HomeMy WebLinkAboutRW110057_068t0000003mjenAAA_Spl. Inspector ReportsMMD11M99ECTgN SERVICES IN[ Ce1l;gMk9) 6336139
B615 AI91ers Sheet
Phone &FAY(919) E39-nM
MISSImVIef0.CA9M91AM
STA
a¢ECTMW SERVW INC.
Observation Report
106 AEMew 15 Avalon Vida
Newport Coast GA vend Hurler RW110057
ppryene' Avalon Vista II Project
MJilraG Design West ArcMtecture
MnehlparplM: ASTM A615 Grade 80 Reber Eglrcs. KNA Engineering, Inc.
Dpuryr Nerve Robert Geta
Wnra[br; Nathu Development
Sani x
density. SAMONVImn KP Construction.
TygeceWakgwrht Structural Masonry qee 08-15-11
1. Varied] the laying up of 8" x 8' x 16 blacks at the let lift section (courses 14) of the proposed new CMU
Well Aiun oltlro Man EntryPoYMalnoi proposed new Mein Renegade Of Parcel 1 gormetlyt 12613).
2. Obaenied mortar Stan; Mix Type "5' Mortar, br proper mivng and handling.
1 Verified reinforcing goal for sire, grade, lap, oration, and bearence.
d. Work observed, unless noted othene se, I5 in accordance wtlh the approved plena and specifications.
capW
Sm 51012]fc c. AOPw'd W
Gr =2 Agony xsw.nwwn
AMiSfA1N5PK110X 591VICES INt �T Cell(949183779M
39
3lespon ien(uOulh AMSTA phone&PA%:19#9103)->939
Mission Ye)q CA 92691 ecnoN saances INC.
Observation Report
len.aepeac 15 Avalon Vista Newport Carl CA rynsWunLer. R5110389& RW1100"&FAA 10057
yar Rwm Avalon Vista II Protect MyliDsc pesi9n West Arcllnedure
MaleM Ltwostal Concrete, Mix Design WS600p" Bglpeer. NNA Engineering Inc.
oewbs Name Robert Getz Coammomc Nahu Development
samples: a^ x e" anNry= a 5UNwwwdbe IT Constiuctlon
1{pagWpkpbeneG Reinforced Concrete Placement qte 08-10-11
1. pbservetl the placement & Contra ragicn of 23.5 cu. ytlsof concrete, mix design #RS500PI0 (5000 PSI), at the
following locations the hot Floor foundation foobng eeNon of the Main Cary Fountain along the east aide of the
proposed new Main Residence of Parcel 1 (fmmedy La 12 & 13), and In the tat high Id "don (castes 1-10)
of the Site Roaming Wall MMm along the math title time Pcd Egulpmend Banker ® the enumplast camera
Parcel 1 formerly Lot 12 & 13), and the tat Floor lOundalon caa4m-place planter wall aec0on wrong the top east
side aide Pod Equipment Bunker Q the southeast comer of Parcel l (formerly Lot 12 & 13).
2. One ao a <" x T = a test gllntlee was taken ham Load #1 (10 cuytls), ticket #7700918, truck #162.
0. Conroe was so di led by RObtatson'8 Ready Mix.
5. Work observed, unless noted otherwise, is in accordance main Me approved
plans and specifications
Removal saw
MEAMWANIll
b
Rc 51c232a. 1C.c. agi hr
sp laid Nn Poerey Inup¢wpuiimeurc