PRE -GRADE MEETING AGREEMENT
DATE: V ! IT 23 JOB ADDRESS:
1. All residential one -unit and two -unit dwelling projects must be completed in a three (3)-year period in accordance
with Newport Beach Municipal Code 15.02.095.
2. The grading plan check number for this site is XZ022-J5'0E) and will be referred to in all reports, certifications
and correspondence.
3. STOP ORDERS: Whenever any work is being done contrary to the provisions of the City Codes, the Chief Building
Official or his authorized representative may order the work stopped by notice in writing served on any persons
engaged in the doing or causing such work to be done and any such persons shall forthwith stop such work until
authorized by the Chief Building Official to proceed with the work.
4. The stamped set of approved plans shall be on the job site at all times.
5. NOTIFICATION OF NONCOMPLIANCE: If, in the course of fulfilling their responsibilities, the civil engineer,
surveyor, the soils engineer, the engineering geologist or the testing agent finds that the work is not being done in
conformance with the approved grading plans, the discrepancies shall be reported immediately in writing to the
person in charge of the grading work and to the Building Division. Recommendations for corrective measures, it
necessary, shall be submitted to the Building Division for approval.
6. When import or export of materials is required, haul routes to and from the site shall be approved by the City
Traffic Engineer and hauling procedures shall be in accordance with Chapter 15 of the Newport Beach Municipal
Code (NBMC). Contractor shall use Best Management Practices (BMP's) to insure that all water quality issues are
addressed.
7. Between October 1 and April 30, erosion control BMP measures shall be in place. During the remainder of the year
dry season wind erosion BMP's (dust control) shall be implemented. Sediment control BMP's shall be installed
and maintained at all operational storm drain inlets internal to the project. BMP's to control off -site sediment
tracking shall be implemented and maintained. Appropriate BMP's to prevent contamination of stormwater from
construction activities shall be implemented. A "weather triggered" action plan and the ability to deploy BMP's to
protect all exposed portions of the site within 48-hours when the National Weather Service forecasts a 50% or
greater chance of rain.
8. All fills shall be compacted throughout to a minimum of 90 percent compaction as determined by ASTM test
method 1557 and approved by the soils engineer. Compaction tests shall be performed according to the
preliminary soils report.
9. All trench (including interior and exterior utility trenches) and retaining wall backfill shall be compacted throughout
to a minimum of 90 percent relative compaction and approved by the soils engineer.
10. Whenever work on which required inspection/testing is covered by additional work without first being
inspected/tested, the Chief Building Official shall require by written notice that the work be exposed for
examination. The work of exposing and recovering shall not entail or be subject to expense to the City of Newport
Beach and will be the sole expense of the Permittee.
11. Landscaping of all slopes and pads shall be in accordance with 15.10.130 of the NBMC.
12. Approved drainage provisions shall be used to protect adjoining properties during the grading operation.
ZZ0Z-6 luawaai6e 5ugaaw apej6ad�swo j
sAepiloH pue sAepunS uo )Isom ON
-w-d 00:9 ol•w•e 00:9 :sAepinleS
'w'd 0£:9 Ol -w•e 00:1 :Aepud g6nojg3 AepuoW
:sjnoH 1-10113mlsuo0 goeag No maN
SSZ£-469 (M) :S1S3f103H N01103dSNl
3NOHd :3A11V1N3S3NdMJ H0V3S iNOdM3N
:auogdalal
:ssaippV
:AS
:2l01VNIGN0O0
:auogdalal
:ssaipp-"�
:All
:'1SI�JOlO3�J
OhL-05,5 :auogdalal
D I C 'S 1 602 :ssaippV
Ja DJVp
MIN :All
{-qi I :?J1N00 9NIO` -dE)
:auogdalal
:ssaippV
:All
MINH031O99
2 2 '�y y, ' lG :auogdalal �� /� :auogdalal
:ssajppV c75n -a :ssaippy
:-NON3 -IIAIO NoIS30 :14010 H I N00R13NMO
-(sjasij japluuds aig'leoppela'se6 harem Names) sal;Illln alendes sannbai uogonilsuoo xaldnp 11V '66
joloadsui 6ulpllnq 9q3 All panojdde ssalun 6uilaaw opei6aid aqp jo; )uesaid aq lsnw molaq palsil sallied [IV -81,
•palinbai aq Aew liodeN uoge/uasg0 iemlonilS V •joloodsui 6ulpllnq agl of paulwgns pue piooai
;o joAeAjns agl All pedwels pue pau6is psnw wod aleoilipa0 apej0 pue eurl a uoiloadsui uogepunol of solid 'Cl,
-liwad agl to sluawaimbai lemads Aue pue Nodal silos )oafoid agp to suopepuawwo38-1 ag3'gaeag lJodm0N
to 43 agl }o apo0 6ulpej0 agl glim Illdwoo of aai6e pue anoge agl to Adoo a a6palmoupe pau6isiapun aql -91,
'papinad
aq llegs a6uej0;o Aluno0 all) gllm „AaAjns l0 pjooaj„ jo „pjooei lawoo„ alp to uoilepiooai to load 'suoiloadsui
uoilepunol Rue of Loud •aoeld ui aq llegs sluawnuow jawoo Apadoid luouewiad lie '6uipei6 30 yels agl of Joljd 'SL
voloodsul 6uipiing aql of paulwgns aq pegs lenoidde uaAljM •lsi6oloa0 6uuaaui6u3 jo jaaui6u3
le3iugoaloa0 aql All panadde pue paloadsui aq llegs suiejpgns pue seaje 9pei6 uo geis'suoileneoxa 131,111001 IIV '71.
'paulwgns uaaq aneq sliodaj pajinbaj agl pue slenoidde ieuoissaloid 'ueld papej6-se aql pue pa)aidwoo
uaaq sell 'saolnap angoaloid jagpo pue sain)onils a6euiejp lie jo uogellelsui 6uipnpui 'Niom lie uagM :IVNld 'a
-uoi)ajosip s,joloadsul 6uipiing agl uo paseq jeuoos jo uoiloadsui uoilepunol le jopedsul 6uipling all)
of papin0.1d aq Begs podej apei6 g6noj aqp 'palaidwoo uaeq sell g 6ulpej6 6noi lie uagM :EJNIOV'd9 Honom 'p
.3
-paoeld si leuapew jalig jo a)aiouoo Aue ajolaq lnq 'suiejpgns
ui adid to luawooeld jaue io suiejp umop 'suiejp aoeiial l0 6uiwol J04V :NO1103dSNl 301A30 90VNIVN0 'q
-paliels si 6uigsniq jo 6uipej6
Rue ejolaq s6ep omp uegl ssal you pnq ')ijom ui6eq of Rpeej si aepwied aq) uagM :DNI133W 30vNE)-3Md 'e
:suoiloadsw 6uimoliol
agl to upea jol Apeai si uoilejado 6uipej6 agl uagM uoisini0 6uipling aq) f4gou pegs lua6e sill jo aauiwiad eql -Cl,
'wPI " em CITY OF NEWPORT BEACH
COMMUNITY DEVELOPMENT DEPARTMENT
>�F�v BUILDING DIVISION
c 00.",P 100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 926588915
9�
www.newoortbeachca.00v 1 (949) 644-3200
SETBACKS AND TOP OF SLAWFLOOR
ELEVATION CERTIFICATE
The purpose of this certificate is to insure that the structure is located properly on site per the approved
drawings. This certificate also verifies the top of slab/floor elevation noted on the approved drawings.
After the top of slab/floor elevation is verified to match the elevation specified on the approved
drawings, the contractor and inspector can measure the height of the structure to the top of slab/floor to
verify that it is equal or less than the dimension shown on building sections and elevations.
This form must be filled out by a registered surveyor or civil engineer authorized to perform surveys.
The survey must be done after the concrete forms are in place or preferable after the concrete slab is
poured or raised floor is built, but prior to starting wall framing.
Engineer/Surveyor's Name — 90 Al .&/O M ^O/JO License # Ls Y& r3
Engineer/Surveyor's Address
Job Address M t 9 a ICY L
r"
Setbacks: Sketch a site plan and specify surveyed setbacks (use back page).
* Top of slab/floor elevation: / Q t,
* If slab/floor elevation varies, sketch a plan or section through slab on the back page and specify the
elevations. Use same datum used in the survey of record.
I certify that the setbacks are
from plans:
are not ❑, per City approved plans. Describe any deviations
I certify that top of slab/floor elevation(s)
any deviations from plans:
�t--15-i3
Date
Fortes/SetbacksandTopofSlabElevationCert.
is 10, is not ❑, per City approved drawings. Describe
/h�f
rvw; r
a
N
N
91/Zo/I I uo1=q!vaZ) Ige'ap emppne\smod
ale(]
£2—L-G
£994S1
vw3Q31W 1
aamol Jo S96£E do jagwnu asuaon .
(paalnbaa ain;eu2ls pue dwe;s;aM)
leas pue ain;eusis #s,jaauI2u3 pn1J ao joAa/unS
•wao; sly;;o joeq aq; uo sueld panoadde-A;IO aq; ww; uol;elnap Aue aglaosap aseald
apinoad) sueld panoadde-AgD ay; q;lm aouelldwoo ul ION SI O
'sueld panoadde-A;lD aq; q;lm aouelldwoo u1 SI
:;oafoad anoge ay; pue;oaaaoo aae s;uawaanseaw;g8laq anoge aq;;eq; A}Iljao I
;ulod uol;enala len;oe pue-sl;adeaed ao low ;ell jo;ulod uol;enala panoaddy •E
sl;ulod uol;enala len;oe pue sl;adeaed ao;ooa;ell jo;ulod uol;enala panoaddy -Z
64 22 sl;ulod uol;enala len;oe pue frWz-1sllad eaed ao;ooa ;ell ;o;ulod uol;enala panoaddy T
J4ari la/ �l s7lVUOUaaavnD .� GNrvv sc3dybed 's-qooa i rlj
sl;ulod uol;enala Ien;oe pue sl a8pla;o;ulod uol;enala panoaddy '£
sl;ulod uol;enala len;oe pue sl a3pla;o;ulod uol;enala panoaddV •Z
9�yr•�' •A 2 sl;ulod uo!;enala len;oe pue --"7v-zT sl a2pla;o;ulod uol;enala panoaddy q
jaoel lil'dr.
(aapai6 ao adols ZL:E) S39018 �� L
%aopadsul Otgpyng aq; Aq pa}sanDaa aq ADw 54ulod uol}Dnala 1ouol4lppV ,s1lwpaon6/sjadoJod
a0'sjoa3011'sa6p1400a4sag4lq aq; aof uol;Dwao1u/ uol;Dnala 6u1N1o11ofaq; apinod asoald
pawnssy ® 6ZOA'JN O 88GAVN O :uo paseq aae s;ulod uol;enala IIV
•uonaadsul dulwea;;ooa aao;aq ao;oadsul ay; o; Adoo leuiRIJo apinoad 'papaau sl uol;eueldxa
aay:wn; ao Aaessaoau sl ands leuol;lppe ;I wao; sly; ;o 31oeq ay; uo molaq ;ewao; ay; asn
-sueld panoadde ay; uo pa;eolpul suol;enala 8ulllea pap;ooi jo';oo„ai; pue a8pu leaf;uo yaea
apinoad page;sul ;aA;au;l ssauI . I lei Sul;ow ao; aouennolle ue apnloul lleys suol;en813
'sueld 9SO41 uo molaq
pa;sll suol;enala aq; paseq pue Aanans olgdea2odo; leul8uo pue ueld panoadde 40ea8 UodmaN;o A;ID
aq; pamalnaa aneq I;eq; Aj!:pao Agaaaq I 'ssaappe anoge aq;;e;oafoad aq; ao; paooaa;o aoAanans ay; sy
57z - _ .2 :(s)aagwnN;lwaadgulpp8
I a I :ssaappy;aaa;S;oafwd
NOUVOIJU1 1301H013H ON101in8
OOZE-17179(6b6)IA06-eoyoe9q;jo au'mmm d`wo�/oyJ
9668-899Z6 VO 'yoea8 podmeN 189L1 xo8 'O'd O a9;u90 OIMO OOl
NOISIAM Ouia•ung n
,tN21WixVdHG s.u211/VdOzaAaG MUMa NOS