Loading...
HomeMy WebLinkAboutXR2024-0518 - Alternative Material & MethodsCITY OF NEWPORT BEACH Ce-Ce it C"9 zuz�, COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915 www.newoortbeachca.00v 1 (949) 644-3200 CASE NO.: ❑ REQUEST FOR MODIFICATION TO PROVISIONS OF TITLE 9 (FIRE CODE) OR TITLE 15 (BUILDING CODE) OF THE NEWPORT BEACH MUNICIPAL CODE (See Reverse for Basis for Approval) (Fee $306) ® REQUEST FOR ALTERNATE MATERIAL OR METHOD OF CONSTRUCTION (See Reverse for Basis for Approval) (Fee $306) For above requests, complete Sections 1, 2 & 3 below by printing in ink or typing. J JOB ADDRESS:6 SKYSAIL CORONA DEL MAR, CA "'aVT APR 25 20?4 PAY 010` III FOR STAFF USE ONLY III Plan Check # F WaQq— 010 # of Stories Occupancy Classification R3 Use of Building S FR # of Units I Project Status 9i Construction Type Verified by[H No. of Items Fee due S W(o DISTRIBUTION: ❑ Owner kplan Check 0?,g Petitioner ❑ Inspector ❑ Fire ❑ Other PETITIONER: SITE ADDRESS: 6 SKYSAIL Petitioner Amir Deihimi Owner Keith Conti (Petitioner to be amhkwt or engineer) Address 6 Skysail Address 23172 Plaza Pointe Drive (Ste. 145) Corona del Mar zip 92625 Laguna Hills, CA zip 92653 Daytime Phone ( 949 ) 954.7244 Daytime Phone ( 714 ) 488-8003 over OF EQUIVALENCY: sheets or data may be attached. Petitioner's Position Engineer -of -Record Signature CA Professional Lic. # C78194 FOR STAFF USE ONLY DEPARTMENT ACTION: In accordance with: MBC 104.11/CFC 104.9 (Alternate materials S methods) ❑ Concurrence from Fire Code Official is required. ❑ Approved ❑ Disapproved By: (DOE DOES NO en any fire protection requirements. (DOES DO SNOT en the structural integrity Date CG4.505.2.1 04/22/2024 ❑ CBC 104.10/CFC 104.8 (CBC Modification) ❑ Written Comments Attached The Request is: ErGranted See reverse for ❑ Denied ( appeal information) ❑ Granted (Ratfflcation required) Cond' ions of Approval• z �— Signa Print Name—— Pea IMIEF BUILDING OFFICIAL Date APPEAL OF DIVISION ACTION TO THE BUILDING BOARD OF APPEALS (See Reverse) Guidelines for Approval of Alternate Materials, Design and Methods of Construction Basis For Approval For the Chief Building Official and Fire Code Official or their designated agent to approve a request for modification or a request for alternate material or method of construction, he/she must determine that special, individual reasons exist that make compliance with the strict letter of the Code impractical and that equivalency is provided. The resulting condition must be in conformance with the spirit and purpose of the Code provisions involved and that such modification does not lessen fire protection, structural integrity or occupant safety. The applicant must provide sufficient information with this application to allow the above evaluation to be made. Requirements for Submittals The applicant design professional shall prepare a Written Report that describes the alternate proposal along with the applicable data listed below: • State specific code provisions for which alternative is requested and why request is being submitted. • Describe by code section those provisions for which alternative is desired. • Compare the proposed alternative versus the code requirements in terms of structural strength, suitability, effectiveness, fire resistance, safety and health impacts affecting the building or user of the building. • Demonstrate that the proposed alternative is compatible with balance of code requirements. • When applicable, specify how authoritative consensus document(s) are used to substantiate proposal. (Reference draft ]CC Building Performance Code Commentary Section 1.4.2.3 for background information). • Provide assumptions, references, and documentation of evaluation methods utilized. This includes intended use, input data, anticipated outputs, and limitations of computer models and other analytical tools or methods. • Specify when and where special inspection and testing are required and the standards of acceptance for demonstrating compliance. Show how the proposed alternate, if accepted, will be identified on the job site. • Where land use restrictions and building setbacks are required, deed restrictions may be an appropriate method to ensure continued compliance. • State how and where alternate proposal is incorporated within construction plans and prepare plan amendments as necessary. The design professional has the responsibility to coordinate all construction documents and ensure compatibility between documents. • The report and design documents shall be dated, signed and stamped by the design professional according to the plan submittal procedure. • For alternate methods of design requests, the applicant shall set performance criteria for his design. Performance criteria shall be reviewed, amended and approved by the Building or Fire Code Official prior to start of design. Alternative Design Review/Verification The Chief Building Official or Fire Code Official has the responsibility to review design submittals for compliance to the adopted codes and procedures. If the Building or Fire Code Official does not have the expertise on staff to make a thorough and competent review, the Building or Fire Code Official shall select a consultant that possesses the necessary qualifications to perform a third -party or peer review. Cost of peer review shall be paid by applicant to the Building Division prior to commencing the review. • Verify that all applicable information and justifications listed above as requirements for submittals is received and verify that evaluation and design methods used by designer are appropriate to the alternative proposed. • Verify products are being used in accordance with their listing conditions as required by recognized listing agencies. If not available, require documentation and/or testing to demonstrate compliance with intent of code and intended use. • Evaluate performance of material and possible flaws that could affect performance of material in its installed state. • The reviewer shall document that the submittal has been reviewed and accepted as meeting the alternative materials, design and methods of construction provisions of the code. If the Building or Fire Code Official is not satisfied that the applicant has met the conditions, the request shouldbe denied in writing with the applicable reason(s). Inspection/Field Verification The alternate proposal as approved in the construction documents must be verified by inspection, and, where necessary, testing as follows: • To verify that alternate materials, systems and fabricated products comply with accepted design criteria and the manufacturer's and engineers installation procedures, inspectors should check product labeling, certification, quality assurance processes, and testing, as applicable. • When appropriate, an approved third party quality assurance inspection and testing service may be required for continuous and complex inspection and testing activities. This is intended to verify that construction complies with the code and the approved plans. Appeal from the determination or action of the Chief Building Official or Fire Code Official or their designated agent may be made to the Building and Fire Board of Appeals. To appeal, the applicant must provide special individual reasons that make compliance with the strict letter of the Code impractical. Appeals or ratifications pertaining to State Disabled Access Standards require complete evidence to substantiate that the proposed design is equivalent to that prescribed by that standards or that due to legal or physical constraints, compliance with the standards or providing equivalency would create an unreasonable hardship. Appeals must be submitted on the Appeal Form available at Permit Counter accompanied by the proper fee. You will be notified in writing of the appeal hearing's time and date. Sika° MB Solvent Free, Epoxy Moisture Barrier PRODUCT DESCRIPTION Sika® MB is a 2-component, solvent free, low viscosity, epoxy for use under wood flooring products, self leveling underlayments, floating floors and other flooring systems that require protection from subfloor moisture. USES • Moisture barrier to help control moisture propagation in cementitious substrates with a moisture content not exceeding 6 % by Tramex Method, residual moisture up to 100 % R.H. or 25 Ib/1,000 ft2/24 In (11.4 kg/92.9m 2/24 h) • For substrate consolidation on concrete, cement and gypsum screeds • Adhesion promoter for old and new adhesive residues in conjunction with other Sika® products • Suitable on concrete, cement, self -leveling and gypsum substrates, OSB, plywood, quarry and terrazzo tiles, water-soluble adhesive and cutbacks PRODUCT INFORMATION CHARACTERISTICS / ADVANTAGES • Solvent -free (100 % solids) • Easy roller applied application, low viscosity • Convenient, easy to mix packaging • Shorter construction periods • Excellent penetration and stabilization of the substrate • Reduction of adhesive consumption • Suitable for use on floors with radiant heating • Compatible with Sika Bond® wood flooring adhesives, Sika® Level products • Can be used below floating floors APPROVALS/STANDARDS Meets ASTM F 3010 Chemical Base Two component epoxy Packaging 2.64 gal (10 L) pail Color Blue Shelf Life 24 months from date of production if stored properly in undamaged sealed containers Storage Conditions Store dry at 50-77 °F (10-25 "C). Protect from moisture. Density 69 Ib/ft3 (1.1 kg/1) TECHNICAL INFORMATION Product Data Sheet Sllo• MB June 2019, Version 01.04 020512081000000017 1/4 Shore D Hardness 7 days 83 (mixed A&B) (ASTM D-2240) Compressive Strength 7 days 10,000 psi (69 MPa) 73 °F (23 °C) 50 % R.H. Permeability to Water Vapor 0.06 g/m2-24hour-mmHG (ASTM E-96) Service Temperature -40-158 °F (-40-70 -C) APPLICATION INFORMATION Coverage Coverage per pail Moisture barrier 250-300 ft2 (23.2-27.9 m1) Adhesion promoter or 400-450 ft2 (37.2-41.8 m2) surface consolidator (Coverage figures do not include allowance for surface profile and porosity or material waste). Application Recommended Results in Coatings Moisture barrier only min.1 Mirror like finish Substrate min. 1 Good penetration consolidation only Adhesion promotion min. 1 Mirror like finish Moisture barrier+ min. 2 Mirror like finish substrate consolidation Moisture barrier+ min. 2 Mirror like finish adhesion promotion MUST produce a monolithic, pinhole -free finish with a continuous film. The need for multiple coats is directly related to surface absorption. Pot Life 50 °F (10 "C) — 60 minutes 68 "F (20 °C) ` 30 minutes 86 7 (30 °C) — 15 minutes Cure Time 50 7 (10 -C) 18 hours 73 °F (23 °C) 8 hours 86 `F (30 `C) 6 hours 'Minimum curing time, prior to walking on primer/or for applying Sika Bond' or Sika Level. Application Time Overcoating Application Minimum Maximum Time Window" Sika® MB 8 hours 36 hours (2nd coat) -When Sika° MB Is left on the substrate far more than the maximum allowable open time, the surface must be mechanically prepared fi.e. sanded( solvent wiped before proceeding. Product Data sheet 5ika' MB June 2019, Version 01.04 020512081000000017 BUILDING TRUST 2/4 APPLICATION INSTRUCTIONS SUBSTRATE PREPARATION • Substrate must be clean, dry, sound and homogeneous, free from oils, grease, dust, and loose or friable particles. Paint, laitance, and other poorly adhering contents must be mechanically removed. • Substrate must have an open textured surface to allow Sika® MB to penetrate. (i.e. Blast cleaning, grinding are considered acceptable means to achevie the desired surface profile. Acid and chemical etching are not acceptable). • At least 50 % of the surface area must be cleared of residual adhesive and cutbacks. (i.e. by grinding or mechanical substrate preparation) • Old cutback can contain asbestos which is dangerous for the health so do not grind, sand or blast. Refer to the Resilient Floor Covering Institute's publication "recommended work practice for removal of resilient floor coverings" for instruction. • Minimum substrate compressive strength > 1,160 psi. Tensile Bond strength > 116 psi at the time SikaO MB is applied. • Repair with Sika' Level SkimCoat or Sika Quick' mortar before priming. • The floor must be cleaned with an industrial vacuum prior to installation of the Sika® MB. • On fiber reinforced concrete, fibers should be flamed off the surface prior to application of Sika® MB as a moisture barrier. • Before overall installation begins, Sika' recommends the application of several small test patches to determine primer application requirements and acceptability of final product performance. MIXING • Add one full can of component A to one full can of component B then mix with an electric drill and mixing (Jiffy Mixertype) paddle at a low speed to reduce air entrainment (300-400 rpm). Using a paint stick or similar is not sufficient to mix the primer. • A minimum mixing time of 3 minutes shall be observed; mixing shall continue until a homogeneous mix has been achieved. • Scrape sides of pail with paint stick or paddle to ensure all contents are thoroughly mixed together. • Unmixed material applied to the floor will not cure properly. APPLICATION METHOD /TOOLS • Apply Sika® MB uniformly (in 2 directions 90') to the substrate using a medium nap roller, ensuring that a continuous coat is achieved over the entire surface (MUST produce a mirror like finish). • Pour contents of pail onto the floor for best working time. Attempting to work from the pail will reduce working time. • When used as a moisture barrier and substrate consolidation / adhesion promotor, prepare the Product Data Sheet Sllo• MB June 2019, Version 01.04 020512081000000017 substrate mechanically as in accordance with the guidelines stated in subtitle "Surface Preparation". Apply the first coat at 10 mils Apply the second coat at 15 mils in accordance with the open time*. 2 coats application: Apply the first coat at 75-115 ftz/gal Apply the second coat at 150-225 ft=/gal in accordance with the application time window*. Then follow one of the option: • Option 1: Broadcast to refusal with oven dried silica sand (20/30) on the second coat immediately. Sweep sand once the epoxy is cured. Apply Sika® Level products on cured epoxy. • Option 2: Apply Sika® Level-02 EZ Primer in accordance with the application time window*. When the primer is dry, apply Sika® Level products. *ref. to appliction time in sections above L l 1:_L` ll : [C iel i L41T91L1 • Clean all tools and application equipment with cleaning solvent (Xylene, MEK are effective). • Hardened/cured material can only be removed mechanically. LIMITATIONS • Proper coverage must be used to achieve moisture barrier properties. • Will not act as a moisture barrier for gypsum screeds. Gypsum based subfloors are very susceptible to excess moisture and will be degraded if exposed to excess moisture from below or above. • Only protects from moisture coming from below the concrete. • Will not prevent hydrostatic pressure. • Must not be applied to a visibly wet substrate. • Does not prevent moisture occurring between the epoxy and the floating floor due to secondary sources of moisture or acclimation, e.g. water condensation. • Is not suitable for use with bonded systems due to possible curing and adhesion problems. • Sika' recommends the use of Sika' Level products on top of it. • Floor covering manufacturer's and Wood flooring manufacturer's recommendations, like room humidity levels and wood acclimation requirements should be strictly followed. • Sika' does not make any standing recommendations as to the structural integrity of old adhesive residues or subflooring materials that are not manufactured by Sika*. • When left on the substrate for more than the maximum allowable open time of 36 hours, prior to placing the adhesive, the surface must be thoroughly cleaned and mechanically prepared (i.e. screened sand) and solvent wiped. Failure to do this, may result in adhesion problems. For detailed instruction contact our Technical Service. When used in conjunction with SikaBond', Sika® MB does not need to be broadcasted with sand. BUILDING TRUST A& 3/4 BASIS OF PRODUCT DATA LEGAL DISCLAIMER Results may differ based upon statistical variations • KEEP CONTAINER TIGHTLY CLOSED depending upon mixing methods and equipment, • KEEP OUT OF REACH OF CHILDREN temperature, application methods, test methods, actual • NOT FOR INTERNAL CONSUMPTION site conditions and curing conditions. • FOR INDUSTRIAL USE ONLY • FOR PROFESSIONAL USE ONLY OTHER RESTRICTIONS See Legal Disclaimer. ENVIRONMENTAL, HEALTH AND SAFETY For further information and advice regarding transportation, handling, storage and disposal of chemical products, user should refer to the actual Safety Data Sheets containing physical, environmental, toxicological and other safety related data. User must read the current actual Safety Data Sheets before using any products. In case of an emergency, call CHEMTREC at 1-800-424-9300, International 703-527-3887. Slka corporation 201 Polito Avenue Lyndhurst, NJ 07071 Phone:+1-800-933-7452 Fax:+1-201-933-6225 usa.sika com e�ewmyc Product Data Sheet Slka• MB June 2019, Version 01.04 020512081000000017 Slka Me dcana SA. de CV. Carretera Libre Celaya Km. 8.5 Fracc. Industrial aalvanera Corregidor., Queretaro C.P. 76920 Phone: 52442 2395800 Fax: 52 442 2250537 Prior to each use of any product of Sika Corporation, its subsidiaries or affiliates ("SIKA"), the user must always read and follow the warnings and instructions on the product's most current product label, Product Data Sheet and Safety Data Sheet which are available at usa.sika.com or by calling SIKA's Technical Service Department at 1-800-933-7452. Nothing contained in any SIKA literature or materials relieves the user of the obligation to read and follow the warnings and instructions for each SIKA product as set forth in the current product label, Product Data Sheet and Safety Data Sheet prior to use of the SIKA product. SIKA warrants this product for one year from date of installation to be free from manufacturing defects and to meet the technical properties on the current Product Data Sheet if used as directed within the product's shelf life. User determines suitability of product for intended use and assumes all risks. User's and/or buyer's sole remedy shall be limited to the purchase price or replacement of this product exclusive of any labor costs. NO OTHER WARRANTIES EXPRESS OR IMPLIED SHALL APPLY INCLUDING ANY WARRANTY OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. SIKA SHALL NOT BE LIABLE UNDER ANY LEGAL THEORY FOR SPECIAL OR CONSEQUENTIAL DAMAGES. SIKA SHALL NOT BE RESPONSIBLE FOR THE USE OF THIS PRODUCT IN A MANNER TO INFRINGE ON ANY PATENT OR ANY OTHER INTELLECTUAL PROPERTY RIGHTS HELD BY OTHERS. Sale of SIKA products are subject to the Terms and Conditions of Sale which are available at https://usa.sika.com/en/group/SikaCorp/termsandconditions.htmi or by calling 1-800-933-7452. Si ka MB-e n-US-(06-2D19)-1-4. pdf 4/4 BUILDING BILLING CONTACT DAWN VAUGHT 1041 W 18TH ST A106 COSTA MESA, CA 92627 Payment Date: 04/25/2024 Reference Number Fee Name F SEW PORT O O� u n e� oq<iaonN�P Transaction Type Payment Method Amount Paid REV2024-0821 Hourly Plan Check Fee - Building Fee Payment CC EPL $137.00 Records Management Fee Fee Payment CC EPL $2.00 6 SKYSAIL DR NEWPORT BEACH, CA 92625 SUB TOTAL $139.00 REV2024-0822 Hourly Plan Check Fee - Building Fee Payment CC EPL $68.50 Hourly Plan Check Fee - Planning Fee Payment CC EPL $53.75 Records Management Fee Fee Payment CC EPL $4.00 2391 MESA DR NEWPORT BEACH, CA SUB TOTAL $126.25 XR2023-2975 I Modification Fee - Alternate Material / Method I Fee Payment I CC EPL I $306.00 6 SKYSAIL DR NEWPORT BEACH, CA 92625 SUB TOTAL $306.00 TOTAL $571.25 April 25, 2024 3:23 AM 100 Civic Center Dr, Newport Beach, CA 92660 Page 1 of 1 City of Newport Beach Community Development 100 Civic Center Dr. Newport Beach, CA 92660 949-644-3141 Welcome 04/2.5/2024 11:23AM Savanah R 017655-0004 000093033 INVOICE VAUGHT, DAWN External Item Reference: INV-00026265 External Payment Reference: REC-004466-2024 Item: Balance due: $0.00 Hourly Plan Check Fee - Building $137.00 Hourly Plan Check Fee - Building $68.50 Hourly Plan Check Fee - Planning $53.75 Modification Fee - Alternate Material / Method $306.00 Records Management Fee $2.00 Records Management Fee $4.00 Payment Id: 181792 -------------- $571.25 Subtotal $571.25 Total $571.25 CREDIT CARD FOR EPL/ENERGOV $571.25 Visa ************0165 Ref=21377037102 Auth=07671G -------------- Change due $0.00 Paid by: VAUGHT, DAWN Thank you for your payment CUSTOMER COPY O '• amI' O un zr'rmoE. zm DEEF GRAD B AM / 14) X$ TOP e BOTTOM/ snRRurs Iz wswn1 z,b 010'O.0 sfe PUN FOR ' oI. -D._ aBlns -� DIMENsoes sEt wswn sneE.s FDR ADOL wFOR. fir- ____ ____ F----- -- _ -I ___ ___ zr-_r I�I DL '. rvP *4I _� _, L A I I ®1 - —T I I I I I I ALNDEwnrrnEN ex I I I )B O I I I I I I I 4o'I osL es II I _La _@_ � 11 4 � Lr� I I I JI T\ I I oil I I I I I I � I I I G I 11 n II I L_1 J I I I II I I I I I I I I! °IT I I I I 1 I ! I I I r��Q) IIr __ ____ -7L__qv I Dm. 1 sw r---- ____-- — I o. 3 11 j 4 11 I NI. 4 - 1 D L-J Oso E'sI II I o_ I---s1®Ir�_ _ _ —_ )5v I I 1 re) oo Grv.. i I I 1 � tD <�rnlcN coxes swB � 11 � aNl � I I 1 I J-- J r 11 I I. III s---.m.`--- L----�C rvz e 1 1 L I I I I L_J I I I I 1 1 I I i I I I I I I II I I III I SNa. AAI I I II sj II - HATCHED AREA IS TO M- MB APPRODUCT 111 M. 1 II I I'I II II II I I �1 I --------------------- I I I I I I I �I II LEIL_________________________ JI L- L___________________________. AEM71FE"AILAIRL., BCTTOM A 44 57IRROPS D' O. C. 5" POOL FOR NSION5. 5EE WSWM .M1ffTS FOR ADE L INPOR. 5F-EAR WALL 5CHEDULE FOUNDATION NOTES CORE I RE,,TcF,,,, -0.oPo,.NP,NFOR,AIION. z. CONTRACTOR5 z5PON115I POR ER i PRCPABRUTED 5nEARwALC From TNe Ground U, o wr LIGHT AND L VIN7E AND NOTFE ENGINEER OFII Core Structure Inc. 2022cLOR e6LLDING CODE t I. el uPu �zabs� NCLFJFAI 11-11API RECORD III D PPEREN. rrA FIND S LMN 5 11 'I '-0 5. TOP OF ALe ERa FOOTwG. GRAse B&w FoonNG.-FICKEi NG. OR 23172 PIEER Pont= Dr. ILLS POOH 70 BE MIN 6 BLOVI FIN15hAA01_ FILLET 9. OR N0115M1f R WAILS, MASA/M 9AP MV0.51 LANCM1ORS CPN Bf VSfD IN Sn�ie M 45 LEE 01 PNR`-0R BOIIL vn WEND DISTA c O MIN PER ESR ersse. Laguna H Its CA 92555 5. FOR DOVBL£ SMEAR PANEL MH 5AA3_Sw CIA u5E MIN. RAG 5__ PLATER Phone: 9A5 JC4724G -® C Ji Al G z< a e z pro_ �Icac U,N,O. nBl ,,t...LET,.wm 6_ cONrRACTORLSRf5POn5BL ro3u BMT AMw0 TO O?0TADDRESSB- BLPAAEAPPAAVA. ._. alDruPJOC-w mucRHtI TO EORTOR RwIEwiAPPRovA.. _ °c@tl''o°C 159EATnING PANEL JOINT AND SILL PLATE NAILING 5LWU Br STAGGERED IN AL 'EASE. EL REFEREE NOMINAL ORFIBER FRAMING AT AWONING PANEL EDGER VOTE NAT 5TA GERED. 5) STUDS RE SPAL D @ I 6" O.C. MAR. V 455 NAITO OTHERWISE ON PLAIN 4) PERoDIc SPEC L sFECIION 5REOVRED. sl u5e CL Fs C G' O c. o s PsoN ETRO G w L TARsv RAME m.N.O.). 6 LSE 5PA'EING PERSCYEOUL IF NDMDER OE FRAMING GJP5 ARE NOT 5PELIfIED ON FRAMING PLAN, . T A LLO BLt 5111 R_ ORSWJS 511CO 24 O. G. MAx. Al 5n rn G CONFDRM5 TO EImER Doc 5 OR P5 z 5TA DARDs. LING ® G O C IN 5 ND5 ARE 5PACED 24C.C. I'PER DABORE 51DED PILLAR FA14C5. J5E TALE THE READING OF SIL.' LANCHOR PEFLT5 O lYEE55' 3.5 4c5'! S O5EOL I Al ORE 5Ds 5CFAAR IN ECTI'DJUE AND LATE I FT.EAA..N. FOR PAPER FIE 5v5 SEES EAR TRANS ER DETA O. -,AN FOR FRAMING aIF III ANDLAPE mE 51ACING_ FORT" s IFE 51H • 5v5. FOUNDATION PLAN 5CALE : 114' = 1'-0' LEGEND r � L J D _- OATTING r-� lI III BAR L_J 111"T's I'll G OTeSPD 11.151111 SCHEWo J ' SP DID NCAIL°L4 N F 11 TfeDETAI RNUMEER 0 ❑x 11115 Ec.Dw+N IF F-FED.IE FFANILLINGTl % 5 EANEL APH' REFER ECHEDU $� E ��0 ° I EPJP" RORro^INSTRUTCNI D'FEET F 7RIBINO, APPLIED 'coca "All" EDz e rroerc E.11 TC cn W= 1'.0.2<' LCFNT 121 A, .OPTIC El HOLDOWN 5ChEDULE s'EON yOLDDwN USP nGL0Cv; 1... DER i _F E KEY NOTES OI 121XR.VI OCAFFAIR SARS- ASOPPM O19w1 No. C]019 04/ 1 7/2024 N N N e U W U a Z W -' EL LU LU A z RE FAJ O Q N ETH U z" a Ut o 0 A.E.. 041,11, PROJECT MPNAGER� S.t4. 5-1.0