Loading...
HomeMy WebLinkAboutRS050650_Final Inspection RecordCounty of Orange Resources & Development Management Department Main Office 300 N. Flower Street Santa Ana, CA 92702-4048 FOR INSPECTIONS CALL (949)472-7922 or Visit us on the web at: http://www.ocplanning.net RESIDENTIAL BUILDING INSPECTION RECORD Building Permit Number:RS050650 Date:04/18/2006 Description of Use:Reissue for expired permit RS031855; detached freestanding Pavilion (solid tile roof) with outdoor fireplace (ht- 13'3" and 17'3") INSPECTION RESULTS Approved Inspection Items Inspection Type(s)Inspected On Approved By 195-Structural Final 03/30/2006 Thomas Dawson 295-Plumbing Final 03/30/2006 Thomas Dawson 495-Electrical Final 03/30/2006 Thomas Dawson PF-Permit Final 03/30/2006 Allan Metz 160-Ext Lath/Flashing 12/06/2005 Thomas Dawson 415-Rough Electrical 11/15/2005 Doug Scott 130-Roof Sheathing/framing 09/08/2005 Robert Ritti 135-Shear Panel/holddowns 09/08/2005 Robert Ritti 140-Framing 09/08/2005 Robert Ritti 207-Underground Gas 07/01/2005 Harold Stansbury 235-Yard Gas Piping 07/01/2005 Harold Stansbury 240-Gas Test 07/01/2005 Harold Stansbury 105-Foundation/loc/hardware 05/26/2005 Phill Duncan 901-Npdes Inspection 05/03/2005 Scott Priegel Page 1 of 2 Building Permit Number:RS050650 Date:04/18/2006 Description of Use:Reissue for expired permit RS031855; detached freestanding Pavilion (solid tile roof) with outdoor fireplace (ht- 13'3" and 17'3") INSPECTION HISTORY All Inspection Items Requested Assigned Inspection Inspection Inspection Inspection Inspected On To Order Type(s)On Status By 03/30/2006 Thomas Dawson 1/9 195-Structural Final 03/30/2006 Approved Thomas Dawson 03/30/2006 Thomas Dawson 1/9 295-Plumbing Final 03/30/2006 Approved Thomas Dawson 03/30/2006 Thomas Dawson 1/9 495-Electrical Final 03/30/2006 Approved Thomas Dawson 03/30/2006 Allan Metz 7/15 PF-Permit Final 03/30/2006 Approved Allan Metz 03/02/2006 Robert Ritti 6/8 195-Structural Final 03/02/2006 Correction Robert Ritti 12/06/2005 Thomas Dawson 2/9 160-Ext Lath/Flashing 12/06/2005 Approved Thomas Dawson 11/15/2005 Doug Scott 4/13 415-Rough Electrical 11/15/2005 Approved Doug Scott 09/08/2005 Robert Ritti 2/12 130-Roof Sheathing/framing 09/08/2005 Approved Robert Ritti 09/08/2005 Robert Ritti 2/12 135-Shear Panel/holddowns 09/08/2005 Approved Robert Ritti 09/08/2005 Robert Ritti 2/12 140-Framing 09/08/2005 Approved Robert Ritti 07/01/2005 Harold Stansbury 2/6 207-Underground Gas 07/01/2005 Approved Harold Stansbury 07/01/2005 Harold Stansbury 2/6 235-Yard Gas Piping 07/01/2005 Approved Harold Stansbury 07/01/2005 Harold Stansbury 2/6 240-Gas Test 07/01/2005 Approved Harold Stansbury 05/25/2005 Phill Duncan 4/6 105-Foundation/loc/hardware 05/26/2005 Approved Phill Duncan 05/03/2005 Scott Priegel 5/10 901-Npdes Inspection 05/03/2005 Approved Scott Priegel 04/19/2005 Robert Ritti 3/8 105-Foundation/loc/hardware 04/19/2005 Partial Approval Robert Ritti Page 2 of 2