HomeMy WebLinkAboutXC2022-1965 - MiscCity of Newport Beach Special Inspector Manual
67
CITY OF NEWPORT BEACH
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DIVISION
100 Civic Center Drive | P.O. Box 1768 | Newport Beach, CA 92658
www.newportbeachca.gov | (949) 644-3200
SPECIAL INSPECTION REPORT
Project Address:_______________________________________________________________________
Permit Number:_______________________________________________________________________
Inspection Type (s):____________________________________________________________________
Inspection Date (s):_______________________________________ ( ) Periodic ( ) Continuous
Describe Inspection, Including Location(s):
List Tests Made:
Total Inspection Time Each Day:
Date:
Hours:
List All Items Requiring Correction (Include Previously Listed Uncorrected Items):
Comments:
To the best of my knowledge, the work inspected was in accordance with the Building Division approved design drawings, specifications and applicable workmanship provisions of the U.B.C. except as noted above.
Special Inspector Signature: Date:
Print Full Name: Newport Beach Registration No.:
SpecialInspectionReport 08/25/2015
201 E. Coast Hwy, Newport Beach
X2022-1965
Concrete - Rebar Ck & Concrete Pour
8/16/23 & 8/17/23
8/16/23 - Observed the reinforcing steel installation for the footings of the retaining wall for concrete pour #1,
which faces the waterway by the bridge and verified reinforcing steel for size, grade, lap, location and
clearances. 8/17/23 - Observed the placement and consolidation of 34 cubic yards of concrete, mix
design # 68031, supplied by Associated Ready Mixed, into the above noted footings. Concrete was
5,000 psi, and slump was 4”. Cast 1 set of (4) 4x8 test cylinders from concrete on truck # 906.
Visual, slump, temperature
8/16/23
4
N/A
Concrete samples cast were from concrete with delivery ticket # 45087363.
8/17/23
465
8/17/23
4
X
Mark Burnett
City of Newport Beach Special Inspector Manual
67
CITY OF NEWPORT BEACH
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DIVISION
100 Civic Center Drive | P.O. Box 1768 | Newport Beach, CA 92658
www.newportbeachca.gov | (949) 644-3200
SPECIAL INSPECTION REPORT
Project Address:_______________________________________________________________________
Permit Number:_______________________________________________________________________
Inspection Type (s):____________________________________________________________________
Inspection Date (s):_______________________________________ ( ) Periodic ( ) Continuous
Describe Inspection, Including Location(s):
List Tests Made:
Total Inspection Time Each Day:
Date:
Hours:
List All Items Requiring Correction (Include Previously Listed Uncorrected Items):
Comments:
To the best of my knowledge, the work inspected was in accordance with the Building Division approved design drawings, specifications and applicable workmanship provisions of the U.B.C. except as noted above.
Special Inspector Signature: Date:
Print Full Name: Newport Beach Registration No.:
SpecialInspectionReport 08/25/2015
201 E. Coast Hwy, Newport Beach
X2022-1965
Concrete Pour
9/12/23
9/12/23 - Observed the placement and consolidation of 29 cubic yards of concrete, mix design # 68031,
supplied by Associated Ready Mixed, into the footing pour #3, that faces the water by the bridge.
Concrete was 5,000 psi, and slump was 4”.
Cast 1 set of (6) 4x8 test cylinders from concrete on truck # 667, with ticket # 45087990.
Visual
9/12/23 (pm)
4
N/A
9/12/23
465
X
Mark Burnett
City of Newport Beach Special Inspector Manual
67
CITY OF NEWPORT BEACH
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DIVISION
100 Civic Center Drive | P.O. Box 1768 | Newport Beach, CA 92658
www.newportbeachca.gov | (949) 644-3200
SPECIAL INSPECTION REPORT
Project Address:_______________________________________________________________________
Permit Number:_______________________________________________________________________
Inspection Type (s):____________________________________________________________________
Inspection Date (s):_______________________________________ ( ) Periodic ( ) Continuous
Describe Inspection, Including Location(s):
List Tests Made:
Total Inspection Time Each Day:
Date:
Hours:
List All Items Requiring Correction (Include Previously Listed Uncorrected Items):
Comments:
To the best of my knowledge, the work inspected was in accordance with the Building Division approved design drawings, specifications and applicable workmanship provisions of the U.B.C. except as noted above.
Special Inspector Signature: Date:
Print Full Name: Newport Beach Registration No.:
SpecialInspectionReport 08/25/2015
201 E. Coast Hwy, Newport Beach
X2022-1965
Concrete - Rebar Ck
9/12/23
9/12/23 - Observed the reinforcing steel installation for the footing pour #3,
which faces the waterway by the bridge and verified reinforcing steel for size, grade, lap, location and
clearances. A615-60 reinforcing steel was used as per plans.
Visual
9/12/23
4
N/A
9/12/23
465
X
Mark Burnett
City of Newport Beach Special Inspector Manual
67
CITY OF NEWPORT BEACH
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DIVISION
100 Civic Center Drive | P.O. Box 1768 | Newport Beach, CA 92658
www.newportbeachca.gov | (949) 644-3200
SPECIAL INSPECTION REPORT
Project Address:_______________________________________________________________________
Permit Number:_______________________________________________________________________
Inspection Type (s):____________________________________________________________________
Inspection Date (s):_______________________________________ ( ) Periodic ( ) Continuous
Describe Inspection, Including Location(s):
List Tests Made:
Total Inspection Time Each Day:
Date:
Hours:
List All Items Requiring Correction (Include Previously Listed Uncorrected Items):
Comments:
To the best of my knowledge, the work inspected was in accordance with the Building Division approved design drawings, specifications and applicable workmanship provisions of the U.B.C. except as noted above.
Special Inspector Signature: Date:
Print Full Name: Newport Beach Registration No.:
SpecialInspectionReport 08/25/2015
201 E. Coast Hwy, Newport Beach
X2022-1965
Concrete - Rebar Ck
9/7/23
9/7/23 - Observed the reinforcing steel installation for the retaining wall for concrete pour #3,
which faces the waterway by the bridge and verified reinforcing steel for size, grade, lap, location and
clearances. A615-60 reinforcing steel was used as per plans.
Visual
9/7/23
4
N/A
9/7/23
465
X
Mark Burnett
City of Newport Beach Special Inspector Manual
67
CITY OF NEWPORT BEACH
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DIVISION
100 Civic Center Drive | P.O. Box 1768 | Newport Beach, CA 92658
www.newportbeachca.gov | (949) 644-3200
SPECIAL INSPECTION REPORT
Project Address:_______________________________________________________________________
Permit Number:_______________________________________________________________________
Inspection Type (s):____________________________________________________________________
Inspection Date (s):_______________________________________ ( ) Periodic ( ) Continuous
Describe Inspection, Including Location(s):
List Tests Made:
Total Inspection Time Each Day:
Date:
Hours:
List All Items Requiring Correction (Include Previously Listed Uncorrected Items):
Comments:
To the best of my knowledge, the work inspected was in accordance with the Building Division approved design drawings, specifications and applicable workmanship provisions of the U.B.C. except as noted above.
Special Inspector Signature: Date:
Print Full Name: Newport Beach Registration No.:
SpecialInspectionReport 08/25/2015
201 E. Coast Hwy, Newport Beach
X2022-1965
Concrete Pour
9/21/23
9/21/23 - Observed the placement and consolidation of 18 cubic yards of concrete, mix design # 68031,
supplied by Associated Ready Mixed, into the wall pour #5, and the
footing pours #4 and 3A, that face the water by the bridge.
Concrete was 5,000 psi, and slump was 4 1/2”.
Cast 1 set of (7) 4x8 test cylinders from concrete on truck # 730, with ticket # 45088254.
Visual, slump, temp
9/21/23
4
N/A
9/21/23
465
X
Mark Burnett
Power
City of Newport Beach Special Inspector Manual
67
CITY OF NEWPORT BEACH
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DIVISION
100 Civic Center Drive | P.O. Box 1768 | Newport Beach, CA 92658
www.newportbeachca.gov | (949) 644-3200
SPECIAL INSPECTION REPORT
Project Address:_______________________________________________________________________
Permit Number:_______________________________________________________________________
Inspection Type (s):____________________________________________________________________
Inspection Date (s):_______________________________________ ( ) Periodic ( ) Continuous
Describe Inspection, Including Location(s):
List Tests Made:
Total Inspection Time Each Day:
Date:
Hours:
List All Items Requiring Correction (Include Previously Listed Uncorrected Items):
Comments:
To the best of my knowledge, the work inspected was in accordance with the Building Division approved design drawings, specifications and applicable workmanship provisions of the U.B.C. except as noted above.
Special Inspector Signature: Date:
Print Full Name: Newport Beach Registration No.:
SpecialInspectionReport 08/25/2015
201 E. Coast Hwy, Newport Beach
X2022-1965
Concrete - Rebar Ck
9/20/23
9/20/23 - Observed the reinforcing steel installation for the wall pours #5 and 5A, and footing pours
#4 and 3A, which face the waterway by the bridge and verified reinforcing steel
for size, grade, lap, location and clearances. A615-60 reinforcing steel was used as per plans.
Visual
9/20/23 (am)
4
N/A
9/20/23
465
X
Mark Burnett
City of Newport Beach Special Inspector Manual
67
CITY OF NEWPORT BEACH
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DIVISION
100 Civic Center Drive | P.O. Box 1768 | Newport Beach, CA 92658
www.newportbeachca.gov | (949) 644-3200
SPECIAL INSPECTION REPORT
Project Address:_______________________________________________________________________
Permit Number:_______________________________________________________________________
Inspection Type (s):____________________________________________________________________
Inspection Date (s):_______________________________________ ( ) Periodic ( ) Continuous
Describe Inspection, Including Location(s):
List Tests Made:
Total Inspection Time Each Day:
Date:
Hours:
List All Items Requiring Correction (Include Previously Listed Uncorrected Items):
Comments:
To the best of my knowledge, the work inspected was in accordance with the Building Division approved design drawings, specifications and applicable workmanship provisions of the U.B.C. except as noted above.
Special Inspector Signature: Date:
Print Full Name: Newport Beach Registration No.:
SpecialInspectionReport 08/25/2015
201 E. Coast Hwy, Newport Beach
X2022-1965
Concrete Pour
9/26/23
9/26/23 - Observed the placement and consolidation of 8 cubic yards of concrete, mix design # 68031,
supplied by Associated Ready Mixed, into the wall pour #5A, that faces the water, by the bridge.
Concrete was 5,000 psi, and slump was 5”.
Cast 1 set of (7) 4x8 test cylinders from concrete on truck # 729, with ticket # 45088359.
Visual, slump, temp
9/26/23
4
N/A
9/26/23
465
X
Mark Burnett
Power
City of Newport Beach Special Inspector Manual
67
CITY OF NEWPORT BEACH
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DIVISION
100 Civic Center Drive | P.O. Box 1768 | Newport Beach, CA 92658
www.newportbeachca.gov | (949) 644-3200
SPECIAL INSPECTION REPORT
Project Address:_______________________________________________________________________
Permit Number:_______________________________________________________________________
Inspection Type (s):____________________________________________________________________
Inspection Date (s):_______________________________________ ( ) Periodic ( ) Continuous
Describe Inspection, Including Location(s):
List Tests Made:
Total Inspection Time Each Day:
Date:
Hours:
List All Items Requiring Correction (Include Previously Listed Uncorrected Items):
Comments:
To the best of my knowledge, the work inspected was in accordance with the Building Division approved design drawings, specifications and applicable workmanship provisions of the U.B.C. except as noted above.
Special Inspector Signature: Date:
Print Full Name: Newport Beach Registration No.:
SpecialInspectionReport 08/25/2015
201 E. Coast Hwy, Newport Beach
X2022-1965
Concrete Pour
9/18/23
9/18/23 - Observed the placement and consolidation of 13 cubic yards of concrete, mix design # 68031,
supplied by Associated Ready Mixed, into the wall pour #4, that faces the water by the bridge.
Concrete was 5,000 psi, and slump was 4 1/4”.
Cast 1 set of (7) 4x8 test cylinders from concrete on truck # 667, with ticket # 45088137.
Visual, slump, temp
9/18/23 (pm)
4
N/A
9/18/23
465
X
Mark Burnett
Power
City of Newport Beach Special Inspector Manual
67
CITY OF NEWPORT BEACH
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DIVISION
100 Civic Center Drive | P.O. Box 1768 | Newport Beach, CA 92658
www.newportbeachca.gov | (949) 644-3200
SPECIAL INSPECTION REPORT
Project Address:_______________________________________________________________________
Permit Number:_______________________________________________________________________
Inspection Type (s):____________________________________________________________________
Inspection Date (s):_______________________________________ ( ) Periodic ( ) Continuous
Describe Inspection, Including Location(s):
List Tests Made:
Total Inspection Time Each Day:
Date:
Hours:
List All Items Requiring Correction (Include Previously Listed Uncorrected Items):
Comments:
To the best of my knowledge, the work inspected was in accordance with the Building Division approved design drawings, specifications and applicable workmanship provisions of the U.B.C. except as noted above.
Special Inspector Signature: Date:
Print Full Name: Newport Beach Registration No.:
SpecialInspectionReport 08/25/2015
201 E. Coast Hwy, Newport Beach
X2022-1965
Concrete - Rebar Ck
9/18/23
9/18/23 - Observed the reinforcing steel installation for the wall pours #4 and #5
which face the waterway by the bridge and verified reinforcing steel for size, grade, lap, location and
clearances. A615-60 reinforcing steel was used as per plans.
Visual
9/18/23 (am)
4
N/A
9/18/23
465
X
Mark Burnett