HomeMy WebLinkAboutXC2022-1965 - Misc (3)Appendix E
LANDSCAPE INSTALLATION CERTIFICATE OF COMPLETION
I hereby certify that:
(1) 1 am a professional appropriately licensed in the State of California to provide
professional landscape design services.
(2) The landscape project for the property located at 2 O / E A S- r-
C 0 A S T H/ G N W c A4 (provide street
address or parcel number(s)) was ins ailed by me or under my supervision.
(3) The landscaping for the identified property has been installed in substantial
conformance with the approved Landscape Documentation Package and complies with
the requirements of the City of Newport Beach Water Efficient Landscape Ordinance
(Municipal Code Section 14.17) and the City of Newport Beach Standards for
Implementation of the City of Newport Beach Water Efficient Landscape Ordinance for
the efficient use of water in the landscape.
(4) The following elements are attached hereto:
a. Irrigation scheduling parameters used to set the controller;
b. Landscape and irrigation maintenance schedule;
c. Irrigation audit report; and
d. Soil analysis report, if not submitted with Landscape Documentation Package,
and documentation verifying implementation of the soil report
recommendations.
(5) The site installation complies with the following:
a. The required irrigation system has been installed according to approved plans
and specifications and if applicable, any prior approved irrigation system
alternatives.
Yes X No
b. Sprinklers comply with ASABE/ICC 802-2014 Landscape Irrigation Sprinkler &
Emitter Standard.
x Yes No
(6) The information I have provided in this Landscape Installation Certificate of
Completion is true and correct and is hereby submitted in compliance with the City of
Newport Beach Design Standards for Implementation of the City of Newport Beach
Water Efficient Landscape Ordinance.
33
PArR /cK �A t PW/n/
Print Name
Signature
2 // 124
Date
52 08 &XOP.
RC4
6E %24
License Number
307 s. cc-o/Zos Y(SdL�Ng r�F�cN, C4 92075
Address
�e58) 79 4 - 72 O*
Telephone
Landscape Design Professional's Stamp
(If APpr9Priotej , :
PATRICK L.
BALDWIN �
[ �20II C
�T9�, am Tea\
0P rAL�F�
34
,R,g7-Aic% 0 BUR7-0^1-
E-mail Address q vp l o , COM
17 January 2024 22.012
Greg Sinks
The Irvine Company Retail Properties
550 Newport Center Drive
Newport Beach, CA 92660
Re: Balboa Marina— Phase 1 Improvements
Landscape Substantial Conformance
Dear Greg,
The landscape installation for the above project has been reviewed for substantial conformance with
the Landscape Improvement Plans prepared by Burton Landscape Architecture Studio.
The items reviewed for substantial conformance included only those which can be seen by simple
visual observation, i.e. irrigation head placement and plant material quantities. Verification of items
such as irrigation coverage, underground improvements, concrete reinforcing, subsurface
conditions, identification of actual or potential drainage and/or erosion problems (with the
exception of existing conditions which could easily be observed), could not be verified for
substantial conformance by Burton Landscape Architecture Studio. Items not included in Burton
Landscape Architecture Studio's scope of work were not under consideration for substantial
conformance. This substantial conformance letter does not pertain to the landscape contractor's
completion of contractual obligations, or completion of punch list items.
It is the opinion of Burton Landscape Architecture Studio, that those landscape items which were
observed, be considered in substantial conformance with the approved landscape improvement
drawings and subsequentaddendums.
Best regards,
Burton Landscape Architecture Studio
Patrick Baldwin
cc Erik Nicholas, Burton Studio
Roger Wilcox, Burton Studio
pdf document
Landscape Architecture Studio
307 5 Cedros Solana Beach Ca 92075
858 794 7204 T 858 794 7207 F
www.burton-studio.com
Cuesta ®_
Construction Co.
MEMORANDUM
To: Erik Nicholas, Burton Landscape Architects Date: 01/31/24
Fr: Mike Paquette
Re: Balboa Marina Landscape and Irrieation Maintenance Information
Erik,
As informed by Danny at Sequioa, here's the landscape and irrigation schedule for the Balboa Marina improvements we
recently installed:
I. Landscaping and Irrigation Maintenance happens once a week, on Wednesday of the week.
2. Irrigation will beset to run twice a week during winter and three times per week during the summer.
Thanks,
Mike Paquette
TARANTINO
Parr Or4us Box 2?964
S-1. .A.— CA 91'9l111b4
949.226.7215
949.608.1380
n A,a.mununnlun.Ha.:per.,m
PROJECT: Balboa Marina
CLIENT: Cuesta Construction
Parameters
Spray Zones: 100% sun, Sandy soil, no slope, subtropical woody shrubs and trees.
Drip Zones: 100% sun, Sandy soil, no slope, subtropical woody shrubs and drought tolerant grasses.
Bubbler Zones: 100% sun, Sandy Soil, no slope, subtropical trees and vines.
Soil Test
vEl•n0.T lr, 11388
TURF AND ORNAMENTAL
(` /(
-atium
CS G�T26 �"CC
DaiEOce LANOSCA96
1441 E ""FADDEN Ave
SOIL TEST AND RECOMMENDATION REPORT �. .y
°e���ING •aNy�[ra�wpo u:wnw
SANSA ANAL CA 93105
—� RESULT5 OF ANAT YSIS — CALCULATED VA UES
RESULTS OF ANALYSE
Le_ to
1,
556 10.5 _ l6 9
p
9
I
f
6
0
Sa
n
n„eancS
NnwAts
DISPLAY
Oi
AVERAGE
RESULTS
SURPLUS
-{—
+
HIGH
ADEQUATE
LOW
SAMPLE WFORMATON
ERTILIM11
WCOMMEROAnONS
N_
S PPA
IW6SO
—
aLnNi fYV]
MEA fYlvC
:1.IE
fT
NitH L'N
KtCI
FM
L,
1
9AL0aJA 141P.I NA
SXPUB
LANOF:'AC�
LOW U
1_UU-3.OD
6e
0,2
U.25
U.OU
0.90
I
5
5
,P
I
Analyeetl by Sped cum :um`yuc, Ln..
.-va belt' . nae_smntlinq yme CeyLs,
yu w f,[:.ps alepecevusane l/Ciu. cam/Ire ip/
Irrigation Audit Map
7� U I Bubbler- Irntrol Adjustable
�Yz - 4 lood Bubbler 533
■Netafim Techline RW
17mm TLRW9-12025
'
O
a.
W�/
w
J Z
O
Z Q
ui
p
m Z
aw
Z2
W d
O
pUz o
ZW Hm
li p
wzE�
Dax
O
W m
q
W
J H
0�
m
��
o`
m
OWEo In E
E
Z
N
N
N
J
Q
Z
m
's
Q
LL
Z
g
O
N
F-
F
'm
a
L
H
U
W
a
a'
a
�
N
V
J
d
m
N
2
U)
o
W
-
�
o
N
a°
J
7
Y
�
Q
�
V
U
W
U
p
,y
p�
N
�
�
N
J
z
0
Mn
U
c
i'
J
Q
m
Z
4
0
Q
Y
m
LL
O
u
N
U)
LU
w
a
m
J
0
C
7
m n
r
W
o
W
i
a
z
Q
z
N
Q
J N Ip h W T
MEME
NONE
NONE
NONE
■
■
•
■
•
EOC=
Emcm
ML.--
N
LL
N
O
O
0
W
(L
LL
U)
m
J
o
Z
rn
o
N
o
Z
O
o
O
o
F
Q
Y
o
z
Z
N
W
CO
N
a
o
U
W
�
�
W
a/
O
W
Z
o
N
W
J
O
N
i
�
�
o
K
o
W
z
LL
d
T
r
o
w
F J
Z w
3
J
O
W
a
F
W
a
W
w
�
K
U
a
N
q
Z
O
a
Q
OLL
w
Z
}
m
r
J
�
�
z
a
a
w
a
w
N
a
�
x
a
w
a
0
0
LL
Q
m
U
a
z
W
z
O
z
a
a
W
z
0
z
W
a a
0
0
E
�
U
z U
CQ
�
m
J N M V N {O h O) OI
0
-P
0
tr
---= - Bubbler- Irritrol Adjustable
Flood Bubbler - 533
��� v Netafim Techline RW
y v
r 11� 17mm TLRW9-12025
i-'
Pot7tealafT lY o ectici iL \z \ oa
/Fir
a
a �(I9il plc walcwav
l �il�sii(i A'
ti
a t
e
In
r,un
1 � m
< L,
All
PREPARED BY: PREPARED FOR °FlL
GRAPHIC SCALE O711712023 0
—_ -- ��° Stantec LanuPrAt'Ao necture udlo 0%. IRVINE COMPANY LANDSCAPE PLAN
( Ix FEET ® M TECHNCA OLOGY
DRIVE SUITE ICC Sy PHASE 1 SR LZ .a
3D7 S Cedn s Solana Beach Ca 92075
3 iin<n=xn. 949923 BEER) no'01 con• BS929a T2DaT BSB29anmF Since 1864 BALBOA MARINA NEWPORT BEACH CA �o
°F mN