LANDSCAPE INSTALLATION CERTIFICATE OF COMPLETION
I hereby certify that:
(1) 1 am a professional appropriately licensed in the State of California to provide
professional landscape design services.
(2) The landscape project for the property located at
333 Holmwood Drive, Newport Beach, CA 92663 (provide
address or parcel number(s)) was installed by me or under my supervision.
street
(3) The landscaping for the identified property has been installed in substantial
conformance with the approved Landscape Documentation Package and complies with
the requirements of the City of Newport Beach Water Efficient Landscape Ordinance
(Municipal Code Section 14.17) and the City of Newport Beach Standards for
Implementation of the City of Newport Beach Water Efficient Landscape Ordinance for
the efficient use of water in the landscape.
(4) The following elements are attached hereto:
a. Irrigation scheduling parameters used to set the controller; (to be provided by contractor)
b. Landscape and irrigation maintenance schedule; (to be provided by contractor)
c. Irrigation audit report; and (to be provided by contractor)
d. Soil analysis report, if not submitted with Landscape Documentation Package,
and documentation verifying implementation of the soil report
recommendations. (to be provided by contractor)
(5) The site installation complies with the following:
a. The required irrigation system has been installed according to approved plans
and specifications and if applicable, any prior approved irrigation system
alternatives.
b. Sprinklers comply with ASABE/ICC 802-2014 Landscape Irrigation Sprinkler &
Emitter Standard.
Yes _ No
(6) The information I have provided in this Landscape Installation Certificate of
Completion is true and correct and is hereby submitted in compliance with the City of
Newport Beach Design Standards for Implementation of the City of Newport Beach
Water Efficient Landscape Ordinance.
33
Alex Koutzoukis
Print Narne
Si na u e
Pn Rnx s41. Wofford Heights, CA 93285
Address
714.519.1027
Telephone
Landscape Dewro
(if Appro j 1�DSCA3
a
c-
11s.3 .223
. 11.m
03.28.23
OF CAL1
Stamp
03.28.2023
Date
#6327
License Number
akoutzoukis@gmail.com
E-mail Address
A
333 Holmwood Landscaping Watering Schedule(6AM run time every
other day)
• Zone 1 Drip System(18mins Every Other Day)
• Zone 2 Drip System Shade(12mins Every Other Day)
• Zone 3 Drip System Sunny(18mins Every Other Day)
• Zone 4 Gravel Drip System Large Planting(18 mins Every Other
Day)
• Zone 5 Pottery Drip System(imins Every Other Day)
COAST GEOTECHNICAL, INC.
12Di) tLrst Comnrmasa;;L {ver..ie, Fulls':nn, CA 92R33 Ph: 71-4-87C-1211 Fax: 714-570-(222 e-nail: coastgeortc,'ii!gmaiLcom
March 5, 2023
Mr. and Mrs. Jeff Atkins
333 Holmwood Drive
Newport Beach, CA 92660
References:
W.O.557518-07
Subject: Final Soils Report for 333 Holmwood Drive,
Newport Beach, California
1. Geotechnical Engineering Investigation for Proposed Residence at 333 Holmwood Drive, Newport Beach,
California; by COAST GEOTECHNICAL, Inc., W.O.557518-01, dated July 25, 2018.
2. Response to Geotechnical Report Review Checklist, Proposed New Residence at 333 Holmwood Drive,
Newport Beach, Califomia; by COAST GEOTECHNICAL, Inc, W.O.557518-02, dated November 21, 2018.
3. Response to Geotechnical Plan Review Comment, Proposed New Residence at 333 Holmwood Drive,
Newport Beach, California; by COAST GEOTECHNICAL, INC., W.O.557518-03, dated January 11, 2019.
4. Rough Grade Compaction Report, Proposed New Residence at 333 Holmwood Drive, Newport Beach,
California; by COAST GEOTECHNICAL, INC., W.O. 557518-04, dated September 17, 2021.
5. Addendum Report for Basement Subgrade, Proposed New Residence at 333 Hohnwood Drive, Newport
Beach, California; by COAST GEOTECHNICAL, Inc., W.O.557518-05, dated October 11, 2021.
6. Memorandum to Plan Change, New Residence at 333 Holmwood Drive, Newport Beach, California; by by
COAST GEOTECHNICAL, Inc., W.O. 557518-06, dated July 13, 2022.
Dear Mr. and Mrs. Atkins:
In accordance with your request, this final soils report has been prepared to address geotechnical
observations and testing performed since completion of rough grading. This report addresses
requested observations and testing. Copies of our daily reports are maintained in our files.
FOUNDATION EXCAVATIONS
The foundation for basement/garage was observed on September 24, 2021 and September 29,
2021. The at -grade foundation excavations were observed on November 10, 2021 and November
17, 2021. The foundation excavation for the western retaining wall was observed on June 10,
2022. The bio-pit foundation excavation near the western courtyard area was observed on
February 6, 2023. The foundation excavations were found to be acceptable at the time of our
final observation.
INTERIOR SLAB SUBGRADE AND TRENCH BACKFILLS
The basement/garage mat slab foundation excavation was observed on October 11, 2021, see
referenced addendum report. The at -grade slab subgrade was observed on November 22, 2021.
COAST GEOTECHNICAL, INC.
Mr. and Mrs. Atkins 2 W.O.557518-07
Final Soils Report March 5 ln2l
Probing and testing of the slab subgrade areas showed acceptable geotechnical conditions for
support of the proposed slab.
BASEMENT/GARAGE WALL SUBDRAIN
The subdrain for the basement/garage wall consisted of four inch diameter SDR 35 perforated
drain pipe (holes down), surrounded by one cubic foot per lineal foot of 3/4 inch rock wrapped in
filter cloth. The subdrain was placed in accordance with plans and geotechnical
recommendations. Proper outlets of the subdrain system are the responsibility of the contractor.
BASEMENT WALL BACKFILL
Backfill of the basement walls, as requested periodically by the contractor, was observed from
October 29, 2021 to November 2, 2021. The basement wall was backfilled with 3/4 inch gravel
to three feet from top of wall. A soil cap was placed above the gravels and separated by filter
fabric. Backfill soils were placed in thin lifts; moisture conditioned as needed and mechanically
compacted to a minimum of 90% relative compaction up to finish pad grade elevations.
Equipment used for compaction of fill soils consisted of mechanical hand compactors and a SVL
75. Earthwork was completed by Coast Concrete.
I.JF1'j
Hardscape subgrade areas around the residence were observed between December 13, 2022 and
March 2, 2023. Probing and testing of the requested hardscape subgrade areas indicated
acceptable geotechnical conditions for support of the proposed hardscape.
OPINION
It is opinion of COAST GEOTECHNICAL, INC. that the summarized geotechnical conditions
approved by this office are in compliance with approved geotechnical reports and Newport Beach
building codes. The final grades appear to conform to approved plans.
We appreciate this opportunity to be of service to you.
Respectfully Submitted:
COAST GEOTECHNICAL, INC.
Ming�i'arng
RCE 54011
4 Ll—Y311741ckd
Andres Bareno
Staff Geologist