HomeMy WebLinkAboutE2018-0065 - MiscV,066-CC(,5'
Date: )
M
NOISE LEVEL AGREEMENT
t4/
Print affected a
dja
cent p/ropert'y Owners Name (owner)
of
Print affected adj ntpropertyOwner'sAddress(owneraddress)
authorize the installation of air conditioning unit(s) at the following neighbor's address,
owner
I am aware the noise will
Print neighbors address with AC units) which exceed 55 db (neighbor's address)
exceed 55 db (decibels) to a maximum rating of 65 db. I give my authorization to install the
unit(s) not to exceed 65 db per the Newport Beach Municipal Code section
10.26.045.
Thank you,
(Signature of affected property owner under penalty of per}ury-f attest that I am the current
affected property owner.
(Print Name of affected pr erty owner)
(Property Address)
Forms\N.o.Le..Ms,eemea
STATE OF CALIFORNIA
ALTERATIONS - HVAC
CEC-CFIR-ALT-03-E (Revised 01/16) CALIFORNIA ENERGY COMMISSION 'qEP'
CERTIFICATE OF COMPLIANCE CF1R-ALT-03-E
Alterations - HVAC CZ 1, 3 to 7 and 16 (Page 1 of 1)
Site Address:
Enforcement Agency:
Date Prepared:
Permit#:
1423 High Buff Dr
Newport Beach
Equipment Type
Equipment Efficiency
New: Ducting or Lineset
Required R-value
Conditioned i
Floor Area (ft )
Thermostat
❑ Packaged System
((Evaporator Coil
J10 AFUE
Cop
❑ R-6 (CZ I-10,12&13) Ducts
Served by system
Setback
❑ Split System
XCondensing Unit
14 SEER
❑ R-8' (CZ 11,14-16) Ducts
ft2
(If not already
HSPF
El >_ R-2.8 Uneset3
present, must
j�Furnace
❑ Lineset
EER
be installed)
HERS VERIFICATION SUMMARY Installer determines work to be completed and matches to one of the options below. At permit application this
form is allowed to be filled out by hand. For final inspection all forms are to be registered (no hand filled forms allowed) and a copy left on site.
P(1. HVAC Changeout/Repair
Required Compliance Documents to be left on site for Final:
(Can include new ducting)
All Equipment,
CFIR-ALT-02-E
Condenser Unit, Evaporator Coil,
CF2R: MCH-01, MCH-20-H
Air Handler/Furnace
CF3R: MCH-20-H
Installer Requirement: Duct leakage (<15%or, <10%to outside, or seal all accessible leaks)
Exempted from duct leakage testing if:
❑ 1. Duct system registered with HERS provider as previously sealed, or 0 2. There is less than 40 linear feet of duct in unconditioned
space, or 0 3. Existing duct systems are constructed, insulated or sealed with asbestos (list manufacture date of building
❑ 2. New HVAC System
Required Compliance Documents to be left on site for Final:
All new equipment and All New Ducts'
CFIR-ALT-02-E
CF2R-MCH-01-E, MCH-20-H, MCH-22-H, MCH-(23 or 24)-H
CF3R-MCH-20-H, MCH-22-11, MCH-(23 or 24)-H2
Installer Requirement: Duct leakage < 5%, Fan Efficacy (0.58W/CFM), Air Flow>_ 350 CFM/ton (or Standards Table 150.0-B / C alternative)
❑ 3. All New Ducts with Replacement
Required Compliance Documents to be left on site for Final:
Includes replacing or installing All New
CF1R-ALT-02-E
Ducts' and one or more of the following:
CF2R-MCH-01-E, MCH-20-H, MCH-(23 or 24)-H
Condenser Unit, Evaporator Coil, Furnace
CF3R-MCH-20-H, MCH-(23 or 24)-H
Installer Requirement: Duct leakage < 5%, Air Flow >_ 350 CFM/ton (or Standards Table 150.0-B / C alternative)
❑ Exempted from duct leakage testing if existing duct systems are constructed, insulated or sealed with asbestos.
❑ 4. New Ducting over 40 feet
Required Compliance Documents to be left on site for Final:
Adding or replacing ducts in unconditioned
CFIR-ALT-02-E
space but less than All New Ducts'
CF2R-MCH-20-H
CFBR-MCH-20-H
Installer Required to: Duct leakage (< 15% or, < 10%to outside, or seal all accessible leaks)
❑ Exempted from duct leakage testing if existing duct systems are constructed, insulated or sealed with asbestos.
' All new ducting requires R-8 insulationwhen more than 40 ft installed in CZs 11 & 14-16 and R-6 in CZs 1-10, 12 & 13, and R-6 insulation when less
than 40 ft installed. This includes in walls, between floors etc.
' A New Duct system is when the duct system is constructed of at least 75 %new duct material, and up to 25%may consist of reused parts from the
dwelling unit's existing duct system (e.g., registers, grilles, boots, air handler, plenums, duct material.
3 R-2.8 W'thick insulation) for linesets 1" and less.
Contractor (Documentation Author's /Responsible Designer's Declaration Statement)
I certify the following under penalty of perjury, under the laws of the State of California:
1. The information provided on this Certificate of Compliance is true and correct.
2. 1 am eligible under Division 3 of the California Business and Professions Code to accept responsibility for the information on this document.
3. That the energy features and performance specifications for the design identified on this Certificate of Compliance conform to the
requirements of Title 24, Parts 1 and 6 of the California Code of Regulations (CCR).
4. That the energy features and performance specifications, materials, components, and manufactured devices for the building design or
system design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the CCR.
5. The building design features or system design features identified on this Certificate of Compliance are consistent with the information
provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement
agency for approval with this building permit application.
Responsi
Designer ame:
Responsible De' ner Signature:
Date Signed:
ucense:�—t/2
A
�5�7,
/-7 l L
Company:
Address:
City/State/Zip:
Phone:
Greenstar Home Services Inc.
951 Min Street
Oran a CA 92865
949-885-0102
For assistance or questions regarding the Energy Standards, contact the Energy Hotline at:1-800-772-3300