Loading...
HomeMy WebLinkAboutSW130132_Final Inspection RecordCounty of Orange OC Public Works Main Office 300 N. Flower Street Santa Ana, CA 92702-4048 FOR INSPECTIONS Visit us on the web at: http://www.ocplanning.net SWIMMING POOL INSPECTION RECORD Building Permit Number:SW130132 Date:01/25/2017 Description of Use:New swimming pool with basin (1009 sqft.) with 9 caissons (1,833 sqft.) [12/8/16 Rev 1 - modify pool barrier fencing; revise infinity basin to smooth spillway surface; install overflow drain at infinity basin for maximum basin water depth of 18 inches] INSPECTION RESULTS Approved Inspection Items Inspection Type(s)Inspected On Approved By 901-Npdes Inspection 01/25/2017 Reggie Plowman 595-Final Light/GFCI Test 01/25/2017 Reggie Plowman PF-Permit Final 01/25/2017 Linda Hochgurtel 570-Approval to Plaster 12/14/2016 Reggie Plowman 573-Door Alarms 12/14/2016 Reggie Plowman 545-Approval to install/pour deck 07/01/2015 Thomas Dawson 541-Pre-deck Bonding 07/01/2015 Thomas Dawson 965-Miscellaneous 06/30/2015 Jeff Heard 563-Anti-Siphon Fill Line (U.G. Only)03/31/2015 Thomas Dawson 550-Underground Gas 03/31/2015 Thomas Dawson 560-Underground Electrical 03/31/2015 Thomas Dawson 901-Npdes Inspection 04/02/2014 Linda Hochgurtel 901-Npdes Inspection 03/18/2014 Thomas Dawson 505-Approval to Gunite 03/18/2014 Thomas Dawson Page 1 of 2 Building Permit Number:SW130132 Date:01/25/2017 Description of Use:New swimming pool with basin (1009 sqft.) with 9 caissons (1,833 sqft.) [12/8/16 Rev 1 - modify pool barrier fencing; revise infinity basin to smooth spillway surface; install overflow drain at infinity basin for maximum basin water depth of 18 inches] INSPECTION HISTORY All Inspection Items Requested Assigned Inspection Inspection Inspection Inspection Inspected On To Order Type(s)On Status By 01/25/2017 Reggie Plowman 2/5 901-Npdes Inspection 01/25/2017 Approved Reggie Plowman 01/25/2017 Reggie Plowman 2/5 595-Final Light/GFCI Test 01/25/2017 Approved Reggie Plowman 01/25/2017 Linda Hochgurtel 0/23 PF-Permit Final 01/25/2017 Approved Linda Hochgurtel 01/24/2017 Reggie Plowman 2/15 595-Final Light/GFCI Test 01/24/2017 Correction Reggie Plowman 12/14/2016 Reggie Plowman 33/34 573-Door Alarms 12/14/2016 Approved Reggie Plowman 12/14/2016 Reggie Plowman 33/34 570-Approval to Plaster 12/14/2016 Approved Reggie Plowman 11/22/2016 Reggie Plowman 3/29 570-Approval to Plaster 11/23/2016 Correction Reggie Plowman 11/22/2016 Reggie Plowman 3/29 573-Door Alarms 11/23/2016 Correction Reggie Plowman 07/01/2015 Thomas Dawson 3/21 545-Approval to install/pour deck 07/01/2015 Approved Thomas Dawson 07/01/2015 Thomas Dawson 3/21 541-Pre-deck Bonding 07/01/2015 Approved Thomas Dawson 06/30/2015 Jeff Heard 1/1 965-Miscellaneous 06/30/2015 Approved Jeff Heard 06/30/2015 Jeff Heard 1/1 563-Anti-Siphon Fill Line (U.G. Only)03/31/2015 Approved Thomas Dawson 06/30/2015 Jeff Heard 1/1 550-Underground Gas 03/31/2015 Approved Thomas Dawson 06/30/2015 Jeff Heard 1/1 560-Underground Electrical 03/31/2015 Approved Thomas Dawson 03/31/2014 Linda Hochgurtel 5/7 901-Npdes Inspection 04/02/2014 Approved Linda Hochgurtel 03/18/2014 Thomas Dawson 13/29 901-Npdes Inspection 03/18/2014 Approved Thomas Dawson 03/18/2014 Thomas Dawson 13/29 505-Approval to Gunite 03/18/2014 Approved Thomas Dawson 12/18/2013 Thomas Dawson 32/37 522-Steel Placement 12/18/2013 Partial Approval Thomas Dawson 11/22/2016 Reggie Plowman 22/24 570-Approval to Plaster 11/22/2016 Reggie Plowman 22/24 573-Door Alarms Page 2 of 2