Loading...
HomeMy WebLinkAboutX2021-2460 - SoilsCOAST GEOTECHNICAL, INC. t200 West Commonwealth Avenue, Fullerton, CA 92833 Ph: 714-870-1211 Fax: 7 t4-870-1222 e-mail: coastgeotec@gmaitcom June 11, 2024 W.O. 607320-04 Mr. and Mrs. Damien Burke 29 Inverness Lane Newport Beach, CA 92660 References: Subject: Final Soils Report for 29Inveness Lane, Newport Beach, California Geotechnical and Geologic Investigation of Proposed New Residence at 29 Inverness Lane, Newport Beach, California; by COAST GEOTECIINICAL, Inc., W.O. 607320-01, dated February 19,2021. 2. Addendum Report, Proposed Retaining Walls, New Residence at 29 Inverness Lane, Newport Beach, California; by COAST GEOTECFINICAL, Inc., W.O. 607320-02, dated September 2, 2021. 3. Rough Grade Compaction Report at at 29 Inverness Lane, Newport Beach, California; by COAST GEOTECIiNICAL, Inc., W.O.607320-03, dated June 16, 2022. Dear Mr. and Mrs. Burke: In accordance with the request of your contractor, this final soils report has been prepared to address geotechnical observations and testing performed since completion of rough grading. This report addresses requested observations and testing. Copies of our daily reports are maintained in our files. FOUNDATION EXCAVATIONS The rear retaining wall foundation consisted of a pile and gradebeam system, and was observed on April, 13, 2022. A total of 20 piles, ranging in depth from 23 to 24 feet below existing grade and founded into bedrock were drilled by Drilco and observed between March 1, 2022 and March 21, 2022. The pile and gradebeam foundation excavations for the residence were observed between March 22, 2022 and April 26, 2022. A total of 65 piles were drilled by Drilco, ranging in depth from 23 to 26 feet below grade and founded into bedrock. The foundations and gradebeams connected with piles were observed during the time of the slab subgrade observations. A total of 7 column pad footings along the southern property line were observed on December 28, 2023 and January 10, 2024. The bio retention planter bottom along the southern side of the property was observed on January 10, 2024 and March 18, 2024. The foundation excavations were found to be acceptable at the time of our final observation. SLAB SUBGRADE AND TRENCH BACKFILLS The interior slab subgrade was observed on June 22, 2022 and June 24, 2022. The patio subgrade at the rear of the residence was observed on July 8, 2022. Probing and testing of the interior COAST GEOTECHNICAL, INC. Mr. and Mrs. Burke 2 W.O.607320-04 Final Soils Report June 11, 2024 residential slab areas indicated acceptable geotechnical conditions for support of the proposed slab, at the time of our final observation. SUBDRAINS AND RETAINING WALL BACIUML The subdrain system behind the rear retaining wall was observed on May 12, 2022, consisted of a four -inch diameter SDR 35 perforated pipe, surrounded with one cubic foot, per lineal pipe foot, of 3/4-inch gravel. The gravels were wrapped in filter fabric. Wall backfill in the areas above the subdrains were observed. Probing and testing of the compacted backfill indicated acceptable geotechnical conditions. POOL The pool/spa pile foundation system was observed from May 27, 2022 through June 2, 2022. The pool pile foundation consisted of ten piles measuring 33 to 34 feet from existing grade and founded into bedrock. The pool bottom was observed on June 28, 2022, and found to be acceptable at the time of our final observation. HARDSCAPE The hardscape subgrade in the rear yard area was observed on December 27, 2023. The hardscape subgrades for the driveways were observed on April 3, 2024. The hardscape subgrade for the front walkway entry was observed on May 2, 2024. The hardscape subgrade for the side walkways along the residence were observed on May 24, 2024. Probing and testing of the requested hardscape area subgrade indicated acceptable geotechnical conditions for support of the proposed hardscape. OPINION It is opinion of COAST GEOTECHNICAL, INC. that the summarized geotechnical conditions approved by this office are in compliance with approved geotechnical reports and Newport Beach building codes. The final grades appear to conform to approved plans. We appreciate this opportunity to be of service to you. Respectfully Submitted: COAST GEOTECHNICAL, INC. -'�'4 cj-01& Robert C. Langhurst Staff Geologist