Loading...
HomeMy WebLinkAbout05 - FY 2022-23 Playground Refurbishment — NOC for Contract No. 8953-1 (23P01)Q SEW Pp�T CITY OF z NEWPORT BEACH c�<,FORN'P City Council Staff Report June 25, 2024 Agenda Item No. 5 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: David A. Webb, Public Works Director - 949-644-3311, dawebb@newportbeachca.gov PREPARED BY: Tom Sandefur, Assistant City Engineer - 949-644-3321, tandefur@newportbeachca.gov TITLE: FY 2022-23 Playground Refurbishment — Notice of Completion for Contract No. 8953-1 (23P01) ABSTRACT: On June 27, 2023, the City Council awarded Contract No. 8953-1 for the Fiscal Year 2022-23 Playground Refurbishment Project to R.E. Schultz Construction, Inc. (R.E. Schultz) of Orange. The total contract award was $293,315 plus a $29,340 allowance for contingencies. The required work is now complete and staff requests the City Council accept the work and close out the contract. RECOMMENDATIONS: a) Accept the completed work and authorize the City Clerk to file a Notice of Completion for the project; b) Authorize the City Clerk to release the Labor and Materials Bond 65 days after the Notice of Completion has been recorded in accordance with applicable portions of Civil Code; and c) Release Faithful Performance Bond one year after acceptance by the City Council. DISCUSSION: Overall Contract Cost/Time Summary Awarded Contract Final Total Contract Total Contract Percent Contract Amount Amount Change Amount Cost Change $293,315.00 $300,937.16 $7,622.16 2.6% Allowed Contract Time + Approved 47 Actual Time Used (Days) 45 Extensions (Days) = The FY 2022-23 Playground Refurbishment project included reusing the existing swing set and Geoplex climber along with the installation of new play equipment and rubber surfacing. The new play equipment is accessible from the ground level. Elevated components meet the City of Newport Beach's desired safety levels and accessibility compliance. Contract No. 8953-1 has now been completed to the satisfaction of the Public Works Department. 5-1 FY2022-23 Playground Refurbishment — Notice of Completion of Contract No. 8953-1 (23P01) June 25, 2024 Page 2 A summary of the contract construction costs are as follows: Original bid amount: $ 293,315.00 Actual Cost of Bid Items Constructed: $ 293,183.40 Total Change Orders: $ 7,753.76 Final contract cost: $ 300,937.16 There were three change orders totaling $7,753.76. This amounted to 2.6% of the original contract amount and was within the contingency allowance. The change orders covered the addition of a concrete pad for park benches, replacement parts to reinstall the existing climber play equipment, and the replacement of a steering wheel on the rescue boat play equipment. A summary of the project schedule milestones is as follows: Estimated Start of Construction per Annual Baseline Schedule March 22, 2024 Actual Start of Construction Per Notice to Proceed February 28, 2024 Contract Completion Date with Approved Extensions May 3, 2024 Actual Substantial Construction Completion Date April 30, 2024 Twenty-seven additional working days were granted to allow for the procurement of the additional materials and hardware necessary to reassemble the existing climber in a new location. FISCAL IMPACT: Funds for the construction contract were expensed from the Building Excise Tax (BET) and General Funds in the following accounts: Account Description BET Fund General Fund General Fund Account Number 14101-980000-21 P01 01201929-980000-22P01 01201929-980000-23P01 Total: Amount $ 20,843.00 $ 9,185.39 $ 270,908.77 $ 300,937.16 The BET fund is used to account for property development taxes imposed on construction and occupancy of all residential, commercial, industrial units, and mobile home parks for which a building or construction permit is issued. BET funds can be used for acquiring, improving, expanding and equipping City fire stations, City libraries and City parks as provided by Chapter 3.12 of Newport Beach Municipal Code. The General Fund is used to account for fiscal resources that are dedicated to government operations of the City and are not required to be accounted for in another fund. 5-2 FY2022-23 Playground Refurbishment — Notice of Completion of Contract No. 8953-1 (23P01) June 25, 2024 Page 3 ENVIRONMENTAL REVIEW: On June 27, 2023, the City Council found this project exempt from the California Environmental Quality Act (CEQA) pursuant to Class 1 Section 15301 (rehabilitation of deteriorated facilities involving no expansion of existing use) of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no potential to have a significant effect on the environment. NOTICING: The agenda item has been noticed according to the Brown Act (72 hours in advance of the meeting at which the City Council considers the item). ATTACHMENT: Attachment A — Location Map 5-3 ATTACHMENT A CITY OF COSTA MESA Q o w 0 17T Ld 15TH S OPROJECT LOCATION PENINSULA PARK PLAYGROUND 110]G1►E►i►L\7jjkfa VICINITY MAP NOT TO SCALE ��0164, sa 1p CITY OF IRVINE P� UNIVERSITY m FY 2022-23 PLAYGROUND CITY OF NEWPORT BEACH REFURBISHMENT PROJECT PUBLIC WORKS DEPARTMENT PENINSULA PARK LOCATION MAP C-8953-1 06/25/24