STRUCTURAL OaeYlrvAnoN REPORT FORM
Report No.
treatment obreradio, makes the soon observation mono suuetwm system. So gcnval conmosome tome approval puns and
'reciMations, at si®rihcmt architecture atagm and at cnm orien three system. Snunwal observation doer not moude or waive the
,seen slbllay forth, rvsycfioestequuW by Section 10& 1701 or other SStabilityOfthe hWe.
This report includes all construction work through 5_day of&jt"201
Project Atldrcrr:
rvm of Record
PMne No. of SOR
CC ��
� t I/� SE/ /.1�
n Nareghi offeni
Ed
(818)865-2026
Pemdt
Summer Observation performeddhIf
0
Ne f
Pborsom of Obrervcr
ryImading
ybV/10)0
by'Karmett Nareghi Armi0985
(819)965-2026
OBSERVED
STRUCTURAL LILAIMEMIcAnip
❑ Fnotin ,Stem Walls
ConWMMnontFMm'
Frame
❑ Concrete
Mat Powtletien
❑Mesapeace
Steel
o(Caismry Pill,, Grade
Stearns❑tuns
0WoonentFnme
❑Word
WNany
weal Aspen
s elm nnnnnm❑Other,
❑Orbsll
Pnrne
❑OtMrs:IBuame
One ... d Deficiencies:
I declare that the bellowing statements are nun m Bte best of my knowledge. 1 am the euginoer or arcliitectretalnea by the
theater to be in tesponsible charge for the structural observation in necoMence Shot the requirements of the County of
Orange.
I. I, or another engineer or architect who I have designated above and is undermy responsible charge, has performed the
required site visits at each significant EfferveGice may: to verify if tfic slrueNre is in general conformance with
approved plans and speecifica ions
2 All de fieienciea wh)<fh22 to beuormctea have been indicated above.
1 1recommead4pptang ofthe stmcturel systems by the County of Orange be wilueld until all observed /
Dale.
Form
MISTAIMSPEGTON SFAVKES VK. Czll:(M)M-799
B645 giera5treet
Pha1e&FgL19<Yl B3)-)939
Mission Viej0.00.Y269f
�T
® AMSTA
Ec ION SEWr ES INC.
Observation Report
.imbue 15 Avalon Vista
Newport Coast. CA 9,mis, lNrCa, SW110105
kA rynle Avalon Vista II Project
Mdareco Design West scandal
Manscal D0.wpem ASTM A6 15 Glad, 50 Reba, Erpli i KNA Engineering, In
oyeyax�ns Robert Geiz
voirtmeati velopmeni
AmpMc
consul S�bwwamnrKP Constructor.
rypsMWak OhrrreS Epoxy Drivel lnodiflatlon' Reinforcing Small Placement CM1eck pate 12-06-11
1. Observed the Imtellaton of (6) -06 horizontal dmoss ® T 8 B for added testing tlowels and of (5) -R5 vertical
M lst theantedpiMsterds smthamin.]"emided.into the existing concrete Wing section for" less
to existing small tie-ins M the nee pilaster®the southeast ezMnor corner of the Kitchen of the proposed
cv Main Residenmof Par 11(formerly LW12&13)pertl ,t Mon SV:1.
2. Verified the all depth and cleanliness of boles prior to the application of Simpson SET-%P Eyxy, Lot
p123C206C exp. 02 20-13.
3. Verified the placement of reinforcing steel placement at the relieving haters: the new coundabon grade team
foutlne sectors Mer mein to ire new cessions (Pile No. P-1 the P-11) located at Pe proposed new Terrace
Lounge, Spa, Family Loggia, Breakfast Terrace & Terrace Lounge C the southwest corner panion 0f Pamel 1
(formerly Lot 12 & 13) Prime Grade Beam Schedule.
6. Verified reinforcing steel for size, grade, lap, location, and clearance.
5. We* verified unless noted otherwise above, is in accordance, wed the approved plans & specifiw5on l
Y
n /�—OC'Y13Z0 -
Par
RC 51023 IC.C, aTrmenW L "7On