLOPE AND PLACE GEOTEXTILE FILTER FABRIC AND ARMOR ROCK PER SECTION CALLOUTS. 2H:1V SLOPE ROCK REVETMENT EXISTING FACE OF SEAWALL TO BE DEMOLISH PROPOSED FLOATING DOCK EXPANSION BULKHEAD LINE 2' WALL OFFSET Ø6' DSM COLUMN (TYPICAL) 4' DSM SPACING (TYPICAL) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 SCALE IN FEET 0 10'-0"20'-0" N No.Description Date Sheet No. Project Number: Engineer of Record: THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED USING A DIGITAL SIGNATURE. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES. Use of Proposals and Designs Designs, sketches, specifications, and/or proposals ("Designs") prepared by Keller North America ("KNA") and/or it's employees have been prepared for exclusive use by KNA and based upon, and in anticipation of, KNA performing the work called for in such Designs. KNA makes no warranties or guarantees as to the suitability of the Design for use by others. The Designs are subject to protection under the Copyright Act of 1976 and Architectural Works Copyright Protection Act of 1990. Use, control, reproduction, publication, or dissemination of such Designs without the prior written consent of an authorized representative of KNA is strictly prohibited. KNA is, and shall continue to be, the sole owner of the Designs. Date: Cr e a t e d B y : Drawn by: Design by: Checked by: Approved by: 1" 0" 1" 1/ 2 " BA L B O A M A R I N A E X P A N S I O N 20 1 E C O A S T H W Y N E W P O R T B E A C H , C A 9 2 6 6 0 16121145 06/19/2023 Jim Gingery Fi r s t I n t i a l L a s t N a m e JRGMM JRGSPB 17461 DERIAN AVENUE SUITE 106 IRVINE, CA 92614 909-393-9300 California 0 FOR REVIEW 05/10/2023 C: \ U s e r s \ J o h n . I n t r i e r i \ A p p D a t a \ L o c a l \ M i c r o s o f t \ W i n d o w s \ I N e t C a c h e \ C o n t e n t . O u t l o o k \ V 7 H F 1 7 C J \ 1 6 1 2 1 1 4 5 B a l b o a M a r i n a E x p a n s i o n R e v . 0 . d w g 6/ 1 4 / 2 0 2 3 9 : 3 9 : 4 2 A M www.Keller-na.com TA S T N LFEOCA RFIO AI JAM E S R .GIN G E R Y REGISTER E D P RO FESSIONAL E N G I N E ER G EOTECHN I C A L EXPIRES: 12/31/2023 KNA-2 DS M L A Y O U T LEGEND: Ø6' DEEP SOIL MIX COLUMN (DSM). INSTALL 30.5' FROM THE EXISTING GROUND SURFACE EL. 10.5' Ø6' DEEP SOIL MIX COLUMN (DSM). INSTALL 18' FROM THE EXISTING GROUND SURFACE EL. 10.5' 1 AS-BUILT 06/19/2023 4 4 EJ 1 Atwell, Lauren From:Scott Williams <Williams@PowerEngConstruction.com> Sent:Sunday, November 12, 2023 8:25 AM To:Atwell, Lauren; Joe Macias Cc:Grace Bowman; Holcomb, Jerry Subject:RE: Bulkhead Wall Stem Pour #4 & Footing Pour #5 Attachments:IMG_9311.JPG; IMG_9308.JPG CAUTION: This email originated from outside of the organiza on. Lauren, Please see photos for the two wall pours that is scheduled for tomorrow at noon. Note we were not able to complete the foo ng yesterday, thus we will finish it tomorrow as we have move the foo ng pour to Tuesday. I will send you foo ng pictures tomorrow a!ernoon once we complete that installa on. Scott Williams Project Manager cell: (510) 332-7692 office: (510) 337-3800 fax: (510) 337-3808 www.PowerEngConstruction.com _________________________________________ Power Engineering Construction Co. 1501 Viking Street, Suite 200, Alameda, CA 94501 From: Atwell, Lauren <latwell@moffattnichol.com> Sent: Friday, November 10, 2023 9:46 AM To: Joe Macias <macias@PowerEngConstruction.com> Cc: Scott Williams <Williams@PowerEngConstruction.com>; Grace Bowman <Bowman@PowerEngConstruction.com>; Holcomb, Jerry <jholcomb@moffattnichol.com> Subject: Bulkhead Wall Stem Pour #4 & Footing Pour #5 Hi All, Following-up from my site visit yesterday to inspect rebar in the Bulkhead Wall Stem Pour #4 on the south end. The rebar arrangement looked adequate for the segment observed (approx. STA 0+84.92 to STA 1+34.96). The concrete pour may con nue as planned given the minor notes below are addressed. 1. Please ensure proper spacing of anodes throughout the stem wall. 4 4 EJ 1 Atwell, Lauren From:Scott Williams <Williams@PowerEngConstruction.com> Sent:Sunday, November 12, 2023 8:25 AM To:Atwell, Lauren; Joe Macias Cc:Grace Bowman; Holcomb, Jerry Subject:RE: Bulkhead Wall Stem Pour #4 & Footing Pour #5 Attachments:IMG_9311.JPG; IMG_9308.JPG CAUTION: This email originated from outside of the organiza on. Lauren, Please see photos for the two wall pours that is scheduled for tomorrow at noon. Note we were not able to complete the foo ng yesterday, thus we will finish it tomorrow as we have move the foo ng pour to Tuesday. I will send you foo ng pictures tomorrow a!ernoon once we complete that installa on. Scott Williams Project Manager cell: (510) 332-7692 office: (510) 337-3800 fax: (510) 337-3808 www.PowerEngConstruction.com _________________________________________ Power Engineering Construction Co. 1501 Viking Street, Suite 200, Alameda, CA 94501 From: Atwell, Lauren <latwell@moffattnichol.com> Sent: Friday, November 10, 2023 9:46 AM To: Joe Macias <macias@PowerEngConstruction.com> Cc: Scott Williams <Williams@PowerEngConstruction.com>; Grace Bowman <Bowman@PowerEngConstruction.com>; Holcomb, Jerry <jholcomb@moffattnichol.com> Subject: Bulkhead Wall Stem Pour #4 & Footing Pour #5 Hi All, Following-up from my site visit yesterday to inspect rebar in the Bulkhead Wall Stem Pour #4 on the south end. The rebar arrangement looked adequate for the segment observed (approx. STA 0+84.92 to STA 1+34.96). The concrete pour may con nue as planned given the minor notes below are addressed. 1. Please ensure proper spacing of anodes throughout the stem wall. 4 4 EJ From: Scott Williams <Williams@PowerEngConstruction.com> Sent: Monday, November 27, 2023 7:59 AM To: Holcomb, Jerry Cc: Joe Macias; Atwell, Lauren Subject: RE: Wall rebar Attachments: IMG_9594.JPG; IMG_9593.JPG; IMG_9591.JPG; IMG_9596.JPG Jerry, It looks like this email might not have gone through last week due to the size, so I had to delete the below pictures. Please let me know if you received this email. Also, below is what I sent in my original email to you: Please see attached pictures of both the foam injection and the wall that is 2.25” +/- off the existing wall under the cap – note our formwork is still at that location and we are actually working on getting it out. The foam injection is working out really good. The footing is currently done and we are working on the wall. Let me know if you have any questions on either one of these items, thanks. Scott Williams Project Manager cell: (510) 332-7692 office: (510) 337-3800 fax: (510) 337-3808 www.PowerEngConstruction.com _________________________________________ Power Engineering Construction Co. 1501 Viking Street, Suite 200, Alameda, CA 94501 From: Holcomb, Jerry <jholcomb@moffattnichol.com> Sent: Saturday, November 18, 2023 1:35 PM To: Scott Williams <Williams@PowerEngConstruction.com> Cc: Joe Macias <macias@PowerEngConstruction.com>; Atwell, Lauren <latwell@moffattnichol.com> Subject: Re: Wall rebar Scott, Are there any additional pictures below the existing wall cap? The same gap should be maintained, so the form work should make a 90 deg turn to go under cap. Let me know if you have any questions. Jerry Holcomb Get Outlook for iOS From: Scott Williams <Williams@PowerEngConstruction.com> Sent: Saturday, November 18, 2023 7:57:20 AM To: Holcomb, Jerry <jholcomb@moffattnichol.com> Cc: Joe Macias <macias@PowerEngConstruction.com>; Atwell, Lauren <latwell@moffattnichol.com> Subject: RE: Wall rebar Jerry, Please see the attached pictures for the last 2 wall pours from 11/17/23. Scott Williams Project Manager cell: (510) 332-7692 office: (510) 337-3800 fax: (510) 337-3808 www.PowerEngConstruction.com _________________________________________ Power Engineering Construction Co. 1501 Viking Street, Suite 200, Alameda, CA 94501 From: Holcomb, Jerry <jholcomb@moffattnichol.com> Sent: Thursday, November 16, 2023 9:35 PM To: Joe Macias <macias@PowerEngConstruction.com>; Atwell, Lauren <latwell@moffattnichol.com> Cc: Scott Williams <Williams@PowerEngConstruction.com> Subject: RE: Wall rebar Hi All,