Loading...
HomeMy WebLinkAboutF2023-0584 - MiscQ4��WPO,Q,7� Cr ,L OF N-E Yi' 1 ORT BEACH O,O)yglyg NrryDEVELOPWNTDEPARTMTNr 4 o B[TLLDIPTCrDWM®N ��Lo asfiR 100 Civic Center Drive I ja C. Box 178a I Newport Beach, CA 92658-8915 www.newpgtftieachca.gov [. Q349) 644-3200 WIRE SPt?rnIKLFa NFFA 13D SYSTEM FIL` -L CHECKU§T (RES)DEN IAL) YES NO 1, Water meter proper size ❑ 2. Fire sprinider system installed Per the approved plans 3. All consh eon covers removed from sprinkler heads El are NOT tc be Installed, but shall be available on the Jobsite ❑ p, 4. Cover plates ❑ 5. All tape and paint removed from sprinkler heads 5. Finish trim installed around sprinkler heads p� 7. Proper signage Posted at all required I94ations 8. Flow test conducted and bell tested 9. Location of nspedors testing valve in approved locakn � ❑ SYSTEMS: rY 10. Clearances around sprinkler heads and riser- no obstructions 1� 11.Opemling pressure gauge Installed at riser showing proper water pressure ❑ 12 Back flow preventar installed ❑ 13. System installed per manufacturers Speciflcdons NOTES FIRE SPRINKLER NFPA 13D SYSTEM FINAL APPROVED: / PERMIT DATE: _ BY: Forms\ Flre Sprinkler NFPA 00 sy�m- FINAI.Cfiakfk FEs10E"AL05/17/1015 CITY OF NEW, PORT BEACE[ Co�� DEVELOPMENT DEPARTMENT 100 civic Center DrK;q . Newport Beach, CA 9265"916 www-newportbeachMUOV 1 (946) 044-32170 ENE SPRDWER WA. ].3D SYSTEM R0UGHINSftCT1GN CHECKLIST YES k7gr CQn@tW_qn and LO Q4onApprovii a,.. Drain va" b- Sacldfbw device (single check) a Beg activation device d- Inspectoes test valve e. Riser sr nd per approved plans 2. Pressure.Test a, System laslad at operating pressure for 2 hours b. Pressure gauge installed nas prior, to tefittings �—Llu 2mucfled in Place r remma test plues) a- installation and spacing Of temporary test plugs 4. Ekbg I . 0. Material instaffed per plan b- Hangers pqrcodes/prLvent upward movement c. An CPVC Piping shall be installed bye Persons who have been car"ad by the Mandaclizer for installation of GpVt PrPfng d. Piping Protectud from damage 5. Sell a- V-4ing.instalod per code b. •Boxes Installed at proper locations -6�OTQ CFVC Plastic Pipe In the garage &half not be aVdsed. S - PrInklG0 that are listed as Response" or 4!ResldarrUaj° must be used. CORRECTIONS AND NOTES-., FIRE SPRIblKLER NFPA 130 SYSTEM ROUGH �INSKMON Al BY; PERMIT DATE -- 7-5 - o� � Lj Fom V'M'P"k(RrMPA0051-RuaghimpctianChe Lt 05/12/2015