Arch. and Struct.-Commercial Plan Check Corrections
It is the responsibility of the applicant to satisfy the requirements (clearances) of each of the departments listed in this document.
Normally, each section will stamp your plans indicating their approval.
To view your plan check status and the latest correction list on the Internet, please visit: http://www.ocplanning.net and click on
'Plan Check Status' Link.
Please note that Planning and Development Services (PDS) Public Counter Hours are open Monday thru Friday
from 7:30 a.m. to 5:00 p.m. except holidays.
Project Number:RW130061
Submittal Date:Jan 31, 2013
CBC Edition: 2010
Plan Check Date: 2/22/2013 12:45 PM
Description:Site retaining walls
and site perament
RW/shoring/caisson/GB/laggin
g system for new
SFD.
Job Address
29 AVALON VISTA
NEWPORT COAST, CA
Owner Address
Mark Moshayedi
14 Channel Vista
Newport Coast CA
Current - 1st Plan Check
Plan Checked By
Edmund Lee
Edmund.Lee@ocpw.ocgov.com
(714) 667-8872
Contact Address
Sheila Patterson-Wright
139 Avenida Navarro
San Clemente CA92672-1
949-492-8586
949-492-8586 FAX
swright@toalengineering.com
Page 1 of 9
RW130061
OBTAIN CLEARANCES (approvals) from:
Current Planning/Zoning (714) 834-2626
GENERAL INFORMATION
Application for which no permit is issued within 180 days following the date of application shall expire by limitation.
An extension of 180 days may be granted upon written request showing circumstances beyond the control of the applicant
have prevented action being taken. In order to renew action for an application after expiration, the applicant
shall resubmit plans and pay a new plan check fee.
Valid Worker´s Compensation Certificate or Owner-Builder Verification is required prior to issuance of building
permits.
Major corrections shall be made on the original tracing and new prints submitted.
The correction list is available on the Internet at http://pdsd.oc.ca.gov (Click on the services tab, then the
Plan Check Processing link).
A grading permit is required. Retaining walls permit will not be issued until Grading permit is issued.
The Civil Engineer or Architect who is responsible for the project shall sign final approved sets of plans.
Note on this correction sheet the location of the completed correction on your plans.
Site Retaining Wall and site perament RW/shoring/caisson/GB/lagging system will be approved until geotechnical
report & grading permit is approved and release.
Page 2 of 9 2/22/2013 12:45 PM
RW130061
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) NOTES
Notes must be shown as worded, on the title sheet of the plan
1. In the case of emergency, call___________________at Work Phone #___________________or Home Phone #_________
__________.
2. Sediment from areas disturbed by construction shall be retained on site using structural controls to the maximum
extent practicable.
3. Stockpiles of soil shall be properly contained to minimize sediment transport from the site to streets, drainage
facilities or adjacent properties via runoff, vehicle tacking, or wind.
4. Appropriate BMP's for construction-related materials, wastes, spills shall be implemented to minimize transport
from the site to streets, drainage facilities, or adjoining properties by wind or runoff.
5. Runoff from equipment and vehicle washing shall be contained at construction sites unless treated to reduce
or remove sediment and other pollutants.
6. All construction contractor and subcontractor personnel are to be made aware or the required best management
practices and good housekeeping measures for the project site and any associated construction staging areas.
7. At the end of each day of construction activity all construction debris and waste materials shall be collected
and properly disposed in trash or recycle bins.
8. Construction sites shall be maintained in such a condition that an anticipated storm does not carry wastes or
pollutants off the site. Discharges of material other than stormwater only when necessary for performance and
completion of construction practices and where they do not: cause or contribute to a violation of any water quality
standard; cause or threaten to cause pollution, contamination, or nuisance; or contain a hazardous substance in
a quantity reportable under Federal Regulations 40 CFR Parts 117 and 302.
9. Potential pollutants include but are not limited to: solid or liquid chemical spills; wastes from paints, stains,
sealants, glues, limes, pesticides, herbicides, wood preservatives and solvents; asbestos fibers, paint flakes
or stucco fragments; fuels, oils, lubricants, and hydraulic, radiator or battery fluids; fertilizers, vehicle/equipment
wash water and concrete wash water; concrete, detergent or floatable wastes; wastes from any engine/equipment
steam cleaning or chemical degreasing and superchlorinated potable water line flushing.
During construction, permittee shall dispose of such materials in a specified and controlled temporary area on
-site, physically separated from potential stormwater runoff, with ultimate disposal in accordance with local,
state and federal requirements.
10. Dewatering of contaminated groundwater, or discharging contaminated soils via surface erosion is prohibited.
Dewatering of non-contaminated groundwater requires a National Pollutant Discharge Elimination System Permit from
the respective State Regional Water Quality Control Board.
11. Graded areas on the permitted area perimeter must drain away from the face of slopes at the conclusion of each
working day. Drainage is to be directed toward desilting facilities.
12. The permittee and contractor shall be responsible and shall take necessary precautions to prevent public trespass
onto areas where impounded water creates a hazardous condition.
13. The permittee and contractor shall inspect the erosion control work and insure that the work is in accordance
with the approved plans.
14. The permittee shall notify all general contractors, subcontractors, material suppliers, lessees, and property
owners: that dumping of chemicals into the storm drain system or the watershed is prohibited.
15. Equipment and workers for emergency work shall be made available at all times during the rainy season. Necessary
materials shall be available on site and stockpiled at convenient locations to facilitate rapid construction of
temporary devices when rain is imminent.
16. All removable erosion protective devices shall be in place at the end of each working day when the 5-Day Rain
Probability Forecast exceeds 40%.
Page 3 of 9 2/22/2013 12:45 PM
RW130061
17. Sediments from areas disturbed by construction shall be retained on site using an effective combination of
erosion and sediment controls to the maximum extent practicable, and stockpiles of soil shall be properly containted
to minimize sediment transport from the site to streets, drainage facilities of adjacent properties via runoff,
vehicle tracking, or wind.
18. Appropriate BMPs for construction-related materials, wastes, spills or residues shall be implemented and retained
on site to minimize transport from the site to streets, drainage facilities, or adjoining property by wind or
runoff.
Page 4 of 9 2/22/2013 12:45 PM
RW130061
Arch. and Struct.-Commercial Plan Check Corrections
Sheet Comments By
Plot Plan
E. Lee1 In your responses, please refer to the alpha-numeric reference numbers that are
shown at the start of each of the following correction items.
Pending E. Lee2 See sheet SWP, and color comment. Please add & refined the scope of shoring/caisson/lagging/
rw wall/grade beam & retaining walls work based on site proposed & permit application
description., (b) a complete retaining wall types, height to bottom of footing,
length, setback, backfill or earthslope, etc. shall add to the sheet when resubmittal.
(c) No retaining wall A, B,C schedule, and full description found from sheet SWP,
(d) Each new proposed RW wall shall have a specific detail reference at a specific
location or section, please clarify & revise current sheet SWP detail reference,
(e) Please provide a separate wall type legend for the building bearing perimeter
wall or /and basement wall in term of proposed group of RW wall, wall type index
is identical and confused.
Pending E. Lee3 Please (a) reprint sheet 3 for shoring, caisson & lagging, which is not legible
to read, (b) Add proposed shoring, caisson & lagging scope of work description to
the plan, including wall height, length, grad beam size, length, each caisson size,
depth etc., (c) please clarify where is the grid lines A to J reference from? which
is not found from sheet SWP?
Pending E. Lee4 Show clearly property line with exact dimensions adjacent to retaining wall.
Pending E. Lee5 Show existing and proposed contours/spot elevations to indicate general site slope
and drainage pattern.
Pending E. Lee6 On site plan delineate all projecting wall elements, and show distance to property
line, or adjacent structures.
Pending E. Lee7 All site & various height of retaining walls shall be shown on the issued Grading
Plan. Please provide
this issued Grading Plan for verification. If this issued Grading Plan does not
show these retaining walls, please revise to show these walls and resubmit.
Pending E. Lee8 Clearly identify new retaining walls index & type on the site plan. Reference structural
details from SWD1-3 to the wall lay out plan shown on site plan.
Pending E. Lee9 Complete attached County retaining wall , etc. form matrix which shall comply with
proposed construction document. Once confirmed, please scan to the plan title sheet
when resubmittal.
General requirements:
Pending E. Lee10 In your responses, please refer to the alpha-numeric reference numbers that
are shown at the start of each of the following correction items.
Page 5 of 9 2/22/2013 12:45 PM = Indicates line item not Cleared.
RW130061
Arch. and Struct.-Commercial Plan Check Corrections
Sheet Comments By
Pending E. Lee11 Clearly identify new retaining walls length & height information on the site
plan. Provide a complete elevation view for the retaining walls, indicate specific
elevation information at top of wall, finished grade elevation, at point of height
change location, from the lowest adjacent grade within 5 feet or 10 feet from the
proposed site. (b) Clarify any catch basin or drain box behind the retaining wall
along the line?
Pending E. Lee12 Show subdrain size, tie into where? and final discharge location per site
situation & soil report and grading drainage plan. (b) Drainage is not permitted
to drain onto adjoining properties. Show drainage on the site plan.
Pending E. Lee13 Please note on Title Sheet, "Construction Plans and Calculations shall comply
with all of the requirements of the California Building Code 2010 Edition, County
grading Ordinances, and other State & OSHA requirements."
Pending E. Lee14 Note on the Plans: "Comply with protection of adjoining property by providing
a written notice to the owners of adjoining buildings advising them that an excavation
deeper than the foundation of the adjoining building and located less than excavation
depth to the property line is to be made and that the adjoining buildings should
be protected. Said notification shall be delivered not less than 10 days prior
to the scheduled starting date of the excavations." (California Civil Code Section
832, Bldg. Code Section 3307.1)
Pending E. Lee15 Provide a copy of permit from the California Division of Industrial Safety for
excavations or trenches over 5 ft
vertical cuts. Note on the plans: "A copy of CALOSHA permit shall be submitted
to Building Inspector prior to excavation."
Pending E. Lee16 See plan, please indicate property line, basement wall lines location, setback
distance away from the shoring elements.
Pending E. Lee17 For projects requiring special inspection and/or structural observation, Form
00-01 and/or 00-02 shall be completed by the architect, engineer, or owner and scan
on the 1st sheet of plans (the site plan). If no special inspection and/or structural
observation are required, the architect or engineer needs to include a note on the
Site Plan to indicate that it is not required.
Pending E. Lee18 Guards shall be provided along open-sided walking surfaces that are located more
than 30 inch above the
grade below. (CBC 1013.1), Please identify and show compliance with design calculation
and detail reference.
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
Pending E. Lee19 Include "National Pollutant Discharge Elimination System Notes" on first sheet
of plans. (This information is provided in the beginning of this document) , see
sheet 1, please filled-out required information at top of form.
Page 6 of 9 2/22/2013 12:45 PM = Indicates line item not Cleared.
RW130061
Arch. and Struct.-Commercial Plan Check Corrections
Sheet Comments By
Pending E. Lee20 Provide Erosion and Sediment Control(ESCP) plan. Show gravel-sandbag location,
detail and minimum 10´ x 10´ concrete washout areas to the site plan. This is separate
from Civil drawing and GB application. (a) Add & scan the entire BMP, ESCP-Small
Area Checklist form to the plan when resubmittal.
Site Retaining Wall and site perament RW/shoring/caisson/GB/lagging system:
Pending E. Lee21 Clarify & response to each color comment from the design calculation and plan.
Pending E. Lee22 Add seismic soil loading information to sheet SWN-1 foundation note area per soil
report recommendation.
Pending E. Lee23 See design calculation result and sheet SWD3, please (a) show number of each type
of caisson, (b) clarify lagging member size, spacing and (c) RW wall above and grade
beam schedule and construction information to the schedule.
Pending E. Lee24 See geotechnical report p. 35-37, please add & scan cast-in-place concrete caisson
and grade beams design recommendations to the plan when resubmittal.
Pending E. Lee25 Soil report shall be review and approved by the County geologist prior to permit
approval & issurance.
Pending E. Lee26 Geotechnical engineer to review, approve, ink stamp and signed on SWP & SWD series
of sheets and details when resubmittal.
Pending E. Lee27 All retaining walls & shoring/caisson/lagging/GB/RW proposed improvement shall
be shown on the approved Grading Plan (GB120111 still under reviewed and not approved
yet) . Please provide this approved Grading Plan for verification. If this approved
Grading Plan does not show these retaining walls, please revise to show these items
and resubmit for recheck.
Pending E. Lee28 SWD3 sheet, detail and note reference is not legible to read, please revise ,
reprint when resubmittal.
Pending E. Lee29 Retaining walls permit will not issue until (a) geotechnical report obtain approval,
(b) grading permit has been approved & issued.
Pending E. Lee30 See design calculation for the permanent shoring pages and soil report recommendation
p. 32, (a) clarify & revise passive resistance for caisson of 450 plf instead of
900 plf used in the design process, (b) add and incorporate soil report recommendation
of lateral creep loading of 1000 plf of the embedment in the creep zone into the
design calculation, please revise, (c) reflect this information to sheet SWN-1,
(d) Identify creep zone depth and dimension to the detail sheet of SWD3.
Page 7 of 9 2/22/2013 12:45 PM = Indicates line item not Cleared.
RW130061
Arch. and Struct.-Commercial Plan Check Corrections
Sheet Comments By
Pending E. Lee31 See geotechnical report p. 28-303, (a) please clarify and add add seismic load
effect to each type of RW wall design per geotechnical report recommendation, (b)
re-design RW recommendation and reflect to the detail sheets.
Pending E. Lee32 Surcharge loads on retaining walls design formula is not a part of CRC or CBC
or from provided geotechnical report, please clarify and provide background document,
( it were shown on the city & county of LA building codes before, not there anymore
) , Please certify and concurred by the geotechnical engineer for that formula used.
Pending E. Lee33 Show clearly property line with exact dimensions adjacent to shoring wall, structural
elements and caisson/pile.
Pending E. Lee34 Clearly identify new retaining walls on plans with their each RW #, length & height
and setback distance to the property line information on the site plan & constructoion
section. Provide a complete elevation view for the retaining walls, indicate specific
elevation information at top of wall, finished grade elevation, at point of height
change location, from the lowest adjacent grade within 5 feet or 10 feet from the
proposed site. (b) Clarify any catch basin or drain box behind the retaining wall
along the line per approved soil report.
Pending E. Lee35 On site plan delineate all projecting shoring wall elements, and show distance
to property line, or adjacent structures.
Pending E. Lee36 All site & various height of shoring walls or related caisson or pile shall be
shown on the issued Grading Plan. Please provide this issued Grading Plan for verification.
If this issued Grading Plan does not show these retaining walls, please revise to
show these walls and resubmit.
Pending E. Lee37 Final set of plan, design calculation shall be stamped and wet signed by Civil
Engineer and Geotechnical Engineer.
Pending E. Lee38 Daylight setback dimension or information shall matched with approved soil report.
Please add to each elevation and section view of the plan.
Pending E. Lee39 Calculate the deflection of soldier piles and compare
with the max. allowable ( 1/2") as specified in the p. 6 of approved soils report.
If not in the report, ask soil engineer to provide a specific recommendation.
Pending E. Lee40 Seismic soil pressure recommendation and input shall add to the retaining wall
design and analysis when resubmittal.
Pending E. Lee41 Comply with the requirements for shotcrete prescribed in CBC Section 1913. Add
notes accordingly.
Pending E. Lee42 Design and detail required lagging. If tie-back
anchors extend across the property line, a notarized
letter is required from the adjacent property owner
allowing the anchors to extend into their property. A
separate permit is required for such offsite work.
Approval from Public Works is required for
encroachment of anchors into the public way.
Page 8 of 9 2/22/2013 12:45 PM = Indicates line item not Cleared.
RW130061
Arch. and Struct.-Commercial Plan Check Corrections
Sheet Comments By
Pending E. Lee43 Note to the plan--- Shoring system is not allowed to support surcharge from adjacent
structures without the recommendations of an approved report and evidence that the
adjoining property owner has been notified in advance.
Pending E. Lee44 Specify and detail on plans excavation, shoring installation and sequence of construction
procedures, which shall comply with geotechnical report.
Pending E. Lee45 Construction joints should be provided in the block walls at each corners at horizontal
intervals of approx. 20 to 25 feet, the separations should be provided in the blocks
and not extend through the footings, the footing s should be poured monolithically
with continuous rebars to serve aseffective grade beams below the walls. please
note to the plan with specific construction details. Add note and detail to the
plan.
Page 9 of 9 2/22/2013 12:45 PM = Indicates line item not Cleared.