HomeMy WebLinkAboutRS130181_OC Waste & Recycling C&D ApplicationOC Waste & Recycling
Construction & Demolition Program
300 North Flower Street, Suite 400, Santa Ana, CA 92703
Office 714-834-4000 Fax 714-834-4057
Construction & Demolition Waste Reduction and Recycling Application
**DIVERSION REQUIREMENT 50n/e**
Please save disposal/recycling receipts, as they are required for compliance verification.
Please complete the following form for construction and demolition materials produced as a result of the
proposed construction/demolition project. Should you have any additional questions, please call OC Waste
& Recycling at 714-834-4000.
Job Site Address: Z! A,yo Lon) V IJ� mrz( pe12T COaS C. 4A-12E.j %
Property Owner / Business Name:
yr7ig.
-6ewi,49- Plveyk a'
Address: /
l y GH.h�i✓� t/gii�
City:
Pew p� f Goa s7/"
State:
G'1�
Zip:
9 26s7
Email /
Mar�1►ioyha'rr4I
Phone:
14!-35;-a40i
Contractor.
J�6LIC�9n� t7EVEGc),O�ieS,
/N�. l�J RUn{tAN1�
Address
95-7Mr ,low i9.✓)
Cire:
State:
601-
Zip:
9Z6s�
Email:
/raje. feCom
Ucense Class/Number.
#79y6zi3
Phone:
`t49-Z�6-�/333
DESCRIPTION OF WO
SLUG l6a4 �e
Length of Project Z4 eWOF J
4115
Total Project Valuation $ 3 0o 'W Total Project Square Footage:
DEMOLITION
CONSTRUCTION
Estimated Total Tonnage:
/✓O F% E
Estimated Total Tonnage:
wvN45F
Exemption:
Recycling / Reuse / Disposal Facilities / Franchised Waste Haulers
Please indicate the facilities that you plan to use for disposing of your unwanted materials. See attached list of
County -approved facilities or franchised waste haulers.
Facility Name Phone Number Material Type Estimated Tonnage
Administrative Fee
• A $25.00 administrative cost -recovery fee will be collected for all covered projects. The application fee is
based on costs related directly to staff time and materials for processing and reviewing each application.
Process for Compliance
• Upon completion of the recycling activity, the applicant will email, fax, mail, or hand -deliver copies of all
receipts from the facility/hauler to OC Waste & Recycling.
• OC Waste & Recycling staff will reconcile the amount recycled and determine compliance.
• If applicant is deemed to be in compliance, no further action is required, and Certificates of Occupancy
are issued as appropriate. If the applicant is deemed to be non -compliant, fines are assessed and must be
paid prior to the issuance of any final Certificates of Occupancy.
Fines and Penalties for Non -Compliance
• Applicants are subject to a fine of up to 25% of the total estimated valuation of the permitted project.
Should the applicant fail to meet diversion policy requirements, a fine will be assessed and must be paid•
prior to the issuance of the final Certificate of Occupancy.
• In casgs •involving multiple units or multiple Certificates of Occupancy, a determination of non-
compliance will result in a maximum total of ten (10) percent, or at least one (1) unit, of the total
permitted units not receiving final Certificates of Occupancy until the fine is paid or, compliance is
determine$, The Mines will be assessed using the tiered rates below: '
Percentage of Debris Diverted
Non -Compliance Fine
50% o or above of total estimated weight diverted
' 0% of total cost of project
30-49% of total estimated weight diverted
5% of total cost of project
11-29% of total estimated weight diverted
15% of total cost of project
0-10% of total estimated weight diverted
25% of total cost of project
Verification
I certify, under penalty of perjury, that these estimates are true and, To the best of my knowledge, the tonnage
estimates reported on this formare my'best estimate of the disposition of the construction and demolition
material generated at this project site.
I understand that these materials must go to a County -approved C&D p`rocessing facility or be removed by a
franchised waste hauler, and the required receipts returned to the County indicating that the materials came
from "County Unincorporated Area," and that I must comply with the 50% diversion requirement or pay a
fine of up to 250I6 of the value of the project. Receipts must include either tons, cubic yards, or truck size and
number of loads.
Additionally, I have been advised that new projects must meet the requirements of the California Green
Building Standards Code and I will comply with the mandatory requirements for material conservation and
resource efficiency if applicable. I understand, if fined, the fine must be paid prior to the issuance of the final
Certificate of Occupancy. 11
Print Name: 1�— b v Owner/Agent/Other: &0-17T a4—
Signatur : Date Signed:
n T�