HomeMy WebLinkAboutM2023-0077 - Miscr AIF"�r
'trrruFi�.^�
Report of Special Inspection
Project Name & Address 27 Linda Isle
Permit Number M2023-0077
Inspection Type(s) R/C
Inspection Date(s) 3-8-24 ElPeriodic zcontinuous
Describe Inspection Made, including locations:
Marine Piles
Scope of work - Remove and replace Cone. Piles at floating dock.
Observed the placement of concrete marine piles per schedule and details on
the approved plan. Schedule on sheet S-2 and details on sheet S-3 / V. Piles
installed by way of water jetting.
Locations: Boat Dock
Pile # 1 = T-Pile 14"sq. x 28' Long, with min. 15' ft. embed.
Locations:
1 ) Pile # 1 installed today.
Work is complete for the areas listed.
List Tests Made
Total Inspection Time Each Day:
Date
Hours
List Items Requiring Correction, Include Uncorrected Items Previously Listed:
To the best of my knowledge, the work inspected was in accordance with the Building Department
approved design drawings, specifications and applicable workmanship provisions of the IBC except as
noted above.
3-8-24
Name: Jon Newsom Registration No. NB-0303
FORM SI41.1e14
Report of Special Inspection
Pmject Name R Address Tony Ganier, 27 Linda Isle
Permit Number M2023-0077
Inspection Type(s) R/C
Inspection Datc(s) 3-12-24 Fcriodic ❑� Continuous
Describe Inspection Made, including locations:
Epoxy
Observed the installation of threaded rods per schedule and details on the
approved plan. Verified the hole depths and proper cleaning with a nylon brush
and compressed air prior to the epoxy. Type of epoxy used Simpson xp, ESR
2508, expiration 2024. Schedule on sheet S-2 and Details on S-4.
Location:
1) Pile Cap - S-4 / K = (2) 5/8" threaded rods with min. 6" embed.
2) Sea Wall Ledger 4 x 8 = 518" threaded rods @ 16" o.c with min. 6" embed.
Work is complete for the areas listed.
List Tests Made
Total Inspection Time Each Day:
Date
Hours - - - --�
List Items Requiring Correction, Include Unco rected Items Previously Listed:
To the best of my knowledge, the wark inspected was in accordance with the Building Department
approved design drawings, specifications and applicable workmanship provisions of the IBC except as
noted above.
3-27-24
Print Full DQamf: Jon Newsom nay: V- NB-0303
R10.N 51.2. W 14