PLANNING AND DEVELOPMENT SERVICES DEPARTMENT
BUILDING PERMITS DIVISION
Main Office
300 N. Flower Street
Santa Ana, CA 92702-4048
No Plan Check Corrections
It is the responsibility of the applicant to satisfy the requirements (clearances) of each of the departments listed in this document.
Normally, each section will stamp your plans indicating their approval.
To view your plan check status and the latest correction list on the Internet, please visit: http://pdsd.oc.ca.gov and click on 'Plan
Check Status' Link
Project Number:RW030956
Submittal Date:Dec 03, 2003
CBC Edition: 1998
Plan Check Date: 12/3/2003 8:54 AM
Description:retaining walls
to max. 6 foot
height
Job Address
5 PELICANS DR
NEWPORT COAST, CA
Owner Address
Bill/ Lil Knight
2496 San Miguel Dr
Orange CA92687
1st Plan Check 10/14/03 1st Recheck 11/24/03 Current - 2nd Recheck 12/3/03
Architect of Record
Eric Trabert Associates
20351 Irvine Ave.
Suite One
Santa Ana Heights CA92707
714-641-1505
714-641-1091 FAX
Engineer of Record
VCA Engineering, Inc.
Attn: Dan Van Dorpe
295 N. Rampart Street
Orange CA92868
(714) 978-9780
Plan Checked By
Albric Ghokasian
Albric.Ghokasian@pdsd.ocgov.com
714-834-2636
714-796-8252 FAX
Contact Address
Edgardo Gelsano
20351 Irvine Ave.
Suite One
Santa Ana Heights CA92707
714-641-1505
714-641-1091 FAX
etrabert1@aol.com
Building Name Construction Type Occupancy Stories Area Fire Requirement
Knight sfd Type V - N U-1 0 4054
Page 1 of 3
RW030956
OBTAIN CLEARANCES (approvals) from:
Current Planning/Zoning (714) 834-2626
Grading Plan Check (714) 834-2656 Gb030139 issued OK
Arch/Structural Plan Check (714) 834-2636 OK
GENERAL INFORMATION
Application for which no permit is issued within 180 days following the date of application shall expire by limitation.
An extension of 180 days may be granted upon written request showing circumstances beyond the control of the applicant
have prevented action being taken. In order to renew action for an application after expiration, the applicant
shall resubmit plans and pay a new plan check fee.
Valid Worker´s Compensation Certificate or Owner-Builder Verification is required prior to issuance of building
permits.
Major corrections shall be made on the original tracing and new prints submitted.
The correction list is available on the Internet at http://pdsd.oc.ca.gov (Click on the services tab, then the
Plan Check Processing link).
Retaining wall permit will be issued after Grading permit is issued.
The Civil Engineer or Architect who is responsible for the project shall sign three final sets of plans. OK
Note on this correction sheet the location of the completed correction on your plans.
Page 2 of 3 12/3/2003 8:54 AM
RW030956
Please show the following notes on the first sheet of the plan:
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
1. In the case of emergency, call___________________at Work Phone #___________________or Home Phone #
___________________.
2. Sediment from areas disturbed by construction shall be retained on site using structural controls
to the maximum extent practicable.
3. Stockpiles of soil shall be properly contained to minimize sediment transport from the site to streets,
drainage facilities or adjacent properties via runoff, vehicle tacking, or wind.
4. Appropriate BMP's for construction-related materials, wastes, spills shall be implemented to minimize
transport from the site to streets, drainage facilities, or adjoining properties by wind or runoff.
5. Runoff from equipment and vehicle washing shall be contained at construction sites unless treated
to reduce or remove sediment and other pollutants.
6. All construction contractor and subcontractor personnel are to be made aware or the required best
management practices and good housekeeping measures for the project site and any associated construction
staging areas.
7. At the end of each day of construction activity all construction debris and waste materials shall
be collected and properly disposed in trash or recycle bins.
8. Construction sites shall be maintained in such a condition that an anticipated storm does not carry
wastes or pollutants off the site. Discharges of material other than stormwater only when necessary
for performance and completion of construction practices and where they do not: cause or contribute
to a violation of any water quality standard; cause or threaten to cause pollution, contamination, or
nuisance; or contain a hazardous substance in a quantity reportable under Federal Regulations 40 CFR
Parts 117 and 302.
9. Potential pollutants include but are not limited to: solid or liquid chemical spills; wastes from
paints, stains, sealants, glues, limes, pesticides, herbicides, wood preservatives and solvents; asbestos
fibers, paint flakes or stucco fragments; fuels, oils, lubricants, and hydraulic, radiator or battery
fluids; fertilizers, vehicle/equipment wash water and concrete wash water; concrete, detergent or floatable
wastes; wastes from any engine/equipment steam cleaning or chemical degreasing and superchlorinated
potable water line flushing.
During construction, permittee shall dispose of such materials in a specified and controlled temporary
area on-site, physically separated from potential stormwater runoff, with ultimate disposal in accordance
with local, state and federal requirements.
10. Dewatering of contaminated groundwater, or discharging contaminated soils via surface erosion is
prohibited. Dewatering of non-contaminated groundwater requires a National Pollutant Discharge Elimination
System Permit from the respective State Regional Water Quality Control Board.
11. Graded areas on the permitted area perimeter must drain away from the face of slopes at the conclusion
of each working day. Drainage is to be directed toward desilting facilities.
12. The permittee and contractor shall be responsible and shall take necessary precautions to prevent
public trespass onto areas where impounded water creates a, hazardous condition.
13. The permittee and contractor shall inspect the erosion control work and insure that the work is in
accordance with the approved plans.
14. The permittee shall notify all general contractors, subcontractors, material suppliers, lessees,
and property owners: that dumping of chemicals into the storm drain system or the watershed is prohibited.
15. Equipment and workers for emergency work shall be made available at all times during the rainy season.
Necessary materials shall be available on site and stockpiled at convenient locations to facilitate
rapid construction of temporary devices when rain is imminent.
16. All removable erosion protective devices shall be in place at the end of each working day when the
5-Day Rain Probability Forecast exceeds 40%.