Loading...
HomeMy WebLinkAboutX2021-0860 - Misc (3)LANDSCAPE IRRIGATION AUDIT REPORT PROJECT: Stern Residence 25 Burning Tree Newport Beach, CA 92660 Landscape Design: KOHEID 1720 Santa Ana Ave. Costa Mesa CA92627 CERTIFIED LANDSCAPE IRRIGATION AUDITOR (CLIA) BIG PICTURE LANDSCAPE Michael McMillen / 714.394.6126 / Bigpicturelandscape(a'Dgmail.com Certified Irrigation Auditor #014256 All of the hydrozones on the irrigation systems were evaluated with a visual inspection. As per your request, we evaluated the irrigation systems in accordance with the California Model Water Efficient Landscape Ordinance (MWELO). SUMMARY This audit was conducted to inspect the overall site irrigation systems within the limits of construction. The irrigation systems are new systems utilizing POTABLE water. IRRIGATION PLANS: Each hydrozone identified on the plans were executed in the field, (Total valve gty.7). Each system layout, components and functionality have met all the requirements of the Irrigation Plans. MWELO: The California Model Water Efficient Landscape Ordinance has been adopted by the City as the standard for new construction and irrigation installations based on AB1881. UNIFORMITY: There was no overhead irrigation on site. Any lawn areas were synthetic. Trees were on a separate bubbler valve, and all landscaped areas utilized drip tubing/ drip mats. The dripline is subterranean, and the planting material has been installed. In lieu of the catch can test, the standard 90% efficiency for pressure compensating drip & low -flow irrigation per the Irrigation Association's Landscape Irrigation Auditor, 3rd edition book was used for the report. A visual confirmation of drip line spacing (multiple locations), was conducted in random planters. The system also implemented drip indicators that were also confirmed operational. Shrub ZONES / STATION 1-7 • Irrigated Area: Zones separated based on Full sun South/ East side of project. • Plant Material: Shrubs - Low water • Plant Condition: Traditional • Microclimate: Full Sun • Soil Category: Silty Clay Loam • Root Depth: Approximately 6-10" • Slope: Overall site 1% (top slope at back of property only) • Compaction: yes • Runoff: No runoff observed • Standing Water: None observed • Hydrozone Separation: Yes • Mulch in Beds: Yes • Febco 825 RP Backflow Master valve installed for irrigation to shrubs at back of property. • Controller: Hunter Hydrawise PRO-HC controller and wireless weather sensor / rain shutoff • Valves: RB XACZ Installed on S,W side Rear corner S/E Front of house. • Emitter Type: RB XFS 6-12 (.6 gph @ 12" o.c. row spacing @ 12"-18" o.c.) RB 1806 SAM-MPR10,12 • Max Flow: 5.04 gpm • Distribution Uniformity:.90 /.77 • Precipitation Rate: 0.6 / 0.47 Punch list Items: 03/29/2024 (Compliance based on the following corrects during the maintenance period) • Complete installation of Rain Sensor Devices 04/12/2024 Zone Audit Conclusion: PASS, project IS within compliance to begin maintenance. The irrigation systems were evaluated and based on the Irrigation Association Audit rules/guidelines and MWELO requirements. Respectfully, Michael McMillen ,• `LIA ° Certified Irrigation Auditor #014256 Big Picture Landscapes "'•• ••° Irrigation Inspection Affidavit Irrigation Plan No: 25 Burninq Tree Newport Beach Project Name: Stern Residence 25 Burning Tree Newport Beach CA 92660 Irrigation / Landscape Plan: KOHEID 1720 Santa Ana Ave. Costa Mesa CA 92627 Field Inspector CLIA : Big Picture Landscape - Michael McMillen 714.394.6126 Date (s) of Inspection: 0312912024 and 0411112024 This project was inspected within the limits of customary access for compliance with the approved irrigation plans on file in City Planning. At least two (2) inspections were conducted. The findings are as follows. Date Inspection: 0312912024 A. Inspections during construction to check mainline in open trench: Yes No 1. Location of mainline conforms to as -built plan X 2. Size of main line conforms to plan X 3. Depth of mainline conforms to plan X 4. Main line conditions is undamaged X 5. Main line pressure tested with water and meter to check for visible leaks X 6. Specific observations attached if needed X _ Date Inspection:0411112024 B. Inspections after completion of system installation prior to sodding: Yes No 1. Irrigation POC has isolation valve X 2. System components (i.e., controller, backflow, rain sensor, etc.) X 3. Drip line GPH and spacing as specified X 4. System activated for observation of compliance X 5. Each station complies installed per plan X 6. Matched precipitation rates provided by zone X 7. As -built plan provided to owner X 8. Specific observations attached as needed X Summary of irrigation review: Pass . This project In Compliance as all Items listed on punch list have been addressed. I hereby certify that I am qualified to submit this irrigation inspection affidavit based on the qualification indicated below: Certified Landscape Irrigation Auditor Certified by The Irrigation Association. CLIA California #014256 IA. 703.536.7080 Respectfully, Michael McMillen G°u� Certified Irrigation Auditor #014256 Big Picture Landscapes "'•4 •S••" Appendix E LANDSCAPE INSTALLATION CERTIFICATE OF COMPLETION I hereby certify that: 1-1 I ANE ,E�E�sr 7-17-138�6 � C�va�r.. Ln..+oscapE) C (1) 1 am a professional appropriately licensed in the State of California to provide professional landscape design services. (2) The landscape project for the property located at (provide street address or parcel number(s)) was installed by me or under my supervision. (3) The landscaping for the identified property has been installed in substantial conformance with the approved Landscape Documentation Package and complies with the requirements of the City of Newport Beach Water Efficient Landscape Ordinance (Municipal Code Section 14.17) and the City of Newport Beach Standards for Implementation of the City of Newport Beach Water Efficient Landscape Ordinance for the efficient use of water in the landscape. (4) The following elements are attached hereto a. Irrigation scheduling parameters used to set the controller; b. Landscape and irrigation maintenance schedule; c. Irrigation audit report; and d. Soil analysis report, if not submitted with Landscape Documentation Package, and documentation verifying implementation of the soil report recommendations. (5) The site installation complies with the following: a. The required irrigation system has been installed according to approved plans and specifications and if applicable, any prior approved irrigation system alternatives. x Yes _ No b. Sprinklers comply with ASABE/ICC 802-2014 Landscape Irrigation Sprinkler & Emitter Standard. JC Yes No (6) The information I have provided in this Landscape Installation Certificate of Completion is true and correct and is hereby submitted in compliance with the City of Newport Beach Design Standards for Implementation of the City of Newport Beach Water Efficient Landscape Ordinance. 33 PATTERSON 15 CORPORATE PLAZA DR. SUITE 150 NEWPORT BEACH, CA 92660 1*1ji�91MVESWI ilVO April 15, 2024 Re: 25 Burning Tree Irrigation Below is the irrigation timeline: Monday/Friday at 4AM (3 stations — 7 valves) Sincerely, Bill Hyland Project Manager 949-723-1800, LIC#802367 W W W.PATTERSONCUSTOMHOMES.COM