REGISTERED INSPECTOR'S REPORT4JobNo.
Date 1-5-24 Tire
TYPEOF
Reinforced Coneroteiurel
Steel Assembly
Oualiry Control
INSPECTION
Poet Tension ConcreteProofing
poxyReinforced
REQUIRED
Masonrysit
Wood Construction
Ceilings
Reber
Other Marine Piles
Job Address: 603 Bay Front
city: Newport Beach
ame: Mary Jo Phillips
Permit No.: M2023-0087 Issued By: Newport Beach
-- ----- -- — --
YPa rc: Boat Dock
Architect: PMA Consulting Inc
Material Description (type. grade, source):
Engineer. PMA Consulting Inc.
contractor: Swift Slip
Bill To:
--------
Subcontractor: South
Inspectors (s) Name: Jon Newsorn
Contact info: Ben
TEST PERFORMED Email Add:
TYPE OF SAMPLE
SLUMP
QUANTITY IN SET
ADDITIONAL REMARKS ON SAMPLES
INSPECTION SUMMARY- LOCATION OF WORK INSPECTED. TEST &WPLESTAKEN.WORK REJECTED, JOS PROBLEMS. PROGRESS REMARKS, Etc.
INCLUDES INFORMATION ABOUT AMOUNT OF MATERIAL PLACED OR (WORK PERFORMED, NUMBER. TYPE A IDENTIFICATION
NO'S OF TEST SIMPLES TAKEN: STRUCTURAL CONNECTIONS (WELD MADE, N.S. BOLTS TORQUE) CHECKED. ETC -
Marine Piles
Scope of work - Remove and replace Conc. Piles at floating dock.
Observed the placement of concrete marine piles per schedule and details on the approved plan.
Schedule on sheet S-2 and details on sheet S-5 / V. Piles installed by way of water jetting.
Locations: Boat Dock
Pile # 1 = (T-Pile)14"sq. x 30' Long, with min. 15' ft. embed.
Pile # 2 = 14"sq, x 32' Long, with min. 15' ft. embed.
Pile # 3 = 14"sq. x 34' Long, with min. 15' ft. embed.
Locations:
1) Pile # 1 installed today.
Work is complete for the areas listed.
CERTIFICATE OF COMPLIANCE CONTINUED ON NEXT PAGE ❑ OF
I HEREBY CERTIFY THAT I HAVE INSPECTED TO THE BEST OF MY KNOWLEDGE TIME IN TIME OUT O.T. SAMPLES
ALL OF THE ABOVE REPORTED WORK UNLESS OTH ERW 1SE NOTED I HAVE
FOUND THIS WORK COMPLIES WITH THE APPROVED PLANS. SPECFCATIONS - ?—
AND APPLICABLE SECTIONS OF THE GOVERNING BUILDING LAWS 12:OOpm 3:DOpm 4
ALL INSPECTIONS BASED ON A MINIMUM OF a M OUl18 AND OVER 4 HWR84-HOUR
�J MINIMUMS. IN ADDITION. ANY INSPECTION EXTENDING PAST THE NOON HOUR WILL
/"✓ M AM a-lWUR MNIWN
SIGNATURE OF REGISTERED INSPECTOR
C 1036034 ICC
ApproI by _
SPEVALTY NO. AGENCY Project Superintendent
61 NBc consultants Inc.
6941 Dresden Circle
Huntington Beach, CA 92647
Office 714-943-2777 Fax 714-892-5829
REGISTERED INSPECTOR'S REPORT
INSPECTION
REQUIRED
Job Address: 603 Bay
forced Concrete
Tension Concrete
forced Masonry
1 Construction
Job No. Data 1-8-24 Tome
itructural Steel Assembly Quality Control
°Ire Proofing Epoxy
lsphelt Reber
'-Bar Ceilings Other Marine Piles
city: Newport Beach
JDO name: Mary Jo Ph111Ips Permit No.: M2023-0087 Issued By: Newport (seam
Type o_r3TU- boat Dock Architect PM.A CnuSldting Inr
Material Description (type Wide, source): Engineer PMA (GnSolling Inc
Bill To: _
Inspectors Is) Name: Jon Newsom
TYPE OF SAMPLE
Contractor. Swift Slip
iSubcontractor: SUUth
---— Contact info: 1)eI)
TEST PERFORMED Email Add:
QUANTITY IN SET ADDITIONAL REMARKS ON SAMPLES
I NSPECTION SUMMARY- LOCATION OF WORK INSPECTED, TEST SAMPLESTM(EN, WORK REJECTED, JOB PROBLEMS, PROGRESS REMARKS. ETC.
INCLUDES INFORMATION ABOUT AMOUNT OF MATERIAL PLACED OR (WORK PERFORMED, NUMBER, TYPE A IDENTIFICATION
NOS OF TEST SAMPLES TAKEN: STRUCTURAL CONNECTIONS (WELD MADE, H.S. BOLTS TORQUE) CHECKED, ETC.
Marine Piles
Scope of work - Remove and replace Conc. Piles at floating dock.
Observed the placement of concrete marine piles per schedule and details on the approved plan.
Schedule on sheet S-2 and details on sheet S-5 I V. Piles installed by way of water jetting.
Locations: Boat Dock
Pile # 1 = (T-Pile) 14"sq. x 30' Long, with min. 15' ft. embed.
Pile # 2 = 14"sq. x 32' Long, with min. 15' ft. embed.
Pile # 3 = 14"sq. x 34' Long, with min. 15ft. embed.
Locations:
1) Pile # 2 installed today.
Work is complete for the areas listed.
CERTIFICATE OF COMPLIANCE
I HEREBY CERTIFY THAT I HAVE INSPECTED TO THE BEST OF MY KNOWLEDGE
ALL OF THE ABOVE REPORTED WORK UNLESS OTHERWISE NOTED I HAVE
FOUND THIS WORK COMPLIES WITH THE APPROVED PLANS, SPECIFICATIONS
AND APPLICABLE SECTIONS OF THE GOVERNING BWLDMG TAWS
SIGNATURE OF REGISTERED INSPECTOR
1036034 ICC
SPECIALTY NO. AGENCY
CONTINUED ON NEXT PAGE ❑ OF
TIME IN - � TIME OUT O.T. SAMPLES
12:00pm '. 3A0pm 4
ALL INSPECTORS BASED ON A MINIMUM OF / HOURS AND OVER 4 HOURS- HOUR
MINIMUMS. IN ADDITION, ANY INSPECTION EMENDING PAST THE NOON HOUR WILL
BE AN SAVOUR MINIMUM
Approved by
Project Superintendent
NBC Consultants Inc.
6941 Dresden Circle
Huntington Beach, CA 92647
Office 714-943-2777 Fax 714-892-5829
REGISTERED INSPECTOR'S REPORT
TYPE OF "Reinforced Concrete
INSPECTION Post Tension Concrete
REQUIRED Fq Reinforced Masonry
Wood Construction
Job Address: 603 Bay Front
1-18-24 Time
:ire Proofing pony
\sphalt abet
%sor Ceilings Other Marine Piles
city: Newport Beach
Job Name: Mary Jo Phillips
YPe o lid Boat Dock
Material Description (type, grade, source):
Permit No.: M2023-0087 Issued By: Newport Bca(h
Architect: PMA Consulting Inc
Engineer: PMA Consulting Inc
Bill To:
Inspectors (s) Name: Jon Newsom
Contractor. Swift Slip
Subcontractor: tiowh
-- — -----
Contact info: Gen
TYPE OF SAMPLE SLUMP
TEST PERFORMED Email Add:
QUANTITY IN SET ADDITIONAL REMARKS ON SAMPLES
INSPECTION SUMMARY - LOCATION OF WORK INSPECTED, TEST SAMPLES TAKEN, WORK REJECTED, JOB PROBLEMS, PROGRESS REMARKS, ETC.
INCLUDES INFORMATION ABOUT AMOUNT OF MATERIAL PLACED OR (WORK PERFORMED, NUMBER. TYPE B IDENTIFICATION
NC'9 OF TEST SAMPLES TAKEN: STRUCTURAL CONNECTIONS (WELD MADE. N.S. BOLTS TORQUE) CHECKED, ETC.
Marine Piles
Scope of work - Remove and replace Conc. Piles at floating dock.
Observed the placement of concrete marine piles per schedule and details on the approved plan.
Schedule on sheet S-2 and details on sheet S-5 / V. Piles installed by way of water jetting.
Locations: Boat Dock
Pile # 1 = (T-Piie)14"sq. x 30' Long, with min. 15' ft. embed.
Pile # 2 = 14"sq. x 32' Long, with min. 15' ft. embed.
Pile # 3 = 14"sq. x 34' Long, with min. 15' ft. embed.
Locations:
1) Pile # 3 installed today.
Work is complete for the areas listed.
$�.r ..,.
LJ,p..w<:3tR:E
r't`_. -
CERTIFICATE OF COMPLIANCE
I HEREBY CERTIFY THAT I HAVE INSPECTED TO THE BEST OF MY KNOWLEDGE
ALL OF THE ABOVE REPORTED WORK UNLESS OTHERWISE NOTED IHAVE
FOUND THIS WORK COMPLIES WITH THE APPROVED PUNS. SPECIFICATIONS
AND APPLICABLE SECTIONS OF THE GOVERNING BUILDING LAWS
SI NATURE OF REGISTERED INSPECTOR
C 1036034 ICC
SPECIALTY NO. AGENCY
CONTINUED ON NEXT PAGE ❑ OF
TIME IN TIME OMIT O T. >—SAMPLES 'I
_ 9:60am_ I 12.00pm 4 - _ -. _
ALL INSPECTIONS BASED ON A MINIMUM OF A HOURS AND OVER 4 HOURSIFNOUR
MINIMUMS. IN ADDITION, ANY INSPECTION EXTENDING PAST THE NOON HOUR WILL
BE AN a -HOUR MINIMUM
I Approved by _-
Project Superintendent
Report of Special Inspection
Project Name & Address Mary Jo Phillips, 603 Bay Front
Permit Nwnbcr M2023-0087
Inspection Type(s) tZC
Inspection Datc(s) 1-5-24 l —]periodic �Cmttinuous
Describe Inspection Made. including locations:
Marine Piles
Scope of work - Remove and replace Conc. Piles at floating dock.
Observed the placement of concrete marine piles per schedule and details on
the approved plan. Schedule on sheet S-2 and details on sheet S-5 / V. Piles
installed by way of water jetting.
Locations: Boat Dock
Pile # 1 = (T-Pile) 14"sq. x 30' Long, with min. 15' ft. embed.
Pile # 2 = 14"sq. x 32' Long, with min. 15' ft. embed.
Pile # 3 = 14"sq. x 34' Long, with min. 15' ft. embed.
Locations:
1) Pile # 1 installed today.
Work is complete for the areas listed.
List Tests Made
Total Inspection Time Each Day:
Date
Hours
List Items Requiring Correction, Include Uncorrected Items Previously Listed:
To the hest of my knowledge, the work inspected was in accordance with the Building Department
approved design drawings, specifications and applicable workmanship provisions of the IBC except as
noted above.
Signed: s-4, Date: 1-5-24
Print Full T1. e: Jon Newsom Registration No. NB-0303
m0.M 4142. 1014
Report of Special Inspection
Pmjeci Name d Address Mary Jo Phillips, 603 Bay Front
Per1nlLNumber M2023-0087
Inspection Type(s) R/C
Inspection Date(s) 1-8-24 �eriodic WIContinuous
Describe Inspection Made. including locations:
Marine Piles
Scope of work - Remove and replace Conc. Piles at floating dock.
Observed the placement of concrete marine piles per schedule and details on
the approved plan. Schedule on sheet S-2 and details on sheet S-5 / V. Piles
installed by way of waterjetting.
Locations: Boat Dock
Pile # 1 = (T-Pile) 14"sq. x 30' Long, with min. 15' ft. embed.
Pile # 2=14"sq. x 32' Long, with min. 15' ft. embed.
Pile # 3 = 14"sq. x 34' Long, with min. 15' ft. embed.
Locations:
1) Pile # 2 installed today.
Work is complete for the areas listed.
List Tests Made
Total Inspection Time Each Day:
List Items Requiring Correction, Include Uncorrected Items Previously Listed:
To the hest of my knowledge, the work inspected was in accordance with the Building Department
approved design drawings, specifications and applicable workmanship provisions of the IBC except as
noted above. / ^
�-2,. - 1-8-24
Print Pull jJet¢e: Jon Newsom Registration No. NB-0303
FOW R-u2. MI
Report of Special Inspection
Project Name & Address Mary Jo Phillips Res., 603 Bay Front
Permit Number M2023-0087
Inspection Type(s) R/C
Inspection Date(s) 1-18-24 eriodic 17continuous
Describe Inspection Made, including locations:
Marine Piles
Scope of work - Remove and replace Conc. Piles at floating dock.
Observed the placement of concrete marine piles per schedule and details on
the approved plan. Schedule on sheet S-2 and details on sheet S-5 / V. Piles
installed by way of waterjetting.
Locations: Boat Dock
Pile # 1 = (T-Pile) 14"sq. x 30' Long, with min. 15' ft. embed.
Pile # 2 = 14"sq. x 32' Long, with min. 15' ft. embed.
Pile # 3 = 14"sq. x 34' Long, with min. 15' ft. embed.
Locations:
1) Pile # 3 installed today.
Work is complete for the areas listed.
List Tests Made
Total Inspection Time Each Day:
Date
Hours
List Items Requiring Correction, Include Uncorrected Items Previously Listed:
To the hest of my knowledge, the work inspected was in accordance with the Building Department
approved design drawings, specifications and applicable workmanship provisions of the IBC except as
noted above.
1-18-24
Print Ft)tiN'lalne: Jon Newsom Registration No. NB-0303
mwst-u `UIl
Report of Special Inspection
Project Name & Address Mary Jo Phillips, 603 Bay Front
Permit Number M2023-0087
Inspection Type(s) R/C
Inspection Date(s) 1-31-24 etiodic Wicontinuous
Describe inspection Made, including locations:
Epoxy
Observed the installation of rebar dowels per schedule and details on the
approved plan. Verified the hole depths and proper cleaning with a nylon brush
and compressed air prior to the epoxy. Type of epoxy used Simpson xp, ESR
2508, expiration 2025. Schedule on sheet S-2, Details on sheet S-3 / K.
Locations:
1) Boat Dock T-Pile #1
a) With (2) 5/8" threaded rods into the top of the T-Pile with min. 6" embed.
Work is complete for the areas listed.
List Tests Made
Total Inspection Time Each Day:
List Items Requiring Correction, Include Uncorrected Items Previously Listed:
To the best of my knowledge, the work inspected was in accordance with the Building Department
approved design drawings, specifications and applicable workmanship provisions of the IBC except as
noted above.
1-31-24