HomeMy WebLinkAboutX2022-0986 - MiscPROJECT STATUS REPORT CaICERTS, Inc
Effective 01/26/2024 07:26 (Page 1 of 2)
GENERAL INFORMATION
Energy Standards Code Year:
2019
❑ ❑
Project Name:
Dr. Green - Remodeled Residence
■
�.
■
Project Type:
Alterations SFR
Address:
2179 Vista Entrada
■
■
City/State/Zip:
Newport Beach / CA / 92660
L ■'
■
Enforcement Agency:
City of Newport Beach
Easy to Verify @ calcerts.com ■
Permit Number:
X2022-0986 / 12-12-2022
OVERALL STATUS
COMPLETE
HERS VERIFIABLE MEASURES:
COMPLETE
CF1R INFORMATION - Certificate of Compliance (Document Lists Required Energy Features) k/
Certificate Type
Compliance
Registered Form
CF1R-PRF-01
Registered Date
2023-09-0517:05:05
Registration Number
222-P010060084C-000-000-0000000-0000
CF2R INFORMATION - Certificate of Installation (Documents the proper installation of required energy features) V/
System
Forrn
Registered Date
Registration Number
CF2R-ENV-01-E
222-P010060084C-000-001-E01001A-0000
Fenestration Installation
2024-01-02 09:49:44
Alana s saldana
(CRC GROUP INC)
CF2R-ENV-03-E
222-P010060084C-000-001-E03001A-0000
Insulation Installation
2024-01-02 09:49:44
Alana s saldana
L,
(CRC GROUP INC)
CF2R-MCH-01-E
222-P010060084C-000-001-M01001A-0000
Space Conditioning
2024-01-02 09:49:44
Alana s saldana
Systems, Ducts and Fans
(CRC GROUP INC)
CF2R-MCH-20-H
222-P010060084C-000-001-M20001B-0000
System 1: 1974
Duct Leakage
2024-01-02 16:27:03
Alana s saldana
(CRC GROUP INC)
CF2R-MCH-23-H
222-P010060084C-000-001-M23001A-0000
System 1: 1974
Airflow
2024-01-02 09:49:44
Alana s saldana
(CRC GROUP INC)
CF2R-MCH-25-H
222-P010060084C-000-001-M25001A-0000
System 1
Refrigerant Charge
2024-01-02 09:49:44
Alana s saldana
(CRC GROUP INC)
HERS ProOderCalCERTS Inn.
CA Building Energy Efficiency Standards 2019 Residential Compliance Dec 2019
PROJECT STATUS REPORT CaICERTS, Inc
Effective 01/26/2024 07:26 (Page 2 of 2)
CF2R-MCH-26-H
222-P010060084C-000-001-M26001A-0000
System 1
Rated Equipment
2024-01-02 09:49:44
Alana s saldana
(CRC GROUP INC)
Non Default Value: CF2R-MCH-01 - SC System Status is different.
Non Default Value: CF2R-MCH-01 - Duct System Status is different.
CF3R INFORMATION - Certificate of Verification (Documents the verification of HERS Measures) i/
System
Form
Registered Date
Registration Number
CF3R-MCH-20-H
222-P010060084C-000-001-M20001B-M20B
System 1: 1974
(Duct Leakage)
2024-01-02 16:12:02
Kevin Boyle (CC2006344)
VY
(KB Energy Services)
CF3R-MCH-23-H
222-P010060084C-000-001-M23001A-M23A
System 1: 1974
(Airflow)
2023-12-31 09:49:51
Kevin Boyle (CC2006344)
(✓
(KB Energy Services)
CF3R-MCH-25-H
222-P010060084C-000-001-M25001A-M25A
System 1
(Refrigerant Charge)
2023-12-31 09:58:19
Kevin Boyle (CC2006344).�/
(KB Energy Services)
CF3R-MCH-26-H
222-P010060084C-000-001-M26001A-M26C
System 1
(Rated Equipment)
2024-0"2 16:11:20
Kevin Boyle (CC2006344)
(KB Energy Services)
HERS Provider: CaICERTS Inc.
CA Building Energy Efficiency Standards 2019 Residential Compliance Dec 2019
O�aEWPT CITY OF NEWPORT BEACH
COMMUNITY DEVELOPMENT DEPARTMENT
u > T BUILDING DIVISION
cgc,Foar`P 3300 Newport Boulevard I P.O. Box 1768 1 Newport Beach, CA 92658
www.newportbeachca.gov 1 (949) 644-3200
Structural Observation Report
Project Address:
2179 Vista Entrada
Report date:
5-05-2023
CNB Inspector Name:
Bill Taman
CNB Permit#:
2022-0986
Building Owner Name:
Owner's Mailing address (if different from site);
Owner's Telephone #:
CNB Plan Check #:
Full Name of Structural Observer (SO):
SO email Address:
SO Telephone #:
SO License I Reg. #:
John Tran
jdtran07@gmail.com
714.815.2356
62653
PLEASE INDICATE STRUCTURAL ELEMENTS AND CONNECTIONS OBSERVED (check aoDlicable boxes)
FOUNDATIONS
SHEAR WALLS
FRAMES
DIAPHRAGMS
INDICATE LOCATION(S)
DATE
(FloodRoof)
OBSERVED
OBSERVED
IR Conventional
❑ Concrete
❑ Steel
❑ Concrete
Remodeled Area
4-21-2023
Footings & Slab
❑ Mat Foundation,
❑ Masonry
❑ Concrete
❑ Steel Deck
Prestressed Concrete
❑ Caissons, Piles,
IX Wood or Manuf.
❑ Masonry
IN Wood
Remodeled Area
4-21-2023
Grade Beams
Shear Panels
❑ Other:
❑ Other:
❑ Other:
❑ Other:
W ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES.
❑ OBSERVED DEFICIENCIES AND COMMENTS:
The final framings, shearwalls, holdowns, and floor nailings are observed in compliance with design speficciations.
e two pact footings in the rear of ttie 15MIZting, reviewed per Joe Paracla specia mspec
compliance with the approved plans.
E_ S
® FINAL STRUCTURAL OBSERVATION REPORT:
r,4
_
The structure generally complies with the approved construction docum
I declare that the following statements are true to the best of my
1. I am the licensed design professional retained by the owner to
charge of the structural observation;
2. I, or another licensed design professional whom I have designated
my responsible charge, have performed the required site visits
construction stage to verify that the structure is in general cor
approved construction documents;
3. 1 understand that all deficiencies which I have documented must bi
final acceptance of the structural systems by the City of Newpc
Division.
STRUCTURAL OBSEKVATIQA DOES N9kTT w/IVE ANY REQUIREMENTS FOR BUILDING
'o. 26 3
xp.0 -24
AE dPLOYEES(OFollE CIV NkW RT BEAC `\
nr- wn � F � \
CITY OF NEWPORT BEACH
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DIVISION
3300 Newport Boulevard I P.O. Box 1768 1 Newport Beach, CA 92658
www.newportbeachca.gov 1 (949) 644-3200
Structural Observation Report
Project Address:
2179 Vista Entrada
Report date:
5-05-2023
CNB Inspector Name:
Bill Tuman
CNB Permit #.
2022-0986
Building Owner Name:
Owners Mailing address (if different from site);
Owners Telephone #:
CNB Plan Check A
Full Name of Structural Observer (SO):
SO email Address:
SO Telephone #:
SO License / Reg. #:
John Tran
jdtran07@gmail.com
714.815.2356
62653
PLEASE INDICATE STRUCTURAL ELEMENTS AND CONNECTIONS OBSERVED (check applicable boxes)
FOUNDATIONS
SHEAR WALLS
FRAMES
DIAPHRAGMS
(Floor/Roof)
INDICATE LOCATION(S)
OBSERVED
DATE
OBSERVED
® Conventional
Footings & Slab
❑ Concrete
❑ Steel
❑ Concrete
Remodeled Area
4-21-2023
❑ Mat Foundation,
Prestressed Concrete
❑ Masonry
❑ Concrete
❑ Steel Deck
❑ Caissons, Piles,
Grade Beams
I& Wood or Manuf.
Shear Panels
❑ Masonry
IN Wood
Remodeled Area
4-21-2023
❑ Other:
❑ Other:
❑ Other:
❑ Other:
fy1 ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES.
❑ OBSERVED DEFICIENCIES AND COMMENTS:
The final framings, shearwalls, holdowns, and floor nailings are observed in compliance with design speficciations.
e two pa oo mgs in the rear of Tic builcting, reviewed per Joe ara a special inspection report, are in
compliance with the approved plans.
❑ REPORT CONTINUED ON ATTACHED PAGES.
M FINAL STRUCTURAL OBSERVATION REPORT:
The structure generally complies with the approved construction documents, and all observed deficiencies were corrected.
I declare that the following statements are true to the best of my knowledge:
1. I am the licensed design professional retained by the owner to be in responsible
charge of the structural observation;
2. I, or another licensed design professional whom I have designated above and is under
my responsible charge, have performed the required site visits at each significant
construction stage to verify that the structure is in general conformance with the
approved construction documents;
3. 1 understand that all deficiencies which I have documented must be corrected, prior to
final acceptance of the structural systems by the City of Newport Beach, Building
Division. _ I
5-05-23
STAMP OF STRUCTURAL OBSERVER
STRUCTURAL OBSERVATION DOES NW WAIVE ANY REQUIREMENTS FOR BUILDING INSPECTION BY AUTHORIZED EMPLOYEES OF THE CITY OF NEWPORT BEACH.