HomeMy WebLinkAboutXR2024-0518 - Alternative Material & MethodsCITY OF NEWPORT BEACH Ce-Ce it C"9 zuz�,
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DIVISION
100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915
www.newoortbeachca.00v 1 (949) 644-3200
CASE NO.:
❑ REQUEST FOR MODIFICATION TO PROVISIONS
OF TITLE 9 (FIRE CODE) OR TITLE 15 (BUILDING CODE)
OF THE NEWPORT BEACH MUNICIPAL CODE
(See Reverse for Basis for Approval) (Fee $306)
® REQUEST FOR ALTERNATE MATERIAL
OR METHOD OF CONSTRUCTION
(See Reverse for Basis for Approval) (Fee $306)
For above requests, complete Sections 1, 2 & 3
below by printing in ink or typing.
J JOB ADDRESS:6 SKYSAIL CORONA DEL MAR, CA
"'aVT
APR 25 20?4
PAY 010`
III FOR STAFF USE ONLY III
Plan Check # F WaQq— 010 # of Stories
Occupancy Classification R3
Use of Building S FR # of Units I
Project Status 9i
Construction Type
Verified by[H
No. of Items
Fee due S W(o
DISTRIBUTION:
❑ Owner kplan Check 0?,g
Petitioner ❑ Inspector
❑ Fire ❑ Other
PETITIONER:
SITE ADDRESS: 6 SKYSAIL Petitioner Amir Deihimi
Owner Keith Conti (Petitioner to be amhkwt or engineer)
Address 6 Skysail Address 23172 Plaza Pointe Drive (Ste. 145)
Corona del Mar zip 92625 Laguna Hills, CA zip 92653
Daytime Phone ( 949 ) 954.7244
Daytime Phone ( 714 ) 488-8003
over
OF EQUIVALENCY:
sheets or data may be attached.
Petitioner's
Position Engineer -of -Record
Signature CA Professional Lic. # C78194
FOR STAFF USE ONLY
DEPARTMENT ACTION: In accordance with: MBC 104.11/CFC 104.9
(Alternate materials S methods)
❑ Concurrence from Fire Code Official is required. ❑ Approved ❑ Disapproved
By:
(DOE DOES NO en any fire protection requirements.
(DOES DO SNOT en the structural integrity
Date
CG4.505.2.1
04/22/2024
❑ CBC 104.10/CFC 104.8
(CBC Modification)
❑ Written Comments Attached
The Request is: ErGranted See reverse for ❑ Denied ( appeal information)
❑ Granted (Ratfflcation required)
Cond' ions of Approval•
z
�—
Signa
Print Name——
Pea IMIEF BUILDING OFFICIAL
Date
APPEAL OF DIVISION ACTION TO THE BUILDING BOARD OF APPEALS (See Reverse)
Guidelines for Approval of Alternate Materials, Design and Methods of Construction
Basis For Approval
For the Chief Building Official and Fire Code Official or their designated agent to approve a request for modification
or a request for alternate material or method of construction, he/she must determine that special, individual reasons
exist that make compliance with the strict letter of the Code impractical and that equivalency is provided. The
resulting condition must be in conformance with the spirit and purpose of the Code provisions involved and that such
modification does not lessen fire protection, structural integrity or occupant safety. The applicant must provide
sufficient information with this application to allow the above evaluation to be made.
Requirements for Submittals
The applicant design professional shall prepare a Written Report that describes the alternate proposal along with the
applicable data listed below:
• State specific code provisions for which alternative is requested and why request is being submitted.
• Describe by code section those provisions for which alternative is desired.
• Compare the proposed alternative versus the code requirements in terms of structural strength, suitability,
effectiveness, fire resistance, safety and health impacts affecting the building or user of the building.
• Demonstrate that the proposed alternative is compatible with balance of code requirements.
• When applicable, specify how authoritative consensus document(s) are used to substantiate proposal.
(Reference draft ]CC Building Performance Code Commentary Section 1.4.2.3 for background information).
• Provide assumptions, references, and documentation of evaluation methods utilized. This includes intended
use, input data, anticipated outputs, and limitations of computer models and other analytical tools or methods.
• Specify when and where special inspection and testing are required and the standards of acceptance for
demonstrating compliance. Show how the proposed alternate, if accepted, will be identified on the job site.
• Where land use restrictions and building setbacks are required, deed restrictions may be an appropriate method
to ensure continued compliance.
• State how and where alternate proposal is incorporated within construction plans and prepare plan amendments
as necessary. The design professional has the responsibility to coordinate all construction documents and
ensure compatibility between documents.
• The report and design documents shall be dated, signed and stamped by the design professional according to
the plan submittal procedure.
• For alternate methods of design requests, the applicant shall set performance criteria for his design.
Performance criteria shall be reviewed, amended and approved by the Building or Fire Code Official prior to
start of design.
Alternative Design Review/Verification
The Chief Building Official or Fire Code Official has the responsibility to review design submittals for compliance to
the adopted codes and procedures. If the Building or Fire Code Official does not have the expertise on staff to
make a thorough and competent review, the Building or Fire Code Official shall select a consultant that possesses
the necessary qualifications to perform a third -party or peer review. Cost of peer review shall be paid by applicant to
the Building Division prior to commencing the review.
• Verify that all applicable information and justifications listed above as requirements for submittals is received and
verify that evaluation and design methods used by designer are appropriate to the alternative proposed.
• Verify products are being used in accordance with their listing conditions as required by recognized listing
agencies. If not available, require documentation and/or testing to demonstrate compliance with intent of code
and intended use.
• Evaluate performance of material and possible flaws that could affect performance of material in its installed
state.
• The reviewer shall document that the submittal has been reviewed and accepted as meeting the alternative
materials, design and methods of construction provisions of the code. If the Building or Fire Code Official is not
satisfied that the applicant has met the conditions, the request shouldbe denied in writing with the applicable
reason(s).
Inspection/Field Verification
The alternate proposal as approved in the construction documents must be verified by inspection, and, where
necessary, testing as follows:
• To verify that alternate materials, systems and fabricated products comply with accepted design criteria and the
manufacturer's and engineers installation procedures, inspectors should check product labeling, certification,
quality assurance processes, and testing, as applicable.
• When appropriate, an approved third party quality assurance inspection and testing service may be required for
continuous and complex inspection and testing activities. This is intended to verify that construction complies
with the code and the approved plans.
Appeal from the determination or action of the Chief Building Official or Fire Code Official or their designated agent
may be made to the Building and Fire Board of Appeals. To appeal, the applicant must provide special individual
reasons that make compliance with the strict letter of the Code impractical. Appeals or ratifications pertaining to
State Disabled Access Standards require complete evidence to substantiate that the proposed design is equivalent
to that prescribed by that standards or that due to legal or physical constraints, compliance with the standards or
providing equivalency would create an unreasonable hardship.
Appeals must be submitted on the Appeal Form available at Permit Counter accompanied by the proper fee. You
will be notified in writing of the appeal hearing's time and date.
Sika° MB
Solvent Free, Epoxy Moisture Barrier
PRODUCT DESCRIPTION
Sika® MB is a 2-component, solvent free, low viscosity,
epoxy for use under wood flooring products, self leveling
underlayments, floating floors and other flooring
systems that require protection from subfloor moisture.
USES
• Moisture barrier to help control moisture propagation
in cementitious substrates with a moisture content not
exceeding 6 % by Tramex Method, residual moisture
up to 100 % R.H. or 25 Ib/1,000 ft2/24 In (11.4 kg/92.9m
2/24 h)
• For substrate consolidation on concrete, cement and
gypsum screeds
• Adhesion promoter for old and new adhesive residues
in conjunction with other Sika® products
• Suitable on concrete, cement, self -leveling and gypsum
substrates, OSB, plywood, quarry and terrazzo tiles,
water-soluble adhesive and cutbacks
PRODUCT INFORMATION
CHARACTERISTICS / ADVANTAGES
• Solvent -free (100 % solids)
• Easy roller applied application, low viscosity
• Convenient, easy to mix packaging
• Shorter construction periods
• Excellent penetration and stabilization of the substrate
• Reduction of adhesive consumption
• Suitable for use on floors with radiant heating
• Compatible with Sika Bond® wood flooring adhesives,
Sika® Level products
• Can be used below floating floors
APPROVALS/STANDARDS
Meets ASTM F 3010
Chemical Base Two component epoxy
Packaging 2.64 gal (10 L) pail
Color Blue
Shelf Life 24 months from date of production if stored properly in undamaged sealed
containers
Storage Conditions Store dry at 50-77 °F (10-25 "C). Protect from moisture.
Density 69 Ib/ft3 (1.1 kg/1)
TECHNICAL INFORMATION
Product Data Sheet
Sllo• MB
June 2019, Version 01.04
020512081000000017
1/4
Shore D Hardness
7 days
83 (mixed A&B) (ASTM D-2240)
Compressive Strength
7 days
10,000 psi (69 MPa) 73 °F (23 °C)
50 % R.H.
Permeability to Water Vapor
0.06 g/m2-24hour-mmHG
(ASTM E-96)
Service Temperature
-40-158 °F (-40-70 -C)
APPLICATION INFORMATION
Coverage
Coverage per pail
Moisture barrier
250-300 ft2 (23.2-27.9 m1)
Adhesion promoter or
400-450 ft2 (37.2-41.8 m2)
surface consolidator
(Coverage figures do not include allowance for surface profile and porosity or material waste).
Application
Recommended Results in
Coatings
Moisture barrier only
min.1 Mirror like finish
Substrate
min. 1 Good penetration
consolidation only
Adhesion promotion
min. 1 Mirror like finish
Moisture barrier+ min. 2 Mirror like finish
substrate consolidation
Moisture barrier+ min. 2 Mirror like finish
adhesion promotion
MUST produce a monolithic, pinhole -free finish with a continuous film. The
need for multiple coats is directly related to surface absorption.
Pot Life 50 °F (10 "C)
— 60 minutes
68 "F (20 °C)
` 30 minutes
86 7 (30 °C)
— 15 minutes
Cure Time 50 7 (10 -C) 18 hours
73 °F (23 °C) 8 hours
86 `F (30 `C) 6 hours
'Minimum curing time, prior to walking on primer/or for applying Sika Bond' or Sika Level.
Application Time Overcoating Application Minimum Maximum
Time Window"
Sika® MB 8 hours 36 hours
(2nd coat)
-When Sika° MB Is left on the substrate far more than the maximum allowable open time, the surface must
be mechanically prepared fi.e. sanded( solvent wiped before proceeding.
Product Data sheet
5ika' MB
June 2019, Version 01.04
020512081000000017
BUILDING TRUST
2/4
APPLICATION INSTRUCTIONS
SUBSTRATE PREPARATION
• Substrate must be clean, dry, sound and
homogeneous, free from oils, grease, dust, and loose
or friable particles. Paint, laitance, and other poorly
adhering contents must be mechanically removed.
• Substrate must have an open textured surface to allow
Sika® MB to penetrate. (i.e. Blast cleaning, grinding are
considered acceptable means to achevie the desired
surface profile. Acid and chemical etching are not
acceptable).
• At least 50 % of the surface area must be cleared of
residual adhesive and cutbacks. (i.e. by grinding or
mechanical substrate preparation)
• Old cutback can contain asbestos which is dangerous
for the health so do not grind, sand or blast. Refer to
the Resilient Floor Covering Institute's publication
"recommended work practice for removal of resilient
floor coverings" for instruction.
• Minimum substrate compressive strength > 1,160 psi.
Tensile Bond strength > 116 psi at the time SikaO MB is
applied.
• Repair with Sika' Level SkimCoat or Sika Quick' mortar
before priming.
• The floor must be cleaned with an industrial vacuum
prior to installation of the Sika® MB.
• On fiber reinforced concrete, fibers should be flamed
off the surface prior to application of Sika® MB as a
moisture barrier.
• Before overall installation begins, Sika' recommends
the application of several small test patches to
determine primer application requirements and
acceptability of final product performance.
MIXING
• Add one full can of component A to one full can of
component B then mix with an electric drill and mixing
(Jiffy Mixertype) paddle at a low speed to reduce air
entrainment (300-400 rpm). Using a paint stick or
similar is not sufficient to mix the primer.
• A minimum mixing time of 3 minutes shall be
observed; mixing shall continue until a homogeneous
mix has been achieved.
• Scrape sides of pail with paint stick or paddle to ensure
all contents are thoroughly mixed together.
• Unmixed material applied to the floor will not cure
properly.
APPLICATION METHOD /TOOLS
• Apply Sika® MB uniformly (in 2 directions 90') to the
substrate using a medium nap roller, ensuring that a
continuous coat is achieved over the entire surface
(MUST produce a mirror like finish).
• Pour contents of pail onto the floor for best working
time. Attempting to work from the pail will reduce
working time.
• When used as a moisture barrier and substrate
consolidation / adhesion promotor, prepare the
Product Data Sheet
Sllo• MB
June 2019, Version 01.04
020512081000000017
substrate mechanically as in accordance with the
guidelines stated in subtitle "Surface Preparation".
Apply the first coat at 10 mils Apply the second coat at
15 mils in accordance with the open time*.
2 coats application: Apply the first coat at 75-115 ftz/gal
Apply the second coat at 150-225 ft=/gal in accordance
with the application time window*. Then follow one of
the option:
• Option 1: Broadcast to refusal with oven dried silica
sand (20/30) on the second coat immediately. Sweep
sand once the epoxy is cured. Apply Sika® Level
products on cured epoxy.
• Option 2: Apply Sika® Level-02 EZ Primer in accordance
with the application time window*. When the primer is
dry, apply Sika® Level products.
*ref. to appliction time in sections above
L l 1:_L` ll : [C iel i L41T91L1
• Clean all tools and application equipment with cleaning
solvent (Xylene, MEK are effective).
• Hardened/cured material can only be removed
mechanically.
LIMITATIONS
• Proper coverage must be used to achieve moisture
barrier properties.
• Will not act as a moisture barrier for gypsum screeds.
Gypsum based subfloors are very susceptible to excess
moisture and will be degraded if exposed to excess
moisture from below or above.
• Only protects from moisture coming from below the
concrete.
• Will not prevent hydrostatic pressure.
• Must not be applied to a visibly wet substrate.
• Does not prevent moisture occurring between the
epoxy and the floating floor due to secondary sources
of moisture or acclimation, e.g. water condensation.
• Is not suitable for use with bonded systems due to
possible curing and adhesion problems.
• Sika' recommends the use of Sika' Level products on
top of it.
• Floor covering manufacturer's and Wood flooring
manufacturer's recommendations, like room humidity
levels and wood acclimation requirements should be
strictly followed.
• Sika' does not make any standing recommendations as
to the structural integrity of old adhesive residues or
subflooring materials that are not manufactured by
Sika*.
• When left on the substrate for more than the
maximum allowable open time of 36 hours, prior to
placing the adhesive, the surface must be thoroughly
cleaned and mechanically prepared (i.e. screened
sand) and solvent wiped. Failure to do this, may result
in adhesion problems. For detailed instruction contact
our Technical Service. When used in conjunction with
SikaBond', Sika® MB does not need to be broadcasted
with sand.
BUILDING TRUST A&
3/4
BASIS OF PRODUCT DATA
LEGAL DISCLAIMER
Results may differ based upon statistical variations
• KEEP CONTAINER TIGHTLY CLOSED
depending upon mixing methods and equipment,
• KEEP OUT OF REACH OF CHILDREN
temperature, application methods, test methods, actual
• NOT FOR INTERNAL CONSUMPTION
site conditions and curing conditions.
• FOR INDUSTRIAL USE ONLY
• FOR PROFESSIONAL USE ONLY
OTHER RESTRICTIONS
See Legal Disclaimer.
ENVIRONMENTAL, HEALTH AND SAFETY
For further information and advice regarding
transportation, handling, storage and disposal of
chemical products, user should refer to the actual Safety
Data Sheets containing physical, environmental,
toxicological and other safety related data. User must
read the current actual Safety Data Sheets before using
any products. In case of an emergency, call CHEMTREC
at 1-800-424-9300, International 703-527-3887.
Slka corporation
201 Polito Avenue
Lyndhurst, NJ 07071
Phone:+1-800-933-7452
Fax:+1-201-933-6225
usa.sika com
e�ewmyc
Product Data Sheet
Slka• MB
June 2019, Version 01.04
020512081000000017
Slka Me dcana SA. de CV.
Carretera Libre Celaya Km. 8.5
Fracc. Industrial aalvanera
Corregidor., Queretaro
C.P. 76920
Phone: 52442 2395800
Fax: 52 442 2250537
Prior to each use of any product of Sika Corporation, its
subsidiaries or affiliates ("SIKA"), the user must always
read and follow the warnings and instructions on the
product's most current product label, Product Data
Sheet and Safety Data Sheet which are available at
usa.sika.com or by calling SIKA's Technical Service
Department at 1-800-933-7452. Nothing contained in
any SIKA literature or materials relieves the user of the
obligation to read and follow the warnings and
instructions for each SIKA product as set forth in the
current product label, Product Data Sheet and Safety
Data Sheet prior to use of the SIKA product.
SIKA warrants this product for one year from date of
installation to be free from manufacturing defects and
to meet the technical properties on the current Product
Data Sheet if used as directed within the product's shelf
life. User determines suitability of product for intended
use and assumes all risks. User's and/or buyer's sole
remedy shall be limited to the purchase price or
replacement of this product exclusive of any labor costs.
NO OTHER WARRANTIES EXPRESS OR IMPLIED SHALL
APPLY INCLUDING ANY WARRANTY OF
MERCHANTABILITY OR FITNESS FOR A PARTICULAR
PURPOSE. SIKA SHALL NOT BE LIABLE UNDER ANY LEGAL
THEORY FOR SPECIAL OR CONSEQUENTIAL DAMAGES.
SIKA SHALL NOT BE RESPONSIBLE FOR THE USE OF THIS
PRODUCT IN A MANNER TO INFRINGE ON ANY PATENT
OR ANY OTHER INTELLECTUAL PROPERTY RIGHTS HELD
BY OTHERS.
Sale of SIKA products are subject to the Terms and
Conditions of Sale which are available at
https://usa.sika.com/en/group/SikaCorp/termsandconditions.htmi
or by calling 1-800-933-7452.
Si ka MB-e n-US-(06-2D19)-1-4. pdf
4/4
BUILDING
BILLING CONTACT
DAWN VAUGHT
1041 W 18TH ST
A106
COSTA MESA, CA 92627
Payment Date: 04/25/2024
Reference Number Fee Name
F SEW PORT
O O�
u n
e�
oq<iaonN�P
Transaction Type Payment Method Amount Paid
REV2024-0821
Hourly Plan Check Fee - Building
Fee Payment
CC EPL
$137.00
Records Management Fee
Fee Payment
CC EPL
$2.00
6 SKYSAIL DR NEWPORT BEACH, CA 92625 SUB TOTAL
$139.00
REV2024-0822
Hourly Plan Check Fee - Building
Fee Payment
CC EPL
$68.50
Hourly Plan Check Fee - Planning
Fee Payment
CC EPL
$53.75
Records Management Fee
Fee Payment
CC EPL
$4.00
2391 MESA DR NEWPORT BEACH, CA SUB TOTAL
$126.25
XR2023-2975 I Modification Fee - Alternate Material / Method I Fee Payment I CC EPL I $306.00
6 SKYSAIL DR NEWPORT BEACH, CA 92625 SUB TOTAL $306.00
TOTAL $571.25
April 25, 2024 3:23 AM 100 Civic Center Dr, Newport Beach, CA 92660 Page 1 of 1
City of Newport Beach
Community Development
100 Civic Center Dr.
Newport Beach, CA 92660
949-644-3141
Welcome
04/2.5/2024 11:23AM Savanah R
017655-0004 000093033
INVOICE
VAUGHT, DAWN
External Item Reference: INV-00026265
External Payment Reference: REC-004466-2024
Item:
Balance due: $0.00
Hourly Plan Check Fee
- Building $137.00
Hourly Plan Check Fee
- Building $68.50
Hourly Plan Check Fee
- Planning $53.75
Modification Fee -
Alternate Material /
Method $306.00
Records Management
Fee $2.00
Records Management
Fee $4.00
Payment Id: 181792
--------------
$571.25
Subtotal $571.25
Total $571.25
CREDIT CARD FOR EPL/ENERGOV $571.25
Visa ************0165
Ref=21377037102
Auth=07671G
--------------
Change due $0.00
Paid by: VAUGHT, DAWN
Thank you for your payment
CUSTOMER COPY
O '• amI' O un zr'rmoE. zm DEEF
GRAD B AM / 14) X$ TOP
e BOTTOM/ snRRurs
Iz wswn1 z,b 010'O.0 sfe PUN FOR
' oI. -D._ aBlns -� DIMENsoes sEt wswn
sneE.s FDR ADOL wFOR.
fir- ____ ____ F----- --
_ -I ___ ___
zr-_r I�I DL '. rvP
*4I _�
_, L A I I ®1 - —T
I
I I I I I ALNDEwnrrnEN ex I
I I )B O I
I
I
I I I I 4o'I osL es II
I
_La
_@_ � 11
4
� Lr� I I I JI T\
I I oil
I I I I I I
� I I I G I 11 n II I
L_1 J I I I II I
I I I I I I I!
°IT
I I I I 1 I
! I I I
r��Q)
IIr __ ____ -7L__qv
I Dm. 1 sw r---- ____-- — I
o. 3 11 j 4
11 I NI.
4 - 1
D
L-J Oso E'sI II I o_ I---s1®Ir�_ _ _ —_ )5v I I
1 re) oo Grv.. i I
I 1
� tD <�rnlcN coxes swB � 11 � aNl � I
I 1
I J-- J r 11 I I.
III s---.m.`---
L----�C
rvz e 1 1 L
I I I I
L_J I I I I
1 1 I I i
I I I
I I I II I
I III I
SNa.
AAI
I I
II
sj II -
HATCHED AREA IS TO
M- MB APPRODUCT 111
M. 1 II I I'I II II II I
I �1 I
---------------------
I I
I I I
I I �I II
LEIL_________________________
JI
L-
L___________________________.
AEM71FE"AILAIRL.,
BCTTOM A 44 57IRROPS
D' O. C. 5"
POOL FOR
NSION5. 5EE WSWM
.M1ffTS FOR ADE L INPOR.
5F-EAR WALL 5CHEDULE
FOUNDATION NOTES CORE
I RE,,TcF,,,, -0.oPo,.NP,NFOR,AIION.
z. CONTRACTOR5 z5PON115I POR ER i PRCPABRUTED 5nEARwALC From TNe Ground U,
o wr LIGHT AND L VIN7E AND NOTFE ENGINEER OFII Core Structure Inc.
2022cLOR e6LLDING CODE t I. el
uPu
�zabs�
NCLFJFAI
11-11API
RECORD III D PPEREN. rrA FIND
S LMN
5
11
'I
'-0
5. TOP OF ALe ERa FOOTwG. GRAse B&w FoonNG.-FICKEi NG. OR 23172 PIEER Pont= Dr.
ILLS POOH 70 BE MIN 6 BLOVI FIN15hAA01_
FILLET
9. OR N0115M1f R WAILS, MASA/M 9AP MV0.51 LANCM1ORS CPN Bf VSfD IN Sn�ie M 45
LEE 01 PNR`-0R BOIIL vn WEND DISTA c O MIN PER ESR ersse. Laguna H Its CA 92555
5. FOR DOVBL£ SMEAR PANEL MH 5AA3_Sw CIA u5E MIN. RAG 5__ PLATER Phone: 9A5 JC4724G
-®
C Ji
Al G z< a
e z
pro_
�Icac
U,N,O. nBl ,,t...LET,.wm
6_ cONrRACTORLSRf5POn5BL ro3u BMT AMw0 TO O?0TADDRESSB-
BLPAAEAPPAAVA. ._. alDruPJOC-w mucRHtI TO EORTOR
RwIEwiAPPRovA..
_
°c@tl''o°C
159EATnING PANEL JOINT AND SILL PLATE NAILING 5LWU Br STAGGERED IN AL
'EASE.
EL REFEREE
NOMINAL ORFIBER FRAMING AT AWONING PANEL EDGER VOTE NAT
5TA GERED.
5) STUDS RE SPAL D @ I 6" O.C. MAR. V 455 NAITO OTHERWISE ON PLAIN
4) PERoDIc SPEC L sFECIION 5REOVRED.
sl u5e CL Fs C G' O c. o s PsoN ETRO G w L TARsv RAME m.N.O.).
6 LSE 5PA'EING PERSCYEOUL IF NDMDER OE FRAMING GJP5 ARE NOT 5PELIfIED
ON FRAMING PLAN,
.
T A LLO BLt 5111 R_ ORSWJS 511CO 24 O. G. MAx.
Al 5n rn G CONFDRM5 TO EImER Doc 5 OR P5 z 5TA DARDs.
LING ® G O C IN 5 ND5 ARE 5PACED 24C.C.
I'PER DABORE 51DED PILLAR FA14C5.
J5E TALE THE READING OF SIL.' LANCHOR PEFLT5 O lYEE55' 3.5 4c5'!
S O5EOL I Al ORE 5Ds 5CFAAR IN ECTI'DJUE AND LATE I FT.EAA..N.
FOR PAPER FIE 5v5
SEES EAR TRANS ER DETA O. -,AN FOR FRAMING aIF III ANDLAPE mE
51ACING_ FORT" s IFE 51H • 5v5.
FOUNDATION PLAN
5CALE : 114' = 1'-0'
LEGEND
r �
L J
D
_-
OATTING
r-�
lI III BAR
L_J
111"T's I'll
G OTeSPD 11.151111 SCHEWo
J ' SP DID NCAIL°L4 N
F 11
TfeDETAI RNUMEER 0
❑x
11115 Ec.Dw+N IF F-FED.IE
FFANILLINGTl
%
5 EANEL APH' REFER ECHEDU
$� E
��0
° I EPJP" RORro^INSTRUTCNI
D'FEET F 7RIBINO, APPLIED
'coca "All"
EDz e rroerc E.11
TC
cn W= 1'.0.2<' LCFNT 121 A, .OPTIC El
HOLDOWN 5ChEDULE
s'EON yOLDDwN USP nGL0Cv; 1...
DER
i _F E
KEY NOTES
OI 121XR.VI OCAFFAIR SARS- ASOPPM O19w1
No. C]019
04/ 1 7/2024
N
N
N
e
U
W
U a
Z
W -'
EL
LU LU A
z
RE
FAJ
O Q
N
ETH
U
z" a Ut
o
0
A.E.. 041,11,
PROJECT MPNAGER�
S.t4.
5-1.0