HomeMy WebLinkAboutX2021-0860 - Misc (3)LANDSCAPE IRRIGATION AUDIT REPORT
PROJECT: Stern Residence 25 Burning Tree Newport Beach, CA 92660
Landscape Design: KOHEID 1720 Santa Ana Ave. Costa Mesa CA92627
CERTIFIED LANDSCAPE IRRIGATION AUDITOR (CLIA)
BIG PICTURE LANDSCAPE
Michael McMillen / 714.394.6126 / Bigpicturelandscape(a'Dgmail.com Certified Irrigation Auditor #014256
All of the hydrozones on the irrigation systems were evaluated with a visual inspection. As per your request,
we evaluated the irrigation systems in accordance with the California Model Water Efficient Landscape
Ordinance (MWELO).
SUMMARY
This audit was conducted to inspect the overall site irrigation systems within the limits of construction. The
irrigation systems are new systems utilizing POTABLE water.
IRRIGATION PLANS:
Each hydrozone identified on the plans were executed in the field, (Total valve gty.7). Each system layout,
components and functionality have met all the requirements of the Irrigation Plans.
MWELO:
The California Model Water Efficient Landscape Ordinance has been adopted by the City as the standard for
new construction and irrigation installations based on AB1881.
UNIFORMITY:
There was no overhead irrigation on site. Any lawn areas were synthetic. Trees were on a separate bubbler
valve, and all landscaped areas utilized drip tubing/ drip mats. The dripline is subterranean, and the planting
material has been installed. In lieu of the catch can test, the standard 90% efficiency for pressure
compensating drip & low -flow irrigation per the Irrigation Association's Landscape Irrigation Auditor, 3rd
edition book was used for the report. A visual confirmation of drip line spacing (multiple locations), was
conducted in random planters. The system also implemented drip indicators that were also confirmed
operational.
Shrub ZONES / STATION 1-7
• Irrigated Area: Zones separated based on Full sun South/ East side of project.
• Plant Material: Shrubs - Low water
• Plant Condition: Traditional
• Microclimate: Full Sun
• Soil Category: Silty Clay Loam
• Root Depth: Approximately 6-10"
• Slope: Overall site 1% (top slope at back of property only)
• Compaction: yes
• Runoff: No runoff observed
• Standing Water: None observed
• Hydrozone Separation: Yes
• Mulch in Beds: Yes
• Febco 825 RP Backflow Master valve installed for irrigation to shrubs at back of property.
• Controller: Hunter Hydrawise PRO-HC controller and wireless weather sensor / rain shutoff
• Valves: RB XACZ Installed on S,W side Rear corner S/E Front of house.
• Emitter Type: RB XFS 6-12 (.6 gph @ 12" o.c. row spacing @ 12"-18" o.c.) RB 1806 SAM-MPR10,12
• Max Flow: 5.04 gpm
• Distribution Uniformity:.90 /.77
• Precipitation Rate: 0.6 / 0.47
Punch list Items: 03/29/2024 (Compliance based on the following corrects during the maintenance period)
• Complete installation of Rain Sensor Devices 04/12/2024
Zone Audit Conclusion: PASS, project IS within compliance to begin maintenance.
The irrigation systems were evaluated and based on the Irrigation Association Audit rules/guidelines and
MWELO requirements.
Respectfully,
Michael McMillen ,• `LIA °
Certified Irrigation Auditor #014256
Big Picture Landscapes "'•• ••°
Irrigation Inspection Affidavit
Irrigation Plan No: 25 Burninq Tree Newport Beach
Project Name: Stern Residence 25 Burning Tree Newport Beach CA 92660
Irrigation / Landscape Plan: KOHEID 1720 Santa Ana Ave. Costa Mesa CA 92627
Field Inspector CLIA : Big Picture Landscape - Michael McMillen 714.394.6126
Date (s) of Inspection: 0312912024 and 0411112024
This project was inspected within the limits of customary access for compliance with the approved
irrigation plans on file in City Planning. At least two (2) inspections were conducted. The findings are as
follows.
Date Inspection: 0312912024
A. Inspections during construction to check mainline in open trench: Yes No
1. Location of mainline conforms to as -built plan X
2. Size of main line conforms to plan X
3. Depth of mainline conforms to plan X
4. Main line conditions is undamaged X
5. Main line pressure tested with water and meter to check for visible leaks X
6. Specific observations attached if needed X _
Date Inspection:0411112024
B. Inspections after completion of system installation prior to sodding:
Yes No
1.
Irrigation POC has isolation valve
X
2.
System components (i.e., controller, backflow, rain sensor, etc.)
X
3.
Drip line GPH and spacing as specified
X
4.
System activated for observation of compliance
X
5.
Each station complies installed per plan
X
6.
Matched precipitation rates provided by zone
X
7.
As -built plan provided to owner
X
8.
Specific observations attached as needed
X
Summary of irrigation review: Pass . This project In Compliance as all Items listed on
punch list have been addressed.
I hereby certify that I am qualified to submit this irrigation inspection affidavit based on
the qualification indicated below:
Certified Landscape Irrigation Auditor Certified by The Irrigation Association. CLIA
California #014256 IA. 703.536.7080
Respectfully,
Michael McMillen G°u�
Certified Irrigation Auditor #014256
Big Picture Landscapes "'•4 •S••"
Appendix E
LANDSCAPE INSTALLATION CERTIFICATE OF COMPLETION
I hereby certify that: 1-1 I ANE ,E�E�sr 7-17-138�6
� C�va�r.. Ln..+oscapE) C
(1) 1 am a professional appropriately licensed in the State of California to provide
professional landscape design services.
(2) The landscape project for the property located at
(provide street
address or parcel number(s)) was installed by me or under my supervision.
(3) The landscaping for the identified property has been installed in substantial
conformance with the approved Landscape Documentation Package and complies with
the requirements of the City of Newport Beach Water Efficient Landscape Ordinance
(Municipal Code Section 14.17) and the City of Newport Beach Standards for
Implementation of the City of Newport Beach Water Efficient Landscape Ordinance for
the efficient use of water in the landscape.
(4) The following elements are attached hereto
a. Irrigation scheduling parameters used to set the controller;
b. Landscape and irrigation maintenance schedule;
c. Irrigation audit report; and
d. Soil analysis report, if not submitted with Landscape Documentation Package,
and documentation verifying implementation of the soil report
recommendations.
(5) The site installation complies with the following:
a. The required irrigation system has been installed according to approved plans
and specifications and if applicable, any prior approved irrigation system
alternatives.
x Yes _ No
b. Sprinklers comply with ASABE/ICC 802-2014 Landscape Irrigation Sprinkler &
Emitter Standard.
JC Yes No
(6) The information I have provided in this Landscape Installation Certificate of
Completion is true and correct and is hereby submitted in compliance with the City of
Newport Beach Design Standards for Implementation of the City of Newport Beach
Water Efficient Landscape Ordinance.
33
PATTERSON
15 CORPORATE PLAZA DR. SUITE 150
NEWPORT BEACH, CA 92660
1*1ji�91MVESWI ilVO
April 15, 2024
Re: 25 Burning Tree Irrigation
Below is the irrigation timeline:
Monday/Friday at 4AM (3 stations — 7 valves)
Sincerely,
Bill Hyland